1 REQUEST FOR QUALIFICATIONS CONSULTING EXECUTIVE ELECTRICAL ENGINEER FOR MULTIPLE BUILDINGS ELECTRICAL DISTRIBUTION SYSTEM UPGRADE Muir Biology Electrical Distribution MTF Electrical Distribution Hubs Hall Electrical Distribution Proposals due THURSDAY, APRIL 28, 2016 Issue Date April 11, 2016
2 I. INTRODUCTION The University of California, San Diego, will be selecting an Executive Electrical Engineer to perform planning, design, bid, and construction administration phase services for the replacement of an Electrical distribution system. II. PROJECT DESCRIPTION This project consists of the replacement and upgrade to Electrical Power Distribution Systems but is not limited to: Substations, Normal and Emergency Power Systems, Distribution Network Systems, Generators, ATS s, Feeder and branch circuiting. This Electrical Distribution upgrade will include the following Project and Locations: Muir Biology Electrical Distribution system & network a. Construction Cost Budget $1,450, MTF Electrical Distribution system & network a. Construction Cost Budget $2,200, Hubs Hall Electrical Distribution system & network a. Construction Cost Budget $2,000,000 Muir Biology Electrical Distribution system & network This facility is fed by a 15 kv nominal power from the campus infrastructure electrical grid. Two original parallel 15 kv substations rated at 750 kva, 5,000 amps for 208 volt power, and 500 kva, 1,600 amps for 480 volt power are installed in the basement main electrical room. The transformers for these substations are dry type and integral to the isolation switch cabinets and distribution switchboards. This room also houses ED4, which is a 5 kv primary 208 volt output substation (circa 1998) that provides infrastructure emergency power. Normal and emergency power are distributed vertically from the basement electrical room via three vertical bus systems with both 480 and 208 volt power provisions. Emergency power is provided by the campus infrastructure to an internal emergency power distribution network serving Life Safety and critical user loads throughout the building. Medical Teaching Facility Electrical Distribution system & network Power is supplied to this facility at 12 kv. A dry-type transformer rated for 1,500 kva service steps the incoming power down to 277/480 volts. The 277/480 volt power is distributed by a switchgear and distribution panel assembly that is rated for 3,000 amp service. This incoming electrical service equipment was manufactured by General Electric and is original to building construction built in The electrical distribution network is a dual voltage configuration. The 277/480 volt power is distributed to branch transformers that step the power down to 120/208 volts. The lighting and major mechanical systems are supported by the 277/480 volt circuit. The panels were manufactured predominantly by General Electric. REQUEST FOR QUALIFICATION 1
3 This facility is supported by the limited 4,160 volt campus emergency power circuit. A dry-type transformer rated for 300 kva service steps the power down to 277/480 volts. A 277/480 volt switchgear and distribution panel assembly rated for 400 amp service distributes this feed to critical systems in this facility. Hubs Hall Electrical Distribution system & network Power is supplied to this facility at 12,480 volts. A dry-type transformer that is rated for 2,000 kva service steps the incoming power down to 277/480 volts. This transformer was manufactured by Sylvania. The 277/480 volt power is distributed by switchgear that is rated for 3,000 amps and was manufactured by Zinsco. The electrical distribution network in this facility is a dual voltage configuration. 277/480 volt power is distributed to branch transformers that step the power down to 120/208 volt power. The lighting and major mechanical systems are supported by the 277/480 volt circuit. The panels were manufactured predominantly by ITE and Zinsco. Emergency power for this facility is produced by a local natural gas-fired emergency generator. It is of 100 kw capacity, generates 277/480 volt power, and was manufactured by Kohler. III. SCOPE OF SERVICES The scope of services will include electrical engineering services, including field investigation, schematic design, design development, detailed phasing plan, construction documents, creation of a Systems Manual, cost estimates, scheduling, the bid/award process, and construction contract administration services. The engineer will provide documentation as directed by the University, including accurate plan views and riser diagrams to substantiate the as-built field survey work, and a Systems Manual detailing the building s current sequence of operations and existing electrical systems. After selection, Electrical Engineers fees will be negotiated based upon a more specific scope. IV. JOINT VENTURES/ASSOCIATIONS The University will not entertain Joint Ventures or Associations on this project. V. PROJECT DELIVERY METHOD The project delivery method will be design/bid/build. REQUEST FOR QUALIFICATION 2
