April 12, Huron Street, 7th Floor Toronto, Ontario M5S 1A2. OHS Manager

Size: px
Start display at page:

Download "April 12, Huron Street, 7th Floor Toronto, Ontario M5S 1A2. OHS Manager"

Transcription

1 April 12, Huron Street, 7th Floor Toronto, Ontario M5S 1A2 FINAL Attention: Yang Ting Shek OHS Manager Re: Re-occupancy of Room 6360 Medical Sciences Building, St. George Campus Pinchin Ltd. was retained by the to provide an opinion related to the re-occupancy of Room 6360 in the Medical Sciences Building (MSB) at the St. George campus. Currently the room has been closed due to concerns with the recent discovery of asbestos-containing debris. BACKGROUND Room 6360 is a laboratory located on the 6 th floor of MSB, and includes two smaller offices, 6360 A and B. The room is under negative pressure, and operates under a fresh air supply. A vertical service shaft is located immediately adjacent to the lab. Sprayed fireproofing containing chrysotile asbestos is present on the structural steel beams and decking above the ceiling of the room, and the fireproofing is also present as overspray inside the vertical service shaft. Room 6360A is adjacent to a construction area on the West side (rooms 6366 and 6368). Asbestos abatement was previously completed in the adjacent construction area (Rooms 6366 and 6368) following Type 3 precautions. INVESTIGATIONS AND TESTING Settled dust was observed in room 6360A on January 31 st, 2017 and reported to the University on February 1 st, 2017, resulting in closing of the lab. The lab was cleaned by Envirosafe with visual inspection and air monitoring completed by Safetech. The lab was reopened by the University following the cleaning and air monitoring. The dust was generated through a breach in the enclosure due to improper abatement methods by the contractor. On March 16 th, a recurrence of settled dust was observed within Room 6360A and reported on March 17, 2017 and the lab was closed shortly after. The settled dust was sampled on March 19 th, consisting of a small pile of debris adjacent to the doorway between 6360A and the construction area. The sample was collected and analyzed by Pinchin which revealed an asbestos concentration of 0.5 to 5% chrysotile asbestos when analyzed by the method prescribed for bulk sample analysis in O.Reg. 278/05, the Pinchin Ltd Milltower Court, Mississauga, ON L5N 7W5 Page 1 of 3

2 Re-occupancy of Room 6360 April 12, 2017 Medical Sciences Building, St. George Campus FINAL Regulation Respecting Asbestos In Construction Projects And Buildings And Repair Operations (U.S. Environmental Protection Agency, Test Method EPA/600/R-93/116, Method for the Determination of Asbestos in Bulk Building Materials, June 1993). The University subsequently closed Room 6360 and conducted a series of investigations, smoke testing and clean-ups in the room to ensure that it was safe to enter, and to determine the cause of the asbestos being present in the room. The source of the asbestos entering the room appears to have been to residual dust trapped in the door between the subject room and the construction area, conduit penetrations, between the top of the block demising wall and the deck, as well as through the electrical outlet in 6360A. Based on our observations and work performed by University staff, the following steps have been taken: The room was cleaned on March 20 th, 2017 by Envirosafe, with inspection and air monitoring by Safetech following cleaning. The lab remained closed following the discovery of further settled dust within the lab the following day. The University sealed all openings between the laboratory and shaft and block wall adjacent to the construction area, including the electrical panel, the doorway, the space between the deck and the block wall, electrical outlets and conduit openings. The University also took steps to reduce the pressure differential between the service shaft and Room This work was completed between March 30, 2017 and April 10, Pinchin was on site on April 9 th and 10 th, 2017 to provide the following services: Inspect Room 6360 following the previous cleaning work and inspect for any further settled construction dust. Perform smoke tests to confirm the effectiveness of the seals between the shaft and the laboratory. Conduct additional air monitoring. The air monitoring results were all below 0.01 fibres per cubic centimeter (f/cc) which is below the Ontario Occupational Exposure Limit of 0.1 f/cc. Refer to the attached inspection report for photos and the air sample results. The room was given a final cleaning by Envirosafe Inc. on April 10, 2017 following the air monitoring to remove clean caulking debris present on counters and the floor in room 6360A (due to sealing the ceiling tiles with caulking) Pinchin Ltd. Page 2 of 3

3 Re-occupancy of Room 6360 April 12, 2017 Medical Sciences Building, St. George Campus FINAL CONCLUSION Following the above the work, it is Pinchin s opinion that Room 6360 is safe for normal occupancy. We recommend that air monitoring be performed in Room 6360 and adjacent areas weekly for a period of three weeks to ensure the air quality remains at acceptable levels during the current construction. We also recommend that the University continue to work on the balancing of the air between the service shafts and the adjacent laboratories. Yours truly, Pinchin Ltd. Prepared by: Reviewed by: Robert Thomas, P.Eng. Chief Technical Officer Brennan Ficko, B.Sc., PMP, PMI-RMP, EP Senior Project Manager rthomas@pinchin.com bficko@pinchin.com Reviewed by: Bruce Stewart, B.Sc., DOHS, CIH, ROH Executive Vice President, Technical Services bstewart@pinchin.com \\pinchin.com\miss\job\203000s\ UniversityofToronto,Consulting,Abatement\Deliverables\Room 6360 Clearance\Room 6360 Clearance - Final - April 12\ Final Letter on 6360 Clearance - April 12, 2017.docx Template: Master Letter Template, January 3, Pinchin Ltd. Page 3 of 3

