NRC Perspectives on Quality Assurance ASQ 35 th Annual Energy & Environmental Training and Education Conference Raleigh/Durham, North Carolina

Size: px
Start display at page:

Download "NRC Perspectives on Quality Assurance ASQ 35 th Annual Energy & Environmental Training and Education Conference Raleigh/Durham, North Carolina"

Transcription

1 NRC Perspectives on Quality Assurance ASQ 35 th Annual Energy & Environmental Training and Education Conference Raleigh/Durham, North Carolina Glenn M. Tracy, Director Division of Construction Inspection & Operational Programs September 16, 2008

2 2

3 NUREG-1055 First published in 1984 Significant quality-related concerns included: Inadequate management control Lack of construction experience and false sense of security based on prior successes Failure to encourage problem reporting and resolution Failure to appropriately delegate Lack of clear communication 3

4 NUREG-1055 (continued) Continuing validity of NUREG-1055 concerns: Olkiluoto 3 in Finland Lungmen in Taiwan Flamanville-3 in France MOX facility 4

5 Construction and Operational Experience Program Updated NRC-INPO MOA to include new builds Issued a RIS on lessons learned on ITAAC reviews Issued an IN on counterfeit parts Drafted an IN on 3 concrete-related ConE events Drafted an NRO office instruction on ConE process Facilitated exchange of inspectors with Finland and Taiwan Significant interactions with international counterparts Evaluated 82 operating experience (OpE) events applicable to the design and construction of new reactors 5

6 Example 1: Catawba AFW pump inoperability due to potential flooding protection deficiencies In January 2008, Catawba discovered that restrictor plates were not welded over floor drain openings (EN 43945) Cause: Failure of the licensee QA program and construction oversight OpE/ConE process results: Event is applicable to all new reactor designs and is safety-significant because of a loss of a passive flood barrier Identified specific improvements for NRC construction inspection procedures (IMC 2503 and IMC2504) Similar past experiences were examined and was concluded that a generic communication (information notice) is warranted 6

7 Example 2: Unidentified Piping Weld Joints at YGN-3 KINS inspector found an unidentified weld joint in the safety injection system piping during installation inspection (inspection of NDE of adjacent weld joints) - Requested a radiographic examination of the weld - Verified it was an unidentified weld joint The inspector required the licensee to examine all piping of the safety class and seismic category in YGN # 3 & 4-43 unidentified weld zones including those of the non-safety class were additionally discovered - All of them were cut out, re-welded and documented 7

8 Unidentified Piping Weld Joints (cont d) Cause Misalignment of the final weld joint of a piping fixed by head plate / piping weld Workers cut the original piping and inserted pups Weld joint was neither inspected nor documented Lesson Importance of installation order to avoid difficulty in fabrication piping Head plate Concrete wall piping Piping penetration Head plate type support 8

9 Worldwide Construction Finland Russia France Canada Slovakia Japan S. Korea Iran Pakistan India Taiwan China Argentina 9

10 Global Supply Chain UK Germany Canada France US Spain Italy Japan S. Korea China 10

11 Vendor Inspection Insights Inadequate implementation of Part 21 requirements (IN ) Inadequate commercial grade dedication programs (lack of engineering involvement) Inappropriate use of commercial supplier surveys Unfamiliarity with NRC regulations (new and existing suppliers) 11

12 International Cooperation Active member of newly-formed Vendor Inspection Cooperation Working Group (VICWG) Joint activities conducted with Korea, France, Finland, Canada, Germany, United Kingdom, and Japan 12

13 Quality Assurance Topics Licensing Reviews Design Verification Inspections Standards Development Activities 13

14 Future Activities/Initiatives Anticipate increasing number of vendor inspections in future fiscal years Public workshop on NRC QA and reporting requirements in the planning stages Expansion of international cooperation Focus on programs and training to identify counterfeit parts 14

15 Prerequisites to Success Effective licensee management oversight of construction Detailed designs must be complete prior to construction Maintain the integrity of the global supply chain 15

Enabling the Nuclear Renaissance The Importance of Quality Assurance

Enabling the Nuclear Renaissance The Importance of Quality Assurance Enabling the Nuclear Renaissance The Importance of Quality Assurance Bill Borchardt Executive Director for Operations US Nuclear Regulatory Commission 35th Annual Energy and Environmental Training and

More information

Successful Nuclear Construction A Regulator s Perspective

Successful Nuclear Construction A Regulator s Perspective Successful Nuclear Construction A Regulator s Perspective Victor McCree Region II Administrator ASME Nuclear Technical Seminars June 6, 2011 Overview Nuclear Construction History and Lessons Learned Nuclear

More information

The Future Begins Now!

