3 UniFormat A Uniform Classification of Construction Systems and Assemblies

4 Copyright U.S. copyright held by The Constructions Specification Institute, Alexandria, VA. Canadian copyright held by Construction Specifications Canada, Toronto, Ontario. All rights reserved. Except as permitted under the United States Copyright Act of 1976, no part of this publication may be reproduced or distributed in any form or by any means, or stored in a database or retrieval system, without the prior written permission of the publisher, The Construction Specifications Institute. For use of UniFormat numbers and titles in commercial applications, educational programs, or publications, please contact the Construction Specifications Institute at csi@csinet.org to obtain copyright license. UniFormat : A Uniform Classification of Construction Systems and Assemblies ISBN $ Retail Cataloging-in-Publication Data is on file with the Library of Congress Robert W. Johnson, RA, FCSI Distinguished Member, CCS, CCCA Johnson and Johnson Consultants, LLC Technical Editor CSI and CSC give acknowledgement and thanks to the members of the UniFormat Task Team for their work: Robert W. Johnson, RA, FCSI Distinguished Member, CCS, CCCA (Chair) Paul R. Bertram, Jr., FCSI, CDT, LEED AP Ellen Kay Crews, FCSI, CCS, CCCA Philip W. Kabza, RA, FCSI, CCS, CCCA, AIA, SCIP Grant B. Owen, CSI Jori Toniello (CSC) Andrew Wilson, CSI, CCS, CCCA Mark Kalin, FCSI, CCS, FAIA, SCIP (Tech Com Liaison) Dennis J. Hall, FCSI, CCS, CCCA, FAIA, SCIP (Board Liaison) The Constructions Specification Institute 110 South Union Street, Suite 100 Alexandria, VA Construction Specifications Canada 120 Carlton Street, Suite 312 Toronto, ON, M5A 4K

5 TABLE OF CONTENTS INTRODUCTION 1 Scope 1 Background 1 History 2 This Edition 3 Basic Organization 3 Relationship with MasterFormat 4 Differences from MasterFormat 4 APPLICATION GUIDE 5 Selecting UniFormat Numbers and Titles 5 The Structure Underlying UniFormat 5 Extending UniFormat by Using MasterFormat 6 Using Uniformat 7 Arranging Cost Information 7 Arranging Preliminary Project Descriptions 7 Arranging Performance Based Project Manuals 8 Organizing Drawings and BIM Object Libraries 8 Arranging Facilities Management Information 9 Arranging Construction Market Information 9 Arranging Information for Design-Build Applications 9 LEVELS ONE THROUGH THREE NUMBERS AND TITLES 11 MASTER LIST OF NUMBERS, TITLES, EXPLINATIONS, AND RELATED MasterFormat NUMBERS 17 Introduction 19 Element A Substructure 25 Element B Shell 31 Element C Interiors 53 Element D Services 69 Element E Equipment and Furnishings 99 Element F Special Construction and Demolition 111 Element G Sitework 119 Element Z General 141 KEY WORD INDEX 1 i

6

7 INTRODUCTION UniFormat is an arrangement of construction information based on physical parts of a facility called functional elements 1, otherwise known as systems and assemblies. These elements are characterized by their function without identifying the work results 2 that compose them. Elements render a view of a constructed facility different from the view rendered by a breakdown of building materials, products, and activities that comprise work results. In this way, UniFormat complements MasterFormat. UniFormat subdivides a facility by functional elements and MasterFormat subdivides by work results. As an outcome of this differing view, UniFormat is able to achieve consistency in economic evaluation of existing and new projects, enhance reporting of design program information, especially for preliminary project descriptions 3 and performance specifications, and provide a basis for systematic filing information for facility management, drawing details, BIM objects, and construction market data. It also provides a means for the sustainable design evaluation of systems and assemblies in contrast to evaluating individual products. SCOPE UniFormat includes elements for a range of building types and construction related to buildings. Future expansions to UniFormat will include elements related to other project types in addition to buildings. Besides elements, detailed titles are presented that provide some designed elements that may apply to any given element; these designed element titles are cross-referenced to MasterFormat. The term designed elements 4 refers to physical parts of buildings with a particular design, construction, or technical solution. BACKGROUND Construction professionals have focused on the need to better organize project information for many years. The project manual concept 5, 50-Division format 6, and MasterFormat were developed in response to these challenges and have evolved through several revisions. These organizational principles enhance communication within the construction industry, improve the retrieval of construction information, and aid the analysis of construction information particularly during the detailed design and construction of a project. The construction industry needed a consistent, expandable organizing concept to standardize information developed in addition to those developed more explicitly for organizing construction documents. This included information used to evaluate and compare alternative construction concepts in terms of a facility's functional parts, particularly during early design stages. There was a 1 Element: Construction entity part which, in itself or in combination with other such parts, fulfils a predominating function of the construction entity. International Organization for Standardization. ISO :2001. Building construction -- Organization of information about construction works -- Part 2: Framework for classification of information. Geneva, Switzerland: ISO, Work result: Construction result achieved in the production stage or by subsequent alteration, maintenance, or demolition processes and identified by one or more of the following: the particular skill or trade involved; the construction resources used; the part of the construction entity which results; the temporary work or other preparatory or completion work which results. Ibid. 3 Preliminary project description: Written documentation for Schematic Design phase documents to provide descriptions of the systems and assemblies comprising the project shown in Schematic Design drawings. Construction Specifications Institute. PPDFormat: A Guide to Developing Preliminary Project Descriptions. Alexandria, VA: CSI, Designed element: Element for which the work results have been defined. International Organization for Standardization. 5 Project manual concept is discussed in Construction Specifications Institute. Project Resource Manual. New York: McGraw-Hill, Module The 50-Division format is discussed in Construction Specifications Institute. Project Resource Manual. New York: McGraw-Hill, Module

8 UNIFORMAT INTRODUCTION need for organizing documents for use in reporting the owner's program information and the designer s parameters and criteria for early design stages. There is also a need for an organizational structure for the evaluation of completed buildings. The facility's fiscal model, owner's program, and designer s parameters and criteria continue to evolve through all production phases and can be introduced into and compared with construction documents at any phase. HISTORY Construction information arranged according to functional building elements was first introduced outside of the United States. Elements were included in one of five tables in a comprehensive Swedish classification system known as "SfB." In 1947, Sweden formed a committee of 32 major building industry organizations called Samarbetskommitten for Byggnadsfr Cgor, which provided the initials for the classification. Its first work was published in 1950 in the form of general material and work specifications for buildings. This was a collection of codes and practices arranged according to SfB. The Royal Institute of Chartered Surveyors (UK) published a standard list of elements in 1969, Standard Form of Cost Analysis, which was reprinted in December The Canadian Institute of Quantity Surveyors published Elemental Cost Analysis Method of Measurement and Pricing. 8 In the early 1970s, the first element-based classification in the United States was developed by the American Institute of Architects (AIA) for the General Services Administration (GSA). UniFormat has since been used by U.S. Federal agencies, RS Means, and others. In 1989, the ASTM Subcommittee on Building Economics began development of classification for building elements. In 1990, the Construction Specifications Institute (CSI) became active on the working group of this ASTM subcommittee. Other participating organizations include the American Association of Cost Engineers, American Society of Professional Estimators, GSA, Naval Facilities Engineering Command, U.S. Air Force, and U.S. Army Corps of Engineers. The ASTM Working Group and DoD Tri Service Committee each prepared versions of an elementbased format in the first half of The two formats were similar but not identical. In August 1992, the National Institute of Standards and Technology (NIST) published UNIFORMAT II: A Recommended Classification for Building Elements and Related Sitework. UNIFORMAT II was influenced greatly by discussions held at ASTM Working Group meetings. The first edition of UniFormat was published by CSI as an interim edition, based on the work of the ASTM Working Group and the DoD Tri Service Committee. The UniFormat Interim Edition was published with the 1992 edition of CSI Manual of Practice and included coordination with the 1988 edition of MasterFormat. This interim edition was published for trial use and comment. After the publication of NIST and CSI versions, ASTM 9 balloted and accepted UNIFORMAT II in 1993 as ASTM E The ASTM standard was based on NIST and DoD documents but did not include a numbering system or the low-level element classification. In 1996, ASTM adopted the numbering scheme used in CSI's UniFormat for the 1996 edition of ASTM E In 1995, CSI and CSC began revising UniFormat. Revisions were intended to align ASTM and CSI documents and to coordinate UniFormat with MasterFormat, 1995 edition. CSI and CSC actively solicited public comments on the UniFormat Interim Edition and continued ongoing discussions with ASTM Subcommittee E06.81 to determine the direction for the next edition. 7 Royal Institute of Chartered Surveyors. Standard Form of Cost Analysis. London: RICS, 1969, reprinted 1995, revised Canadian Institute of Quantity Surveyors, Elemental Cost Analysis Method of Measurement and Pricing. Toronto, Ontario, Canada: CIQS, first issued 1972, revised 1990, Committee E6 Building Performance, Subcommittee E06.81 Building Economics. 2

9 UNIFORMAT INTRODUCTION THIS EDITION In 2005, a CSI/CSC task team was appointed to review the contents of UniFormat and recommend revisions and improvements. An initial scoping and brainstorming meeting was held at the National Institute of Science and Technology (NIST) headquarters in July 2006 with attendees from CSI, NIST, the ASTM subcommittee, the General Services Administration (GSA), National Institute of Building Sciences (NIBS), the National Building Information Model Standard (NBIMS) Project Committee, and the Naval Facilities Engineering Command (NAVFAC), among others. Outcomes from that meeting served to give direction to the CSI/CSC effort. Over the next five years, several additional workshops were held and three drafts for commentary were produced. This revised edition of UniFormat is the result of decisions made in response to discussion and commentary received. The CSI/CSC UniFormat Task Team made the following changes to this edition: Revised UniFormat to increase its usefulness for classifying information for new applications such as Building Information Modeling (BIM). Changed the title of the introductory element from Project Description to Introduction and added additional material on project criteria and owner s development activities. Moved stairs from Category C Interiors to B Shell. Reorganized Category D Services to reflect more of a systems approach with generic functional categories. Provided standardized numbers for Level 4 titles throughout UniFormat. Added example performance requirements to many functional elements. Separated Related Activities from physical elements in the A Substructure and G Sitework elements. These activities may be included with functional elements as appropriate. Placed supplementary components for many functional elements into separate categories to avoid repeating them with each functional element. The Supplementary Components are intended to be included with each functional element in that category as appropriate. MasterFormat references have been updated to the 2010 version of MasterFormat. BASIC ORGANIZATION UniFormat classifies information into the following nine Level 1 elements: INTRODUCTION A SUBSTRUCTURE E EQUIPMENT AND FURNISHINGS B SHELL F SPECIAL CONSTRUCTION AND DEMOLITION C INTERIORS G BUILDING SITEWORK D SERVICES Z GENERAL The nine elemental categories above can be used to arrange preliminary project descriptions, cost information, BIM elements, facility management information, and organizing drawing details. Category Z General is designated by the last letter of the alphabet to ensure that this category will remain last no matter how the content of UniFormat may be expanded to cover additional types of construction. 3

10 UNIFORMAT INTRODUCTION Titles in Levels 1 through 3 can be applied to most project descriptions and preliminary cost estimates. Level 4 provides a more detailed breakdown of the functional elements. Detailed listings below Level 4 provide a checklist of designed elements for selection of design, construction, or technical solutions to allow for a more comprehensive and complete application of UniFormat. RELATIONSHIP WITH MASTERFORMAT MasterFormat establishes a location for specifying element-based project information within Project Manuals. This location is in Division 01, within Performance Requirements. MasterFormat refers to UniFormat for organizing and titling elements. The two documents provide complementary views of project information for such diverse applications as Project Manuals and cost estimating, where reference to both products and functional elements may be useful. The information in UniFormat under 30 Procurement Requirements and 40 Contracting Requirements in the Introduction is based on the MasterFormat organizational structure for that subject matter. The information in UniFormat under Z10 General Requirements is also based on the MasterFormat organizational structure. DIFFERENCES FROM MASTERFORMAT The primary difference between UniFormat and MasterFormat lies in how each views construction information. UniFormat identifies elements, each with one or more characteristic functions. For example, foundations provide the function to stabilize and support. Numbered UniFormat classifications stop above the level of defining the technical solutions used to achieve the function described. The detailed listings in UniFormat below Level 4 do provide a checklist of possible construction solutions that relate to MasterFormat. By comparison, information in MasterFormat is arranged by work results, defined in MasterFormat as permanent or temporary aspects of construction projects achieved in the production stage or by subsequent alteration, maintenance, or demolition processes, through the application of a particular skill or trade to construction resources." This arrangement allows for more specificity in description of the information addressed, but also makes some of the functions served by UniFormat, such as preliminary project descriptions, comparison of design choices, or early cost estimates, more difficult or impossible. Work results are the basic components in MasterFormat's view of construction. This view emphasizes the perspective of the product manufacturer, supplier, detailed designer, specifier, cost estimator, and contractor during the detailed design and construction phases. UniFormat, on the other hand, looks at construction the way elements are used. This perspective coincides with the way the user, owner, cost estimator, and designer look at construction during the early design phases and when evaluating completed projects. This suggests using UniFormat for organizing preliminary project descriptions, cost summaries, and performance specifications of entire elements, such as HVAC systems and exterior wall assemblies, and using MasterFormat to organize detailed cost estimates and analyses, descriptive specifications, and more detailed information about design choices made. UniFormat and MasterFormat titles suggest complementary views of construction products and performance requirements: UniFormat names elements that have a determinable function; MasterFormat names components that have specifiable characteristics. Because construction information is viewed, used, and manipulated by people with varying interests at the various stages of the project, complementary organizational concepts are helpful. 4

11 APPLICATION GUIDE This application guide suggests basic strategies for numbering and titling elements for information storage and retrieval purposes. It is not intended to describe rigid methods for applying UniFormat but to develop the user's intuition for using this system consistently. This application guide also includes important considerations for applying UniFormat for organizing cost information, preliminary project descriptions, arranging project manuals, and organizing facility management and construction market information. Discussions are provided for understanding the underlying structure and presentation conventions used and for selecting UniFormat numbers and titles. SELECTING UNIFORMAT NUMBERS AND TITLES Not all UniFormat titles will be used for a given project. UniFormat is an expandable structure that can accommodate additional titles to meet specific requirements. However, designated numbers and titles listed should not be changed. This helps set a consistent arrangement. UniFormat titles are generic, descriptive titles independent of the design solution. UniFormat titles are the starting point for elements. When creating a user-defined Level 3 or 4 title, incorporate wording from the parent title so the new titles are complete, clear, and descriptive. THE STRUCTURE UNDERLYING UNIFORMAT The UniFormat hierarchy comprises the major categories of construction information separated by their special function. These special functions include the following nine categories: INTRODUCTION A SUBSTRUCTURE E EQUIPMENT AND FURNISHINGS B SHELL F SPECIAL CONSTRUCTION AND DEMOLITION C INTERIORS G BUILDING SITEWORK D SERVICES Z GENERAL The letters and titles of Level 1 categories are fixed and should not be changed in application. The first category, Introduction, does, not have a letter designation. This allows it to appear first in the list of titles and distinguishes its contents from the other titles. The contents of Introduction are not building systems or assemblies. Instead, it is a collection of basic information that allows users to give readers an introduction to the project before reading details of the building elements in other categories. Introduction contains Procurement and Contracting Requirements and allows UniFormat to be used as a stand-alone contracting structure for construction projects, especially design-build applications. Category Z General, which also does not contain information about building systems or assemblies, is designated by the last letter of the alphabet so that the system can expand beyond building construction and allow this category to remain last. UniFormat divides Level 1 categories into classes of information by separating the categories into the discrete concepts that compose them. Level 2 classes carry the letter of their parent category, plus a two-digit number. Alphanumeric designations and titles of Level 2 classes are also fixed and should not be changed in application. 5

12 UNIFORMAT APPLICATION GUIDE Levels 3 and 4 are developed by further subdividing Level 2 classes. These subclasses carry the alphanumeric designation of their parent category and class, plus a two-digit number per level, with the two-digit Level 4 numbers being set off by a decimal point as shown in the example below. Alphanumeric designations and titles of Level 3 and 4 subclasses are also fixed and should not be changed in application. Alphanumeric designations for Level 4 that are unassigned within a group of Level 3 subclasses can be assigned by the user. Detailed listings below Level 4 present specialized design solutions of their parent Level 4 subclasses. Particular materials may be identified (e.g., concrete and steel) to differentiate one specialized solution from another. No standard alphanumeric designation is assigned to these subclasses, though extensions may be assigned by the user. The user-assigned number should carry the alphanumeric designation of the parent Level 4 subclass, plus additional characters, such as a two-digit number, an alphanumeric designator, or the corresponding MasterFormat number separated from the Level 4 number by an additional decimal point. The numbering system is as follows (the CF appended to the Continuous Footings title below is merely one possible example of how to number such a title): A SUBSTRUCTURE Level 1 A10 Foundations Level 2 A1010 Standard Foundations Level 3 A Wall Foundations Level 4 A CF Continuous Footings Level 5 The numbering system can expand to allow for additional numbers and titles at any level. Should a user choose to use a variety of lower level titles beyond Level 5, the added digits should include any numbering provided for parent subcategories similar to the way demonstrated by the upper level numbering. This allows UniFormat to expand in the future and allows users to add titles and numbers for subjects not in the current edition. User-defined numbers and titles that fit within the established framework of UniFormat can similarly be added at any level, as long as they do not duplicate the subject matter of any existing title or take the place of any existing number. EXTENDING UNIFORMAT BY USING MASTERFORMAT Some users may want to add MasterFormat materials and methods information to a document organized according to UniFormat. MasterFormat numbers may be included if some materials and methods have been determined. For example, if the building structural frame will be steel but the design solutions for exterior walls have not been determined, MasterFormat numbers could be included for B10 Superstructure but not for B20 Exterior Vertical Enclosures. Users may refine documents organized according to UniFormat during subsequent design phases as materials and construction activities are determined. The following is an example application for adding MasterFormat numbers to the UniFormat alphanumeric designations. A2010 Walls for Subgrade Enclosures is an example where the direct relationship with MasterFormat is referenced in the detailed listings below Level 4. A20 Subgrade Enclosures A2010 Walls for Subgrade Enclosures A Subgrade Enclosure Wall Construction Cast-in-Place Concrete Cast-in-Place Concrete Unit Masonry Unit Masonry 6

13 UNIFORMAT APPLICATION GUIDE In the example above, a related MasterFormat number is not available until the material designations of cast-in-place concrete and unit masonry are included. When the material to be used for Subgrade Enclosure Walls has been decided upon, a MasterFormat number can then be added after another decimal point to designate the material to be used for Subgrade Enclosure Wall Construction. A A Cast-in-Place Concrete Subgrade Enclosure Wall Construction Unit Masonry Subgrade Enclosure Wall Construction This use of MasterFormat numbers as an extension for UniFormat is available for users who want to indicate direct relationships between the two organizational principles in the project information. The transition from project information organized according to UniFormat to one organized according to MasterFormat may be made easier by using MasterFormat extensions. If MasterFormat number extensions have been added, the document organized according to UniFormat may be searched or sorted according to those MasterFormat extensions to regroup information according to MasterFormat. This may help reveal additional information, for example, a list of all elements of castin-place concrete construction in the project. USING UNIFORMAT ARRANGING COST INFORMATION The list of elements or systems serves as a basis to organize cost information. Cost information may be reported in varying degrees of detail; as design decisions are made, the information can be refined. This arrangement of cost information allows for the comparison of various building elements and evaluation of alternative technical solutions, particularly during early design phases. The UniFormat cost model can evolve along with a cost model organized according to MasterFormat. These two cost models render different views of the same project and provide details appropriate for different requirements. For example, a cost model organized by UniFormat can provide information about the cost of a concrete structure compared with a steel structure, even though there will be more concrete or steel on the project. UniFormat provides cost comparison information for the structural function so that the value, cost, and time scheduling of various structural solutions may be evaluated. In comparison, a cost model organized by MasterFormat can provide information about the cost of all the concrete and steel on a project regardless of the structural system chosen. Value analysis requires a consistent naming scheme carried throughout the project. UniFormat is particularly useful for value analysis, which requires attaching a cost to a particular use or facility function rather than to particular products and activities. Using MasterFormat in combination with element designations organized by UniFormat helps the value analyst evaluate value-analysis change proposals. The Related Activities categories in UniFormat may be included with the appropriate functional elements in formulating cost information. The items under Supplementary Components categories in UniFormat should be included with the functional elements as appropriate. ARRANGING PRELIMINARY PROJECT DESCRIPTIONS Preliminary project descriptions are described in the CSI publication PPDFormat: A Guide to Developing Preliminary Project Descriptions. A preliminary project description helps the owner understand the various components and systems proposed by the designer for the project. It also serves a requirement normally included in a design services agreement in which the designer must submit a report after completing the schematic design before proceeding to design development. These descriptions may be supported by, and serve as a basis of, an estimate of probable construction costs. 7

14 UNIFORMAT APPLICATION GUIDE UniFormat provides a logical sequence of elements to describe a construction project before all materials and methods have been determined. UniFormat is used to organize, and serves as a checklist for preparing, preliminary project descriptions at various levels of detail. As the design progresses, both descriptions and the estimate of probable construction cost can be refined. Thus Preliminary Project Descriptions can be used to document the early design process as it progresses. This can begin with the determination and recording of the performance requirements for the various functional elements. The potential technical solutions for value analysis can then be listed. Finally the selected solution and resulting components can be added. The above steps will not move at the same pace for the various functional elements. A Preliminary Project Description can be used to record that progress for the various functional elements so that an up-to-date progress report can be easily produced at any time. The Related Activities categories in UniFormat may be included with the appropriate functional elements in preparing Preliminary Project Descriptions or they may be kept separate. The items under Supplementary Components categories in UniFormat may be included with the appropriated functional elements or they can be described separately. ARRANGING PERFORMANCE BASED PROJECT MANUALS Arranging Project Manuals, or portions of them, according to UniFormat is appropriate when performance specifying is the method employed for all or some of the project. Performance specifying can be used at many levels, from a single product to major subsystems or entire projects. It allows the owner to access a range of options, from existing technology to innovative systems and developing technologies. Performance specifying encourages full bidding competition based on nonrestrictive requirements and, in its broadest application, is used for design-build projects. Whether the entire building or only a portion of it is specified using performance specifications, UniFormat can be used to organize performance specifications for elements crossing MasterFormat section and division boundaries. The Procurement Requirements and Contracting Requirements in the Introduction may be used for performance based contract documents. The General Requirements in Z General may be used for the same purpose. A checklist of some performance requirements has been added to many of the functional elements in this edition of UniFormat. These performance requirement checklists are not intended to be comprehensive or complete but to provide some examples. ORGANIZING DRAWINGS AND BIM OBJECT LIBRARIES UniFormat numbers and titles can be used as a file-naming convention for library files of standard details and schedules. The Uniform Drawing System (UDS) portion of the U.S. National CAD Standard (NCS) provides a detailed description for this application. 10 Similarly, UniFormat can be used to organize BIM element libraries. Library files are named differently from project files because the information requirements are different and demand different classification and indexing. Library file naming should be grouped by building systems, assemblies, or use because that is the most natural way to search for them. UniFormat is the best used for organizing and naming objects representing building systems and assemblies, otherwise known as functional elements. UniFormat s usefulness continues as the solutions to these elements are defined, but as the level of detail increases and more system components are identified, MasterFormat also becomes a useful tool for organizing project objects and information. Project detail and object files must also be organized to make it easy to produce 10 National Institute of Building Sciences. United States National CAD Standard, version 4.0. Washington, DC: NIBS, 2007, UDS-01.16, Library Files 8

15 UNIFORMAT APPLICATION GUIDE project contract documents, record documents, and facility management documents, possibly from multiple files, and organization by both UniFormat and MasterFormat make that possible. The NCS recommends an eight-character designator for naming CAD library schedule files. A numbering system based on UniFormat can be used for preliminary phases of a project. UniFormat numbers can be used during the construction documents phase for schedules made up of assemblies of materials that might otherwise have separate MasterFormat numbers. ARRANGING FACILITIES MANAGEMENT INFORMATION As UniFormat is used for preliminary project descriptions to communicate element concepts to a building owner, preliminary project descriptions can be refined and used to communicate the building's functional elements for real estate due-diligence reports and organizing maintenance and operation programs and data. UniFormat is an ideal organizational framework to describe systems design intent for facility commissioning purposes. UniFormat can be used to document how elements function. Preliminary project descriptions can be refined and can evolve through all design phases, ultimately making the commissioning authority's system performance testing and acceptance easier. Descriptions can then be used by the facility operators and maintenance personnel to store information about systems maintenance and operations. ARRANGING CONSTRUCTION MARKET INFORMATION Market information reporting agencies can use UniFormat to describe the facility being reported. UniFormat can also be used to assemble, store, and report information about elements separate from and in addition to reports on products and activities. This helps show trends for major elements containing products and activities crossing MasterFormat section and division boundaries. ARRANGING INFORMATION FOR DESIGN-BUILD APPLICATIONS Design-build project delivery has created a need for an organizational structure for communicating functional performance requirements, including organizing design-build requests for proposals. The requirements for a design-build proposal may also include some prescriptive requirements. To communicate project performance and prescriptive requirements to design-build entities in requests for proposals, owners must describe those requirements. In turn, design-build contractors must respond to performance requirements with proposed construction solutions in their proposals. UniFormat provides the organizational structure to describe performance and prescriptive requirements as well as for construction solution responses to those requirements. The Procurement Requirements and Contracting Requirements in the Introduction may be used for design-build contract documents. The General Requirements in Z General may be used for the same purpose. A checklist of some performance requirements has been added to many of the functional elements in this edition of UniFormat. These performance requirement checklists are not intended to be comprehensive or complete but to provide some examples. 9

16

17 LEVELS ONE THROUGH THREE NUMBERS AND TITLES INTRODUCTION 10 PROJECT DESCRIPTION 1010 Project Summary 1020 Project Program 1030 Project Criteria 1040 Existing Conditions 1050 Owner s Work 1090 Funding 20 OWNER DEVELOPMENT 2010 Site Acquisition 2020 Permits 2030 Professional Services 2050 Other Activities 2080 Budget Project Contingencies 2090 Budget Financing 30 PROCUREMENT REQUIREMENTS 3010 Project Delivery 3020 Solicitation 3030 Instructions for Procurement 3040 Available Project Information 3050 Procurement Forms and Supplements 40 CONTRACTING REQUIREMENTS 4010 Contracting Forms and Supplements 4020 Project Forms 4030 Conditions of the Contract 4040 Revisions, Clarifications, and Modifications 11

18 LEVELS ONE THROUGH THREE NUMBERS AND TITLES ELEMENT A SUBSTRUCTURE A10 FOUNDATIONS A1010 Standard Foundations A1020 Special Foundations A20 SUBGRADE ENCLOSURES A2010 Walls for Subgrade Enclosures A40 SLABS-ON-GRADE A4010 Standard Slabs-on-Grade A4020 Structural Slabs-on-Grade A4030 Slab Trenches A4040 Pits and Bases A4090 Slab-On-Grade Supplementary Components A60 WATER AND GAS MITIGATION A6010 Building Subdrainage A6020 Off-Gassing Mitigation ELEMENT A90 A9010 A9020 A9030 A9040 B SHELL B10 B1010 B1020 B1080 B20 B2010 B2020 B2050 B2070 B2080 B2090 B30 B3010 B3020 B3040 B3060 B3080 SUBSTRUCTURE RELATED ACTIVITIES Substructure Excavation Construction Dewatering Excavation Support Soil Treatment SUPERSTRUCTURE Floor Construction Roof Construction Stairs EXTERIOR VERTICAL ENCLOSURES Exterior Walls Exterior Windows Exterior Doors and Grilles Exterior Louvers and Vents Exterior Wall Appurtenances Exterior Wall Specialties EXTERIOR HORIZONTAL ENCLOSURES Roofing Roof Appurtenances Traffic Bearing Horizontal Enclosures Horizontal Openings Overhead Exterior Enclosures 12 ELEMENT C INTERIORS C10 INTERIOR CONSTRUCTION C1010 Interior Partitions C1020 Interior Windows C1030 Interior Doors C1040 Interior Grilles and Gates C1060 Raised Floor Construction C1070 Suspended Ceiling Construction C1090 Interior Specialties C20 INTERIOR FINISHES C2010 Wall Finishes C2020 Interior Fabrications C2030 Flooring C2040 Stair Finishes C2050 Ceiling Finishes C2090 Interior Finish Schedules

19 LEVELS ONE THROUGH THREE NUMBERS AND TITLES ELEMENT D SERVICES D10 CONVEYING D1010 Vertical Conveying Systems D1030 Horizontal Conveying D1050 Material Handling D1080 Operable Access Systems D20 D2010 D2020 D2030 D2050 D2060 D30 D3010 D3020 D3030 D3050 D3060 D3070 D40 D4010 D4030 D50 D5010 D5020 D5030 D5040 D5080 D60 D6010 D6020 D6030 D6060 D6090 D70 D7010 D7030 D7050 D7070 D7090 D80 D8010 PLUMBING Domestic Water Distribution Sanitary Drainage Building Support Plumbing Systems General Service Compressed-Air Process Support Plumbing Systems HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Facility Fuel Systems Heating Systems Cooling Systems Facility HVAC Distribution Systems Ventilation Special Purpose HVAC Systems FIRE PROTECTION Fire Suppression Fire Protection Specialties ELECTRICAL Facility Power Generation Electrical Service and Distribution General Purpose Electrical Power Lighting Miscellaneous Electrical Systems COMMUNICATIONS Data Communications Voice Communications Audio-Video Communication Distributed Communications and Monitoring Communications Supplementary Components ELECTRONIC SAFETY AND SECURITY Access Control and Intrusion Detection Electronic Surveillance Detection and Alarm Electronic Monitoring and Control Electronic Safety and Security Supplementary Components INTEGRATED AUTOMATION Integrated Automation Facility Controls ELEMENT E EQUIPMENT AND FURNISHINGS E10 EQUIPMENT E1010 Vehicle and Pedestrian Equipment E1030 Commercial Equipment E1040 Institutional Equipment E1060 Residential Equipment E1070 Entertainment and Recreational Equipment E1090 Other Equipment E20 E2010 E2050 FURNISHINGS Fixed Furnishings Movable Furnishings 13

20 LEVELS ONE THROUGH THREE NUMBERS AND TITLES ELEMENT F SPECIAL CONSTRUCTION AND DEMOLITION F10 SPECIAL CONSTRUCTION F1010 Integrated Construction F1020 Special Structures F1030 Special Function Construction F1050 Special Facility Components F1060 Athletic and Recreational Special Construction F1080 Special Instrumentation F20 F2010 F30 F3010 F3030 F3050 FACILITY REMEDIATION Hazardous Materials Remediation DEMOLITION Structure Demolition Selective Demolition Structure Moving ELEMENT G SITEWORK G10 SITE PREPARATION G1010 Site Clearing G1020 Site Elements Demolition G1030 Site Element Relocations G1050 Site Remediation G1070 Site Earthwork G20 G2010 G2020 G2030 G2040 G2050 G2060 G2080 G30 G3010 G3020 G3030 G3050 G3060 G3090 G40 G4010 G4050 G50 G5010 G90 G9010 SITE IMPROVEMENTS Roadways Parking Lots Pedestrian Plazas and Walkways Airfields Athletic, Recreational, and Playfield Areas Site Development Landscaping LIQUID AND GAS SITE UTILITIES Water Utilities Sanitary Sewerage Utilities Storm Drainage Utilities Site Energy Distribution Site Fuel Distribution Liquid and Gas Site Utilities Supplementary Components ELECTRICAL SITE IMPROVEMENTS Site Electric Distribution Systems Site Lighting SITE COMMUNICATIONS Site Communications Systems MISCELLANEOUS SITE CONSTRUCTION Tunnels ELEMENT Z GENERAL Z10 GENERAL REQUIREMENTS Z1010 Price and Payment Procedures Z1020 Administrative Requirements Z1040 Quality Requirements Z1050 Temporary Facilities and Controls Z1060 Product Requirements Z1070 Execution and Closeout Requirements Z1090 Life Cycle Activities 14

21 LEVELS ONE THROUGH THREE NUMBERS AND TITLES Z70 Z7010 Z7030 Z7050 Z7070 Z90 Z9010 Z9030 Z9050 Z9090 TAXES, PERMITS, INSURANCE AND BONDS Taxes License Fees Permit Costs Bond Fees FEES AND CONTINGENCIES Overhead Profit Construction Contingencies Financing Costs 15

22

23 MASTER LIST OF NUMBERS, TITLES, EXPLANATIONS, AND RELATED MasterFormat NUMBERS INFORMATION The left column includes the master list of UniFormat numbers and titles in Levels 1-4 and subsequent titles. The middle column includes related 6-digit classification numbers of MasterFormat. Not all of the items have related MasterFormat numbers. The right column includes general descriptions of the Level 4 categories. The explanation together with the detailed listings in the left column under each Level 4 category provide an understanding of the scope of the Level 4 category. Under the headings "See also" are lists of other categories in UniFormat which contain elements of work related to the Level 4 category. 17

24

25 INTRODUCTION 10 PROJECT DESCRIPTION General Requirements: Z Project Summary Includes: Brief summary of overall project and each facility that comprises the project Summary of Work Multiple Contract Summaries Work Restrictions Project Program Includes: Description of scope, size, scale, and quality of the project. Includes regulatory requirements, such as applicable codes and other standards that are to govern the design and construction Site Program Includes: Description of site development and design requirements, and desired quality. Includes related data sheets used to identify specific program requirements for each site improvement Facility Program Includes: Description of required spaces, sizes, quality, materials, relationships, and design requirements. Includes related data sheets used to identify specific program requirements Project Criteria Includes: Project design criteria as imposed by zoning, code, and other legal requirements. Includes other criteria for the design of the project including sustainable design and historic restoration criteria Zoning Requirements Zoning Permits: Planned Unit Development Requirements Planned Unit Development: Code Analysis Design Loads Sustainable Design Requirements Sustainable Design Reporting: Z Sustainable Design Closeout Documentation: Z Facility Environmental Requirements Indoor Air Quality Requirements Indoor Air Quality Procedures: Z Historic Restoration Requirements Selective Historic Demolition: F

26 INTRODUCTION Historic Treatment Procedures: Z Existing Conditions Includes: Summary of existing conditions that affect development of a project or facilities comprising a project. Existing Condition Information: Assessment Surveys Existing Conditions Assessment Exiting Material Assessment Hazardous Material Assessment Environmental Assessment Information: Existing Material Information: Existing Hazardous Material Information: Subsurface Investigation Geophysical Investigations Geotechnical Investigations Geophysical Data: Geotechnical Data: Owner s Work Includes: Summary of work to be completed separately by the owner or separate contractors. Includes work that is performed before, during, or after the work of the project Funding Includes: Summary of owner's project funding information Budget Includes: Summary of the owner's project budget Sources Includes: Summary of the owner's project funding sources Cash Flow Includes: Summary of the owner's project cash flow requirements or projections. 20 OWNER DEVELOPMENT 2010 Site Acquisition Includes: Summary of the owner s securing of the project site Site Purchase Site Lease Rights-of-Way and Easements 2020 Permits Includes: Permits and approvals required for design and construction. Permit Costs: Z Zoning Permits Zoning Requirements: Planned Unit Development Planned Unit Development Requirements:

27 INTRODUCTION Building Permits Permit Application: Regulatory Required Permits Professional Services Includes: Summary of professional services to be retained by the owner Project Managers Design Professionals Architects Structural Engineers Mechanical, Electrical, and Plumbing Engineers Landscape Architects Civil Engineers Interior Designers Other Consultants Surveyors Geotechnical Engineers Commissioning Agents Sustainable Design Consultants Testing Laboratories Special Inspectors Attorneys Land/Project Development 2050 Other Activities Includes: Summary of owner s other miscellaneous activities in support of project Advertising and Promotion Relocations Moving Disruptions Temporary Relocations Rezoning Code Appeals and Variances Budget Project Contingencies Budget Design Contingencies Includes: Risk factor applied to the project budget to compensate for extent of available design definition. Design Contingencies: Z Budget Construction Contingencies Includes: Risk factor applied to the project budget to compensate for degree of unknown or unforeseeable construction conditions Budget Unforeseen Subsurface Conditions Includes: Risk factor applied to the project budget to compensate for degree of unforeseeable subsurface conditions Budget Project Delays Includes: Risk factor applied to the project budget to compensate for degree of unforeseeable subsurface conditions Budget Financing Includes: Summary of owner s budget for financing of the project. Financing Costs: Z Construction Loans Permanent Loans 21

28 INTRODUCTION 30 PROCUREMENT REQUIREMENTS Project Delivery Project Delivery Methods Includes: Description of project delivery method such as general contract, multiple prime contracts, construction management, designbuild, or integrated project delivery. Includes qualifications solicitation, qualifications statements, project approach, and project team. Design-Bid Build Design-Negotiate Build Construction Management Construction Manager as Advisor (CMa) Construction Manager as Constructor (CMc) Design-Build Standard Bridging Owner-Build Integrated Project Delivery Project Alliances Single Purposed Entities Relational Contracts Number of Construction Contracts Includes: Listing and scope of construction contracts. Single Contract Multiple Contracts Methods of Payment Includes: Description of methods of payment. Stipulated Sum Unit Price Cost Plus a Fee Cost Plus a Fee with a Guaranteed Maximum Price (GMP) 3020 Solicitation Includes: Project information to attract qualified bidders or proposers Advertisements and Invitations Instructions for Procurement Includes: Conditions affecting the award of the contract and procedures with which bidders and proposers must comply Instructions Supplementary Instructions Procurement Definitions Procurement Scopes Procurement Meetings

29 INTRODUCTION Procurement Substitution Procedures Available Project Information Includes: Information that is made available to bidders, proposers, or contractors but that is not normally intended to be included in the contact documents Preliminary Schedules Project Budget Information Existing Condition Information Existing Conditions: Survey Information Environmental Assessment Information Existing Material Information Existing Hazardous Material Information Assessment: Geophysical Data Geotechnical Data Subsurface Investigation: Permit Application Building Permits: Procurement Forms and Supplements Includes: Forms and supplements for submitting bids or proposals Bid Forms Proposal Forms Procurement Form Supplements Representations and Certifications CONTRACTING REQUIREMENTS Contracting Forms and Supplements Includes: Contract Forms and attachments Notice of Award Agreement Forms Agreement Form Supplements Notice to Proceed Project Forms Includes: Includes forms related to contracting requirements Bond Forms Certificates and Other Forms Clarification and Modification Forms Closeout Forms Conditions of the Contract Includes: Rights, responsibilities, and relationships of the parties to a construction contract Contracting Definitions General Conditions Supplementary Conditions Revisions, Clarifications, and Modifications Includes: Filing and documentation of revisions, clarifications, and modifications to the construction documents Precontract Revisions Record Clarifications and Proposals Record Modifications

