1 Request for Proposal W Clark Hall Professional Engineering Services to Assess the Existing Retaining Wall and to Develop Repair Recommendations 1
2 2
3 West Virginia University Request for Proposals W: Clark Hall Retaining Wall Assessment 1. Background The retaining wall is located between Clark Hall and the Charles C. Wise, Jr. Library on the Downtown Campus of West Virginia University (WVU). The existing brick façade is showing signs of deterioration at multiple locations. There are concerns regarding possible failure of the wall and/or the brick facade. WVU would like to repair or replace the exterior wall structure and brick façade to eliminate any safety concerns due to the existing brick condition or possibility of wall and/or brick failure. 2. Project Scope WVU is seeking proposals from Engineering firms specializing in this type of investigation and professional services to assist the University in assessing the condition of the existing wall. The successful firm will aid the University in identifying the cause of the walls brick façade failure, develop a scope of work to remediate all identified issues, and provide prioritized recommendations for completing the proposed remediation work. 3
4 The project is expected to be completed in three phases consisting of (1) the investigation of the existing wall and development of a scope of work for replacement or remediation, (2) the design and development of bid documents and specifications to replace or remediate identified deficiencies in the wall, and (3) the bidding and construction administration of the replacement or remediation work. The selection of the consulting firm and award of the contract will be for the first phase of the work: the investigation and assessment of the existing walls condition. At the conclusion of the investigation phase, the consulting firm will provide a written scope of work for either the replacement or remediation of the walls issues and present all findings to WVU. WVU will then review the proposed scope and make a determination on how to proceed with the design and execution of the replacement or remediation work. Based upon the developed scope of work for replacement or remediation, the successful firm will be given the opportunity to continue with the phase two and phase three should WVU elect to continue with those phases. The investigation phase will include but is not limited to the following: Hiring of a masonry contractor, supervision and overseeing of masonry contractor to make and repair exploratory openings, to assist in the wall investigation. Hiring, supervision, and overseeing of a Geotechnical Engineering Company Evaluation of the current condition of the existing masonry or cement wall and brick façade Investigation of the cause(s) of the failure A written report detailing observations, test results, and identified deficiencies A written scope of work required to replace the wall or remediate all identified deficiencies A presentation of the Consultant s findings to WVU representatives at the end of the investigation Once a firm has been selected, a fully executed AIA B101 with West Virginia Supplementary Conditions will be issued to the successful firm. 3. Project Constraints Sidewalks, ramps and green space near the wall are used by students enrolled at West Virginia University. Such areas are continuously used during the Fall, Spring and Summer Semesters. It is anticipated that the investigative work will begin with the issuance of a Purchase Order and that the fall semester will be underway. All efforts shall be made to protect students, faculty, staff, and existing facilities during the investigation phase. All work to be coordinated with Facilities Management. Grass areas will need to be in a useable condition at the end of the investigation phase as weather permits or suitable fencing to keep students, faculty and staff from having access will be used. Contractor will be required to repair any defects that occur in 4
5 fence when notified by Consultant or may be notified by WVU, Facilities Management, if immediate action is deemed necessary by WVU, Environmental Health and Safety. All construction and testing activities will need to be closely coordinated with the WVU Project Manager, and WVU Facilities Management Group. It is imperative that a detailed schedule of investigative activities and tests be provided to WVU in advance of starting the work. 4. Anticipated Services INVESTIGATION PHASE: Task 0: Contractor Support The Consultant will oversee the contracting of Geotechnical Engineering efforts. Prepare a scope of work and arrange for a Contractor and a Geotechnical Engineer, to provide construction and geotechnical support to the Consultant as necessary to complete the services described within this RFP. The services of the contractor will include, but may not be limited to the development of a site specific safety plan that encompasses work on the displaced retaining wall adjacent to a heavily congested area with pedestrian traffic, site protection, and pedestrian protection for all investigation activities to be undertaken on site. Work with Engineer and University in obtaining match of existing brick and mortar. A sample panel must be approved prior to mobilizing to the site. Provide access to exterior of the wall. Height of wall at tallest point is approximately 12ft. The locations