1 SPECIFICATION

2 SPECIFICATION CONFIGURATION AND DESIGN CRITERIA 4 PIPE FAN COIL AIR CONDITIONING Loads The structure is designed to accommodate the following uniformly distributed and concentrated imposed loads: LG7 COMPLIANT LED LIGHTING FINISHED FLOOR-TO-CEILING HEIGHT 2.75M (5.45M IN GROUND FLOOR RECEPTION) RAISED FLOOR (150MM) PLANNING GRID 1.5M 8 X 24 PERSON PASSENGER LIFTS, 1X 2,500KG GOODS LIFT, DEDICATED CYCLE LIFT, DEDICATED CAR LIFT Imposed loading Uniform Concentrated Offices: General 3.50 kn/m² 2.7 kn Partitions allowance 1.00 kn/m² Allocated plant and equipment areas 7.50 kn/m² 4.5 kn Servicing: Toilet areas 2.50 kn/m² 2.7 kn Basement plant and equipment areas 7.50 kn/m² 4.5 kn Storage 7.50kN/m² 4.5 kn Floor finishes (false floor) 0.55 kn/m² Services 0.15 kn/m² Ceiling 0.15 kn/m² Dimensional Description The following nominal internal dimensions are provided to the areas of the office accommodation, subject to completion of the fit-out works in accordance with the Category A specification: Floor to ceiling heights (all dimensions clear height) Basement Level 2: 4.500m Basement Level 1: (excluding area below loading bay) 3.750m Ground Floor: 5.450m First Seventeenth offices: 2.750m Integrated Floor Zone On typical floors the integrated M&E and structural floor zone is 1,150mm. 29 SHOWERS AND 500 LOCKERS 500 BICYCLE SPACES This comprises the following: Office Floor Raised floor (including tile): Floor slab: Structural beams: Structural tolerance: Lighting zone (including tile): Total Occupational Densities 150mm 130mm 725mm 45mm 100mm 1,150mm 5 CAR PARKING SPACES BREEAM EXCELLENT WIRED SCORE PLATINUM Based upon population per m² of net internal area (NIA) occupational densities are as follows: (The population density used for the design of the lifts assumes a 20% absenteeism) Plant and mains sizing: Means of escape: 1:6m² WC provision (calculated on a floor-by-floor basis): (The population density used for the design of the toilets assumes an 80% utilisation factor.) Male: Female ratio (based on floor-by-floor calculations): 60:60 One unisex disabled toilet (with handed layout on alternate floors) and two ambulant toilets are provided on each floor. Standards for WC provision meet those set out in BS6465 Part 1: 2006 (+A1 2009)