30

31 A SUBSTRUCTURE Facility Substructure Performance Requirements A10 FOUNDATIONS Foundations Performance Requirements Load Capacity Settlement A1010 Standard Foundations Includes: Formwork, concrete, masonry and reinforcement. Includes Standard Foundation Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Substructure Excavation: A9010. Construction Dewatering: A9020. Excavation Support Systems: A9030. Backfill and Compaction: A Soil Treatment: A9040. A Wall Foundations Continuous Footings Cast-In-Place Concrete Foundation Walls Cast-In-Place Concrete Precast Concrete Unit Masonry Treated Wood Foundations Subdrainage Systems: A6010. A Column Foundations Spread Footings Cast-In-Place Concrete Column Piers Cast-In-Place Concrete A Standard Foundation Supplementary Components Includes: Void forms, dampproofing and Insulation, to be included with standard foundation elements above as appropriate. Void Forms Dampproofing Insulation A1020 Special Foundations May Include: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Substructure Excavation: A9010. Construction Dewatering: A9020. Excavation Support Systems: A9030. Backfill and Compaction: A Soil Treatment: A9040. A Driven Piles Includes: Piles, pile driving, pile cut off, pile testing. 25

32 A SUBSTUCTURE A Bored Piles Includes: Drilling, casing, bell bottom excavation, dewatering, removal of excavated materials, reinforcing, and concrete. A Caissons Includes: Sunken or driven load-bearing enclosures to protect excavation for foundations, promote substructure construction, and become part of permanent structure. A Special Foundation Walls Includes: Foundation walls of a special design. A Foundation Anchors Includes: Anchor assemblies to fasten deep foundations, walls, and similar element to rock or other material. A Underpinning Includes: Replacing a structural element s foundation while the structural element remains in place. Excavation Support Systems: A9030. A Raft Foundations Includes: Fine grading, subbase layer, mud slab, insulation, vapor retarder, waterproofing, formwork, expansion joints, control joints, reinforcement, concrete, and finishing. Cast-In-Place Concrete Slab-On-Grade Supplementary Components: A4090. A Pile Caps Includes: Formwork, reinforcement, and concrete. Cast-In-Place Concrete A Grade Beams Includes: Formwork, reinforcement, and concrete. Cast-In-Place Concrete A20 SUBGRADE ENCLOSURES Basement Construction Performance Requirements Thermal Resistance Lateral Earth Pressures Water Vapor Transmission Resistance A2010 Walls for Subgrade Enclosures Includes: Perimeter walls enclosing building space below grade. Includes formwork, reinforcing, concrete and masonry. Includes Subgrade Enclosure Wall Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Substructure Excavation: A9010. Construction Dewatering: A9020. Excavation Support Systems: A9030. Backfill and Compaction: A Soil Treatment: A9040. A Subgrade Enclosure Wall Construction Cast-In-Place Concrete Precast Concrete Unit Masonry

33 A SUBSTUCTURE A Subgrade Enclosure Wall Interior Skin Plaster and Gypsum Board Wall Finishes: C2010. A Subgrade Enclosure Wall Supplementary Components Includes: Dampproofing, waterproofing, insulation, and vapor retarders to be included with subgrade enclosure wall elements above as appropriate. Dampproofing Waterproofing Insulation Vapor Retarder Perimeter Insulation: A Waterproofing below Slabs on Grade: A Subdrainage Systems: A6010. A40 SLABS-ON-GRADE Slabs-On-Grade Performance Requirements Load Capacity Thermal Resistance Water Vapor Transmission Resistance Levelness A4010 Standard Slabs-on-Grade Includes: Slab construction supported continuously by earth or compacted fill. Includes fine grading, subbase layer, mud slab, insulation, vapor retarder, waterproofing, formwork, expansion joints, control joints, reinforcement, concrete, and finishing. Includes: Slabs-On-Grade Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. Cast-In-Place Concrete Substructure Excavation: A9010. Construction Dewatering: A9020. Excavation Support Systems: A9030. Backfill and Compaction: A Soil Treatment: A9040. Subgrade Enclosure Wall Waterproofing: A Flooring: C2030. A4020 Structural Slabs-on-Grade Includes: Self-supporting slab construction not supported continuously by earth or compacted fill. Includes formwork, accessories, reinforcement, concrete, and finishing. Includes Slabs-On-Grade Supplementary Components as appropriate. May Include: Related Activities: Excavation, dewatering, excavation support systems, backfill and compaction, and soil treatment. 27

34 A SUBSTUCTURE Cast-In-Place Concrete Floor Structural Frame: B1010. Flooring: C2030. A4030 Slab Trenches Includes: Linear depressions in slabs on grade to collect and transmit liquids. Includes excavation, formwork, accessories, reinforcement, concrete, finishing, and trench cover. Cast-In-Place Concrete A4040 Pits and Bases Includes: Depressions in slabs on grade or protrusions above slabs on grade. Includes formwork, accessories, reinforcement, concrete, finishing, pit covers, and anchor bolts. Cast-In-Place Concrete A4090 Slab-On-Grade Supplementary Components Includes: Insulation, vapor retarder, waterproofing, mud slabs, and subbase layer to be included with slab-on-grade elements above as appropriate. A Perimeter Insulation A Vapor Retarder A Waterproofing A Mud Slab A Subbase Layer A60 WATER AND GAS MITIGATION A6010 Building Subdrainage Includes: Systems to collect moisture and water below grade usually located at perimeter of structure or below slabs. Includes excavation, perforated pipe, drainage boards, granular fill, filter fabrics, and connection to storm sewerage systems or to daylight. Subdrainage Systems Performance Requirements Building Support Plumbing Systems: D2030. Retaining Wall Drainage: G Site Subdrainage: G A Foundation Drainage A Underslab Drainage Retaining Walls: G2060. A6020 Off-Gassing Mitigation Includes: Mitigation of gases from underground sources. Off-Gassing Mitigation Performance Requirements A Radon Mitigation A Methane Mitigation A90 SUBSTRUCTURE RELATED ACTIVITIES May be included with any other substructure element above. A9010 Substructure Excavation Includes: Excavation for structures below grade. 28

35 A SUBSTUCTURE A Backfill and Compaction Includes: Placing backfill and compacting fill in excess excavation for structures below grade. Backfill and Compaction Performance Compaction Site Earthwork: G1070. A9020 Construction Dewatering Includes: Removal of excessive water during construction operations. Construction Dewatering Performance Requirements A9030 Excavation Support Includes: Cribbing, anchors, and other means of permanent and temporary support of excavations. Excavation Support Performance Requirements Lateral Earth Pressures Underpinning: A A Anchor Tiebacks Includes: Anchor assemblies to support Excavation Soil Anchors Excavation Rock Anchors A Cofferdams Includes: Watertight enclosure that allow construction operation below the surface of water. Sheet Piling Cofferdams Timber Cofferdams Precast Concrete Cofferdams A Cribbing and Walers Includes: Structural members to line and support the lining of an excavation. Timber Cribwork A Ground Freezing Includes: Stabilizing earthwork by freezing. A Slurry Walls Includes: Subsurface barriers constructed of trenches filled with a slurry mixture to impede or stop groundwater flow. Bentonite Slurry Walls Attipulgite Slurry Walls Slurry-Geomembrane Composite Slurry Walls Lean Concrete Slurry Walls Bio-Polymer Trench Drain A9040 Soil Treatment Includes: Soil treatments to resist invasion of adjoining structure by pests and growth of vegetation. Rodent Control Rodent Control Devices: C Termite Control Vegetation Control Site Soil Treatment: G

36

37 B SHELL Facility Shell Performance Requirements B10 SUPERSTRUCTURE Superstructure Performance Requirements Special Structures: F1020. B1010 Floor Construction Floor Construction Performance Requirements Load Capacity Deflection Vibration Fire Rating Sound Transmission Levelness Thermal Resistance Water Vapor Transmission Resistance B Floor Structural Frame Includes: Structural elements required for support of floor construction within basements and above grade. Includes columns, girders, beams, trusses, joists. Includes cast-in-place concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Includes framed and sleeved openings for services. Includes Floor Construction Supplementary Components as appropriate. Columns Supporting Floors Cast-In-Place Concrete Precast Concrete Unit Masonry Structural Metal Framing Wood Framing Heavy Timber Construction Glued-Laminated Columns Structural Plastics Floor Girders and Beams Cast-In-Place Concrete Precast Concrete Structural Metal Framing Steel Joist Girder Framing Wood Framing Heavy Timber Construction Glued-Laminated Beams Structural Plastics Floor Trusses Structural Metal Framing Cold-Formed Metal Trusses Wood Framing Heavy Timber Trusses Shop-Fabricated Wood Trusses Floor Joists Metal Joists Cold-Formed Metal Joist Framing Wood Framing

38 B SHELL Wood-I-Joists Metal-Web Wood Joists Walls for Subgrade Enclosures: A2010. Exterior Load-Bearing Walls: B2010. Interior Load-Bearing Walls: C1010. B Floor Decks, Slabs, and Toppings Includes: Structural slab, deck, and sheathing floor construction at intermediate floors of basement construction and above grade. Includes cast-in-place concrete, precast concrete, cementitious decks and toppings, metal decking, wood sheathing, and wood decking. Includes framed and sleeved penetrations for services and housekeeping pads for equipment. Includes Floor Construction Supplementary Components as appropriate. Cast-In-Place Concrete Precast Concrete Cast Decks and Underlayment Metal Decking Acoustical Metal Decking Raceway Decking Assemblies Structural Panels Wood Decking Sheathing Glued-Laminated Construction Plastic Decking Composite Decking Raised Floor Construction: C1060. Flooring: C2030. B Balcony Floor Construction Includes: Structural frame and decks, slabs, and sheathing for balcony construction. Includes framed and sleeved penetrations for services and housekeeping pads for equipment. Includes Floor Construction Supplementary Components as appropriate. Cast-In-Place Concrete Precast Concrete Glass Unit Masonry Structural Metal Framing Metal Joists Metal Balconies Wood Framing Structural Panels Heavy Timber Construction Wood Decking Sheathing Shop-Fabricated Structural Wood Glued-Laminated Construction Structural Plastics

39 B SHELL Composite Decking Exterior Balcony Railings: B2080. Traffic Bearing Coatings: B3040. Exterior Ceilings and Soffits: B3080. Interior Railings: C1090. Flooring: C2030. B Mezzanine Floor Construction Includes: Structural frame and decks, slabs, and sheathing for mezzanine construction. Includes framed and sleeved penetrations for services and housekeeping pads for equipment. Includes Floor Construction Supplementary Components as appropriate. Cast-In-Place Concrete Precast Concrete Glass Unit Masonry Structural Metal Framing Metal Joists Wood Framing Structural Panels Heavy Timber Construction Wood Decking Sheathing Shop-Fabricated Structural Wood Glued-Laminated Construction Structural Plastics Composite Decking Interior Railings: C1090. Flooring: C2030. Modular Mezzanines: F B Ramps Includes: Structural frame and decks, slabs, and sheathing for ramp construction. Cast-In-Place Concrete Precast Concrete Structural Metal Framing Metal Joists Metal Ramps Wood Framing Structural Panels Heavy Timber Construction Wood Decking Sheathing Shop-Fabricated Structural Wood Glued-Laminated Construction Structural Plastics Composite Decking Interior Railings and Handrails: C1090. Flooring: C2030. B Floor Construction Supplementary Components Includes: Vapor retarders, air barriers, insulation, fireproofing, firestopping, expansion control, sound, vibration, and seismic control to be included with floor construction elements above as appropriate. 33

40 B SHELL Grouting Vapor Retarder Air Barrier Insulation Fireproofing Plaster Fireproofing: C2010 and C2050. Gypsum Board Fireproofing: C2010 and C2050. Firestopping Expansion Control Sound, Vibration, and Seismic Control B1020 Roof Construction Roof Construction Performance Requirements Load Capacity Fire Rating Sound Transmission Thermal Resistance Vapor Transmission Resistance B Roof Structural Frame Includes: Structural elements required for support of roof construction. Includes columns, girders, beams, trusses, and joists. Includes cast-in-place concrete, precast concrete, unit masonry, metal framed, and wood framed systems. Includes framed and sleeved openings for services. Includes Roof Construction Supplementary Components as appropriate. 34 Columns Supporting Roofs Cast-In-Place Concrete Precast Concrete Unit Masonry Structural Metal Framing Wood Framing Heavy Timber Construction Glued-Laminated Columns Structural Plastics Roof Girders and Beams Cast-In-Place Concrete Precast Concrete Structural Metal Framing Steel Joist Girder Framing Wood Framing Heavy Timber Construction Glued-Laminated Beams Structural Plastics Roof Trusses Structural Metal Framing Cold-Formed Metal Trusses Wood Framing Heavy Timber Trusses Shop-Fabricated Wood Trusses Roof Joists Metal Joists Cold-Formed Metal Joist Framing Wood Framing Wood-I-Joists

41 B SHELL Metal-Web Wood Joists Exterior Load-Bearing Walls: B2010. Interior Load-Bearing Partitions: C1010. B Roof Decks, Slabs, and Sheathing Includes: Structural roof deck, slab, and sheathing construction. Includes cast-in-place concrete, precast concrete, cementitious decks and toppings, metal decking, wood sheathing, wood decking, timber decking and expansion control. Includes framed and sleeved penetrations for services and housekeeping pads for equipment. Includes Roof Construction Supplementary Components as appropriate. Cast-In-Place Concrete Precast Concrete Cast Decks and Underlayment Lightweight Concrete Roof Insulation Metal Decking Acoustical Metal Decking Raceway Decking Assemblies Structural Panels Wood Decking Sheathing Glued-Laminated Construction Plastic Decking Composite Decking Roofing: B3010. B Canopy Construction Includes: Structural frame and decks, slabs, and sheathing for canopy construction. Cast-In-Place Concrete Precast Concrete Structural Metal Framing Canopy Support Truss Assemblies Metal Joists Wood Framing Structural Panels Heavy Timber Construction Wood Decking Sheathing Shop-Fabricated Structural Wood Glued-Laminated Construction Structural Plastics Composite Decking Canopy Roofing: B Exterior Ceilings and Soffits: B3080. Manufactured Canopies: F B Roof Construction Supplementary Components Includes: Vapor retarders, air barriers, insulation, fireproofing, firestopping, and expansion control to be included with roof construction elements above as appropriate. Grouting Vapor Retarder

42 B SHELL Air Barrier Insulation Fireproofing Plaster Fireproofing: C2010 and C2050. Gypsum Board Fireproofing: C2010 and C2050. Firestopping Expansion Control Roofing Vapor Retarder and Insulation: B B1080 Stairs Includes: Stairs, fire escapes, metal walkways, and ladders. Stairways Performance Requirements Load Capacity B Stair Construction Includes: Structural framing for exterior and interior stairs including treads, risers, and landings. Includes fire escapes and ladders. Concrete Stair Forming Cast-In-Place Concrete Precast Concrete Stairs Precast Concrete Stair Treads Metal Stairs Metal Stair Treads and Nosings Decorative Metal Stairs Wood Stairs Stair Finishes: C2040. Retractable Stairs: E Exterior Steps and Ramps: G2030. B Stair Soffits Plaster and Gypsum Board Ceiling Finishes: C2050. B Stair Railings Wire Rope Railings Metal Railings Decorative Metal Railings Wood Railings Plastic Railings Composite Railings Exterior Railings: B Interior Railings: C1090. B Fire Escapes B Metal Walkways Includes: Catwalks and gratings over horizontal openings. Metal Catwalks Metal Gratings B Ladders Roof Ladders: B Elevators: D

43 B SHELL B20 EXTERIOR VERTICAL ENCLOSURES Vertical Exterior Enclosure Performance Sustainable Design Requirements B2010 Exterior Walls Includes: Exterior Wall Supplementary Components as appropriate. Includes Exterior Wall Opening Supplementary Components as appropriate. Exterior Walls Performance Requirements Wind Load Capacity Fire Rating Thermal Resistance Vapor Transmission Resistance Air Infiltration Resistance Sound Transmission Exterior Windows: B2020. Exterior Doors and Grilles: B2050. Exterior Louvers and Vents: B2070. Exterior Wall Appurtenances: B2080. B Exterior Wall Veneer Includes: Nonstructural outside face elements of exterior walls. Includes precast concrete veneer, unit masonry veneer, exterior insulation and finish systems, manufactured siding, and stucco. Includes water repellents, coatings, and painting. Precast Concrete Unit Masonry Masonry Veneer Exterior Stone Cladding Stone Masonry Veneer Manufactured Masonry Façade Support Truss Assemblies Exterior Finish Carpentry Simulated Stone Water Repellents Exterior Insulation and Finish Systems Wall Panels Faced Panels Siding Cement Plastering Cement Stucco Painting and Coating B Exterior Wall Construction Includes: Exterior wall construction including backup systems for wall veneer. May be vertical load bearing. Includes cast-in-place concrete walls, precast concrete walls, unit masonry walls, metal framed wall systems, and wood framed wall systems. Cast-In-Place Concrete Precast Concrete Unit Masonry Structural Metal Stud Framing Wood Framing Structural Panels Sheathing

44 B SHELL B Exterior Wall Interior Skin Includes: Materials to provide finish or protective covering on inside of face of exterior walls. May include insulation and vapor retarder. Plaster and Gypsum Board Wall Finishes: C2010. B Fabricated Exterior Wall Assemblies Includes: Manufactured or fabricated assemblies that include exterior veneer and wall construction within one fabricated assembly and may also include interior skin. Includes Exterior Wall Supplementary Components as appropriate. Unit Masonry Panels Fabricated Wall Panel Assemblies Fabricated Faced Panel Assemblies Curtain Wall Assemblies Translucent Wall Assemblies Window Wall: B B Parapets Includes: Exterior wall construction above plane of roof. Includes Exterior Wall Veneers. Cast-In-Place Concrete Precast Concrete Unit Masonry Structural Metal Stud Framing Wood Framing Structural Panels Sheathing Exterior Wall Veneer: B B Equipment Screens Includes: Exterior wall construction to screen equipment from public view. Includes Exterior Wall Veneers. Precast Concrete Unit Masonry Louvered Equipment Enclosures Exterior Wall Veneer: B Exterior Fixed Grilles and Screens: B B Exterior Wall Supplementary Components Includes: Weather barriers, vapor retarders, air barriers, insulation, and expansion joints to be included with exterior wall elements above as appropriate. Grouting Weather Barriers Vapor Retarder Air Barrier Insulation Expansion Joints B Exterior Wall Opening Supplementary Components Includes: Lintels, joint sealants, flashing, and sills to be included with exterior wall elements above as appropriate. Lintels Joint Sealants Flashing Sills 38

45 B SHELL B2020 Exterior Windows Includes: Fixed or operable windows used singly and in multiples located in the exterior vertical enclosure. Includes Exterior Window Supplementary Components as appropriate. Includes windows units with louver blinds integrally set between glass panels. Includes metal, wood, plastic, and composite window units. May Include: Wall Opening Supplementary Components as appropriate. Exterior Windows Performance Requirements Performance Class and Grade Wind Load Capacity Windborne Debris Resistance Thermal Resistance Condensation Resistance Water Resistance Air Infiltration Shading Coefficient Solar Heat Gain Coefficient Visible Light Transmittance Sound Transmission Forced Entry Resistance Bullet Resistance Radio-Frequency-Interference Protection Radiation Protection Pressure Resistance Exterior Wall Opening Supplementary Components: B Exterior Opening Protection Devices: B Skylights: B Roof Windows: B Interior Windows: C1020. Window Treatments: E2010. B Exterior Operating Windows Includes: Window screens and storm windows. Window Screens Storm Windows B Exterior Fixed Windows B Exterior Window Wall Storefronts Curtain Wall Assemblies: B Interior Glazed Partitions: C

46 B SHELL B Exterior Special Function Windows Includes: Exterior windows with special characteristics for a special function. Interior Special Function Windows: C Exterior Pressure-Resistant Windows Pressure-Resistant Glazing Exterior Pressure-Resistant Doors: B Interior Pressure-Resistant Doors: C , Exterior Pass Windows Interior Pass Windows: C Exterior Radio-Frequency-Interference Shielding Windows Exterior Radio-Frequency- Interference Shielding Doors: B Interior Radio-Frequency- Interference Shielding Windows: C Interior Radio-Frequency- Interference Shielding Doors: C Exterior Radiation Shielding Windows Radiation-Resistant Glazing Exterior Radiation Shielding Doors: B Interior Radiation Shielding Windows: C Interior Radiation Shielding Doors: C Radiation Detection and Alarm: D Radiation Protection: F Exterior Security Windows Security Glazing Ballistics-Resistant Glazing Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z

47 B SHELL Exterior Detention Windows Exterior Detention Doors: B Interior Detention Windows: C Interior Detention Doors: C Detention Monitoring and Control: D7070. Detention Equipment: E Detention Cell Modules: F Metal Detention Enclosures: F Detention Project Procedures: Z Exterior Sound Control Windows Exterior Sound Control Doors: B , Interior Sound Control Windows: C Interior Sound Control Doors: C , B Exterior Window Supplementary Components Includes: Glazing, operating hardware, screens, and other accessories to be included with exterior window elements above as appropriate. Hardware Glazing Finishes Exterior Wall Opening Supplementary Components: B Exterior Opening Protection Devices: B B2050 Exterior Doors and Grilles Includes: Doors, grilles, and gates located in the exterior vertical enclosure. Includes screen and storm door assemblies. Includes Exterior Door Supplementary Components as appropriate. May Include: Wall Opening Supplementary Components as appropriate. Exterior Doors Performance Requirements Wind Load Capacity Thermal Resistance Air Infiltration Water Resistance Sound Transmission Forced Entry Resistance Bullet Resistance Radio-Frequency-Interference Protection Radiation Protection

48 B SHELL Pressure Resistance Exterior Wall Opening Supplementary Components: B Interior Doors: C1030. Interior Grilles: C1040. B Exterior Entrance Doors Includes: Exterior personnel door assemblies at exterior main entrances. Includes automatic, revolving, balanced, and other special operating entrance doors, and sliding storefront wall systems. Includes Exterior Door Supplementary Components as appropriate when not part of storefront or curtain wall system. Sliding Glass Doors All-Glass Entrances Automatic Entrances Revolving Door Entrances Balanced Door Entrances Sliding Storefronts Glazed Curtain Wall: B Exterior Window Wall: B Interior Entrance Doors: C B Exterior Utility Doors Includes: Exterior personnel doors assemblies other than at main entrances. Includes Exterior Door Supplementary Components as appropriate. B Exterior Oversize Doors Includes: Large exterior door assemblies to allow for passage of large objects involving a variety of operating methods. Includes Exterior Door Supplementary Components as appropriate including operators and drive mechanisms. Exterior Coiling Doors Exterior Panel Doors Exterior Sectional Doors Exterior Single-Panel Doors Exterior Multi-Leaf Vertical Lift Doors Exterior Telescoping Vertical Lift Doors Hangar Doors B Exterior Special Function Doors Includes: Exterior door assemblies for a variety of special functions and applications involving a variety of operating methods. Includes Exterior Door Supplementary Components as appropriate including controls and operators. Exterior Cold Storage Doors Cold Storage Rooms: F Exterior Industrial Doors

49 B SHELL Exterior Radio-Frequency-Interference Shielding Doors Exterior Radio-Frequency- Interference Shielding Windows: B Interior Radio-Frequency- Interference Shielding Windows: C Interior Radio-Frequency- Interference Shielding Doors: C Exterior Radiation Shielding Doors Radiation-Resistant Glazing Exterior Radiation Shielding Windows: B Interior Radiation Shielding Windows: C Interior Radiation Shielding Doors: C Radiation Detection and Alarm: D Radiation Protection: F Exterior Security Doors Security Glazing Ballistics-Resistant Glazing Exterior Security Windows: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Exterior Detention Doors Exterior Detention Windows: B Interior Detention Windows: Interior Detention Doors: C Detention Monitoring and Control: D7070. Detention Equipment: E Detention Cell Modules: F Metal Detention Enclosures: F Detention Project Procedures: Z

50 B SHELL Exterior Sound Control Doors Exterior Sound Control Windows: B Interior Sound Control Windows: C Interior Sound Control Doors: C Exterior Traffic Doors Interior Traffic Doors: C Exterior Pressure-Resistant Doors Exterior Pressure-Resistant Windows: B Interior Pressure-Resistant Doors: C Interior Special Function Doors: C B Exterior Grilles Includes: Exterior devices of open construction to provide moveable barrier to provide access through wall or other divider. Exterior Coiling Grilles Exterior Folding Grilles Exterior Fixed Grilles and Screens: B Interior Grilles: C B Exterior Gates Includes: Exterior devices of solid or open construction to provide moveable barrier to provide access through wall or other divider. Interior Gates: C Fences and Gates: G2060. Exterior Security Gates Exterior Security Windows: B Exterior Security Doors: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z B Exterior Door Supplementary Components Includes frames, hardware, glazing and louvers that are part of door to be included with exterior door elements above as appropriate. Frames Specialty Door Frames Door Hardware Door Glazing Door Louvers

51 B SHELL Finishes Interior Door Louvers: C B2070 Exterior Louvers and Vents Includes: Exterior louvers which are not an integral part of mechanical equipment, including louvers connected to ducts. B Exterior Louvers Exterior Louvers Performance Requirements Performance Rating Wind Load Capacity Free Area Air Performance Wind-Driven Rain Performance Sound Transmission Louvered Equipment Screens: B Exterior Door Louvers: B Interior Louvers: C Interior Door Louvers: C B Exterior Vents B2080 Exterior Wall Appurtenances B Exterior Fixed Grilles and Screens Includes: Exterior enclosures, grilles and screens of wood, metal, plastic, and other materials for a variety of purposes including screening of equipment. Decorative Metal Wood Screens Plastic Fabrications Composite Fabrications Equipment Screens: B Interior Screens: C1010. Site Screening Devices: G B Exterior Opening Protection Devices Includes: Manufactured items such as louvers, fins, shutters, demountable panels, awnings, and sun screens to provide sun control, privacy, security, insulation, and storm protection on exterior of windows, skylights, and entrances. Includes fixed and moveable, manually and electrically operated, and automatically controlled devices. Window Treatments: E2010. Exterior Protection Exterior Sun Control Devices Storm Panels Awnings B Exterior Balcony Walls and Railings Balcony Walls Cast-In-Place Concrete Precast Concrete Unit Masonry Structural Metal Stud Framing Wood Framing Includes: Complete balcony wall and railing assemblies. Includes cast-in-place concrete, 45

52 B SHELL Sheathing Exterior Wall Veneer: B Railings Metal Railings Decorative Metal Railings Wood Railings Plastic Railings Composite Railings Balcony Floor Construction: B Interior Railings: C1090. Stair Railings: B B Exterior Fabrications Includes: Exterior fabrications of a variety of materials formed to various profiles for a variety of purposes including column covers. Glass-Fiber-Reinforced Concrete Metal Fabrications Column Covers Decorative Metal Ornamental Woodwork Plastic Fabrications Simulated Stone Fabrications Composite Fabrications Plaster Fabrications Interior Fabrications: C2020. B Bird Control Devices Includes: Mechanical, electrical, physical, and chemical repellant systems, and protective devices. Pest Control Devices: C B2090 Exterior Wall Specialties Includes: Complete fabrication of metal, wood, and fiberglass, including accessories and appurtenances. Wall Specialties Exterior Clocks Below-Grade Egress Assemblies Window Wells Roof Specialties: B B30 B3010 EXTERIOR HORIZONTAL ENCLOSURES Horizontal Exterior Enclosure Performance Roofing Roofing Performance Requirements Sustainable Design Requirements Roof Construction: B

53 B SHELL B Steep Slope Roofing Includes: Lapped roofing shingles, shakes and roofing tiles, including fastening and flashing products and methods. Includes Roofing Supplementary Components as appropriate. Steep Roofing Performance Requirements Sustainable Design Requirements Fire Rating Exterior Fire-Test Exposure Wind Resistance Wind Uplift Resistance FMG Fire/Windstorm Rating FMG Hail Resistance Rating Impact Resistance Thermal Resistance Exposed Surface Solar Reflectance Energy Performance Water Vapor Transmission Resistance Roofing Weight Roofing Shingles and Shakes Roof Tiles Roof Panels Sheet Metal Roofing Sheet Metal Roofing Specialties Rainwater Management: B B Low-Slope Roofing Includes: Includes membrane roofing of various types and protected membrane roofing, including fastening and flashing products. Includes Roofing Supplementary Components as appropriate. Low-Slope Roofing Performance Requirements Sustainable Design Requirements Fire Rating Exterior Fire-Test Exposure Wind Uplift Resistance FMG Fire/Windstorm Rating FMG Hail Resistance Rating Thermal Resistance Exposed Surface Solar Reflectance Energy Performance Water Vapor Transmission Resistance Roofing Weight Low-Slope Roofing Membrane Protected Membrane Roofing Low-Slope Roofing Cover Roofing Ballast Roofing Gravel Roofing Pavers Roofing Coatings Vegetated Low-Slope Roofing Rainwater Management: B Traffic Bearing Horizontal Enclosures: B

54 B SHELL B Canopy Roofing Includes: Roofing of various types over canopies. Includes Roofing Supplementary Components as appropriate. Canopy Frame: B Exterior Ceilings and Soffits: B3080. Manufactured Canopies: F B Roofing Supplementary Components Includes: Substrate boards, vapor retarder, air barriers, deck insulation, flashing and sheet metal, and expansion joints to be included with roofing elements above as appropriate. Substrate Board Deck Insulation Vapor Retarder Air Barrier Sheet Metal Flashing and Trim Flexible Flashing Copings Counterflashing Systems Gravel Stops and Fascias Expansion Joints Lightweight Concrete Roof Insulation: B Roof Construction Vapor Retarders and Air Barriers: B Roof Construction Insulation: B Rainwater Management: B B3020 Roof Appurtenances Includes: Roof specialties and accessories installed on or in roofing or traffic bearing horizontal enclosure systems. Includes components for the management of rainwater. Includes accessories installed on and in roofing other than mechanical and structural items. Vents and Hatches: B B Roof Accessories Roof Ladders Ladders: B Roof Curbs Relief Vents Ridge Vents Roof Walkways Snow Guards B Roof Specialties Cupolas Spires Steeples Weathervanes Sheet Metal Roofing Specialties: B

55 B SHELL B Rainwater Management Includes: Components to manage rain water from roofing and traffic bearing horizontal enclosures. Conductor Heads Gutters Downspouts Scuppers Precast Concrete Splash Blocks Stormwater Drainage Piping System: D B3040 Traffic Bearing Horizontal Enclosures Includes: Horizontal enclosures that are also traffic bearing. Includes Horizontal Enclosure Supplementary Components as appropriate. Traffic Bearing Horizontal Enclosures Fire Rating Exterior Fire-Test Exposure Wind Uplift Resistance Thermal Resistance Water Vapor Transmission Resistance Slip Resistance System Weight Low Slope Roofing: B3010. Roof Appurtenances: B3020. Rainwater Management: B B Traffic Bearing Coatings Includes: Surface applied waterproofing exposed to weather and suitable for pedestrian or vehicular traffic. B Horizontal Waterproofing Membrane Includes waterproofing membranes of various types. Includes substrate board, deck insulation, vapor retarder, sheet metal flashing and trim, flexible flashing, and expansion joints. B Wear Surfaces Includes: Wearing surfaces on top of horizontal waterproofing membrane that are suitable for pedestrian or vehicular traffic. Roof Pavers Rigid Paving Unit Pavers B Horizontal Enclosure Supplementary Components Includes: Substrate board, deck insulation, vapor retarder, sheet metal flashing and trim, flexible flashing, and expansion joints to be included with horizontal enclosure elements above as appropriate. Substrate Board Deck Insulation Vapor Retarder Sheet Metal Flashing and Trim Flexible Flashing Copings Counterflashing Systems Gravel Stops and Fascias Expansion Joints Rainwater Management: B

56 B SHELL B3060 Horizontal Openings Includes: Openings in horizontal enclosures including roofing and traffic bearing horizontal enclosures. Includes Horizontal Opening Supplementary Components as appropriate. Horizontal Openings Performance Requirements B Roof Windows and Skylights Roof Window and Skylight Performance Load Capacity Concentrated Loads Deflection Thermal Resistance Solar Heat Gain Visible Light Transmittance Air Infiltration Resistance Roof Windows Includes: Operable and non-operable roof windows. Unit Skylights Includes: Skylights without framing with plastic and glass glazing. Framed Skylights Includes: Skylights with framing. Metal-Framed Skylights Plastic-Framed Skylights Skylight Protection and Screens Exterior Windows: B2020. B Vents and Hatches Includes: Other roof openings such as roof hatches, smoke vents, and gravity roof ventilators. Roof Hatches Smoke Vents Roof Appurtenances: B3020. Elevators: D B Horizontal Opening Supplementary Components Includes: Frames, hardware, glazing, flashing, and joint sealants to be included with horizontal opening elements above as appropriate. Frames Hardware Glazing Flashing Joint Sealants B3080 Overhead Exterior Enclosures Includes: Exposed to weather construction under horizontal enclosure construction. Includes suspension and support systems, insulation, vapor retarders, and air barriers. Overhead Exterior Enclosures Performance Wind Load Capacity Thermal Resistance Vapor Transmission Resistance Fire Rating B Exterior Ceilings Wall Panels Faced Panels Plaster and Gypsum Board Specialty Ceilings Textured Ceilings

57 B SHELL Painting and Coating Interior Suspended Ceiling Construction: C1070. B Exterior Soffits Soffit Panels Faced Panels Plaster and Gypsum Board Specialty Ceilings Textured Ceilings Painting and Coating Soffit Vents B Exterior Bulkheads Wall Panels Faced Panels Plaster and Gypsum Board Specialty Ceilings Textured Ceilings Painting and Coating

58

59 C INTERIORS Interiors Performance Requirement C10 INTERIOR CONSTRUCTION Interior Construction Performance Requirements C1010 Interior Partitions Interior Partitions Performance Requirements Lateral Load Capacity Fire Rating Sound Transmission Thermal Resistance Water Vapor Transmission Resistance Bullet Resistance Radio-Frequency-Interference Protection Radiation Protection Applied Wall Finishes: C2010. C Interior Fixed Partitions Includes: Enclosures and partitions which are fixed and secured in place. Includes walls of concrete; and masonry; and wood and metal stud partitions with associated wall surfaces. Includes partitions of an open nature, such as wire mesh partitions. Partitions may be load bearing or non-load bearing. Includes Interior Partition Supplementary Components as appropriate. Cast-In-Place Concrete Precast Concrete Unit Masonry Structural Metal Stud Framing Wood Framing Plaster and Gypsum Board Wire Mesh Partitions Compartments and Cubicles: C1090. C Interior Glazed Partitions Includes: Partitions primarily composed of glazed elements that may be fabricated or field constructed. Includes Interior Partition Supplementary Components as appropriate. Storefronts Exterior Window Walls: B C Interior Demountable Partitions Includes: Partitions which can be demounted and relocated with minimum of labor. Interior Demountable Partitions Performance Requirements Lateral Load Capacity Fire Rating Sound Transmission Flame Spread Index Smoke Developed Index Demountable Metal Partitions

60 C INTERIORS Demountable Wood Partitions Demountable Plastic Partitions Demountable Composite Partitions Demountable Gypsum Partitions C Interior Operable Partitions Includes: Track-supported, operable panels and partitions, top hung and floor supported, and manually and power operated. Includes auditorium partitions and dividers. Includes overhead supports. Interior Operable Partitions Performance Requirements Fire Rating Sound Transmission Noise Isolation Sound Adsorption Flame Spread Index Smoke Developed Index Accordion Folding Partitions Coiling Partitions Folding Panel Partitions Sliding Partitions Interior Sliding Doors: C Interior Folding Doors: C Gymnasium Dividers: E C Interior Screens Includes: Portable and open dividers. Portable Partitions, Screens and Panels Grilles and Screens Interior Grilles and Gates: C1040. C Interior Partition Supplementary Components Includes: Sound isolation components, firestopping, and expansion control to be included with interior partition elements above as appropriate. Sound Isolation Acoustic Insulation Firestopping Expansion Control C1020 Interior Windows Includes: Interior fixed or operable windows used singly and in multiples. Includes Interior Window Supplementary Components as appropriate. Includes metal, wood, plastic, and composite window units. Interior Windows Performance Requirements Fire Rating Sound Transmission Forced Entry Resistance Bullet Resistance Radio-Frequency-Interference Protection Radiation Protection Exterior Windows: B2020. Interior Glazed Partitions: C C Interior Operating Windows C Interior Fixed Windows

61 C INTERIORS C Interior Special Function Windows Includes interior windows with special characteristics for a special function. Interior Observation Windows Interior Pass Windows Exterior Pass Windows: B Interior Radio-Frequency-Interference Shielding Windows Exterior Radio-Frequency- Interference Shielding Windows: B Exterior Radio-Frequency- Interference Shielding Doors: B Interior Radio-Frequency- Interference Shielding Doors: C Interior Radiation Shielding Windows Radiation-Resistant Glazing Exterior Radiation Shielding Windows: B Exterior Radiation Shielding Doors: B Interior Radiation Shielding Doors: C Radiation Detection and Alarm: D Radiation Protection: F Interior Security Windows Security Glazing Ballistics-Resistant Glazing Exterior Security Windows: B Exterior Security Doors: B Exterior Security Gates: B Interior Security Doors: C Interior Security Gates: C Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Interior Detention Windows Exterior Detention Windows: B Exterior Detention Doors: B Interior Detention Doors: C Detention Monitoring and Control: D7070. Detention Equipment: E Metal Detention Enclosures: F