4 VI. CONSULTANTS The University is only selecting the Executive Electrical Engineer at this time. All sub-consultants, such as, but not limited to, architect, other engineering disciplines (structural, etc.), will be selected at a later date in collaboration with the selected Electrical engineering firm. VII. SUBMITTAL REQUIREMENTS AND SELECTION CRITERIA The University requests the following submittal material for use in the selection of a professional engineering firm to perform the Scope of Services described in Section III. A. Demonstrated experience and excellence in design and construction administration of infrastructure projects consisting of switching stations, MV (12KV nominal) switchgear, digital, relays, bus-ducts, underground duct banks, cables, short circuit, coordination, arc flash studies and comparable utility systems. The engineering firm should have experience on a large campus type institution with multiple switching stations, primary electrical distribution systems, on-site generation, emergency generators, systems including construction within an operational large campus with constrained site conditions and multiple ongoing construction projects. B. Proven technical, cost management, scheduling, and quality control capabilities. C. Qualifications of the Principals and Project Team Members, including a clear definition of the primary responsibility of each. D. Outline of the basic work plan to accomplish the work. E. Demonstrated in-house ability for creation, preparation and processing of required construction documents. F. Demonstrated ability to perform bidding support and construction administration, submittal/substitution review, plan check services. G. Demonstrated ability to efficiently, and in a timely manner, review shop drawings, change orders, field orders, RFIs and other construction related activities. H. Proven success in coordination of disciplines. I. Proven technical, scheduling and cost management capabilities. J. Proximity to the project site or proven methodology for video-conferencing and Internet meetings. K. Demonstrated Qualifications of the Principals and Project Team Members, including a clear definition of the primary responsibility of each. Provide resumes for key team members. L. Proven successful experience on three comparable projects, two of which must have been completed within the last five years. Submissions must demonstrate the quality and complexity of work performed and results achieved. M. Established relationships and successfully completed design services at the University of California are welcome though not a requirement. N. Ability to provide Professional Liability Insurance in the amount of $1,000,000 Each Occurrence and $2,000,000 per Project Aggregate. REQUEST FOR QUALIFICATION 3
5 VIII. STATEMENT OF UNDERSTANDING All Short-listed firms will be required to sign a Statement of Understanding. By signing the document it is acknowledged that a draft copy of the standard Executive Design Professional Agreement (EDPA) has been read, and with reservation of rights, the terms and conditions are generally agreed upon. Additionally, notwithstanding this is a qualification based selection process, it is understood that fees for basic services are expected to fall within a limited and commercially reasonable range for work as referenced in the Executive Design Professional/Fee Guideline provided to short-listed candidates. IX. PROCEDURES FOR SUBMISSION Engineering firms wishing to be considered should submit background materials indicating their past experience in the design of infrastructure projects and medium voltage switching stations, including references, Standard Forms 330, University of California Consultant Experience Form (Attachment A) and University Statement of Qualifications (Attachment B). One electronic copy on CD or flash drive, in pdf format, should be submitted, with any graphic images, spreadsheets or pages larger than 8.5 x 11 submitted in landscape view. No paper copies or ed submittals will be accepted. Proposals are due no later than 4:00 p.m. on THURSDAY, APRIL 28, Mailing Address: University of California, San Diego Jennifer Mora, Contracts Analyst Office of Facilities Design and Construction 9500 Gilman Drive MC 0916 La Jolla, CA Delivery or Overnight Mail Physical Address: University of California, San Diego Jennifer Mora, Contracts Analyst Office of Facilities Design and Construction North Torrey Pines Road, Suite 465 La Jolla, CA Hours of business: Monday through Friday, 8:00 a.m. to 4:30 p.m. Technical questions or questions regarding the scope of the project should be directed to Doug Darois, Project Manager at (858) UC San Diego requests that interested firms refrain from contacting any other party regarding this project. REQUEST FOR QUALIFICATION 4
