1 DOCUMENT BID DOCUMENT 1 Submit bids in compliance with Document Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject any and all bids. This bidding document is not part of the Contract Documents, unless specifically referenced in the Owner/Contractor Agreement. 2 Project Name & Address: New O'Reilly Auto Parts Store 1309 Highway 501 East Myrtle Beach, SC Contractor Name & Address: 4 Bid is to be provided by both individual sections and by lump sum. Variations will not be accepted and bid rejected. Refer to division sections for summary of work. a. Division 1 General Requirements: (1) General Conditions b. Division 2 Existing Conditions: (1) Demolition (2) Asbestos & Hazardous Material Work (3) Site Preparation (Sub) (4) Soil Testing (Compaction) (5) Pavement Sub Base (6) Slab Sub Base (7) Driven Piles (8) Bored and Belled Concrete Piers (9) Concrete Paving a) Parking Lot b) Misc. Slab on Grade c) Concrete Curb (10) Storm Drainage System (11) Fencing (12) Striping lot (13) Landscaping Bid Form Revised Page 1

2 c. Division 3 Concrete: (1) Footings, Piers, Foundation and Slab on Grade (2) PostTension Slab on Grade a) Concrete Testing d. Division 4 Masonry: e. Division 5 Metals: f. Division 6 Wood and Plastics: g. Division 7 Thermal and Moisture Protection: h. Division 8 Door and Windows: (1) Doors and Frames (2) Sectional Overhead Doors (3) Aluminum Storefronts & Glazing i. Division 9 Finishes: (1) Dry Wall (2) Acoustical Ceiling (3) Resilient Flooring (4) Painting (5) EIFS j. Division 10 Specialties: Bid Form Revised Page 2

3 k. Division 13 Special Construction: (1) Metal Building Systems a) Butler Metal Building Package b) Metal Building Erection c) Metal Building Insulation Value By Owner Value By Owner l. Division 20, 21, 22, 23, & 25 Mechanical: (1) Plumbing (2) HVAC (Excluding owner supplied equipment) m. Division 26 Electrical: 5 Profit and Overhead 0.0% 6 Grand Base Bid: The Bidder proposes to perform all work required by the Contract Documents for the amount of (fill in words and numbers) Dollars (words) 7 Alternates : If an Alternate is selected by the Owner, the Bidder proposes to do the Work required by the Contract Documents by increasing or decreasing the Base Bid the following amount: a. Alternate No Hot Mixed Asphalt Paving: Decrease Bid by: b. Alternate No Irrigation Systems Increase bid by: 8 Unit Prices Earthwork: Any earth excavation, backfill, import and export in addition to that required by the drawings and specifications shall be paid for at the following unit prices and shall include overhead and profit: a. Solid rock excavation, per cu. yd: b. Trench rock excavation, per cu. yd: c. Pit rock excavation, per cu. yd: d. Trench and pier excavation, per cu. yd: e. Trench and pier backfill, per cu. yd: Bid Form Revised Page 3

4 f. Mass earth excavation, per cu. yd: g. Mass earth backfill, per cu. yd: h. Remove and Replace, per cu. yd: i. Soil Stabailization, per cu. yd: (1) Conctractor to list type and method proposed: 9 Unit Prices Bored and Belled Concrete Piers: Drill, Case, Steel Reinforcement, Concrete, per L.F. including overhead and profit: 10 Unit Prices CastInPlace Concrete: Any concrete, steel reinforcement and form work for foundation footings, walls, and slabs in addition to that required by the drawings and specifications shall be paid for at the following unit price, inlcuding overhead and profit: a. Concrete, stell reinforcement and form work, per cu. yd: b. Concrete, steel reinforcement (grade beam), per cu. yd: c. Concrete, steel reinforcement and form work for exterior flat work, per cu. yd: 11 By submitting this bid Form, the Bidder certifies that Bidder has visited the project site, is aware of existing conditions which affect the work, and has reviewed the Contract Documents, including the following Addenda: (List addenda received) 12 Time:The Bidder agrees to substanially complete the Work within (fill in) Ninety calendar days from the date of Notice to Proceed. (Note: The time stipulated shall not exceed ninety (90) calendar days.) 13 If awarded the contract, Bidder agrees to enter into and execute a Contract on the basis of this bid, and to furnish proof of insurance in accordance with the Instructions to Bidders and the General Conditions of the Contract for Construction. 14 Firm Name and Address of Bidder: Name: Title: Date: Bid Form Revised Page 4