4 Inspection Report Project Information Date: April 10, 2017 Pinchin Representative: Brennan Ficko Report Number: 02 Project Name: Medical Sciences Buildings Visual Inspection and Ambient Air Monitoring, Room 6360 Client: Contractor: N/A Site Address: 1 Kings College Circle, Toronto, Ontario Client File Number: Arrival on Site: 9:30 Distribution: Yang Ting Shek yangting.shek@utoronto.ca Irfan Miraj Irfan.miraj@utoronto.ca Description of Work in Progress Work Area Room 6360 (Includes 6360A and 6360B) Work in Progress Visual Inspection and Testing of Seals in Room 6360 and Ambient Air Monitoring Airborne Asbestos Monitoring Sample No. Sample Type Location/ Description Start Time Finish Time Flow Rate (L/min) Duration (Minutes) Air Volume (L) Total Fibres Calculated Airborne Asbestos Concentration f/cc Reportable Airborne Asbestos Concentration f/cc Blank Room :42 N/A N/A N/A N/A 3 N/A N/A Ambient Ambient Room 6360A Room :45 12:30 9:43 12: , ,425 Calibration of air sampling pump checked before and after sample collection. 5 < <0.01 Pinchin Ltd Milltower Court, Mississauga, ON L5N 7W5 Page 1 of 4

5 Inspection Report; Report Number: 02 April 10, 2017 Medical Sciences Buildings Visual Inspection and Ambient Air Monitoring, Room Kings College Circle, Toronto, Ontario 1. SAMPLES & TESTING 4. NEGATIVE PRESSURE 7. WASTE HANDLING 2. SITE ISOLATION 5. PERSONAL PROTECTIVE EQUIPMENT 8. CLEANING 3. FACILITIES/EQUIPMENT 6. DUST SUPPRESSION 9. OTHER Item Comments Action The air sampling results in the table above show that the fibre levels are less than 0.01 f/cc. The Ontario occupational exposure limit for asbestos is 0.1 f/cc. The actual results (where less than the reportable detection limit of the method) are also provided in the table above. Pinchin completed a visual inspection of the site isolation completed by the University. Based on our review, we noted the following items that have been effectively sealed based on smoke testing within the lab during the inspection: 1.) The door between 6360A and the construction side 2.) The conduit penetrations and electrical outlet between 6360A and the construction side 3.) All penetrations into the concrete block wall from the shaft side 4.) Magnehelic Gauge 5.) Electrical Panel. A visual inspection was completed throughout the room. The inspection included all shelving, drawers, flooring and beneath stored items in the lab. It should be noted that there is a wax, used for the wood drawers that will flake off through the use of the drawers and will be present. At the time of the inspection on April 10 th, small bits of caulking debris were observed present in 6360A following caulking of the ceiling tiles, including staining on the lab counters in 6360A. Pinchin notified the University and recommended that this the floor, and counters and top of the fridge are cleaned prior to re-opening the room. Photographs 2017 Pinchin Ltd. Page 2 of 4

6 Inspection Report; Report Number: 02 April 10, 2017 Medical Sciences Buildings Visual Inspection and Ambient Air Monitoring, Room Kings College Circle, Toronto, Ontario Room 6360A Room 6360 following visual inspection Room 6360 following visual inspection 2017 Pinchin Ltd. Page 3 of 4

7 Inspection Report; Report Number: 02 April 10, 2017 Medical Sciences Buildings Visual Inspection and Ambient Air Monitoring, Room Kings College Circle, Toronto, Ontario Example of Sealant Applied on electrical outlet, block wall and door in Room 6366 and double layer drywall and sealant over doorway J:\203000s\ UniversityofToronto,Consulting,Abatement\Deliverables\Room 6360 Clearance\ DRAFT Inspection Report - Room Inspection and Asbestos Air Monitoring, April 10, 2017.docx Template: Master Inspection Report for HAZ/IEQ, January 20, Pinchin Ltd. Page 4 of 4

Appendix D Location Specific Technical Reports

Appendix D Location Specific Technical Reports Appendix D Location Specific Technical Reports SEL Project Number 119917 March 29, 2017 Air Sampling Program University of Toronto Medical Sciences Building 1 King s College Circle, Toronto, Ontario Page

More information

T. Harris Environmental Management Inc.

T. Harris Environmental Management Inc. T. Harris Environmental Management Inc. Environmental Consultants 93 Skyway Avenue, Suite 101 Toronto, Ontario M9W 6N6 Tel. (416) 679-8914 Fax. (416) 679-8915 1-888-ASK-THEM, York University 4700 Keel

More information

March 29 th, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

March 29 th, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 March 29 th, 2017 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and TEM

More information

May 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

May 1 st, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 May 1 st, 2018 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and TEM