of access will be selected by the Engineer, Consultant and University. Two test pits should be excavated to expose the retaining face of the wall in order to permit verification of the wall structural components. Depending on the materials, core samples of the wall components may be extracted for laboratory analysis. Remove and replace approximately five square feet of brick at approximately five locations. The exact size, location, and number of exploratory openings will be determined by the Engineer once access is provided and will be based on initial observations. Remove and replace approximately three sections of parapet cap. Remove not more than five cores for future compressive strength testing if the wall is constructed of concrete. Remove small sections of concrete at opening locations for verification of reinforcing bar size and condition. Engineer will mark exact locations of reinforcing bars and other construction support as described herein during the investigation. The services of the geotechnical Engineer will include, but may not be limited to, the geotechnical scope of work that includes a field investigation to determine geotechnical conditions that support the existing distressed masonry wall as well as its retained soil conditions. Three (3) Standard Penetration Test (SPT) Borings should be advanced on the high side of the distressed retaining wall to a design depth of 25 + feet below existing grade or to refusal, whichever occurs first. The purpose of the test borings is to define the soil profile, depth to rock and groundwater (if at shallow depths), to provide 5
6 representative samples where required, and to identify conditions which will influence the retaining wall. The test borings will need to be grouted to within 5ft of top and backfilled with the soil that is excavated at that location. The location and associated depth of each test boring will be estimated based upon reports and pictures by others of the distressed masonry retaining wall. This information is critical to determine how best to repair or replace the masonry retaining wall and to define evaluation/design parameters for the wall. This information also affords the Contractor with soils information for construction planning/strategy and bidding purposes. Samples of the subsurface soils should be obtained using a split-spoon sampler and the Standard Penetration Test (SPT) procedure (ASTM D1586). Normal sampling will need to be conducted at 2-1/2+ foot intervals within the upper 10 feet and, at 5+ foot intervals thereafter. Any required bulk samples should be obtained from the auger cuttings of representative soil types. If unusual subsurface conditions are encountered or if more detailed information is required, then additional split-spoon sampling may be performed as needed. No rock coring will need to be performed as part of this study. Direct shear testing (ASTM D3080) will need to be performed in order to determine the consolidated drain strength and residual strength of the soil under direct shear boundary conditions. This testing provides soil phi angle and cohesion properties. The Geotechnical Engineer shall notify Miss Utility and retain a private utility locator to locate all utilities within the grassy area along the retaining face of the wall. All utilities must be located prior to mobilization on site for the geotechnical investigation. All utility markings should be maintained in legible condition. The test borings should be backfilled with the auger spoils at each test boring location and will take place prior to demobilization from the site. Laboratory testing will need to be performed as necessary to determine the engineering properties and characteristics of the subsurface materials. Laboratory testing should include, but shall not be limited to, soil strength and classification tests such as Moisture-Density Relationship (Proctor Tests), Atterberg Limits, Sieve Analyses, and Natural Moisture Contents. A report should be issued to the Consultant and University after the initial evaluation is completed. Once the report has been issued, the Geotechnical Engineer should participate in a meeting with Consultant and WVU to discuss the findings from the investigation. It will be necessary to receive the information from the investigation as soon as possible so the structural analysis can proceed. Any unusual subsurface conditions, which may be encountered that could adversely affect construction methods or design, may need additional testing, and analysis should be provided in the report. If such conditions are encountered, the Geotechnical Engineer should notify the Consultant of such conditions. The Geotechnical Engineer should retain a sub-consultant or conduct a geophysical survey of the retaining wall to locate the heel of the existing wall. The survey should consist of ground penetrating radar and electric resistivity imaging to determine the depth and distance of the heel from the face of the retaining wall. 6
