Dominion Traditional Building Group Fox Groves Road Remington, VA 22734
|
|
- Amice Perkins
- 6 years ago
- Views:
Transcription
1 Dominion Traditional Building Group 6625 Wilson Road, Marshall, VA Phone: July 13, 2016 Property: Presqu Isle Address: 8183 Fox Groves Road Remington, VA Property Owner (s): Josh Millson Martula Contact Information:
2 Introduction: Aubrey Von Lindern, by way of the Stone House Foundation, provided our contact information to the property owner in the hope that we would be able to an estimate for stabilization work (primarily masonry and roofing; possibly indows and doors) for two circa 1820 brick slave quarters located on the property. As part of our initial site assessment we took measurements with which to produce basic scale drawings of the two buildings. These would be used for our more detailed follow up assessment and as a reference for any future planning/work that takes place on the buildings. We made plans to include David Logan, owner of Vintage Inc., at our follow up visit to the property. Vintage specializes in historic woodworking and building techniques. On June 13th, 2016, Tim Winther, Mike Ondrick, and David Logan met to conduct a detailed survey of the two slave duplexes. On July 13th, 2016, Tim Winther of DTBG met with the owners to present the first draft of this report. The amended report is as follows.
3 Table of Contents: 1. University of Mary Washington Report 2. Introduction to Recommendations 3. Recommendations 4. Duplex 2: (duplex closest to main house) Masonry 5. Duplex 1: (duplex farthest from main house) Masonry 6. Additional Thoughts/Questions 7. Woodworking
4 Introduction to Recommendations: Duplex 1 will refer to the duplex closest to the main house. Duplex 2 will refer to the duplex farthest from the main house. The pricing and recommendations that we are providing is based on visible and or known needed repairs. It would be impossible to provide thorough recommendations and pricing without being able to take some steps that would require some financial outlay from the owners. We would propose that these steps be taken in a way that will in part contribute to lessening additional damage to the buildings, more specifically to Duplex 2. Please keep in mind with regard to pricing that we generally work from a higher initial number to account for any unforeseen conditions. We would regard this as a working document that can be used by both DTBG and the owner to establish a set scope of work and budget. It is important to have a complete understanding of the buildings conditions and the owners end result for the buildings before developing a budget, schedule and complete scope of work. We would always look for efficiencies to keep costs down. Owner input of their objectives is critical to this process. Recommendations: Duplex 2: Masonry Before starting any repair work the overall condition of the building must be known in order to prioritize the scope of work. In a building of this condition it is most important to stop the structure from deteriorating further. In the case of this building, we would start by removing the vegetation from around the east, west, and north walls. This work would include the removal of the shrubs and their root systems.
5 We would hand dig along the foundation walls to uncover and cut any roots that may be making their way through the foundation and walls. We would use a mini excavator to clear the root mats around the perimeter of the building. We would improve the drainage away from the building at grade. This action would cease any further damage from the roots and allow us to properly assess the condition of the foundation wall. At the east and west walls and the interior partition that runs between them; there is overwhelming evidence of rising damp issues. This is evidenced by the decay of the bricks located at and a bit above the floor line of the building at the interior. We would recommend at some point installing a perimeter drain around the east, west and north walls. During this installation any repairs to the foundation could be made and the exterior brick below grade parged. Until the root clearing portion of work is completed the cost of these potential repairs is unknown. At a minimum the vegetation must be dealt with to prevent further damage. We would suggest removing the addition that is attached to the original building during or after this phase of work. The owners have expressed an interest in this being done as part of their final vision for the building. Combining this activity with the vegetation removal phase would create a cleaner environment in which to assess the building and complete the repairs. 1. Remove the addition from the east side of the building. 2. Using a mini excavator and by hand digging; remove all the vegetation and roots from around the building at the east, west, and north walls. 3. Remove the vine that has grown up the east side of the building and now engulfs the chimney stem at the north gable. Any needed repair work below grade could take place at this time or in the future. Removal of Addition: Price includes disposal: Not To Exceed: $10,600.00
6 Removal of Vegetation/Roots from exterior walls and removal of vine at chimney stem: Estimated Cost: $6, Installation of Perimeter Drain: Estimated Cost: $2, Parging of below grade exterior foundation surfaces following any needed foundation repairs: Estimated Cost: $2, At some point the majority of the interior plaster is going to need to be removed. It is mostly unsound. There are areas that at a minimum must be removed to facilitate needed brick repairs. The ceilings need replacement as well. Removing both the plaster and the ceilings would allow for a proper assessment of the buildings structure. There is now no way to assess the interior foundation at the crawl space or the roof framing at the attic. At a minimum we suggest removing enough flooring and ceiling to gain access to these areas. Any interior plaster could be removed as needed to perform visible repairs. Removal the plaster and ceilings from the two rooms making up the original duplex: Estimated Cost (including disposal): $10, Work to gain access to the attic and crawl space would be billed hourly.
