Installer Guide. Item

Size: px
Start display at page:

Download "Installer Guide. Item"

Transcription

1 Installer Guide Item

2 Required tools and fixings Electric drill (non-impact setting) T-30 Torq bit (wedge type) 8mm hex socket Pozi head drill bit Tape measure Pencil/pen Hammer Tin snips Angle grinder (to cut tiles down to the correct size) Roofing Nails No.4 x 70mm Screws (Zinc Coated)

3 General heath and safety The Construction (Design and Management) Regulations 2015* and general construction site training must be followed. Safe working at heights training must be adhered to. Anybody handling photovoltaic (PV) modules should be trained in correct manual handling practice. All appropriate health and safety regulations should be followed correctly. Avoid installing the system in poor weather conditions, including strong wind, rain, ice or snow. Tile courses should be laid in accordance with BS 5534:2014* unless told otherwise. All components as specified in this manual must be used and instructions followed fully to ensure a safe and weather tight installation. Product has been designed to meet the requirements of the UK Building Regulations. Installation must also meet UK Building Regulation requirements. Artificially concentrated sunlight shall not be directed on the module or panel. *latest at time of print Health and Safety i

4 Electrical hazards ii WARNING: PV modules produce a DC voltage whenever exposed to light. This voltage cannot be switched off. PV modules are pre-wired with touch proof connectors to prevent an electric shock during general handling. WARNING: Care must be taken not to cut or damage cable insulation or expose bare wire. Each Sunstation module is factory fitted with three bypass diodes. Please see the product data-sheet for specifications. No additional bypass diodes are necessary. Removal or replacement of any diode without written authority of Solarcentury will invalidate the Solarcentury product warranty. Whenever necessary to comply with local codes, use a listed fuse or circuit breaker, rated for the maximum series fuse rating of the module and system voltage. Under normal conditions, a photovoltaic module is likely to experience conditions that produce more current and/or voltage than reported at standard test conditions. Accordingly, the values of I SC and V OC marked on this module should be multiplied by a factor of when determining component voltage ratings, conductor current ratings, fuse sizes, and size of controls connected to the PV output. All work must be carried out with the Sunstation system disconnected from the mains electrical supply. Please see appendix for grounding guidelines. Any grounding connections made must be in accordance with the requirements in BS EN :2007 Electrical installations should be designed and installed in accordance with BS 7671:2008 incorporating Amendment No 1:2011*. *Latest at time of print. Sunstation module is tested and meets the requirements of IEC and IEC

5 Installation limitations Sunstation has been designed to integrate with a variety of roof and tile types. However depending upon the age, type and location of the roof some strengthening work may be necessary; i.e. changing or adding extra battens. The following are minimum recommendations for the roof construction: The system should not be installed within: 2 tile widths, 2 tile heights at the top of the array, and 1 tile height at the bottom of an array, from the edge of the roof Residential buildings with a truss rafter roof Duopitch, monopitch or hip roof construction A roof pitch between 25 and 60 For integration with profiled or flat single lapped tiles Additionally information of roof coverings types are specified in the datasheet available at: Rafter gauge must be no more than 600mm Batten gauge must no more than 330mm* Battens must meet the requirements of BS 5534:2014** or BS 5534:2004** Battens must be 50x25mm in size Battens, rafters, and the general state of the roof must be in good condition and not subject to rot or other degradation Can only be installed as four sided shapes i.e. squares and rectangles Must only be installed in portrait orientation * For details of any additional battening that may be required to strengthen the roof contact Solarcentury **Sunstation must be installed using battens that are graded to BS In some cases this may require replacing the battens where the modules are to be mounted. For roof constructions that fall outside the above limitations then please contact Solarcentury for installation requirements. iii

6 Environmental limitations iv Sunstation is intended for use in terrestrial applications only. Modules must not be installed where they could be submerged in water The recommended ambient temperature should be within -20 C (-4 F) to 46 C (115 F). The temperature limits are defined as the monthly average high and low of the installation site. The limit operating temperature should be -40 C (-40 F) to 85 C (185 F). Ensure modules are not subject to wind or snow loads exceeding the maximum permissible loads. The modules should be installed in a location where there is no shading throughout the year. Ensure there are no obstacles to block light near the installation site. Modules should not be installed in a location that is within 50m of the sea. Lightning protection is recommended for PV systems that are to be installed in locations with high probability of lightning strikes. Do not use modules near equipment or in locations where flammable gasses may be generated or collected. Modules must not be installed nor operated in areas where hail, snow, sand, dust, air pollution, soot, etc., are excessive. Modules must not be sited in locations where aggressive substances such as salt, salt mist, salt-water, chemically active vapours, acid rain, any other type of corrosive agent, could affect the safety and/or performance of the module. Please adopt appropriate measures to ensure the performance and safety of the modules when they are installed in extreme conditions.

7 Installation considerations Do NOT walk on the surface of the module. Ensure no cable ends are left exposed to the weather during work breaks or after completion of works. Units must be kept in a weatherproof environment before installation. Do not leave tools or unsecured materials above the module installation area, to avoid potential damage to the units. Only load as many modules onto the roof as you expect to install during the installation time you have available. Modules should be handled carefully to avoid any damage before installation. Ensure all cable connectors are dry and free of dirt before making connections. Tile family compatibility: interlocking thick leading edge interlocking thin leading edge interlocking profiled tile interlocking pantile non-interlocking pantile For other tile types please contact Solarcentury. Sunstation has been tested to meet the requirements of BS 476-3:2004 and EN 13501: A1:2009 and achieved a fire rating of EXT.S.AA, B roof (t1) and B roof (t4). As a result Sunstation may be installed anywhere on the roof and without limitation to the area covered. v

8 Wiring considerations vi Sunstation PV panels should be connected in series in strings. Strings can be connected horizontally or vertically.! WARNING: PV modules produce a DC voltage whenever exposed to light. This voltage cannot be switched off. PV modules are pre-wired with touch proof connectors to prevent an electric shock during general handling.