7 Task 1: Review of Limited Design Documents Prior to mobilization, the Consultant will meet with the University s Project Manager and Building Maintenance Staff to coordinate the investigation. Any available Design Documents from the original building construction and any subsequent remedial construction will be provided by the University for the Consultant s use. The Consultant will perform a limited review of any available documents to become generally familiar with the design and construction of the wall. Task 2: Visual and Geotechnical Survey The Consultant will perform a survey of the existing wall. Consultant will supervise the masonry contractor to assist in the investigation and supervise the Geotechnical Engineer during their on site evaluation. Task 3: Structural Analysis, Letter Report & Meeting The Consultant will perform structural analysis of the existing retaining wall system based on the as-built wall data collected and the geotechnical report. The analysis will assess structural capacity and overall stability of the wall system. If deemed structurally adequate, recommendations will be developed to address the cracking and deflection in the existing wall system. If the existing wall system is not deemed structurally adequate or salvageable through strengthening, present options (least 2) for replacing the wall system with estimated cost. Task 5: Summary Letter Report and Presentation Upon completion of the investigation which includes the work as described within this RFP the Consultant will prepare a summary report for the University. This report will outline all observations, findings, conclusions, and include a recommended scope of work for remediation. The recommended scope of work for remediation will be prioritized within the report. Following the submittal of this summary report, the Consultant will attend a meeting with the University to present the findings, discuss all recommendations, and answer any questions. DESIGN PHASE: 7
8 The complete list of services required for the Design Phase and the schedule for completion of these services will be based upon the outcome of the investigation, the consultant s recommendations, and WVU s final selection of specific items to pursue for remediation. At a minimum the consultant should anticipate providing design drawings, specifications, an opinion of probable cost, and an estimated construction schedule to complete the project during the summer of Specific scope of work for bidding and construction will be selected by WVU from the consultant s recommendations provided in Phase One. BIDDING PHASE and CONSTRUCTION PHASE The successful design firm will be required to closely coordinate with the WVU Project Manager during the Bidding and Construction Administration Phase. At a minimum the consultant should anticipate providing the following services: Conduct the pre-bid meeting and respond to all questions submitted by registered bidders during the bid process. Conduct construction progress meetings on site. Make occasional site visits and document visits with photographs and written reports. Approve submittals, answer RFI s, compile and analyze change orders, issue sketches, punch lists, etc. Assist WVU with final documentation and Close-out. Provide at a minimum one (1) site visit at pre-construction to kick-off the project, weekly site visits during construction, one (1) visit at substantial completion, and one (1) visit at final completion. All site visits shall include written reports and photographic documentation. 5. Schedule WVU anticipates that all work for the Investigation Phase will begin immediately. The Investigation Phase must be completed by December 31, If possible WVU would like to have the investigation completed earlier to ensure that the building and grounds are clean and prepared for winter. As a key component of this proposal, the submitting firm will provide a schedule indicating the time necessary to fully provide the services and complete the scope of work for the INVESTIGATION phase described in this RFP. 8
9 The Design and Construction schedule will be developed and finalized at the conclusion of investigation based on the developed scope of work for the remediation. 6. Pre-Proposal Conference and Site Visit A MANDATORY Pre-Proposal Conference and Site Visit is scheduled for, September 30, 2015 at 11:00 a.m., at Clark Hall, 100 Prospect Street, Morgantown WV, in Room 214, on the Downtown Campus of West Virginia University. All bidders will be required to attend both Pre- Proposal Conference and Site Visit 7. Form of Proposal and Selection Criteria WVU is seeking an Engineer led team comprised of consultants with appropriate qualifications and experience to carry out the anticipated services for the scope of work described within this RFP. The selected team will possess specialized skills in investigating, testing, and assessing existing wall and demonstrate a minimum of five (5) years experience in investigation and remediation of masonry, concrete retaining walls. Interested firms should provide qualifications in a written proposal to WVU for review and evaluation. The written proposal should not exceed ten (10) pages, not including the cover, and will address all information described in the following list of criteria: I. Project Approach (limit 2 pages) 20% Submit a description of the consulting team s approach to the project. Highlight any anticipated challenges and present any initial proposals to address these challenges. II. Project Team Overview (limit 3 pages) 30% Summarize qualification and experience of the lead firm associated with retaining wall investigation and remediation projects. Submit an organizational chart of the proposed project team. Provide a list of all sub-consultants that