More information

September 11, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7

September 11, University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 September 11, 2017 University of Toronto 255 McCaul Street, Level 4 Toronto, Ontario M5T 1W7 Attn: Mr. Irfan Miraj, P.Eng., MHSc. Manager, Hazardous Construction Materials Group Re: Results of PCM and

More information

CITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT

CITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT CITY OF SASKATOON SURVEYOR S BUILDING ASBESTOS SURVEY REPORT MAY 2013 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson

More information

TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204 & 206 WINDSOR, ONTARIO. Issued: March 15 th, 2010

TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204 & 206 WINDSOR, ONTARIO. Issued: March 15 th, 2010 Environmental Consultants 931 Commissioners Rd East, Suite 100 London, Ontario N5Z 3H9 Tel: (519) 685-9048 Fax: (519) 685-1042 TYPE 3 ASBESTOS ABATEMENT UNIVERSITY OF WINDSOR BIOLOGY BUILDING LABS 204

More information

ASSESSMENT OF ASBESTOS-CONTAINING BUILDING MATERIALS

ASSESSMENT OF ASBESTOS-CONTAINING BUILDING MATERIALS ASSESSMENT OF ASBESTOS-CONTAINING BUILDING MATERIALS KERR HALL NORTH KHN 113A LABORATORY RENOVATION PROJECT RYERSON UNIVERSITY 350 VICTORIA STREET, 2 ND FLOOR TORONTO, ONTARIO M5B 2K3 Prepared for: Mr.

More information

Cosmo Senior Center Asbestos Survey Report

Cosmo Senior Center Asbestos Survey Report Cosmo Senior Center Asbestos Survey Report February 2015 Prepared For: City of Saskatoon Infrastructure Services - Facilities Branch 3130 Laurier Drive, Saskatoon, SK. Attn: Brent Anderson Prepared By:

More information

TRANSIT STORAGE & ADMINISTRATION BUILDING ASBESTOS SURVEY REPORT

TRANSIT STORAGE & ADMINISTRATION BUILDING ASBESTOS SURVEY REPORT TRANSIT STORAGE & ADMINISTRATION BUILDING ASBESTOS SURVEY REPORT April 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent

More information

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Curtis House Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

DST Consulting Engineers Inc. RE: Field Inspection Report #30 Week Ending February 19th, 2016 Plan No.: F; Project ID: B3165A-0001

DST Consulting Engineers Inc. RE: Field Inspection Report #30 Week Ending February 19th, 2016 Plan No.: F; Project ID: B3165A-0001 Suite 15, Parkwood Office Centre 9353-50th Street Tel: (780) 454-2120 www.dstgroup.com 23 February 2016 Mr. Pedro Mendonca Project Procurement Specialst Alberta Infrastructure 6950 113 Street, 2 nd Floor,

More information

City of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report

City of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report City of Saskatoon #9 450 Ontario Avenue Asbestos Survey Report April 2016 Prepared For: City of Saskatoon Support Services 222 3 rd Avenue North, Saskatoon, SK. S7K 0J5 Attn: Lana Dodds Prepared By: Bersch

More information

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 31, 2016 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701

More information

ASBESTOS ABATEMENT PROJECT COMPLETION REPORT

ASBESTOS ABATEMENT PROJECT COMPLETION REPORT ASBESTOS ABATEMENT PROJECT COMPLETION REPORT Windows and Door Replacement Program Falstaff Community Centre 50 Falstaff Avenue Toronto, Ontario M6L 2C7 Presented to: City of Toronto, Parks, Forestry &

More information

HAZARDOUS BUILDING MATERIALS SURVEY

HAZARDOUS BUILDING MATERIALS SURVEY HAZARDOUS BUILDING MATERIALS SURVEY Renovation Project Areas Social Services 178 Charlotte Street Peterborough, Ontario K9J 8S1 Presented to: City of Peterborough 500 George Street North Peterborough,

More information

ETERNAL MEMORIALS ASBESTOS SURVEY REPORT

ETERNAL MEMORIALS ASBESTOS SURVEY REPORT ETERNAL MEMORIALS ASBESTOS SURVEY REPORT February 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson Prepared

More information

TRANSIT REPAIR TERMINAL NORTH BUILDING ASBESTOS SURVEY REPORT

TRANSIT REPAIR TERMINAL NORTH BUILDING ASBESTOS SURVEY REPORT TRANSIT REPAIR TERMINAL NORTH BUILDING ASBESTOS SURVEY REPORT April 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent

More information

DERRICK CARROLL ASBESTOS SURVEY REPORT

DERRICK CARROLL ASBESTOS SURVEY REPORT DERRICK CARROLL ASBESTOS SURVEY REPORT March 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson Prepared By:

More information

CITY OF SASKATOON BOWERMAN HOUSE ASBESTOS SURVEY REPORT

CITY OF SASKATOON BOWERMAN HOUSE ASBESTOS SURVEY REPORT CITY OF SASKATOON BOWERMAN HOUSE ASBESTOS SURVEY REPORT APRIL 2013 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson

More information

Designated Substance Sampling, 1631 Queen Street East, Toronto, ON

Designated Substance Sampling, 1631 Queen Street East, Toronto, ON April 27, 2018 Meaghan Aldcroft Environmental Coordinator City of Toronto, Corporate Services Facilities Management Metro Hall, 55 John Street Toronto ON, M5V 3C6 Re: Designated Substance Sampling, 1631

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

FINAL COPY. Airborne Asbestos Risk Assessment Basic Medical Sciences Building University of Manitoba, Bannatyne Campus

FINAL COPY. Airborne Asbestos Risk Assessment Basic Medical Sciences Building University of Manitoba, Bannatyne Campus COPY Airborne Asbestos Risk Assessment Prepared for: University of Manitoba Environmental Health and Safety 191 Frank Kennedy Centre Winnipeg, Manitoba R3T 2N2 Attention: Mr. Grant McCaughey, P.Eng., CRSP

More information

LT Custom Furnishings Keele Street Vaughan, Ontario L6A 0K6. December 20, 2013 Pinchin File: Copyright 2013 by Pinchin Environmental Ltd.

LT Custom Furnishings Keele Street Vaughan, Ontario L6A 0K6. December 20, 2013 Pinchin File: Copyright 2013 by Pinchin Environmental Ltd. Toxic Substance Reduction Plans Summary For ISOPROPYL ALCOHOL (CAS # 67-63-0) METHYL ETHYL KETONE (CAS# 78-93-3) n-butyl ACETATE (CAS# 123-86-4) HYDROTREATED HEAVY NAPHTHA (CAS# 64742-48-9) LT Custom Furnishings

More information

Assessment of Mould Growth Loretto Abbey Catholic Secondary School 101 Mason Boulevard Toronto, Ontario

Assessment of Mould Growth Loretto Abbey Catholic Secondary School 101 Mason Boulevard Toronto, Ontario Assessment of Mould Growth Loretto Abbey Catholic Secondary School 101 Mason Boulevard Toronto, Ontario Prepared for: Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario, M2N

More information

Dr. Gerhard Herzberg Park Aquatic Rec-Unit Asbestos Survey Report

Dr. Gerhard Herzberg Park Aquatic Rec-Unit Asbestos Survey Report Dr. Gerhard Herzberg Park Aquatic Rec-Unit Asbestos Survey Report October 2016 Prepared For: City of Saskatoon 1101 Avenue P North Saskatoon, SK S7L 7K6 Attn: Hazel Fernandez Prepared by: Bersch & Associates

More information

Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and Safety Department

Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager, Occupational Health and Safety Department 701210-356 2 April 2014 Toronto Catholic District School Board Catholic Education Centre 80 Sheppard Avenue East North York, Ontario M2N 6E8 Attention: Re: Mr. Corrado Maltese, B.Sc., C.R.S.P Senior Manager,

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

Asbestos Assessment Campbellford / Seymour Community Centre 313 County Road 38 Campbellford, Ontario

Asbestos Assessment Campbellford / Seymour Community Centre 313 County Road 38 Campbellford, Ontario Asbestos Assessment Campbellford / Seymour Community Centre 313 County Road 38 Campbellford, Ontario Prepared for: Municipality of Trent Hills P. O. Box 1030, 66 Front Street South Campbellford, Ontario,

More information

FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario

FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario FINAL Asbestos Management Program University of Windsor 401 Sunset Avenue, Windsor, Ontario Prepared for: University of Windsor 401 Sunset Avenue Windsor, Ontario, N9B 3P4 Attn: Danny A. Castellan, P.Eng.

More information

HMIS Quick Reference Guide

HMIS Quick Reference Guide Pinchin Environmental Ltd. Page 1 What is HMIS?... 3 Ontario Regulation 278/05... 3 Your University of Windsor Asbestos Assessment... 4 Logging In... 5 NAVIGATING HMIS ONLINE... 5 Viewing Data from Building

More information

A. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification

A. Prior to commencement of any work, make a complete inspection of all of the facilities listed in this specification SECTION 028200 - ABESTOS ABATEMENT PART 1 - GENERAL 1.1 SCOPE OF WORK A. The following asbestos-containing materials is known to be present on the First and Second Floor classrooms of the North Wing of

More information

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 10, 2015 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

PRE-DEMOLITION HAZARDOUS BUILDING MATERIALS SURVEY

PRE-DEMOLITION HAZARDOUS BUILDING MATERIALS SURVEY PRE-DEMOLITION HAZARDOUS BUILDING MATERIALS SURVEY Residential Property 1533 Sherbrooke Street Peterborough, Ontario K9K 0E6 Presented to: City of Peterborough 500 George Street North Peterborough, Ontario

More information

DESIGNATED SUBSTANCES REPORT

DESIGNATED SUBSTANCES REPORT Replacement of Hangers Doors Ottawa, Ontario Page 1 of 4 PART 1 GENERAL 1.1 Regulatory Requirements.1 The following Designated Substances Report (DSR) was prepared in order to meet the owners or engineer

More information

Calvin College Asbestos Operations and Maintenance Plan

Calvin College Asbestos Operations and Maintenance Plan Calvin College Asbestos Operations and Maintenance Plan INTRODUCTION Calvin College s Asbestos Operations and Maintenance Plan has three primary objectives: 1) remove existing contamination and remove/repair