62 C INTERIORS Detention Project Procedures: Z Interior Sound Control Windows Exterior Sound Control Windows: B Exterior Sound Control Doors: B Interior Sound Control Doors: C C Interior Window Supplementary Components Includes: Frames, sills, operating hardware, glazing to be included with interior window elements above as appropriate. Frames and Sills Hardware Glazing Finishes C1030 Interior Doors Includes: Interior door assemblies. Includes metal doors and frames, wood doors and frames, plastic doors, and composite doors. Includes Interior Door Supplementary Components as appropriate. Interior Doors Performance Requirements Fire Rating Temperature-Rise Limit Sound Transmission Thermal Resistance Forced Entry Resistance Bullet Resistance Radio-Frequency-Interference Protection Radiation Protection Pressure Resistance Exterior Doors: B2050. C Interior Swinging Doors C Interior Entrance Doors Includes: Exterior personnel door assemblies at interior main entrances. Includes automatic, revolving, balanced, and other special operating entrance doors, and sliding storefront wall systems. Includes Interior Door Supplementary Components as appropriate when not part of storefront system. All-Glass Entrances Automatic Entrances Revolving Door Entrances Balanced Door Entrances Sliding Storefronts Exterior Entrance Doors: B C Interior Sliding Doors Sliding Glass Doors Interior Operable Partitions: C

63 C INTERIORS C Interior Folding Doors Interior Operable Partitions: C C Interior Coiling Doors Coiling Counter Doors C Interior Panel Doors Includes: Interior large opening doors constructed of panels that move. Interior Sectional Doors Interior Single-Panel Doors Interior Multi-Leaf Vertical Lift Doors Interior Telescoping Vertical Lift Doors C Interior Special Function Doors Includes: Interior door assemblies for a variety of special functions and applications involving a variety of operating methods. Includes Interior Door Supplementary Components as appropriate. Interior Cold Storage Doors Interior Industrial Doors Interior Lightproof Doors Interior Darkroom Doors Photographic Processing Equipment: E Interior Radio-Frequency-Interference Shielding Doors Exterior Radio-Frequency- Interference Shielding Windows: B Exterior Radio-Frequency- Interference Shielding Doors: B Interior Radio-Frequency- Interference Shielding Windows: C Interior Radiation Shielding Doors Radiation-Resistant Glazing Exterior Radiation Shielding Windows: B Exterior Radiation Shielding Doors: B Interior Radiation Shielding Windows: C Radiation Detection and Alarm: D Radiation Protection: F Interior Security Doors Security Revolving Door Entrances Security Glazing

64 C INTERIORS Ballistics-Resistant Glazing Exterior Security Windows: B Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Gates: C Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Interior Vault Doors Vault Equipment: E Vaults: F Interior Detention Doors Exterior Detention Windows: B Exterior Detention Doors: B Interior Detention Windows: C Detention Monitoring and Control: D7070. Detention Equipment: E Metal Detention Enclosures: F Detention Project Procedures: Z Interior Sound Control Doors Exterior Sound Control Windows: B Exterior Sound Control Doors: B Interior Sound Control Windows: C Interior Traffic Doors Exterior Traffic Doors: B Interior Pressure-Resistant Doors Exterior Pressure-Resistant Windows: B Exterior Pressure-Resistant Doors: B Exterior Special Function Doors: B C Interior Access Doors and Panels Includes: Doors and panels in walls, ceilings, and floors to provide access to concealed spaces. Includes frames and hardware. 58

65 C INTERIORS C Interior Door Supplementary Components Includes: Frames, hardware, glazing, and louvers that are part of door to be included with interior door elements above as appropriate. Frames Specialty Frames Hardware Glazing Door Louvers Exterior Door Louvers: B Interior Louvers: C C1040 Interior Grilles and Gates Includes: Interior operable grilles and gates. Includes frames and hardware. Interior Screens: C C Interior Grilles Interior Sliding Metal Grilles Interior Coiling Grilles Interior Folding Grilles C Interior Gates Includes: Interior devices of solid or open construction, usually hinged, to provide moveable barrier for access through partition or other divider. Includes hardware, accessories, and finishing. Exterior Gates: B2050. Fences and Gates: G2060. Interior Security Gates Exterior Security Windows: B Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Interior Folding Gates C1060 Raised Floor Construction Raised Floor Construction Performance Requirements Load Capacity Concentrated Loads Rolling Loads Impact Loads Deflection Slip Resistance Static Dissipative Conductive C Access Flooring Includes: Free-standing, elevated accessible floor assembly forming an underfloor cavity that may be used for utility or other purposes. 59

66 C INTERIORS C Platform/Stage Floors Includes: Fixed construction of raised floor for platforms or stages. Folding and Portable Stages: E C1070 Suspended Ceiling Construction Includes: Ceiling Suspension Components. Suspended Ceiling Construction Performance Requirements Fire Rating Sound Transmission Sound Attenuation Sound Absorption Light Reflectance Flame Spread Index Smoke Developed Index Applied Ceiling Finishes: C2050. C Acoustical Suspended Ceilings Includes: Suspended tiles and panels with specific characteristics for acoustical purposes. Acoustic Insulation Applied Acoustical Ceiling Treatment: C C Suspended Plaster and Gypsum Board Ceilings Includes: Suspended assemblies with plaster and gypsum board surfaces. Suspension Systems Acoustic Insulation C Specialty Suspended Ceilings Includes: Suspended specialty ceiling panels, units, and materials manufactured as finished Textured Suspended Ceilings C Special Function Suspended Ceilings Includes: Suspended ceiling assemblies with an additional special function including integrated ceiling assemblies. Security Ceiling Assemblies Security Lighting: D Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Integrated Ceiling Assemblies C Ceiling Suspension Components Includes: Hangers and framing to suspend ceiling and sound isolation components to be included with suspended ceiling construction elements above as appropriate. Suspension Systems Suspended Ceiling Sound Isolation C1090 Interior Specialties C Interior Railings and Handrails Includes: Complete interior railing assemblies of various types including glazed railings. Interior Railings and Handrails Performance Requirements Uniform Load on Handrails and Top Rails of Guards 60

67 C INTERIORS Concentrated Load on Handrails and Top Rails of Guards Concentrated Load on Infill of Guards Metal Railings Decorative Metal Railings Wood Railings Plastic Railings Composite Railings Stair Railings: B Exterior Railings: B C Interior Louvers Includes: Interior louvers, and other items for ventilation which are not an integral part of the mechanical system. Includes operable and stationary louvers. Interior Louvers Performance Requirements Free Area Air Performance Sound Transmission Louvered Equipment Screens: B Exterior Door Louvers: B Exterior Louvers: B Interior Door Louvers: C C Information Specialties Includes: Visual display units, display cases, directories, interior signage, telephone specialties, and informational kiosks. Visual Display Units Chalkboards Markerboards Tackboards Sliding Visual Display Units Visual Conference Units Visual Display Rails Visual Display Wall Panels Visual Display Fabrics Display Cases Display Turntables: D Display Lighting: D Refrigerated Display Equipment: E Directories Interior Signage Traffic Signs and Traffic Signals: G2010. Parking Lot Traffic Signage: G2020. Exterior Signage: G2060. Telephone Specialties Voice Communications Terminal Equipment: D Informational Kiosks

68 C INTERIORS C Compartments and Cubicles Includes: Manufactured compartments and cubicles for specific purposes. Toilet Compartments Shower & Dressing Compartments Cubicles Tub and Shower Doors Toilet, Bath, and Laundry Accessories: C C Service Walls Includes: Wall assemblies and wall-mounted units incorporating services. Patient Bed Service Walls Modular Service Walls C Wall and Door Protection Includes: Manufactured protective devices for walls and doors. Corner Guards Bumper Guards Protective Wall Covering Door and Frame Protection C Toilet, Bath, and Laundry Accessories Includes: Manufactured items for use in conjunction with toilets, baths, and laundries. Toilet Accessories Bath Accessories Laundry Accessories Compartments and Cubicles: C Unframed Mirrors: C C Interior Gas Lighting Exterior Gas Lighting: G C Fireplaces and Stoves Includes: Masonry fireplaces and manufactured and fabricated fireplaces, stoves, chimneys, dampers, and specialties for use in construction of fireplaces and stove units. Site Constructed Fireplaces Refractory Masonry Masonry Fireplaces Manufactured Fireplaces Manufactured Fireplace Chimneys Fireplace Specialties Stoves C Safety Specialties Includes: Accessories that provide emergency aid. Emergency Access and Information Cabinets Emergency Aid Specialties Fire Protection Specialties: D4030. C Storage Specialties Includes: Lockers, postal specialties, storage specialties, and wardrobe and closet specialties. Lockers Locker Room Benches Postal Specialties Mail Boxes

69 C INTERIORS Mail Chutes Postal Equipment: E Storage Assemblies Storage Shelving Storage Racks Mercantile Storage Assemblies Wardrobe and Closet Specialties Hat and Coat Racks Closet and Utility Shelving Checkroom Equipment: E1030. C Other Interior Specialties Includes: Pest control devices, flags and banners, security mirrors and domes, and scales. Pest Control Devices Insect Control Devices Rodent Control Devices Soil Treatment Rodent Control: A9040. Bird Control Devices: B Temporary Pest Control: Z Flags and Banners Flagpoles: G Unframed Mirrors Toilet, Bath, and Laundry Accessories: C Security Mirrors and Domes Interior Security Doors: C Interior Security Gates: C Electronic Safety and Security: D70. Interior Pedestrian Security Equipment: E Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Scales C20 INTERIOR FINISHES Interior Finishes Performance Requirements C2010 Wall Finishes Includes: Wall finishes applied over solid substrates. Includes Wall Finish Supplementary Components as appropriate. Wall Finishes Performance Requirements Flame-Spread Index Smoke-Developed Index Light Reflectance Sound Absorption Interior Partitions: C

70 C INTERIORS C Tile Wall Finish Includes: Manufactured surfacing units of impervious, vitreous, semi-vitreous, and nonvitreous materials; glazed, unglazed, conductive, and textured surfaces. Tile Flooring: C C Wall Paneling Includes: Covering or cladding of interior walls with paneling. Includes associated furring, fastening, and trim. Wood Paneling Prefinished Paneling Board Paneling Plastic Paneling Composite Paneling Ceiling Paneling: C C Wall Coverings Includes: Wall coverings applied over solid substrates. Includes vinyl-coated fabric, vinyl and cork wall coverings; wall papers; and flexible wood sheets. Flexible Wood Sheets C Wall Carpeting Includes: Wall carpet materials and accessories. Floor Carpeting: C C Stone Facing Includes: Natural stone applied as an interior veneer surface. Masonry Flooring: C2030. C Special Wall Surfacing Includes: Manufactured decorative interior wall surface products including plastic blocks. Stretched-Fabric Wall Systems Fabric-Wrapped Panels Plastic Blocks C Wall Painting and Coating Includes: Interior painting and coating with transparent and opaque finishes. Includes stains, varnishes, lacquers, primers, fillers, paint removers, and waxes, and preparation of surfaces. Interior Ceiling Painting and Coating: C C Acoustical Wall Treatment Includes: Sound absorbing, reflecting, and diffusing wall units, and accessories. Acoustic Wall Coating Acoustic Room Components Sound-Absorbing Wall Units Acoustical Ceiling Treatment: C2050. C Wall Finish Supplementary Components Includes: Furring to be included with wall finish elements above as appropriate. Wood Furring Metal Furring C2020 Interior Fabrications Includes: Interior fabrications of a variety of materials formed to various profiles for a variety of purposes including column covers. Glass-Fiber-Reinforced Concrete

71 C INTERIORS Metal Fabrications Column Covers Decorative Metal Ornamental Woodwork Plastic Fabrications Simulated Stone Fabrications Composite Fabrications Plaster Fabrications Exterior Fabrications: B C2030 Flooring Includes: Flooring Supplementary Components as appropriate. Flooring Performance Requirements Slip Resistance Critical Radiant Flux Classification Static Dissipative Conductive Chemical Resistance Acid Resistance Static Control Sound Absorption Access Flooring: C Stair Finishes: C2040. C Flooring Treatment Includes: Coatings and surfacings for finished floor, applied to provide a specific performance characteristic. Slip-Resistant Flooring Treatment C Tile Flooring Includes: Manufactured surfacing units of impervious, vitreous, semi-vitreous, and nonvitreous materials; glazed, unglazed, conductive, abrasive, and textured surfaces. Includes wall base units. Tile Wall Finishes: C C Specialty Flooring Includes: Heavy duty and other specialty flooring. Includes asphaltic plank, laminate, bamboo, leather, cork, acoustic, synthetic turf, metal, structural glass, chemical-resistant, acid resistant, conductive, and static control flooring. Chemical-Resistant Flooring Chemical-Resistant Tiling Chemical-Resistant Brick Flooring Acid-Resistant Flooring Conductive Flooring Conductive Tiling Conductive Resilient Flooring Conductive Terrazzo Flooring Static-Control Flooring Static Resistant Flooring Treatment Static-Control Resilient Flooring C Masonry Flooring Includes: Fired clay unit masonry, cat stone, and stone flooring. Includes wall base. Brick Flooring Stone Flooring Composition Stone Flooring Stone Wall Facing: C

72 C INTERIORS C Wood Flooring Includes: Strip, parquet, block, and composition wood flooring. Includes C Resilient Flooring Includes: Resilient tile and sheet flooring. Includes integral and applied wall bases. C Terrazzo Flooring Includes: Cast-in-place, sand-cushion, monolithic, bonded and adhesively- bonded portland cement terrazzo; poured-in-place epoxy, polyester, and resinous matrix terrazzo; and precast terrazzo. Includes integral or precast wall bases, accessories, and finish sealers. Portland Cement Terrazzo Flooring Terrazzo Floor Tile Resinous Matrix Terrazzo Flooring Wall Finishes: C2010. C Fluid-Applied Flooring Includes: Flooring applied in a viscous state. Elastomeric Liquid Flooring Epoxy-Marble Chip Flooring Magnesium-Oxychloride Flooring Resinous Flooring Quartz Flooring C Carpeting Includes: Floor carpet materials including cushions, accessories, and wall base. Tile Carpeting Sheet Carpeting Wall Carpeting: C Moveable Rugs and Mats: E2050. C Athletic Flooring Includes: Flooring for athletic purposes. Wood Athletic Flooring Resilient Athletic Flooring Fluid-Applied Athletic Flooring Athletic Equipment: E Athletic Rooms: F Athletic & Recreational Special Construction: F1060. Athletic Areas: G C Entrance Flooring Includes: Special floor surfaces at entrances. Entrance Floor Mats and Frames Entrance Floor Grilles Entrance Floor Gratings Entrance Floor Grids Entrance Tile C Flooring Supplementary Components Includes: Furring, underlayment, and sound and vibration control to be included with flooring elements above as appropriate. Wood Furring Underlayment Acoustic Underlayment Sound and Vibration Control C2040 Stair Finishes Includes: Stair tread, riser, and landing finish of various materials. Stair Finish Performance Requirements Slip Resistance Critical Radiant Flux Classification C Tile Stair Finish

73 C INTERIORS C Masonry Stair Finish C Wood Stair Finish C Resilient Stair Finish C Terrazzo Stair Finish C Carpeted Stair Finish Stair Construction: B Stair Soffits: B Stair Railings: B Flooring: C2030. C2050 Ceiling Finishes Includes: Finishes applied to interior ceiling substrates. Ceiling finishes may be applied to suspended ceiling construction. Includes Ceiling Finish Supplementary Components as appropriate. Ceiling Finishes Performance Requirements Sound Absorption Light Reflectance Flame Spread Index Smoke Developed Index Stair Soffits: B Exterior Ceilings: B Exterior Soffits: B Interior Suspended Ceiling Construction: C1070. C Plaster and Gypsum Board Finish Includes: Lathing including accessories and trim. Includes interior plaster including veneer plaster, acoustical plaster, and plaster fireproofing. Includes sound barrier boards and blankets. Includes unfinished and prefinished gypsum board and gypsum backing board for other finishes. Includes gypsum board fireproofing. Suspended Plaster and Gypsum Board Ceilings: C C Ceiling Paneling Includes: Covering or cladding of interior ceilings with paneling. Includes associated furring, fastening, and trim. Wood Paneling Prefinished Paneling Board Paneling Plastic Paneling Composite Paneling Wall Paneling: C C Ceiling Painting and Coating Includes: Interior painting and coating of ceilings with transparent and opaque finishes. Includes stains, varnishes, lacquers, primers, fillers, paint removers, and waxes, and preparation of surfaces. Interior Wall Painting and Coating: C C Acoustical Ceiling Treatment Includes: Sound absorbing, reflecting, and diffusing ceiling units and accessories. Includes directly applied acoustical tiles and panels. 67

74 C INTERIORS Acoustical Metal Decking Acoustic Ceiling Coating Acoustic Room Components Sound-Absorbing Ceiling Units Suspended Acoustical Ceilings: C Acoustical Wall Treatment: C C Ceiling Finish Supplementary Components Includes: Furring and sound isolation components to be included with ceiling finish elements above as appropriate. Wood Furring Metal Furring Ceiling Sound Isolation C2090 Interior Finish Schedules Includes: Schedules of finishes common to C20 Interior Finishes. Room Finish Schedule

75 D SERVICES Facility Services Performance Requirements D10 CONVEYING Conveying Equipment Performance Requirements Starting and Adjusting : Z Demonstration and Training : Z D1010 Vertical Conveying Systems Construction Aids: Z D Elevators Includes: Passenger and freight elevators of all types, including cars, enclosures, controls, safety equipment, hoistway equipment, and elevator machinery. Includes associated metal fabrications including pit ladders. Elevators Performance Requirements Cab Capacity Car Load Capacity Car Speed Door Opening Speed Freight Elevators Electric Traction Freight Elevators Hydraulic Freight Elevators Passenger Elevators Electric Traction Passenger Elevators Hydraulic Passenger Elevators Residential Elevators Electric Traction Residential Elevators Hydraulic Residential Elevators Service Elevators Electric Traction Service Elevators Hydraulic Service Elevators Limited-Use/Limited Application Elevators Custom Elevator Cabs and Doors Elevator Equipment and Controls Vents and Hatches: B Ladders: B Elevator Telephones: D D Lifts Includes: Vertical or inclined lifts and related equipment for a variety of purposes. Sidewalk lifts include doors. Lifts Performance Requirements Speed People Lifts Wheelchair Lifts Platform Lifts Orchestra Lifts

76 D SERVICES Stage Lifts Theater and Stage Equipment: E Sidewalk Lifts Vehicle Lifts Mortuary Lifts: E Loading Dock Lifts: E Recreational Equipment: E D Escalators Includes: Passenger conveying systems composed of moving treads installed in inclined position including associated components, hardware, controls, safety equipment, and related items. Escalators Performance Requirements Speed D Dumbwaiters Includes: Packaged and field assembled, motorized and hand- operated dumbwaiters including associated components for book lifts, cart lifts, and other applications. Systems include associated components, hardware, controls, and safety equipment. Dumbwaiters Performance Requirements D Moving Ramps Includes: Passenger conveying systems composed of moving belts installed in inclined position including associated components, hardware, controls, safety equipment, and related items. Moving Ramps Performance Requirements Speed D1030 Horizontal Conveying Horizontal Conveying Performance Requirements D Moving Walks Includes: Passenger conveying systems composed of moving belts installed in horizontal position including associated components, hardware, controls, safety equipment, and related items. Moving Walks Performance Requirements Speed D Turntables Includes: Structural turntables for various applications. Turntables Performance Requirements Industrial Turntables Vehicle Turntables Hospitality Turntables Hospitality Equipment: E Hospitality Casework: E Hospitality Furniture: E Restaurant Turntables

77 D SERVICES Exhibit Turntables Display Turntables Display Cases: C Display Lighting: D Refrigerated Display Equipment: E Exhibit Equipment: E Entertainment Turntables Stage Turntables Theater and Stage Equipment: E D Passenger Loading Bridges Includes: Operating bridges for loading and unloading of passengers to and from aircraft and ships. Passenger Loading Bridges Performance Requirements Aircraft Passenger Loading Bridges Ship Passenger Loading Bridges D People Movers People Mover Performance Requirements Car Capacity Car Speed Monorails Includes: Single rail vehicles suspended from or straddle the guideway. Includes associated track, equipment, controls, and accessories. Funiculars Includes: Steep cable railways in which ascending cars counterbalance descending cars. Includes associated track, cable, Cable Transportation Includes: Steep slope transportation system utilizing moving cable. Includes associated cable, support structures, equipment, controls, and accessories. D1050 Material Handling Material Handling Performance Requirements Load Capacity Construction Aids: Z D Cranes Includes: Hoisting towers, cranes, crane rails, and related accessories. D Hoists Includes: Manual and motor operated hoists and related accessories. D Derricks Includes: Manual and motor operated derricks and related accessories. D Conveyors Includes: Automatic guided vehicles, conveyors, diverters, and chutes. Includes controls and accessories. D Baggage Handling Equipment Includes: Operating equipment for handling, scanning, and weighing of baggage at terminals. Includes controls and accessories. D Chutes Includes: Chutes which support the operation of the building or structure. Coal Chutes Escape Chutes Laundry and Linen Chutes

78 D SERVICES Trash Chutes Solid Waste Handling Equipment: E D Pneumatic Tube Systems Includes: Pneumatically operated tube system for the delivery of small items within a facility. Includes controls and accessories. Office Equipment: E D1080 Operable Access Systems Operable Access Systems Performance Requirements Maintenance Equipment: E D Suspended Scaffolding Includes: Suspended scaffolding when part of the completed project. D Rope Climbers Includes: Powered rope climbers to access exterior façade. D Elevating Platforms Includes: Fixed elevating platforms to provide a movable elevated working platform for people and materials. Platform Lifts: D D Powered Scaffolding Includes: Powered scaffolding when part of the completed project. Window Washing Scaffolding D Building Envelope Access Façade Access Equipment D20 PLUMBING Plumbing Performance Requirements Starting and Adjusting : Z Demonstration and Training : Z D2010 Domestic Water Distribution Includes: Facility domestic water distribution system. Include Domestic Water Distribution Supplementary Components as appropriate. Domestic Water Distribution Performance Requirements Sustainable Design Requirements Plumbing Fixture Water Consumption Swimming Pool Plumbing Systems: F Pools and Tubs Plumbing Systems: F Interior Fountain Plumbing Systems: F Site Domestic Water Distribution: G D Facility Potable-Water Storage Tanks Includes: Tanks for storage of potable water serving a facility and located within, on, under, or closely associated with a structure. 72

79 D SERVICES D Domestic Water Equipment Includes: Equipment for domestic water distribution system. Domestic Water Pumps Domestic Water Softeners Includes: Equipment for the softening of domestic water. Domestic Water Filtration Equipment Includes: Equipment for the filtering of domestic water. Domestic Water Heaters Includes: Equipment to heat domestic water. Includes electric and fuel-fired equipment. Electric Domestic Water Heaters Fuel-Fired Domestic Water Heaters Domestic Water Heat Exchangers Includes: Equipment to heat domestic water by means of heat exchange. D Domestic Water Piping Includes: Piping, valves, and specialties associated with domestic water distribution located within, under, or closely associated with a structure. Includes circulating pumps. May Include: Water service from the structure to the utility water service line. Domestic Water Piping Specialties D Plumbing Fixtures Includes: Terminal devices on the domestic water plumbing system. Includes rough-in piping, trim, fittings, and connection to vent piping. Residential Plumbing Fixtures Residential Water Closets Residential Urinals Residential Bidets Residential Lavatories Residential Sinks Residential Bathtubs Residential Showers Residential Disposers Residential Laundry Trays Residential Plumbing Fixture Trim Commercial Plumbing Fixtures Commercial Water Closets Commercial Urinals Commercial Bidets Commercial Lavatories Commercial Sinks Commercial Bathtubs Commercial Showers Commercial Disposers Shampoo Bowls Wash Fountains Commercial Laundry Trays Commercial Plumbing Fixture Trim Flushometers Healthcare Plumbing Fixtures Healthcare Water Closets Healthcare Sinks Healthcare Bathtubs Healthcare Showers

80 D SERVICES Healthcare Faucets Healthcare Flushometers Process Support Plumbing Systems: D2060. Healthcare Equipment: E Healthcare Casework: E Healthcare Furniture: E Healthcare Special Procedures: Z Emergency Plumbing Fixtures Emergency Showers Eyewash Equipment Eye/Face Wash Equipment Hand-Held Emergency Drench Hoses Combination Emergency Fixture Units Emergency Fixture Water-Tempering Equipment Security Plumbing Fixtures Security Water Closets Security Urinals Security Lavatories Security Sinks Security Plumbing Fixture Trim Security Flushometers Security Plumbing Fixture Supports Electronic Safety and Security: D70. Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z Drinking Fountains and Water Coolers Drinking Fountains Remote Water Coolers D Domestic Water Distribution Supplementary Components Includes: Common work results for plumbing, plumbing insulation, and instrumentation and Mechanical Metal Supports Common Work Results for Plumbing Expansion Fittings and Loops Meters and Gages Valves Hangers and Supports Heat Tracing Vibration and Seismic Controls Identification Insulation Instrumentation and Controls D2020 Sanitary Drainage Includes: Facility sanitary sewerage system located within, under, or closely associated with a structure. Include Sanitary Drainage Supplementary Components as appropriate. 74

81 D SERVICES Sanitary Drainage Systems Performance Requirements Swimming Pool Plumbing Systems: F Pools and Tubs Plumbing Systems: F Interior Fountain Plumbing Systems: F Sanitary Sewerage Utilities: G3020. D Sanitary Sewerage Equipment Includes: Interceptor, separator, pumps, and septic tanks that are part of facility sanitary sewerage system. Sanitary Waste Interceptors Sanitary Waste Separators Sanitary Sewerage Pumps Packaged, Submersible Sewerage Pump Units Packaged, Wastewater Pump Units Facility Packaged, Sewerage Pumping Stations Facility Septic Tanks Utility Septic Tanks: G D Sanitary Sewerage Piping Includes: Sanitary waste and vent piping system within and under structures. May Include: Sanitary piping from the structure to the utility sanitary sewer. Sanitary Sewers Sanitary Waste and Vent Piping Sanitary Waste Piping Specialties Sanitary Drains Fats, Oils, and Grease Disposal Systems Grease Removal Devices Backwater Valves Air-Admittance Valves Sanitary Drainage Manholes Sanitary Drainage Piping Cleanouts D Sanitary Drainage Supplementary Components Includes: Common work results for plumbing, plumbing insulation, and instrumentation and control for plumbing to be included with sanitary drainage elements above as appropriate. Mechanical Metal Supports Common Work Results for Plumbing Expansion Fittings and Loops Meters and Gages Valves Hangers and Supports Heat Tracing Vibration and Seismic Controls Identification Insulation Instrumentation and Controls

82 D SERVICES D2030 Building Support Plumbing Systems Includes: Facility stormwater drainage and gray water systems. Include Building Support Plumbing System Supplementary Components as appropriate. Building Support Plumbing Systems Performance Requirements Rainwater Management: B Storm Drainage Utilities: G3020. D Stormwater Drainage Equipment Includes: Drainage pumps, and sump pumps that are part of stormwater drainage system. Stormwater Drainage Pumps Stormwater Drainage Sump Pumps Rainwater Storage Tanks D Stormwater Drainage Piping Includes: Storm drainage piping system within, under, or closely associated with a structure. Includes storm drains for areas closely associated with a structure such as courtyards, plazas, and loading dock areas. May Include: Storm drainage piping from the structure to the utility storm drain. Rainwater Leaders Stormwater Drainage Piping Specialties Stormwater Drainage Manholes Stormwater Drainage Piping Cleanouts D Facility Stormwater Drains Includes: Various types of drains to collect storm water. Area Drains Roof Drains Trench Drains Site Stormwater Drains: G D Gray Water Systems Includes: Systems to collect, treat, and distribute gray water for other uses such as irrigation. Gray Water Tanks Gray Water Equipment Gray Water Treatment Equipment Gray Water Piping System Gray Water Specialties D Building Support Plumbing System Supplementary Components Includes: Common work results for plumbing, plumbing insulation, and instrumentation and control for plumbing to be included with building support plumbing system elements above as appropriate. Mechanical Metal Supports Common Work Results for Plumbing Expansion Fittings and Loops Meters and Gages Valves Hangers and Supports Heat Tracing Vibration and Seismic Controls Identification Insulation Instrumentation and Controls

83 D SERVICES D2050 General Service Compressed-Air Includes: Compressed air system serving general service requirements General Service Compressed-Air Performance Requirements General Service Compressed-Air Piping General Service Compressed-Air Valves General Service Packaged Air Compressors and Receivers Laboratory and Healthcare Compressed-Air: D D2060 Process Support Plumbing Systems Includes: Process Support Plumbing System Supplementary Components as appropriate. D Compressed-Air Systems Includes: Compressed-air systems for laboratory and healthcare purposes. Compressed-Air Systems Performance Requirements Laboratory Air Operating Pressure Medical Air Operating Pressure Dental Air Operating Pressure Instrument Air Operating Pressure Medical Laboratory Air Operating Pressure Air Capacity Compressed-Air Piping Compressed-Air Equipment General Service Compressed-Air: D2050. D Vacuum Systems Includes: Vacuum systems for laboratory and healthcare purposes. Vacuum Systems Performance Requirements Laboratory Vacuum Operation Level Medical Surgical Vacuum Operation Level Waste Anesthetic Gas Disposal Vacuum Operation Level Dental Vacuum Operation Level Oral-Evacuation Vacuum Operation Level Healthcare Laboratory Vacuum Operation Level Vacuum Piping Vacuum Equipment Waste Anesthesia-Gas Piping D Gas Systems Includes: Gas systems for laboratory and healthcare purposes. Gas Systems Performance Requirements Medical Carbon Dioxide Operating Pressure Medical Helium Operating Pressure Medical Nitrogen Operating Pressure Medical Nitrous Oxide Operating Pressure Medical Oxygen Operating Pressure Gas Piping Gas Storage Tanks Gas Equipment D Chemical-Waste Systems Includes: Chemical-waste systems for laboratory and healthcare purposes. Chemical-Waste Systems Performance Requirements Single-Wall Piping Pressure Rating

84 D SERVICES Double-Containment Piping Pressure Rating Field-Fabrication Containment-Piping Pressure Rating Laboratory Chemical-Waste Piping Healthcare Chemical-Waste Piping Chemical-Waste Tanks D Processed Water Systems Includes: Processed water systems for laboratory and healthcare purposes. Processed Water Systems Performance Reagent-Water Piping Operating Pressure Deionized-Water Piping Operating Pressure Distilled-Water Piping Operating Pressure Reverse-Osmosis-Water Piping Operating Pressure Processed Water Piping Processed Water Equipment Healthcare Plumbing Fixtures: D Healthcare Equipment: E Laboratory Equipment: E Healthcare Special Procedures: Z D Process Support Plumbing System Supplementary Components Includes: Common work results for plumbing, plumbing insulation, and instrumentation and controls to be included with process support plumbing systems elements above as appropriate. Mechanical Metal Supports Healthcare Metal Supports Common Work Results for Plumbing Valves Hangers and Supports Heat Tracing Vibration and Seismic Controls Identification Insulation Instrumentation and Controls D30 HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) HVAC Performance Requirements Starting and Adjusting : Z Demonstration and Training : Z D3010 Facility Fuel Systems Includes: Fuel-oil, gasoline, natural-gas, and liquefied-petroleum fuel systems associated with a structure. Facility Fuel Systems Performance Requirements Fuel System Operating Pressure Fuel Storage Tank Capacity Fuel Pump Capacity Site Fuel Distribution: G

85 D SERVICES D Fuel Piping Includes: Fuel piping, valves, piping specialties, and other components within, under, or closely associated with a structure. D Fuel Pumps Includes: Fuel pumps within or closely associated with a structure. Facility Fuel-Oil Pumps Facility Gasoline Dispensing Pumps D Fuel Storage Tanks Includes: Fuel tanks under or closely associated with a structure. D3020 Heating Systems Includes: Associated ductwork, piping, valves, and specialties. Includes: Heating System Supplementary Components as appropriate. Heating Systems Performance Requirements Sustainable Design Requirements D Heat Generation Includes: Boilers, furnaces, solar, geothermal, and biomass heat generation, fuel fired heaters, and heat exchangers. Fuel Heat Generation Includes: Fuel-fired boilers and generators for hot water and steam systems. Includes breechings, chimneys, and stacks. Breechings, Chimneys, and Stacks Fuel-Fired Heating Boilers Electric Heating Boilers Includes: Electric boilers and generators for hot water and steam systems. Heating Boiler Feedwater Equipment Includes: Equipment to remove oxygen and other dissolved gases in boiler feed. Boiler Feedwater Pumps Deaerators Furnaces Includes: Fuel-fired and electric furnaces. Solar Heat Generation Includes: Equipment powered by solar energy. Heating Solar Collectors Packaged Solar Heating Equipment Geothermal Heat Generation Biomass Heat Generation Fuel-Fired Heaters Includes: Fuel-fired radiant and unit heaters. Heat Exchangers for HVAC Includes: Equipment used to transfer heat from one medium to another. Facility Fuel Systems: D3010. Facility Distribution: D Facility Steam Distribution: D HVAC Air Distribution: D D Thermal Heat Storage Includes: Equipment to store thermal energy for use in heating and with charging or discharging this energy at a controllable rate. D Decentralized Heating Equipment Includes: Heating equipment that serves a portion of a HVAC system. Convection Heating Units Includes: Convection units may provide heating and cooling. Valance Heating Units Chilled Beams Air Coils Fan Coil Units Unit Ventilators

86 D SERVICES Induction Units Radiators Convectors Finned-Tube Radiation Heaters Unit Heaters Radiant Heating Units Includes: Electric cables or panels and hydronic piping used for radiant heating for space heating. D Heating System Supplementary Components Includes: Common work results for HVAC, insulation, and instrumentation and control to be included in heating system elements above as appropriate. Mechanical Metal Supports Common Work Results for HVAC Meters and Gages General-Duty Valves Hangers and Supports Vibration and Seismic Controls Identification Anti-Microbial Coatings Anti-Microbial Ultraviolet Emitters Testing, Adjusting, and Balancing Insulation Instrumentation and Control D3030 Cooling Systems Includes: Associated ductwork, piping, valves, and specialties. Includes: Cooling System Supplementary Components as appropriate. Cooling Systems Performance Requirements Sustainable Design Requirements D Central Cooling Includes: Refrigerant compressors, condensers, packaged compressor and condenser units, water chillers, and cooling towers. Refrigerant Compressors Includes: Various type of compressors used in refrigeration process. Refrigerant Condensers Includes: Condensing units used to reject heat from the refrigeration process. Packaged Compressor and Condenser Units Includes: Compressor in combination with condensing units used to reject heat from the refrigeration process. Water Chillers Includes: Various types of chillers used for building space cooling. Cooling Towers Includes: Factory- and field-fabricated cooling towers and liquid coolers. Includes piping and specialties; chemical water treatment; vibration and seismic controls; and integral controls not a part of the condenser water distribution systems. Facility Hydronic Distribution Systems: D3050. Refrigeration Detection and Alarm: D Site Hydronic Cooling Distribution: G

87 D SERVICES D Evaporative Air-Cooling Includes: Equipment used to reject heat from the refrigeration process by evaporation. D Thermal Cooling Storage Includes: Equipment to store thermal energy for use in cooling and with charging or discharging this energy at a controllable rate. Chilled-Water Thermal Storage Ice Storage D Decentralized Cooling Includes: Cooling equipment that serves a portion of a HVAC system. Air-Conditioners Packaged Terminal Air-Conditioners Room Air-Conditioners Self-Contained Air-conditioners Computer-Room Air-Conditioners Split-System Air-Conditioners Unitary Heat Pumps Air-Source Heat Pumps Water-Source Heat Pumps Convection Cooling Units Note: Convection units may provide heating and cooling. Valance Cooling Units Chilled Beams Air Coils Fan Coil Units Unit Ventilators Induction Units Convectors D Cooling System Supplementary Components Includes: Common work results for HVAC, insulation, and instrumentation and control to be included in cooling system elements above as appropriate. Mechanical Metal Supports Common Work Results for HVAC Meters and Gages General-Duty Valves Hangers and Supports Vibration and Seismic Controls Identification Anti-Microbial Coatings Anti-Microbial Ultraviolet Emitters Testing, Adjusting, and Balancing Insulation Instrumentation and Control D3050 Facility HVAC Distribution Systems Includes: Facility Distribution Systems Supplementary Components as appropriate. Exterior Louvers: B Interior Louvers: C Heat Generation: D3020. Integrated Construction: F1010. Site Energy Distribution: G3050. D Facility Hydronic Distribution Includes: Piping systems and equipment for distribution of heating hot water and cooling chilled water. Includes piping systems, pumps, tanks, supports and anchors, vibration and seismic controls, identification, and piping and equipment insulation. 81

88 D SERVICES Hydronic Distribution Performance Requirements Hot-Water Heating Piping Working Pressure and Temperature Chilled-Water Piping Working Pressure and Temperature Dual-Temperature Heating and Cooling Water Piping Working Pressure and Temperature Condenser-Water Piping Working Pressure and Temperature Glycol Cooling-Water Piping Working Pressure and Temperature Makeup-Water Piping Working Pressure and Temperature Condensate-Drain Piping Working Temperature Blowdown-Drain Piping Working Temperature Air-Vent Piping Temperature Hydronic Pumps Capacities Boilers: D Chillers: D Cooling Towers: D Hydronic Piping System Hydronic Pumps Hydronic Piping Water Treatment for Hydronic Systems D Facility Steam Distribution Includes: Piping systems and equipment for distribution of steam and condensate return. Includes piping systems, pumps, tanks, supports and anchors, vibration and seismic controls, identification, and piping and equipment insulation. Steam Distribution Performance Requirements High Pressure Steam Piping Working Pressure Low Pressure Steam Piping Working Pressure Condensate Piping Working Pressure and Temperature Makeup-Water Piping Working Pressure and Temperature Steam Condensate Pump Capacity Boilers: D Steam Piping System Steam Condensate Pumps Steam Piping Water Treatment for Steam Systems D HVAC Air Distribution Includes: Systems for distribution of air including supply systems, return systems, and general exhaust systems. Does not include special exhaust systems such as kitchen hood, paint booth, and fume hood exhaust systems. 82