will be utilized to address each area listed under Project Scope. Summarize qualifications and experience of each subconsultant and note any previous working relationships with sub-consultants. If technical expertise resides in-house, please identify. III. Project Team Experience (limit 5 pages) 30% Team Experience based on at least 3 retaining wall investigation and remediation projects completed within the last 5 years for work of a similar scope and scale. Submitted projects should demonstrate the firm s ability to execute a project of similar complexity and size. Please emphasize any projects of comparable type for Higher Education Institutions. Include the following for each project: Project Name, Location, Description and Scope of Services provided, and Contact information for Owner s Project Manager 9
10 IV. Project Schedule (limit 1 page) 15% Provide an anticipated schedule to complete the investigation phase following the award of a contract for professional services. This schedule should start with the award of the contract and finish with the delivery of the summary report and presentation to WVU. V. Project Fee (limit 1 page) 5% Provide a Stipulated Lump Sum Fee for all work to be provided in the Investigation Phase based upon the scope described in this RFP. This Fee will be inclusive of all project costs including all reimbursable expenses, sub-consultants, and contractor support costs. The actual fee will be negotiated when the scope of the investigation is further defined during the pre-design meeting. If for some reason the negotiations are unsuccessful, West Virginia University will negotiate with the second firm. The Consultant fee for Phase Two and Phase Three, will be negotiated separately at following the conclusion of the Investigation and the presentation of the results to WVU. If the negotiations are unsuccessful, WVU reserves the right to terminate Phase Two and Phase Three, and issue a separate RFP for those services. 8. Submitting Your Proposal Proposals are limited to ten (10) pages, not including the cover. Page size is limited to 8.5x11 with a minimum 10 point font. Electronic submittal only. Please send in pdf format as a single document. All questions will be submitted via to Rob Beck, (RABeck@mail.wvu.edu) with a courtesy copy to Richard Steele (Rick.Steele@mail.wvu.edu). Questions will be accepted until, October 2, 2015 at Noon (Eastern Standard Time) and an Addendum addressing all submitted questions will be issued no later than Tuesday, October 6, 2015, prior to Noon (Eastern Standard Time). Any questions submitted after this date will not be answered. Proposals will be due by Monday, October 12, 2015 no later than 4:00 p.m. (Eastern Standard Time). 10
11 Proposal Submission Information: Submission of Proposal: Proposals will be received until 4:00 p.m. on October 12, 2015 at the address listed below. For information pertaining to this project or proposal procedures please contact: West Virginia University Procurement Services Third Floor Rob Beck One Waterfront Place / Don Knotts Blvd P.O. Box 6024 Morgantown, WV (304) bid@mail.wvu.edu 11
Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming
March 9, 2016 Proposal No. WYP16064 Campbell County School District Mr. Andy Mravlja 1000 W. 8 th Street Gillette, WY 82716 amravlja@ccsd.k12.wy.us RE: PROPOSAL Geotechnical Engineering Evaluation Campbell
More informationA. Section includes temporary excavation support and protection systems.
SECTION 31 50 00 - EXCAVATION SUPPORT AND PROTECTION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-5 Issue date: July 2012 SUBSURFACE (GEOTECHNICAL) INVESTIGATION PROCEDURE 1. General: Provide project specific foundation and soils (geotechnical) investigation as required to comply with
More informationBoth envelopes must have the following information in the lower left hand corner:
SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Design & Construction REQUEST FOR PROPOSAL Third Party Testing and Special Inspections Parking Lots and Ramps Arts Campus Parking Reconfiguration Phase 2 Project #0674501 Addendum
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS College of Pharmacy Building Construct Deep Foundations Special Inspections and Testing Services University of Iowa Project #0329505 Addendum #1 Issued: Thursday, October 06, 2016
More informationREQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA
REQUEST FOR PROPOSALS FOR Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA City of Coralville Iowa Coralville, IA Page 1 of 6 Please review and provide response to this letter
More informationREQUEST FOR QUOTATIONS (RFQ)
REQUEST FOR QUOTATIONS (RFQ) Phase 1 Environmental Site Assessment (ESA) 1216 Martin Luther King Jr Way, Tacoma WA Page 1 RFQ AT A GLANCE: ADDRESS: PROJECT DESCRIPTION: 1214 Martin Luther King Jr. Way,
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Design & Construction January 18, 2017 Re: Request for Proposals- Third Party Testing and Special Inspections for Concrete, Applied Fire-Proofing, and High Performance Coatings 0691801
More informationREQUEST FOR QUOTES: # LE
REQUEST FOR QUOTES: #15-07-1391LE Navajo Division of Transportation Department of Airports Management ADOT GRANT #E5S2R - Independent Fee Estimate - Reconstruct Runway 15/33 (Approximately 2,000 x 75 )
More informationThe Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.