More information

Occupational Exposure Assessment Report: Airborne Asbestos Fibers

Occupational Exposure Assessment Report: Airborne Asbestos Fibers June 13, 2016 Occupational Exposure Assessment Report: Airborne Asbestos Fibers VAV Repair Stevenson Hall 1801 E. Cotati Avenue Rohnert Park CA 94928 Prepared for: Craig Dawson 1801 E. Cotati Avenue Rohnert

More information

A.C.T. Center Asbestos Survey Report

A.C.T. Center Asbestos Survey Report A.C.T. Center Asbestos Survey Report December 2014 Prepared For: City Of Saskatoon- Infrastructure Services Department 3130 Laurier Drive, Saskatoon, SK. Attn: Brent Anderson Prepared By: Bersch & Associates

More information

Occupational Health and Safety June 2009 ASBESTOS MANAGEMENT PROGRAM

Occupational Health and Safety June 2009 ASBESTOS MANAGEMENT PROGRAM Occupational Health and Safety June 2009 ASBESTOS MANAGEMENT PROGRAM SECTION TABLE OF CONTENTS PAGE TABLE OF CONTENTS... I 1.0 INTRODUCTION... 1 1.1 Objectives... 1 2.0 BACKGROUND... 2 2.1 Asbestos...

More information

Toxic Substance Reduction Plans Summary For Propylene Glycol Methyl Ether Acetate (CAS# ) Hexavalent Chromium (CAS# N/A -19)

Toxic Substance Reduction Plans Summary For Propylene Glycol Methyl Ether Acetate (CAS# ) Hexavalent Chromium (CAS# N/A -19) Toxic Substance Reduction Plans Summary For Propylene Glycol Methyl Ether Acetate (CAS# 108-65-6) Hexavalent Chromium (CAS# N/A -19) Caledon Tubing, a Division of Martinrea International Inc. 580 James

More information

WOODLAWN CEMETERY OFFICE ASBESTOS SURVEY REPORT

WOODLAWN CEMETERY OFFICE ASBESTOS SURVEY REPORT WOODLAWN CEMETERY OFFICE ASBESTOS SURVEY REPORT February 2014 Prepared For: City of Saskatoon Infrastructure Services Department 1101 Avenue P North, Saskatoon SK, Canada S7L 7K6 Attn: Brent Anderson Prepared

More information

WHY SHOULD PROJECT OWNERS PROVIDE A LIST OF DESIGNATED SUBSTANCES?

WHY SHOULD PROJECT OWNERS PROVIDE A LIST OF DESIGNATED SUBSTANCES? In Ontario, section 30 of the Occupational Health and Safety Act requires that a project owner identify designated substances on the project and provide a list to prospective constructors as part of the

More information

Margaret Batts Tobin Laboratory

Margaret Batts Tobin Laboratory Roof Evaluation of Margaret Batts Tobin Laboratory The University of Texas At San Antonio Performed for UTSA Zero/Six Consulting, LLC 8423 Stewart Road Galveston, Texas 77554 409 740 0090 voice Table of

More information

Asbestos Assessment East Facilities Services 97 Railside Road, Toronto, Ontario

Asbestos Assessment East Facilities Services 97 Railside Road, Toronto, Ontario Asbestos Assessment East Facilities Services 97 Railside Road, Toronto, Ontario Prepared for: Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario, M2N 6E8 Attention: Kathleen

More information

Toxics Substance Reduction Plan Summary For Chromium (CAS # ) Copper (CAS# ) Nickel (CAS# )

Toxics Substance Reduction Plan Summary For Chromium (CAS # ) Copper (CAS# ) Nickel (CAS# ) For Chromium (CAS #7440-47-3) Copper (CAS# 7440-50-8) Nickel (CAS# 7440-02-0) Canada Alloy Castings, a division of Flowserve Canada Corporation 529 Manitou Drive Kitchener, Ontario N2C 1S2 December 21,

More information

Frequently Asked Questions (FAQs) on Asbestos St. George Campus

Frequently Asked Questions (FAQs) on Asbestos St. George Campus Frequently Asked Questions (FAQs) on Asbestos St. George Campus If you work or learn at MSB (New FAQs: March 30, 2017): 1. Am I safe if I go to work in MSB now? Except for those specific rooms which we

More information

REPORT. Asbestos-Containing Building Materials Assessment Report - Nutana Lawn Bowling Storage Garage CITY OF SASKATOON.