89 D SERVICES HVAC Air Distribution Performance Requirements Sustainable Design Requirements Fan Total Airflow and External Static Pressure Pressure Class, Seal Class, and Leakage Class for Supply Ducts Pressure Class, Seal Class, and Leakage Class for Return Ducts Filtration Efficiency Air-Handling Units Includes: Air-handling units consisting of fans, coils, dampers, control devices, and other accessories. Indoor Central-Station Air-Handling Units Packaged Outdoor HVAC Equipment Custom-Packaged Outdoor HVAC Equipment HVAC Air Distribution Components Includes: Ducts, duct accessories, fans, terminal units, and air inlets and outlets. HVAC Fans HVAC Ducts and Casings Air Plenums and Chases Air Duct Accessories Air Terminal Units Air Outlets and Inlets HVAC Air Cleaning Devices Includes: Devices of a variety of types to clean distribution air. Particulate Air Filtration Gas-Phase Air Filtration Electronic Air Cleaners Humidity Control Includes: Equipment that adds or removes moisture from a medium in order to control the humidity. Integrated Ceiling Assemblies: C D Facility Distribution Systems Supplementary Components Includes: Common work results for HVAC, insulation, and instrumentation and control to be included in distribution system elements above as appropriate. Mechanical Metal Supports Common Work Results for HVAC Expansion Fittings and Loops Meters and Gages General-Duty Valves Hangers and Supports Heat Tracing Vibration and Seismic Controls Identification Anti-Microbial Coatings Anti-Microbial Ultraviolet Emitters Testing, Adjusting, and Balancing Insulation Instrumentation and Control D3060 Ventilation Includes: Supply air, return air, exhaust air, outside air, and air cleaning systems. Includes Ventilation Supplementary Components as appropriate. 83

90 D SERVICES Ventilation Performance Requirements Sustainable Design Requirements Fan Total Airflow and External Static Pressure Pressure Class, Seal Class, and Leakage Class for Exhaust Ducts D Supply Air Supply Air HVAC Fans Supply Air Ducts and Casings Supply Air Plenums and Chases Supply Air Duct Accessories Supply Air Terminal Units Supply Air Outlets D Return Air Return Air HVAC Fans Return Air Ducts and Casings Return Air Plenums and Chases Return Air Duct Accessories Return Air Outlets and Inlets D Exhaust Air Special Exhaust Systems Includes: Special systems for exhausting air such as kitchen hood, paint booth, and fume hood exhaust systems. Exterior Louvers: B2070. Interior Louvers: C Laboratory Equipment: E Food Service Equipment: E Air-Borne Particulate Collection Systems Sawdust Collection Systems Engine Exhaust Systems Ventilation Hoods Commercial Kitchen Hoods Fume Hood Exhaust Exhaust Air HVAC Fans Exhaust Air Ducts and Casings Exhaust Air Plenums and Chases Exhaust Air Duct Accessories Exhaust Air Inlets D Outside Air Outside Air HVAC Fans Outside Air Ducts and Casings Outside Air Plenums and Chases Outside Air Duct Accessories Outside Air Terminal Units Outside Air Outlets and Inlets D Air-to-Air Energy Recovery Includes: Air-to-air energy recovery units. D HVAC Air Cleaning D Ventilation Supplementary Components Includes: Common work results for HVAC, insulation, and instrumentation and control to be included in ventilation elements above as appropriate. Mechanical Metal Supports Common Work Results for HVAC Hangers and Supports Vibration and Seismic Controls Identification

91 D SERVICES Anti-Microbial Coatings Anti-Microbial Ultraviolet Emitters Testing, Adjusting, and Balancing Insulation Instrumentation and Control D3070 Special Purpose HVAC Systems D Snow Melting Includes: Electric cables and hydronic piping used for snow and ice control. Radiant-Heating Electric Cables Radiant-Heating Hydronic Piping D40 FIRE PROTECTION Starting and Adjusting : Z Demonstration and Training : Z Site Fire Protection Water Distribution: G D4010 Fire Suppression Includes: Fire Suppression Supplementary Components as appropriate. Fire Suppression Performance Requirements D Water-Based Fire-Suppression Includes: Systems that use water for fire extinguishing and suppression. Includes piping, fittings, and specialties; hoses, valves, cabinets; fire pumps, accessories, and controls. Water-Based Fire Suppression Performance Requirements Sprinkler Occupancy Hazard Classifications Standard-Pressure Piping Working Pressure High-Pressure Piping Working Pressure Fire Protection Specialties: D4030. Detection and Alarm: D7050. Integrated Automation: D8010. Site Fire Protection Water Distribution: G Fire-Suppression Water Storage Fire Pumps Fire-Suppression Piping Fire-Suppression Standpipes Fire-Suppression Sprinkler Systems Includes: Piping, fittings, valves, hangers, supports, other specialties, and sprinklers for fire protection systems. Includes limited area sprinkler systems, fire pumps, accessories, and controls. Wet-Pipe Sprinkler Systems Dry-Pipe Sprinkler Systems Preaction Sprinkler Systems Combined Dry-Pipe and Preaction Sprinkler Systems Deluge Fire-Suppression Sprinkler Systems Water Spray Fixed Systems Antifreeze Sprinkler Systems Foam-Water Systems D Fire-Extinguishing Includes: Systems that use other than water for fire extinguishing and suppression. Includes piping, fittings, and specialties; valves, accessories, and controls. 85

92 D SERVICES Carbon-Dioxide Fire-Extinguishing Systems Clean-Agent Fire-Extinguishing Systems Wet-Chemical Fire-Extinguishing Systems Dry-Chemical Fire-Extinguishing Systems D Fire Suppression Supplementary Components Includes: Expansion fittings and loops, meters and gages, general-duty valves, hanger and supports, heat tracing, vibration and seismic controls, identification, insulation, and instrumentation and control to be included in fire protection elements above as appropriate. Mechanical Metal Supports Common Work Results for Fire Suppression Expansion Fittings and Loops Meters and Gages General-Duty Valves Hangers and Supports Heat Tracing Vibration and Seismic Controls Identification Insulation Instrumentation and Control D4030 Fire Protection Specialties Includes: Fire fighting devices and storage cabinets except devices connected to a fire suppression system. D Fire Protection Cabinets D Fire Extinguishers D Breathing Air Replenishment Systems D Fire Extinguisher Accessories D50 ELECTRICAL Electrical Performance Requirements Starting and Adjusting : Z Demonstration and Training : Z D5010 Facility Power Generation Facility Power Generation Performance Requirements Includes: Power Generation Supplementary Components as appropriate. Voltage Power Output Ratings D Packaged Generator Assemblies Includes: Generator, frequency changers, and rotary converters and uninterruptible power units. Engine Generators Steam-Turbine Generators Hydro-Turbine Generators Wind Energy Equipment Frequency Converters Rotary Converters Uninterruptible Power Systems D Battery Equipment Includes: Batteries, battery racks, battery chargers, static power converters, uninterruptible power supplies, and accessories. Batteries Battery Racks Battery Units Central Battery Equipment

93 D SERVICES Static Power Converters Battery Chargers Battery Monitoring Static Uninterruptible Power Supply D Photovoltaic Collectors Includes: Solar cells to convert sunlight to electricity. D Fuel Cells Includes: Fuel cell electricity generating equipment. D Power Filtering and Conditioning Includes: Capacitors, chokes and inductors, filters, power factor controllers, and voltage regulators. Capacitors Chokes and Inductors Electromagnetic-Interference Filters Harmonic Filters Power Factor Correction Equipment Slip Controllers Static-Frequency Converters Radio-Frequency-Interference Filters Voltage Regulators D Transfer Switches Includes: Switches that transfer from one source of electricity to another. D Facility Power Generation Supplementary Components Includes: Grounding and bonding, hanger and supports, raceway and boxes, vibration and seismic controls, identification, wiring connectors, and instrumentation and control to be included in power generation system elements above as appropriate. Electrical Metal Supports Common Work Results for Electrical Grounding and Bonding Hangers and Supports Raceways and Boxes Vibration and Seismic Controls Identification Wiring Connectors Instrumentation and Control D5020 Electrical Service and Distribution Includes: Electrical Service and Distribution Supplementary Components as appropriate. Electrical Service and Distribution Performance Requirements D Electrical Service Includes: Includes meters, substations, transformers, switchgear, switchboards, and protective devices where electrical power enters structure. Electricity Metering Substations Transformers Switchgear and Switchboards Protection Devices Site Electrical Distribution Systems: G

94 D SERVICES D Power Distribution Includes: Bus assemblies, distribution equipment, and electrical wiring system to distribute electrical power to switchboards, panelboards, and motor control centers. Switchboards and Panelboards Switchboards Panelboards Motor-Control Centers Bus Assemblies Distribution Equipment Electrical Cabinets and Enclosures Electrical Wiring System Raceways and Enclosures Ducts Cable Trays Wiring Site Electrical Distribution Systems: G4010. D Facility Grounding Includes: Raceways and wiring to ground and bond electrical distribution system. Raceways Wiring Site Grounding: G D Electrical Service and Distribution Supplementary Components Includes: Grounding and bonding, hanger and supports, raceways and boxes, cable trays, utility poles, vibration and seismic controls, identification, wiring connectors, and instrumentation and control to be included in electrical service and distribution system elements above as appropriate. Electrical Metal Supports Common Work Results for Electrical Grounding and Bonding Hangers and Supports Raceways and Boxes Cable Trays Utility Poles Vibration and Seismic Controls Identification Wiring Connectors Instrumentation and Control D5030 General Purpose Electrical Power Includes: General Purpose Electrical Power Supplementary Components as appropriate. General Purpose Electrical Power Performance Requirements D Branch Wiring System Includes: Raceways, ducts, cable trays, and wiring to deliver power from branch panelboards to point of use. Raceways and Enclosures Ducts Cable Trays Wiring

95 D SERVICES D Wiring Devices Includes: Electrical devices at point of use including electrical outlets and switches. D General Purpose Electrical Power Supplementary Components Includes: Grounding and bonding, hanger and supports, raceways and boxes, cable trays, vibration and seismic controls, identification, wiring connectors, and instrumentation and control to be included in general purpose electrical power elements above as appropriate. Electrical Metal Supports Common Work Results for Electrical Grounding and Bonding Hangers and Supports Raceways and Boxes Cable Trays Vibration and Seismic Controls Identification Wiring Connectors Instrumentation and Control D5040 Lighting Includes: Lighting Supplementary Components as appropriate. Lighting Performance Requirements Sustainable Design Requirements Lighting Levels for Various Areas of Facility Site Lighting: G4050. Roadway Lighting: G Parking Lot Lighting: G Pedestrian Plaza and Walkway Lighting: G Airfield Lighting: G Athletic, Recreation, and Playfield Area Lighting: G2050. Landscape Lighting: G D Lighting Control Includes: Clock and calendar, photoelectric switches, occupancy sensors, and light-leveling control devices. Lighting Control Devices Lighting Control Panels Central Dimming Control Modular Dimming Control Network Lighting Control Theatrical Lighting Control D Branch Wiring for Lighting Includes: Raceways, ducts, cable trays, and wiring beyond branch circuit panelboards to lighting fixtures. Raceways and Enclosures Ducts Cable Trays Wiring Wiring Devices D Lighting Fixtures Includes: Luminaries, lighting equipment, ballasts, and accessories. Includes fluorescent, high intensity discharge, incandescent, mercury vapor, neon, and sodium vapor lighting. Interior Lighting Emergency Lighting Exit Signs Classified Location Lighting

96 D SERVICES Special Purpose Lighting Outline Lighting Underwater Lighting Hazard Warning Lighting Obstruction Lighting Helipad Lighting Security Lighting Display Lighting Theatrical Lighting Detention Lighting Healthcare Lighting Integrated Ceiling Assemblies: C D Lighting Supplementary Components Includes: Grounding and bonding, hanger and supports, raceways and boxes, cable trays, vibration and seismic controls, identification, wiring connectors, and instrumentation and control to be included in lighting system elements above as appropriate. Electrical Metal Supports Common Work Results for Electrical Grounding and Bonding Hangers and Supports Raceways and Boxes Cable Trays Vibration and Seismic Controls Identification Wiring Connectors Instrumentation and Control D5080 Miscellaneous Electrical Systems Includes: Miscellaneous Electrical Systems Supplementary Components as appropriate. D Lightning Protection Includes: Wiring and equipment for lightning protection. Lightning Protection Performance Requirements Lightning Protection for Structures Lightning Protection and Dissipation Early Streamer Emission Lightning Protection Lightning Protection Surge Arresters and Suppressors Site Lightning Protection: G D Cathodic Protection Includes: Equipment and controls for cathodic protection of structures and underground metal construction and piping. Cathodic Protection Performance Requirements Passive Cathodic Protection for Underground and Submerged Piping Passive Cathodic Protection for Underground Storage Tanks D Transient Voltage Suppression Includes: Devices to protect against voltage surges on electrical distribution systems. 90

97 D SERVICES D Miscellaneous Electrical Systems Supplementary Components Includes: Grounding and bonding, hanger and supports, raceways and boxes, cable trays, vibration and seismic controls, identification, wiring connectors, and instrumentation and control to be included in miscellaneous electrical system elements above as appropriate. Common Work Results for Electrical Grounding and Bonding Hangers and Supports Raceways and Boxes Cable Trays Vibration and Seismic Controls Identification Wiring Connectors Instrumentation and Control D60 COMMUNICATIONS Communications Performance Requirements Site Communications Systems: G5010. D6010 Data Communications Includes: Communications Supplementary Components as appropriate. Data Communication Performance Requirements D Data Communications Network Equipment Includes: Switching and routing equipment for data communications. Data Communications Firewalls Data Communications Routers, CSU/DSU, Multiplexers, Codecs, and Modems Data Communications Network Management Data Communications Switches and Hubs Data Communications Wireless Access Points D Data Communications Hardware Includes: Computer equipment for data communications. Data Communications Mainframes Data Communications Storage and Backup Data Communications Servers Data Communications Desktops Data Communications Laptops Data Communications Handhelds D Data Communications Peripheral Data Equipment Includes: Additional equipment for data communications. Printers Scanners External Devices Audio-Video Devices Virtual Reality Equipment Disaster Recovery Equipment D Data Communications Software Includes: Software for data communications. Virus Protection Software Application Suites Software Graphics/Multimedia Software Customer Relationship Management Software Operating System Software Database Software

98 D SERVICES Virtual Private Network Software Internet Conferencing Software D Data Communication Program and Integration Services Includes: Custom programming and integration requirements. Web Development Database Development Application Development Network Integration Requirements Data Communications Integration Requirements D6020 Voice Communications Includes: Communications Supplementary Components as appropriate. Voice Communication Performance D Requirements Voice Communications Switching and Routing Equipment Includes: Switching and routing equipment for voice communications. PDX/Key Systems Internet Protocol Voice Switches D Voice Communications Terminal Equipment Includes: Telephones and other equipment associated with use of telephone lines. Telephone Sets Wireless Transceivers Elevator Telephones Ring-Down Emergency Telephones Facsimiles and Modems TTY equipment Radio Communications Equipment Telephone Specialties: C D Voice Communications Messaging Includes: Voice mail, fax servers and other automated response systems. Voice Mail and Auto Attendant Interactive Voice Response Facsimile Servers D Call Accounting Includes: Hardware and software that facilitates call accounting. Toll Fraud Equipment and Software Telemanagement Software D Call Management Includes: Call center equipment and systems. Digital Voice Announcers Automatic Call Distributors Call Status and Management Displays Dedicated 911 Systems D6030 Audio-Video Communication Includes: Communications Supplementary Components as appropriate. Audio-Video Communication Performance Requirements D Audio-Video Systems Includes: Stand alone and integrated audiovideo systems and equipment that generally support a single room or space in a facility with many components that function as one system. Architecturally Integrated Audio-Video Equipment Integrated Audio-Video Systems and Equipment Portable Audio-Video Equipment Audio-Video Accessories Master Antenna Television Systems Audio-Video Conferencing

99 D SERVICES D Electronic Digital Systems Includes: Hardware, software, and equipment for digital signage systems. Point of Sale Systems Transportation Information Display Systems Public Information Systems D6060 Distributed Communications and Monitoring Includes: Communications Supplementary Components as appropriate. Distributed Communications and Monitoring Performance Requirements D Distributed Audio-Video Communications Systems Includes: Paging, public address, sound masking, and intercommunication systems what service all or part of a facility. Paging Systems Public Address and Mass Notification Systems Sound Masking Systems Intercommunications and Program Systems Assistive Listening Systems D Healthcare Communications and Monitoring Includes: Communications and monitoring systems for healthcare applications. Patient Monitoring and Telemetry Systems Telemedicine Systems Healthcare Imaging Systems Nurse Call/Code Blue Systems Healthcare Equipment: E Healthcare Special Procedures: Z D Distributed Systems Includes: Clocks, interior antenna systems, and tracking systems. Clock Systems Infrared and Radio Frequency Tracking Systems Internal Cellular, Paging, and Antenna Systems D6090 Communications Supplementary Components D Supplementary Components Includes: Grounding and bonding, pathways, hanger and supports, conduits and back boxes, cable trays, utility poles, vibration and seismic controls, and identification, to be included in communications system elements above as appropriate. Communications Metal Supports Common Work Results for Communications Grounding and Bonding Pathways Hangers and Supports Conduits and Back Boxes Cable Trays Utility Poles Vibration and Seismic Controls Identification

100 D SERVICES D70 ELECTRONIC SAFETY AND SECURITY Electronic Safety and Security Performance Requirements Exterior Security Windows: B , Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Security Ceiling Systems: C Security Mirrors and Domes: C Security Plumbing Fixtures: D Security Lighting: D Interior Pedestrian Security Equipment: E Security Equipment: E Exterior Pedestrian Security Equipment: G Security Procedures: Z Temporary Security Barriers & Enclosures: Z Starting and Adjusting : Z Demonstration and Training : Z D7010 Access Control and Intrusion Detection Includes: Electronic Safety and Security Supplementary Components as appropriate. Access Control and Intrusion Detection Performance Requirements D Access Control Includes: Control and monitoring equipment and systems for controlling access to a facility. Access Control Hardware Access Control Global Applications Access Control Systems and Database Management Access Control Systems Infrastructure Access Control Remote Devices Access Control Interfaces Access Control Identification Management Systems Security Access Detection Access Control Vehicle Identification System D Intrusion Detection Includes: Hardware, software, and equipment for burglary systems and perimeter protection systems. Intrusion Detection Control, GUI and Logic Systems Intrusion Detection Systems Infrastructure

101 D SERVICES Intrusion Detection Remote Devices and Sensors Intrusion Detection Interfaces Perimeter Security Systems D7030 Electronic Surveillance Includes: Equipment for detecting and controlling access by persons to a facility site, building, or within a building. Includes Electronic Safety and Security Supplementary Components as appropriate. Electronic Surveillance Performance Requirements D Video Surveillance Includes: Closed circuit television equipment and systems including cameras and recording equipment. Video Surveillance Control and Management Systems Video Surveillance Monitoring and Supervisory Interfaces Digital Video Recorders and Analog Recording Devices Video Surveillance Systems Infrastructure Video Surveillance Remote Positioning Equipment Video Surveillance Remote Devices and Sensors D Electronic Personal Protection Includes: Systems and equipment that monitor and annunciate the need for assistance. Electronic Personal Safety Detection Systems Electronic Personal Safety Alarm Annunciation and Control Systems Electronic Personal Safety Interfaces to Remote Monitoring Electronic Personal Safety Emergency Aid Devices D7050 Detection and Alarm Includes: Equipment for detecting hazardous conditions in a building or on a facility site and communicating an alarm signal. Includes alarm devices, detection devices, safety switches, and associated items. Includes Electronic Safety and Security Supplementary Components as appropriate. Detection and Alarm Performance Requirements Fire Protection Systems: D4010. Integrated Automation Systems: D8010. D Fire Detection and Alarm Includes: Monitoring and recording of fire protection devices and fire suppression systems; audio and/or visual warning systems for inhabitants of structures and for fire fighting authorities; activation of elevators and air handling systems to a predetermine fire mode; and other fire protection functions. 95

102 D SERVICES Fire Detection and Alarm Performance Requirements Digital, Addressable Fire-Alarm Systems Zoned Fire-Alarm Systems Fire Detection and Alarm Control, GUI and Logic Systems Fire Detection and Alarm Annunciation Panels and Fire Stations Fire Detection and Alarm Interfaces Fire Detection Sensors Smoke Detection Sensors Carbon-Monoxide Detection Sensors Fire Alarm Initiating Devices Fire Alarm Integrated Audio Visual Evacuation Fire Protection Systems: D4010. Integrated Automation Systems: D8010. D Radiation Detection and Alarm Includes: Systems and equipment for the detection and notification of radioactive presence. Radiation Detection and Alarm Performance Requirements Radiation Detection and Alarm Control, GUI and Logic Systems Radiation Detection and Alarm Integrated Audio Evacuation Systems Radiation Detection Sensors Radiation Dosimeters Exterior Radiation Shielding Windows: B Exterior Radiation Shielding Doors: B Interior Radiation Shielding Windows: C Interior Radiation Shielding Doors: C Radiation Protection: F D Fuel-Gas Detection and Alarm Includes: Systems and equipment for the detection and notification of fuel gas presence. Fuel-Gas Detection and Alarm Performance Requirements Fuel-Gas Detection and Alarm Control, GUI and Logic Systems Fuel-Gas Detection and Alarm Integrated Audio Evacuation Systems Fuel-Gas Detection Sensors Site Gas Distribution: G D Fuel-Oil Detection and Alarm Includes: Systems and equipment for the detection and notification of fuel oil presence. Fuel-Oil Detection and Alarm Performance Requirements Fuel-Oil Detection and Alarm Control, GUI and Logic Systems

103 D SERVICES Fuel-Oil Detection and Alarm Integrated Audio Evacuation Systems Fuel-Oil Detection Sensors Site Fuel-Oil Distribution: G D Refrigeration Detection and Alarm Includes: Systems and equipment for the detection and notification of refrigerant presence. Refrigeration Detection and Alarm Performance Requirements Refrigeration Detection and Alarm Control, GUI and Logic Systems Refrigeration Detection and Alarm Integrated Audio Evacuation Systems Refrigeration Detection Sensors Cooling Systems: D3030. D Water Intrusion Detection and Alarm Includes: Systems and equipment for the detection and notification of water presence. Water Intrusion Detection and Alarm Performance Requirements Water Detection and Alarm Control, GUI and Logic Systems Water Detection Sensors D7070 Electronic Monitoring and Control Includes: Electronic Safety and Security Supplementary Components as appropriate. Electronic Monitoring and Control Performance Requirements D Electronic Detention Monitoring and Control Includes: Electronic equipment and systems for detention applications. Hard-Wired Detention Monitoring and Control Systems Relay-Logic Detention Monitoring and Control Systems PLC Electronic Detention Monitoring and Control Systems Computer-Based Detention Monitoring and Control Systems Discreet-Logic Detention Monitoring and Control Systems Discreet-Distributed Intelligence Detention Monitoring and Control Systems Exterior Detention Windows: B Exterior Detention Doors: B Interior Detention Windows: C Interior Detention Doors: C Detention Equipment: E Detention Furniture: E Detention Cell Modules: F Metal Detention Enclosures: F Detention Project Procedures: Z

104 D SERVICES D7090 Electronic Safety and Security Supplementary Components D Supplementary Components Includes: Conductors and cables, grounding and bonding, pathways, vibration and seismic controls, and identification, to be included in electronic safety and security system elements above as appropriate. Common Work Results for Electronic Safety and Security Conductors and Cables Grounding and Bonding Pathways Vibration and Seismic Controls Identification D80 INTEGRATED AUTOMATION Integrated Automation Performance Requirements Starting and Adjusting : Z Demonstration and Training : Z D8010 Integrated Automation Facility Controls Includes: Hardware and/or software that allows the building automation system to monitor and control other facility equipment and systems. Includes Integrated Automation Supplementary Components as appropriate. Integrated Automation Facility Controls Performance Requirements D Integrated Automation Control of Equipment D Integrated Automation Control of Conveying Equipment D Integrated Automation Control of Fire-Suppression Systems D Integrated Automation Control of Plumbing Systems D Integrated Automation Control of HVAC Systems D Integrated Automation Control of Electrical Systems D Integrated Automation Control of Communication Systems D Integrated Automation Control of Electronic Safety and Security Systems D Integrated Automation Supplementary Components Includes: Conductors and cables, grounding and bonding, pathways, vibration and seismic controls, and identification, to be included in integrated automation system elements above as appropriate. Common Work Results for Integrated Automation Conductors and Cables Grounding and Bonding Pathways Vibration and Seismic Controls Identification

105 E EQUIPMENT AND FURNISHINGS Equipment and Furnishings Performance Requirements E10 EQUIPMENT Equipment Performance Requirements Starting and Adjusting : Z Demonstration and Training : Z E1010 Vehicle and Pedestrian Equipment E Vehicle Servicing Equipment Includes: Equipment associated with vehicle service facilities. Vehicle Lubrication Equipment Tire-Changing Equipment Vehicle Washing Equipment Vehicle Lifts: D Vehicle Turntables: D E Interior Parking Control Equipment Includes: Equipment associated with the control of movement of vehicle parking. Interior Parking Key and Card Control Units Interior Parking Ticket Dispensers Interior Parking Meters Interior Parking Fee Collection Equipment Interior Parking Gates Exterior Parking Control Equipment: G E Loading Dock Equipment Includes: Equipment for the protection of service docks and for the loading and unloading of service vehicles. Loading Dock Bumpers Loading Dock Seals and Shelters Loading Dock Levelers Loading Dock Lifts Loading Dock Lights Vehicle Lifts: D E Interior Pedestrian Control Equipment Includes: Equipment associated with the control of movement of pedestrians. Interior Pedestrian Gates Interior Money-Changing Equipment Interior Pedestrian Fare Collection Equipment Interior Pedestrian Detection Equipment Interior Pedestrian Security Equipment Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Security Mirrors and Domes: C

106 E EQUIPMENT AND FURNISHINGS Electronic Safety and Security: D70. Security Equipment: E Exterior Pedestrian Security Equipment: G Security Procedures: Z Temporary Security Barriers & Enclosures: Z E1030 Commercial Equipment E Mercantile and Service Equipment Includes: Equipment used in retail and service stores. Cash Registers and Checking Equipment Vending Equipment Checkroom Equipment Weighing and Wrapping Equipment Barber and Beauty Shop Equipment E Vault Equipment Includes: Equipment specifically designed for money or valuable material storage, including vault ventilators and specialized security equipment. Safe Deposit Boxes Safes Vault Ventilators Interior Vault Doors: C Vaults: F E Teller and Service Equipment Includes: Equipment specifically designed for handling and transfer of money and other highsecurity items. Teller Equipment Systems Automatic Banking Systems Money Handling Equipment Money Cart Pass-Through Package Transfer Units E Refrigerated Display Equipment Includes: Display cases that include refrigeration. Display Cases: C Display Turntables: D Display Lighting: D E Commercial Laundry and Dry Cleaning Equipment Includes: Equipment for commercial laundry and dry cleaning operations including coinoperated equipment. Dry Cleaning Equipment Drying and Conditioning Equipment Finishing Equipment Commercial Ironing Equipment Commercial Washers and Extractors Coin-Operated Laundry Equipment Hanging Garment Conveyors Residential Laundry Appliances: E E Maintenance Equipment Includes: Built-in and free-standing equipment for building maintenance. Floor and Wall Cleaning Equipment Housekeeping Carts Vacuum Cleaning Systems

107 E EQUIPMENT AND FURNISHINGS Window Washing Systems Operable Access Systems: D1080. E Hospitality Equipment Includes: Specialized equipment for the purpose of registering, admitting, and controlling rooms and other information at hotels, motels, hospitals, and other similar facilities. Registration Equipment Hospitality Turntables: D Hospitality Casework: E Hospitality Furniture: E E Unit Kitchens Includes: Manufactured units incorporating plumbing fixtures, appliances, casework and countertops. Residential Appliances: E Residential Casework: E E Photographic Processing Equipment Includes: Photographic film processing equipment and other products for darkroom use. Darkroom Processing Equipment Film Transfer Cabinets Darkroom Doors: C Laboratory Casework: E E Postal, Packaging, and Shipping Equipment Includes: Equipment for normal mailing, packaging, shipping, and delivery operations for professional, commercial, and institutional applications. Packaging Equipment Shipping Equipment Postal Equipment Copiers Postal Specialties: C E Office Equipment Includes: Computers, printers, copiers, drafting equipment, plotters, carto-stereographs, and other equipment used in offices. Computers Printers Facsimile Machines Copiers Pneumatic Tube Systems: D Office Furniture: E Office Shelters and Booths: F E Foodservice Equipment Includes: Equipment used for liquid and solid food storage, preparation, display, serving, and clean-up in commercial and institutional kitchens and bars. 101

108 E EQUIPMENT AND FURNISHINGS Food Storage Equipment Refrigerated Food Storage Cases Walk-In Coolers Walk-In Freezers Food Service Shelving Food Preparation Equipment Food Delivery Carts and Conveyors Food Delivery Carts Food Delivery Conveyors Food Cooking Equipment Commercial Ranges Commercial Ovens Food Dispensing Equipment Bar Equipment Service Line Equipment Soda Fountain Equipment Ice Machines Cleaning and Disposal Equipment Commercial Dishwashers Ventilation Hoods: D Disposers: D E1040 Institutional Equipment E Educational and Scientific Equipment Includes: Equipment associated with libraries, education facilities, laboratories, planetariums, observatories, and museums. Library Equipment Automatic Book Storage and Retrieval Systems Book Depositories Book Theft Protection Equipment Library Stack Systems Library Casework: E Library Furniture: E Audio-Visual Equipment Projection Screens Projectors Players and Recorders Laboratory Equipment Laboratory Fume Hoods Laboratory Incubators Laboratory Sterilizers Laboratory Refrigerators Emergency Safety Appliances Service Fittings and Accessories Biological Safety Cabinets Process Support Plumbing Systems: D2060. Special Exhaust: D Laboratory Casework: E Laboratory Furniture: E Planetarium Equipment Planetarium Projectors

109 E EQUIPMENT AND FURNISHINGS Planetarium Pendulums Planetariums: F Observatory Equipment Telescopes Observatories: F Vocational Shop Equipment Exhibit Equipment Exhibit Turntables: D Arts and Crafts Equipment Kilns E Healthcare Equipment Includes: Specialized equipment for healthcare facilities for humans and animals. Includes film illuminators, fluoroscopes, hubbard tubs, radioisotopic equipment, and surgical equipment. Healthcare Metal Supports Medical Sterilizing Equipment Examination and Treatment Equipment Patient Care Equipment Dental Equipment Optometry Equipment Operating Room Equipment Radiology Equipment Mortuary Equipment Mortuary Refrigerators Crematorium Equipment Mortuary Lifts Therapy Equipment Healthcare Plumbing Fixtures: D Process Support Plumbing Systems: D2060. Healthcare Lighting: D Healthcare Communications & Monitoring: D Healthcare Casework: E Healthcare Furniture: E Healthcare Special Procedures: Z E Religious Equipment Includes: Built-in and free-standing religious equipment, including baptistery and chancel fittings. Baptisteries Musical Equipment: E Fixed Religious Art: E Religious Casework: E Fixed Pews: E Movable Religious Art: E E Security Equipment Includes: Equipment specifically designed for secure operations. Security Equipment Performance Requirements Deal Drawers Gun Ports

110 E EQUIPMENT AND FURNISHINGS Valuable Material Storage Exterior Security Windows: B Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Security Ceiling Systems: C Security Mirrors and Domes: C Security Plumbing Fixtures: D Security Lighting: D Electronic Safety and Security: D70. Interior Pedestrian Security Equipment: E Exterior Pedestrian Security Equipment: G Security Procedures: Z Temporary Security Barriers & Enclosures: Z E Detention Equipment Includes: Equipment specifically designed for detention facilities. Detention Equipment Performance Requirements Levels of Security Detention Pass-Through Doors Detention Gun Lockers Exterior Detention Windows: B Exterior Detention Doors: B Interior Detention Windows: C Interior Detention Doors: C Detention Lighting: D Detention Monitoring and Control: D7070. Detention Furniture: E Detention Cell Modules: F Metal Detention Enclosures: F Detention Project Procedures: Z E1060 Residential Equipment Includes: Built-in and free-standing appliances and other components specifically for residential use. Fireplaces and Stoves: C Residential Furniture: E

111 E EQUIPMENT AND FURNISHINGS E Residential Appliances Residential Kitchen Appliances Residential Laundry Appliances Unit Kitchens: E Residential Casework: E E Retractable Stairs E Residential Ceiling Fans E1070 Entertainment and Recreational Equipment Includes: Equipment for use in athletic, recreational, and therapeutic activities. E Theater and Stage Equipment Includes: Equipment for support of theatrical, instrumental, and voice programs. Includes cycloramas, entertainment ticket dispensers, scenery and flats, and tormentors. Acoustical Shells Folding and Portable Stages Rigging Systems and Controls Stage Curtains Platform/Stage Floors: C Stage and Orchestra Lifts: D Stage Turntables: D Theatrical Lighting Control: D Voice Communication Systems: D6020. Fixed Multiple Seating: E E Musical Equipment Includes: Musical instruments, including prefabricated and field assembled instruments. Bells Carillons Organs E Athletic Equipment Includes: Equipment for use in interior athletic and exercise activities. Exercise Equipment Gymnasium Equipment Interior Scoreboards Gymnasium Dividers Interior Operable Partitions: C Athletic Flooring: C Gymnasium Dividers: E Athletic Rooms: F Athletic & Recreational Special Construction: F1060. Athletic Areas: G E Recreational Equipment Includes: Equipment for use in recreational activities. Includes curling rinks and pistol and rifle range equipment. Bowling Alley Equipment Shooting Range Equipment Climbing Walls Table Games Equipment

112 E EQUIPMENT AND FURNISHINGS Game Room Equipment Swimming Pools: F Athletic & Recreational Special Construction: F1060. Recreational Areas: G E1090 Other Equipment E Solid Waste Handling Equipment Includes: Equipment involving the collection, shredding, compaction, removal and incineration of trash and other solid waste. Solid Waste Handling Equipment Performance Requirements Solid Waste Bins Incinerators Recycling Equipment Waste Compactors and Destructors Composting Equipment Facility Waste Shredders Facility Waste Balers Trash Chutes: D E Agricultural Equipment Includes: Equipment related to land cultivating, raising crops, and feeding, breeding, and raising of livestock. Milkers Stock Feeders Stock Waterers Agricultural Waste Clean-Up Equipment Kennels and Animal Shelters: F E Horticultural Equipment Includes: Equipment related to cultivating flowers, fruits, vegetables, or ornamental plants. Hydroponic Growing Systems Seeders Transplanters Potting Machines Flat Fillers Baggers Soil Mixers Agricultural Irrigation Planting Irrigation: G E Decontamination Equipment Includes: Equipment associated with decontamination operations. Hazardous Materials Remediation: F2010. Site Remediation: G1050. E20 FURNISHINGS Furnishings Performance Requirements E2010 Fixed Furnishings E Fixed Art Includes: Interior and exterior fixed art objects. Murals Fixed Wall Decorations Paintings Tapestries

113 E EQUIPMENT AND FURNISHINGS Wall Hangings Fixed Sculptures Art Glass Fixed Religious Art Religious Equipment: E Religious Casework: E Fixed Pews: E Movable Religious Art: E Suspended Decorative Elements Moveable Art: E E Window Treatments Includes: Interior window coverings and associated hardware and controls. Window Blinds Curtains and Drapes Interior Shutters Window Shades Window Treatment Operating Hardware Windows with Integral Blinds: B2020. Exterior Protection Devices for Openings: B E Casework Includes: Custom and manufactured stock design steel, wood, and laminate faced cabinets and other casework units. Includes countertops with integral sinks, fixtures and accessories. Specialty Casework Bank Casework Hospitality Casework Hospitality Turntables: D Hospitality Equipment: E Hospitality Furniture: E Residential Casework Unit Kitchens: E Residential Appliances: E Utility Room Casework Educational/Library Casework Library Equipment: E Library Furniture: E Laboratory Casework Process Support Plumbing Systems: D2060. Laboratory Equipment: E Laboratory Furniture: E Display Casework

114 E EQUIPMENT AND FURNISHINGS Healthcare Casework Healthcare Plumbing Fixtures: D Process Support Plumbing Systems: D2060. Healthcare Communications & Monitoring: D Healthcare Equipment: E Healthcare Furniture: E Healthcare Special Procedures: Z Religious Casework Religious Equipment: E Fixed Religious Art: E Fixed Pews: E Movable Religious Art: E Reception Casework Countertops Lockers: C Storage Specialties: C Mercantile and Service Equipment: E E Fixed Multiple Seating Includes: Fixed, and telescoping seating for theaters, auditoriums, lecture halls, stadiums, arenas, gymnasiums, religious buildings, restaurants, and other facilities where multiple seating is required. Fixed Waiting Area Seating Fixed Audience Seating Stadium and Arena Seating Bleachers Fixed Booths and Tables Multiple-Use Fixed Seating Telescoping Stands Fixed Pews and Benches Fixed Seat and Table Assemblies Lecture Hall Seating Moveable Multiple Seating: E Exterior Grandstands and Bleachers: F E Other Fixed Furnishings Fixed Interior Planters and Artificial Plants Includes: Fixed artificial plants, planters, and accessories. Fixed Interior Artificial Plants Fixed Interior Planters Interior Landscaping Accessories Movable Interior Planters and Artificial Plant: E

115 E EQUIPMENT AND FURNISHINGS E2050 Movable Furnishings Includes: Items of moveable furniture and furnishing accessories. Includes furniture for a variety of uses including classroom, dormitory, ecclesiastical, hotel and motel, laboratory, library, lounge, medical, office, restaurant, and residential. Interior Demountable Partitions: C1010. Storage Assemblies: C1090. Library Casework: E E Movable Art Includes: Interior and exterior moveable art objects such as paintings, and sculpture. Fixed Art: E Movable Sculptures Movable Religious Art Religious Equipment: E Musical Equipment: E Fixed Religious Art: E Religious Casework: E Fixed Pews: E E Furniture Includes: Movable interior furniture. Office Furniture Office Equipment: E Office Shelters and Booths: F Seating Office Seating Healthcare Seating Retail Furniture Hospitality Furniture Hotel and Motel Furniture Restaurant Furniture Hospitality Turntables: D Hospitality Equipment: E Hospitality Casework: E Educational Furniture Detention Furniture Detention Monitoring and Control: D7070. Detention Equipment: E Detention Cell Modules: F Metal Detention Enclosures: F Detention Project Procedures: Z Institutional Furniture Classroom Furniture Lecterns Dormitory Furniture Library Furniture Library Equipment: E Library Casework: E