ADDENDUM #1 EXTERIOR REPAIRS YOUTH SERVICES BUREAU 63 LINDEN STREET MANCHESTER, CT 06040 BID #15/16-68 S/P+A PROJECT NO. 15.207 DATE: March 15, 2016 The following changes to the Drawings and Project Specifications
More informationREQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA
REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA GENERAL INFORMATION Greenwood School District 50 is
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationTHE NUCLEUS INNOVATION AND RESEARCH PARK PARKING GARAGE
REQUEST FOR DESIGN-BUILD PROPOSALS THE NUCLEUS INNOVATION AND RESEARCH PARK PARKING GARAGE Lump Sum Proposal ISSUED TUESDAY, JUNE 10, 2014 RESPONSES DUE WEDNESDAY, JULY 2, 2014 BY 4:00 PM EDT TABLE OF
More informationENGINEERING DIRECTIVE
Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Design & Construction August 18, 2017 Re: Request for Proposals- Third Party Testing and Special Inspections University of Iowa The University of Iowa, located in Iowa City, Iowa,
More informationPAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA
PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationImplementation of this Special Provision requires a complete understanding of the following documents:
VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009
More informationDENVER INTERNATIONAL AIRPORT GATE APRON REHABILITATION AND DRAINAGE IMPROVEMENT PROGRAM DESIGN AND CA SERVICES RFP/RFQ
The following is an excerpt from the Concourse C Field Investigation Services for 2016 Design Work performed by Jacobs. This is a sample of what may be expected for future field investigation services.
More informationREQUEST FOR PROPOSALS TO DEVELOP FINAL DESIGN, CONSTRUCTION DOCUMENTS AND BIDDING SERVICES FOR VAN ANDEL ARENA PLAZA
REQUEST FOR PROPOSALS TO DEVELOP FINAL DESIGN, CONSTRUCTION DOCUMENTS AND BIDDING SERVICES FOR PLAZA Grand Rapids, MI August 2, 20 A joint venture between: SMG Venue Management Van Andel Arena Downtown
More informationAnswer: Yes additional labor classifications can be added to the Staff and Fee Schedule (Exhibit 2-6). Yes all rates are to be completed.
SOUTH BROOKLYN RESILIENCY PROJECTS Project #6253/ Contract # 62530001 Questions & Answers August 18, 2016 1. Relative to the Staff and Fee Schedule (Exhibit 2-6) - Can we supplement the list of labor classifications
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationSTANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000
DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories
More informationLantz-Boggio Architects, P.C LBA Project No
SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely
More informationHAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016
HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED
More informationREQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION
REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as
More informationCase History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River
DEEP FOUNDATIONS 207 Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River W. Robert Thompson, III, 1 M.ASCE, P.E., Jeffrey R. Hill, 2 M.ASCE, P.E., and J. Erik Loehr,
More informationSoil Improvement by Compaction Grouting
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction
More informationREQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.
REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the
More informationGEOTECHNICAL INVESTIGATION. Proposed RETAIL DEVELOPEMNT 1300 W. Pflugerville Parkway Pflugerville, Texas PROJECT NO. 17-DG8780.
GEOTECHNICAL INVESTIGATION PROJECT NO. 17-DG8780 Prepared for: PROFESSIONAL STRUCIVIL ENGINEERS, INC Austin, Texas Prepared by: GEOSCIENCE ENGINEERING & TESTING, INC. Dallas, Texas October, 2017 2712 Satsuma
More informationSECTION BORING AND/OR JACKING PIPE
02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe
More informationSECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)
PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction November 11, 2015 Re: Request for Proposals - Special Inspections Seamans Center for the Engineering Arts and Sciences-South Annex Addition Project
More informationTABLE OF CONTENTS Structural Library
Title Description DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 Project Title Page Project Manual title page. 000107 Seals Page For seals of design professionals on Project Manual. 000115
More informationREQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS
REQUEST FOR PROPOSALS GUTHRIE MEMORIAL LIBRARY ENVELOPE REHABILITATION YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS Table of Contents Section 1: Background...... 2 Section 2: Scope of Services... 2 Section
More informationOscar Stanton De Priest House Preservation Consultant Request for Proposal due February 12, 2018, COB January 18, 2018
Oscar Stanton De Priest House Preservation Consultant Request for Proposal due February 12, 2018, COB January 18, 2018 Project Overview Landmarks Illinois (LI) is seeking qualified Preservation Consultant
More informationSECTION DUCTILE IRON PILES
SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.