9 Beware of partial shading Position your array to reduce partial shading. When arrays are connected in strings if one panel is under shading this will effect the efficiency of the whole array.! WARNING Cables must not be trapped between panels and battens vii

10 Preparation 1 Pre installation check list Before you go on to the roof, check that: Roof tiles are compatible with sunstation For the up to date list of compatible tiles see the Sunstation datasheet, available at: Roof can accommodate array (see page iii ) Accessories box contains the correct number of parts (see your configurator bill of materials) Modules are undamaged, check surface and cables Roof is facing south (between east & west) You have all the required tools ready (see inside cover) You have read and understood this guide fully

11 Positioning the array Find the A size of your array in the table below A height A dimensions show the visible area of the array once tiles are re-laid. This is marked with a dashed red line: A width (for example 325cm) Number of columns A width of array 225cm 325cm 430cm 535cm 640cm 745cm 850cm 5 535cm 7 745cm Width of array Number A height of rows of array cm cm cm cm Height of array 2

12 Measure the size of the roof 3 Decide on the approximate position of the array, considering shading and minimum tile restrictions: There must be a minimum of 2 complete tiles at the sides and top of the array, and 1 complete tile at the bottom

13 Positioning the array The complete B size of the array is shown below: 235mm (from min A height) A width 146mm 146mm Flexible flashing B dimensions are marked with a dotted green line 146mm 250mm 4

14 All tiles within the B area must be removed for installation. Additional tiles may need to be removed to install the flexible flashing. 5 Ensure there are no clashes with flues or other components on the roof within this area.

15 Finalise horizontal position Remove the tiles from the bottom right hand corner of the array and mark the A line on a batten. Desired position (for example centre of roof) Remove corner tile to reveal batten Detail on sheet 7 6

16 Shift position to reduce tile cutting 7 Consider tile cutting when positioning the array. You may want to align the A line with a full tile (excluding interlock) on one side to reduce cutting or shift the array to have equal cutting on both sides Detail from page 6 Array shifted to reduce tile cutting Check both sides of the array and mark final A line on batten

17 Remove tiles Remove all tiles within the B area. Ensure there are no clashes with flues or other components on the roof within this area. Next rafter Additional tiles may need to be removed as battens must be screwed to one rafter beyond the array. 8

18 Reinforce battens 9 All battens within the B area must be screwed to every rafter Battens Recommended Screw Min No.4 x 70mm Zinc - Coated Battens must be reinforced on both sides when they meet on a rafter. Screw using a skew screwing technique.! WARNING - If sarking present then increase reinforcement screw length by sarking thickness

19 Batten requirements Measure batten spacing. If batten spacing is less than 330mm skip to page 11 If batten spacing is greater than 330mm add an additional 25 x 50mm graded batten above every batten: Additional battens added 10

20 Build up support for flexible flashing 11 A line 250mm

21 Build up a support structure for the flexible flashing using battens or feather board Keep the angled section as shallow as possible but at a min of 5 from horizontal to stop water pooling Support (angled section) Batten Tile Rafter minimum of 5 Horizontal Ensure there are no gaps in the support Tip Featherboard or battens can be used 12

22 Lay flexible flashing 13 Tack in place to flexible flashing support. Keep nails within the top 30mm when securing flexible flashing. Ensure overlap with tile is approx 100mm 100mm! WARNING - Do not stick flexible flashing to tiles as this stage.

23 Lay flexible flashing Fold over top and side 20mm (min) for extra water barrier Nail to top of support Use self adhesive back adhere to tiles Tip Ensure flashing is taught and fold over top edge for extra water proofing 14

24 Finalise vertical position 15 Using a module and a top perimeter set your top tile angle to match the laid tile angle.! WARNING - Ensure the tiles overlapping the top perimeter match the laid tile angle of the roof

25 Finalise vertical position Shift module and top perimeter up and down until laid tile angle is matched 170mm minimum WARNING - Ensure a minimum tile! overlap of 170mm on top perimeter 16

26 Bottom datum 17 Measure down from bottom of temporary modules left extrusion using the table below. Detail on page 18 Remove temporary module and top perimeter Modules high Distance 1 0mm mm mm mm

27 Bottom datum Measurement must be within mm from the top of the bottom row of tiles 200mm 100mm Shift vertical position to meet both parameters WARNING - This may effect your! top perimeter tile angle. Cutting top course of tiles may be required to match laid tile angle at top and be within zone at bottom. om. 18

28 Position starter rail 19 Position starter rail using vertical datum and horizontal A line. Detail on page 20! WARNING - Position is critical this determines the position of the array

29 Position starter rail Ensure bottom of starter rail aligns with vertical datum as show below. Bottom of fixing tray in line with vertical datum 150mm minimum! WARNING - Ensure a minimum 150mm overlap between starter rail and flexible flashing. Cutting top course of tiles may be required to achieve both laid tile angle at top correct overlap. 20

30 Place edge of starter rail here 35 mm Die cut removed area Line up with marked A line, see page 7 Template can be used to position starter rail

31 Batten buddies Every time screw A is used a batten buddy must also be used. Choose 5 equally spaced battens with one at the top and one at the bottom. Screw A 330mm maximum spacing. Add extra battens if required.! WARNING - Batten buddy may fall under flexible flashing. Ensure screw penetrates batten buddy. Do not over torque screws 21

32 Reinforcement battens 22 Reinforcement battens may be required in higher wind load zones. Within 95mm Within 45mm - 95mm If in a high wind load zone and a batten does not naturally occur, battens must be added at the top and bottom of every module/ starter rail as shown above.! WARNING - All battens within the B area must be screwed to every rafter