6 UC San Diego encourages the participation of Small, Disadvantaged, Minority-owned, Womenowned and Service/Disabled Veteran-owned Business Enterprises (S/D/M/W/DVBE s) and is committed to promote a diverse pool of firms for our building programs. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each candidate firm may be required to show evidence of its equal employment opportunity policy. The University of California is an Equal Opportunity Employer minorities and women are encouraged to apply for consideration. REQUEST FOR QUALIFICATION 5
REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT
REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE THORNTON HOSPITAL EAST ENTRY AND ATRIUM, & THORNTON HOSPITAL RADIOLOGY/MRI MEDICAL CENTER, LA JOLLA FD&C Project No 5022 Proposals due Tuesday, March
More information***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA. and
***REVISED*** REQUEST FOR QUALIFICATIONS EXECUTIVE ARCHITECT FOR THE MOORES CANCER CENTER PHARMACY UCSD MEDICAL CENTER LA JOLLA and ENCINITAS PHARMACY UPGRADE UNIVERSITY OF CALIFORNIA, SAN DIEGO FD&C Project
More informationEast Village Utilities Design & Construction Administration Services Code Item 307B
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte East Village Utilities
More informationLEVEL I PREQUALIFICATION DOCUMENTS
Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,
More informationMedium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany
Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany 1 Contents 1 Scope 3 2 Power Demand and Distribution in today s Mission Critical Applications
More information1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:
SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,
More informationLEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION
Project No. 4863/A4L-396 LEVEL I PREQUALIFICATION DOCUMENTS for COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS December 8, 2015
REVELLE ELECTRICAL SWITCH STATION EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO Project No.: 4892/A4L-398/966176 General: ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS December 8, 2015 The following changes,
More informationLEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS
Project No. 5005/A4L-424/ 962520 LEVEL I PREQUALIFICATION DOCUMENTS for GEISEL RESTROOM RENOVATIONS University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La
More informationResidence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase
More informationPETALUMA HISTORICAL LIBRARY AND MUSEUM Project # C
REQUEST FOR PROPOSALS CITY OF PETALUMA, CALIFORNIA PETALUMA HISTORICAL LIBRARY AND MUSEUM Project # C16201304 KEY ELEMENTS & ACTIVITIES Complete Comprehensive Analysis & Scope Development Complete Design
More informationInformation Technology Infrastructure Upgrades Advance Planning, Design, & Construction Administration Services Code Item 303
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704-687-0615 PROJECT: UNC Charlotte Information Technology
More informationSECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V
SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals
More informationLEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA
Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationREQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES. June 2018
REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR CONSTRUCTION MANAGEMENT AND TENANT REPRESENTATIVE SERVICES June 2018 UNIVERSITY OF CALIFORNIA, DAVIS HEALTH FACILITIES DESIGN & CONSTRUCTION 4800 2 ND AVENUE,
More informationCone University Center HVAC Modernization Design and Construction Administration Services Code Item 320
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte Cone University Center
More informationREQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS
REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms
More informationRequest for Qualifications Architects CENTRAL UTILITY PLANT SHOP AND POWER CENTER
Request for Qualifications Architects CENTRAL UTILITY PLANT SHOP AND POWER CENTER The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses
More informationStudent Government Office Renovations Design/Construction Administration Services Code Item 305
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, NC 28223 Telephone: 704-687-0615 PROJECT: UNC Charlotte Student Government Office
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationSewer Capital Improvement Program Wastewater Treatment Plant No. 3 Generator Banking Sealed Bid No A/E Project No. 2282
CITY OF KENNER WASTEWATER TREATMENT PLANT NO. 3 GENERATOR BANKING IMC#2282 ADDENDUM NO. 1 DATE: September 28, 2017 PROJECT: City of Kenner Sewer Capital Improvement Program Wastewater Treatment Plant No.