The Future Begins Now! The Future Begins Now! AP1000 Simplicity and Certainty Presented by Michael Kirst Regional Vice President, Central and Eastern Europe Westinghouse Electric Company The Nuclear Renaissance is a Reality

More information

GE Hitachi Nuclear Opportunities for Localization in RSA

GE Hitachi Nuclear Opportunities for Localization in RSA GE Hitachi Nuclear Opportunities for Localization in RSA October 2012 GE Hitachi Nuclear Alliance Wilmington, NC USA Tokyo, Japan Wilmington, NC USA Wilmington, NC Yokosuka, Japan Peterborough, ON Canada

More information

Contributions of U.S. National Laboratories to International Nuclear Safety

Contributions of U.S. National Laboratories to International Nuclear Safety Contributions of U.S. National Laboratories to International Nuclear Safety Peter B. Lyons Principal Deputy Assistant Secretary Office of Nuclear Energy United States Department of Energy IAEA International

More information

Countermeasures for the Falsification of Quality Verification Documents

Countermeasures for the Falsification of Quality Verification Documents Technical Meeting on Procurement Activities and on Counterfeit, Fraudulent and Substandard Items: Experiences and Lessons Learned, IAEA Headquarters, Vienna, Austria, 8-11 September 2014 Countermeasures

More information

Global Perspectives on SMRs Developing Countries Expectations

Global Perspectives on SMRs Developing Countries Expectations Global Perspectives on SMRs Developing Countries Expectations Dr Atam Rao Head Nuclear Power Technology Development Jun 18, 2010 The 4 th Annual Asia-Pacific Nuclear Energy Forum on Small and Medium Reactors

More information

Opportunities and limits of enhanced co-operation from MDEP experience. Lennart Carlsson Senior Advisor SSM

Opportunities and limits of enhanced co-operation from MDEP experience. Lennart Carlsson Senior Advisor SSM Opportunities and limits of enhanced co-operation from MDEP experience Lennart Carlsson Senior Advisor SSM MDEP Basics What is MDEP? And why A unique multinational initiative undertaken by national regulatory

More information

How to face higher quality expectations for the global nuclear supply chain

How to face higher quality expectations for the global nuclear supply chain Nuclear Science and Technology Symposium How to face higher quality expectations for the global nuclear supply chain Helsinki, 3 November 2016 Stephane GALOPIN stephane.galopin@fr.bureauveritas.com Nuclear

More information

OE Supply-Chain in Nuclear Dr. Boris Gehring March 2017

OE Supply-Chain in Nuclear Dr. Boris Gehring March 2017 OE Supply-Chain in Nuclear Dr. Boris Gehring March 2017 2015-02-12 It should not finally look like this! Owners Engineers and Supply-Chain services In NPP New build, OE and SCS will help to keep: -Time-line

More information

DAVID J. HOLLER DETAILED EXPERIENCE

DAVID J. HOLLER DETAILED EXPERIENCE DAVID J. HOLLER EXPERIENCE SUMMARY QA Professional and Technical Specialist with 33 years of nuclear power-related experience. Experience and capabilities include quality program assessment, management

More information

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065 NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065 DQASIP PROCUREMENT, RECEIVING, AND STORAGE PROGRAM APPLICABILITY: 2512 35065-01 INSPECTION OBJECTIVES To determine whether equipment procurement specifications

More information

Attributes of a Successful Nuclear Construction Project A Regulator s Perspective. Luis A. Reyes NRC Region II Administrator October 26, 2009

Attributes of a Successful Nuclear Construction Project A Regulator s Perspective. Luis A. Reyes NRC Region II Administrator October 26, 2009 Attributes of a Successful Nuclear Construction Project A Regulator s Perspective Luis A. Reyes NRC Region II Administrator October 26, 2009 1 Background Last nuclear plant construction period was not

More information

Sargent & Lundy LLC April 8, 2014

Sargent & Lundy LLC April 8, 2014 Farid M. Berry Vice President & Project Director Sargent & Lundy LLC April 8, 2014 Role of the OWNER S ENGINEER Technical Meeting on Becoming a Knowledgeable Customer Obninsk and Novovoronezh, Russian

More information

Delaware IEEE Briefing. July 30, 2012 Jamie Mallon, Nuclear Development Manager

Delaware IEEE Briefing. July 30, 2012 Jamie Mallon, Nuclear Development Manager Delaware IEEE Briefing July 30, 2012 Jamie Mallon, Nuclear Development Manager Agenda Introductions National / Regional Energy Overview PSEG Power / PSEG Nuclear Overview Fukushima Update New Nuclear Development

More information

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea

Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Int Conference on Effective Nuclear Regulatory Systems, April 9, 2013, Canada Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Seon Ho SONG* Korea Institute of Nuclear Safety

More information

US REGULATORY OVERSIGHT OF COMMERCIAL-GRADE DEDICATION

US REGULATORY OVERSIGHT OF COMMERCIAL-GRADE DEDICATION US REGULATORY OVERSIGHT OF COMMERCIAL-GRADE DEDICATION KERRI KAVANAGH CHIEF OF THE QUALITY ASSURANCE VENDOR INSPECTION BRANCH- 2, OFFICE OF NEW REACTORS, US NUCLEAR REGULATORY COMMISSION Agenda Background