33 Screws over rafters If the screw is over a rafter and a batten buddy cannot be used, pre-drill fixing tray and use screw B. Screw used to reinforce batten must be removed first. Screw B Groove Screw into groove when securing starter rail and modules 23

34 Screw bottom of starter rail to batten 24 A line / tile cut line (see page 7) Use 1x Screw A and batten buddy 35mm See template! WARNING - Ensure screw penetrates batten buddy if hidden under flexible flashing

35 Square the starter rail 3000mm 1800mm 2400mm Top edge of bottom row of tiles Tip Square to the bottom row of tiles using the 3,4,5 rule Start 25

36 Screw starter rail to battens and mark position 26 Mark position of starter rails on battens Do not screw through top 90mm Screw to 5 battens using screw A and batten buddies WARNING - Do not screw through the! top 90mm of the starter rail fixing tray

37 Prepare first right perimeter To avoid the perimeter from damaging the flexible flashing the end needs to be folded at an angle 1. Use tin snips to cut along 70mm perforated section 2. Fold bottom section up 3. Fold side section back 70mm 27

38 28 Fit right perimeter and fix using perimeter clips Align top of perimeter like this Perimeter clips (x3) using screw C 3 perimeter clips must be used, one at the top, one at the bottom and one in the middle of the perimeter! WARNING Do not pierce right perimeter. This is a weather protection component, piercing may lead to leakage

39 Lay foam Starter rail Tile Right perimeter Foam Lip If possible, position foam in the highest point on the tile 29

40 Replace tiles mm Gap Replace tiles over perimeter, lip on perimeter may need to be flattened by hand to stop tiles kicking up. Remove interlock from tiles.! WARNING Tiles must be replaced in accordance with BS 5534:2014

41 Check panel cables Panel must be returned if cables are damaged Electrical installation must be in accordance with the national regulations of the country where the installation shall be installed! WARNING Panels are live, they cannot be switched off 31

42 Fit panel 32 Ensure panel is fully engaged Align bottom of panel with bottom of perimeter Use float to square panel to bottom row of tiles

43 Screw panel to all battens Screw to 5 battens using screw A and batten buddies. Do not screw through top 90mm of fixing tray Screw through drill line Tip Move the cables to one side so they can be accessed easily! WARNING - Panel must be screwed to at least 5 battens. If battens are spaced more than 330mm apart additional battens must be added (see page 10). Do not over torque screws. Ensure screw penetrates batten buddy. 33

44 Fit corner, slide into right perimeter 34 If array is only 1 row tall skip to page 43

45 Fit next starter rail Screw to 5 battens using screw A and batten buddies. Screw through drill line. Bottom of next starter rail should align with the perimeter corner clip slot! WARNING - Panel must be screwed to at least 5 battens. If battens are spaced more than 330mm apart additional battens must be added (see page 10) 35

46 Fit next right perimeter 36 Perimeter clips (x3) using screw C 3 perimeter clips must be used, top, middle and bottom.

47 Fit foam Ensure end of foam strips meet 37

48 Replace tiles 38! WARNING Tiles must be replaced in accordance with BS 5534:2014

49 Fit panel, consider wiring to previous panel There is 10mm of adjustment within the joint. Use this float to square panel. Tip Move the cables to one side so they can be accessed easily 39

50 40 Screw to battens using Screw A and batten buddies. Screw through drill line. DO NOT SCREW to bottom batten until step on page 52! WARNING - Panel must be screwed to at least 5 battens. If battens are spaced more than 330mm apart additional battens must be added (see page 10)

51 If array is more than 2 rows tall repeat steps to top of column Fit next corner (see 34) Fit next starter rail using screw A and batten buddies (see 35) 41

52 42 Fit next right perimeter (see 36) Fit foam and replace tiles (see 37 and 38) Fit next panel (see 39)

53 Screw batten for top perimeter Top edge of panel 180mm Batten must start and finish on a rafter Use existing batten if possible 43

54 Fit last right corner and slide into right perimeter 44! WARNING Tiles must be replaced in accordance with BS 5534:2014

55 Fit foam and replace tiles on right side! WARNING Tiles must be replaced in accordance with BS 5534:

56 Fit top perimeter 46 Ensure it fully engages Align vertically with PV panel. If needed, use 3x wedges to level tiles. Top perimeter Tile Wedge Added batten Panel Batten Rafter Correct tile angle

57 Screw top perimeter to batten using guide holes If not using a wedge use Screw C 20mm If using a wedge use Screw D 30mm! WARNING Do not pierce top perimeter. This is a weather protection component, piercing may lead to leakage 47

58 Fit foam over top perimeter 48

59 Apply foam and tile over top perimeter Don t tile over left most screw hole on top perimeter! WARNING - Tiles must be replaced in accordance with BS 5534:2014, ensure tile overlap is between a minimum of 170mm and a maximum of 250mm 49

60 Middle 50 Fit first panel on next column, consider wiring and screw to 5 battens Ensure panel is fully engaged and aligned with adjacent panel, use float to square panel Screw to 5 battens using screw A and batten buddies.! WARNING - Panel must be screwed to at least 5 battens. If battens are spaced more than 330mm apart additional battens must be added (see page 10)

61 Fit soak tray IF array is only 1 row tall skip to page 56 Slide soak tray under previous panel and align centrally with notch Ensure it fully engages with a Click! 51

62 Fully secure previous panel 52 Screw previous panel to final battens using screw A and batten buddy Screw through the soak tray if necessary

63 If array is more than 2 rows, continue up column Fit next panel, wire to previous Screw panel to battens using screw A and batten buddies Do not screw to bottom battens until installing panel on next column 53

64 54 Slide soak tray into position centrally align and Click! Screw previous panel to final battens using screw A and batten buddy If array is more than 3 rows repeat steps 53 and 54

