1 AGENDA ITEM NO. 3.g REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: September 28, 2010 SUBJECT: AWARDING A CONSTRUCTION CONTRACT FOR THE 2010 SURFACE SEAL PROGRAM, RFB #2211, TO VALLEY SLURRY SEAL COMPANY OF WEST SACRAMENTO, AS THE LOWEST RESPONSIBLE BIDDER IN THE AMOUNT OF $519, FOR THE BASE BID AND 2 BID ALTERNATES Report in Brief The Public Works and Engineering Department performs annual Pavement Maintenance Programs on the City s residential, arterial and collector streets. Included in these programs is the annual Street Surface Seal Program. Staff recommends that the City Council award the contract for the 2010 Surface Seal Program, RFB #2211, to Valley Slurry Seal Company of West Sacramento, as the lowest responsible bidder in the amount of $519, for the Base Bid and 2 Bid Alternates. Background The Street Surface Seal Program is one of the annual street preventative maintenance programs. An asphalt rubber cape seal is one of the strategies incorporated into the City s Pavement Management System to ensure an adequately maintained street system. Typically, the City has only used slurry seal as the preventative maintenance treatment to extend the life of asphalt pavement, as it can increase the time by five to seven years before a pavement overlay or reconstruction project is necessary. Because it is good practice to interchange between slurry and cape seal, this year cape seal will be applied. Cape seals extend the life of asphalt pavement even longer than slurry due to the rubberized give; they can add up to ten years of life to a roadway. An asphalt rubber cape seal is a two step process that starts with the application of an asphalt rubber seal coat followed by an application of a slurry seal coat. Slurry seal consists of an application of a mixture of asphaltic emulsion, latex, aggregate, and water over the existing pavement. Slurry is applied by a specialized machine mounted on a large truck, where the materials are mixed and applied in one continuous operation. The machine can apply slurry in various widths while the thickness typically varies from 1/8 to 1/4 inch. Preparatory work consists of the repair of failed areas by patch paving contractors in addition to skin patching and crack sealing by City crews. Slurry seal fills small cracks, results in a new wearing surface, and provides an excellent seal against the damaging effects of water intrusion into the pavement.
2 AWARDING A CONSTRUCTION CONTRACT FOR THE 2010 SURFACE SEAL PROGRAM, RFB #2211, TO VALLEY SLURRY SEAL COMPANY OF WEST SACRAMENTO, AS THE LOWEST RESPONSIBLE BIDDER IN THE AMOUNT OF $519, FOR THE BASE BID AND 2 BID ALTERNATES September 28, 2010 Page 2 The Street Surface Seal Program also includes the removal of existing pavement markers and thermoplastic stripes and legends; and the placement of temporary pavement delineators during the slurry seal operation, followed by use of permanent traffic striping, legends, and pavement markers. The striping, legends and pavement markers are included as part of this contract because it is more cost-effective and efficient for the contractor to perform this work on long stretches of arterial and collector streets rather than by City crews. This strategy also allows the City signs and markings crews to keep up with their regularly scheduled traffic maintenance work. As bid, the 2010 Surface Seal Program consists of a cape seal with isolated dig-outs on Glazier Drive; Glazier Court; Thornwood Drive; Candlewood Court, Stillwater Court and Willow Pass Road from Landana Road to the City Limits. Alternate 1 consists of cape seal on Solano Way between Marsh Drive and Broadmoor Avenue. Alternate 2 consists of dig outs on Pine Hollow Road between Ygnacio Valley Road the City Limits. Bids were opened at 10:00 a.m. on Friday, September 3, Two (2) bids were received, ranging from $519, to $891,452.30, as shown on the Bid Summary (Attachment 1). The Engineer s Estimate was $883, for the Base Bid and both Bid Alternates. Valley Slurry Seal Company of West Sacramento submitted the low bid of $519, Discussion Valley Slurry Seal Company s low bid of $519,528.52, is approximately 41% lower than the Engineer s Estimate of $883, Staff contacted the low bidder to obtain confirmation of their bid amount. Valley Slurry Seal confirmed that they are comfortable with their bid and ready to perform the work as bid. While Valley Slurry Seal s bid is 41% lower than the Engineer s Estimate, many of the contract line items are heavily dependent on the market price of oil products including asphalt concrete for the dig-outs. With the extremely favorable bid, staff recommends increasing the project scope by contract change order. Through Street Saver, our street maintenance database program, staff is evaluating an increase in the number of streets to be included in this year s program by an additional 25% or approximately $125,000, based on the bid amount. Valley Slurry Seal Company possesses a proper and valid contractor s license, and has provided satisfactory references. Valley Slurry Seal has successfully completed similar projects, including the 2008 and 2009 Surface Seal Programs. Based on the foregoing information, staff recommends that the City Council award a construction contract to Valley Slurry Seal Company as the lowest responsible bidder for 2010 Surface Seal Program, RFB #2211. The project schedule calls for beginning construction in October 2010, and completing the work in November 2010.