7 Known Repairs Duplex 2: North Gable Wall: Owing to the pronounced bulge in this wall and the condition of its chimney and corners at the east and west walls we believe that this wall needs to be taken down and rebuilt. This would include the chimney and firebox. If during the dismantling of the wall we are able to save portions of the wall that are worth saving, we would do so. This work would include cleaning the salvaged brick for reuse, separating the exterior brick from the interior brick and preparing adjacent surfaces for rebuilding. A compatible lime based mortar, color matched to the original would be used. Some stabilization or upgrade of the chimney base below grade may be required. This work might add up to $2, to the cost of rebuilding this wall. Please bear in mind that we are estimating the costs to the worst case. We would endeavor to leave intact as much of the original building fabric as possible. Teardown and rebuild of the north gable end wall to include chimney and firebox: Estimated Cost: $45, West Wall: There are two windows at this wall. Both require rebuilding above and below them. This work should be done in conjunction with the removal of the windows for replacement or repair. This wall requires repointing along its base. The majority of the work is located toward the north end of the building. All work would be done using compatible lime mortar, color matched to the original. Estimated Cost: $6,985.00
8 South Gable Wall: The parapet and top corners of this wall need to be removed and rebuilt. The chimney stem needs to be rebuilt. There is a crack that needs to be stitch repaired and repairs to the lower corners need to be made. All work would be done using compatible lime mortar, color matched to the original. Estimated Cost: $14, East Wall: The arch above the door needs to be rebuilt. There are areas of spot pointing that should be done. This wall would be better assessed following the removal of the porch. There may be some filling in of brick or patching that needs to take place following this work. This pricing only reflects repairs made to the areas of the wall that are exposed and not covered by the porch. Estimated Cost: $2, Building Interior: Masonry The biggest issues facing the interior of the building are the rising damp damage found at the east and west walls and the interior partition that runs between them and the condition of the plaster. A further investigation of the crawl space and some plaster removal is needed to properly assess the issues involving the rising damp. Understanding the cause of this problem would be the first step. Knowing what the owners desire for a finished wall appearance would dictate the method of repair. This can be priced following a more detailed survey of the crawl space and the exterior foundation walls below grade.
9 We have previously outlined our thoughts regarding the condition of the interior plaster. As this does not play a part in the structural integrity no pricing for the interior wall finishes are given other than the cost to remove the existing plaster. Allowances for Budgeting Duplex 2: Foundation Repairs below grade: This work would include the removal of any roots that have penetrated the foundation walls, the replacement of any decayed bricks and any repointing needed below grade. Estimated Cost: $5, Crack Repairs to interior walls behind plaster: This work would account for any crack repairs found following the removal of the interior plaster. Estimated Cost: $1, Repair to damage at interior partition wall due to rising damp issues: Estimated Cost: $5, Installation of three coat lime plaster to two rooms making up the original rooms of the duplex: Estimated Cost: $15,760.00
10 Duplex 1: Masonry Known Repairs Duplex 1: North Gable Wall: This wall appears to be in good shape. The low areas of the wall shows signs of having had some brick replacement and repointing with modern mortar. These areas are to the exterior of the damaged interior wall at this location. The moisture trapped by the modern mortar is the likely culprit for the increased decay of the interior bricks in these areas. We would recommend cutting out this modern mortar and replacing it with a compatible lime mortar, color matched and struck to match the original. Estimated Cost: $2, West Wall: Repairs need to be made to the eave, the top of the wood framed opening beneath the porch and at the base of the concrete pad. Estimated Cost: $1, South Gable Wall:
11 There are some areas of this wall that have been repointed using modern mortar. These have been lightly applied and would be fairly easy to remove. We recommend their removal and replacement with compatible lime mortar. At the parapet, there is some amount of repointing that needs to be done. We would recommend cleaning this area with a biocide to kill the growth of mold there. Estimated Cost: $5, East Wall: Areas of this wall have been repointed with modern mortar. There is some brick replacement that needs to be done at the top of the wall at the north end. We recommend removing the modern mortar and replacing it with a compatible lime mortar. Estimated Cost: $6, The most critical of the exterior work on this duplex would be that to the two gable walls. Building Interior: Masonry In the north room of the duplex, the area of brick above the door needs to be rebuilt. There is brick replacement and rebuilding that needs to take place at the right side of the firebox and at the right side north gable wall. This is the area at which modern mortar repairs have been done to the exterior of the wall. We would perform these using compatible lime mortars. Estimated Cost: $3, At the center partition between the north and south rooms of the original building, there is substantial brick decay at both sides of the door between the two rooms. We would want to investigate the condition of the foundation in the crawl space prior to making a recommendation
12 and estimating the cost of the repairs. The final finish of the wall would also factor into the decision making process here. Allowances for Budgeting Duplex 1: Removal of the plaster and ceilings from the two rooms making up the original duplex: Estimated Cost (including disposal): $10, Repair to damage at interior partition wall due to rising damp issues: Estimated Cost: $5, Crack Repairs to interior walls behind plaster: Estimated Cost: $1, Installation of three coat lime plaster to the two rooms making up the original walls of the duplex: Estimated Cost: $15, Additional Thoughts: Duplex 1 requires much less overall work than Duplex 2. There are some repairs that we have recommended that are not critical for the long term longevity of the building. These would primarily be some of the repointing work. The damage to the interior north gable wall of this building is evidence that it should at some point be removed and replaced with compatible mortar.