65 Fit top panel & screw to battens Fit next panel, wire to previous Screw panel to battens using screw A Do not yet screw to bottom battens 55

66 Add extra batten if needed 56 see page 43 for more details! WARNING Batten must start and finish on a rafter

67 Slide in soak tray Slide soak tray under previous panel and align centrally with notch Ensure it fully engages with a Click! 57

68 Fit top perimeter and screw to batten 58 see pages 46 to 48 for more details

69 Fit foam and tile over top perimeter Repeat steps 50 to 59 stop before installing the first panel on the last column! WARNING Tiles must be replaced in accordance with BS 5534:

70 End 60 Prepare first left perimeter To avoid the perimeter from damaging the flexible flashing the end needs to be folded at an angle 1. Use tin snips to cut along 70mm perforated section 2. Fold bottom section up 3. Fold side section back 70mm

71 Fit next panel Screw to 5 battens using screw A and batten buddies. Stick flexible flashing to tiles once batten buddies on last module have been installed! WARNING - Panel must be screwed to at least 5 battens. If battens are spaced more than 330mm apart additional battens must be added (see page 10) 61

72 Fit soak tray and screw previous panel 62 Click! Screw previous panel to final battens using screw A and batten buddy

73 Fit left perimeter Perimeter clips (x3) using screw C 3 perimeter clips must be used, top, middle and bottom.! WARNING - Do not pierce left perimeter. This is a weather protection component, piercing may lead to leakage 63

74 Fit left corner, foam and replace tiles 64 Bend lip and cut tiles if required! WARNING Tiles must be replaced in accordance with BS 5534:2014

75 For arrays 2 or more rows tall continue up column Fit next panel, screw to 5 battens using batten buddies and screw A see page 61 for more details Fit next soak tray see page 62 for more details 65

76 66 Fit next left perimeter using 3 evenly spaced perimeter clips see page 63 for more details Fit left corner, foam and replace tiles. See page 64 for more details If array is more than 2 rows repeat steps 65 and 66

77 Fit final corner Add top batten if necessary 67

78 Fit final top perimeter and screw to batten 68

79 Fit foam and replace any remaining tiles to complete array! WARNING Tiles must be replaced in accordance with BS 5534:

80 Appendix 70 Earth bonding General If bonding or grounding is necessary then terminals should be attached in the pre-drilled grounding locations shown below in Figure G.1: (a single location or combination of the locations can be used.) Figure G.1 Top of panel A A B B Bottom of panel C C

81 Sunstation modules use an anodic oxide aluminium frame to resist corrosion therefore the frame of the modules may need to be connected to the equipment grounding connector to prevent lightning and static injury. For optimal performance it is recommended that the DC cathode of the modules array is connected to ground. Failure to comply with this requirement may reduce the performance of the system. Grounding connectors should be stainless steel studs or bolts with a suitable clamping arrangement of the correct size for the grounding cable being used. The grounding method must not result in direct contact of dissimilar metals with the aluminium frame of the modules that will result in galvanic corrosion. An addendum to UL standard 1703 Flat Plate Photovoltaic Modules and Panels recommends metal combinations not exceeded an electrochemical potential difference of 0.6 Volts. Toothed washers must be used on one side of the joint as shown in figure G.2 to ensure the surface of the oxide film is penetrated and a good electrical contact is made. The grounding locations are pre-drilled in the locations shown in the figure G.1 on page 64 and are marked with a grounding sign. DO NOTE DRILL ANY ADDITIONAL GROUNDING HOLES. 71

82 Method The grounding method between modules must be approved by a qualified electrician and the grounding device must be produced by qualified electrical manufacturer. Note: grounding components not supplied. A) Choose the applicable pre-drilled grounding hole (shown in Figure G.1) B) Thread the earth wire into earth connection tab and secure in place. The material and size of the grounding wire should meet the relevant requirements of the national, regional and local rule, law and standard. C) Arrange the components as shown in Figure G.2. D) Secure the earth connection tab in place by tightening the lock nut. The recommended torque of the locking nut is 2.0 Nm Nm. 72 Figure G.2 Order of M5 Components Ground bolt* M5 Earth connection tab for M5 bolt Earth wire Module Serrated / toothed washer Washer Locking nut M5 * The head of the ground bolt should not be deeper than 12mm as this may interfere with installation

83 Components Top perimeter Right corner Soak tray Left corner Right perimeter Starter rail PV panel Left perimeter Flexible flashing Flexible foam

84 Screw guide Screw A (must be used with batten buddy) Screw B Included washer must be used with screws A and B Screw C Screw D 20mm 30mm

85

86 +44 (0) Great Sutton Street London EC1V 0DF United Kingdom Item

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

C21e Plain Tile. Roof Installation Guide & Warranty. For new builds and re-roofing with C21 solar electric plain tile type M50-S39

C21e Plain Tile. Roof Installation Guide & Warranty. For new builds and re-roofing with C21 solar electric plain tile type M50-S39 Roof Installation Guide C21e Plain Tile For new builds and re-roofing with C21 solar electric plain tile type M50-S39 On completion, please return the outer front and back page to the commissioning electrician

More information

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG 016 V1 SERAPHIM ECLIPSE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG ROAD NO. 1-. TELEPHONE: +86-519-8877608 FAX: +86-519-88786181 MAILBOX: info@seraphim-energy.com

More information

YINGLI SOLAR TWINMAX MODULES Installation and User Manual

YINGLI SOLAR TWINMAX MODULES Installation and User Manual YINGLI SOLAR TWINMAX MODULES Installation and User Manual Revision Date Aug 3rd, 2016 Applicable for IEC certified products This manual applies to photovoltaic TwinMAX modules ( TwinMAX modules, also commonly