3 AWARDING A CONSTRUCTION CONTRACT FOR THE 2010 SURFACE SEAL PROGRAM, RFB #2211, TO VALLEY SLURRY SEAL COMPANY OF WEST SACRAMENTO, AS THE LOWEST RESPONSIBLE BIDDER IN THE AMOUNT OF $519, FOR THE BASE BID AND 2 BID ALTERNATES September 28, 2010 Page 3 Fiscal Impact The Street Preventative Maintenance Program is funded through Gas Tax, Proposition 111, and Measure C revenue. The available budget for the 2010 Surface Seal Program is sufficient to fully fund the work. Public Contact Twelve (12) potential bidders, fourteen (14) builder exchanges, and the Concord Chamber of Commerce were solicited in the aforementioned bid process. Notice of this bid was published in the Contra Costa Times newspaper August 16 and August 21, 2010; and posted in the Finance Department lobby and on the City s website. Residents on streets scheduled to be cape sealed will receive letters ahead of time that describe the program and will also be advised of the work schedule by barricade postings and door hangers a few days prior to their street being cape sealed. Recommendation for Action Staff recommends that the City Council award the contract for the 2010 Surface Seal Program, RFB #2211, to Valley Slurry Seal Company of West Sacramento, as the lowest responsible bidder in the amount of $519, for the Base Bid and 2 Bid Alternates. Prepared by: Danea Gemmell, PE Acting City Engineer Dept. of Public Works and Engineering Danea.Gemmell@ci.concord.ca.us Daniel E. Keen City Manager Dan.Keen@ci.concord.ca.us Attachment 1: Bid Results Cape Seal Program
4 Attachment No. 1 MEMORANDUM September 20, 2010 TO: FROM: Dan Sequeria Associate Civil Engineer Anita Bell-Karno Purchasing Agent SUBJECT: RFB # Pavement Maintenance Project Twelve (12) potential bidders, fourteen (14) builder exchanges, and the Concord Chamber of Commerce were solicited of the aforementioned solicitation. Notice of this bid was published in the Contra Costa Times newspaper August 16 and August 21, 2010; and posted in the Finance Department lobby. The bid document was also posted on the City s website. Addendum No. 1 was issued September 1 and faxed to all known potential bidders. It was also posted in the Finance Department lobby and on the City s website. Friday, September 3, 2010, at 10:00 a.m. submitted bids were publicly opened by the City Clerk. Two submittals were received. The bid tabulation is attached. Both submittals were reviewed for completeness and math errors. Both submittals are complete and correct. According to the State of California Contractors State License Board s website, both bidders possess current and active Contractor s license and in the classification specified. Copies of the submittals are being sent to you via in-house mail for your review. As provided in the solicitation document, award is to be made on the base bid. Valley Slurry Seal Company of West Sacramento, California is the apparent low bidder. Please contact me if there are any questions. Attachment cc: File AB-K/ab-k
5 Attachment No. 1 RFB # PAVEMENT MAINTENANCE PROJECT DETAILED BID RESULTS Total Bidder Base Bid Alternate No. 1 Alternate No. 2 Valley Slurry Seal $299, $143, $77, Co West Sacramento, CA $515, $244, $131, Base Bid Detailed Tabulation (Unit Price) Valley Slurry Seal Co $5, $35, $0.57 $2.69 $11, $38, $1.10 $4.00 Alternate No. 1- Detailed Tabulation (Unit Price) Valley Slurry Seal Co $4, $ $12, $ Alternate No. 2- Detailed Tabulation (Unit Price) Valley Slurry Seal Co $4, $25, $1.94 $8, $23, $4.00