More information

Plutonium & Highly Enriched Uranium, 2015 Institute for Science and International Security David Albright Serena Kelleher-Vergantini

Plutonium & Highly Enriched Uranium, 2015 Institute for Science and International Security David Albright Serena Kelleher-Vergantini This work was generously funded by a grant from the Nuclear Threat Initiative (NTI) and builds on earlier work done at ISIS by one of the authors. Plutonium & Highly Enriched Uranium, 2015 Institute for

More information

CNSC Framework for the Regulation of Licensees Supply Chain

CNSC Framework for the Regulation of Licensees Supply Chain CNSC Framework for the Regulation of Licensees Supply Chain IFNEC Conference, Paris,7 and 8 November 2017 Pierre Lahaie Director, Management Systems Division Directorate of Safety Management Technical

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL IRIB INSPECTION PROCEDURE 71124 RADIATION SAFETY PUBLIC AND OCCUPATIONAL PROGRAM APPLICABILITY: IMC 2515 EFFECTIVE DATE: January 1, 2010 71124-01 INSPECTION OBJECTIVE To independently

More information

NUPIC General Membership and Vendor Meetings June Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S.

NUPIC General Membership and Vendor Meetings June Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S. NUPIC General Membership and Vendor Meetings June 2014 Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S. NRC 1 Insights from the Fukushima Event 2014 NRC Vendor Inspections Recent

More information

Are There Limits to Green Growth?

Are There Limits to Green Growth? Are There Limits to Green Growth? Edward B. Barbier Key Points Introduction 1 1 http://www.greengrowthknowledge.org/ Green stimulus during the Great Recession 2 3 3 Table 1: Green stimulus during the Great

More information

International management system: ISO on environmental management

International management system: ISO on environmental management International management system: ISO 14000 on environmental management Introduction In response to the growing interest from businesses in environmental standards, the International Standardization Institute,

More information

Nuclear Power Outlook

Nuclear Power Outlook Q1 2019 A PUBLICATION OF UXC.COM Nuclear Power Outlook 1501 MACY DRIVE ROSWELL, GA 30076 PH +1 770 642-7745 FX +1 770 643-2954 NOTICE UxC, LLC ( UxC ) shall have title to, ownership of, and all proprietary

More information

IAEA Workshop on Construction Technologies for Nuclear Power Plants: A Comprehensive Approach

IAEA Workshop on Construction Technologies for Nuclear Power Plants: A Comprehensive Approach IAEA Workshop on Construction Technologies for Nuclear Power Plants: A Comprehensive Approach Paris, France, 12-16 December 2011 Workshop Director: Bismark.Tyobeka Local Counterpart: Michel Debes DRAFT

More information

Process Maturity Profile

Process Maturity Profile Carnegie Mellon Process Maturity Profile CMMI v1.1 SCAMPI SM v1.1 Class A Appraisal Results 2005 End-Year Update March 2006 We could not produce this report without the support of the organizations and

More information

Industry Responses to NRC Request for Additional Information Concerning the Industry s September 15, 2010 Proposal on Changes during Construction

Industry Responses to NRC Request for Additional Information Concerning the Industry s September 15, 2010 Proposal on Changes during Construction ATTACHMENT 1 Industry Responses to NRC Request for Additional Information Concerning the Industry s September 15, 2010 Proposal on Changes during Construction The following provides the additional information

More information

Graded approach practices for the mechanical components of French research reactor projects

Graded approach practices for the mechanical components of French research reactor projects Graded approach practices for the mechanical components of French research reactor projects Claude PASCAL RMR/RR Rabat IAEA conference, november 2011 Content Context Classification of SSCs Associated Requirements

More information

Nuclear Energy & Economic Competitiveness in Various Regulatory Systems

Nuclear Energy & Economic Competitiveness in Various Regulatory Systems Nuclear Energy & Economic Competitiveness in Various Regulatory Systems Presentation at: The re-emergence of nuclear energy: An option for climate change & emerging countries? UNAM, Mexico City, April

More information

Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2. Fuel Retrievability in Spent Fuel Storage Applications

Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2. Fuel Retrievability in Spent Fuel Storage Applications Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2 Issue: Fuel Retrievability in Spent Fuel Storage Applications Introduction: This Interim Staff Guidance (ISG) provides guidance to

More information

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants

Regulatory Guide Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Regulatory Guide 1.160 Revision 2 Page 1 of 14 Revision 2 March 1997 Regulatory Guide 1.160 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants Publication Information (Draft issued as

More information

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and suppliers. It is transmitted to you in confidence and trust,