More information

PITCHED ROOF. Photovoltaic Mounting Systems. Assembly Instructions. for roofing tiles, plain tiles and slate

PITCHED ROOF. Photovoltaic Mounting Systems. Assembly Instructions. for roofing tiles, plain tiles and slate Photovoltaic Mounting Systems Assembly Instructions PITCHED ROOF for roofing tiles, plain tiles and slate S:FLEX GmbH 09/2017 / design and engineering is subject to change 1 Index 1 Introduction 1.1 Intended

More information

SoliTek PV Modules INSTALLATION MANUAL

SoliTek PV Modules INSTALLATION MANUAL SoliTek PV Modules INSTALLATION MANUAL Version: 16 10 14 According to: IEC 61215 IEC 61730 For: SOLID PRO 300-310 W p SOLID PRO 250-260 W p SOLID PRO 150-160 W p Thank you for choosing SoliTek panels.

More information

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series

More information

On-roof system Tau Installation manual

On-roof system Tau Installation manual On-roof system Tau Installation manual 810-0052 Table of Contents 1 Introduction 1 1.1 Short description 1 1.2 Intended use 1 1.3 Standards and guidelines 1 1.4 About these instructions 1 Tau The innovative

More information

YINGLI SOLAR PANDA BIFACIAL MODULES Installation and User Manual

YINGLI SOLAR PANDA BIFACIAL MODULES Installation and User Manual YINGLI SOLAR PANDA BIFACIAL MODULES Installation and User Manual Revision date Jan. 15th, 2018 Applicable for IEC certified products The third edition This manual applies to photovoltaic PANDA BIFACIAL

More information

Field Connector for simple installation. Floating Perimeter detail. Field Connector. Perimeter & XL Connector

Field Connector for simple installation. Floating Perimeter detail. Field Connector. Perimeter & XL Connector mm M0-.5 Turnbuckle connections to structural steel 30mm Perimeter Extrusion Simple supported 4 screw assembly and vertically supported flanged grid 750 Montevideo Road Tel (40)799-4200 Main Runner with

More information

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR

ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR ON-ROOF ATTACHMENT FLAT COLLECTOR HELIOSTAR INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements Generel requirements The on-roof attachment set is capable for installation of

More information

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev MANUAL EN MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES mounting system for pitched roof with tiles for solar panels in landscape setup ESDEC BV 2016 TABLE OF CONTENT 1. Introduction 1 2. General installation

More information

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West Exposition East West CONTENTS 1 Notes on the Sika SolarMount 1 system (Exposition East West) for PV solar arrays 3 2 Setting up on site 3 3 Required Tools for mounting Sika SolarMount 1 to Sika roofing

More information

INSTALLATION INSTRUCTIONS ENGLISH

INSTALLATION INSTRUCTIONS ENGLISH INSTALLATION INSTRUCTIONS ENGLISH Safety instructions 04 General notes 07 Material & tool requirements 08 System overview 10 installation of CREODUR 11 Maintenance 22 04 INTENDED USE Creotecc mounting

More information

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560 Installation Guide Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560 Rev 1.0, September 2017 Sales: 740-249-1877 Sales@EcolibriumSolar.com Field Support:

More information

YINGLI SOLAR PV MODULES Installation and User Manual

YINGLI SOLAR PV MODULES Installation and User Manual YINGLI SOLR PV MODULES Installation and User Manual Revision Date pr 19th, 2016 pplicable for IEC certified products This manual applies to photovoltaic modules ( PV modules, also commonly known as solar

More information

Mounting instructions

Mounting instructions Mounting instructions novotegra for tile roofs top-fix I TABLE OF CONTENTS 1 Notes... 1 2 Maintenance of the mounting system... 3 3 novotegra for tile roofs... 3 4 System components, tools and equipment...

More information

GroundTrac. Installation Manual

GroundTrac. Installation Manual APPLICATION: The GroundTrac system is designed with a minimum amount of installed footings at greatly reduced labor. The system integrates with ordinary 1-1/2 schedule #40 galvanized water pipe. This ground

More information

Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For POWER-STRUT Mounting System only

Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For POWER-STRUT Mounting System only Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For POWER-STRUT Mounting System only Please read carefully before installing. Burndy LLC recommends that the sufficient details

More information

Grant Solar Thermal Systems

Grant Solar Thermal Systems Grant Solar Thermal Systems On-Roof, Flat Roof and In-Roof Systems Installation and User Instructions UK DOC 0073 Rev 1.0 May 2017 System Options Grant Sahara with a Bronze anodized frame, this blends

More information

INSTALLATION GUIDE.

INSTALLATION GUIDE. INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Canyon Shake counter batten

More information

Clenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170

Clenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170 Clenergy ezrack SolarRoof Code-Compliant Planning and Installation With Australia AS/NZS1170 The ezrack has been developed as a universal system for roof-mounting on pitched roofs. The use of patented

More information

TRAPEZOIDAL SHEET METAL RAIL

TRAPEZOIDAL SHEET METAL RAIL Photovoltaic Mounting Systems Assembly Instructions TRAPEZOIDAL SHEET METAL RAIL Mounting system for roofing with trapezoidal sheet metal S:FLEX GmbH 09/2017 / design and engineering is subject to change

More information

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal

ST-AK 1/12. Photovoltaic Mounting Systems. Assembly Instructions. Mounting system for roofing with trapezoidal sheet metal Photovoltaic Mounting Systems Assembly Instructions ST-AK 1/12 Mounting system for roofing with trapezoidal sheet metal S:FLEX GmbH 09/2017 / design and engineering is subject to change 1 Index 1 Introduction

More information

ifix INSTALLATION MANUAL PV flat roof installation system Version

ifix INSTALLATION MANUAL PV flat roof installation system Version ifix PV flat roof installation system INSTALLATION MANUAL Version 2012-09-06 ifix Installation Manual Version 2012-09-06 Seite 1 Table of contents Table of contents... 1 Special characteristics of ifix...