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationStanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings
SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2
More informationREPORT TO MAYOR AND COUNCIL
AGENDA ITEM NO. 3.i REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: July 24, 2012 SUBJECT: AWARD A CONSTRUCTION CONTRACT IN THE AMOUNT OF $165,862.60 TO (FUNDED BY: SEWER ENTERPRISE
More informationRequest for Proposal: Due October 11, :00 pm
Remove and replace approx. 6000 sq. ft. of asphalt, clean and tack 1200 sq. ft. of low spots, seal coat and stripe parking lot at 1030 Temple Ave Camarillo, CA 93010 Request for Proposal: Due October 11,
More informationAGENDA ITEM NO. June 6, 2017
DocuSign Envelope ID: 7CA39164-0C90-42A5-B40D-ED361AA88939 AGENDA ITEM NO. June 6, 2017 May 23, 2017 Honorable Board of Supervisors County of Alameda 1221 Oak Street, Suite 536 Oakland, CA 94612-4305 Dear
More informationCONTRACTOR S PROPOSAL FISCAL YEAR STREET IMPROVEMENT PROJECT AND MAIN STREET BRIDGE REHABILITATION
CONTRACTOR S PROPOSAL COMPANY ADDRESS CITY, STATE, ZIP ( ) TELEPHONE NUMBER City of Hesperia 9700 Seventh Avenue Hesperia, CA 92345 Ladies and Gentlemen: STATE LICENSE NUMBER Pursuant to the Public Notice
More informationPAVEMENT MANAGEMENT REPORT 2011
PAVEMENT MANAGEMENT REPORT 2011 COUNTY OF RIVERSIDE TRANSPORTATION DEPARTMENT PAVEMENT MANAGEMENT REPORT Table of Contents Page Executive Summary Current Total Miles Current Road Network Condition. Current
More informationFlexible Pavement of Ohio
Flexible Pavement of Ohio 49 th Annual Meeting & Equipment Exposition Wednesday, March 9, 2011 Doug Davis, P.E., P.S. Muskingum County Engineer Zanesville, Ohio Roads are living and breathing organisms.
More information550 Surface Treatments
Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2
More informationHAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016
HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt
More informationDEPARTMENT OF PUBLIC WORKS ROAD OPERATIONS DIVISION REVIEW OF CONTRACT (A/B-118) ASPHALT RECYCLING, INC. APRIL 2000
DEPARTMENT OF PUBLIC WORKS ROAD OPERATIONS DIVISION REVIEW OF CONTRACT (A/B-118) ASPHALT RECYCLING, INC. APRIL 2000 Prepared by: April 24, 2000 The Honorable Carlton Henley Chairman The Board of County
More informationStudent Services & Classroom Addition
SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationBERKELEY STREETS: A PAVEMENT MANAGEMENT PROGRAM
Public Works Department BERKELEY STREETS: A PAVEMENT MANAGEMENT PROGRAM City Council Work Session November 15, 2011 Berkeley Streets: An Introduction Our streets today PRESENTATION OUTLINE 1. Berkeley
More informationMaintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments
Asphalt Pavement Preservation: Evaluation, Maintenance & Rehabilitation Maintenance & Rehabilitation Treatments Identification of Alternative Treatments Before selecting a treatment for a pavement, we
More informationCold Foam In-Place Recycling (CIR)
Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface
More information507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING
507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING
More informationSpecifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.
Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationWashington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26)
Washington State Department of Transportation Case Study Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Background Stretching the time between major rehabilitation projects can save
More informationSACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):
SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications
More informationSECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS
SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This
More informationPROPOSAL PACKET CITY OF MASCOUTAH HUNTERS TRAIL PAVING. BID DATE: 9:00 a.m., August 31, 2017
PROPOSAL PACKET CITY OF MASCOUTAH HUNTERS TRAIL PAVING BID DATE: 9:00 a.m., August 31, 2017 1. Proposal Packets and Specifications will be available in the office of the City Clerk, 3 West Main Street,
More informationTRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM
VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational
More informationANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore
More informationCarter Bridge to Brooks Street Design Build RFI Questions and Answers
1. Project Limits -- Nick Wyatt of Kokosing Construction Co., Inc The project criteria defines the project limits by listing 19 bridges. However, portions of these structures were very recently overlayed
More informationBid Form. To the Texas Department of Transportation hereinafter called the Agent.
Bid Form TxDOT CSJ No. 1809HILLS Project: 2017 Airport Improvements Project Description: Schedule 1 Base Bid: Rehabilitate and mark RW 16-34, partial parallel TW, stub TWs including run-up areas, terminal
More informationFinance & Technology Administrator (815) ext 223
2017 PAVING IMPROVEMENTS BID PACKET Due: Location: April 26, 2017 by 10:00 am Oregon Park District Fairgrounds Park 607 Fair Park Drive Oregon, IL 61061 Bid Proposal: 2017 Paving Improvements Administrative
More informationADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA
ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in
More informationPavement Preservation-ODOT Leading the Way
Ohio Township Association Topics Discussed Pavement Preservation-ODOT Leading the Way ODOT s new pavement preservation program How townships can take advantage of the new changes New specification information
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationPURCHASING DIVISION BOARD OF COUNTY COMMISSIONERS BROWARD COUNTY, FLORIDA. Terrazzo Floors at Concourse B, C and E ADDENDUM NO. 4
Addendum No. 4 Page 1 of 5 ATTENTION ALL POTENTIAL BIDDERS: PURCHASING DIVISION BOARD OF COUNTY COMMISSIONERS BROWARD COUNTY, FLORIDA Terrazzo Floors at Concourse B, C and E ADDENDUM NO. 4 DATE OF ADDENDUM:
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationCITY COMMISSION AGENDA MEMO May 15, Randy D. DeWitt, P.E., Assistant Director of Public Works for Water and Wastewater
CITY COMMISSION AGENDA MEMO May 15, 2015 FROM: Randy D. DeWitt, P.E., Assistant Director of Public Works for Water and Wastewater MEETING: June 2, 2015 SUBJECT: PRESENTER: Award Contract for the 2015 Water
More informationPalm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax
Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $
More informationCost Considerations of Asphalt Rubber Hot Mix
Cost Considerations of Asphalt Rubber Hot Mix Gene R. Morris, P.E. International Surfacing, Inc. Kent R. Hansen, P.E. International Surfacing Inc. MATERIAL DESCRIPTION AND PROPERTIES Asphalt-rubber (A-R)
More informationREPORT TO MAYOR AND COUNCIL
AGENDA ITEM NO. 2.b REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: January 10, 2012 SUBJECT: ADOPT RESOLUTION NO. 12-1, AUTHORIZING THE CONTRA COSTA COUNTY FLOOD CONTROL & WATER
More informationBITUMINOUS MIXTURE # 13A BID SHEET
BITUMINOUS MIXTURE # 13A BID SHEET Sealed bids will be received at the office of the Clinton County Road Commission at 3536 S. US Highway 27, St. Johns, Michigan, until 1:00 P.M. Tuesday, January 31 st,
More informationREQUEST FOR PROPOSAL Asphalt & Concrete Repair
REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress
More informationSECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS
SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material
More informationSTANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS
STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking
More informationWhat is a Cape Seal Overlay?