More information

Harmony the future of electricity and nuclear delivering its potential

Harmony the future of electricity and nuclear delivering its potential Harmony the future of electricity and nuclear delivering its potential Agneta Rising Director General March 2018 New build and new countries 2 Highest level of construction in twenty five years: 58 reactors

More information

ANALYTICAL STANDARDS AND REAGENTS

ANALYTICAL STANDARDS AND REAGENTS ANALYTICAL STANDARDS AND REAGENTS productivity future growth globalization compliance Waters, the industry leader in liquid chromatography and mass spectrometry, understands that standards and reagents

More information

The Global State of Software Testers

The Global State of Software Testers The Global State of Software Testers Table of Contents Introduction Software Testing as an Industry and Career Path 2 An Introduction to Software Testing and Quality Assurance 2 QualiTest Group 2 The Global

More information

An Industry View on Harmonization of Codes & Standards

An Industry View on Harmonization of Codes & Standards An Industry View on Harmonization of Codes & Standards Dr. Andrew Wasylyk Project Manager - CORDEL 12 th April 2017 OECD NEA Workshop Paris, France IEA 2degree scenario: Nuclear is required to provide

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL INSPECTION PROCEDURE CQV/EQV INSPECTION OF COMMERCIAL-GRADE DEDICATION PROGRAMS PROGRAM APPLICABILITY: 2504, 2507, 2700-01 INSPECTION OBJECTIVES 01.01 To verify that the dedicating

More information

International efficiency comparison of thermal power plants: up to 2011

International efficiency comparison of thermal power plants: up to 2011 August 19, 2014 International efficiency comparison of thermal power plants: up to 2011 Research Institute of Innovative Technology for the Earth (RITE) Systems Analysis Group Contact to: Junichiro Oda,

More information

NRC INSPECTION MANUAL

NRC INSPECTION MANUAL NRC INSPECTION MANUAL QVIB INSPECTION PROCEDURE 70702 PART 52, INSPECTION OF PREOPERATIONAL TEST PERFORMANCE PROGRAM APPLICABILITY: 2504 70702-01 INSPECTION OBJECTIVES 01.01 To provide guidance for inspection

More information

Page 1 / 11. Version 0 June 2014

Page 1 / 11. Version 0 June 2014 Page 1 / 11 CORRESPONDENCE MATRIX NQSA NSQ-100 version 0 NUCLEAR SAFETY AND QUALITY MANAGEMENT SYSTEM REQUIREMENTS Model for quality management in design & development, manufacturing, erection, commissioning

More information

Boiling Water Reactor Vessel and Internals Project (QA)

Boiling Water Reactor Vessel and Internals Project (QA) Boiling Water Reactor Vessel and Internals Project (QA) Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared,

More information

Section III Advancements for New Reactors

Section III Advancements for New Reactors Section III Advancements for New Reactors Bryan Erler -Erler Engineering Ltd. Vice President ASME Nuclear Codes & Standards Presented at South African Workshop Supporting Nuclear New Build and Manufacturing

More information

Historical Perspectives on Nuclear Procurement in North America

Historical Perspectives on Nuclear Procurement in North America Historical Perspectives on Nuclear Procurement in North America Marc H. Tannenbaum Technical Leader IAEA Meeting on Procurement Activities and CFSIs September 8, 2014 Topical Historical Perspectives Some

More information

After Fukushima: Does the Nuclear Industry Have a Future?

After Fukushima: Does the Nuclear Industry Have a Future? After Fukushima: Does the Nuclear Industry Have a Future? Stephanie Cooke Nuclear Intelligence Weekly October 2011 Japan Pre-Fukushima 54 operating reactors (48.9 MW gross) 38 reactors online (as of March

More information

Welcome to the Bank Statement Processing introduction topic. During this training, we use the acronym BSP for Bank Statement Processing.

Welcome to the Bank Statement Processing introduction topic. During this training, we use the acronym BSP for Bank Statement Processing. Welcome to the Bank Statement Processing introduction topic. During this training, we use the acronym BSP for Bank Statement Processing. 1 In this topic, we discuss the options for the external reconciliation

More information

In 2013, global production

In 2013, global production 48 th Census of World Casting Production Steady Growth in Global Output Worldwide casting production continued to grow in 2013, up more than 3.4 million metric tons, an increase of 3.4% in comparison to

More information

Energy, Electricity and Nuclear Power Estimates for the Period up to 2050

Energy, Electricity and Nuclear Power Estimates for the Period up to 2050 REFERENCE DATA SERIES No. 1 2018 Edition Energy, Electricity and Nuclear Power Estimates for the Period up to 2050 @ ENERGY, ELECTRICITY AND NUCLEAR POWER ESTIMATES FOR THE PERIOD UP TO 2050 REFERENCE

More information

Harmony the Role of Nuclear Energy to meet electricity needs in the 2 degree scenario