5 15 If Bidder is partnership, list name and title of each partner: 16 If Bidder is a corporation, complete the following: State and License Number: Affix Corporate Seal here (seal): 17 SubContractor Information: A. Demolition B. Sitework C. Landscape D. Asphalt E. Concrete F. Masonry G. Carpentry H. Drywall I. EIFS J. Glass K. Storefront L. Painting M. Ceiling N. PEMB Erection O. Plumbing P. HVAC Q. Electrical R. Insulation S. Asbestos Removal Bid Form Revised Page 5

6 Qualifications / Exclustions: END OF DOCUMENT Bid Form Revised Page 6

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

PAULDING COLLEGE & CAREER ACADEMY

PAULDING COLLEGE & CAREER ACADEMY PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE

More information

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Billing Requirements G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project Sitework / Paving Excavation and Grading Labor

More information

Subcontractor Qualification Form

Subcontractor Qualification Form Subcontractor Qualification Form Date Submitted: General Information Company Name: Mailing Address: Physical Address: Email: Primary Contact: License Number (if applicable): Contracting Specialty: Street/PO

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening. DOCUMENT 00 43 36B EXPANDED SUBCONTRACTORS LISTING TO: CLARK COUNTY SCHOOL DISTRICT hereinafter called "Owner" FROM: ~AU;)"''"-' Oeve\,(;p,-...e,.,,... IA... t. ~o~ t>.m..e>u,i-j (Print Company Name) Pe-Mo1..,,,-t,:;>.tJ

More information

Subcontractor Pre-qualification Statement

Subcontractor Pre-qualification Statement Subcontractor Pre-qualification Statement By submitting this Statement, Subcontractor affirms that the information provided herein is true and sufficiently complete so as not to be misleading. All fields

More information

PAWLEYS ISLAND TOWN HALL

PAWLEYS ISLAND TOWN HALL DOCUMENT 001116 - INVITATION TO RE-BID 1.1 PROJECT INFORMATION A. Notice to Bidders: Prequalified bidders are invited to submit bids for Project as described in this Document according to the Instructions

More information

DOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:.

DOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:. DOCUMENT 004120 - BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) BID INFORMATION Bidder:. Project Name: Remodeling for Urban Style Apartments 409 N. Broadway Green Bay, WI 54303 Owner: Architect:

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Job Cost Summary 11/27/08

Job Cost Summary 11/27/08 by Division with % Complete Job# = 186 Sample Company 2005 Job Cost Summary 186 Williams Post Office 1 General Requirements 1000.000 GENERAL REQUIREMENTS % COMPLETE 25 % COMPLETE % COMPLETE % COMPLETE

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1 September 9, 2014 to the BIDDING DOCUMENTS for ELLIS COUNTY COMPLEX Records Storage Building Waxahachie, Texas

More information

Schedule of Values Cruise Terminal 2 Expansion

Schedule of Values Cruise Terminal 2 Expansion Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......

More information

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project: RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

Detailed Estimating-Introduction. Dr. Al-Hammad

Detailed Estimating-Introduction. Dr. Al-Hammad Detailed Estimating-Introduction By Dr. Al-Hammad Outline Introduction Successful Construction Estimating The Detailed Estimating Procedure The stretch - out - Length concept (SOL) Site Work and Excavation

More information

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4 RE: ITB: PORTLAND COMMUNITY COLLEGE 12000 SW 49 th Avenue Portland, Oregon 97219 Sylvania Campus Bookstore Remodel Dated: February 22, 2017 April 11, 2017 ADDENDUM NO. 4 This addendum, together with the