More information

Installation Guide for Imerys Large Format PVt 60 Photovoltaic Panel

Installation Guide for Imerys Large Format PVt 60 Photovoltaic Panel Installation Guide for Imerys Large Format PVt 60 Photovoltaic Panel Innovation for sustainable homes CONTENTS 1 INTRODUCTION AND PRODUCT DESCRIPTION 3 2 FIXING RECOMMENDATIONS AND CONSIDERATIONS 4 3 TECHNICAL

More information

ALLMET CONTINENTAL INSTALLATION GUIDE

ALLMET CONTINENTAL INSTALLATION GUIDE ALLMET CONTINENTAL INSTALLATION GUIDE www.allmet.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Allmet Continental

More information

Pacific Tile Counter Batten and Batten

Pacific Tile Counter Batten and Batten Pacific Tile Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation

More information

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics

Permitting and Inspecting PV Systems. PV Codes and Standards 101. Photovoltaic System Basics Permitting and Inspecting PV Systems Presented by Bill Brooks, PE Brooks Engineering PV Codes and Standards 101 What are the applicable codes and standards for PV systems? Electrical codes - NEC Article

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS S-DOME SYSTEM GB TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 3 4 5 8 9 Table

More information

For Silverback Solar

For Silverback Solar Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Silverback Solar Please read carefully before installing. Wiley Electronics recommends that the sufficient details of

More information

mounting systems applications overview

mounting systems applications overview mounting systems applications overview catalogue version January 2015 tritec mounting systems: overview of applications i. pitched roof: roof-top 1. Tiles, shingles and corrugated panels 1.1 TRI-STAND

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

Mounting instructions. novotegra for trapezoidal metal - roof parallel

Mounting instructions. novotegra for trapezoidal metal - roof parallel Mounting instructions novotegra for trapezoidal metal - roof parallel I TABLE OF CONTENTS 1 Notes... 1 2 Maintenance of the mounting system... 3 3 novotegra for trapezoidal metal - roof parallel... 3 4

More information

Specification Lightning Protection Systems

Specification Lightning Protection Systems Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and

More information

technical drawings Cutted roof tile Levelling batten Plasma roof tile Plasma eave tile (without ribs on the lower side) C Metalic batten Linkage tile

technical drawings Cutted roof tile Levelling batten Plasma roof tile Plasma eave tile (without ribs on the lower side) C Metalic batten Linkage tile technical drawings Straight bond Cross bond Cutted roof tile Levelling batten 1 Plasma eave tile (without ribs on the lower side) C Metalic batten Linkage tile Omega batten 2 Barge tile right Gable left

More information

660 Volts 630 & 800AMP

660 Volts 630 & 800AMP Ergon Energy Corporation Limited Technical Specification for Switch- Disconnectors and Fuse-Switch- Disconnectors 660 Volts 630 & 800AMP ETS-06-02-01 Check this is the latest Process Zone version before

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

INSTALLATION INSTRUCTIONS ENGLISH

INSTALLATION INSTRUCTIONS ENGLISH INSTALLATION INSTRUCTIONS ENGLISH Safety instructions 04 General notes 07 Material & tool requirements 08 System overview 10 installation of ALUTEC 12 Maintenance 27 04 INTENDED USE Creotecc mounting

More information

FOR JA Solar PHOTOVOLTAIC MODULES

FOR JA Solar PHOTOVOLTAIC MODULES 1.1 INSTALLATION MANUAL FOR JA Solar PHOTOVOLTAIC MODULES JAP6(DG)-60***/3BB/1500 series, 245 to265 in increment of 5 JAM6(DG)-60***/1500V series, 250 to 270 in increment of 5 JAM6(K)(DG)-60***/4BB/1500

More information

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA TABLE OF CONTENTS TABLE OF CONTENTS SAFETY REGULATIONS MATERIALS REQUIRED ASSEMBLY ENGINEERING DRAWINGS TERMS AND CONDITIONS

More information

Flat roof for the loading-optimized elevation (adhesive system)

Flat roof for the loading-optimized elevation (adhesive system) Mounting systems Flat roof for the loading-optimized elevation (adhesive system) FLAMONT Production I Professional wholesale Adhesive mounting without roof penetration no weight easy to install low price

More information

SolarStyl BIPV New Building Integrated Photovoltaic System August V13 Page 0

SolarStyl BIPV New Building Integrated Photovoltaic System August V13 Page 0 SolarStyl BIPV New Building Integrated Photovoltaic System 2010 August V13 Page 0 By ArcelorMittal Stainless & Nickel Alloys SolarStyl Frame for BIPV Systems To simplify photovoltaic roof and facade design.

More information

rec Peak energy modules

rec Peak energy modules Installation manual rec Peak energy modules For installations according to UL 1703 Contents Table of figures 2 INTRODUCTION 3 How to use THIS MANual 3 YOUR RESPONSIBILITY as AN INSTALLER 3 SUPPORT 3 LIABILITY

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL INFORMATION SECTION 07320 TWO-PIECE TAPERED MISSION CLAY ROOFING TILE PART 1 GENERAL 1.01 SECTION INCLUDES A. Formed clay roofing tiles, complete with components and other required accessories

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16 long / 1/2 thick or 16 oz. copper Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Modular CABANA Kit 16 x 16 (6x6) Hipped Roof & Build-in Transoms Entry Key Lock Set (bright brass or dark bronze)

More information

PM200M00 PM245P00 PM250M01 PM300P00 PM318B00 PM318B01 PM096B00. Version 1.1

PM200M00 PM245P00 PM250M01 PM300P00 PM318B00 PM318B01 PM096B00. Version 1.1 BenQ Solar Photovoltaic Modules Installation Guide (IEC, ETL) PM200M00 PM245P00 PM250M01 PM300P00 PM318B00 PM318B01 PM096B00 Version 1.1 Note: The content of this manual is subject to change without notice.