REPORT. Asbestos-Containing Building Materials Assessment Report - Nutana Lawn Bowling Storage Garage CITY OF SASKATOON. CITY OF SASKATOON Asbestos-Containing Building Materials Assessment Report - Nutana Lawn Bowling Storage Garage REPORT Submitted to: The City of Saskatoon 1101 Avenue P North Saskatoon, SK S7L 7K6 Report

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT Conducted for: Woodbridge Township Education Association 34 Green Street Woodbridge, New Jersey 07095 Conducted at: Indiana Avenue School 256 Indiana Avenue Iselin, New

More information

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY:

ASBESTOS SURVEY. Old Detective s Building Wadesboro, NC INSPECTED &PREPARED BY: ASBESTOS SURVEY Old Detective s Building Wadesboro, NC PREPARED FOR: Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Date of Inspection September 28, 2016 Date of Report October

More information

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING In Ontario, section 30 of the Occupational Health and Safety Act requires that a project owner identify designated substances on the project and provide a list to prospective constructors before contracts

More information

Asbestos Inventory and Condition Assessment

Asbestos Inventory and Condition Assessment Prepared for: School District 85 - Vancouver Island North PO Box 90 Port Hardy, British Columbia V0N 2P0 Asbestos Inventory and Condition Assessment NWest Project Number: 30639 V.1.0 Prepared by: 201-415

More information

SECTION 2080 ASBESTOS ABATEMENT

SECTION 2080 ASBESTOS ABATEMENT SECTION 2080 ASBESTOS ABATEMENT PART 1 - GENERAL 1.01 SECTION INCLUDES A. Specification for the abatement of identified asbestos-containing materials (ACMs) and asbestos-containing construction materials

More information

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: C-CORE BUILDING MEMORIAL UNIVERSITY OF NEWFOUNDLAND Prepared for: Memorial University of Newfoundland St. John s, NL Pinchin LeBlanc Environmental

More information

Hazardous Building Materials Assessment St. Louis Elementary School 75 Allen Street Waterloo, Ontario

Hazardous Building Materials Assessment St. Louis Elementary School 75 Allen Street Waterloo, Ontario St. Louis Elementary School 75 Allen Street Waterloo, Ontario Prepared for: City of Waterloo 500 Parkside Drive Waterloo, Ontario Attention: Jean Starchuk 79146 October 31, 2012 Pinchin Environmental Ltd.

More information

Ministry of Education St Albans Primary School. Asbestos Assessment 7 th of October 2015

Ministry of Education St Albans Primary School. Asbestos Assessment 7 th of October 2015 South Island Head Office PO Box 28147, Beckenham, Unit 24, 105 Bamford Street, Woolston, Christchurch Tel: 03 384 8966 Mobile: 0274 33 78 72 Email: info@k2.co.nz North Island Office Unit 23, 203 Kirkbride

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

Toxics Substance Reduction Plan Summary For Chromium (CAS #NA-04)

Toxics Substance Reduction Plan Summary For Chromium (CAS #NA-04) Toxics Substance Reduction Plan Summary For Chromium (CAS #NA-04) StampTek A Division of Teknion Ltd. 555 Petrolia Road, Unit #3 Toronto, Ontario M3J 2X8 December 10, 2012 Pinchin File: 75796 Copyright

More information

ASBESTOS GUIDELINES. GUIDANCE: Asbestos Page 1 of 14 Jan07/ver01

ASBESTOS GUIDELINES. GUIDANCE: Asbestos Page 1 of 14 Jan07/ver01 ASBESTOS GUIDELINES GUIDANCE: Asbestos Page 1 of 14 Jan07/ver01 Nugent Asbestos Guidelines. Section Contents Pag e 1.0 Accountability and Responsibility 3 1.1 Nugent hief 3 Executive 1.2 The Director of

More information

Section Asbestos Removal

Section Asbestos Removal Section Cover Page Section 02 82 33 2017-10-01 Use this Section to specify removal of materials containing asbestos, as listed below. Always use in conjunction with Section 02 82 01 - Asbestos Control

More information

Toxics Substance Reduction Plan For MANGANESE (CAS # NA-10) Snap-On Tools of Canada Ltd Millcreek Drive Mississauga, Ontario L5N 2W6

Toxics Substance Reduction Plan For MANGANESE (CAS # NA-10) Snap-On Tools of Canada Ltd Millcreek Drive Mississauga, Ontario L5N 2W6 Toxics Substance Reduction Plan For MANGANESE (CAS # NA-10) Snap-On Tools of Canada Ltd. 6500 Millcreek Drive Mississauga, Ontario L5N 2W6 December 6, 2012 Pinchin File: 69018 Copyright 2012 by Pinchin

More information

Pre-Demolition Hazardous Building Materials Survey

Pre-Demolition Hazardous Building Materials Survey Pre-Demolition Hazardous Building Materials Survey Commercial and Residential Property 212 and 210 Street East Peterborough, Ontario K9L 2A3 Presented to: City of Peterborough 500 George Street North Peterborough,

More information

LIMITED ASBESTOS INSPECTION REPORT

LIMITED ASBESTOS INSPECTION REPORT LIMITED ASBESTOS INSPECTION REPORT FOR CITY OF ROCK HILL 150 Johnson Street Rock Hill, SC 29731 (803) 817-5147 LOCATION Building #842, #844, #846, & #848 Crest Street Rock Hill, South Carolina INSPECTION

More information

CORPORATE Asbestos Management Program. Homestead Land Holdings

CORPORATE Asbestos Management Program. Homestead Land Holdings CORPORATE Asbestos Management Program Homestead Land Holdings Prepared for: Homestead Land Holdings October 1, 2007 Copyright 2007 by Pinchin Environmental Ltd. PINCHIN ENVIRONMENTAL LTD. 515 LEGGET DRIVE,