13 Duplex 2 has some issues that need to be addressed much sooner than later. The vegetation needs to be dealt with permanently. The roots need to go. The vine going up the roof to the chimney stem needs to be killed. We would not attempt to remove the vine until the work on the north gable wall took place. It is most likely that the vine has rooted itself throughout the masonry here. Attempting to remove it may dislodge masonry and create an unsafe condition. We would suggest placing this item at the top of the priorities list. This work would also provide an opportunity to assess the condition of the foundation. Operable Chimneys: At our last meeting we discussed making the chimneys operable. The chimney located at the gable wall of Duplex 2 would be rebuilt during reconstruction and so pricing is needed. We don t truly know the overall condition of the interiors of the other three. The chimney stem at the other gable end of this duplex needs to be rebuilt. This pricing has been included. What remains are unknowns as it relates to the interiors. For budgetary considerations, I would expect to spend no more than $3, each to perform whatever repairs would be needed to make them operable.
14 Tuesday, July 19, 2016 Vintage, Inc. David Logan 600 North Loudoun Street Winchester, VA Tim Winther by Re: Pricing categories and estimates for Presqu Isle Dear Tim, As placeholders, I did some rough estimates below, making many assumptions: 1. Phase I, detailed in previous letter: $ Windows and doors: removal, restoration, reinstallation: $30,000 jambs, sashes, wavy glass. 3. Flooring removal and floor structure repairs, reinstallation, and floor finishing: $35, Heart pine flooring, 1500 square feet: $22, Ceiling and roof structure repairs: $12, Painting, interior: $7500. I am assuming that we will use historic paints, like milkpaint and/or linseed oil based paints. 7. Painting, exterior: $ Hardware, hinges, locks: $ Roof repairs and painting: The roof looks sound to me. It needs some flashing attention, followed by scraping and painting. $10, Guttering. 1/2 round galvanized. $6000. The total above comes to $140,000. Please recognize the rounding, and know that there are many decisions that we will make together that affect these figures, both up and down. Sincerely, David Logan
Introduction. LLB wishes to thank the Trustees, Director and Building Committee of the Gleason Public Library for their assistance and guidance.
1 E x e c u t i v e s u m m a r y Introduction Architect Lerner Ladds + Bartels and engineers Simpson Gumpertz & Heger were selected to provide services to investigate and determine the causes of deterioration
More informationStonework Renovation
Stonework Renovation Cathedral Church of the Advent Birmingham, Alabama 2001-2005 Stonework Committee: Dr. Thomas A. S. Wilson John C. Carraway Lowell K. Christy Bryan F. Helm John Morse Matt Owen Rick
More informationSITE AND BUILDING INSPECTION CHECKLIST
PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water
More informationSlave Housing Data Base
Slave Housing Data Base Building Name: Tuckahoe Plantation, Quarter B Evidence Type: Extant Site ID: Historical Site Name: Tuckahoe Plantation City or Vicinity: County: Goochland State: Virginia UTM: @NW
More informationSTRUCTURAL ASSESSMENT OBSERVATION REPORT
Consulting Engineers THORSON BAKER & Associates, Inc. 3030 West Streetsboro Road (330) 659-6688 phone Richfield, Ohio 44286 (330) 659-6675 fax www.thorsonbaker.com STRUCTURAL ASSESSMENT OBSERVATION REPORT
More informationEidem Farm Brooklyn Park, MN
Eidem Farm Brooklyn Park, MN East Farm House Structural Condition Assessment Prepared By 1 0 0 P O R T L A N D A V E N U E S O U T H, S U I T E 1 0 0 M I N N E A P O L I S, M I N N E S O T A 5 5 4 0 1
More informationDr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018
G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake
More informationObservations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds,
Observations and suggestions, rehabilitation and re-use of stable building, 12, Back Newton Grove, Chapeltown, Leeds, 12, Back Newton Grove is a brick-built stable building formerly attached to 12 Newton
More informationKNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT CERTIFICATE OF APPROPRIATENESS APPLICATION
KNOXVILLE HISTORIC ZONING COMMISSION STAFF REPORT CERTIFICATE OF APPROPRIATENESS APPLICATION PROPERTY ADDRESS: 227 Leonard Pl FILE NO.: 8 F 15 HZ DISTRICT: Ft. Sanders NC 1 MEETING DATE: 8/20/2015 APPLICANT:
More informationSTATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM
GEORGIA DEPARTMENT OF NATURAL RESOURCES (DNR) - HISTORIC PRESERVATION DIVISION (HPD) PART A PRELIMINARY CERTIFICATION Section I Property and Owner Information STATE PREFERENTIAL PROPERTY TAX ASSESSMENT
More informationHERITAGE PERMIT APPLICATION SUBMISSION GUIDELINES
HERITAGE PERMIT APPLICATION SUBMISSION GUIDELINES WHAT IS A DESIGNATED HERITAGE PROPERTY? A designated heritage property is a property that has been identified as historically or architecturally significant
More informationHARLEY CLARKE MANSION Condition Assessment
HARLEY CLARKE MANSION Condition Assessment 2603 Sheridan Road Evanston, Illinois 60201 Final Report August 24, 2016 WJE No. 2016.5003 Prepared for: Ms. Lisa DiChiera Landmarks Illinois 30 North Michigan
More informationCase Study # 2 -Pritchard House Restoration
Case Study # 2 -Pritchard House Restoration STABILIZING THE STRUCTURE Jacking up the house to level and install new piers New Concrete Footers and Piers Using old and New Bricks Layers of old asphalt roof
More informationHistoric Preservation Commission Training. Preservation Treatments and Best Practices
Historic Preservation Commission Training Preservation Treatments and Best Practices The Secretary of the Interior s Standards 1 A property will be used as it was historically or be given a new use that
More information******** Condominiums Masonry Assessment
******** Condominiums Masonry Assessment On April 23rd, 2014, I examined the exterior masonry conditions and photographed both general and specific conditions on the building. I was directed by **********,
More informationMAINTENANCE PLAN Wing Village Hall, Morcott Road, Wing, Oakham LE15 8SA
MAINTENANCE PLAN Roof Covering Roof slates Yearly Maintenance & Finishes 1 1, 8 & 13 Timber fascia and soffit boards Slates in good condition, some have been replaced during routine maintenance of roof.
More informationRockland Library Assessment Executive Summary
Rockland Library Assessment Executive Summary performed for City of Rockland, Maine 270 Pleasant Street Rockland, ME 04841 February 2, 2016 Civil & Structural Engineering 132 Brentwood Street Portland,
More informationCarroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage
Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public
More informationMasonry Study. Club House and Jr. Club House Pequot Yacht Club Southport, Connecticut 03-44
Club House and Jr. Club House Southport, Connecticut 03-44 669 Harbor Road Southport, Connecticut 06890 Architect: Martin A. Benassi, AIA Architect Two Broadway Hamden, CT 06518 Date: Table of Contents
More informationNEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER
SUMMARY OGDENSBURG, NY The New York Main Street program (NYMS) is administered by the Office of Community Renewal (OCR) under the direction of the New York State Housing Trust Fund Corporation (HTFC).
More informationChapter 4 Rehabilitation
Chapter 4 Rehabilitation A. Introduction B. Facades & Storefronts C. Windows D. Entrances, Porches, & Doors E. Foundation F. Roof G. Masonry H. Wood I. Paint J. Rear of Buildings Jamaica NationalHeritage
More informationWesleyan University 1.1 RELATED INFORMATION, DOCUMENTS AND REQUIREMENTS
Wesleyan University SCOPE OF WORK 346 WASHINGTON STREET ASPHALT ROOF REPLACEMENT PROJECT 23AB VINE STREET ASPHALT ROOF REPLACEMENT PROJECT 72 HOME NORTH SIDE ROOF REPLACEMENT 64 FOUNTAIN AVE ROOF REPAIR
More informationSubject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3
MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape
More informationNathan Clifford School Building Conditions Assessment Report
Nathan Clifford School Building Conditions Assessment Report Submitted To: The City of Portland April 12, 2013 Prepared By: Winton Scott Architects Becker Structural Engineers, Inc. Conditions Assessment
More informationDesign Guidelines for
Chapter 4 Architectural Features Design Guidelines for Architectural Features This chapter presents the design policies and guidelines for the rehabilitation of an historic resource located in Georgetown,
More informationLOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN
INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS
More informationDL Engineering Inc. Structural / Civil Engineering
9/3/2014 Complete Basement Systems 63250 Quentin St., #114 Aurora, CO 80011 DL Engineering Inc. 2750 South Wadsworth Blvd. D-115 Denver, CO 80227 720-413-8982 dlemier@dlengineer.com www.dlengineer.com
More informationCHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD
TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of
More informationCSE Engineering, Inc.