More informationIII. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE
III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the
More informationAn information series from the national authority on concrete masonry technology. Drainage swale. (optional) Cap unit. (optional)
Provided by: Brown's Concrete Products Limited An information series from the national authority on concrete masonry technology ROLES AND RESPONSIBILITIES ON SEGMENTAL RETAINING WALL PROJECTS TEK 15-3A
More informationSECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL
SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division
More informationSPECIAL INSPECTION AND TESTING AGREEMENT
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650
More informationPROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ)
PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) MARCH 2018 INTRODUCTION AND BACKGROUND The City of Keller is in search of the most qualified firms to provide professional expertise and
More informationDIVISION 02 EXISTING CONDITIONS
DIVISION 02 EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal
More informationScience Technology Engineering and Mathematics (STEM) Initiative
DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and
More informationCOMPACTED CLAY LINERS
Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement
More informationCONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133
GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project
More information2016 San Francisco Building Code AB-082 ADMINISTRATIVE BULLETIN
ADMINISTRATIVE BULLETIN NO. AB-082 : DATE : November 21, 2018 [Supersedes Administrative Bulletin AB-082 originally issued 03/25/2008, revised 12/19/2016] SUBJECT : Permit Processing and Issuance TITLE
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationSECTION STRUCTURAL EXCAVATION FOR STRUCTURES
1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.4 PERMEATION GROUTING 7.4.1 Definitions 7.4.1.1 Geotechnical Data Report (GDR)
More informationTERMS OF BID FOR GEOTECHNICAL INVESTIGATIONS
TERMS OF BID FOR GEOTECHNICAL INVESTIGATIONS INTRODUCTION Transport and Mass Transit Department, Government of Khyber Pakhtunkhwa (the Client) has engaged NESPAK for provision of Technical Assistance and
More informationTOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR
February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for
More informationCONCRETE SEGMENTAL RETAINING WALLS
32 32 23.13 CONCRETE SEGMENTAL RETAINING WALLS 1.00 GENERAL 1.01 DESCRIPTION A. The work shall consist of furnishing and installing concrete segmental retaining wall (CSRW) units to the lines, grades and
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationFerrero, Orr, Vega, Courville
RESOLUTION NO. 0 4-0 2 7 RESOLUTION AUTHORIZING THE EXECUTION OF A CONSULTANT SERVICES AGREEMENT AMENDMENT WITH KLEINFELDER, INC., FOR THE DOWNTOWN MULTI-MODAL TRANSPORTATION CENTER BUILDING WHEREAS, the
More informationThe Tender Documents shall be amended and will become part of the Contract Documents.
Tender No. MET17-103 Mulgrave Park Exterior Upgrades: Repairs to Retaining Walls, Stairs, and Rail ADDENDUM NO. 04 11 October 2017 The Tender Documents shall be amended and will become part of the Contract
More informationREQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA
REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for engineering design services
More informationBOONE COUNTY PUBLIC LIBRARY (859) 342-BOOK (2665)
ROOF Boone County Public Library is seeking competitive sealed bids to replace an existing Shingle Roof and EPDM membrane roof on the Florence Branch located at 7425 U.S. 42, Florence, KY 41042. The successful
More informationSan Antonio Water System Standard Specifications for Construction
ITEM NO. 903 Construction Qc/Qa Program Formatted: Font: 11.5 pt Formatted: Font: 11.5 pt 903.1 DESCRIPTION: This item shall govern the preparation and implementation of the Contractor s Construction Quality
More informationResponse 1: Yes. Please see Changes to Solicitation above. The due date for proposal submission has
This addendum is hereby made part of the Request for Proposal for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of
More informationPROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.
Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)
More informationB. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings.