More information

Asbestos Procedures. Asbestos Abatement and Repair

Asbestos Procedures. Asbestos Abatement and Repair Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see for a list of known asbestos containing materials located on the Olympia campus. Where

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

McMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304

McMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304 The Campaign for McMaster University The Campaign for McMaster University McMaster University Asbestos Awareness Environmental & Occupational Health Support Services Gilmour Hall Room 304 The Campaign

More information

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928

Work Plan dated February 17, Prepared by Axiom Partners, Inc. Stephen E. Minassian Massachusetts Asbestos Designer License #AD051928 ABATEMENT WORK PLAN FOR EMERGENCY ASBESTOS ABATEMENT PROJECT CONSENTINO MIDDLE SCHOOL 685 WASHINGTON STREET HAVERHILL, MASSACHUSETTS Work Plan dated February 17, 2016 Prepared by Axiom Partners, Inc. Stephen

More information

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM

DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM DUQUESNE UNIVERSITY ASBESTOS MANAGEMENT PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 2 Definitions 2 Responsibilities 3 Hazard

More information

Greystone Heights Park Aquatic Rec-Unit Asbestos Survey Report

Greystone Heights Park Aquatic Rec-Unit Asbestos Survey Report Greystone Heights Park Aquatic Rec-Unit Asbestos Survey Report October 2016 Prepared For: City of Saskatoon 1101 Avenue P North Saskatoon, SK S7L 7K6 Attn: Hazel Fernandez Prepared by: Bersch & Associates

More information

World Inspection Network

World Inspection Network 64725 Acanto Dr Guest house Carriage garage Exterior pool Interior pool Cracked tiles in the Master bath Sauna Page 1 of 16 Moisture damage on the West gym wall outside the Sauna Improper plumbing connection

More information

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN 56-5.1 Asbestos Survey Requirements for Building/Structure Demolition, Renovation, Remodeling and Repair (a) (b) Asbestos Survey Required. An

More information

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101 Issued 6/1/95 Revised 11/08/2004; 3/6/06 Please direct any questions or comments about the applicability of this document to Luigi

More information

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions MANAGEMENT PLANNER INITIAL Asbestos Training Course Federal Edition Training Services International www.training.com What management planning qualifications exist? How do I become certified to perform

More information

Asbestos Management Program

Asbestos Management Program Asbestos Management Program March 20, 2006 MNarchMarch TABLE OF CONTENTS OVERVIEW.. 4 ASBESTOS CONTROL PROGRAM.. 4 OWNER RESPONSIBILITIES 4 PROGRAM SUPERVISOR S RESPONSIBLITIES... 5 WORKER S RESPONSIBILITIES....

More information

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823

ASBESTOS BUILDING INSPECTION REPORT. for. Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Office of Environmental and Occupational Safety East Lansing, Michigan 48823 at the Demonstration Hall Building #57 East Lansing, Michigan

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

REASSESSMENT SURVEY OF ASBESTOS - CONTAINING MATERIALS ANNE HATHAWAY DAYCARE CENTRE 103 Bruce Street Stratford, Ontario

REASSESSMENT SURVEY OF ASBESTOS - CONTAINING MATERIALS ANNE HATHAWAY DAYCARE CENTRE 103 Bruce Street Stratford, Ontario REASSESSMENT SURVEY OF ASBESTOS - CONTAINING MATERIALS ANNE HATHAWAY DAYCARE CENTRE 103 Bruce Street Stratford, Ontario June 30 th, 2014 Prepared for: Debbie Kindler - Supervisor 103 Bruce Street Stratford,

More information

ASBESTOS MANAGEMENT PROGRAM. Carleton University

ASBESTOS MANAGEMENT PROGRAM. Carleton University ASBESTOS MANAGEMENT PROGRAM Carleton University November Oct 10/06 2/25 Table of Contents 1 INTRODUCTION... 3 2 PURPOSE... 3 3 SCOPE... 3 4 ROLES & RESPONSIBILITIES... 3-7 5 INVENTORY... 7 6 ACCESS CONTROL...

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

ASBESTOS ASSESSMENT Science Building Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Science Building Memorial University of Newfoundland St. John s, NL Project #: 14610 ASBESTOS ASSESSMENT Science Building Memorial University of Newfoundland St. John s, NL Prepared for: Tina Giles-Murphy Director, Department of Health and Safety Memorial University of

More information

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES

APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES APPE NDIX F TY PE 2 ASBE STOS WORK PROCEDURES TY PE 2 WOR K PR OCE DUR ES These procedures are to be followed by all maintenance personnel and contractors performing the following work at KPDSB buildings.