3 Car Parking and Cycle Provision 5 car parking spaces are provided, 2 of which are designated disabled. 55 basement motorcycle spaces are provided. 500 bicycle spaces are provided. Parking is accessed via a car lift within the loading bay. A separate bicycle lift is accessed via Creechurch Place. Refuse Disposal The loading bay has been designed to accommodate a portable compaction skip and a bin store. Design Life The building is to be designed for the following maintained service life in accordance with BS 7543 and BS ISO Structural frame: External masonry walls: External cladding/curtain walling: (Double glazed units: powder coatings, 30 years anodising: 30 years) External seals and gaskets: Roof coverings: Internal walls: External works and hard landscaping: Mechanical and electrical services: in accordance with CIBSE guide M table 13.A1 Foundations and Substructure 60 years 60 years 30 years 20 years Piled foundations with secant pile walls around the perimeter of the site are proposed alongside bearing piles and pile caps located internally. The substructure is formed of concrete up to the ground floor level. This comprises 350mm thick RC flat slabs at ground floor and Level B1 and 400mm thick RC flat slab at Level B2. RC concrete columns are located beneath the superstructure columns. Concrete walls are provided around lift shaft openings to support the floor slabs. The waterproofing system for the formation level substructure will be designed as Grade 3 space, in accordance with BS8102:2009 Table 2. Superstructure The proposed superstructure of the building comprises a steel frame with Fabsec cell beams and steel columns supporting a composite slab on structural metal decking. Long-span steel beams have been adopted in order to maximise column free space. Typical bays have secondary beams spanning 14.0m and 16.9m supported by 10.5m primary beams. At ground floor level the majority of the columns have been designed for vehicle impact. BUILDING ENVELOPE Office Cladding Double Skin Unitised Façade System Double skin aluminium, thermally broken, externally drained and ventilated unitised façade system combining inner inward opening vent with IGU and outer full height single glazed pane structurally bonded to an aluminium carrier frame profile. Intermediate mullion at 750/1,500mm centres on these units. Variations to the façade system include inner insulated spandrel panel and outer single glazed back painted pane structurally bonded to an aluminium carrier frame profile; external aluminium louvre panel and horizontal weather louvres with insulated backing panel. Blinds (external with cavity) Venetian blinds are included as integral to the cladding system and operate raising and lowering on a timed mechanism with full ability for tenant override control to be installed. Facade Access External Elevations Are maintained via 3 fixed boom stationary swing arm building maintenance units located at roof level. Power and water supplies will be provided for cleaning the external elevations. Latchways or other safety fall restraint systems will also be provided where required. Internal Elevations Internal glazed wall elevations will be designed to be accessible via an internal opening leaf of the twin skin system. INTERIOR Reception Entrance Lobby The entrance area is situated to the Northwest end of the building, accessed off Creechurch Lane. The building is entered via two 3m powerassisted revolving doors, each with a single leaf automated pass door to one side. The entrance lobby also includes a facility to accommodate a lobby retail area which can be separated from the main lobby circulation route. The lobby shop can also be entered directly from the public pedestrian route off of Mitre Passage. The walls in the reception area are clad full height in stone. At the base there will be a flush stone skirting. Where access is required to service risers, these will be discrete and frameless, and lift-off panels utilised wherever possible. The main floor to the reception area will be non-slip, hard wearing grey honed natural stone. At the entrance to the building the floor is finished with a large mat well. Perimeter trench heater finished with an anodized architectural metal grille to match the external cladding colour will be provided along the perimeter glazing.

4 Office Areas The walls of the office areas are made up of the floor to ceiling height glazed perimeter cladding together with the painted plasterboard walls of the cores. A fully accessible SAS 330 perforated linear metal ceiling system with division strips and including light fittings, smoke detectors, motion sensors, and diffusers has been designed for the office ceiling and will coordinate with the 1,500mm planning grid. A fully accessible 600mm x 600mm raised access flooring system will be installed to provide a nominal service zone of 110mm. Passenger Lifts A double bank of lifts (low rise and high rise) totalling eight passenger lifts, work as a single group of lifts up to Level 9, after which, a single bank of four lifts (high rise) serve levels The low rise passenger lifts will be of the machine room less type. The passenger lifts will utilise destination hall call control. The passenger lifts will be designed to achieve an average waiting time of no more than 25 seconds with an up peak arrival rate of 15% of the population in a five minute period. The lift cars will be 24 person (1,800kg) capacity and be fitted out with high quality durable finishes commensurate with the finishes in the lift lobby at ground floor level. Goods Lift The goods lift in Core 2 serves all occupied levels including the roof. This lift will be 1,500mm wide, 2,300mm high and 3,200 mm deep with a rating of 2,500kg capacity travelling at 1.6 metres per second. Landing doors will be at least 1,300mm wide by 2,300mm high. Cycle Lift One dedicated cycle lift will serve the transfer of cycles and cyclists from the ground floor entrance at Creechurch Place to the cycle facilities on the lower ground floor. Shuttle Lift One dedicated shuttle lift will serve riders and drivers from basement and lower ground up to the ground floor reception. The lift car will be 8 person (630kg) capacity and measures 1,400mm deep, 1,100mm wide with a travel speed of 1.0m/s. Vehicle Lift One dedicated traction vehicle lift will serve the transfer of cars and motorbikes from the ground floor entrance within the loading bay to the parking facilities at basement level. The lift car will be 72 person (3,000kg) capacity and measures 6,500mm deep, 3,000mm wide with a travel speed of 0.5m/s. SERVICES INSTALLATION Basis of Design Temperature and Humidity Outdoor design conditions: CIBSE weather file for London Region Air conditioning: Summer: 29 C db, 20 C wb, Winter: -4 C (saturated) Frost protection: Plant protected to 8 C Cooling plant selection: Chillers selected for full load operation at 35 C db Internal Design Conditions Offices: Summer: 24 C ± 2 C db during occupied hours Winter: 20 C ± 2 C db during occupied hours No humidity control (provision made for the tenant to install humidification to achieve 30-40% average space relative humidity). Entrance / Reception: Summer: 25 C ± 2 C Winter: 21 C ± 2 C No humidity control Toilets: Stairwells and Circulation: Casual Gains Occupancy: Equipment / Small Power: Base Provision: Additional capacity: 22 C ± 4 C db (during occupied hours. No humidity control) Heated only to 18 C db minimum. No humidity control lift 90 W/person sensible, 50 W/person latent 10 W/m² (net lettable area) 25 W/m² (net lettable area) 10 W/m² (net lettable area, available on riser and at central plant) Ventilation Rates Office outside air: 1.50 l/s/m² (net lettable area) Office AHU filtration: BS EN779 Primary G3, Secondary M6 Toilet ventilation: 10 air changes per hour extract/8 air changes per hour transfer air Plantrooms: 2 6 air changes per hour Storage areas: 1 air change per hour minimum Infiltration Offices floors: Entrance: Summer: 0.25 air changes per hour for 4.5m from perimeter Winter: 0.50 air changes per hour for 4.5m from perimeter Summer: 1.00 air changes per hour Winter: 1.00 air changes per hour