More information

Prequalification Form

Prequalification Form 1.0 General Information Date: 1.1 Name of Firm _ County Telephone Toll Free Fax Website _ for Bid Purposes: Name Phone 1.2 Legal Identity: Sole Proprietorship Partnership Corporation Limited Liability

More information

1. FROM (Bidder): (Name)

1. FROM (Bidder): (Name) Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3

More information

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs SUBCONTRACTOR PROFESSIONAL SERVICES PREQUALIFICATION FORM Prequalification Form will NOT be accepted unless completed in its entirety. Business Information Company Name: Primary Address 1: Primary Address

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS 010100-01 Mobilization 1 LS 010500-01 Construction Surveying 1 LS 015000-01 Temporary Construction Fence 1 LS 029100-01 Tree Retention and Protection 1 LS 015150-01 Erosion and Sediment Control 1 LS Division

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16 FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management August 2, 2018 INVITATION TO TENDER ITT No. PS20180883 RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16 RE: REVISIONS TO BASE PRICE TABLE IN SCHEDULE

More information

SECTION BID FORM. Garfield Street Drainage Improvements

SECTION BID FORM. Garfield Street Drainage Improvements SECTION 00410 BID FORM Garfield Street Drainage Improvements ARTICLE 1 - BID RECIPIENT 1.01 This Bid is submitted to: City of Lindsborg, Kansas City Clerk s Office 101 S. Main Street Lindsborg, KS 67456

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty...

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty... TABLE OF CONTENTS SECTION TITLE PAGE Forms Notice to Contractors... 1 Bid Proposal... 4 A. Unit Price Schedule... 5 B. Bid Form... 10 C. Reservation... 10 D. Subcontractors... 10 E. Notice... 10 F. Disclosure...

More information

COMPARISON ANALYSIS CONSTRUCTION MANAGEMENT VS. GENERAL CONTRACTING. What s the Difference? CM GC

COMPARISON ANALYSIS CONSTRUCTION MANAGEMENT VS. GENERAL CONTRACTING. What s the Difference? CM GC COMPARISON ANALYSIS CONSTRUCTION MANAGEMENT VS. CONTRACTING What s the Difference? CM GC BIDDING PROCESS: CONTRACTING Owners are responsible for soliciting bid packages from general contractors General

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

CIRCLE K SUB-CONTRACTOR BID FORM

CIRCLE K SUB-CONTRACTOR BID FORM CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

The bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.

The bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum. ADDENDUM NO. FOUR March 5, 2018 NORTH IDAHO COLLABORATIVE EDUCATION BUILDING North Idaho College, Coeur d Alene, ID DPW PROJECT 16251 - H2A PROJECT 1616 This addendum is hereby incorporated into and is

More information

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically

More information

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:

More information

REVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia:

REVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia: REVISED BID FORM SEALED BIDS WILL BE RECEIVED at the Department of Procurement Services, City Hall, 900 E. Broad Street, Rm. 1104, Richmond, Virginia 23219, UNTIL BUT NOT LATER THAN 2:30 P.M. ON February

More information

Subcontractor & Vendor Outreach & Information Session. September 20, 2016

Subcontractor & Vendor Outreach & Information Session. September 20, 2016 Subcontractor & Vendor Outreach & Information Session September 20, 2016 Agenda Introductions Project Overview Orientation to the GC-CM Contracting Method Project Bidding Requirements Procurement Packages

More information

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31 Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends

More information

ADDENDUM 3 - JULY 24, 2015

ADDENDUM 3 - JULY 24, 2015 CAMINO REAL REGIONAL MOBILITY AUTHORITY EL PASO STREETCAR PROJECT SPECIAL SPECIFICATION EP-MSF Maintenance and Storage Facility. Description. Construct the Maintenance and Storage Facility (MSF) building

More information

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF

ADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds

More information

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture 1. SUBMITTED BY: DATE: Name of Firm: Street Mailing Address (If different): Primary Fax: E-mail: Website: Address of the office that