What is a Cape Seal Overlay? Combination of mass crack sealing utilizing polymer modified emulsion, covered with a quality crushed aggregate and an application of quick set slurry seal Presented by, Neil
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE Skanska USA Civil West CA Dist. Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066100 DUST CONTROL LS 1 3,000.00
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 Control 6316-00-001 Project RMC - 631600001 Highway US0059 County HARRISON Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationPavement Maintenance Best Practices. Thomas J. Wood
Pavement Maintenance Best Practices Thomas J. Wood Agenda Why pavement maintenance / preservation is important Dealing with cracks When to apply a surface treatment Fog Sealing Micro Milling UTBWC Thin
More information2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017
2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:
More informationCOUNTY OF SAN JOAQUIN
August 1, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital
More informationCold In-Place Recycling
Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,
More informationApril 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS
April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009
More informationCITY OF SANTA ROSA CITY COUNCIL RESOLUTION APPROVING SOLID WASTE COLLECTION SERVICES AGREEMENT BETWEEN THE CITY OF SANTA ROSA AND RECOLOGY
CITY OF SANTA ROSA CITY COUNCIL Agenda Item # 14.1 For Council Meeting of: August 29, 2017 TO: FROM: SUBJECT: MAYOR AND CITY COUNCIL GLORIA HURTADO, DEPUTY CITY MANAGER RESOLUTION APPROVING SOLID WASTE
More informationFiling Plans and Specifications
Upcoming Utilities Department Projects Anticipated To Have Plans and Specifications Filed August, September, October Report for Council Infrastructure Committee on 7-19-2016 Water and WPC Plant Projects
More informationCITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: December 12, 2012
CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: December 12, 2012 TO: VIA: FROM: SUBJECT: City Council Gus Vina, City Manager Tim Nash, Finance Director Glenn Pruim, Director of Public Works/Engineering
More informationCHAPTER 11 PAVEMENT TYPE DETERMINATION
CHAPTER 11 PAVEMENT TYPE DETERMINATION 11.1 PAVEMENT TYPE SELECTION FACTORS A highway system designation shall not determine the choice of pavement type. The following factors should be considered when
More informationPAVEMENT PRESERVATION A SOLUTION FOR SUSTAINABILITY
PAVEMENT PRESERVATION A SOLUTION FOR SUSTAINABILITY Susanne Chan Pavement Design Engineer Pavements and Foundations Section, Ministry of Transportation Ontario 0 Wilson Avenue, Downsview, Ontario, MM J,
More informationTown of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS
Advertisement for Bids ROAD MAINTENANCE PROJECTS Notice is hereby given by the Town of Wascott, Douglas County, WI, that it will receive sealed bids for crack routing and sealing, chip seal coating, and
More informationCONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL
CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard
More informationOverview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin
Overview Preventive Maintenance Concepts What are thin and ultra thin mixes Experience in Michigan with ultra thin Case Study- Washington County Thin mix overlays Preventive Maintenance The planned strategy