More informationADDENDUM NUMBER ONE BRISTOL WATER FILTRATION PLANT MCC UPGRADE CITY OF BRISTOL, TENNESSEE
ADDENDUM NUMBER ONE BRISTOL WATER FILTRATION PLANT MCC UPGRADE CITY OF BRISTOL, TENNESSEE Pre-bid Meeting minutes are attached to this Addendum. I. QUESTIONS 1. Can an allowance for Power Company costs
More informationusername: U16062 password: 8ojhiog2
University of Illinois at Urbana-Champaign Request for Professional Services Qualifications (QBS): Bevier Hall - Infrastructure Renovation Phase 2 First published September 23, 2015 QBS #PSSU16062 Project
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationLincoln City Visitor and Convention Bureau. City of Lincoln City REQUEST FOR QUALIFICATIONS
Lincoln City Visitor and Convention Bureau City of Lincoln City REQUEST FOR QUALIFICATIONS Visitor Center Concept Development and Designs Architectural Services Lincoln City, Oregon April 20, 2018 RFQ
More informationCONSTRUCTION OF NEW 132/33 KV GIS SUBSTATION AT KULI, DISTRICT - MURSHIDABAD. (Package-12)
Section I - NOTICE INVITING TENDER ABRIDGED NOTICE INVITING TENDER WBSETCL (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION OF NEW
More informationThe Lothian Residence Hall Building System Infrastructure Analysis project will develop a phased strategy that will include the following elements:
UNIVERSITY OF CALIFORNIA, RIVERSIDE REQUEST FOR PROPOSAL PRE-DESIGN AND PRE-ENGINEERING PROGRAMMING LOTHIAN RESIDENCE HALL BUILDING SYSTEM INFRASTRUCTURE AND SEISMIC ANALYSIS Introduction The University
More informationNZQA registered unit standard version 4 Page 1 of 5. Carry out switching operations on metal clad switchgear
Page 1 of 5 Title Carry out switching operations on metal clad switchgear Level 4 Credits 3 Purpose People credited with this unit standard are able to: demonstrate knowledge of metal clad switchgear,
More informationREQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN
REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services
More informationWEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES
1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified
More informationPlease refer to Page 418 on Contract Documents Part 2, Attachment A, Acceptable Suppliers for Major Equipment.
Question No. 1 Do the graphic symbols in drafting follow IEEE or IEC Standards? Please follow IEEE Standards. Question No. 2 For Standard Specifications for Public Works Construction by Public Works Standard,
More informationWhat Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?
What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? How to compare apples-to-apples bids. By R. Dee Jones, P.E., AVO Training Institute Electrical Engineering Division Manager/Principal
More informationSCOPE OF WORK SUBSTATIONS
Page 2 of 11 REVISION CONTROL Issued for Internal Review Issued for Client Review Issued for DFS REVISION HISTORY Revision Date Pages Revised Remarks 00 29/08/2017 Multiple Comments incorporated 01 05/04/2018
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES
More informationAppendix A Technical Specifications Engineering Services for the Nocatee 230/26kV Substation
Appendix A Technical Specifications Engineering Services for the Nocatee 230/26kV Substation 1. Scope of Work 1.1. Provide civil and electrical engineering services for the Nocatee 230/26kV Substation.
More informationPower and Energy Systems Engineering
Engineering Planning Project Management Operations Support Provided By J. J. Bergeron & Company, Inc. 1900 Veterans Memorial Blvd. Suite 205 Metairie, La. 70005 Power and Energy Systems Engineering Services
More informationCareer Center Advance Planning/Design Services Code Item 321
The University of North Carolina at Charlotte Temporary Office Space Facilities Management - Capital Projects Hickory Building (Building #536 on Campus Map) 9316 Mary Alexander Road Charlotte, NC 28223
More informationADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)
Office of the Capital Planning, Design & Construction Phone: 973-720-2352 Fax: 973-720-2829 WWW.WPUNJ.EDU ADDENDUM NO 1 TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP-16-01-99-B)
More informationSUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard
SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator
More informationPRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION
PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the
More informationNEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems
NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems SUBCHAPTER 9 NET METERING AND INTERCONNECTION STANDARDS FOR CLASS I
More informationSUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY
SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional
More informationMETERING INSTALLATION
4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL: (858) 534-2177 FAX: (858) 534-4363
More informationSession 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile
Session 9: Photovoltaic System Case Studies And Electric Distribution Planning for DER October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado, U.S.A.
More informationREQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES. Issuance Date November 27, 2017
REQUEST FOR PROPOSALS EXECUTIVE SEARCH SERVICES Issuance Date November 27, 2017 Submittal Deadline January 8, 2018 Page Is Blank For Photocopying MARIN LAFCO 2 TABLE OF CONTENTS Section Page Number I.