116 E EQUIPMENT AND FURNISHINGS Audio-Visual Furniture Laboratory Furniture Process Support Plumbing Systems: D2060. Laboratory Equipment: E Laboratory Casework: E Healthcare Furniture Healthcare Communications & Monitoring: D Healthcare Equipment: E Healthcare Casework: E Healthcare Special Procedures: Z Industrial Furniture Welding Benches Welding Screens Residential Furniture Residential Casework: E Systems Furniture E Accessories Includes: Interior furnishing accessories not attached to permanent construction. Office Accessories Table Accessories Portable Lamps Bath Furnishings Shower Curtains Bedroom Furnishings Furnishing Accessories Moveable Rugs and Mats Carpeting: C Entrance Flooring: C E Movable Multiple Seating Includes: Portable seating for auditoriums, lecture halls, stadiums, arenas, gymnasiums, religious buildings, restaurants, and other facilities where multiple seating is required. Portable Audience Seating Portable Multiple-Use Seating Portable Pews and Benches Portable Seat and Table Assemblies Portable Waiting Area Seating Fixed Multiple Seating: E Exterior Grandstands and Bleachers: F E Other Movable Furnishings Movable Interior Planters and Artificial Plants Includes: Moveable artificial plants, and planters. Movable Interior Artificial Plants Movable Interior Planters Interior Landscaping Accessories Fixed Interior Planters and Artificial Plants: E

117 F SPECIAL CONSTRUCTION AND DEMOLITION F10 SPECIAL CONSTRUCTION Special Construction Performance Requirements F1010 Integrated Construction F Building Modules Includes: Fabricated and pre-engineered modules for site assembly by stacking or linking. Building Modules Performance Requirements Load Capacity Wind Load Capacity Fire Rating Thermal Resistance Vapor Transmission Resistance Air Infiltration Resistance Sound Transmission Hospital Unit Modules Dwelling Unit Modules Dormitory Unit Modules Detention Cell Modules Exterior Detention Windows: B Exterior Detention Doors: B Interior Detention Windows: C Interior Detention Doors: C Detention Lighting: D Detention Monitoring and Control: D7070. Detention Equipment: E Detention Furniture: E Metal Detention Enclosures: F Detention Project Procedures: Z F Manufactured/Fabricated Rooms Includes: Prefabricated and pre-engineered rooms designed and constructed to meet critical performance requirements of environmental control, dimensional tolerances, sound control, fire protection, and other special conditions. Manufactured/Fabricated Rooms Performance Requirements Fire Rating Thermal Resistance Vapor Transmission Resistance

118 F SPECIAL CONSTRUCTION AND DEMOLITION Sound Transmission Interior Special Function Windows: C Interior Special Function Doors: C Special Facility Components: F1050. Controlled Environment Rooms Clean Rooms Clean Room Special Procedures: Z Hyperbaric Rooms Insulated Rooms Cold Storage Rooms Cold Storage Doors: C Constant Temperature Rooms Sound-Conditioned Rooms Office Shelters and Booths Includes: Interior shelters and booths. Office Equipment: E Office Furniture: E Covers and Shelters: G2060. Planetariums Planetarium Equipment: E Special Activity Rooms Saunas Steam Baths Athletic Rooms Athletic Flooring: C Athletic Equipment: E Athletic & Recreational Special Construction: F1060. Athletic Areas: G Vaults Interior Vault Doors: C Vault Equipment: E Vaults: F Metal Detention Enclosures F Modular Mezzanines Includes: Prefabricated and pre-engineered mezzanine modules complete with structural support, flooring, railings, stairs, and other accessories. Modular Mezzanines Performance Requirements Load Capacity Deflection Vibration Levelness Mezzanine Construction: B

119 F SPECIAL CONSTRUCTION AND DEMOLITION F1020 Special Structures Special Structures Performance Requirements Superstructure: B10. F Fabric Structures Includes: Structures of flexible membrane material support by air pressure, tensioned cables, or other framing system. Fabric Structures Performance Requirements Load Capacity Air-Supported Fabric Structures Tensioned Fabric Structures Framed Fabric Structures F Space Frames Includes: Three-dimensional structural frame of any material capable of transmitting loads in three dimensions. Space Frames Performance Requirements Load Capacity F Geodesic Structures Includes: Dome shaped structure constructed of straight members of any material that form a triangular gridwork. Geodesic Structures Performance Requirements Geodesic Domes F Manufacturer-Engineered Structures Includes: Prefabricated, pre-engineered buildings and structures assembled on temporary and permanent foundations. Manufactured-Engineered Structures Performance Requirements Load Capacity Wind Load Capacity Fire Rating Thermal Resistance Vapor Transmission Resistance Air Infiltration Resistance Sound Transmission Glazed Structures Exterior Grandstands and Bleachers Metal Building Systems Observatories Planetarium Equipment: E Telescoping Stands: E Special Facility Components: F1050. Covers and Shelters: G2060. F Manufactured Canopies Includes: Fabricated and pre-engineered canopies. Manufactured Canopy Performance Requirements Load Capacity Wind Load Capacity Canopy Frame: B Canopy Roofing: B Exterior Ceilings and Soffits: B3080. F Rammed Earth Construction Rammed Earth Walls

120 F SPECIAL CONSTRUCTION AND DEMOLITION F Towers Includes: Fabricated and pre-engineered structures of a vertical nature for a variety of purposes. Towers Performance Requirements Wind Load Capacity Functional Towers Decorative Towers Electrical Utility Towers: G Towers Grounding: G Communications Towers: G F1030 Special Function Construction F Sound and Vibration Control Includes: Manufactured components for the reduction of undesirable sound and vibration within a structure. Sound and Vibration Control Performance Requirements Sound Transmission Vibration Acoustical Wall Treatment: C2010. Acoustical Ceiling Treatment: C2050. Plumbing Vibration, and Seismic Control: D20. HVAC Sound, Vibration, and Seismic Control: D30. Fire Protection Sound, Vibration, and Seismic Control: D40. F Seismic Control Includes: Manufactured components for the control of seismic loads on a structure. Seismic Control Performance Requirements Seismic Zone Plumbing Sound, Vibration, and Seismic Control: D20. HVAC Sound, Vibration, and Seismic Control: D30. Fire Protection Sound, Vibration, and Seismic Control: D40. F Radiation Protection Includes: Radiation shielding components and structures for protection against radio frequency, x-ray, nuclear radiation, electromagnetic fields, and high energy magnetic pulse projection. Radiation Protection Performance Requirements Radiation Levels Radio Frequency Protection X-Ray Protection Nuclear Radiation Protection Electromagnetic Field Protection

121 F SPECIAL CONSTRUCTION AND DEMOLITION High Energy Magnetic Pulse Protection Exterior Radiation Shielding Windows: B Exterior Radiation Shielding Doors: B Interior Radiation Shielding Windows: C Interior Radiation Shielding Doors: C Radiation Detection and Alarm: D F1050 Special Facility Components F Pools Includes: Prefabricated and pre-engineered components, field assembled for aquatic sport, recreation, and health purposes. Pools Performance Requirements Swimming Pools Tubs and Pools Hot Tubs Therapeutic Pools Whirlpool Tubs Pool Plumbing Systems Pool Equipment Pool Water Treatment Pool Pumps Pool Equipment Controls Pool Piping System Pool Specialties Underwater Lighting: D Swimming Pool Equipment: F1050. Special Activity Rooms: F1010. F Interior Fountains Includes: Interior decorative or functional manufactured fountains. Interior Fountains Performance Requirements Interior Fountain Plumbing Systems Interior Fountain Equipment Interior Fountain Water Treatment Interior Fountain Pumps Interior Fountain Equipment Controls Interior Fountain Piping System Interior Fountain Specialties Underwater Lighting: D Exterior Fountains: G F Interior Water Features Includes: Interior water features other than fountains such as water curtains. Decorative Water Curtains F Aquariums Includes: Tubs, bowls, and other containers for containing and displaying of aquatic animals and plants. F Amusement Park Structures and Equipment Includes: Fabricated or pre-engineered components, field assembled for sport or recreational purposes. Water Slides Wave Generating Equipment Amusement Park Rides

122 F SPECIAL CONSTRUCTION AND DEMOLITION F Ice Rinks Includes: Freezing equipment, piping, floor systems, and surrounding enclosures for ice rinks. F Animal Containment Includes: Enclosures, gates, and feeding devices for kennels and animal shelters. Agricultural Equipment: E1090. Fences and Gates: G2060. F1060 Athletic and Recreational Special Construction Includes: Special construction for athletic and recreational activities that are directly related to the adjacent construction. F Indoor Soccer Boards F Safety Netting F Arena Football Boards F Floor Sockets F Athletic and Recreational Court Walls F Demountable Athletic Surfaces Athletic Flooring: C Athletic Equipment: E Athletic Rooms: F Athletic Areas: G Swimming Pools: F Recreational Areas: G F1080 Special Instrumentation Includes: Instrumentation for measuring and recording phenomena such as stresses in structures, solar and wind energy, and effects of earthquakes. F Stress Instrumentation F Seismic Instrumentation F Meteorological Instrumentation Solar Instrumentation Wind Instrumentation F Earth Movement Monitoring F20 FACILITY REMEDIATION F2010 Hazardous Materials Remediation Includes: Remediation for abatement and removal and disposal of contaminated materials within structures. Hazardous Materials Remediation Performance Requirements Decontamination Equipment: E Site Remediation: G1050. F Transportation and Disposal of Hazardous Materials Includes: Transporting and disposal of hazardous materials within structures. F Asbestos Remediation Includes: Abatement or removal of asbestos material within structures. Asbestos Abatement Engineered Control of Asbestos Containing Removal and Disposal of Asbestos Containing F Lead Remediation Includes: Abatement or removal of lead material within structures. Lead Hazard Control Activities Lead-Based Paint Remediation Removal and Disposal of Materials Containing

123 F SPECIAL CONSTRUCTION AND DEMOLITION F Polychlorinate Biphenyl Remediation Includes: Abatement or removal of polychlorinated biphenyl material within structures. Handling of Lighting Ballasts and Lamps Removal and Disposal of Polychlorinate F Mold Remediation Includes: Remediation of areas and materials contaminated by mold, mildew, or fungus. Precautions for Mold Remediation Mold Remediation Preparation and Containment Mold Remediation Clearance Air Sampling Removal and Disposal of Materials with Mold F30 DEMOLITION Site Elements Demolition: G1020. F3010 Structure Demolition Includes: Complete removal and disposal of structures. F Building Demolition F Tower Demolition F Bridge Demolition F Dam Demolition F3030 Selective Demolition Includes: Removal and disposal of parts of structures. F Selective Building Demolition F Selective Interior Demolition F Selective Bridge Demolition F Selective Historic Demolition Historic Restoration Requirements: Building Demolition: F Historic Treatment Procedures: Z F3050 Structure Moving Includes: Preparation and processes of relocating and raising structures. Structure Moving Performance Requirements Site Element Relocations: G1030. F Structure Relocation F Structure Raising

124

125 G SITEWORK Site Construction Performance Requirements G10 SITE PREPARATION Site Preparation Performance Requirements G1010 Site Clearing Includes: Removal of vegetation from the site, including stripping of sod and soil, and tree pruning for site clearing. G Clearing and Grubbing G Tree and Shrub Removal and Trimming Shrub and Tree Transplanting: G2080. Temporary Tree and Plant Protection: Z1050. G Earth Stripping and Stockpiling Soil Stripping and Stockpiling Sod Stripping and Stockpiling G1020 Site Elements Demolition Includes: Removal of above and below grade site improvements. Demolition: F30. G Utility Demolition G Infrastructure Demolition G Selective Site Demolition G1030 Site Element Relocations Structure Moving: F3050. G Utility Relocation Includes: Relocation of utility systems. G1050 Site Remediation Includes: Remediation of contaminated sites. Site Remediation Performance Requirements Decontamination Equipment: E Facility Remediation: F20. Contaminated Site Special Procedures: Z G Physical Decontamination Includes: Soil decontamination by physical treatment processes. Coagulation and Flocculation Decontamination Reverse-Osmosis Decontamination Solidification and Stabilization Decontamination Mechanical Filtration Decontamination Radioactive Decontamination Surface Cleaning Decontamination Surface Removal Decontamination G Chemical Decontamination Includes: Soil decontamination by chemical treatment processes. Chemical Precipitation Decontamination Ion Change Decontamination Neutralization Decontamination G Thermal Decontamination Includes: Soil decontamination by thermal treatment processes. Incineration Decontamination

126 G SITEWORK Thermal Desoption Decontamination Vitrification Decontamination G Biological Decontamination Includes: Soil decontamination by biological treatment processes. Aerobic Processes Decontamination Anaerobic Processes Decontamination Bioremediation Decontamination Soil Washing through Separation/Solubilization Organic Decontamination G Remediation Soil Stabilization Includes: Insiu and exsitu soil stabilization for remediation. G Site Containment Includes: Containment of contaminated site materials. Waste Containment Gas Containment G Sinkhole Remediation Includes: Remediation of underground voids in soluble rock created by groundwater. Sinkhole Remediation by Grouting Sinkhole Remediation by Backfilling G Hazardous Waste Drum Handling Includes: The handling of drums containing material contaminated with toxic and hazardous materials. G Contaminated Site Material Removal Includes: Removal and disposal of contaminated site materials. Removal and Disposal of Contaminated Soils Includes: Removal of toxic and hazardous site materials including polychlorinate biphenyl, asbestos, and organically contaminated soils. Hazardous Waste Recovery Processes Includes: Removal of hazardous and toxic materials from soil. Transportation and Disposal of Hazardous Materials: F Underground Storage Tank Removal Includes: Removal of underground tanks and appurtenances which have been used to store toxic and hazardous materials. Landfill Construction and Storage Includes: Construction of landfills and storage of hazardous materials. G Water Remediation Includes: Remediation of contaminated water. Groundwater Treatment Water Decontamination G1070 Site Earthwork Includes: Moving earth to establish new contours and elevations. Site Earthwork Performance Requirements Degree of Compaction G Grading Includes: Earthmoving to reshape contours. Rough Grading Fine Grading Finish Grading G Excavation and Fill Includes: Excavation and fill for foundations, structures, pavement, railways, ditches, channels, culverts, drains, and utilities. Building Substructure Excavation: A9010. Building Backfill and Compaction: A

127 G SITEWORK Excavation Rock Removal Fill Backfill Compaction Flowable Fill Geofoam Trenching and Backfilling G Embankments Includes: Soil and rock embankments for support or containment and protection purposes. Roadway Embankments Railway Embankments G Erosion and Sedimentation Controls Includes: Construction of permanent erosion checks and controls. Temporary Erosion and Sediment Control: Z G Soil Stabilization Includes: Addition and integration of material in and on soil to stabilize and strengthen soil material and the construction of which it is a part. Includes fully grouted, passive (nontensioned) soil nails used to resist failure forces on slopes. Soil Mixing Stabilization Chemical Treatment Soil Stabilization Geosynthetic Soil Stabilization Pressure Grouting Soil Stabilization Shotcrete Soil Slope Stabilization Soil Nailing G Rock Stabilization Includes: Various technologies to make an unstable rock slope more stable. Rock Bolting and Grouting Rock Slope Netting Rock Slope Wire Mesh Shotcrete Rock Slope Stabilization Vegetated Rock Slope Stabilization G Soil Reinforcement Includes: Various technologies to reinforce the strength and stability of soils. Geosynthetic Soil Reinforcement Fiber Soil Reinforcement Reinforced Soil Retaining Walls: G G Slope Protection Includes: Various technologies to protect slopes from erosion. Geosynthetic Slope Protection Slope Protection with Slope Paving Containment Barriers G Gabions Includes: Wire baskets filled with rock used for a variety of purposes. Gabion Boxes Gabion Mattresses Gabion Retaining Walls: G G Riprap Includes: Cover of rock used to stabilized slopes subject to water erosion intended to be permanent. 121

128 G SITEWORK G Wetlands Includes: Construction and restoration of excavated basis with purposely placed wetland vegetation to enhance pollutant removal from stormwater runoff. Constructed Wetlands Wetlands Restoration G Earth Dams Includes: Dams constructed of earth. Storm Drainage Ponds and Reservoirs: G G Site Soil Treatment Includes: Soil treatment to resist invasion of adjoining structure by pests and growth of vegetation. Rodent Control Termite Control Vegetation Control Soil Treatment: A9040. G20 SITE IMPROVEMENTS Site Improvements Performance Requirements Site Improvements Grounding: G G2010 Roadways Includes: Pavement, curbs and gutters, appurtenances, lighting, and vehicle fare collection for roadways. May Include: Site earthwork. Roadways Performance Requirements Live Load Capacity Lighting Levels Site Earthwork: G1070. Parking Lots: G2020. Pedestrian Plazas and Walkways: G2030. Airfields: G2040. Athletic, Recreational, and Playfield Areas: G2050. Temporary Roads: Z G Roadway Pavement Roadway Base Courses Includes: Prepared and compacted soil and granular layers placed before installation of roadway pavement. Flexible Roadway Pavement Includes: Finished roadway pavement of granular and asphaltic materials. Seal coats and restoration of existing pavements. Rigid Roadway Pavement Includes: Finished roadway pavement with high bending resistance, usually of concrete. Roadway Unit Pavement Includes: Blocks or tiles used for roadway pavement. Includes unit pavers set in mastic, sand, or mortar. Unit Pavers: B3040. Roadway Aggregate Surfacing

129 G SITEWORK G Roadway Curbs and Gutters Includes: Construction at perimeter of roadway pavements to separate pavements from adjacent surfaces, provide vehicular restraint, and facilitate drainage. G Roadway Appurtenances Includes: Accessories for roadway construction. Speed Bumps Pavement Snow Melting Systems Snow Melting: D Roadway Construction Vehicle Barriers Impact Attenuating Devices Vehicle Delineators Traffic Signage Roadway Signaling and Control Equipment Traffic Signals Traffic Control Equipment Roadway Monitoring Equipment Pavement Markings G Roadway Lighting Site Lighting: G4050. G Vehicle Fare Collection Includes: Equipment associated with the control of movement of vehicles on roadways and is integral system with equipment to dispense tickets and collect fares for vehicles. Vehicle Ticketing Equipment Vehicle Fare Collection Equipment Vehicle Fare Gates G2020 Parking Lots Includes: Pavement, curbs and gutters, appurtenances, lighting, and parking control equipment for parking lots. May Include: Site earthwork. Parking Lots Performance Requirements Live Load Capacity Lighting Levels Site Earthwork: G1070. Roadways: G2010. Pedestrian Plazas and Walkways: G2030. Airfields: G2040. Athletic, Recreational, and Playfield Areas: G2050. Temporary Parking Areas: Z G Parking Lot Pavement Parking Lot Base Courses Includes: Prepared and compacted soil and granular layers placed prior to installation of parking lot pavement. Flexible Parking Lot Pavement Includes: Finished parking lot pavement of granular and asphaltic materials. Rigid Parking Lot Pavement Includes: Finished parking lot pavement with high bending resistance, usually of concrete. 123

130 G SITEWORK Parking Lot Unit Pavement Includes: Blocks or tiles used for parking lot pavement. Unit pavers set in mastic, sand, or mortar. Unit Pavers: B3040. Parking Lot Aggregate Surfacing G Parking Lot Curbs and Gutters Includes: Construction at perimeter of parking lot pavement to separate pavement from adjacent surfaces, provide vehicular restraint, and facilitate drainage. G Parking Lot Appurtenances Includes: Accessories for parking lot construction. Bicycle Racks: G2060. Parking Bumpers Pavement Snow Melting Systems Snow Melting: D Parking Lot Traffic Signage Parking Lot Pavement Markings G Parking Lot Lighting Site Lighting: G4050. G Exterior Parking Control Equipment Includes: Equipment associated with the control of movement of vehicle parking. Exterior Parking Key and Card Control Units Exterior Parking Ticket Dispensers Exterior Parking Meters Exterior Parking Fee Collection Equipment Exterior Parking Gates Interior Parking Control Equipment: E G2030 Pedestrian Plazas and Walkways Includes: Pavement, curbs and gutters, appurtenances, lighting, and pedestrian control equipment for pedestrian plazas and walkways. Includes exterior steps and ramps. May Include: Site earthwork. Pedestrian Plazas and Walkways Performance Lighting Levels Site Earthwork: G1070. Roadways: G2010. Parking Lots: G2020. Airfields: G2040. Athletic, Recreational, and Playfield Areas: G2050. G Pedestrian Pavement Includes: Prepared and compacted soil and granular layers placed before installation of pedestrian pavement. Pedestrian Pavement Base Courses Flexible Pedestrian Pavement Includes: Finished pedestrian pavement of granular and asphaltic materials. Rigid Pedestrian Pavement Includes: Finished pedestrian pavement with high bending resistance, usually of concrete. 124

131 G SITEWORK Pedestrian Unit Pavement Includes: Blocks or tiles used for pedestrian pavement. Unit pavers which may be set in mastic, sand, or mortar. Unit Pavers: B3040. Pedestrian Aggregate Surfacing G Pedestrian Pavement Curbs and Gutters Includes: Construction at perimeter of pedestrian pavements to separate pavement from adjacent surfaces and facilitate drainage. G Exterior Steps and Ramps Includes: Steps and ramps in exterior locations including applied finishes such as coatings and tile and railings. Snow Melting: D Stair: B1080. G Pedestrian Pavement Appurtenances Includes: Accessories for pedestrian pavement construction. Pavement Markings Tactile Warning Surfacing Pavement Snow Melting Systems Snow Melting: D G Plaza and Walkway Lighting Site Lighting: G4050. G Exterior Pedestrian Control Equipment Includes: Equipment associated with the control of movement of pedestrians. Exterior Pedestrian Gates Exterior Money-Changing Equipment Exterior Pedestrian Fare Collection Equipment Exterior Pedestrian Detection Equipment Exterior Pedestrian Security Equipment Exterior Security Gates: B Electronic Safety and Security: D70. Interior Pedestrian Security Equipment: E Security Equipment: E Security Procedures: Z Temporary Security Barriers & Enclosures: Z G2040 Airfields Includes: Pavement, curbs and gutters, appurtenances, lighting, and airfield signally and control equipment for airfields. May Include: Site earthwork. Airfields Performance Requirements Live Load Capacity Lighting Levels Site Earthwork: G1070. Roadways: G2010. Parking Lots: G2020. Pedestrian Plazas and Walkways: G2030. Athletic, Recreational, and Playfield Areas: G2050. Airport Special Procedures: Z

132 G SITEWORK G Aviation Pavement Includes: Prepared and compacted soil and granular layers placed before installation of airfield pavement. Aviation Pavement Base Courses Flexible Aviation Pavement Rigid Aviation Pavement Aviation Aggregate Surfacing G Aviation Pavement Curbs and Gutters Includes: Construction at perimeter of airfield pavements to separate pavement from adjacent surfaces and facilitate drainage. G Aviation Pavement Appurtenances Includes: Accessories for aviation pavement construction. Airfield Pavement Markings Pavement Snow Melting Systems Snow Melting: D Airfield Traffic Signage G Airfield Lighting Site Lighting: G4050. G Airfield Signaling and Control Equipment Includes equipment associated with airfield signaling, landing, and traffic control including weather observation equipment. Airfield Signals Airfield Landing Equipment Airfield Traffic Control Tower Equipment Weather Observation Equipment Airfield Control Equipment G2050 Athletic, Recreational, and Playfield Areas Includes: Surfacing, fencing, equipment, grandstands and bleachers, and lighting for athletic, recreational, and playfield areas. May Include: Site earthwork. Site Earthwork: G1070. Roadways: G2010. Parking Lots: G2020. Pedestrian Plazas and Walkways: G2030. Airfields: G2040. G Athletic Areas Includes: Exterior surfacing, fencing, equipment, and lighting for athletic areas. Athletic Areas Performance Requirements Lighting Levels Athletic Surfaces Baseball Field Surfacing Field Sport Surfacing Running Track Surfacing Tennis Court Surfacing Athletic Court Fencing Tennis Court Fences and Gates Tennis Court Wind Breaker Athletic Equipment Athletic Field Equipment Exterior Athletic Equipment Exterior Scoreboards

133 G SITEWORK Exterior Athletic Lighting Athletic Flooring: C Athletic Equipment: E Athletic Rooms: F Grandstands and Bleachers: F Athletic & Recreational Special Construction: F1060. Site Lighting: G4050. G Recreational Areas Includes: Exterior surfacing, fencing, equipment and structures, and lighting for recreational areas. Recreational Areas Performance Requirements Lighting Levels Recreational Surfaces Recreational Court Surfacing Recreational Court Fences and Gates Recreational Area Lighting Site Lighting: G4050. G Playfield Areas Includes: Exterior surfacing, equipment and structure, and lighting for playfield areas. Play Areas Performance Requirements Lighting Levels Playfield Surfacing Synthetic Resilient Surfacing Playfield Equipment and Structures Playground Equipment Play Structures Playfield Lighting Site Lighting: G4050. G2060 Site Development G Exterior Fountains Includes: Exterior decorative or functional manufactured fountains. Exterior Fountains Performance Requirements Exterior Fountain Plumbing Systems Exterior Fountain Equipment Exterior Fountain Water Treatment Exterior Fountain Pumps Exterior Fountain Equipment Controls Exterior Fountain Piping System Exterior Fountain Specialties Interior Fountains: F G Fences and Gates Includes: Exterior fences and gates. Also includes cattle guards. Fences and Gates Performance Requirements Security Level Gate Operators Chain Link Fences and Gates Welded Wire Fences and Gates Decorative Metal Fences and Gates Plastic Fences and Gates Wire Fences and Gates Wood Fences and Gates

134 G SITEWORK Cattle Guards Exterior Gates: B Interior Gates: C Temporary Fencing: Z G Site Furnishings Includes: Manufactured site furniture and fixtures. Planting Accessories: G2080. Tree Grates: G2080. Bicycle Racks Trash and Litter Receptors Planters Site Seating and Tables G Exterior Signage Includes: Exterior signs with the exception of roadway and parking lot signage. Traffic Signage: G2010. Parking Lot Traffic Signage: G2020. Temporary Project Signage: Z G Flagpoles Includes: Flagpoles of metal, wood, and fiberglass, including concrete bases and accessories. Flagpoles Performance Requirements Wind Load Capacity Automatic Flagpoles Ground-Set Flagpoles Nautical Flagpoles Wall-Mounted Flagpoles Interior Flags and Banners: C G Covers and Shelters Includes: Manufactured covers and shelters. Parking Lot Appurtenances: G2020. Covers and Shelters Performance Requirements Load Capacity Attendant Booths Site Constructed Attendant Booths Manufactured Attendant Booths Car Shelters Walkway Coverings Transportation Stop Shelters G Exterior Gas Lighting Interior Gas Lighting: C G Site Equipment Includes: Equipment located on the site, such as car washing, banking, theater equipment, and other freestanding equipment. Banking Equipment Automatic Banking Systems G Retaining Walls Includes: Retaining walls associated with site construction. Includes Subdrainage. Retaining Walls Performance Requirements Lateral Earth Pressures Cast-In-Place Concrete Retaining Walls Precast Concrete Retaining Walls

135 G SITEWORK Unit Masonry Retaining Walls Segmental Retaining Walls Metal Crib Retaining Walls Timber Retaining Walls Reinforced Soil Retaining Walls Reinforced Soil: G Gabion Retaining Walls Gabions: G Soldier-Beam Retaining Walls Stone Retaining Walls Retaining Wall Subdrainage Subdrainage: G G Site Bridges Includes: Fabricated and constructed brides for foot and vehicular travel on a facility site. Site Bridges Performance Requirements Live Load Capacity Pedestrian Bridges Vehicular Bridges Temporary Bridges: Z G Site Screening Devices Includes: Self-supporting walls for noise control and privacy. Screens and Louvers Louvered Equipment Screens: B Exterior Door Louvers: B Exterior Fixed Grilles and Screens: B Interior Louvers: C Interior Door Louvers: C Sound Barriers G Site Specialties Metal Bollards G2080 Landscaping See: Horticultural Equipment: E G Planting Irrigation Includes: Excavation and backfill, piping, equipment, and accessories. Planting Irrigation Performance Requirements Irrigation Pumps Drip Irrigation Sprinkler Systems Agricultural Irrigation: E Site Irrigation Water Distribution: G G Turf and Grasses Includes: Lawns and grasses including seeding and sodding. Hydro-Mulching Plugging Seeding Sodding Sprigging

136 G SITEWORK G Plants Includes: Ground covers, plants and bulbs, shrubs, and trees. Includes planting accessories such as tree grates and prefabricated planters. Ground Covers Plants and Bulbs Shrubs Trees G Planting Accessories Includes: Accessories to separate and protect exterior plants. Landscape Edging Landscape Timbers Planters Tree Grates Tree Grids Decorative Landscape Boulders Vertical Planting Nets and Grids G Landscape Lighting Site Lighting: G4050. G Landscaping Activities Planting Preparation Transplanting Includes: Relocation of existing shrubs and trees including excavation and replanting. Tree and Shrub Removal and Trimming: G1010. Temporary Tree and Plant Protection : Z1050. G30 LIQUID AND GAS SITE UTILITIES Site Plumbing Utilities Performance Utilities Grounding: G G3010 Water Utilities Includes: Water distribution for domestic consumption, fire fighting, and irrigation for a facility site and for multiple facilities. Includes trenching and backfilling. Includes Liquid and Gas Site Utilities Supplementary Components as appropriate. Trenching and Backfilling: G Supplementary Components: G G Site Domestic Water Distribution Includes: Supply wells, piping, equipment, storage tanks, and water ponds and reservoirs. Site Domestic Water Distribution Performance Requirements Water Utility Service Water Supply Wells Water Distribution Piping Water Distribution Equipment Water Service Connections Water Distribution Valves Fire Hydrants Water Pumping Stations Water Metering

137 G SITEWORK Disinfecting of Water Distribution Water Storage Tanks Water Distribution Ponds Water Distribution Pond Liners Water Distribution Pond Covers Domestic Water Distribution: D2010. G Site Fire Protection Water Distribution Includes: Supply wells, piping, equipment, storage tanks, and water ponds and reservoirs. Site Fire Protection Water Distribution Water Utility Service Water Supply Wells Water Distribution Piping Water Distribution Equipment Includes: Systems for transmission and distribution of fire protection water outside the building. Utility piping materials, utility structures, valves, hydrants, excavation, bedding, backfill, and compaction. Testing and flushing. Water Service Connections Water Distribution Valves Fire Hydrants Water Pumping Stations Water Metering Water Storage Tanks Fire Protection Water Ponds Water Pond Liners Water Pond Covers Water Based Fire-Suppression: D G Site Irrigation Water Distribution Includes: Supply wells, piping, equipment, storage tanks, and water ponds and reservoirs. Site Irrigation Water Distribution Performance Water Utility Service Irrigation Water Wells Water Distribution Piping Water Distribution Equipment Water Service Connections Water Distribution Valves Water Pumping Stations Water Metering Water Storage Tanks Water Ponds and Reservoirs Water Pond and Reservoir Liners Water Pond and Reservoir Covers Planting Irrigation: G G3020 Sanitary Sewerage Utilities Includes: Sanitary sewerage for a facility site and for multiple facilities. Includes piping, septic tanks that serve multiple facilities, structures, and lagoons. Includes trenching and backfilling. Includes Liquid and Gas Site Utilities Supplementary Components as appropriate. 131

138 G SITEWORK Sanitary Sewerage Utility Performance Sanitary Drainage: D2020. Trenching and Backfilling: G Supplementary Components: G G Sanitary Sewerage Utility Connection G Sanitary Sewerage Piping Low Pressure Sanitary Sewerage Sanitary Sewerage Force Mains G Utility Septic Tanks Includes: Systems for collecting sanitary waste on-site. Piping materials, excavation, bedding, backfill, compaction, and testing. Septic Tanks and Effluent Wet Wells Septic Tank Effluent Pumps Drainage Field Facility Septic Tanks: D G Sanitary Sewerage Structures Sewerage Manholes, Frames, and Covers Sewerage Cleanouts G Sanitary Sewerage Lagoons G3030 Storm Drainage Utilities Includes: Storm drainage for surface or combination of surface and subsurface water for a facility site or for multiple facilities. Includes piping, culverts, water drains, drainage pumps, Subdrainage, and storm drainage ponds and reservoirs. Includes trenching and backfilling. Includes Liquid and Gas Site Utilities Supplementary Components as appropriate. Storm Drainage Utility Performance Trenching and Backfilling: G Supplementary Components: G G Storm Drainage Utility Connection G Storm Drainage Piping G Culverts Pipe Culverts Concrete Culverts G Site Storm Water Drains Area Drains Trench Drains Storm Water Treatment Facility Stormwater Drains: D G Storm Drainage Pumps G Site Subdrainage Includes: Subdrainage for interception and removal of water. Subdrainage Piping Drainage Layers

139 G SITEWORK Geotextile Subsurface Drainage Filtration Foundation Drainage: A Underslab Drainage: A Retaining Wall Drainage: G G Storm Drainage Ponds and Reservoirs Stabilization Ponds Retention Basins Leaching Pits Water Pond and Reservoir Liners Earth Dams: G1070. G3050 Site Energy Distribution Includes: Energy distribution for a facility site or multiple facilities. Includes hydronic heating, steam energy, and hydronic cooling distribution. Includes trenching and backfilling. Includes Liquid and Gas Site Utilities Supplementary Components as appropriate. Facility Distribution Systems: D3050. Trenching and Backfilling: G Supplementary Components: G G Site Hydronic Heating Distribution Includes: Hot water piping, valves, piping specialties, pumps, and other components serving a facility site or multiple facilities. Site Hydronic Heating Distribution Performance Requirements Heating Utility Connection Underground Heating Distribution Aboveground Heating Distribution G Site Steam Energy Distribution Includes: Steam and condensate piping, valves, piping specialties, and other components serving a facility site or multiple facilities. Site Steam Distribution Performance Requirements Steam Utility Connection Underground Steam and Condensate Aboveground Steam and Condensate G Site Hydronic Cooling Distribution Includes: Chilled condenser piping, valves, piping specialties, pumps, and other components serving a facility site or multiple facilities. Site Hydronic Cooling Distribution Performance Requirements Cooling Utility Connection Underground Cooling Distribution Aboveground Cooling Distribution

140 G SITEWORK G3060 Site Fuel Distribution Includes: Gas, fuel-oil, gasoline, diesel fuel, and aviation fuel distribution for a facility site or multiple facilities. Includes trenching and backfilling. Includes Liquid and Gas Site Utilities Supplementary Components as appropriate. Facility Fuel Systems: D3010. Trenching and Backfilling: G Supplementary Components: G G Site Gas Distribution Includes: Gas piping, valves, piping specialties, pumps, storage tanks, and other components serving a facility site or multiple facilities. Site Gas Distribution Performance Requirements Gas Utility Connection Natural-Gas Distribution Liquefied Petroleum Gas Distribution Compressed Gases Storage Tanks Fuel-Gas Detection and Alarm: D G Site Fuel-Oil Distribution Includes: Fuel-oil water piping, valves, piping specialties, pumps, storage tanks, and other components serving a facility site or multiple facilities. Site Fuel-Oil Distribution Performance Fuel-Oil Piping Fuel-Oil Pumps Fuel-Oil Storage Tanks Fuel-Oil Detection and Alarm: D G Site Gasoline Distribution Includes: Gasoline piping, valves, piping specialties, pumps, storage tanks, and other components serving a facility site or multiple facilities. Site Gasoline Distribution Performance Gasoline Piping Gasoline Pumps Gasoline Storage Tanks G Site Diesel Fuel Distribution Includes: Diesel fuel piping, valves, piping specialties, pumps, storage tanks, and other components serving a facility site or multiple facilities. Site Diesel Fuel Distribution Performance Diesel Fuel Piping Diesel Fuel Pumps Diesel Fuel Storage Tanks G Site Aviation Fuel Distribution Includes: Aviation fuel piping, valves, piping specialties, pumps, storage tanks, and other components serving a facility site or multiple facilities. Site Aviation Fuel Distribution Performance Aviation Fuel Piping Aviation Fuel Pumps Aviation Fuel Grounding Aviation Fuel Storage Tanks

141 G SITEWORK G3090 G Supplementary Components Common Work Results for Utilities Manholes and Structures Utility Structures Pressure Piping Tied Joint Restraint System Trenchless Utility Installations Utility Identification Instrumentation and Control G40 Liquid and Gas Site Utilities Supplementary Components ELECTRICAL SITE IMPROVEMENTS Includes: Common work results for utilities and instrumentation and control to be included in liquid and gas utility elements above as appropriate. Site Electrical Utilities Performance G4010 Site Electric Distribution Systems Includes: Equipment and related facilities for site transformation from site service voltage to site distribution voltage, including unit substations, transformers, circuit breakers, interrupter switches, cutouts and fuses, associated switchgear and accessories, concrete foundations, metal framing, fence enclosures, line structures, surface pavement, insulators, lightning arrestors, and grounding systems. Site Electric Distribution System Performance Requirements Building Electrical Service and Distribution: D5020. Demonstration and Training: Z1070. Startup and Adjusting: Z1070. G Electrical Utility Services G Electric Transmission and Distribution Includes: Structures and wiring to distribute electrical power to and across sites. Electrical Utility Towers Towers: F Towers Grounding: G Communications Towers: G Electrical Utility Poles Communications Utility Poles: G Underground Ducts and Manholes Insulators and Fittings Transmission and Distribution Equipment Wiring Direct Current Transmission Transmission and Distribution Specialties G Electrical Substations Includes: Assembly of structures, switches, circuit breakers, buses, and transformers to switch circuits and convert power from transmission voltages to distribution voltage. Deadend Structures Structural Bus Supports

142 G SITEWORK Substation Bus Assemblies Control House Equipment Substation Control Wiring G Electrical Transformers Includes: Transformers for substation applications to transform transmission voltage to distribution voltage. G Electrical Switchgear and Protection Devices Circuit Breakers Fusible Interrupter Switchgear Cutouts Fuses Surge Arresters Shunt Arresters Reclosers G Site Grounding Includes: Conducting connection between an element and a ground electrode placed in the earth to provide a safe path for the dissipation of fault currents, lightning strikes, static discharges, EMI and RFI signals and interference. Facility Grounding: D Site Improvements Grounding Site Improvements: G20. Tower Grounding Towers: F Utilities Grounding Liquid and Gas Site Utilities: G30 Utility Substation Grounding Electrical Substations: G Site Grounding Conductors Site Lightning Protection Lightning Protection: D G Electrical Distribution System Instrumentation and G4050 Site Lighting G Area Lighting Includes: Underground and overhead electric feeders and branch circuits. Transformers, wire, conduits, ductbanks, manholes, poles, luminaries, controls, grounding system, excavation, backfilling, and compaction. Area Lighting Performance Requirements Lighting Levels Interior Lighting: D5040. Roadway Lighting: G Parking Lot Lighting: G Pedestrian Plaza and Walkway Lighting: G Airfield Lighting: G Athletic, Recreation, and Playfield Area Lighting: G2050. Landscape Lighting: G