Harmony the Role of Nuclear Energy to meet electricity needs in the 2 degree scenario Harmony the Role of Nuclear Energy to meet electricity needs in the 2 degree scenario Agneta Rising Director General Harmony London March 2016 THE CURRENT STATUS OF NUCLEAR ENERGY 2 Accelerating rise in

More information

CNSC Oversight of Counterfeit, Fraudulent and Suspect Items

CNSC Oversight of Counterfeit, Fraudulent and Suspect Items CNSC Oversight of Counterfeit, Fraudulent and Suspect Items Chantal Gélinas Hosted by the IAEA Bratislava, Slovakia January 19 22, 2016 e-doc: 4898218 nuclearsafety.gc.ca Canadian Nuclear Power Reactor

More information

SMART Standard Design Approval inspection result July. 4 th

SMART Standard Design Approval inspection result July. 4 th SMART Standard Design Approval inspection result 2012. July. 4 th Content Ⅰ. Inspection outline. 1 Ⅱ. Inspection proceedings 2 Ⅲ. SMART Standard Design features. 3 Ⅳ. Standard Design inspection result

More information

Regulatory Cooperation Forum 22 January 2013 Brussels

Regulatory Cooperation Forum 22 January 2013 Brussels Regulatory Cooperation Forum 22 January 2013 Brussels Kenta Okano Regulatory Activities Section, Division of Nuclear Installation Safety Department of Nuclear Safety & Security/IAEA K.Okano@iaea.org Overview

More information

Javier Reig Head, Nuclear Safety Division

Javier Reig Head, Nuclear Safety Division Javier Reig Head, Nuclear Safety Division Regulatory Authorities An initiative taken by national safety authorities to leverage their resources and knowledge for new reactor design reviews. Canada China

More information

Nuclear Power Development in Europe: Rosatom perspective

Nuclear Power Development in Europe: Rosatom perspective ROSATOM Nuclear Power Development in Europe: Rosatom perspective Alexey Kalinin Head, International Business, Rosatom CEO, Rusatom Overseas Platts 7 th Annual European Nuclear Conference June 25-26, 2012

More information

IAEA Activities to support Operating Nuclear Power Plants and Newcomers

IAEA Activities to support Operating Nuclear Power Plants and Newcomers IAEA Activities to support Operating Nuclear Power Plants and Newcomers Ki Sig Kang Tech. Head Division of Nuclear Power 1 KANG Ki Sig Republic of Korea Working Nuclear Industry since 1984 NPP design and

More information

Supplier Evaluation Program Doosan QA Team / Jeong Sun Kim

Supplier Evaluation Program Doosan QA Team / Jeong Sun Kim Supplier Evaluation Program 2018.11.05 Doosan QA Team / Jeong Sun Kim Contents Introducing of Doosan Applicable Requirements for Supplier Evaluation Supplier Evaluation and Control Challenges/ Risks for

More information

Reactor Oversight Process

Reactor Oversight Process Reactor Oversight Process Mark A. Cunningham NRRC Workshop on Risk-Informed Decision Making: A Survey of U.S. Experience Tokyo, Japan, June 1-2, 2017 Introduction The USNRC modified its reactor inspection

More information

Activities of OECD/NEA in the Regulatory Aspects of Plant Life Management

Activities of OECD/NEA in the Regulatory Aspects of Plant Life Management Activities of OECD/NEA in the Regulatory Aspects of Plant Life Management Andrei Blahoianu NEA / CSNI / IAGE Chairman Andrei.Blahoianu@cnsc-ccsn.gc.ca ccsn.gc.ca Alejandro Huerta OECD/NEA Nuclear Safety

More information

Living with ITAAC. ASME Nuclear Technical Seminars: Blueprint for New Build June 5-8, 2011 Columbia, SC

Living with ITAAC. ASME Nuclear Technical Seminars: Blueprint for New Build June 5-8, 2011 Columbia, SC Living with ITAAC ASME Nuclear Technical Seminars: Blueprint for New Build June 5-8, 2011 Columbia, SC Presented by: Augi Cardillo, Ed Pleins, Thom Ray Westinghouse Electric Company Definition and Purpose

More information

All you need to make your vehicle workshop clean, safe and efficient

All you need to make your vehicle workshop clean, safe and efficient All you need to make your vehicle workshop clean, safe and efficient Improve your workshop Exhaust and welding fumes, dust from sanding and grinding, oil spillage and untidy hoses - these are just some

More information

Inside the Midmarket: A 2011 Perspective

Inside the Midmarket: A 2011 Perspective Exclusively for midsize businesses Inside the Midmarket: A 2011 Perspective Nordic Report Global Overview: Survey of 2,112 midmarket leaders, with 160 from the Nordics, reveals how business priorities

More information

Turkish Atomic Energy Authority Department of Nuclear Safety February 2016

Turkish Atomic Energy Authority Department of Nuclear Safety February 2016 Turkish Atomic Energy Authority Department of Nuclear Safety 02-05 February 2016 1 Turkish Atomic Energy Authority Nuclear Regulatory Framework for Licensing of NPPs Legislation and Regulatory Documents