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB CONSTRUCTION COST BREAKDOWN Property Owner s Name or Borrowers Name Brief Description of Project John Homeowner Build single family residence Property Address Property City Property Zip Code 4625 Jillbarr

More information

1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees:

1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees: 1.4 Names of officers, owners, partners and principals. Identify relationship of each to firm and if active in firm: 1.5 Other than persons listed above, number of full-time office employees: 1.6 Number

More information

TABLE OF CONTENTS. (Δ = Rev 06/08)

TABLE OF CONTENTS. (Δ = Rev 06/08) TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement

More information

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

TABLE OF CONTENTS Structural Library

TABLE OF CONTENTS Structural Library Title Description DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 Project Title Page Project Manual title page. 000107 Seals Page For seals of design professionals on Project Manual. 000115

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

How to Estimate the Cost of a Medical Office Building Using Conceptual BIM (DProfiler)

How to Estimate the Cost of a Medical Office Building Using Conceptual BIM (DProfiler) How to Estimate the Cost of a Medical Office Building Using Conceptual BIM (DProfiler) CPE Candidate No. 0115805 July 2015 1 P age How to Estimate the Cost of a Medical Office Building Using Conceptual

More information

DIVISION 1 - GENERAL CONDITIONS TOTAL:

DIVISION 1 - GENERAL CONDITIONS TOTAL: ITB 39-08/09 UNIT PRICE BID BREAKDOWN CONSTRUCTION OF THE 35th STREET RESTROOM FACILITIES & STREET END IMPROVEMENTS The following unit quantity breakdown is provided FOR INFORMATIONAL PURPOSES ONLY. Bidders

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

Kimberly School District New Elementary School

Kimberly School District New Elementary School Kimberly School District New Elementary School Bids to complete work as defined will be accepted, from invited contractors, by Starr Corporation until March 21st, 2017 at 2:00 PM. Bids may be delivered

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 37 38 39 40 4 42 43 44 45 46 DIVISION 02 EXISTING CONDITIONS Demolition; Removal & Disposal: CMU Partitions AD Quan UM

More information

CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID

CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE II GENERAL CONSTRUCTION STATE PROJECT # 241-0099EA WINDSOR, CT. 1. Sealed proposals for the trade contracts listed below will be received by Capitol Region

More information

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO: ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015

More information

SECTION ALTERNATES

SECTION ALTERNATES SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Midwester State University Health Science Center

Midwester State University Health Science Center Bid Proposal For: Bid Due: Bids Received At: Email Bid to: Midwester State University Health Science Center 8-Aug-17 Midwestern State University Attn: Steven Shelley - Director of Purchasing/Contract Management

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA

A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA McKee and Associates Architecture and Interior Design Addendum No. SEVEN Date: 07.11.17 Project: A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA A7.1

More information

City Park Addendum No: 4 (Published)

City Park Addendum No: 4 (Published) Notice Basic Information Reference Number 0000198133 Issuing Organization City of Buda Owner Organization Project Type IFB - Invitation for Bid (Formal) Project Number 18--012 Title City Park Source ID

More information

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting September 20, 2018 Progress Update PROGRESS UPDATE Rien Construction (General

More information

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7 TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure

More information

STATE PROJECT NUMBER TZ MnDOT

STATE PROJECT NUMBER TZ MnDOT 1.1 NOTICE TO RESPONDERS ADDENDUM NUMBER SIX DATED 24 October 2014 MnDOT LITTLE FALLS TRUCK STATION 15038 Pine Avenue, Little Falls MN 56345 STATE PROJECT NUMBER TZ 90468 WIDSETH SMITH NOLTING 610 Fillmore

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8 TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance

More information

Concrete. Conveying Systems. Doors, Windows & Interiors

Concrete. Conveying Systems. Doors, Windows & Interiors Concrete Concrete : Cast-in-Place Concrete Concrete : Cementitious Decks Concrete : Concrete Accessories Concrete: Concrete Block & Brick Concrete : Concrete Coring & Sawing Concrete : Concrete Curing