More informationelectrical engineering division Arc Flash Study Planning Kit Everything You Need To Ensure The Success of Your Arc Flash Project
Arc Flash Study Planning Kit Everything You Need To Ensure The Success of Your Arc Flash Project training institute WHAT IS AN ARC FLASH? An arc flash occurs when electric current passes through the air
More informationREQUEST FOR PROPOSALS. For CONSTRUCTION MANAGER/GENERAL CONTRACTOR SERVICES EOU DATA CENTER PROJECT. May 1, 2018
REQUEST FOR PROPOSALS For CONSTRUCTION MANAGER/GENERAL CONTRACTOR SERVICES EOU DATA CENTER PROJECT May 1, 2018 PROJECT WEBSITE: https://secure.orpu.org/bid www.orpin.oregon.gov ISSUE DATE: May 1, 2018
More informationMentors and Partners for Candidates in the Induction Program to Clear a Preliminary Single Subject, Multiple Subject, or Education Specialist
Mentors and Partners for Candidates in the Induction Program to Clear a Preliminary Single Subject, Multiple Subject, or Education Specialist California Teaching Credential Guidelines and Tips for the
More informationPURCHASING DEPARTMENT
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationDiocese of San Diego BUILDING AND RENOVATION GUIDELINES. Table of Contents. Building and Renovation Committee Bylaws 2
ADMINISTRATION Diocesan-16 2/1/2011 Diocese of San Diego BUILDING AND RENOVATION GUIDELINES Table of Contents Page Building and Renovation Committee Bylaws 2 I. Preliminary Discussions at the Diocesan
More informationFIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.
FIELD TEST AND OPERATIONAL CHECK SECTION 16080 PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Refer to Section 16010, Electrical General Requirements. 1.2 WORK INCLUDED A. General Scope: 1. The Contractor
More informationCOUNTY OF SAN JOAQUIN
June 4, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project.
LOS ANGELES COMMUNITY COLLEGES 770 Wilshire Boulevard, Los Angeles, CA 90017 Telephone: 213/891-2000 CITY EAST HARBOR MISSION PIERCE SOUTHWEST TRADE TECHNICAL VALLEY WEST ADMINISTRATIVE OFFICES Date: October
More informationSWITCH ELECTRICAL SERVICE TO CAMPUS 12Kv SYSTEM / ATHLETICS. Project No.: Contract No.:
SWITCH ELECTRICAL SERVICE TO CAMPUS 12Kv SYSTEM / ATHLETICS Project No.: 5108052 Contract No.: 996004 Advertisement Scope Contractor Pre-Bid Conference and Job Walk Plan Holder s List Addendum No. 1 ADVERTISEMENT
More informationProfessional Qualifications Supplement (PQS) Instructions. GENERAL INSTRUCTIONS UF-368, Reitz Union Expansion and Renovation
BUSINESS AFFAIRS www.facilities.ufl.edu FACILITIES PLANNING AND CONSTRUCTION DIVISION Professional Qualifications Supplement (PQS) Instructions GENERAL INSTRUCTIONS UF-368, Reitz Union Expansion and Renovation
More informationScience Building Advance Planning/Design Services Code Item 301
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte Science Building Advance
More informationDETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED. (A Govt of West Bengal Enterprise)
DETAILED NOTICE INVITING TENDER WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION
More informationUniversity of California, Merced Design, and Construction June 2014
University of California, Merced Design, and Construction June 2014 ADVERTISEMENT FOR REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR GEOTECHNICAL ENGINEERING SERVICES The Merced campus of the University
More informationCHILLED WATER PRODUCTION SUB-ELEMENT
CHILLED WATER PRODUCTION SUB-ELEMENT The University of Central Florida employs three chilled water production plants combined with a three million gallon thermal energy storage tank to augment the chilled
More informationREQUEST FOR PROPOSAL (RFP) No.: J-19 PRECONSTRUCTION AND CONSTRUCTION SERVICES, MEDIUM VOLTAGE SUBSTATION REPLACEMENT, LAS POSITAS COLLEGE
REQUEST FOR PROPOSAL (RFP) No.: J-19 PRECONSTRUCTION AND CONSTRUCTION SERVICES, MEDIUM VOLTAGE SUBSTATION REPLACEMENT, LAS POSITAS COLLEGE To: All Prospective Bidders Addendum No. One This Addendum One
More informationMT. SAN JACINTO COMMUNITY COLLEGE DISTRICT REQUEST FOR PROPOSALS (RFP) # For Seismic Peer Review for the Temecula Campus Bldg.
MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT REQUEST FOR PROPOSALS (RFP) # 2018-008 For Seismic Peer Review for the Temecula Campus Bldg. G & F RFP Issue Date: Tuesday, November 20, 2018 Proposal Submittal
More informationCity of Sultan Request for Proposals City Attorney Services
The City Council of the ( City ) invites interested law firms and individuals with a minimum of seven (7) years of municipal experience to submit a written proposal to provide City Attorney services. As
More informationUnion Power Cooperative
Union Power Cooperative INTERCONNECTION STANDARD STANDARD FOR INTERCONNECTING SMALL GENERATION 100 kw OR LESS 1. Definitions: 1.1 Area EPS: Area Electric Power System: The electric facilities of the local
More informationCID (Campus Infrastructure Development) Roadway Improvements Advance Planning/Design Services Code Item 301A
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte CID (Campus Infrastructure
More informationLOWER MANHATTAN DEVELOPMENT CORPORATION
LOWER MANHATTAN DEVELOPMENT CORPORATION REQUEST FOR QUALIFICATIONS The Lower Manhattan Development Corporation, a subsidiary of the New York State Urban Development Corporation d/b/a Empire State Development
More informationTechnical Assignment #2 Electrical Systems Existing Conditions and Building Load Summary Report. Executive Summary
Matthew Fracassini Lighting/Electrical Greenwich Academy Upper School Greenwich, CT Primary Faculty Consultant: Mistrick Technical Assignment #2 Electrical Systems Existing Conditions and Building Load
More informationREQUEST FOR PROPOSALS
I. INTRODUCTION The Port of Oakland Aviation Division requests proposals from qualified consultants to perform technical evaluations for existing Terminal 1 buildings at Oakland International Airport (OAK).
More informationUniversity of Michigan: Central Plant Distributed Control System Upgrades
International District Energy Association University of Michigan: Central Plant Distributed Control System Upgrades Presented by Thomas J. Mergen, P.E. Stanley Consultants, Inc. Agenda Background Predesign
More informationDESIGN DEVELOPMENT PHASE
UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design
More informationAGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM
AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM BETWEEN AND (1) [Eastern / London / South Eastern] Power Networks plc Company Number [02366906 / 03929195
More informationREQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater.
REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION University of Wisconsin-Whitewater March 2008 Project No. 08B21 TABLE OF CONTENTS PAGE Table of Contents... 2 Project
More informationPosition Status: Classified; Salary Level 26, Fulltime, Non-exempt
Identity and Access Management Analyst Portland Community College Requisition Number: 09194 Location: Sylvania Campus Address: 12000 SW 49th Avenue, Portland, OR Hours of Work: 8 a.m. to 5 p.m. Monday
More informationPENNSYLVANIA TURNPIKE COMMISSION
PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING or PROJECT MANAGEMENT FIRM Program Management Services for All Electronic Toll (AET) Conversion Project Reference No. 3-233 The Pennsylvania
More informationREQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System
REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System Issued by the City of Montpelier, Vermont Department of Planning and Community Development Responses Due: August 12, 2011,
More informationThe City of Madison requests statements of qualifications for architectural and engineering design services for the PINNEY LIBRARY project.