More information

PRIMAR RENC Model. REGIONAL ENC/ECDIS SEMINAR Rio, Brazil, 5-6 November Odd Breivik, NHS. Operated by the Norwegian Hydrographic Service

PRIMAR RENC Model. REGIONAL ENC/ECDIS SEMINAR Rio, Brazil, 5-6 November Odd Breivik, NHS. Operated by the Norwegian Hydrographic Service PRIMAR RENC Model REGIONAL ENC/ECDIS SEMINAR Rio, Brazil, 5-6 November 2008 Odd Breivik, NHS PRIMAR RENC Regional ENC Coordinating Centre RENC concept is at the core of the WEND Principles (World Wide

More information

Siemens Partner Program

Siemens Partner Program Siemens Partner Program Factory Automation Partner Strategy for Factory Automation End Customer Focus on core competencies Demand on efficient solutions Certified Partner Added value in solutions and services

More information

Solution Partner Program Global Perspective

Solution Partner Program Global Perspective Solution Partner Program Global Perspective SPACe 2012 Siemens Process Automation Conference Business Development Solution Partner Program Copyright Siemens AG 2012. All rights reserved Solution Partner

More information

Impacto de las Nuevas Tendencias Regulatorias en la Producción de Parenterales. Innovacion en Packaging Primario

Impacto de las Nuevas Tendencias Regulatorias en la Producción de Parenterales. Innovacion en Packaging Primario Impacto de las Nuevas Tendencias Regulatorias en la Producción de Parenterales Innovacion en Packaging Primario 1 Contents Company Highlight What s Changing in Pharma Pharma Trends Harmonisation New Requirements

More information

DOE NP2010 Nuclear Power Plant Construction Infrastructure Assessment

DOE NP2010 Nuclear Power Plant Construction Infrastructure Assessment October 21, 2005 DOE NP2010 Nuclear Power Plant Construction Infrastructure Assessment Prepared for Department of Energy Washington, D. C. Under Order No. DE-AT01-020NE23476 DOE NP2010 Nuclear Power Plant

More information

Minimum Staff Complement

Minimum Staff Complement Minimum Staff Complement Safety in Numbers S. Dolecki & H. McRobbie Human and Organizational Performance Division Directorate of Safety Management Canadian Nuclear Society Conference Niagara Falls, Ontario

More information

QUALIFICATION OF ULTRASONIC INSPECTIONS IN THE ITER VACUUM VESSEL MANUFACTURING PROJECT

QUALIFICATION OF ULTRASONIC INSPECTIONS IN THE ITER VACUUM VESSEL MANUFACTURING PROJECT QUALIFICATION OF ULTRASONIC INSPECTIONS IN THE ITER VACUUM VESSEL MANUFACTURING PROJECT R. Martínez-Oña, A. García, M.C. Pérez, Tecnatom, Spain; G. Pirola, Ansaldo Nucleare, Italy ABSTRACT The vacuum vessel

More information

Strategy and Outlook Annual General Meeting. Hubert Sagnières May 5, 2011

Strategy and Outlook Annual General Meeting. Hubert Sagnières May 5, 2011 Strategy and Outlook 2011 Annual General Meeting Hubert Sagnières May 5, 2011 The Optical Market in 2011 A still significantly under-penetrated market A high ramp-up potential A growing, profitable mid-range

More information

WENRA. Recommendation in. in French reactors.

WENRA. Recommendation in. in French reactors. WENRA Recommendation in connection with macrosegregation anomalies found in French reactors. 1 01 Background 01.1 The findings in France In late 2014, mechanical tests performed on a Reactor Pressure Vessel

More information

PrimePCR Pricing and Bulk Discounts

PrimePCR Pricing and Bulk Discounts Assay and Control Bulk Discounts 25% off 5 or more assays Primer Assay Pricing Product Catalog # Description List Price (EUR) Primer Assays (desalted) 10025636 Primer assay desalted, 200 reactions 96 10025637

More information

Staples & OB10. Conference Presentation. Kevin Bourke & Joachim Eckerle Date: Presented by:

Staples & OB10. Conference Presentation. Kevin Bourke & Joachim Eckerle Date: Presented by: Staples & OB10 Conference Presentation Presented by: Kevin Bourke & Joachim Eckerle Date: November 2012 Staples Structure $24 Billion USD Global Sales 88,000+ Associates One of the Largest ecommerce Sales

More information

ISO TC265 Carbon Dioxide Capture, Transportation, and Geological Storage

ISO TC265 Carbon Dioxide Capture, Transportation, and Geological Storage ISO TC265 Carbon Dioxide Capture, Transportation, and Geological Storage Author Organisation ISO TC265 Author Role On behalf of Lynn Barber ISO TC265 Secretariat ISO A Global System Over 600 organisations