CSE Engineering, Inc. Consulting Structural Engineers December 3, 2012 Mr. Joel Heenan Plans Examiner City of Albany Building Department 333 Broadalbin Street Albany, OR 97321 Re: : Old Church Building
More informationPHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT
PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT Prepared for: GATTER ARCHITECTS 111 MAIN ST. PHILMONT, NY 12565 Prepared by: TACONIC ENGINEERING, DPC PO BOX 272 CHATHAM, NY 12037 TACONIC
More informationSparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G
Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G February 29, 2008 Ms. Leslie Wolfenden Save Austin's Cemeteries PO Box 41814 Austin, TX 78704 (512) 917-1666
More informationPROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX HOUSTON, TEXAS (713)
PROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX 271492 HOUSTON, TEXAS 77277 http://www.profengineering.com (713) 664-1264 June 19, 2000 Mr. Samuel Underdog 329 Castle Dr. Houston TX 77018 Dear Mr.
More informationEXECUTIVE SUMMARY INTRODUCTION Terms of Reference Building Description Documents Reviewed SUMMARY OF FIELD DATA 4
Abbott Place Wood Framed Window Condition Assessment May 30, 2012 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1.0 INTRODUCTION 2 1.1 Terms of Reference 2 1.2 Building Description 3 1.3 Documents Reviewed 3 2.0
More informationMetropolitan Bible Church Façade 453 Bank Street Ottawa, Ontario
Metropolitan Bible Church Façade 453 Bank Street Ottawa, Ontario Metropolitan Bible Church [JCAL 2008] JCAL Project No. 08024 July 2009 Prepared By: Table of Content Section 1.0 Executive Summary...1 Section
More informationGreat Hall Skylight Investigation September June 2016
September 2015 - June 2016 GREAT HALL 2007 GREAT HALL CONSTRUCTION OCTOBER 30, 1924 Completed in 1925, and designed by Daniel Burnham and successor firm Graham Anderson Probst and White, the Great Hall
More informationChapter 2 Understanding The Problem
Chapter 2 Understanding The Problem What Causes Most Of The Problems With Stucco? EIFS was originally intended to seal and insulate the exterior of the home from the elements. Problems occur when poorly
More informationTable of Contents. Page # 3 Part 1 General Assessment General Materials Known conditions Unknown conditions
Table of Contents Page # 3 Part 1 General Assessment General Materials Known conditions Unknown conditions Part two Specific Assessment with Photos 3 Attic Below 4 Belfry Floor 5 Columns 7 Interior Surfaces
More informationDesign Guidelines for Construction and Renovation in the Longmeadow Historic District
Design Guidelines for Construction and Renovation in the Longmeadow Historic District Revision 2008.1 The following list of Guidelines has been compiled to facilitate the homeowner's planning for projects
More informationSTRUCTURAL ASSESSMENT REPORT
STRUCTURAL ASSESSMENT REPORT FOR WASHINGTON PARK NATIONAL BANK 6300 South Cottage Grove Ave. Chicago, Illinois 60637 Prepared For: Cook County Land Bank Authority 69 W. Washington, Chicago Illinois April
More informationConnaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20
Connaught Facility Audit report for: Connaught Regina, SK Report Created: 2012-04-02 Page 1 of 20 Facility Details Facility Connaught Address: Location: Regina, SK Facility Zone: 8 Grade Configuration:
More informationOscar Stanton De Priest House Preservation Consultant Request for Proposal due February 12, 2018, COB January 18, 2018
Oscar Stanton De Priest House Preservation Consultant Request for Proposal due February 12, 2018, COB January 18, 2018 Project Overview Landmarks Illinois (LI) is seeking qualified Preservation Consultant
More informationCITY HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION
CITY HISTORIC ZONING COMMISSION STAFF REPORT - CERTIFICATE OF APPROPRIATENESS APPLICATION MEETING DATE: 10/18/2012 FILE NO.: 092712ONK APPLICANT: Lawrence Eaton (under contract to purchase) ADDRESS OF
More information2019 IAQA Annual Meeting
Daniel Stih, CMC. CIEC Healthy Living Spaces Stanley Yeskolski CIEC, CMC Investigative Inspection Services Inc. 2 Purpose The presentation will provide a over view of: Installation Details Problem Areas
More informationArts Center- Building needs
Arts Center- Building needs Built in 1928 Last renovated in 1986 Priority 1- fascia repair Loose, rotting and missing fascia needs to be replaced to prevent water intrusion. There are seven different pieces