More information2013 PAVEMENT MANAGEMENT PLAN
BAKER CITY DEPARTMENT OF PUBLIC WORKS 2013 PAVEMENT MANAGEMENT PLAN Maintenance and Rehabilitation Planning 1655 1 st Street, Baker City, OR 97814 Phone: 541.523.6541 Fax: 541.524.2029 mowen@bakercity.com
More informationTOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK
TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,
More informationOGFC Meets CRM : Where the Rubber meets the Rubber
OGFC Meets CRM : Where the Rubber meets the Rubber GEORGE B. WAY, P.E. Pavement Section Engineer Arizona Department of Transportation Materials Group March 25, 1998 The Asphalt Conference Atlanta, Georgia
More informationHENNEPIN COUNTY Department of Human Resources Hennepin County Government Center 300 South Sixth Street Minneapolis, MN 55487
HENNEPIN COUNTY Department of Human Resources Hennepin County Government Center 300 South Sixth Street Minneapolis, MN 55487 http://hennepin.jobs INVITES APPLICATIONS FOR THE POSITION OF: Laborer, Seasonal
More informationCITY OF BELLINGHAM, WASHINGTON Purchasing-Vendor Guide
P U R C H A S I N G O F F I C E, 2 2 2 1 P A C I F I C S T, B E L L I N G H A M W A. 9 8 2 2 9 P H O N E 360-778-7750 F AX 3 6 0-778-7706 P U R C H A S I N G O F F I C E, 2 7 7 8-7 7 5 0 CITY OF BELLINGHAM,
More informationAMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS
AMERICA RIDES ON US KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS KEYS TO A SUCCESSFUL ALTERNATE BIDDING PROCESS INTRODUCTION With alternate bidding, road and highway agencies offer the opportunity to
More informationCRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS 2012
CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS General Inmation Bidders Sealed bids must be received by 12:00 Noon, Monday, April 23, at the Wascott Town Hall as stated in the public notice and advertisement
More informationAsphalt Pavement Maintenance and Rehabilitation Strategies
Asphalt Pavement Maintenance and Rehabilitation Strategies 2016 CAPTG Workshop: How to Assess and Extend the Service Life of Airfield Pavements Presented by: Genevieve Long, P.E. Monday, September 19,
More informationBID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER
BID # 14-47 REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey
More informationVANDERBILT UNIVERSITY
VANDERBILT UNIVERSITY CAMPUS PLANNING & CONSTRUCTION PROJECT MANUAL GUIDELINES INTRODUCTION These instructions are intended to guide the Architect in preparing the Project Manual for Vanderbilt University
More informationPavement Design. TTP Orientation Seminar 2017
Pavement Design TTP Orientation Seminar 2017 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles
More informationIntroduction to Pavement Overlays
Introduction to Pavement Overlays Course No: C02-046 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:
More informationFull Depth Reclamation
Full Depth Reclamation FDR Has Been Around A While 2 3 What is Full Depth Reclamation (FDR)? Full Depth Reclamation is a pavement rehabilitation technique in which the full flexible pavement section and
More informationBID PROPOSAL. For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES. Page Article 1 Bid Recipient...
BID PROPOSAL For the Construction of: JEMEZ SPRINGS WATER TANK REHABILITATION TABLE OF ARTICLES Page Article 1 Bid Recipient... 1 Article 2 Bidder s Acknowledgements... 1 Article 3 Bidder s Representations...