More information

Advanced Nuclear Technology (ANT)

Advanced Nuclear Technology (ANT) Advanced Nuclear Technology (ANT) 2010 Year End Webcast December 9, 2010 Audio Information: 1-888-203-1028 Participant Code: 8008 December 2010 APC Webcast Objectives Review Project Status Reports (PSRs)

More information

WATLOW A Trusted and Reliable Partner

WATLOW A Trusted and Reliable Partner Watlow Products and Technical Support Delivered Worldwide Watlow Watlow has grown in product capability, market through decades of building key relationships and developing world-class experience and global

More information

PrimePCR Pricing and Bulk Discounts

PrimePCR Pricing and Bulk Discounts Assay and Control Bulk Discounts 25% off 5 or more assays Primer Assay Pricing Product Catalog # Description List Price (CHF) Primer Assays (desalted) 10025636 Primer assay desalted, 200 reactions CHF

More information

October 22, 2013 SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC SUPPLEMENTAL INSPECTION REPORT / AND ASSESSMENT FOLLOW-UP LETTER

October 22, 2013 SUBJECT: THREE MILE ISLAND STATION, UNIT 1 - NRC SUPPLEMENTAL INSPECTION REPORT / AND ASSESSMENT FOLLOW-UP LETTER UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 EA-13-046 October 22, 2013 Mr. Michael J. Pacilio Senior Vice President,

More information

PrimePCR Pricing and Bulk Discounts

PrimePCR Pricing and Bulk Discounts Assay and Control Bulk Discounts 25% off 5 or more assays Primer Assay Pricing Product Catalog # Description List Price (DKK) Primer Assays (desalted) 10025636 Primer assay desalted, 200 reactions DKK

More information

Get the Most from Hidden Information in Your Production Data. The Key to Maximize Productivity. Production Analytics. Process Efficiency

Get the Most from Hidden Information in Your Production Data. The Key to Maximize Productivity. Production Analytics. Process Efficiency Production Analytics Process fficiency Product Optimization Highest Yield Get the Most from Hidden Information in Your Production Data The Key to Maximize Productivity Production analytics with PROMI Your

More information

Aluminium & Non-Ferrous Production Optimization Fast, Reliable, Efficient

Aluminium & Non-Ferrous Production Optimization Fast, Reliable, Efficient Optical Surface Inspection for Aluminium & Non-Ferrous Production Optimization Fast, Reliable, Efficient Leading the Way in Aluminium & Non-Ferrous Process Improvement BEYOND INSPECTION MORE Than Just

More information

MOVE YOUR SUBMERGED ARC WELDING SOLUTION

MOVE YOUR SUBMERGED ARC WELDING SOLUTION ME CH A NIC A TO THE NEXT LEVEL EN C Y 300 % + L P ROP ER T IE S IMP E V O R D MOVE YOUR SUBMERGED ARC WELDING SOLUTION EFFICI DEPOSITION RATE YOURSELF WHERE ARE YOU TODAY? WHERE DO YOU WANT TO BE IN THE

More information

Rosatom Global Development, International Cooperation Perspective

Rosatom Global Development, International Cooperation Perspective ROSATOM STATE ATOMIC ENERGY CORPORATION ROSATOM Rosatom Global Development, International Cooperation Perspective Atomex-Europe 013 Forum Nikolay Drozdov Director, International Business State Corporation

More information

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident

New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident FEDERAL ENVIRONMENTAL, INDUSTRIAL AND NUCLEAR SUPERVISION SERVICE (ROSTECHNADZOR) New Safety Requirements Addressing Feedback From the Fukushima Daiichi Accident Alexander Sapozhnikov Department for Safety

More information

Boiling Water Reactor Vessel and Internals (QA)

Boiling Water Reactor Vessel and Internals (QA) Boiling Water Reactor Vessel and Internals (QA) Program Description Program Overview As boiling water reactors have aged, various forms of operation-limiting stress corrosion cracking have appeared, first

More information

The Nuclear Landscape A Snapshot of the Global Issues and Players

The Nuclear Landscape A Snapshot of the Global Issues and Players American Association for the Advancement of Science Annual Meeting February 12th 16th, 2009, Chicago Keeping the Lights on the Revival of Nuclear Energy for our Future The Nuclear Landscape A Snapshot

More information

South African nuclear industry overview Van Zyl de Villiers R&D Division Necsa

South African nuclear industry overview Van Zyl de Villiers R&D Division Necsa South African nuclear industry overview Van Zyl de Villiers R&D Division Necsa ASME Nuclear Codes and Standards Workshop 7 October 2008 Contents South African energy challenges South African Nuclear Energy

More information

Cross-border Executive Search to large and small corporations through personalized and flexible services

Cross-border Executive Search to large and small corporations through personalized and flexible services Cross-border Executive Search to large and small corporations through personalized and flexible services In-depth local knowledge of each job market as well as reliable information on compensation, industry