More informationSection X - Miscellaneous
Section X - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in HRSD
More informationSection 32 - Miscellaneous
Section 32 - Miscellaneous A. Introduction This section provides design criteria, specific requests/recommendations and preferences related to specifying and constructing systems and materials used in
More informationREPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers
REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR Prepared by: Global Village Engineers 23 JANUARY, 2001 23 January 2001 Senor Carlos Cortez Hernandez Alcaldia Municipal de Tecoluca San Vicente, El
More informationDwight Train Station and Freight Depot Rehabilitation Friday, July 22, 2005
Dwight Train Station and Freight Depot Rehabilitation Friday, July 22, 2005 Prepared by: History Construction Management, LLC Odell, IL 60460 On behalf of: Dwight Mainstreet For the use of: Village of
More informationHistoric Congressional Cemetery 2009 Burial Vault Conservation Projects
Historic Congressional Cemetery 2009 Burial Vault Conservation Projects If you own a brick home built around the turn of the century the last century you have probably had to pony up for a repointing of
More informationMID-CITY HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application
MID-CITY HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application This document is for information purposes only and does not need to be submitted with the Application Form. Mid-City
More informationProperty Inspection Checklist
Property Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are
More informationPG&E BUILDING AT 215 MARKET STREET
San Francisco, CA ICRI Northern California Chapter 2017 Concrete Repair Awards Simpson Gumpertz & Heger Inc. OVERVIEW The historic 215 Market Street Annex is a seven-story office building in downtown San
More informationCITY OF TYLER HISTORICAL PRESERVATION BOARD CERTIFICATE OF APPROPRIATENESS APPLICATION (Unified Development Code Article XI, Division B)
CITY OF TYLER HISTORICAL PRESERVATION BOARD CERTIFICATE OF APPROPRIATENESS APPLICATION (Unified Development Code Article XI, Division B) Owner(s) of Property: Address of Property: Telephone Number: Please
More informationTown of Sudbury, MA HISTORIC DISTRICTS COMMISSION GENERAL GUIDELINES
Town of Sudbury, MA HISTORIC DISTRICTS COMMISSION GENERAL GUIDELINES The following general guidelines are used to determine appropriateness. More detail on specific kinds of changes (e.g., changing roofing,
More informationMAJOR DEFECTS BUILDING SURVEY REPORT
MAJOR DEFECTS BUILDING SURVEY REPORT XXXXXX Road Bedminster Bristol BS3 XXX Prepared for Mr XXXXXXX July 2017 T J Maggs MRICS MAGGS AND ALLEN 22 Richmond Hill Clifton Bristol BS8 1BA 0117 973 4049 survey@maggsandallen.co.uk
More informationHistoric Preservation DESIGN GUIDELINES
CITY OF GRANBURY Historic Preservation DESIGN GUIDELINES 9. BUILDING EXTERIOR MATERIALS MASONRY: BRICK, STONE, TERRA COTTA, CONCRETE, STUCCO, AND MORTAR Commentary: Masonry features of brick cornices and
More informationExterior structures (fences, sheds, decks, retaining walls, detached garages) in good condition, no evidence of termite damage or rotted wood
Please Note: This checklist should not be relied upon as a home inspection report, nor should it be considered a substitute for a home inspection. This list is representative, but NOT exhaustive. If you
More informationRehabilitation of the Old Brunswick County Courthouse
SCOPE OF WORK AND PROJECT BUDGET: Rehabilitation of the Old Brunswick County Courthouse June 30, 2010 Presented by: ARCHITECT Enteros Design, PC 314 Exchange Alley Suite A Petersburg, VA 23803 804.861.1200
More informationWelcome to your MOT Checklist
MOT Checklist 2 Welcome to your MOT Checklist Your church buildings can be one of your greatest assets or a major drain on resources. Often the problems come because we haven t done regular checks around
More informationCounty of Santa Barbara, California Facility Condition Assessment 2014
Project No.: P05000.001 Building Number: P05000 Lompoc VMB Grounds Project Description: Overlay, Seal Coat and Restripe Parking Lots Background: The asphalt paving comprises approximately 135,600 square
More informationPolicies & Guidelines
Policies & Guidelines Facilities Maintenance and Repair These Policies and Guidelines are provided by the Falconbridge Homeowners Association (FHA) Board of Directors to explain how the Declarations of