More information

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. S-Dome 2.0 System.

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. S-Dome 2.0 System. Mounting systems for solar technology ASSEMBLY INSTRUCTIONS S-Dome 2.0 System www.k2-systems.com Content T Tools overview 3 T General safety information 4 T Required Materials 6 T Assembly 9 T Notes QUALITY

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used for

More information

SECTION METAL ROOF PANELS

SECTION METAL ROOF PANELS SECTION 07 41 13 PART 1 GENERAL 1.1 SECTION INCLUDES A. Standing-seam roof panels. B. Metal roofing accessories. 1.2 RELATED SECTIONS A. Section 07 62 00 - Sheet Metal Flashing. B. Section 07 72 00 - Roof

More information

ValkPro+ Installation manual. Van der Valk Solar Systems. Use in combination with the Project Report of the ValkPVplanner. Solar Mounting Systems

ValkPro+ Installation manual. Van der Valk Solar Systems. Use in combination with the Project Report of the ValkPVplanner. Solar Mounting Systems ValkPro+ Installation manual Use in combination with the Project Report of the ValkPVplanner Version 14 EN Van der Valk Solar Systems Solar Mounting Systems Please Note Table of contents This manual is

More information

Mounting System MCG 1.1 Membrane-Connected Glass. System description

Mounting System MCG 1.1 Membrane-Connected Glass. System description Mounting System MCG 1.1 Membrane-Connected Glass System description SUNOVA MCG 1.1 System Fields of application: Not suitable for: (please inquire for other SUNOVA systems) The SUNOVA MCG system is a lightweight

More information

Mounting System MCG 3.0 Membrane-Connected Glass. System description

Mounting System MCG 3.0 Membrane-Connected Glass. System description Mounting System MCG 3.0 Membrane-Connected Glass System description SUNOVA MCG 3.0 System Fields of application: Not suitable for: (please inquire for other SUNOVA systems) The SUNOVA MCG 3.0 system is

More information

INSTALLATION USE AND MAINTENANCE MANUAL OF MICRON PHOTOVOLTAIC MODULES by CAPPELLO ALLUMINIO

INSTALLATION USE AND MAINTENANCE MANUAL OF MICRON PHOTOVOLTAIC MODULES by CAPPELLO ALLUMINIO INSTALLATION USE AND MAINTENANCE MANUAL OF MICRON PHOTOVOLTAIC MODULES by CAPPELLO ALLUMINIO Index 03 Introduction Disclaimer Warranty certificate of Micron photovoltaic modules by Cappello Alluminio General

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

Prospective Construction Systems for Mass Housing

Prospective Construction Systems for Mass Housing Prospective Construction Systems for Mass Housing TECHNOLOGY PROFILE Light Gauge Steel Framed Structures (LGSF) Building Materials & Technology Promotion Council Ministry of Housing & Urban Poverty Alleviation

More information

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets Seismic Frame Two-Post Rack Page 11-3 Seismic Protection Products - Racks Page 11-6 Seismic Protection Products - Runway Page 11-8 Seismic

More information

BILLION POWER. Your one stop Supplier for all kinds of Solar Modules and BOS. Scan this quickmark,to visit our website.

BILLION POWER. Your one stop Supplier for all kinds of Solar Modules and BOS. Scan this quickmark,to visit our website. BILLION POWER Your one stop Supplier for all kinds of Solar Modules and BOS. BAODI NG BILLION POWER TECHNOLOGY CO.,LTD Website:www.billionpower.cn Email: info@billionpower.cn Scan this quickmark,to visit

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES WITH PLASTERBOARD GTEC THERMAL BOARD 1 BUILDING INSULATION THE REGULATIONS Building regulations are in place to drive improvements in thermal efficiency,

More information

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. SpeedRail System.

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. SpeedRail System. Mounting systems for solar technology ASSEMBLY INSTRUCTIONS SpeedRail System www.k2-systems.com Content TTTools overview 3 TTGeneral safety information 4 TTGuidelines 5 TTComponents: Portrait assembly

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95

ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95 ROOFING APPLICATION STANDARD (TAS) No. 102(A)-95 TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MECHANICALLY ATTACHED, CLIPPED, RIGID, ROOF SYSTEMS (For Methods of Mechanical Attachment Excluding Clips,

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

Installation instructions

Installation instructions Installation instructions IBC AeroFix Date: 30-Jun-2015 1 Contents 0. Introduction... 3 01. Tool list... 4 02. General information, standards and regulations... 4 03. System variants... 8 04. Technical

More information

moment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web:

moment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web: CrossRail48SConnector RE: CrossRail48SConnectorEvaluation DesignReferenceDocuments MinimumDesignLoadsforBuildingsandOtherStructures 2010AluminumDesign MetalCurtainWallFasteners Overview Methods&DesignParameters

More information

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS US-HXRACK-IM-002 ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS Read all instructions carefully and observe all warnings before installation. See Installation, Operation

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PP-01-KSV PANEL PROFILES CS-PP-02-KSV PANEL PROFILES CS-PP-03-KSV PANEL PROFILES CS-PJ-01-KSV KS SERIES EXPANDED PANEL JOINT CS-PJ-02-KSV KS SERIES ENGAGED PANEL JOINT CS-PJ-03-KSV

More information

Installation Instruction photovoltaic modules E-PV 250W on the flat roof or fundation 10/2013 Get acquainted before the installation.