143 G SITEWORK G Flood Lighting G Building Illumination G Exterior Lighting Supplementary Components Lighting Poles and Standards Site Lighting Instrumentation and Controls G50 SITE COMMUNICATIONS G5010 Site Communications Systems Includes: Communications distribution for a facility site or multiple facilities. Data Communications Systems: D6010. Voice Communications Systems: D6020. Audio-Video Communications: D6030. Distributed Communications and Monitoring: D6060. G Site Communications Structures Includes: Structures for aboveground and underground distribution of communications cables and signals. Communications Transmission Towers Antenna Towers Towers: F Electrical Utility Towers: G Towers Grounding: G Communications Utility Poles Electrical Utility Poles: G Aerial Cable Installation Hardware Communications Underground Ducts, Manholes, and Handholes Communications Vaults, Pedestal, and Enclosures Communications Blowers, Fans, and Ventilation G Site Communications Distribution Includes: Copper and optical fiber outside cable plant. Copper Communications Distribution Cabling Optical Fiber Communications Distribution Coaxial Communications Distribution Cabling Grounding and Bonding for Communications Cable Pressurization Equipment Cleaning, Lubrication, and Restoration Chemicals G Wireless Communications Distribution Includes: External wireless communications systems. Laser Transmitter and Receivers Microwave Transmitter and Receivers Infrared Transmitter and Receivers UHF/VHF Transmitter and Receivers For Site Electronic Safety and Security Systems Access Control and Intrusion Detection: D7010. Electronic Surveillance: D7030. Detection and Alarm: D7050. Electronic Monitoring and Control: D

144 G SITEWORK G90 MISCELLANEOUS SITE CONSTRUCTION Other Site Construction Performance G9010 Tunnels Includes: Vehicular, pedestrian, and service tunnels. Includes tunnel boring, bracing and jacking work, linings and casing, grouting support systems, boring machines, and control and spoil removal systems. Includes Tunnel Construction Related Activities as appropriate. Tunnel Performance Requirements G Vehicular Tunnels Includes: Tunnels to allow for movement of vehicles. Vehicular Tunnel Support Systems Rock Reinforcement and Initial Support Steel Ribs and Lagging Vehicular Tunnel Grouting Cement Tunnel Grouting Chemical Tunnel Grouting Vehicular Tunnel Construction Cast-In-Place Concrete Tunnel Lining Precast Concrete Tunnel Lining Shotcrete Tunnel Lining Shaft Construction Cast-In-Place Concrete Shaft Lining Precast Concrete Shaft Lining Vehicular Submersible Tube Tunnels G Pedestrian Tunnels Includes: Tunnels to allow for the movement of pedestrians. Pedestrian Tunnel Support Systems Rock Reinforcement and Initial Support Steel Ribs and Lagging Pedestrian Tunnel Grouting Cement Tunnel Grouting Chemical Tunnel Grouting Pedestrian Tunnel Construction Cast-In-Place Concrete Tunnel Lining Precast Concrete Tunnel Lining Shotcrete Tunnel Lining Shaft Construction Cast-In-Place Concrete Shaft Lining Precast Concrete Shaft Lining Pedestrian Submersible Tube Tunnels G Service Tunnels Includes: Tunnels to house utility systems and to connect different facilities on site. Service Tunnel Support Systems Rock Reinforcement and Initial Support Steel Ribs and Lagging Service Tunnel Grouting Cement Tunnel Grouting Chemical Tunnel Grouting Service Tunnel Construction Cast-In-Place Concrete Tunnel Lining Precast Concrete Tunnel Lining Shotcrete Tunnel Lining Shaft Construction Cast-In-Place Concrete Shaft Lining Precast Concrete Shaft Lining Service Submersible Tube Tunnels

145 G SITEWORK G Tunnel Construction Related Activities Includes: Tunnel excavation and other activities related to tunnel construction to be included with tunnel construction above as appropriate. Tunnel Excavation Shield Driving Tunnel Excavation Tunnel Drilling and Blasting Tunnel Boring Machine Tunnel Cut and Cover

146

147 Z GENERAL Z10 GENERAL REQUIREMENTS Project Summary: Project Program: Project Criteria: Existing Conditions: Owner s Work: Z1010 Price and Payment Procedures Z Allowances Includes: Allowances included in the elemental estimate or the contract for systems or assemblies that are not defined at the time the estimate or contract is prepared. Cash Allowances Contingency Allowances Testing and Inspection Allowances Installation Allowances Product Allowances Quantity Allowances Time Allowances Z Unit Prices Includes: Unit prices included in the elemental estimate or the contract for portions of work with quantities that are not defined at the time the estimate or contract is prepared. Unit Price Measurement Unit Price Payment Z Alternates Includes: Alternates included in the elemental estimate or the contract to add or delete work from the base project. Z Value Analysis Includes: Analysis of components for elemental estimate or the contract on basis of value versus cost and time. Value Engineering Z Substitution Procedures Includes: Requirements for consideration of substitutions. Z Contract Modification Procedures Includes: Requirements for making clarifications and proposals for change, and modifications to the contract documents. Requests for Interpretation Clarification Notices Minor Changes in the Work Supplemental Instructions Field Orders Amendments Construction Change Directives Work Change Directives Proposal Requests Proposal Worksheet Summaries Change Order Requests Change Orders Z Payment Procedures Includes: Requirements for process or schedules of values, progress payments, and final payment. 141

148 Z GENERAL Schedule of Values Progress Payment Procedures Payment Procedures for Testing Laboratory Services Z1020 Administrative Requirements Z Project Management and Coordination Includes: Requirements for administration of construction contracts and coordination and scheduling of various parts of the work among the contractors and subcontractors. Includes coordination with separate contractors and the owner. Project Management Field Supervision Project Coordination Facility Services Coordination Multiple Contract Coordination Project Meetings Project Web Site Electronic Communication Protocols Z Construction Progress Documentation Includes: Requirements for scheduling, recording, and reporting progress. Scheduling of Work Construction Progress Schedule Submittals Schedule Survey and Layout Data Construction Progress Reporting Periodic Work Observation Photographic Documentation Video Monitoring and Documentation Z Submittal Procedures Includes: Requirements for processing of submittals during the construction stage. Certificates Design Data Field Test Reporting Shop Drawings, Product Data, and Samples Source Quality Control Reporting Sustainable Design Reporting Sustainable Design Requirements: Sustainable Design Closeout Documentation: Z Z Special Procedures Includes: Requirements for special project situations and specific facility types. Special Project Procedures Airports Airfields: G2040. Detention Facilities Exterior Detention Windows: B Exterior Detention Doors: B Interior Detention Windows: C Interior Detention Doors: C

149 Z GENERAL Detention Lighting: D Detention Monitoring and Control: D7070. Detention Equipment: E Detention Furniture: E Detention Cell Modules: F Healthcare Facilities Healthcare Plumbing Fixtures: D Process Support Plumbing Systems: D2060. Healthcare Lighting: D Healthcare Communications & Monitoring: D Healthcare Equipment: E Healthcare Casework: E Healthcare Furniture: E Clean Rooms Clean Rooms: F Contaminated Sites Site Remediation: G1050. Alteration Project Procedures Owner Safety Requirements Governmental Safety Requirements Health, Safety, and Emergency Response Procedures Infection Control Procedures Environmental Procedures Indoor Air Quality Procedures Indoor Air Quality Requirements: Security Procedures Exterior Security Windows: B Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Security Ceiling Systems: C Security Mirrors and Domes: C Security Plumbing Fixtures: D Security Lighting: D Electronic Safety and Security: D70. Interior Pedestrian Security Equipment: E

150 Z GENERAL Security Equipment: E Exterior Pedestrian Security Equipment: G Temporary Security Barriers & Enclosures: Z Sustainability Certification Project Procedures Historic Treatment Procedures Historic Restoration Requirements: Selective Historic Demolition: F Z1040 Quality Requirements Includes: Procedures to measure and report the quality and performance of construction. Qualifications for fabricators, installers, manufacturers testing agencies and others involved in the construction. Field and source quality control. Z Regulatory Requirements Includes: Information require for conformance to regulatory requirements including building codes, mechanical codes, electrical codes, zoning, and other regulations. Codes Laws Rules Fees Permits Z References Includes: Reference standards applicable to the project. Abbreviations and Acronyms Definitions Reference Standards Z Quality Assurance Includes: Requirements for proactive activities to assure the quality of construction before and during the execution of the work. Manufacturer Qualifications Supplier Qualifications Fabricator Qualifications Installer Qualifications Testing and Inspecting Agency Qualifications Code-Required Special Inspector Qualifications Manufacturer s Field Services Field Samples Mockups Z Quality Control Includes: Requirement for reactive activities to evaluate completed activities and elements for conformance with the requirements. Source Quality Control Procedures Field Quality Control Procedures Testing and Inspecting Services Plant Inspection Procedures Testing Laboratory Services Code-Required Special Inspections and Procedures

151 Z GENERAL Z1050 Temporary Facilities and Controls Includes: Requirements for installation, maintenance, and removal of temporary utilities, controls, and construction aids during construction. Z Temporary Utilities Includes: Requirements for utilities used on site during construction. Temporary Electricity Temporary Fire Protection Temporary Fuel Oil Temporary Heating, Cooling, and Ventilating Temporary Lighting Temporary Natural Gas Temporary Telecommunications Temporary Water Z Construction Facilities Includes: Requirements for facilities used on site during construction. Field Offices and Sheds First Aid Facilities Sanitary Facilities Z Temporary Construction Includes: Requirements for temporary access facilities required during construction. Temporary Bridges Site Bridges: G Temporary Decking Temporary Overpasses Temporary Ramps Temporary Runarounds Z Construction Aids Includes: Requirements related to using tools and equipment during construction. Temporary Elevators Temporary Hoists Temporary Cranes Temporary Scaffolding and Platforms Temporary Swing Staging Vertical Conveying Equipment: D1010. Material Handling Systems: D1050. Z Temporary Vehicular Access and Parking Includes: Requirements for access and parking facilities required to accommodate construction of the owner s operations during construction. Temporary Access Roads Haul Routes Temporary Parking Areas Parking Lots: G2020. Temporary Roads Roadways: G2010. Traffic Control Staging Areas Z Temporary Barriers and Enclosures Includes: Requirements and procedures for protection of public, occupants, and spaces during construction. Temporary Air Barriers Temporary Dust Barriers Temporary Noise Barriers

152 Z GENERAL Temporary Barricades Temporary Fencing Fences and Gates: G Temporary Protective Walkways Temporary Security Barriers Temporary Security Enclosures Exterior Security Windows: B Exterior Security Doors: B Exterior Security Gates: B Interior Security Windows: C Interior Security Doors: C Interior Security Gates: C Security Ceiling Systems: C Electronic Safety and Security: D70. Interior Pedestrian Security Equipment: E Security Equipment: E Security Procedures: Z Temporary Tree and Plant Protection Z Temporary Controls Includes: Requirements for environment controls during construction. Temporary Erosion and Sediment Control Erosion and Sedimentation Controls: G Temporary Pest Control Pest Control Devices: C Temporary Environmental Controls Temporary Storm Water Pollution Control Z Project Identification Includes: Signage identifying the project and the project team during construction. Temporary Project Signage Temporary Interior Signage Exterior Signage: G Z1060 Product Requirements Z Common Product Requirements Includes: General requirements for products used in construction. Z Product Options Includes: General requirements for contractor s options in selecting products. Z Owner-Furnished Products Includes: General requirements for products that are furnished by the owner. Z Product Delivery Requirements Includes: General requirements for packing, shipping, delivery, and acceptance of products. Z Product Storage and Handling Requirements Includes: General requirements for storage and handling of products. Hazardous Materials Toxic Materials Z1070 Execution and Closeout Requirements Includes: Requirements for final acceptance of project by the Owner. 146

153 Z GENERAL Z Examination and Preparation Includes: General requirements for determining acceptable conditions for installation. Includes general requirements for preparing to install, erect, or apply products. Mobilization Acceptance of Conditions Field Engineering Protection of Adjacent Construction Z Execution Includes: General requirements of installing, applying, or erecting projects. Application Erection Installation Bracing and Anchoring Existing Products Cutting and Patching Construction Equipment Costs Small Tools and Consumable Costs Z Cleaning and Waste Management Includes: Requirements for maintaining site in clean and neat condition during construction. Includes final cleaning prior to turning the project over to the owner. Progress Cleaning Site Maintenance Construction Waste Management and Disposal Final Cleaning Z Starting and Adjusting Includes: Requirements for checkout, startup, and adjusting procedures to ensure safe operation during acceptance testing and commissioning. Checkout Procedures Startup Procedures Z Protecting Installed Construction Includes: General requirements for protecting installed construction. Z Closeout Procedures Includes: Requirements for completion of the project including substantial and final completion steps. Preliminary Closeout Reviews Final Closeout Review Closeout Requirements Demobilization Z Closeout Submittals Includes: Requirements for the processing closeout submittals at completion of the project. Completion and Correction List Maintenance Contracts Operation and Maintenance Data Final Site Survey Bonds Warranties Project Record Documents Spare Parts Extra Stock Materials Sustainable Design Closeout Documentation Sustainable Design Requirements: Sustainable Design Reporting: Z

154 Z GENERAL Z Demonstration and Training Includes: Requirements and procedures for demonstration of the products and systems of the facility and training the owner's operating and maintenance personnel. Z1090 Life Cycle Activities Z Commissioning Includes: Requirements for commissioning facilities and facility systems. General Commissioning Requirements Facility Substructure Commissioning Facility Shell Commissioning Interiors Commissioning Z Facility Operation Includes: Requirements for operating facility after commissioning. Facility Operation Procedures Z Facility Maintenance Includes: Requirements for maintaining facility after commissioning. Facility Maintenance Procedures Recycling Programs Z Facility Decommissioning Includes: Requirement for deactivating a facility or portion of it from operation. Facility Decommissioning Procedures Z70 TAXES, PERMITS, INSURANCE AND BONDS Z7010 Taxes Includes: Cost of taxes on project construction. Z7030 License Fees Includes: Cost of license fees required for the construction of the project. Z7050 Permit Costs Includes: Cost of permits required for the construction of the project. Permits: Z7070 Bond Fees Includes: Cost of bonds required for construction of the project. Z90 FEES AND CONTINGENCIES Z9010 Overhead Includes: Contractor s office and field overhead costs in construction the project. Includes definition of overhead costs. Z9030 Profit Includes: Contractor s profit for constructing the project. Includes definition of profit. Z9050 Construction Contingencies Budget Construction Contingencies: Z Design Contingencies Includes: Risk factor applied to the project budget, cost estimate, or contract to compensate for extent of available design definition. Budget Design Contingencies: Z Bidding Contingencies Includes: Risk factor applied to the project budget, cost estimate, or contract to compensate for the results of the bidding process. 148

155 Z GENERAL Z Escalation Contingencies Includes: Risk factor applied to the project budget, cost estimate, or contract to compensate for the change in monetary value during time between the preparation of the estimate and the scheduled start of construction. Z9090 Financing Costs Includes: Summary of the owner's project financing costs. Budget Financing:

156

157 KEY WORD INDEX INFORMATION The alphabetical subject list on the following pages will enable the user of UniFormat to find the proper location for most subjects for a building construction project. Each page of the index is divided into two main columns and subdivided into three smaller columns. The alphabetical subject list in the first smaller column was created using terms taken from the UniForma t Level 1-4 titles and the detailed listings under them. The second smaller column contains the UniFormat Level 1-4 numbers related to the subject. There are some more general categorization terms created to help organize the index that often do not have UniFormat numbers associated with them. The third smaller column contains MasterFormat numbers from the 2010 edition related to each subject. Not all of the subject terms have related MasterFormat numbers. It should be noted that subject relationships are drawn to the highest level appropriate MasterFormat number. The user should reference the complete MasterFormat listing for more detailed titles that may occur under the MasterFormat number referenced. For example: The key word index refers to Unit Masonry, but does not include references to the lower level listings of Clay Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, and Adobe Unit Masonry. The key word index refers to Windows, but does not include references to the lower level listings of Metal Windows, Wood Windows, Plastic Windows, and Composite Windows. 151

158

159 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER A Agreement Form Supplements Agreement Forms Abbreviations and Acronyms Z Agricultural Acceptance of Conditions Z Equipment E Access Control D Irrigation E Global Applications D Waste Clean-Up Equipment E Hardware D Air Barriers Identification Management D Exterior Wall B Systems Floor Construction B Interfaces D Roof Construction B Remote Devices D Roofing B Systems and Database D Temporary Z Management Air Cleaning Systems Infrastructure D HVAC D Vehicle Identification System D HVAC Outside Air D Access Control and Intrusion D Air Coils Detection Cooling D Access Doors and Panels C Heating D Interior Air Compressors and D Access Flooring C Receivers, General Service Accessories E Air Distribution, HVAC D Interior Landscaping E Duct Accessories D Planting G Outlets and Inlets D Roof B Plenums and Chases D Toilet, Bath, and Laundry C Terminal Units D Accordion Folding Partitions C Air-Admittance Valves D Acid-Resistant Flooring C Air-Borne Particulate Collection D Acoustic Insulation Systems Interior Partitions C Air-Conditioners D Plaster and Gypsum Board C Computer-Room D Ceilings Packaged Terminal D Suspended Ceilings C Room D Acoustic Self-Contained D Room Components C Split-System D Underlayment, Flooring C Aircraft Passenger Loading D Wall Coating C Bridges Acoustical Airfields G Ceiling Treatment C Control Equipment G Metal Decking C Landing Equipment G Metal Floor Decking B Lighting G Metal Roof Decking B Signaling and Control G Shells E Equipment Suspended Ceilings C Signals G Wall Treatment C Traffic Control Tower G Administrative Requirements Z Equipment Adobe Unit Masonry: See Unit Air-Handling Units D Masonry Airport Special Procedures Z Advertisements Air-Source Heat Pumps D Advertising Air-Supported Fabric F Aerial Cable Installation G Structures Hardware Air-to-Air Energy Recovery D Aerobic Processes G All Glass Decontamination Entrances Aggregate Surfacing Exterior B Aviation G Interior C Parking Lot G Storefronts: See Storefronts Pedestrian G Allowances Z Roadway G Alteration Project Procedures Z

160 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Alternates Z Asbestos F Aluminum Abatement F Decking: See Metal Decking Remediation F Framed Storefronts: See Asphalt Unit Pavement: See Storefronts Unit Pavement Doors: See Exterior and Assessment Interior Doors Existing Conditions Joists: See Metal Joists B Existing Material Windows: See Exterior and Hazardous Material Interior Windows Assistive Listening Systems D Amendments Z Athletic and Recreational Amusement Park F Court Walls F Rides F Special Construction F Structures and Equipment F Athletic Anaerobic Processes G Areas G Decontamination Court Fencing G Anchor Tiebacks A Equipment, Exterior G Anchors, Foundation A Equipment, Interior E Animal Containment F Field Equipment G Antenna Towers G Flooring C Antifreeze Sprinkler Systems D Rooms F Anti-Microbial Coatings Surfaces G Cooling System D Surfaces, Demountable F Distribution Systems D Athletic, Recreational, and G Heating System D Playfield Areas Ventilation D Attendant Booths G Anti-Microbial Ultraviolet Manufactured G Emitters Site Constructed G Cooling System D Attipulgite Slurry Walls A Distribution Systems D Attorneys Heating System D Audience Seating Ventilation D Fixed E Application Z Portable E Application Development D Audio-Video Application Suites D Accessories D Appurtenances Communications D Exterior Wall B Conferencing D Parking Lot G Devices D Pedestrian Pavement G Systems D Roadway G Audio-Visual Roof B Equipment E Aquariums F Furniture E Architects Automatic Architecturally Integrated Audio- D Banking Systems E Video Equipment Banking Systems, Site G Area Drains D Book Storage and Retrieval E Site Storm Drainage G Systems Area Lighting G Call Distributors D Arena Football Boards F Entrances, Exterior B Art Entrances, Interior C Glass E Flagpoles G Fixed E Available Project Information Movable E Aviation Fuel Artificial Plants Distribution, Site G Fixed Interior E Grounding, Site G Movable Interior E Piping, Site G Arts and Crafts Equipment E Pumps, Site G Storage Tanks, Site G

161 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Aviation Pavement G Below-Grade Egress B Appurtenances G Assemblies Curbs and Gutters G Bentonite Slurry Walls A Awnings B Bicycle Racks G B Bid Forms Bidding Contingencies Z Backfill and Compaction, A Bidets D Substructure Commercial D Backfill, Site G Residential D Backwater Valves D Biological Decontamination G Baggage Handling Equipment D Biological Safety Cabinets E Baggers E Biomass Heat Generation D Balanced Door Entrances Bio-Polymer Trench Drain A Exterior B Bioremediation G Interior C Decontamination Balcony Bird Control Devices B Floor Construction B Bleachers E Walls and Railings, Exterior B Exterior F Board Paneling Walls, Exterior B Ceilings C Ballistics-Resistant Glazing Walls C Exterior Windows B Boilers D Exterior Doors B Electric Heating D Interior Windows C Feedwater Pumps D Interior Doors C Fuel-Fired Heating D Bank Casework E Bollards, Metal G Banking Equipment, Site G Bonds Banners C Fees Z Baptisteries E Forms Bar Equipment E Closeout Submittal Z Barber and Beauty Shop E Book Depositories E Equipment Book Theft Protection E Barricades, Temporary Z Equipment Barriers and Enclosures, Z Booths and Tables, Fixed E Temporary Bored Piles A Base Courses Boring Machine, Tunnel G Aviation Pavement G Bowling Alley Equipment E Parking Lot G Bracing and Anchoring Z Pedestrian Pavement G Branch Wiring System D Roadway G Lighting D Baseball Field Surfacing G Breathing Air Replenishment D Basements: See Subgrade A Systems Enclosures Breechings, Chimneys, and D Bath Accessories C Stacks Bath Furnishings E Brick Bathtubs Flooring C Commercial D Masonry: See Unit Masonry Healthcare D Unit Pavement: See Unit Residential D Pavement Batteries D Bridges Chargers D Demolition F Equipment D Site G Monitoring D Temporary Z Racks D Bronze Units D Doors: See Exterior and Beams, Grade A Interior Doors Bedroom Furnishings E Framed Storefronts: See Bells E Storefronts 155

162 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Windows: See Exterior and Casework E Interior Windows Cash Allowances Z Budget Cash Registers and Checking E Construction Contingencies Equipment Design Contingencies Cast Floor Decks and B Financing Underlayment Information, Project Cast-In-Place Concrete: See Project Contingencies CIP Concrete Project Delays Cathodic Protection D Unforeseen Subsurface Cattle Guards G Conditions Catwalks, Metal B Building Ceilings Demolition F Exterior B Envelope Access D Finishes C Illumination G Metal Furring C Modules F Paneling C Permits Sound Isolation C Subdrainage A Suspended Construction C Building Support Plumbing D Suspended Plaster and C Supplementary Components D Gypsum Board Bulkheads, Exterior B Suspension Components C Bumper Guards C Suspension Systems C Bumpers, Loading Dock E Wood Furring C Bus Assemblies D Cement Plastering, Exterior B C Walls Cement Tunnel Grouting Cable Pressurization G Pedestrian G Equipment Service G Cable Transportation D Vehicular G Cable Trays Central Branch Wiring D Battery Equipment D Communications D Cooling D Electrical Distribution D Dimming Control D Electrical Service and D Certificates Z Distribution Certificates and Other Forms General Purpose Power D Certifications Lighting D Chain Link Fences and Gates G Lighting Branch Wiring D Chalkboards C Miscellaneous Electrical D Change Order Requests Z Caissons A Change Orders Z Call Accounting D Checkout Procedures Z Call Management D Checkroom Equipment E Call Status and Management D Chemical Displays Decontamination G Canopies Precipitation G Construction B Decontamination Manufactured F Treatment Soil Stabilization G Roofing B Chemical Tunnel Grouting Support Truss Assemblies B Pedestrian G Capacitors D Service G Car Shelters G Vehicular G Carbon-Dioxide Fire- D Chemical-Resistant Flooring C Extinguishing Brick C Carbon-Monoxide Detection D Tiling C Sensors Chemical-Waste Carillons E Systems D Carpeted Stair Finish C Healthcare D Carpeting C Laboratory D

163 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Tanks D Clean-Agent Fire-Extinguishing D Chilled Beams Systems Cooling D Cleaning and Disposal E Heating D Equipment, Food Service Chilled-Water Thermal Storage D Cleaning and Waste Z Chokes and Inductors D Management Chutes D Cleaning, Lubrication, and G CIP Concrete Restoration Chemicals Balcony Construction B Cleanouts Canopy Construction B Sanitary Drainage D Column Piers A Sewerage G Columns Supporting Stormwater Drainage D Floors B Clearing and Grubbing G Roofs B Climbing Walls E Continuous Footings A Clock Systems D Exterior Balcony Walls B Clocks, Exterior B Exterior Wall Construction B Closeout Floor Decks, Slabs, and B Forms Toppings Procedures Z Floor Girders and Beams B Requirements Z Foundation Walls A Submittals Z Grade Beams A Closet and Utility Shelving C Interior Partitions C Coagulation and Flocculation G Mezzanine Construction B Decontamination Parapets B Coal Chutes D Pile Caps A Coatings Pits and Bases A Roofing B Raft Foundations A Traffic Bearing B Ramps B Coaxial Communications G Retaining Walls G Distribution Cabling Roof Decks and Slabs B Codes Z Roof Girders and Beams B Analysis Slab Trenches A Appeals and Variances Spread Footings A Required Special Inspections Z Stairs B and Procedures Standard Slabs-on-Grade A Required Special Inspector Z Structural Slabs-on-Grade A Qualifications Subgrade Enclosure A Cofferdams A CIP Concrete Shaft Lining Coiling Pedestrian Tunnels G Counter Doors, Interior C Service Tunnels G Doors Vehicular Tunnels G Exterior B CIP Concrete Tunnel Lining Interior C Pedestrian G Grilles Service G Exterior B Vehicular G Interior C Circuit Breakers, Site Electrical G Partitions C Civil Engineers Coin-Operated Laundry E Clarifications Equipment Forms Cold Storage Notices Z Doors Classified Location Lighting D Exterior B Classroom Furniture E Interior C Clay Unit Masonry: See Unit Rooms F Masonry Cold-Formed Metal Clean Rooms F Floor B Special Procedures Z Joists B Trusses B

164 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Roof B Communications D Joists B Audio-Video D Trusses B Blowers, Fans, and G Column Covers Ventilation Exterior B Data D Interior C Distributed D Columns Distribution, Site G Foundations A Site G Piers A Structures, Site G Supporting Supplementary Components D Floors B Supplementary Components, G Roofs B Site Combination Emergency D Systems D Fixture Units Transmission Towers G Combined Dry-Pipe and D Utility Poles G Preaction Sprinkler Systems Voice D Commercial Compaction, Site G Dishwashers E Compartments and Cubicles C Disposers D Completion and Correction List Z Equipment E Composite Ironing Equipment E Balcony Decking B Kitchen Hoods D Canopy Decking B Laundry and Dry Cleaning E Doors: See Exterior and Equipment Interior Doors Ovens E Exterior Fabrications B Plumbing Fixtures D Exterior Fixed Grilles and B Ranges E Screens Washers and Extractors E Fabrications, Interior C Commissioning Z Floor Decking B Agents Mezzanine Decking B Common Product Z Paneling, Ceilings C Requirements Paneling, Walls C Common Work Results for Railings, Exterior Balcony B Communications D Railings, Interior C Electrical D Ramp Decking B Service and Distribution D Roof Decking B Facility Power Generation D Stair Railings B Lighting D Windows: See Exterior and Miscellaneous Electrical D Interior Windows Electronic Safety and D Composition Stone Flooring C Security Composting Equipment E Fire Suppression D Compressed Gases Storage G HVAC D Tanks, Site Cooling System D Compressed-Air Distribution Systems D Equipment D Heating System D General Service D Ventilation D Piping D Integrated Automation D Systems, Healthcare D Plumbing D Systems, Laboratory D Building Support D Computer-Based Detention D Domestic Water D Monitoring and Control Process Support D Systems Sanitary Drainage D Computer-Room Air- D Utilities G Conditioners Communication Systems, D Computers, Office E Integrated Automation Control Concrete Culverts G

165 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Forming and Accessories: Convectors See CIP Concrete Cooling D Reinforcing: See CIP Heating D Concrete Converters Stair Forming B Frequency D Concrete Unit Masonry: See Rotary D Unit Masonry Static Power D Conditions of the Contract Static-Frequency D Conductive Flooring C Conveying D Resilient C Equipment, Integrated D Terrazzo C Automation Control Tiling C Horizontal D Conductor Heads B Vertical D Conductors and Cables, D Conveyors D Electronic Safety and Security Food Delivery E Conductors, Site Grounding G Coolers, Walk-In E Conduits and Back Boxes, D Cooling Systems, HVAC D Communications Supplementary Components D Constant Temperature Rooms F Cooling, HVAC Constructed Wetlands G Central D Construction Decentralized D Aids Z Towers D Change Directives Z Utility Connection G Contingencies Z Copiers, Office E Contingencies, Budget Copings Dewatering A Horizontal Waterproofing B Dewatering, Substructure A Roofing B Equipment Costs Z Copper Communications G Facilities Z Distribution Cabling Management Corner Guards C Progress Z Cost Plus a Fee Method of Documentation Z Reporting Z Schedule Z Temporary Z Payment Waste Management and Z With a GMP Disposal Counterflashing Systems Consultants Horizontal Waterproofing B Containment Barriers G Roofing B Contaminated Countertops E Site Material Removal G Covers and Shelters G Site Special Procedures Z Cranes D Contingencies, Project, Budget Temporary Z Contingency Allowances Z Crematorium Equipment E Continuous Footings A Cribbing and Walers A Contract Modification Z Cubicles C Procedures Culverts G Contracting Cupolas B Definitions Curbs and Gutters Forms and Supplements Parking Lot G Requirements Pedestrian Pavement G Control House Equipment, Site G Roadway G Electrical Curbs, Roof B Controlled Environment Rooms F Curtain Wall Assemblies B Convection Curtains and Drapes E Cooling Units D Curtains, Stage E Heating Units D Custom Elevator Cabs and D Doors 159

166 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Customer Relationship D Decontamination Management Software Biological G Custom-Packaged Outdoor D Chemical G HVAC Equipment Equipment E Cut and Cover, Tunnel G Physical G Cutouts, Site Electrical G Thermal G Cutting and Patching Z Decorative D Landscape Boulders G Towers F Dams Water Curtains F Demolition F Decorative Metal Earth G Exterior Fabrications B Dampproofing Exterior Fixed Grilles and B Exterior Wall B Screens Standard Foundation A Fences and Gates G Subgrade Enclosure Wall A Railings Darkroom Exterior Balcony B Doors, Interior C Interior C Processing Equipment E Stair B Data Communications D Stairs B Desktops D Interior C Firewalls D Dedicated 911 Systems D Handhelds D Definitions Z Hardware D Deluge Fire-Suppression D Integration Requirements D Sprinkler Systems Laptops D Demobilization Z Mainframes D Demolition F Network Equipment D Selective F Network Management D Demonstration and Training Z Peripheral Data Equipment D Demountable Program and Integration D Athletic Surfaces F Services Composite Partitions C Routers, CSU/DSU, D Gypsum Partitions C Multiplexers, Codecs, and Metal Partitions C Modems Partitions, Interior C Servers D Plastic Partitions C Software D Wood Partitions C Storage and Backup D Dental Equipment E Switches and Hubs D Derricks D Wireless Access Points D Design Contingencies Z Database Budget Development D Design Software D Data Z Deadend Structures, Site G Loads Electrical Professionals Deaerators D Design-Bid Build Deal Drawers E Design-Build Decentralized-HVAC Cooling D Heating D Deck Insulation Design-Negotiate Build Horizontal Waterproofing B Detection Roofing B Intrusion D Decks, Slabs, and Sheathing, B Security Access D Roof Detection and Alarm D Decks, Slabs, and Toppings, B Fire D Floor Fuel-Gas D Fuel-Oil D

167 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Radiation D Heat Exchangers D Refrigeration D Heaters D Water Intrusion D Piping D Detention Piping Specialties D Cell Modules F Pumps D Doors, Exterior B Site G Doors, Interior C Softeners D Equipment E Supplementary Components D Facility Special Procedures Z Door and Frame Protection C Furniture E Door Frames Gun Lockers E Exterior B Lighting D Interior C Pass-Through Doors E Doors and Grilles, Exterior B Windows Doors Exterior B Exterior B Interior C Interior C Diesel Fuel G Dormitory Distribution, Site G Furniture E Piping, Site G Unit Modules F Pumps, Site G Downspouts B Storage Tanks, Site G Drainage Digital Field G Addressable Fire-Alarm D Layers, Site G Systems Foundation A Video Recorders and Analog D Underslab A Recording Devices Drains Voice Announcers D Area D Direct Current Transmission, G Facility Stormwater D Site Electrical Roof D Directories C Sanitary D Disaster Recovery Equipment D Site Storm Drainage G Discreet-Distributed D Trench D Intelligence Detention Drench Hoses, Hand-Held D Monitoring and Control Emergency Systems Drilling and Blasting, Tunnel G Discreet-Logic Detention D Drinking Fountains D Monitoring and Control Drip Irrigation G Systems Driven Piles A Dishwashers, Commercial E Dry Cleaning Equipment E Disinfecting of Site Water G Dry-Chemical Fire- D Distribution Extinguishing Systems Display Drying and Conditioning E Cases C Equipment Casework E Dry-Pipe Sprinkler Systems D Equipment, Refrigerated E Ducts, Electrical Lighting D Branch Wiring D Turntables D Electrical Distribution D Disposers, Residential D Lighting Branch Wiring D Distributed Duct Accessories, HVAC Audio-Video D Air D Communications and D Exhaust Air D Monitoring Outside Air D Systems D Return Air D Distribution Systems, HVAC D Supply Air D Supplementary Components D Ducts and Casings, Air Domestic Water Distribution D Exhaust Air D Equipment D HVAC D Filtration Equipment D Outside Air D

168 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Return Air D Electromagnetic Supply Air D Field Protection F Dumbwaiters D Interference Filters D Dust Barriers, Temporary Z Electronic Dwelling Unit Modules F Air Cleaners D E Communication Protocols Z Detention Monitoring and D Early Streamer Emission D Control Lightning Protection Digital Systems D Earth Dams G Monitoring and Control D Earth Movement Monitoring F Surveillance D Earth Stripping and Stockpiling G Electronic Personal D Earthwork, Site G Protection Educational and Scientific E Safety Alarm Annunciation D Equipment and Control Systems Educational Safety Detection Systems D Casework E Safety Emergency Aid D Furniture E Devices EIFS, Exterior Walls B Safety Interfaces to Remote D Elastomeric Liquid Flooring C Monitoring Electric Distribution Systems, G Electronic Safety and D Site Security Electric Domestic Water D Supplementary Components D Heaters Elevating Platforms D Electric Heating Boilers D Elevators D Electric Traction Elevators D Equipment and Controls D Freight D Telephones D Passenger D Temporary Z Residential D Software D Service D Embankments G Electric Transmission and G Emergency Distribution, Site Access and Information C Electrical D Cabinets Cabinets and Enclosures D Aid Specialties C Distribution Equipment D Fixture Water-Tempering D Distribution System G Equipment Instrumentation and Controls Lighting D Service D Plumbing Fixtures D Site Improvements G Safety Appliances E Substations, Site G Enclosures Switchgear and Protection G Exterior Horizontal B Exterior Vertical B Devices, Site Overhead Exterior B Systems, Integrated D Subgrade A Automation Control Traffic Bearing Horizontal B Transformers, Site G Energy Distribution, Site G Wiring System D Engine Electrical Service and D Exhaust Systems D Distribution Generators D Supplementary Components D Engineered Control of F Electrical Utility Asbestos Containing Materials Poles, Site G Entertainment and E Services, Site G Recreational Equipment Towers, Site G Entertainment Turntables D Electricity Entrance Metering, Facility D Doors Temporary Z Exterior B Interior C

169 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Flooring C Expansion Control Gratings C Exterior Wall B Grids C Floor Construction B Grilles C Horizontal Waterproofing B Mats and Frames C Interior Partitions C Tile C Roof Construction B Environmental Roofing B Assessment Information Expansion Fittings and Controls, Temporary Z Loops Procedures Z Building Support Plumbing D Requirements, Facility Distribution Systems, HVAC D Epoxy-Marble Chip Flooring C Domestic Water D Equipment E Fire Suppression D Screens B Sanitary Drainage D Site G Exterior Equipment and Furnishings E --- Bulkheads B Erection Z Ceilings B Erosion and Sedimentation G Enclosures, Overhead B Controls Finish Carpentry B Temporary Z Gas Lighting G Escalation Contingencies Z Grilles B Escalators D Horizontal Enclosures B Escape Chutes D Insulation and Finish B Evaporative Air-Cooling D Systems Examination and Preparation Z Louvers and Vents B Examination and Treatment E Opening Protection Devices B Equipment Protection B Excavation and Fill, Site G Signage G Excavation Soffits B Rock Anchors A Steps and Ramps G Soil Anchors A Sun Control Devices B Site G Vertical Enclosures B Substructure A Exterior Athletic Support, Substructure A Equipment G Tunnel G Lighting G Execution Z Exterior Doors B Execution and Closeout Z Supplementary Components B Requirements Exterior Wall B Exercise Equipment E Air Barrier B Exhaust Air D Appurtenances B Duct Accessories D Construction B Ducts and Casings D Dampproofing B HVAC Fans D Expansion Joints B Inlets D Grouting B Plenums and Chases D Insulation B Exhibit Interior Skin B Equipment E Specialties B Turntables D Vapor Retarder B Existing Conditions Veneer B Assessment Weather Barrier B Information Exterior Wall Opening Existing Hazardous Material Flashing B Information Joint Sealants B Existing Material Lintels B Assessment Sills B Information Exterior Windows B Existing Products, Installation Z Supplementary Components B Exit Signs D External Devices D