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Henderson County High School Career and Technical Education Addition and Renovation Addendum # 1

Henderson County High School Career and Technical Education Addition and Renovation Addendum # 1 Henderson County High School Career and Technical Education Addition and Renovation Addendum # 1 Date: April 24, 2015 Attached Pre Bid Agenda Attached Pre Bid Sign In Sheet Attached Addendum # 1 from RBS

More information

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Plumbing - 220000 Without limiting the application of all of the Contract Documents to the Subcontract,

More information

Fundamentals of Building Construction: Materials and Methods

Fundamentals of Building Construction: Materials and Methods Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of

More information

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

ADDENDUM #1 BL Construction of Club Drive Park: Phase II October 25, 2017 ADDENDUM #1 BL094-17 Construction of Club Drive Park: Phase II 1389 Peachtree Street, NE Suite 200 Atlanta, GA 30309 Phone: 404.873.6730 www.tsw-design.com Principals: William Tunnell

More information

CEFPI Monthly Meeting

CEFPI Monthly Meeting CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type

More information

TAXABLE PAYMENTS FACTSHEET. If you run a business in the building and. construction industry then you ll soon need

TAXABLE PAYMENTS FACTSHEET. If you run a business in the building and. construction industry then you ll soon need If you run a business in the building and construction industry then you ll soon need to do your Taxable Payments reporting. This factsheet contains a summary of the key tax changes surrounding taxable

More information

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE HUMPHREYS COUNTY BOARD OF SUPERVISOR BELZONI, MISSISSIPPI APRIL 20, 2016 EMILY POOLE ARCHITECTURE,

More information

City of Redlands. Incorporated Cajon St., Ste. 20 Redlands, CA Tenant Improvement

City of Redlands. Incorporated Cajon St., Ste. 20 Redlands, CA Tenant Improvement Residential Tenant Improvement New Commercial DIRECTIONS: After all final inspections have been completed by all involved agencies/departments you must obtain authorized signatures from all the involved

More information

TELEPHONE: (215) Addendum No. 03

TELEPHONE: (215) Addendum No. 03 THE SCHOOL DISTRICT OF PHILADELPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 03 Subject:

More information

ADDENDUM No. 5 TO CONSTRUCTION CONTRACT DOCUMENTS BRIDGEPORT PUBLIC UTILITY DISTRICT (BPUD) Arsenic Removal Project Construction Contract

ADDENDUM No. 5 TO CONSTRUCTION CONTRACT DOCUMENTS BRIDGEPORT PUBLIC UTILITY DISTRICT (BPUD) Arsenic Removal Project Construction Contract ADDENDUM No. 5 TO CONSTRUCTION CONTRACT DOCUMENTS BRIDGEPORT PUBLIC UTILITY DISTRICT (BPUD) Arsenic Removal Project Construction Contract May 15, 2017 THE BIDDER SHALL EXECUTE THE CERTIFICATION WITHIN

More information

MARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD

MARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD MARCH 2018 2016 BOND & TIF PROJECT UPDATE Grapevine-Colleyville ISD GHS Agricultural Sciences Building Renovation Multipurpose Activity Centers Additions and Renovations to TES and GMS Cannon Elementary

More information

City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION

City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION KAREN FREEMAN-WILSON 401 Broadway Room 307 FLORZELL HAWKINS, JR. Mayor Gary, IN 46402 Building Commissioner (219) 881-1377 Fax: (219) 881-1425 SCOPE

More information

Project Estimate Summary

Project Estimate Summary Project Estimate Summary Project Cost Evaluation Table 4 shows the Construction Cost, CC/SF, Total Cost, TC/SF, the Building Systems Cost, and Building Systems Cost/SF based on the budget for. Table 4

More information

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP Agenda Introduction (5 minutes) UCF Introduction (5 minutes) Project

More information

CITY OF TACOMA Department of Public Utilities Tacoma Power

CITY OF TACOMA Department of Public Utilities Tacoma Power CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL

More information

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General

More information