SECTION 31 63 16 AUGER CAST GROUT PILES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division- 01 Specification
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs
ADDENDUM NUMBER 3 AUGUST 18, 2016 Jackson County Utility Authority Project No. 20150619124 Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs FROM: BURK-KLEINPETER, INC. ENGINEERS, ARCHITECTS, PLANNERS,
More informationQuotation Notice. The salient features and precise requirements:
Quotation Notice Sealed quotations are invited from reputed firms/agencies for conducting field tests/ Laboratory tests for depicting the nature of sub soils, strata and evaluates the various soil properties
More informationResidence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase
More informationRequest for Proposal
1 Request for Proposal Bell Tower Masonry Restoration ******* Church Grand Rapids, MI 49503 ********** Church is soliciting proposals for masonry restoration of their bell tower. Restoration companies
More informationSECTION XXXXX STONE COLUMNS PART 1 - GENERAL
SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01
More informationRequest for Proposal. Design Consultant Services for the Parking Structure Capital Improvement Plan 2018 Project No
Division of Finance and Business Operations Request for Proposal Design Consultant Services for the No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system,
More informationGreater New Haven Water Pollution Control Authority. New Haven, Connecticut
Greater New Haven Water Pollution Control Authority New Haven, Connecticut Plans and Specifications for the Construction of CWF 2016-07 RE-BID - CSO Reduction Utilizing Green Infrastructure - West River
More informationGENERAL CONTRACTOR PRE-QUALIFICATION FORM
GENERAL CONTRACTOR PRE-QUALIFICATION FORM This form must be completed and submitted by all firms wanting to be pre-approved to bid on the Missouri State Capitol Building Exterior Stone Renovations and
More informationADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV
ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA
More informationVillage of Lincolnwood
Village of Lincolnwood REQUEST FOR QUALIFICATIONS (RFQ) MUNICIPAL ENGINEERING SERVICES Response Due Date: Friday, March 21, 2014, 4:00 p.m. Send Sealed Qualifications to: Timothy C. Wiberg Village Manager
More informationmtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida
mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationEngineering Request for Proposals BJWSA Project CIP #1894 Raw Water Canal Improvements Engineering Contract
Engineering Request for Proposals BJWSA Project CIP #1894 Raw Water Canal Improvements Engineering Contract Introduction The Beaufort Jasper Water & Sewer Authority (BJWSA) seeks an Engineering Contract
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationTown of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)
, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11) Request for Qualifications Construction Inspection and Testing Services Issued: January 3, 2017 Due: January 24, 2017 I. INTRODUCTION
More informationSADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS. (Boilerplate language, map and other contract language to be added on approval of Board)
October 17, 2017 SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS (Boilerplate language, map and other contract language to be added on approval of Board) PROPOSAL SUBMITTALS DUE NOVEMBER 17,
More informationPROJECT INFORMATION. 1.1 Site Location. October 4, Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203
October 4, 2017 Jerry Schwab/President 315 Aden Ave., Suite 26 Glendale, CA 91203 P: 888.900.3823 E: jscwab@schwabeng.com Re: Geotechnical Engineering Letter Report VAMC Bldg 202 Domiciliary C-D Entryway
More informationExhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction
- State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES... 1 ARTICLE 2 - PROGRAM VERIFICATION STAGE... 2 ARTICLE 3 - SCHEMATIC DESIGN
More information17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS
17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain
More informationREQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.
REQUEST FOR PROPOSAL Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend For St. Charles Health System Issued: May 9, 2016 Proposal Due: June 9,
More informationADDENDUM #001 Date: March 21, 2019
ADDENDUM #001 Date: March 21, 2019 Wayne State College Bowen Hall JJA Project: 3529 Sealant Replacement and Exterior Renovations Drawings & Specifications 1111 Main Street; Wayne, Nebraska 68787 Dated:
More informationSPECIAL SPECIFICATION 6666 Charter Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,
More informationCOUNTY OF SAN JOAQUIN
June 4, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital
More informationCONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE
CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson
More informationFlorence County Government
Florence County Government Procurement Department April 29, 2016 ADDENDUM NO.1- CONSTRUCTION OF A BOARDWALK AND FISHING PIERS AT LAKE CITY PARK PROJECT (BID NO. 35-15/16) The following changes shall be
More informationINTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements
RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown
More informationChapter 6, Construction
Chapter 6, Construction CHAPTER CONTENTS 6.1 OWNER-CONTRACTOR AGREEMENT A. Preparation B. Owner Signature C. Award 6.2 PRE-CONSTRUCTION CONFERENCE A. Administration B. Attendees C. Pre-Construction Conference
More informationRequest for Proposal
Request for Proposal Architectural/Engineering Services Restaurant Improvements to Greyhound Intercity Bus Terminal 205 S. Lamar Dallas, TX 75201 This project is partially funded by a transportation improvement
More informationSECTION GENERAL EXCAVATION
02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,
More informationREQUEST FOR QUALIFICATIONS ARCHITECTURAL
REQUEST FOR QUALIFICATIONS ARCHITECTURAL and ENGINEERING CONSULTING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS SQ # 10565 MIDDLESEX COUNTY COLLEGE 2600 WOODBRIDGE AVENUE EDISON, NEW JERSEY 08818
More informationADDENDUM NO. 1. Clarification/Question/Answer/Updated Plan Sheets
ADDENDUM NO. 1 DATE: July 20, 2016 INVITATION FOR BID: IFB K160021767 Bellemeade Park Pedestrian Trails and Bridge Project (UPC 107531) DATED: June 28, 2016 RECEIPT DATE: July 28, 2016 @ 2:30 P.M. OPENING
More information