170 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Extra Stock Materials Z Fans Eye/Face Wash Equipment D HVAC D Eyewash Equipment D Residential Ceiling E F Fats, Oils, and Grease D Disposal Systems Fabric Structures F Faucets, Healthcare D Fabricated Exterior Wall B Feedwater Equipment, Heating D Assemblies Boiler Faced Panel Assemblies B Fees Z Wall Panel Assemblies B Fees and Contingencies Z Fabricated Rooms F Fences and Gates G Fabrications Recreational Court G Exterior B Temporary Z Interior C Tennis Court G Fabricator Qualifications Z Fiber Soil Reinforcement G Fabric-Wrapped Wall Panels C Field Facade Engineering Z Access Equipment D Offices and Sheds Z Support Truss Assemblies B Orders Z Faced Panels Quality Control Procedures Z Exterior Bulkheads B Samples Z Exterior Ceilings B Services, Manufacturer s Z Exterior Soffits B Sport Surfacing G Exterior Walls B Supervision Z Facility Test Reporting Z Decommissioning Z Fill, Site G Procedures Z Film Transfer Cabinets E Fuel Systems D Filtration Equipment, Domestic D Fuel-Oil Pumps D Water Gasoline Dispensing Pumps D Final Grounding D Cleaning Z HVAC Distribution Systems D Closeout Review Z Hydronic Distribution D Site Survey Z Maintenance Z Financing Procedures Z Budget Operation Z Costs Z Procedures Z Fine Grading G Packaged, Sewerage D Finish Grading G Pumping Stations Finishes, Interior C Potable-Water Storage D Ceiling C Tanks Stair C Program Wall C Remediation F Finishing Equipment E Septic Tanks D Finned-Tube Radiation Heaters D Services Coordination Z Fire Alarm D Shell Commissioning Z Integrated Audio Visual D Steam Distribution D Evacuation Systems Stormwater Drains D Initiating Devices D Substructure Commissioning Z Fire Detection and Alarm D Facility Power Generation D Annunciation Panels and D Supplementary Components D Fire Stations Facsimiles and Modems D Control, GUI and Logic Servers D Systems Fan Coil Units Interfaces D Cooling D Fire Detection Sensors D Heating D Fire Escapes B Fire Extinguishers D Accessories D

171 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Fire Hydrants Supplementary Components B Site Domestic Water G Floor Site Fire Protection G Decks, Slabs, and Toppings B Fire Protection D Girders and Beams B Cabinets D Joists B Specialties D Sockets F Temporary Z Structural Frame B Fire Pumps D Trusses B Fire Suppression D Flooring C Supplementary Components D Access C Fire-Extinguishing D Entrance C Fireplaces and Stoves C Supplementary Components C Specialties C Treatment C Fireproofing Flowable Fill G Floor Construction B Fluid-Applied Flooring C Roof Construction B Athletic C Firestopping Flushometers D Floor Construction B Healthcare D Interior Partitions C Security D Roof Construction B Foam-Water Systems D Fire-Suppression, Water- D Folding Based Doors, Interior C Piping D Gates, Interior C Sprinkler Systems D Grilles Sprinkler Systems D Exterior B Standpipes D Interior C Water Storage D Panel Partitions C Fire Suppression Systems, D Folding and Portable Stages E Integrated Automation Control Food First Aid Facilities Z Cooking Equipment E Fixed Delivery Carts E Furnishings E Delivery Carts and E Grilles and Screens, Exterior B Conveyors Partitions, Interior C Delivery Conveyors E Windows, Exterior B Dispensing Equipment E Windows, Interior C Preparation Equipment E Flagpoles G Service Shelving E Flags and Banners C Storage Equipment E Flashing Foodservice Equipment E Exterior Wall Openings B Footings Horizontal Openings B Continuous A Flat Fillers E Spread A Flexible Flashing Forms Horizontal Waterproofing B Agreement Roofing B Agreement Supplements Flexible Pavement Bid Aviation G Bond Parking Lot G Certificates Pedestrian G Clarification Roadway G Closeout Flexible Wood Sheet Wall C Contracting Covering Modification Flood Lighting G Notice of Award Floor and Wall Cleaning E Notice to Proceed Equipment Procurement Floor Construction B Project Balcony B Proposal Mezzanine B

172 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Foundations A Integrated Audio Evacuation D Anchors A Systems Column A Fuel-Oil Drainage A Detection and Alarm D Raft A GUI and Logic Systems D Special A Integrated Audio D Standard A Evacuation Systems Walls A Detection Sensors D Fountains Piping, Site G Equipment G Pumps, Site G Exterior G Storage Tanks, Site G Interior F Fume Hood Exhaust D Equipment Controls Fume Hoods, Laboratory E Exterior G Functional Towers F Interior F Funding Exterior G Budget Interior F Cash Flow Piping System Sources Exterior G Funiculars D Interior F Furnaces D Plumbing Systems Furnishings E Exterior G Accessories E Interior F Movable E Pumps Site G Exterior G Furniture E Interior F Fuses, Site Electrical G Specialties Fusible Interrupter Switchgear, G Exterior G Site Electrical Interior F Water Treatment G Exterior G Gabions G Interior F Boxes G Framed Fabric Structures F Mattresses G Framed Skylights B Retaining Walls G Frames Game Room Equipment E Exterior Doors B Garment Conveyors, Hanging E Horizontal Openings B Gas Interior Doors C Containment G Interior Windows C Distribution, Site G Freezers, Walk-In E Equipment D Freight Elevators D Lighting, Exterior G Frequency Converters D Lighting, Interior C Fuel Mitigation A Cells D Piping Distribution, Site G Site Utilities G Heat Generation D Storage Tanks D Oil, Temporary Z Utility Connection G Piping D Gas Systems Pumps D Healthcare D Storage Tanks D Laboratory D Fuel-Fired Gasoline Domestic Water Heaters D Distribution, Site G Heaters D Piping, Site G Heating Boilers D Pumps, Site G Fuel-Gas Detection and D Storage Tanks, Site G Alarm Gas-Phase Air Filtration D Detection Sensors D GUI and Logic Systems D

173 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Gates Glazed Exterior B Partitions, Interior C Parking G Structures F Pedestrian G Glazing Interior C Exterior Parking E Doors B Pedestrian E Windows B Operators G Horizontal Openings B Recreational Court G Interior Roadway Vehicle Fare G Doors C Tennis Court G Windows C General Z --- Glued-Laminated Commissioning Z Balcony Construction B Requirements Canopy Construction B Conditions Columns Supporting Requirements Z Floors B General Purpose Electrical D Roofs B Power Floor Decks B Supplementary Components D Floor Girders and Beams B General Service D Mezzanine Construction B Compressed-Air Ramps B Packaged Air Compressors D Roof Decks B and Receivers Roof Girders and Beams B Piping D Governmental Safety Z Valves D Requirements General-Duty Valves Grade Beams A Cooling System D Grading G Distribution Systems D Grandstands and Bleachers G Fire Suppression D Exterior F Heating System D Graphics/Multimedia Software D Geodesic Grasses G Domes F Gratings Structures F Entrance Floor C Geofoam G Metal B Geophysical Gravel Stops and Fascias Data Horizontal Waterproofing B Investigations Roofing B Geosynthetic Gravel, Roofing B Slope Protection G Gray Water Systems D Soil Reinforcement G Equipment D Soil Stabilization G Piping System D Geotechnical Specialties D Data Tanks D Engineers Treatment Equipment D Investigations Grease Removal Devices D Geotextile Subsurface G Green Roofing: See Vegetated B Drainage Filtration Low-Slope Roofing Geothermal Heat Generation D Grilles Girders and Beams Exterior B Floor B Operating B Roof B Interior C Glass Unit Masonry: See Unit Grilles and Gates, Interior C Masonry Grilles and Screens Glass-Fiber-Reinforced Exterior Fixed B Concrete Interior Fixed C Exterior Fabrications B Ground Covers G Interior Fabrications C Ground Freezing A

174 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Grounding and Bonding Process Support Plumbing D Communications D Sanitary Drainage D Communications Distribution G Ventilation D Electrical Service and D Hardware Distribution Exterior Electronic Safety and D Doors B Security Windows B Facility Power Generation D Horizontal Openings B General Purpose Power D Interior Integrated Automation D Doors C Lighting D Windows C Miscellaneous Electrical D Hard-Wired Detention D Grounding, Site G Monitoring and Control Ground-Set Flagpoles G Systems Groundwater Treatment G Harmonic Filters D Grouting Hat and Coat Racks C Exterior Wall B Hatches, Roof B Floor Construction B Haul Routes Z Roof Construction B Hazard Warning Lighting D Gun Ports E Hazardous Materials Gutters B Assessment Gymnasium Remediation F Dividers E Requirements Z Equipment E Hazardous Waste Gypsum Board Drum Handling G Ceilings, Suspended C Recovery Processes G Exterior Health, Safety, and Emergency Z Bulkheads B Response Procedures Wall Interior Skin B Healthcare Ceilings B Casework E Soffits B Chemical-Waste Systems D Finish, Ceilings C Communications and D Interior Partitions C Monitoring Stair Soffits B Compressed-Air Systems D Subgrade Enclosure Wall A Equipment E Interior Skin Facility Special Procedures Z H Furniture E Gas Systems D Hand-Held Emergency Drench D Imaging Systems D Hoses Lighting D Handling of Lighting Ballasts F Metal Supports E and Lamps Containing Plumbing Fixtures D Mercury or PCB Processed Water Systems D Hangar Doors B Seating E Hangers and Supports Vacuum Systems D Building Support Plumbing D Heat Exchangers Communications D Domestic Water D Cooling System D HVAC D Distribution Systems D Heat Generation D Domestic Water D Biomass D Electrical Service and D Fuel-Fired D Distribution Geothermal D Facility Power Generation D Solar D Fire Suppression D Heat Pumps D General Purpose Power D Air-Source D Heating System D Unitary D Lighting D Water-Source D Miscellaneous Electrical D

175 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Heat Tracing Membrane B Building Support Plumbing D Sheet Metal Flashing and B Distribution Systems D Trim Domestic Water D Substrate Board B Fire Suppression D Vapor Retarder B Process Support Plumbing D Horticultural Equipment E Sanitary Drainage D Hospital Unit Modules F Heaters, Domestic Water D Hospitality Casework E Heating Boilers D Equipment E Electric D Furniture E Feedwater Equipment D Turntables D Fuel-Fired D Hot Tubs F Heating Solar Collectors D Hotel and Motel Furniture E Heating Systems D Housekeeping Carts E Supplementary Components D Humidity Control D Heating Utility Connection G HVAC D Heating, Cooling, and Z Air Ventilating, Temporary Cleaning D Heating, Ventilation, and Air D Cleaning Devices D Conditioning: See HVAC Distribution D Heavy Timber Distribution Components D Balcony Construction B Ducts and Casings D Canopy Construction B Heat Exchangers D Columns Supporting Systems, Integrated D Floors B Automation Control Roofs B HVAC Fans D Floor Exhaust Air D Girders and Beams B Outside Air D Trusses B Return Air D Mezzanine Construction B Supply Air D Ramps B Hydraulic Elevators Roof Freight D Girders and Beams B Passenger D Trusses B Residential D Helipad Lighting D Service D High Energy Magnetic Pulse F Hydro-Mulching G Protection Hydronic Historic Cooling Distribution, Site G Restoration Requirements Distribution, Facility D Treatment Procedures Z Heating Distribution, Site G Hoists D Piping D Temporary Z Pumps D Hollow Metal Doors: See Hydroponic Growing Systems E Exterior and Interior Doors Hydro-Turbine Generators D Horizontal Conveying D Hyperbaric Rooms F Horizontal Enclosures, B Exterior I Traffic Bearing B Ice Horizontal Openings B Machines E Supplementary Components B Rinks F Horizontal Waterproofing Storage D Copings B Identification Counterflashing Systems B Building Support Plumbing D Deck Insulation B Communications D Expansion Joints B Cooling System D Flexible Flashing B Distribution Systems D Gravel Stops and Fascias B Domestic Water D

176 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Electrical Service and D Instrumentation and Control Distribution Building Support Plumbing D Electronic Safety and D Cooling System D Security Distribution Systems D Facility Power Generation D Domestic Water Systems D Fire Suppression D Electrical Service and D Integrated Automation D Distribution General Purpose Power D Facility Power Generation D Heating System D Fire Suppression D Lighting D General Purpose Power D Miscellaneous Electrical D Heating System D Process Support Plumbing D Lighting D Sanitary Drainage D Liquid and Gas Site Utilities G Ventilation D Miscellaneous Electrical D Impact Attenuating Devices G Process Support Plumbing D Incineration Decontamination G Sanitary Drainage D Incinerators E Site Lighting G Indoor Air Quality Ventilation D Procedures Z Instrumentation, Special F Requirements Insulated Rooms F Indoor Central-Station Air- D Insulation Handling Units Building Support Plumbing D Indoor Soccer Boards F Cooling System D Induction Units Distribution Systems D Cooling D Domestic Water D Heating D Exterior Wall B Industrial Fire Suppression D Doors, Interior C Floor Construction B Exterior B Heating System D Furniture E Process Support Plumbing D Turntables D Roof Construction B Infection Control Procedures Z Sanitary Drainage D Information Slab-On-Grade A Environmental Assessment Standard Foundation A Existing Condition Subgrade Enclosure Wall A Existing Hazardous Material Ventilation D Existing Material Insulators and Fittings, Site G Geophysical Data Electrical Geotechnical Data Integrated Audio-Video D Specialties C Systems and Equipment Survey Integrated Automation D Informational Kiosks C Control of Infrared and Radio Frequency D Communication Systems D Tracking Systems Conveying Equipment D Infrared Transmitter and G Electrical Systems D Receivers Electronic Safety and D Infrastructure Demolition G Security Systems Inlets, Exhaust Air D Equipment D Insect Control Devices C Facility Controls D Installation Z Fire-Suppression Systems D Allowances Z HVAC Systems D Installer Qualifications Z Plumbing Systems D Institutional Integrated Equipment E Ceiling Assemblies C Furniture E Construction F Instructions Project Delivery Procurement Interactive Voice Response D

177 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Interceptors, Sanitary Waste D Remote Devices and D Intercommunications and D Sensors Program Systems Systems Infrastructure D Interior Investigations Construction C Geophysical Demountable Partitions C Geotechnical Designers Subsurface Door Frames C Invitations Door Glazing C Ion Change Decontamination G Door Hardware C Ironing Equipment, Commercial E Door Louvers C Irrigation Door Specialty Frames C Agricultural E Doors C Planting G Finish Schedules C Pumps G Finishes C Fixed Partitions C J Gas Lighting C Joint Sealants Glazed Partitions C Exterior Wall Openings B Lighting D Horizontal Openings B Money-Changing Equipment E Joists Operable Partitions C Floor B Parking Roof B Control Equipment E Fee Collection Equipment E K Gates E Kilns E Key and Card Control E Kiosks, Informational C Units Kitchen Appliances, Residential E Meters E Ticket Dispensers E L Planters and Artificial Plants, E Laboratory Movable Casework E Railings and Handrails C Chemical-Waste Systems D Scoreboards E Compressed-Air Systems D Screens C Equipment E Skin, Subgrade Enclosure A Fume Hoods E Wall Furniture E Specialties C Gas Systems D Windows C Incubators E Interior Partitions C Processed Water Systems D Supplementary Components C Refrigerators E Interior Pedestrian Sterilizers E Control Equipment E Vacuum Systems D Detection Equipment E Ladders B Fare Collection Equipment E Roof B Gates E Lagoons, Sanitary Sewerage G Security Equipment E Land/Project Development Interiors C --- Landfill Construction and G Commissioning Z Storage Internal Cellular, Paging, and D Landscape Antenna Systems Architects Internet Edging G Conferencing Software D Lighting G Protocol Voice Switches D Timbers G Intrusion Detection D Landscaping G Control, GUI and Logic D Accessories, Interior Fixed E Systems Accessories, Interior Movable E Interfaces D Activities G

178 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Laser Transmitter and G Site G Receivers Lightproof Doors, Interior C Laundry Lights, Loading Dock E Accessories C Lightweight Concrete Roof B Appliances, Residential E Insulation Chutes D Limited-Use/Limited Application D Equipment, Coin-Operated E Elevators Laundry Trays D Linen Chutes D Commercial D Lintels, Exterior Wall Openings B Residential D Liquefied Petroleum Gas G Lavatories D Distribution, Site Commercial D Liquid and Gas Site Utilities G Residential D Supplementary Components G3090 Security D Loading Bridges D Laws Z Aircraft Passenger D Leaching Pits G Ship Passenger D Lead Loading Dock Equipment E Based Paint Remediation F Bumpers E Hazard Control Activities F Levelers E Remediation F Lifts E Lean Concrete Slurry Walls A Lights E Lecterns E Seals and Shelters E Lecture Hall Seating, Fixed E Loans Levelers, Loading Dock E Construction Library Permanent Casework E Locker Room Benches C Equipment E Lockers C Furniture E Louvered Equipment B Stack Systems E Enclosures License Fees Z Louvers Life Cycle Activities Z Exterior B Lifts D Exterior Door B Loading Dock E Interior C Mortuary E Interior Doors C Lighting D Low Pressure Sanitary G Airfield G Sewerage Area G Low-Slope Roofing B Control D Control Devices D M Control Panels D Magnesium-Oxychloride C Fixtures D Flooring Flood G Mail Interior D Boxes C Landscape G Chutes C Parking Lot G Maintenance Playfield G Contracts Z Plaza and Walkway G Equipment E Poles and Standards, Site G Manholes Recreational Area G Communications G Roadway G Liquid and Gas Site Utilities G Site G Sanitary Drainage D Supplementary Components D Sewerage G Temporary Z Site Electrical G Lightning Protection D Stormwater Drainage D Dissipation D Manufactured Structures D Fireplace Chimneys C Surge Arresters and D Fireplaces C Suppressors 172

179 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Masonry Exterior Wall B Canopy Construction B Veneer Floor Construction B Rooms F Mezzanine Construction B Manufacturer Ramps B Engineered Structures F Roof Construction B Field Services Z Metal Railings Qualifications Z Exterior Balcony B Markerboards C Interior C Masonry Metal Stairs B Fireplaces C Railings B Flooring C Treads and Nosings B Stair finish C Metal Supports Veneer, Exterior Walls B Electrical Service and D Master Antenna Television D Distribution Systems Facility Power Generation D Material Handling D General Purpose Power D Mechanical Filtration G Lighting D Decontamination Metal-Framed Skylights B Mechanical Metal Supports Metal-Web Wood Joists Building Support Plumbing D Floor B Cooling System D Roof B Distribution Systems D Meteorological Instrumentation F Domestic Water D Meters and Gages Fire Suppression D Building Support Plumbing D Heating System D Cooling System D Process Support Plumbing D Distribution Systems D Sanitary Drainage D Domestic Water D Ventilation D Fire Suppression D Medical Sterilizing Equipment E Heating System D Meetings, Project Z Sanitary Drainage D MEP Engineers Methane Mitigation A Mercantile and Service E Methods of Payment Equipment Mezzanine Floor Construction B Mercantile Storage Assemblies C Microwave Transmitter and G Metal Receivers Balconies B Milkers E Bollards G Minor Changes in the Work Z Building Systems F Mirrors, Unframed C Catwalks B Miscellaneous Electrical D Crib Retaining Walls G Systems Detention Enclosures F Supplementary Components D Doors: See Exterior and Miscellaneous Site G Interior Doors Construction Exterior Fabrications B Mitigation Fabrications, Interior C Gas A Floor Decking B Methane A Gratings B Off-Gassing A Ramps B Radon A Roof Decking B Water A Walkways B Mobilization Z Windows: See Exterior and Mockups Z Interior Windows Modems D Metal Furring Modifications Ceilings C Forms Wall Finish C Modular Metal Joists Dimming Control D Balcony Construction B Mezzanines F Service Walls C

180 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Mold Remediation F Office Clearance Air Sampling F Accessories E Preparation and F Equipment E Containment Furniture E Money Cart Pass-Through E Seating E Money Handling Equipment E Shelters and Booths F Money-Changing Equipment Openings, Horizontal B Exterior G Operable Interior E Access Systems D Monorails D Partitions, Interior C Mortuary Operating Room Equipment E Equipment E Operating System Software D Lifts E Operating Windows Refrigerators E Exterior B Motor-Control Centers D Interior C Movable Furnishings E Operation and Maintenance Z Moving Data Ramps D Optical Fiber Communications G Walks D Distribution Cabling Mud Slab, Slab-On-Grade A Optometry Equipment E Multi-Leaf Vertical Lift Doors Orchestra Lifts D Exterior B Organic Decontamination G Interior C Organs E Multiple Contracts Ornamental Woodwork Coordination Z Exterior Fabrications B Summaries Interior C Multiple Seating Other Fixed E Fixed Furnishings E Movable E Interior Specialties C Multiple-Use Seating Movable Furnishings E Fixed E Outlets and Inlets Portable E Air D Murals E Outside Air D Musical Equipment E Return Air D N Supply Air D Outline Lighting D Natural-Gas Distribution G Outside Air D Temporary Z Duct Accessories D Nautical Flagpoles G Ducts and Casings D Network HVAC Fans D Integration Requirements D Outlets and Inlets D Lighting Control D Plenums and Chases D Neutralization Decontamination G Terminal Units D Noise Barriers, Temporary Z Ovens, Commercial E Notice of Award Overhead Z Notice to Proceed Overhead Exterior Enclosures B Nuclear Radiation Protection F Oversize Doors, Exterior B Number of Construction Owner Contracts Activities Nurse Call/Code Blue Systems D Development O Safety Requirements Z Owner s Work Observation Windows, Interior C Owner-Build Observatories F Owner-Furnished Products Z Equipment E Obstruction Lighting D P Off-Gassing Mitigation A Package Transfer Units E

181 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Packaged Partitions, Interior C Compressor and Condenser D Demountable C Units Fixed C Generator Assemblies D Glazed C Outdoor HVAC Equipment D Operable C Solar Heating Equipment D Pass Windows Terminal Air-Conditioners D Exterior B Submersible Sewerage Pump D Interior C Units Passenger Wastewater Pump Units D Elevators D Packaging Equipment E Loading Bridges D Paging Systems D Passive Cathodic Protection D Painting and Coating for Ceilings C Underground and D Exterior Submerged Piping Bulkheads B Underground Storage Tanks D Ceilings B Pathways Soffits B Communications D Walls B Electronic Safety and D Wall C Security Paintings E Integrated Automation D Panel Doors Patient Exterior B Bed Service Walls C Interior C Care Equipment E Panelboards D Monitoring and Telemetry D Paneling Systems Ceiling C Pavement Wall C Appurtenances, Aviation G Parapets B Aviation G Parking Areas, Temporary Z Curbs and Gutters, Aviation G Parking Bumpers, Parking Lot G Markings Parking Control Equipment Airfield G Exterior G Parking Lot G Interior E Pedestrian G Parking Fee Collection Roadway G Equipment Parking Lot G Exterior G Pedestrian G Interior E Roadway G Parking Gates Snow Melting Exterior G Pavers, Roofing B Interior E Paving, Slope Protection G Parking Key and Card Payment Procedures Z Control Units for Testing Laboratory Z Exterior G Services Interior E PDX/Key Systems D Parking Lots G Pedestrian Appurtenances G Bridges G Curbs and Gutters G Plazas and Walkways G Lighting G Tunnels G Pavement G Pedestrian Control Parking Meters Equipment Exterior G Exterior G Interior E Interior E Parking Ticket Dispensers Pedestrian Detection Exterior G Equipment Interior E Exterior G Particulate Air Filtration D Interior E

182 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Pedestrian Fare Collection Walls B Equipment Windows B Exterior G Fabric Structures F Interior E Facility Pedestrian Gates Fuel Systems D Exterior G Power Generation D Interior E Services D Pedestrian Pavement G Shell B Appurtenances G Fences and Gates G Curbs and Gutters G Fire Detection and Alarm D Pedestrian Security Fire Suppression D Equipment Flagpoles G Exterior G Floor Construction B Interior E Flooring C People Lifts D Foundations A People Movers D Fuel-Gas Detection and D Performance Requirements Alarm Access Control and Intrusion D Fuel-Oil Detection and Alarm D Detection Furnishings E Airfields G Gas Systems D Area Lighting G General Purpose Electrical D Athletic Areas G Power Audio-Video Communication D General Service D Basement Construction A Compressed-Air Building Modules F Geodesic Structures F Building Support Plumbing D Hazardous Materials F Systems Remediation Cathodic Protection D Heating Systems D Ceiling Finishes C Horizontal Conveying D Chemical-Waste Systems D Horizontal Exterior Enclosure B Communications D Horizontal Openings B Compressed-Air Systems D HVAC D Construction Dewatering A HVAC Air Distribution D Conveying Equipment D Hydronic Distribution D Cooling Systems D Integrated Automation D Covers and Shelters G Facility Controls D Data Communication D Interior Detection and Alarm D Construction C Detention Equipment E Doors C Distributed Communications D Finishes C and Monitoring Fountains F Domestic Water Distribution D Louvers C Dumbwaiters D Partitions C Electrical D Railings and Handrails C Service and Distribution D Windows C Electronic Interiors C Monitoring and Control D Lifts D Safety and Security D Lighting D Surveillance D Lightning Protection D Elevators D Manufactured Canopy F Equipment E Manufactured/Fabricated F Equipment and Furnishings E Rooms Escalators D Manufactured-Engineered F Excavation Support A Structures Exterior Material Handling D Doors B Modular Mezzanines F Fountains G Moving Ramps D Louvers B Moving Walks D

183 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Off-Gassing Mitigation A Special Construction F Operable Access Systems D Special Structures F Other Site Construction G Stair Finish C Overhead Exterior B Stairways B Enclosures Steam Distribution D Parking Lots G Storm Drainage Utility G Passenger Loading Bridges D Structure Moving F Pedestrian Plazas and G Subdrainage Systems A Walkways Substructure A People Mover D Superstructure B Planting Irrigation G Suspended Ceiling C Play Areas G Construction Plumbing D Towers F Pools F Traffic Bearing Horizontal B Processed Water Systems D Enclosures Radiation Detection and D Tunnels G Alarm Turntables D Radiation Protection F Vacuum Systems D Raised Floor Construction C Ventilation D Recreational Areas G Vertical Exterior Enclosure B Refrigeration Detection and D Voice Communication D Alarm Wall Finishes C Retaining Walls G Water Intrusion Detection D Roadways G and Alarm Roof Construction B Perimeter Security Systems D Roofing B Periodic Work Observation Z Sanitary Drainage D Permits Sanitary Sewerage Utility G Z Security Equipment E Application Seismic Control F Building Site Costs Z Aviation Fuel Distribution G Planned Unit Development Bridges G Zoning Construction G Pest Control Diesel Fuel Distribution G Devices C Domestic Water G Temporary Z Distribution Pews and Benches Electric Distribution System G Fixed E Electrical Utilities G Portable E Fire Protection Water G Photographic Fuel-Oil Distribution G Documentation Z Gas Distribution G Processing Equipment E Gasoline Distribution G Photovoltaic Collectors D Hydronic Cooling G Physical Decontamination G Distribution Piers, Column A Hydronic Heating G Piles Distribution Bored A Improvements G Caps A Irrigation Water G Driven A Plumbing Utilities G Pipe Culverts G Preparation G Piping Specialties, Stormwater D Remediation G Drainage Steam Distribution G Piping System, Gray Water D Slabs-On-Grade A Piping Solid Waste Handling E Compressed-Air D Equipment Domestic Water D Sound and Vibration Control F Fire-Suppression D Space Frames F Fuel D

184 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Gas Exterior Fabrications B General Service D Exterior Fixed Grilles and B Compressed-Air Screens Healthcare Chemical-Waste D Fabrications, Interior C Hydronic D Fences and Gates G Laboratory Chemical-Waste D Floor Decking B Processed Water D Framed Skylights B Sanitary Sewerage D Paneling, Ceilings C Sanitary Waste and Vent D Paneling, Walls C Site Railings, Exterior Balcony B Aviation Fuel G Railings, Interior C Diesel Fuel G Roof Decking B Fuel-Oil G Stair Railings B Gasoline G Windows: See Exterior and Storm Drainage G Interior Windows Steam D Platform Lifts D Stormwater Drainage D Platform/Stage Floors C Vacuum D Platforms, Elevating D Waste Anesthesia-Gas D Play Structures G Pits and Bases A Players and Recorders E Planetariums F Playfield Areas G Equipment E Equipment and Structures G Pendulums E Lighting G Projectors E Surfacing G Planned Unit Development Playground Equipment G Permits Plaza and Walkway Lighting G Requirements PLC Electronic Detention D Plant Inspection Procedures Z Monitoring and Control Planters and Artificial Plants, E Systems Fixed Interior Plenums and Chases, Air D Planters Exhaust Air D Exterior G Outside Air D Fixed Interior E Return Air D Movable Interior E Supply Air D Site G Plugging G Planting Plumbing D Accessories G Plumbing Fixtures D Irrigation G Commercial D Preparation G Emergency D Plants and Bulbs G Healthcare D Plants, Exterior G Residential D Plaster Security D Ceilings, Suspended C Supports, Security D Exterior Bulkheads B Trim Exterior Ceilings B Commercial D Exterior Fabrications B Residential D Exterior Soffits B Security D Exterior Wall Interior Skin B Plumbing Systems Fabrications, Interior C Integrated Automation D Finish, Ceilings C Control Interior Partitions C Interior Fountain F Stair Soffits B Pool F Subgrade Enclosure Wall A Pneumatic Tube Systems D Interior Skin Point of Sale Systems D Plastic Polychlorinate Biphenyl F Blocks, Walls C Remediation Doors: See Exterior and Interior Doors 178

185 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Ponds, Site Domestic Water G Roof Girders and Beams B Covers Shaft Lining Site Domestic Water G Pedestrian Tunnels G Site Irrigation Water G Service Tunnels G Liners Vehicular Tunnels G Site Domestic Water G Splash Blocks B Site Irrigation Water G Stair Treads B Ponds and Reservoirs, G Stairs B Storm Drainage Subgrade Enclosure A Liners, Storm Drainage G Tunnel Lining Pools F Pedestrian G Equipment F Service G Equipment Controls F Vehicular G Piping System F Unit Pavement: See Unit Plumbing Systems F Pavement Pumps F Precautions for Mold F Specialties F Remediation Water Treatment F Precontract Revisions Portable Prefinished Paneling Audio-Video Equipment D Ceilings C Lamps E Walls C Partitions, Screens and C Preliminary Panels Closeout Reviews Z Portland Cement Terrazzo C Schedules Flooring Pressure Grouting Soil G Porous Unit Pavement: See Stabilization Unit Pavement Pressure Piping Tied Joint G Postal Restraint System Equipment E Pressure-Resistant Packaging, and Shipping E Doors Equipment Exterior B Specialties C Interior C Potting Machines E Glazing B Power Windows, Exterior B Distribution, Facility D Price and Payment Procedures Z Factor Correction Equipment D Printers Filtering and Conditioning D Communications D Powered Scaffolding D Office E Preaction Sprinkler Systems D Procedures Precast Concrete Alteration Project Z Balcony Construction B Checkout Z Canopy Construction B Closeout Z Cofferdams A Contract Modification Z Columns Supporting Floors B Environmental Z Columns Supporting Roofs B Facility Equipment Screens B Decommissioning Z Exterior Balcony Walls B Maintenance Z Exterior Wall Construction B Operation Z Exterior Wall Veneer B Field Quality Control Z Floor Decks B Health, Safety, and Z Floor Girders and Beams B Emergency Response Foundation Walls A Historic Treatment Z Interior Partitions C Indoor Air Quality Z Mezzanine Construction B Infection Control Z Parapets B Payment Z Ramps B Plant Inspection Z Retaining Walls G Price and Payment Z Roof Decks B Procurement Substitution

186 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Progress Payment Z Program Security Z Record Documents Z Source Quality Control Z Summary Special Z Web Site Z Special Project Z Projection Screens E Startup Z Projectors E Submittal Z Promotion Substitution Z Proposal Sustainability Certification Z Forms Project Requests Z Process Support Plumbing D Worksheet Summaries Z Systems Protected Membrane Roofing B Supplementary Components D Protecting Installed Z Processed Water Construction Equipment D Protection Devices D Piping D Systems, Healthcare D Protection of Adjacent Z Systems, Laboratory D Construction Procurement Protective Definitions Walkways, Temporary Z Form Supplements Wall Covering C Forms and Supplements Public Address and Mass D Instructions Notification Systems Meetings Public Information Systems D Requirements Pumping Stations, Facility D Scopes Sewerage Substitution Procedures Pumps Product Boiler Feedwater D Allowances Z Domestic Water D Data Z Exterior Fountain G Delivery Requirements Z Facility Fuel-Oil D Options Z Facility Gasoline Dispensing D Requirements Z Fire D Storage and Handling Z Fuel D Requirements Hydronic D Professional Services Interior Fountain F Profit Z Irrigation G Program Pool F Facility Sanitary Waste D Project Site Site Aviation Fuel G Progress Cleaning Z Diesel Fuel G Progress Payment Procedures Z Fuel-Oil G Project Gasoline G Alliances Steam Condensate D Budget Information Storm Drainage G Contingencies, Budget Stormwater Drainage D Coordination Z Criteria Delays, Budget Q Delivery Methods Qualifications Z Description Quality Forms Assurance Z Identification Z Control Z Management and Z Requirements Z Coordination Quantity Allowances Z Managers Quartz Flooring C Meetings Z

187 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER R Raft Foundations A Railings Raceway Decking Assemblies Exterior Balcony B Assemblies Floor B Interior C Roof B Stair B Raceways and Boxes Railway Embankments G Electrical Service and D Rainwater Distribution Leaders D Facility Power Generation D Management B General Purpose Power D Storage Tanks D Lighting D Raised Floor Construction C Miscellaneous Electrical D Rammed Earth Construction F Raceways and Enclosures Walls F Branch Wiring D Ramps B Electrical Distribution D Metal B Lighting Branch Wiring D Temporary Z Raceways, Facility Grounding D Ranges, Commercial E Radiant Heating Reception Casework E Electric Cables D Reclosers, Site Electrical G Hydronic Piping D Record Units D Clarifications and Proposals Radiation Detection and D Modifications Alarm Recreational Detection Sensors D Area Lighting G Dosimeters D Areas G GUI and Logic Systems D Court Fences and Gates G Integrated Audio Evacuation D Court Surfacing G Systems Equipment E Radiation Protection F Surfaces G Radiation Resistant Glazing Recycled-Rubber Pavement: Exterior Windows B See Unit Pavement Exterior Doors B Recycling Interior Windows C Equipment E Interior Doors C Programs Z Radiation Shielding References Z Doors Standards Z Exterior B Refractory Masonry C Interior C Refrigerant Windows Compressors D Exterior B Condensers D Interior C Refrigerated Radiators D Display Equipment E Radio Communications D Food Storage Cases E Equipment Refrigeration Detection and D Radio Frequency Protection F Alarm Radioactive Decontamination G Detection Sensors D Radio-Frequency- GUI and Logic Systems D Interference Integrated Audio Evacuation D Filters D Systems Shielding Doors Refrigerators Exterior B Laboratory E Interior C Mortuary E Shielding Windows Registration Equipment E Exterior B Regulatory Interior C Required Permits Radiology Equipment E Requirements Z Radon Mitigation A Reinforced Soil Retaining Walls G

188 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Related Activities Regulatory Z Substructure A Sustainable Design Tunnel Construction G Toxic Materials Z Relational Contracts Zoning Relay-Logic Detention D Reservoirs, Site Irrigation G Monitoring and Control Water Systems Residential Relief Vents B Appliances E Religious Casework E Art Ceiling Fans E Fixed E Elevators D Movable E Equipment E Casework E Furniture E Equipment E Kitchen Appliances E Relocations Laundry Appliances E Disruptions Plumbing Fixtures D Moving Resilient Flooring C Temporary Athletic C Remediation Stair Finish C Asbestos F Resinous Flooring C Facility F Matrix Terrazzo C Lead F Restaurant Mold F Furniture E Polychlorinate Biphenyl F Turntables D Sinkhole G Retail Furniture E Site G Retaining Walls G Soil Stabilization G Subdrainage G Water G Retention Basins G Removal and Disposal of Retractable Stairs E Asbestos Containing F Return Air D Materials Duct Accessories D Contaminated Soils G Ducts and Casings D Materials Containing Lead F HVAC Fans D Materials with Mold F Outlets and Inlets D Polychlorinate Biphenyls F Plenums and Chases D Representations and Reverse-Osmosis G Certifications Decontamination Requests for Interpretation Z Revisions Requirements Precontract Administrative Z Revolving Door Entrances Closeout Z Exterior B Contracting Interior C Environmental, Facility Rezoning Execution and Closeout Z Ridge Vents B General Commissioning Z Rigging Systems and Controls E Governmental Safety Z Rights-of-Way and Easements Hazardous Materials Z Rigid Pavement Historic Restoration Aviation G Indoor Air Quality Horizontal Waterproofing B Owner Safety Z Parking Lot G Planned Unit Development Pedestrian G Procurement Roadway G Product Z Ring-Down Emergency D Product Delivery Z Telephones Product Storage and Z Riprap G Handling Roads, Temporary Z Quality Z Regulatory

189 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Roadways G Room Appurtenances G Air-Conditioners D Construction G Finish Schedule C Curbs and Gutters G Rope Climbers D Embankments G Rotary Converters D Lighting G Rough Grading G Monitoring Equipment G Rugs and Mats, Moveable E Pavement G Rules Z Rock Running Track Surfacing G Anchors, Excavation A Bolting and Grouting G S Removal G Safe Deposit Boxes E Stabilization G Safes E Rock Reinforcement and Safety Initial Support Netting F Pedestrian Tunnels G Specialties C Service Tunnels G Samples Z Vehicular Tunnels G Field Z Rock Slope Sanitary Drainage D Netting G Drains D Wire Mesh G Facilities Z Rodent Control G Manholes D Devices C Piping Cleanouts D Soil Treatment A Supplementary Components D Roof Sanitary Sewerage Accessories B Equipment D Appurtenances B Force Mains G Curbs B Lagoons G Decks, Slabs, and Sheathing B Piping D Drains D G Girders and Beams B Pumps D Hatches B Structures G Joists B Utilities G Ladders B Utility Connection G Panels B Sanitary Sewers D Pavers, Horizontal B Sanitary Waste Waterproofing Interceptors D Specialties B Piping Specialties D Structural Frame B Separators D Tiles B Sanitary Waste and Vent D Trusses B Piping Walkways B Saunas F Windows B Sawdust Collection Systems D Roof Construction B Scaffolding Supplementary Components B Powered D Roofing B Suspended D Ballast B Window Washing D Canopy B Scaffolding and Platforms, Z Coatings B Temporary Gravel B Scales C Low-Slope B Scanners D Membrane, Low-Slope B Schedule of Values Z Pavers B Schedules Shingles and Shakes B Room Finish C Steep Slope B Interior Finish C Supplementary Components B Preliminary Scheduling of Work Z