More information

ASSESSMENT FOR PRIORITIZATION OF WINDOW REPLACEMENT AND INSTALLATION OF AIR-CONDITIONING SYSTEMS

ASSESSMENT FOR PRIORITIZATION OF WINDOW REPLACEMENT AND INSTALLATION OF AIR-CONDITIONING SYSTEMS ASSESSMENT FOR PRIORITIZATION OF WINDOW REPLACEMENT AND INSTALLATION OF AIR-CONDITIONING SYSTEMS (Addendum to Risk Assessment Phase II report dated April 21, 2017) JOHN FISHER PUBLIC SCHOOL Presented to:

More information

Alabama Home Inspections

Alabama Home Inspections Cover Page Property Inspection Report 1000 Sample Dr., Sampletown USA Inspection prepared for: Report Sample Inspection Date: 1/21/2010 Time: 400pm Size: Approx. 2,200sf Weather: Cloudy 62 Inspector: Bobby

More information

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: QUEEN ELIZABETH II LIBRARY MEMORIAL UNIVERSITY OF NEWFOUNDLAND

ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: QUEEN ELIZABETH II LIBRARY MEMORIAL UNIVERSITY OF NEWFOUNDLAND ASBESTOS AND LEAD PAINT BUILDING MATERIALS SURVEY FOR: QUEEN ELIZABETH II LIBRARY MEMORIAL UNIVERSITY OF NEWFOUNDLAND Prepared for: Memorial University of Newfoundland St. John s, NL Pinchin LeBlanc Environmental

More information

Asbestos Management Program

Asbestos Management Program Oct. 10/06 Oct 10/06 1/13 Table of Contents 1 INTRODUCTION...2 2 PURPOSE...2 3 SCOPE...2 4 ROLES & RESPONSIBILITIES...2 5 INVENTORY...6 6 ACCESS CONTROL...6 7 INSPECTION...6 8 CLASSIFICATIONS OF ASBESTOS

More information

Designated Substances Survey Guelph Greyhound Station 141 Macdonell Street Guelph, Ontario

Designated Substances Survey Guelph Greyhound Station 141 Macdonell Street Guelph, Ontario Designated Substances Survey Guelph Greyhound Station 141 Macdonell Street Guelph, Ontario Prepared By: R.J. Burnside & Associates Limited 292 Speedvale Avenue West Unit 7 Guelph ON N1H 1C4 July 2010 File

More information

Ensure policy is adhered to by all employees. Follow policy requirements.

Ensure policy is adhered to by all employees. Follow policy requirements. 1.0 Scope and Application This policy as been developed to minimize the potential health risk to County employees and the public resulting from the presence of Asbestos Containing Materials (ACM) or Presumed

More information

25, 2017 CITY OF SASKATOON

25, 2017 CITY OF SASKATOON CITY OF SASKATOON Asbestos-Containing Building Materials Assessment Report - Lt. Col. D. Walker Park Storage Shed REPORT Submitted to: The City of Saskatoon 1101 Avenue P North Saskatoon, SK S7L 7K6 Report

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

Toxics Substance Reduction Plan Summary For Methanol and Xylene. Tigercat International Inc Industrial Road Cambridge, Ontario N1R 8H5

Toxics Substance Reduction Plan Summary For Methanol and Xylene. Tigercat International Inc Industrial Road Cambridge, Ontario N1R 8H5 Toxics Substance Reduction Plan Summary For Methanol and Xylene Tigercat International Inc. 1556 Industrial Road Cambridge, Ontario N1R 8H5 January 2, 2013 Pinchin File: 68843.008 Copyright 2012 by Pinchin

More information

These procedures are to be followed by all persons required to perform the following work:

These procedures are to be followed by all persons required to perform the following work: These procedures are to be followed by all persons required to perform the following work: Entry into any ceiling space above which an asbestos-containing fireproofing or thermal insulation is present.

More information

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc.

Asbestos Abatement Standard Procedures Indoor Environment Group, Inc. The following work procedures are specified on all full containment asbestos abatement projects that we design. A. Preliminary Air Sampling: Many buildings contain background fiber levels prior to, or

More information

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos? CHAPTER 34 ASBESTOS 34 ASBESTOS This chapter provides some brief information about asbestos in construction. If you encounter asbestos on the job, you will need more information. Here are the two main

More information

Rutgers Environmental Health and Safety (REHS)

Rutgers Environmental Health and Safety (REHS) Rutgers Environmental Health and Safety (REHS) Program Name: Asbestos Management Program Responsible Executive: Executive Director of REHS Adopted: Reviewed/Revised: August 2, 2018 1. Program Statement

More information

Rowan University Asbestos Management Program

Rowan University Asbestos Management Program Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos

More information

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: PROJECT NO. 1197 REPORT TO CITY OF STRATFORD ON ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: 1099 KINGSTON ROAD, SUITE 260 PICKERING, ONTARIO L1V 1B5 Tel: (416) 410-4333

More information

ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA

ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA ADDENDUM 2 TECHNICAL SPECIFICATIONS REMOVAL OF HAZARDOUS MATERIALS PROJECT NEON DEMOLITION PACKAGE C LAS VEGAS, NEVADA Converse Project No.: 12-43224-01 Prepared For Nevada Department of Transportation

More information

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation. Thames Valley District School Board PROCEDURE Title ASBESTOS PROCEDURES Procedure No. 2005a Department ORGANIZATIONAL SUPPORT SERVICES (HUMAN RESOURCES) Reference(s) Policy: Health and Safety - Occupational

More information