More informationabqstudio Damp Exercise St John the Evangelist, Penge Sean Albuquerque - Year 1 February 2011 chartered architects and designers
Damp Exercise St John the Evangelist, Penge Sean Albuquerque - Year 1 February 2011 Contents Introduction 1 Damp Generally 2 The Inspection 4 Conclusions 8 Drawings 9 Interior Photographs 12 Exterior Photographs
More informationGroundwater Seepage. Causes of Basement Seepage and Leaks Hydrostatic Pressure
Groundwater Seepage The following guide can be used by you and your crews when assessing seepage at a property. Bear in mind that this guide is not all-inclusive, and should be used in a supplementary
More informationGROUNDS Grading General Grading, slope and drainage: Satisfactory N/A See Notes. Grading and slope at house wall
GROUNDS Grading General Grading, slope and drainage: Satisfactory Grading and slope at house wall Satisfactory (within 5 feet from building) Sidewalk Concrete Brick Flagstone Other Patio stones Driveway
More informationProperty Maintenance Guide
Property Maintenance Guide Beeville Main Street 400 N. Washington Street 361.358.4641 www.cityofbeevillemainstreet.com 1 Property Maintenance Guide Beeville Main Street This booklet is intended to help
More informationDesign Guidelines - Residential
This section provides guidance for residential buildings. If you own or lease space in a residential building, or operate a business in a building that was originally designed as a residence, these guidelines
More informationSt. Charles Community Unit School District 303
St. Charles Community Unit School District 303 Mold Conditions Report For Norris Recreation Center August 2, 2012 By ATS&R Planners/Architects/Engineers Report by: David M. Maroney AIA / NCARB Architect
More informationKORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No
000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20
More informationINTRODUCTION. Photo 1: View of the Pulda House from the northwest. Pulda Farm Conditions Assessment Page 1 HMR Architects
INTRODUCTION Photo 1: View of the Pulda House from the northwest. The Pulda Farm is located at 300 Old Georges Road, North Brunswick Township, Middlesex County, New Jersey. It is situated on the south
More informationROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:
ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place
More informationRESIDENTIAL GARAGE AND DRIVEWAY
RESIDENTIAL GARAGE AND DRIVEWAY GENERAL REQUIREMENTS: PERMIT: For new garages or garage additions the fee is $20.00 per hundred square feet or portion thereof ($50 minimum). Demolition permits are $65.00
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationFaçade Improvement Specifications: 221 S. Lafayette, Greenville, MI. General Section:
Façade Improvement Specifications:, Greenville, MI SEE ARCHITECTUAL RENDERINGS ATTACHED TO PROVIDE ADDITIONAL DETAIL: General Section: $ General Building Permit: Permit for working on project. Contact
More informationGLOBAL PROPERTY INSPECTIONS TECHNICAL BULLETIN
GLOBAL PROPERTY INSPECTIONS TECHNICAL BULLETIN TM June 1, 2002 TOPIC: Exterior Coverings This is the sixth in a series of technical bulletins in which an over-all examination of the home will be discussed
More informationFoundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance
www.epa.gov/iaq/moisture Foundations Issue Building foundations are vulnerable to moisture problems for a number of reasons, including: Water from rain and from plumbing leaks is drawn by gravity to foundations,
More informationCity of Washburn Building Assessment
City of Washburn Building Assessment Structural Assessment Report 204 W. Bayfield St. September 30, 2016 KOA No. 162078.01 Prepared For: City of Washburn 119 Washington Ave. Washburn, WI 54891 Prepared
More informationWHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED.
WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED. Build walls and ceilings with a strong base, sturdy reinforcements and much more with Phillips extensive line of high quality products. As a single source
More informationCUYLER-BROWNVILLE HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application
CUYLER-BROWNVILLE HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application This document is for information purposes only and does not need to be submitted with the Application Form.