More informationSPECIFICATIONS FOR SAND SEAL
SPECIFICATIONS FOR SAND SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the
More informationMassDOT Pavement Preservation Updates
MassDOT Pavement Preservation Updates Northeast Pavement Preservation Partnership Boston, MA November 8-10, 2011 1 April 20, 2012 Leading the Nation in Transportation Excellence www.mass.gov/massdot Topics
More informationREQUEST FOR PROFESSIONAL SERVICES
REQUEST FOR PROFESSIONAL SERVICES The City of Lander is currently soliciting proposals from consultants who can offer a complete and accurate assessment of the condition of the City of Lander s street
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets
More informationFULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015
FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES OTEC - October 27, 2015 OVERVIEW Time + Traffic + Environment = Deterioration Temporary repairs include overlays or mill and fills to extend service life
More informationI. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department
I. General Information Civil Engineering Surveying Environmental Consulting Tysinger, Hampton & Partners, Inc. OPTIONAL PRE-BID MEETING MINUTES Austin Springs Road Water Line Replacement Project ITB #6190
More informationCHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS
CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS The following list of Standard Documents defines the methods, materials, and testing to be utilized when designing and
More information603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS
SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this
More informationThe GREENBOOK 2015 Standard Specifications for Public Works Construction
203-3.4.4 Rubberized Polymer Modified Emulsion (RPME). 203-4.4.4.1 General. RPME shall consist of a mixture of emulsified asphalt, crumb rubber, and latex. RMPE shall contain between 0.55 pounds per gallon
More informationComputer-Aided Maintenance Management
52 TRANSPORTATION RESEARCH RECORD 1276 Computer-Aided Maintenance Management JOHN P. ZANIEWSKI AND MICHAEL J. WILES A maintenance management system (MMS) allows managers to organize and control maintenance
More informationOptimum Time for Application of Slurry Seal to Asphalt Concrete Pavements
Optimum Time for Application of Slurry Seal to Asphalt Concrete Pavements Elie Y. Hajj, Luis Loria, Peter E. Sebaaly, Corina M. Borroel, and Paulina Leiva This study evaluated the field performance of
More informationSECTION 7 STREET DESIGN
SECTION 7 STREET DESIGN Table of Contents SECTION 7... 3 STREET DESIGN... 3 7.1 GENERAL DESIGN CRITERIA... 3 7.2 ROADWAY GEOMETRICS... 3 7.2.1 Functional Classification... 3 7.2.2 Minor Street Design Guidelines...
More informationPavement Design. TTP Orientation Seminar 2013
Pavement Design TTP Orientation Seminar 2013 What are Pavements? Engineered structures in contact with the earth's surface built to facilitate movement of people and goods Pedestrians Personal vehicles
More informationChip Seal News & Views
Chip Seal News & Views by Tom Doolittle, Doolittle Construction Phone #425-455-1150, Email DooCons@aol.com www.chipseals.com Issue 2, February 2007 Double Chip Seal Proves It s Worth (Second in a series
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes
More informationPavement Management Systems
Pavement Management Systems Basics and Benefits David R. Johnson, P.E. Regional Engineer Asphalt Institute Rocky Mountain Region djohnson@asphaltinstitute.org Presentation Outline Definition Requirements
More information:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,
General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell
More informationA. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).
SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish
More informationMaryland Transportation Authority (MDTA)
Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David
More information1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.
SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:
VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revisions to Chapter VII of Manual of Instructions Materials Acceptance and Materials Notebook Program NUMBER: MD 407-17
More informationBSS 200 Synthetic Track Surfacing System System Specifications
BSS 200 Synthetic Track Surfacing System System Specifications G.3 - Bidder: FieldTurf USA, Inc. Part I - General 1.1 - Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment,
More informationDepartment of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/
Connecting South Dakota and the Nation Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota 57501-5405 605/773-3464 FAX: 605/773-6215 May 6, 2011 RE: 0009-391
More informationConcrete Pavement Estimating 101 and. March 10, 2017 CPAM Concrete Paving Workshop Mankato MN Presenters:
Concrete Pavement Estimating 101 and Economy of Scale March 10, 2017 CPAM Concrete Paving Workshop Mankato MN Presenters: Stefan Gantert, PE ---Bob McPartlin, PE Common Questions: What is the price of
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson
More informationTHE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE
THE STRENGTH AND STIFFNESS MODULUS OF THIN LAYER HOT MIX ASPHALT CONCRETE AT VARIOUS TEMPERATURE Abdulhakim Mustafa Elshawesh 1), Ary Setyawan 2), Sholihin As ad 3) Post Graduate Civil Engineering ProgramsUniversitas
More informationAn Overview of Low Cost Pavement Alternatives in Canada
An Overview of Low Cost Pavement Alternatives in Canada Venkat Lakkavalli P. Eng., M. Sc. Leader, Pavement Engineering The City of Calgary Alberta, Canada Acknowledgement Acknowledge Authors, Co-authors
More information