Installation Instruction photovoltaic modules E-PV 250W on the flat roof or fundation 10/2013 Get acquainted before the installation. Installation Instruction photovoltaic modules E-PV 250W on the flat roof or fundation 10/2013 Get acquainted before the installation. 1. General information Lightning Protection System In case of LPS we

More information

J41 Reinforced bitumen membrane roof coverings

J41 Reinforced bitumen membrane roof coverings J41 Reinforced bitumen membrane roof coverings To be read with Preliminaries/General conditions. A comprehensive waterproofing system comprising two reinforced bituminous membranes fully adhered to thermal

More information

Metafor Panel System Installation Guide

Metafor Panel System Installation Guide Installation Guide innovative cladding design solutions Product Description Universal Flashing Kit Supplemental Guide for VM Pro-Zinc Training To enroll in a VM PRO-ZINC Training Course contact: UMICORE

More information

Installation manual. rec TwinPeak SERIEs. For the installation of REC TwinPeak Series solar panels certified according to IEC / 61730

Installation manual. rec TwinPeak SERIEs. For the installation of REC TwinPeak Series solar panels certified according to IEC / 61730 Installation manual rec TwinPeak SERIEs For the installation of REC TwinPeak Series solar panels certified according to IEC 61215 / 61730 Contents Contents 2 Table of figures 2 INTRODUCTION 3 How to use

More information

Air flue duct for use with ecotec boilers

Air flue duct for use with ecotec boilers For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions.

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions. Axiom www.hsiheadwalls.com SURFACE MOUNTED ARRAY Patient Headwall Installation Instructions Installation Guidelines Tel: 925.427.7800 Fax: 925.427.0800 support@hsiheadwalls.com Hospital Systems Inc. 750

More information

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017]

SLATE ROOFING INSTALLATION PROPOSAL [Last updated 10/08/2017] [Change these specifications as needed. Use this sample proposal at your own risk. This is a simple, general proposal and is not meant to be a comprehensive proposal for all situations or projects. If

More information

Tremline. Fascia System. Installation Procedures

Tremline. Fascia System. Installation Procedures Tremline Fascia System Installation Procedures 5 TOP CAP MITERED TOP CAPS JOINT PLATE RIGHT-HAND END CAP PREFAB OUTSIDE CORNER 10 FASCIA FASCIA HOLDER 10 FASCIA CLAMPING RING DECK BRACKET SCUPPER PREFAB

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,

More information

Industry Standard Terms & Definitions Of The Steel Deck Institute

Industry Standard Terms & Definitions Of The Steel Deck Institute Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck

More information

Schüco Mounting System MSE 210 Mounting on trapezoidal roofing

Schüco Mounting System MSE 210 Mounting on trapezoidal roofing Solar products Schüco Mounting System MSE 210 Mounting on trapezoidal roofing English Schüco Installation instructions: Installation instructions: MSE 210 trapezoidal roof Art. No. 259 713 08.2009-02 Printed

More information

Chapter 7. Roof Framing

Chapter 7. Roof Framing Chapter 7. Roof Framing 7.1 ROOFING PREP WORK 7.2 INSTALLING ROOF TRUSSES 7.3 INSTALLING PORCH TRUSSES 7.4 SHEATHING ROOF 7.5 INSTALLING SUB-FASCIA 7.6 BUILDING AND INSTALLING SCUTTLE BOX 7.7 INSTALLING

More information

B5 for garages, equestrian and other single storey buildings

B5 for garages, equestrian and other single storey buildings Cl/SfB l (4-) l Nf9 l March 2017 l B5 for garages, equestrian and other single storey buildings Corrugated sheet and accessories www.cembrit.co.uk Cembrit companies have been manufacturing corrugated sheets

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

All panels can be supplied in a range of styles, to suit the applications pictured below.

All panels can be supplied in a range of styles, to suit the applications pictured below. Evolution Radiant panel system LPHW up to 90 C Suspended ceiling grid or soffit mounting Vertical wall surface mounting Standard widths 150mm to 900mm 1 Description Introduction Evolution by Dunham-Bush

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

Three-sided barrier compliant to DIN EN ISO Depending on location, design also as wind protection. Clear height (DH) Three-sided barrier

Three-sided barrier compliant to DIN EN ISO Depending on location, design also as wind protection. Clear height (DH) Three-sided barrier of 5 Page Car SingleVario 06 Stack Parker 06 50 for vehicle up to 5.00 m = 6 long (50 for vehicle up to 5.0 m 7 long) Depending on location, design also as wind protection. Product Data CONFORMITY 06/06/G63

More information

Mounting System MCG 3.0 Membrane-Connected Glass. System description

Mounting System MCG 3.0 Membrane-Connected Glass. System description Mounting System MCG 3.0 Membrane-Connected Glass System description SUNOVA MCG 3.0 System Fields of application: Not suitable for: (please inquire for other SUNOVA systems) The SUNOVA MCG 3.0 system is

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. D-Dome System.

Mounting systems for solar technology ASSEMBLY INSTRUCTIONS. D-Dome System. Mounting systems for solar technology ASSEMBLY INSTRUCTIONS D-Dome System www.k2-systems.com Content TTTools overview 3 TTGeneral safety information 4 TTRequired Materials 6 TTAssembly 9 TTNotes 17 QUALITY

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 095133 - ACOUSTICAL METAL PAN CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE Environmental StoneWorks specification guideline should be used to assist design professionals in the preparation of projects. Edit and delete items that may not be applicable. Verify all referenced section

More information

ZS880 Linear Shower Drain Installation Instructions

ZS880 Linear Shower Drain Installation Instructions Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

Siding and Soffit Installation Guidelines

Siding and Soffit Installation Guidelines Siding and Soffit Installation Guidelines email web phone 07 46 16 Longboard Siding & Soffit INTRODUCTION INSTALLATION GUIDELINES NOTE: These instructions are prepared for persons experienced in the field

More information