More informationROME ART AND COMMUNITY CENTER
ROME ART AND COMMUNITY CENTER 308 W. Bloomfield St. Rome, NY 13440 INSULATION AND SLATE ROOFING REPAIRS SCOPE OF WORK: A. SPRAY FOAM INSULATE ATTIC AREA B. FRONT ROOF REPAIR C. REAR ROOF REPAIRS D. INTERIOR
More informationHISTORIC DISTRICT BOARD OF REVIEW SAVANNAH HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application
HISTORIC DISTRICT BOARD OF REVIEW SAVANNAH HISTORIC DISTRICT Instructions for Certificate of Appropriateness Application This document is for information purposes only and does not need to be submitted
More informationTOFT HOUSE, THRESHFIELD Heritage Statement Feature: Window frames in South Elevation - windows 5,6,7,12,13 Description Softwood painted casements with side hung opening lights. Single glazed. Simply constructed
More informationPre-Listing Home Inspection Checklist
Pre-Listing Home Inspection Checklist Charles Guth P.A. Homeward R.E. CharlesGuth.com 727-709-4663 Prior to putting your home on the market it is a recommended that you have your home pre-inspected to
More informationBEAUMONT MILL VILLAGE CHURCH GUIDELINES
BEAUMONT MILL VILLAGE CHURCH GUIDELINES This section is purely optional, but is included in the guidelines as a tool to assist when doing exterior renovations. Additional property(s) owned by the churches,
More informationHorse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments
November 4, 2014 Heidi Hubble Facilities and Services MSC 3545 New Mexico State University P.O. Box 30001 Las Cruces, NM 88003 Re: Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report,
More information43. CONSERVATORY. Conservatory. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle
Classification: Cluster: Location: Total Area: No. of Stories Acreage Owned: Acquired: 1904 Most Recent Improvements: THE CONSERVATORY Conservatory Close to junction of Inselrhue and Loiter Way, Belle
More informationThe contemporary masonry wall. Flashing. Ice dams - bad End dams - good
The contemporary masonry wall Designed to drain Kept dry with air cavity Expected to leak Uses foam plastic insulation 3 courses = 8 inches (one block course) Through wall flashing Weeps @ 16 o.c. Flashing
More informationThe Butler Gallery at the Evans Home CONSERVATION REPORT. McCullough Mulvin Architects. September 2016
The Butler Gallery at the Evans Home CONSERVATION REPORT McCullough Mulvin Architects September 2016 To be read in conjunction with impact statement and condition survey / recommendations in Carrig reports
More informationTown Office Building, 17 School Road, Community Room, addition completed 2007
Town Office Building, 17 School Road, Community Room, addition completed 2007 Existing Conditions and Needed Improvements: Poor acoustics in the room; No internet connection, no guest WIFI; No generator
More informationHorticulture Building
005 Horticulture Building University of Saskatchewan Heritage Register November 2014 005 Horticulture Building Alternate Names Header Houses Figure 1. A window sill of Indiana limestone set into a greystone
More informationProperty Inspection Report
DAVID A. MEACHAM Professional Inspection & Construction Services Property Inspection Report Prepared for David Smith Property Address 1154 Gulf View Drive Tampa Bay, Florida Inspection Date Friday, October
More informationFirstEnergy Program Overview
FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio
More informationOak Park Historic Preservation Commission October 13, 2016 Meeting Minutes Oak Park Village Hall, Room 101, 7:30 pm
Oak Park Historic Preservation Commission October 13, 2016 Meeting Minutes Oak Park Village Hall, Room 101, 7:30 pm ROLL CALL PRESENT: ABSENT: STAFF: Chair Christopher Payne, Greg Battoglia, Jennifer Bridge,
More informationAnson County. Facilities Assessment & Proposed Improvements to BC Moore & Historic Courthouse
Anson County Facilities Assessment & Proposed Improvements to BC Moore & Historic Courthouse Presentation to the Board of County Commissioners March 26, 2007 Participants & Credits Outline of Presentation
More informationVILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID # STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION
VILLAGE OF ORLAND PARK, ILLINOIS ADDENDUM NO. 1 REBID #15-019 STELLWAGEN FARMHOUSE RESTORATION: PHASE 1 EXTERIOR FOUNDATION Date: Wednesday, April 13, 2016 To: From: RE: All Potential Bidders Village of
More informationCOPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31
Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends
More informationJAY E. BUTLER, being first duly sworn deposes and states as follows: 1. I am a Professional Engineer licensed in the State of New York.
SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK In the Matter of DEVELOP DON T DESTROY BROOKLYN; Index No. DANIEL GOLDSTEIN; ATLANTIC AVENUE BETTERMENT ASSOCIATION; RJI No. FORT GREENE ASSOCIATION;
More informationEXTERIOR SIDING CONDITION SURVEY
EXTERIOR SIDING CONDITION SURVEY FOR FARRWOOD 2 CONDOMINIUMS 49-176 FARRWOOD DRIVE HAVERHILL, MA APRIL 2016 c/o PROPERTY MANAGEMENT OF ANDOVER, INC. P.O. BOX 488 ANDOVER, MA 01810 213 WEST STREET, MILFORD,
More information501 Broadway. Notes. By using any McGIS products or services, you indicate your acceptance of the Licensing Agreement:
501 Broadway 0 0.02 0.0 Miles By using any McGIS products or services, you indicate your acceptance of the Licensing Agreement: http://www.mcgis.org/license Notes 1: 1,147 Printed: 10/22/2015 3:19:01 PM
More information