More information

CMMI Update. Mary Beth Chrissis, as represented by: Pat O Toole Software Engineering Institute. Pittsburgh, PA May 15, 2008

CMMI Update. Mary Beth Chrissis, as represented by: Pat O Toole Software Engineering Institute. Pittsburgh, PA May 15, 2008 Mary Beth Chrissis, as represented by: Pat O Toole Software Engineering Institute Carnegie Mellon University Pittsburgh, PA 15213 May 15, 2008 CMMI Today The CMMI Product Suite was released 1/2002 and

More information

CNRA MDEP 2018 Nuclear Supply Chain Management Workshop

CNRA MDEP 2018 Nuclear Supply Chain Management Workshop CNRA MDEP 2018 Nuclear Supply Chain Management Workshop 5-6 Nov emb er 2 NE A 018 B ou H e ad q logn u ar t e - Bi e llan rs c ou rt PROGRAMME 2018 NUCLEAR SUPPLY CHAIN MANAGEMENT WORKSHOP 1 Background

More information

Contents. DYWIDAG Tie Rods DYWIDAG Threadbar Tie Rods... 4 GEWI Steel Waling Tie Rods... 6 DYWIDAG Tie Rods with Strand Tendons...

Contents. DYWIDAG Tie Rods DYWIDAG Threadbar Tie Rods... 4 GEWI Steel Waling Tie Rods... 6 DYWIDAG Tie Rods with Strand Tendons... DYWIDAG Tie Rods 2 Contents DYWIDAG Tie Rods DYWIDAG Threadbar Tie Rods... 4 GEWI Steel Waling Tie Rods... 6 DYWIDAG Tie Rods with Strand Tendons... 7 3 DYWIDAG Threadbar Tie Rods Tie Rods produced from

More information

Pyramid Research. Publisher Sample

Pyramid Research.  Publisher Sample Pyramid Research http://www.marketresearch.com/pyamidresearch-v4002/ Publisher Sample Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST

More information

A new environment for nuclear safety: Main challenges for the OECD/NEA

A new environment for nuclear safety: Main challenges for the OECD/NEA A new environment for nuclear safety: Main challenges for the OECD/NEA Javier Reig Director Nuclear Safety OECD Nuclear Energy Agency TSO Conference, Beijing, October 2014 2014 Organisation for Economic

More information

- 1 - Ingenieurgesellschaft für wissenschaftlich technischen Umweltschutz

- 1 - Ingenieurgesellschaft für wissenschaftlich technischen Umweltschutz - 1 - Strategies for Radiological Characterisation in Decommissioning S. Thierfeldt, K. Haneke - Brenk Systemplanung GmbH, Aachen OECD/NEA Workshop on Radiological Characterisation for Decommissioning

More information

NB-435 Rev. 1 Page 2 of 5

NB-435 Rev. 1 Page 2 of 5 The National Board has developed this Body of Knowledge to outline duties and responsibilities for individuals performing inspections during the construction phase of nuclear components, parts, and appurtenances

More information

Generation III+ technology: What has gone wrong?

Generation III+ technology: What has gone wrong? Generation III+ technology: What has gone wrong? Steve Thomas & Paul Dorfman Steve Thomas (stephen.thomas@gre.ac.uk) Professor of Energy Policy, PSIRU (www.psiru.org), Business School University of Greenwich

More information

ENERGY REGULATORS STATEMENT

ENERGY REGULATORS STATEMENT ENERGY REGULATORS STATEMENT ON SOUND REGULATION AND PROMOTING INVESTMENTS IN ENERGY INFRASTRUCTURE Framework and Participants In the framework of the forthcoming G20 Summit, to be held in St. Petersburg

More information

Main conclusions from previous day

Main conclusions from previous day Technical Meeting on Regulatory Oversight of Human and Organizational Factors Vienna, Austria 14-18 December 2015 Main conclusions from previous day International Atomic Energy Agency DAY 1 TM on Regulatory

More information

CHAPTER 3 SPECIAL INSPECTION MANUAL

CHAPTER 3 SPECIAL INSPECTION MANUAL STUDY GUIDE OBJECTIVE To become familiar with the Special Inspection recommendations of the Special Inspection Manual. REFERENCE KEY POINTS What are the duties and responsibilities of the Special Inspector

More information

Wassenaar Arrangement. What is it all about? India s entry: What it means for us? What critics have to say?

Wassenaar Arrangement. What is it all about? India s entry: What it means for us? What critics have to say? Wassenaar Arrangement What is it all about? India s entry: What it means for us? What critics have to say? Roots Cold War-era Coordinating Committee for Multilateral Export Controls (COCOM) COCOM existed

More information

Pyramid Research. Publisher Sample

Pyramid Research.   Publisher Sample Pyramid Research http://www.marketresearch.com/pyamidresearch-v4002/ Publisher Sample Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST

More information