Department of Public Works Engineering Division Robert F. Phillips, P.E., City Engineer City-County Building, Room 115 210 Martin Luther King, Jr. Boulevard Madison, Wisconsin 53703 Phone: (608) 266-4751
More informationADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR. BID No. 2019PW299
ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR BID No. 2019PW299 CHAFFEY COMMUNITY COLLEGE DISTRICT TRANSFORMER REPLACEMENT PROJECT RANCHO CUCAMONGA, CALIFORNIA COUNTY OF SAN BERNARDINO CHAFFEY COMMUNITY
More informationLOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX N - Campus Utilities Assessment Findings
LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX N - Campus Utilities Assessment Findings Louisiana State University Campus Master Plan Campus Utilities Introduction Based
More informationCUSTOMER SERVICE POLICIES
Resolution U-10670 Effective December 18, 2013 Section Title Page No. 1.0 Statement of General Policy... 2 2.0 Electrical Service... 3 2.1 Electrical Service Availability and Characteristics... 3 2.2 Large-Load
More informationTelecommunication Spaces
Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137
More informationNew York State Contract Reporter
The New York State Contract Reporter NYS' official source of contracting opportunities Bringing business and government together Statements of Qualifications are sought from engineering firms to provide
More informationPresentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects
Presentation Title ( Arial, Font size 28 ) Urban Rooftop PV Projects Date, Venue, etc..( Arial, Font size 18 ) 3 rd April 2012 1 Renewable Energy Portfolio of Tata Power Mithapur 25 MW Samana 50 MW Mulshi
More informationGeneral Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action
Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and
More informationRequest for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents
Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents Administration of Project: Local Higher Education Project Name Olscamp Central Chiller Plant CCP-3 Response
More informationEDS GAS ZONE IDENTIFICATION AND ALARMS ON GAS INSULATED SWITCHGEAR
ENGINEERING DESIGN STANDARD EDS 03-0026 GAS ZONE IDENTIFICATION AND ALARMS ON GAS INSULATED SWITCHGEAR Network(s): Summary: EPN, LPN, SPN This standard sets out the system of gas zone identification and
More informationScience Technology Engineering and Mathematics (STEM) Initiative
DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and
More informationREQUEST FOR PROPOSALS
Birmingham Jefferson Civic Center Authority address 2100 Richard Arrington Jr. Blvd North Birmingham, AL 35203 website www.bjcc.org phone 205.458.8400 REQUEST FOR PROPOSALS DESIGN & ENGINEERING SERVICES
More informationRequest for Proposals: Tax Increment Financing District Application Services Response Date: December 11, 2009, 2:00 PM
Website: www.cedoburlington.org Request for Proposals: Tax Increment Financing District Application Services Response Date: December 11, 2009, 2:00 PM I. PURPOSE The city of Burlington's Community and
More information~~F NOTE: THE BID DATE HAS BEEN EXTENDED TO 2:00 P.M., THURSDAY, MAY 4, UNIVERSITY OF CALIFORNIA, SAN DIEGO. April 20, 2017
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES
More informationPFS Underground Buildings for Transformer Substations Up to 36 kv
Transformer Substations PFS Underground Buildings for Transformer Substations Up to 36 kv PFS Underground Transformer Substation Buildings description The PFS building is a monoblock concrete enclosure
More informationReference Information:
Solar PV Simplified Standard Permit Application Requirements For: Central/String Inverter(s) & Micro-Inverter(s) Systems for One and Two Family Dwellings SCOPE: Use this application only for utility-interactive
More informationJanice Reedus, Director of Business & Auxiliary Services Campus Center Building A, Room Houbolt Road Joliet, IL 60431
DATE: January 9, 2015 Addendum No. 1 Page 1 of 7 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: Commissioning Agent Services
More informationJun :50PM TECHNICIAN, TELEVISION, PRIN PRINCIPAL TELEVISION TECHNICIAN
Position Description Report Run Date Jun 8 2017 1:50PM Position Number: 02017246 Dept: IET ACADEMIC TECHNOLOGY SVCS - 061417 Position: TECHNICIAN, TELEVISION, PRIN Approved Payroll Title Code: 8291 Approved
More informationVFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT)
VFA SAMPLE RFP (DETAILED FACILITY CONDITION ASSESSMENT) I. Purpose As part of a strategic planning directive, the has decided to undertake a comprehensive condition audit and plant capital renewal
More information1.0 ABOUT THE NU GUIDELINES
Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner
More informationInstructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village
Instructions for Submission of Contractor's State, ment of Qualifications (SOQ) UF Bid Number ITB17KO-107 Whitney Research Village SCOPE OF WORK New work shall include all Labor, Material Supervision and
More informationPUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)
PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit
More informationIrvine Unified School District
REQUEST FOR PRE-QUALIFICATION QUESTIONNAIRE PRE-QUALIFICATION QUESTIONNAIRE FOR AUDIO VISUAL INSTALLATION SERVICES The (District) is looking to pre-qualify several audio visual (AV) installation and integration
More information