190 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Scoreboards Sensors Exterior G Carbon-Monoxide Detection D Interior E Fire Detection D Screening Devices, Site G Fuel-Gas Detection D Screens and Louvers, Site G Fuel-Oil Detection D Screens Radiation Detection D Equipment B Refrigerant Detection D Interior C Smoke Detection D Sculptures Water Detection D Fixed E Separators, Sanitary Waste D Movable E Septic Tanks Scuppers B Effluent Pumps G Seals and Shelters, Loading E Facility D Dock Utility G Seat and Table Assemblies Septic Tanks and Effluent Wet G Fixed E Wells Portable E Service Seating E Elevators D Seating and Tables, Site G Fittings and Accessories E Sectional Doors Line Equipment E Exterior B Tunnels G Interior C Walls C Security Services D --- Access Detection D Sewerage Barriers, Temporary Z Cleanouts G Ceiling Assemblies C Manholes, Frames, and G Doors, Exterior B Covers Doors, Interior C Sewers, Sanitary D Enclosures, Temporary Z Shaft Construction Equipment E Pedestrian Tunnels G Gates, Interior C Service Tunnels G Lighting D Vehicular Tunnels G Mirrors and Domes C Shampoo Bowls D Plumbing Fixtures D Sheathing Procedures Z Balcony B Windows, Exterior B Canopy B Windows, Interior C Exterior Balcony Walls B Seeders E Exterior Walls B Seeding G Floor B Segmental Retaining Walls G Mezzanine B Security Glazing Parapets B Exterior Windows B Ramps B Exterior Doors B Roof B Interior Windows C Sheet Carpeting C Interior Doors C Sheet Metal Flashing and Seismic Trim Control F Horizontal Waterproofing B Instrumentation F Roofing B Selective Sheet Metal Roofing B Bridge Demolition F Specialties B Building Demolition F Sheet Piling Cofferdams A Demolition F Shell B --- Historic Demolition F Shelving Interior Demolition F Closet and Utility C Site Demolition G Food Service E Self-Contained Air-conditioners D Shield Driving Tunnel G Excavation 184

191 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Ship Passenger Loading D Residential D Bridges Security D Shipping Equipment E Site Shooting Range Equipment E Acquisition Shop Drawings, Product Data, Z Aviation Fuel Distribution G and Samples Bridges G Shop-Fabricated Structural Clearing G Wood Constructed Fireplaces C Balcony Construction B Containment G Canopy Construction B Development G Mezzanine Construction B Diesel Fuel Distribution G Ramps B Earthwork G Shop-Fabricated Wood Electric Distribution Systems G Floor Trusses Development G Floor B Energy Distribution G Roof B Equipment G Shotcrete Stabilization Fire Protection Water G Rock Slope G Distribution Soil Slope G Fuel Distribution G Shotcrete Tunnel Lining Fuel-Oil Distribution G Pedestrian G Furnishings G Service G Gas Distribution G Vehicular G Gasoline Distribution G Shower & Dressing C Grounding G Compartments Irrigation Water Distribution G Shower Curtains E Lease Showers D Lighting G Commercial D Maintenance Z Emergency D Preparation G Healthcare D Program Residential D Purchase Shrubs G Remediation G Shunt Arresters, Site Electrical G Screening Devices G Shutters, Interior E Soil Treatment G Sidewalk Lifts D Specialties G Siding, Exterior Walls B Storm Water Drains G Signage Subdrainage G Exterior G Survey, Final Z Interior C Site Communications G Temporary Project Z Systems Signaling and Control G Distribution G Equipment, Roadway Structures G Sills, Exterior Wall Openings B Site Elements Simulated Stone Demolition G Exterior Wall Veneer B Relocations G Fabrications, Exterior B Site Improvements G Fabrications, Interior C Grounding G Single Contract Site Hydronic Cooling G Single Purposed Entities Distribution Single-Panel Doors Aboveground G Exterior B Underground G Interior C Site Hydronic Heating G Sinkhole Remediation G Distribution Backfilling G Aboveground G Grouting G Underground G Sinks D Commercial D Healthcare D

192 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Site Steam Energy G Telemanagement D Distribution Virtual Private Network D Piping, Aboveground G Virus Protection D Piping, Underground G Soil Sitework G --- Anchors, Excavation A Skylights B Mixers E Protection and Screens B Mixing Stabilization G Slab Trenches A Nailing G Slabs-On-Grade A Reinforcement G Standard A Stabilization G Structural A Remediation G Supplementary Components A Stripping and Stockpiling G Sliding Treatment A Doors, Interior C Site G Glass Doors Washing through G Exterior B Separation/Solubilization Interior C Solar Metal Grilles, Interior C Collectors, Heating D Partitions C Heat Generation D Storefronts Instrumentation F Exterior B Soldier-Beam Retaining Walls G Interior C Solicitation Visual Display Units C Solid Waste Slip Controllers D Bins E Slip-Resistant Flooring C Handling Equipment E Treatment Solidification and Stabilization G Slope Protection G Decontamination Slope Paving G Sound and Vibration Control F Slurry Walls A Flooring C Slurry-Geomembrane A Sound Barriers, Site G Composite Slurry Walls Sound Control Small Tools and Consumable Z Doors Costs Exterior B Smoke Interior C Detection Sensors D Windows Vents B Exterior B Snow Guards B Interior C Snow Melting D Sound Isolation Aviation Pavement G Ceilings C Parking Lot Pavement G Interior Partitions C Pedestrian Pavement G Suspended Ceilings C Roadway Pavement G Sound Masking Systems D Sod Stripping and Stockpiling G Sound, Vibration, and Seismic B Soda Fountain Equipment E Control, Floor Construction Sodding G Sound-Absorbing Units Soffits Ceiling C Panels B Wall C Vents B Sound-Conditioned Rooms F Stair B Source Quality Control Softeners, Domestic Water D Procedures Z Software Reporting Z Customer Relationship D Space Frames F Management Spare Parts Z Data Communications D Special Database D Activity Rooms F Graphics/Multimedia D Construction F Internet Conferencing D Construction and Demolition F --- Operating System D Exhaust Systems D

193 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Facility Components F Stadiums: See Grandstands F Foundation Walls A and Bleachers, Exterior Foundations A Stage Inspectors Curtains E Instrumentation F Lifts D Procedures Z Turntables D Project Procedures Z Stages, Folding and Portable E Purpose HVAC Systems D Staging Areas Z Purpose Lighting D Stainless-Steel Structures F Doors: See Exterior and Wall Surfacing C Interior Doors Special Function Framed Storefronts: See Construction F Storefronts Doors Windows: See Exterior and Exterior B Interior Windows Interior C Stairs B Suspended Ceilings C Construction B Windows Finishes C Exterior B Railings B Interior C Retractable E Specialties Soffits B Emergency Aid C Standard Foundations A Exterior Fountain G Supplementary Components A Exterior Wall B Standard Slabs-on-Grade A Fire Protection D Starting and Adjusting Z Fireplace C Startup Procedures Z Gray Water D Static Power Converters D Information C Static Resistant Flooring C Interior C Treatment Interior Fountain F Static Uninterruptible Power D Pool F Supply Postal C Static-Control Flooring C Roof B Resilient Flooring C Safety C Static-Frequency Converters D Sheet Metal Roofing B Steam Site G Baths F Storage C Condensate Pumps D Telephone C Distribution, Facility D Wardrobe and Closet C Energy Distribution, Site G Specialty Piping D Casework E Piping System D Ceiling Exterior Bulkheads B Utility Connection G Ceilings, Exterior Ceilings B Turbine Generators D Ceilings, Exterior Soffits B Steel Decking: See Metal Door Frames, Exterior B Decking Flooring C Steel Joist Girders and Frames, Interior Doors C Beams Suspended Ceilings C Floor B Spires B Roof B Split-System Air-Conditioners D Steel Joists: See Metal Joists B Spread Footings A Steel Ribs and Lagging Sprigging G Pedestrian Tunnels G Sprinkler Systems Service Tunnels G Fire-Suppression D Vehicular Tunnels G Landscaping G Steel Windows: See Exterior Stabilization Ponds G and Interior Windows Stadium and Arena Seating E Steel-Framed Storefronts: See Storefronts 187

194 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Steep Slope Roofing B Pumps D Steeples B Stipulated Sum Method of Sump Pumps D Payment Stoves C Stress Instrumentation F Stretched-Fabric Wall Systems C Stock Structural Aluminum Framing: B Feeders E See Structural Metal Framing Waterers E Structural Bus Supports, Site G Stone Electrical Cladding, Exterior Walls B Structural Engineers Facing C Structural Frame Flooring C Floor B Masonry Exterior Wall B Roof B Veneer Structural Metal Retaining Walls G Floor Girders and Beams B Veneer, Interior C Floor Trusses B Storage Roof Girders and Beams B Assemblies C Roof Trusses B Racks C Structural Metal Columns Shelving C Supporting Floors B Specialties C Supporting Roofs B Storage Tanks Structural Metal Framed Facility Potable-Water D Balcony Construction B Fuel D Canopy Construction B Gas D Mezzanine Construction B Rainwater D Ramps B Site Structural Metal Stud Aviation Fuel G Framed Compressed Gases G Exterior Balcony Walls B Diesel Fuel G Exterior Walls B Domestic Water G Interior Partitions C Fire Protection Water G Parapets B Fuel-Oil G Structural Panel Gasoline G Balcony Construction B Irrigation Water G Canopy Construction B Storefronts Exterior Walls B Exterior B Floor Decks B Interior C Mezzanine Construction B Storm Drainage Utilities G Parapets B Piping G Ramps B Pumps G Roof Deck B Utility Connection G Structural Plastic Storm Panels B Balcony Construction B Storm Water Canopy Construction B Pollution Control, Temporary Z Columns Supporting Floors B Treatment, Site G Columns Supporting Roofs B Storm Windows B Floor Girders and Beams B Mezzanine Construction B Ramps B Roof Girders and Beams B Stormwater Drainage Structural Slabs-on-Grade A Equipment D Structural Stainless-Steel B Manholes D Framing: See Structural Metal Piping D Framing Piping Cleanouts D Structural Steel Framing: See B Piping Specialties D Structural Metal Framing 188

195 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Structure Exterior Wall B Demolition F Exterior Wall Opening B Moving F Exterior Window B Raising F Facility Distribution Systems D Relocation F Facility Power Generation D Structures, Special F Fire Suppression D Stucco, Exterior Walls B Floor Construction B Subbase Layer, Slab-On- A Flooring C Grade General Purpose Electrical D Subdrainage Power Building A Heating System D Piping, Site G Horizontal Opening B Retaining Wall G Integrated Automation D Site G Interior Door C Subgrade Enclosure Walls A Interior Partition C Construction A Interior Window C Interior Skin A Lighting D Supplementary Components A Miscellaneous Electrical D Subgrade Enclosures A Process Support Plumbing D Submersible Tube Tunnels Roof Construction B Pedestrian G Roofing B Service G Sanitary Drainage D Vehicular G Slab-On-Grade A Submittals Standard Foundation A Procedures Z Subgrade Enclosure Wall A Schedule Z Support Plumbing D Substation G Ventilation D Bus Assemblies, Site G Wall Finish C Electrical Supplementary Conditions Control Wiring, Site Electrical G Supplementary Instructions Substations, Facility D Supplier Qualifications Z Substitution Procedures Z Supply Air D Substrate Board Duct Accessories D Horizontal Waterproofing B Ducts and Casings D Roofing B HVAC Fans D Substructure A --- Outlets D Backfill and Compaction A Plenums and Chases D Excavation A Terminal Units D Excavation Support A Surface Cleaning G Related Activities A Decontamination Subsurface Investigation Surface Removal G Summary of Work Decontamination Sump Pumps, Stormwater D Surfaces Drainage Athletic G Sun Control Devices, Exterior B Recreational G Superstructure B Playfield G Supplemental Instructions Z Surge Arresters, Site Electrical G Supplementary Components Surveillance, Electronic D Ceiling Finish C Surveillance, Video D Communications D Survey and Layout Data Z Cooling System D Survey Information Domestic Water Distribution D Surveyors Electrical Service and D Surveys Distribution Suspended Ceilings Electronic Safety and D Acoustical C Security Construction C Exterior Door B Plaster and Gypsum Board C Exterior Lighting G Suspension Systems C

196 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Sound Isolation C Temporary Special Function C Access Roads Z Specialty C Air Barriers Z Suspension Systems C Barricades Z Suspended Decorative E Barriers and Enclosures Z Elements Bridges Z Suspended Scaffolding D Construction Z Sustainability Certification Z Controls Z Project Procedures Cranes Z Sustainable Design Decking Z Closeout Documentation Z Dust Barriers Z Consultants Electricity Z Reporting Z Elevators Z Requirements Environmental Controls Z Swimming Pools F Erosion and Sediment Z Swing Staging, Temporary Z Control Swinging Doors, Interior C Facilities and Controls Z Switchboards and D Fencing Z Panelboards Fire Protection Z Switchgear and Switchboards, D Fuel Oil Z Facility Heating, Cooling, and Z Synthetic Resilient Surfacing, G Ventilating Playfield Hoists Z Systems Furniture E Interior Signage Z T Lighting Z Natural Gas Z Table Accessories E Noise Barriers Z Table Games Equipment E Overpasses Z Tackboards C Parking Areas Z Tactile Warning Surfacing G Pest Control Z Tanks Project Signage Z Chemical-Waste D Protective Walkways Z Gray Water D Ramps Z Tapestries E Roads Z Taxes Z Runarounds Z Taxes, Permits, Insurance and Z Scaffolding and Platforms Z Bonds Security Barriers Z Telecommunications, Z Security Enclosures Z Temporary Storm Water Pollution Z Telemanagement Software D Control Telemedicine Systems D Swing Staging Z Telephones Telecommunications Z Elevator D Tree and Plant Protection Z Ring-Down Emergency D Utilities Z Sets D Vehicular Access and Z Specialties C Parking Telescopes E Water Z Telescoping Stands E Tennis Court Telescoping Vertical Lift Fences and Gates G Doors Surfacing G Exterior B Wind Breaker G Interior C Tensioned Fabric Structures F Television Systems, Master D Terminal Units Antenna Air D Teller and Service Equipment E Outside Air D Teller Equipment Systems E Supply Air D Termite Control G Soil Treatment A

197 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Terrazzo Flooring C Towers F Stair Finish C Antenna G Tile C Communications G Testing and Inspecting Transmission Allowances Z Demolition F Agency Qualifications Z Grounding G Services Z Toxic Materials Requirements Z Testing Laboratories Traffic Bearing Services Z Coatings B Testing, Adjusting, and Horizontal Enclosures B Balancing Traffic Control Z Cooling System D Equipment, Roadway G Distribution Systems D Traffic Doors Heating System D Exterior B Ventilation D Interior C Textured Ceiling Traffic Signage Exterior Bulkheads B Airfield G Exterior Ceilings B Parking Lot G Exterior Soffits B Roadway G Suspended Ceilings C Traffic Signals, Roadway G Theater and Stage Equipment E Training Z Theatrical Transfer Switches D Lighting D Transformers, Facility D Lighting Control D Therapeutic Pools F Transient Voltage Suppression D Therapy Equipment E Translucent Wall Assemblies B Thermal Transmission and Cooling Storage D Distribution Decontamination G Equipment G Desoption Decontamination G Specialties, Site Electrical G Heat Storage D Transplanters E Thermal Storage Transplanting G Chilled-Water D Transportation Heat D Information Display Systems D Ice D Stop Shelters G Tile Transportation and Disposal of F Flooring C Hazardous Materials Stair Finish C Trash and Litter Receptors, G Wall Finish C Site Tile Carpeting C Trash Chutes D Timber Treated Wood Foundations A Cofferdams A Tree and Shrub Removal and G Cribwork A Trimming Framed Storefronts: See Trees G Storefronts Grates G Retaining Walls G Grids G Time Allowances Z Trench Drains D Tire-Changing Equipment E Site Storm Drainage G Toilet Trenching and Backfilling, Site G Accessories C Trenchless Utility Installations G Compartments C Liquid and Gas Site Utilities Toilet, Bath, and Laundry C Trusses Accessories Floor B Toll Fraud Equipment and D Roof B Software TTY equipment D Tub and Shower Doors C Tubs and Pools F

198 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Tunnel Construction Unit Pavers, Horizontal B Pedestrian G Waterproofing Related Activities G Unit Prices Z Service G Measurement Z Vehicular G Method of Payment Tunnel Grouting Pedestrian G Service G Vehicular G Payment Z Tunnel Support Systems Unit Skylights B Pedestrian G Unit Ventilators Service G Cooling D Vehicular G Heating D Tunnels G Unitary Heat Pumps D Pedestrian G Urinals D Service G Commercial D Vehicular G Residential D Turf and Grasses G Security D Turntables D Utilities U Grounding G Temporary Z UHF/VHF Transmitter and G Utility Receivers Demolition G Underground Doors, Exterior B Ducts and Manholes, Site G Relocation G Electrical Room Casework E Ducts, Manholes, and G Septic Tanks G Handholes, Communications Structures, Liquid and Gas G Storage Tank Removal G Site Utilities Underlayment, Flooring C Substation Grounding G Underpinning A Towers, Site Electrical G Underslab Drainage A Utility Identification Underwater Lighting D Electrical Service and D Unforeseen Subsurface Distribution Conditions, Budget Liquid and Gas Site Utilities G Unframed Mirrors C Site Electrical G Uninterruptible Power Systems D Utility Poles Unit Heaters D Communications D Unit Kitchens E Communications, Site G Unit Masonry Columns Supporting Floors B V Columns Supporting Roofs B Vacuum Equipment Screens B Cleaning Systems E Exterior Balcony Walls B Equipment D Exterior Wall Piping D Construction B Systems, Healthcare D Panels B Systems, Laboratory D Veneer B Valance Foundation Walls A Cooling Units D Interior Partitions C Heating Units D Parapets B Valuable Material Storage E Retaining Walls G Value Analysis Z Subgrade Enclosure A Value Engineering Z Unit Pavement Valves Parking Lot G Air-Admittance D Pedestrian G Backwater D Roadway G Building Support Plumbing D Domestic Water D

199 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER General Service D Vibration and Seismic Compressed-Air Controls Process Support Plumbing D Communications D Sanitary Drainage D Cooling System D Vapor Retarders Distribution Systems D Exterior Wall B Domestic Water D Floor Construction B Electrical Service and D Horizontal Waterproofing B Distribution Roof Construction B Electronic Safety and D Roofing B Security Slab-On-Grade A Facility Power Generation D Subgrade Enclosure Wall A Fire Suppression D Vaults F General Purpose Power D Doors, Interior C Heating System D Equipment E Integrated Automation D Ventilators E Lighting D Vaults, Pedestal, and G Miscellaneous Electrical D Enclosures, Communications Process Support Plumbing D Vegetated Sanitary Drainage D Rock Slope Stabilization G Ventilation D Low-Slope Roofing B Video Monitoring and Z Vegetation Control G Documentation Soil Treatment A Video Surveillance D Vehicle and Pedestrian E Control and Management D Equipment Systems Vehicle Monitoring and Supervisory D Barriers G Interfaces Delineators G Remote Devices and D Fare Collection Equipment, G Sensors Roadway Remote Positioning D Fare Collection, Roadway G Equipment Fare Gates, Roadway G Systems Infrastructure D Lifts D Virtual Lubrication Equipment E Private Network Software D Servicing Equipment E Reality Equipment D Ticketing Equipment, G Virus Protection Software D Roadway Visual Conference Units C Turntables D Visual Display Washing Equipment E Fabrics C Vehicular Rails C Bridges G Units C Tunnels G Wall Panels C Vending Equipment E Vitrification Decontamination G Ventilation D Vocational Shop Equipment E Supplementary Components D Voice Communications D Vents and Hatches B Messaging D Vents Switching and Routing D Exterior B Equipment Relief B Terminal Equipment D Ridge B Voice Mail and Auto Attendant D Smoke B Void Forms, Standard A Soffit B Foundation Vertical Voltage Regulators D Conveying D Enclosures, Exterior B W Planting Nets and Grids G Waiting Area Seating Fixed E Portable E

200 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Walk-In Water Distribution Coolers E Equipment Freezers E Site Domestic Water G Walkways Site Fire Protection G Coverings G Site Irrigation G Metal B Water Distribution Piping Roof B Site Domestic Water G Wall Site Fire Protection G Carpeting C Site Irrigation G Coverings C Water Distribution Ponds, Site G Decorations, Fixed E Domestic Water Foundations A Water Distribution Valves Hangings E Site Domestic Water G Paneling C Site Fire Protection G Specialties, Exterior B Site Irrigation G Veneer, Exterior B Water Distribution, Site G Wall and Door Protection C Irrigation Wall Finishes C Water Features, Interior F Supplementary Components C Water Intrusion Detection and D Wall Panels Alarm Exterior Bulkheads B Water Metering Exterior Ceilings B Site Domestic Water G Exterior Walls B Site Fire Protection G Wall-Mounted Flagpoles G Site Irrigation G Walls Water Mitigation A Subgrade Enclosures A Water Ponds Exterior B Covers, Fire Protection G Exterior Balcony B Fire Protection G Rammed Earth F Liners, Fire Protection G Slurry A Water Ponds and Reservoirs, G Wardrobe and Closet C Site Irrigation Specialties Water Pumping Stations Warranties, Closeout Submittal Z Site Domestic Water G Wash Fountains D Site Fire Protection G Washers and Extractors, E Water Pumping Stations, Site G Commercial Irrigation Waste Water Remediation G Balers, Facility E Water Repellents, Exterior Wall B Compactors and Destructors E Veneer Containment G Water Service Connections, Management Z Site Construction Z Domestic Water G Shredders, Facility E Fire Protection G Waste Anesthesia-Gas Piping D Irrigation G Water Chillers D Water Slides F Water Closets D Water Spray Fixed Systems D Commercial D Water Storage Tanks, Site Healthcare D Domestic Water G Residential D Fire Protection G Security D Irrigation G Water Coolers, Remote D Water Storage, D Water Decontamination G Fire-Suppression Water Detection and Alarm D Water Supply Well, Site Control, GUI and Logic Domestic Water G Systems Fire Protection G Water Detection Sensors D Water Treatment Exterior Fountain G Hydronic Systems D

201 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Interior Fountain F Wire Rope Stair Railings B Pool F Wireless Steam Systems D Communications Distribution G Water Utilities G Transceivers D Water Utility Service, Site Wiring Domestic Water G Branch Wiring D Fire Protection G Electrical Distribution D Irrigation G Facility Grounding D Water Wells, Site Irrigation G Lighting Branch Wiring D Water, Temporary Z Site Electrical G Water-Based Fire-Suppression D Waterproofing Wiring Connectors Horizontal B Electrical Service and D Slab-On-Grade A Distribution Subgrade Enclosure Wall A Facility Power Generation D Water-Source Heat Pumps D General Purpose Power D Wave Generating Equipment F Lighting D Wear Surfaces, Horizontal B Miscellaneous Electrical D Waterproofing Wiring Devices Weather Barrier, Exterior Wall B Branch Wiring D Weather Observation G Lighting Branch Wiring D Equipment Wood Weathervanes B Athletic Flooring C Web Development D Balcony Decking B Weighing and Wrapping E Canopy Decking B Equipment Columns Supporting Floors B Welded Wire Fences and G Columns Supporting Roofs B Gates Doors: See Exterior and Welding Interior Doors Benches E Exterior Fixed Grilles and B Screens E Screens Wet-Chemical Fire- D Fences and Gates G Extinguishing Systems Flooring C Wetlands G Mezzanine Decking B Restoration G Wood Floor Wet-Pipe Sprinkler Systems D Decking B Wheelchair Lifts D Girders and Beams B Whirlpool Tubs F Joists B Wind Energy Equipment D Trusses B Wind Instrumentation F Wood Framed Window Treatments E Balcony Construction B Operating Hardware E Canopy Construction B Window Walls, Exterior B Exterior Balcony Walls B Window Washing Exterior Walls B Scaffolding D Interior Partitions C Systems E Mezzanine Construction B Window Wells B Parapets B Windows Ramps B Blinds E Wood Furring Exterior B Ceilings C Interior C Flooring C Screens B Wall Finish C Wood Paneling Ceilings C Walls C Shades E Wood Railings Wire Fences and Gates G Exterior Balcony B Wire Mesh Partitions C Interior C

202 KEY WORD INDEX KEY WORD UF NUMBER MF NUMBER KEY WORD UF NUMBER MF NUMBER Wood Ramp Decking B Wood Roof Decking B Girders and Beams B Joists B Trusses B Wood Stairs B Finish C Railings B Wood Unit Pavement: See Unit Pavement Wood Windows: See Exterior and Interior Windows Wood-I-Joists Floor Joists B Roof Joists B Work Change Directives Z Work Restrictions X-Y-Z X-Ray Protection F Zoned Fire-Alarm Systems D Zoning Permits Requirements

203

204

Building Information Modeling (BIM) Execution Plan

Building Information Modeling (BIM) Execution Plan 10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

What happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems

What happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems What happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems Discussion Points History of MasterFormat and CLA CLA Consultant What BICSI

More information

TABLE OF CONTENTS Structural Library

TABLE OF CONTENTS Structural Library Title Description DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 Project Title Page Project Manual title page. 000107 Seals Page For seals of design professionals on Project Manual. 000115

More information

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

Report For Class D Construction Cost Estimate

Report For Class D Construction Cost Estimate Report For Class D Construction Cost Estimate Douglas McNeill Director Jon Gilford Senior Cost Manager Turner & Townsend 170 Laurier Avenue West Suite 604 Ottawa Ontario K1P 5V5 t: +1 (613) 221 9560 e:

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project: RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:

More information

The New MasterFormat TM & Your HVAC Business

The New MasterFormat TM & Your HVAC Business SMACNA & SMWIA 2006 Partners In Progress Conference Las Vegas/March 30, 2006 The New MasterFormat TM & Your HVAC Business Thomas E. Glavinich, D.E., P.E. Civil, Environmental, & Architectural Engineering

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

PAULDING COLLEGE & CAREER ACADEMY

PAULDING COLLEGE & CAREER ACADEMY PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

DOCUMENT BID DOCUMENT

DOCUMENT BID DOCUMENT DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject

More information

Construction Specifition takeoff.com/

Construction Specifition  takeoff.com/ Construction specifications Construction Specifition A specification (often abbreviated as spec) can be termed as a type of a technical standard to be referenced by a contract or procurement document.

More information

MASTERFORMAT 2004 EDITION NUMBERS & TITLES

MASTERFORMAT 2004 EDITION NUMBERS & TITLES MASTERFORMAT 2004 EDITION NUMBERS & TITLES MASTERFORMAT 2004 EDITION NUMBERS & TITLES 6/8/2004 (revised August 2004, ) The numbers and titles presented here are identical to the MasterFormat 2004 Edition

More information

Document Synopses by Series

Document Synopses by Series Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98

A101 Standard form of agreement between Owner and Contractor-Stipulated sum with instruction sheet wrapped (2017) $55.98 Please note new address! 310 SE 1 Street Miami, Fl 33131 QUESTIONS ABOUT AIA DOCUMENT CONTENT docinfo@aia.org 202.626.7526 Contact: Marilyn Lugo 305.448.7488 WEB: www.aia.org/contractdocs/reference A SERIES

More information

Construction Documents Education Program

Construction Documents Education Program PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

School Assessment Report

School Assessment Report School Assessment Report School: Sutton Middle School (Powers Ferry) Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:32:59 AM FOR OFFICIAL USE ONLY Final School

More information

School Assessment Report

School Assessment Report School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

School Assessment Report

School Assessment Report School Assessment Report School: Humphries Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:35:17 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

- DATA REQUIREMENTS BIM

- DATA REQUIREMENTS BIM UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical

More information

Construction Contract Basics

Construction Contract Basics PDHonline Course P120 (2 PDH) Construction Contract Basics Instructor: Kevin D. Waddell, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment

More information

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY

AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY AMERICAN INSTITUTE OF ARCHITECTS (AIA) DOCUMENT SUMMARY Conventional Project Family A101 2007 (formerly A101 1997) Standard Form of Agreement Between Owner and Contractor where the basis of payment is

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

Audio Presentation. Session 1 FUNDAMENTALS. Project Delivery Education Program. Construction Document Technology (CDT) Preparatory Course

Audio Presentation. Session 1 FUNDAMENTALS. Project Delivery Education Program. Construction Document Technology (CDT) Preparatory Course Audio Presentation Session 1 FUNDAMENTALS Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org This

More information

Standard Form of Agreement Between Owner and Contractor where the basis

Standard Form of Agreement Between Owner and Contractor where the basis AIA Rochester - A Chapter of The American Institute of Architects 205 St. Paul Street, 1st Floor, Rochester, NY 14604 (585) 232-7650Telephone Office Hours: Monday Friday 9:00AM 2:00 PM Please call before

More information

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 01 Project Title Page 00 01 10 Table of Contents 00 01 15 List of Drawing Sheets 00 21

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,

More information

PAWLEYS ISLAND TOWN HALL

PAWLEYS ISLAND TOWN HALL DOCUMENT 001116 - INVITATION TO RE-BID 1.1 PROJECT INFORMATION A. Notice to Bidders: Prequalified bidders are invited to submit bids for Project as described in this Document according to the Instructions

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina Project Manual for Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina DWG Consulting Engineers 1009 Anna Knapp Blvd. Suite 202 Mt Pleasant, South Carolina 29464

More information

FACILITY INVENTORY: GET WHAT YOU ASK FOR by William Faesenmeier

FACILITY INVENTORY: GET WHAT YOU ASK FOR by William Faesenmeier FACILITY INVENTORY: GET WHAT YOU ASK FOR by William Faesenmeier A comprehensive inventory of a facility is the foundation of any facility asset management program. Due to limitations of staff, qualifications

More information

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

Subcontractor Pre-qualification Statement

Subcontractor Pre-qualification Statement Subcontractor Pre-qualification Statement By submitting this Statement, Subcontractor affirms that the information provided herein is true and sufficiently complete so as not to be misleading. All fields

More information

Exhibit A Scope of Services and Deliverables

Exhibit A Scope of Services and Deliverables Exhibit A Scope of Services and Deliverables Attachment to MnDOT Contract No. for Project Name Project # 16-TZ dated Scope of Services includes: Programming / Schematic Design Phase Design Development

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY PART 1 - GENERAL SECTION 01 01 11 MULTIPLE CONTRACT SUMMARY 1.01 SCOPE OF WORK A. This Section includes a summary of each Contract, including responsibilities for coordination and temporary facilities

More information

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS

1.1 THE ARCHITECT S SPECIFICATIONS AND DRAWINGS 1.2 THE BIDDING CONTRACTORS GENERAL The commercial bidding process is a well-defined path of positioning oneself to be the successful bidder amongst a group purporting to offer the same quality materials and labor. There are certain

More information

AIA Contract Documents

AIA Contract Documents AIA Contract Documents Availability by series Series Document # Former # Document Title Family Software Paper DOD aia.org A101 2007* A101 2007 SP* A101 2017 A102 2007* A111 1997 A102 2017 A103 2007* A114

More information

Prequalification Form

Prequalification Form 1.0 General Information Date: 1.1 Name of Firm _ County Telephone Toll Free Fax Website _ for Bid Purposes: Name Phone 1.2 Legal Identity: Sole Proprietorship Partnership Corporation Limited Liability

More information

Eastern Michigan University

Eastern Michigan University Eastern Michigan University Prepared by: EMU Physical Plant Facilities Planning and Construction Page Intro-1 Purpose of Eastern Michigan University Physical Plant; Facilities Planning and Construction

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

How to Estimate with. RSMeans Data

How to Estimate with. RSMeans Data How to Estimate with RSMeans Data How to Estimate with RSMeans Data Basic Skills for Building Construction Fourth Edition RSMeans and Saleh A. Mubarak, Ph.D. Barbara Balboni, Technical Editor RSMeans

More information

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically

More information

AIA Contract Documents: Retail Price List

AIA Contract Documents: Retail Price List A Series (Owner-Contractor) Documents The Prices Below are for Single Purchases and Do Not Include Shipping, Handling and Tax AIA Contract Documents: Retail Price List A101-2007 Standard Form of Agreement

More information

1. Instructions to Bidders AIA Document A701, 1997 Section of the above referenced IFB is hereby amended and restated as follows:

1. Instructions to Bidders AIA Document A701, 1997 Section of the above referenced IFB is hereby amended and restated as follows: Segments 3, 4, 6 and 7 Pier Repairs Invitation for Bids (IFB) Project/Contract #C4962 Addendum # 1 November 30, 2018 To All Bidders: 1. Instructions to Bidders AIA Document A701, 1997 Section 5.3.1.3 of

More information

Technical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction

Technical Report II. The Office Building. Rendering courtesy of DAVIS. Brett Miller. Dr. Gannon Construction Technical Report II The Office Building Rendering courtesy of DAVIS Brett Miller Dr. Gannon Construction 10/16/2013 Executive Summary This technical report analyzes key features of The Office Building

More information

SECTION : OPERATION & MAINTENANCE MANUALS

SECTION : OPERATION & MAINTENANCE MANUALS SECTION 01 17 73: OPERATION & MAINTENANCE MANUALS 1. GENERAL: A. This section includes requirements for Contract Record - Operations and Maintenance manuals required prior to project closeout including,

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2018 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $5M Buildings Over $100M Buildings $5M - $15M Other Structures Under $1M Buildings

More information

PROJECT # University of South Carolina, Aiken USCA Convocation Center Shed Aiken, South Carolina ADDENDUM NUMBER

PROJECT # University of South Carolina, Aiken USCA Convocation Center Shed Aiken, South Carolina ADDENDUM NUMBER University of South Carolina, Aiken PROJECT #10010.01 SECTION 00911 - ADDENDUM NUMBER 2 PARTICULARS 1.01 DATE: April 10, 2012 1.02 PROJECT: USC AIKEN CONVOCATION CENTER SHED 1.03 STATE PROJECT NUMBER:

More information

Construction Family of Documents

Construction Family of Documents Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications

More information

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016. ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,

More information

Archdiocesan Procedures For Building and Renovation Projects

Archdiocesan Procedures For Building and Renovation Projects Archdiocesan Procedures For Building and Renovation Projects - 1 - JULY 31, 2006 ARCHDIOCESAN PROCEDURES FOR BUILDING AND RENOVATION PROJECTS TABLE OF CONTENTS 2 1. Introduction 3 2. General Requirements

More information

Archdiocesan Procedures For Building and Renovation Projects

Archdiocesan Procedures For Building and Renovation Projects Archdiocesan Procedures For Building and Renovation Projects - 1 - JULY 31, 2006 ARCHDIOCESAN PROCEDURES FOR BUILDING AND RENOVATION PROJECTS TABLE OF CONTENTS 2 1. Introduction 3 2. General Requirements

More information

BUSI 401 Commercial Property Analysis

BUSI 401 Commercial Property Analysis BUSI 401 Commercial Property Analysis PURPOSE AND SCOPE The Commercial Property Analysis course BUSI 401 is intended to give the real estate practitioner student a working knowledge of the design, construction,

More information

Proposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages:

Proposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages: Page 1 of 16 APPENDIX B: PROPOSAL REQUIREMENTS Proposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages: TECHNICAL

More information

TABLE OF CONTENTS Site Civil Library

TABLE OF CONTENTS Site Civil Library Title DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 Project Title Page Project Manual title page. 000107 Seals Page For seals of design professionals on Project Manual. 000115 List of Drawing

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

Table of Contents Chapter 1 INTRODUCTION Chapter 2 DEFINITIONS Chapter 3 DELIVERABLES Chapter 4 BASIS OF DESIGN

Table of Contents Chapter 1 INTRODUCTION Chapter 2 DEFINITIONS Chapter 3 DELIVERABLES Chapter 4 BASIS OF DESIGN Chapter 1 INTRODUCTION 1.00.00 Introduction Chapter 2 DEFINITIONS 2.00.00 Definitions Chapter 3 DELIVERABLES 3.00.00 Deliverables Chapter 4 BASIS OF DESIGN 4.01.01 Energy and Environment 4.01.02 Codes,

More information

1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1. Section Temporary Facilities and Controls for limitations and procedures governing temporary use of Owner's facilities. SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Minimum Standards for Construction of Aircraft Hangars ARTICLE 1. MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Section 1. - Purpose Section 2. - Goals Section 3. General Provisions Section 4.

More information

Both envelopes must have the following information in the lower left hand corner:

Both envelopes must have the following information in the lower left hand corner: SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including

More information

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be

More information

2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY:

2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY: 2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY: THE NIGERIAN INSTITUTE OF QUANTITY SURVEYORS HELD AT: BARCELONA HOTELS, NO. 23 BLANTYRE

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture 1. SUBMITTED BY: DATE: Name of Firm: Street Mailing Address (If different): Primary Fax: E-mail: Website: Address of the office that

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

AIA Contract Documents

AIA Contract Documents AIA Contract Documents Availability by series Series Document # Former # Document Title Software Available at AIAOC DOD aia.org A101 2007* A101 2007 SP* A101 2017 A102 2007* A111 1997 A102 2017 A103 2007*

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

GUIDELINES FOR PREPARING SECTION C: COSTS OF THE PROJECT CAPITAL IMPROVEMENT BUDGET (CIB) (Updated January 2008)

GUIDELINES FOR PREPARING SECTION C: COSTS OF THE PROJECT CAPITAL IMPROVEMENT BUDGET (CIB) (Updated January 2008) GUIDELINES FOR PREPARING SECTION C: COSTS OF THE PROJECT CAPITAL IMPROVEMENT BUDGET (CIB) (Updated January 2008) The following guidelines are to be used in the preparation of Section C: Costs of the project

More information

Information Delivery Manual (IDM) for Quantity Takeoff for Cost Estimating

Information Delivery Manual (IDM) for Quantity Takeoff for Cost Estimating Information Delivery Manual (IDM) for Quantity Takeoff for Cost Estimating Version: 1.0 -- 30-May-11 IDM for Design to Quantity Takeoff for Cost Estimating Page 2 Table of Contents 1 Process Model... 3

More information

Longmeadow High School Section 12.1

Longmeadow High School Section 12.1 Longmeadow High School Section 12.1 Schematic Design 12 Total Project Budget and MSBA Form 3011 The attached Total Project Budget and Form 3011 includes all costs associated with Administrative, Architecture

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement

More information

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries

Section 6 - Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA requirements. (2) If CAM decides to cancel any s listed in the Bills

More information