5 Energy The building will target a BREEAM 2011 rating of Excellent. Water Storage / Break tanks Domestic cold water storage: Fluid category 1: 5 l/person based on an occupancy of 1 person per 8m 2 (net lettable area) with a 60% diversity applied. Fluid category 2: 15 l/person based on an occupancy of 1 person per 8m² (net lettable area) with a 60% diversity applied. Fluid category 5: Provision of tank for wash down facilities in basement areas. Domestic hot water storage: Centralised water heaters to provide hot water to core toilet areas and showers throughout building. Rainwater Drainage Design intensity: approx) l/s/m 2 (150 mm /1 hour General Office Areas Base Power Provisions Maximum load assessment for incoming UKPN connections are based on the following: Small power: Upgrade Power Allowances Tenant busbars: Basement Storage Area Power Provisions 8 W/m² Small power: 5 W/m² 8 W/m² (net lettable area) for open plan Cat A + 2W/m² for tenant additional lighting. 25 W/m² (net lettable area) 10 W/m² (net lettable area) Central Plant: 10% on transformer supply capacity (minimum) Plant Room Power Provisions 8 W/m² Miscellaneous power allowances plant: W/m² 5 10 W/m² Power Diversities Office lighting: 0.90 Office small power: 0.80 Upgrade allowance: 1.00 Mechanical plant: Fire detection/alarms category: BS 5839 Type L1 Resilience Space allocated for 2 tenants generators of 1,250 KVA prime rated each. Illumination Levels Offices lux average, maintained level in open plan on working plane utilising regulating control gear. Cavity reflectances: Ceiling 80% Walls 60% Working plane 35% (average) Workstation density: 1 per 8m² luminance Limit: 65 cut off angle uniformity Ratio: Better than 3:1 across floor. Better than 0.8 over projected task area of 2m x 1m. Specific power density: 1.5 W/m²/100 lux maximum Unified glare rating: No greater than 19. Working plane: 750mm AFFL Colour Temperature: Cool White (4,000K) colour Rendering index: RA Illumination Levels Other Areas Generally in accordance with CIBSE recommendations. Toilets: Corridors and stairs: Plant rooms: suit Stores: lux with enhanced lighting giving approximately 500lux over vanity unit 150 lux average (100 lux min on stair treads) lux with higher local levels to specific tasks 150 lux Acoustic Targets Noise levels are subject to completion of fit-out works in accordance with base build specification. Area/Space: Maximum NR Office: 8 Toilets, stairs and corridors: Reception foyer: 40 Plantrooms: 75 Plug and Play Connectivity Dedicated fibre-to-the-building symmetric 1GB broadband connectivity, enabling superfast upload as well as download speeds connectivity on each floor through Hyperoptic s private London wide network.

SUMMARY SPECIFICATION

SUMMARY SPECIFICATION Seventy St. Mary Axe has been designed with the most exacting of occupiers in mind. The result is a world-class building with a robust specification and the highest quality finishes. Occupancy ratio of

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION STRUCTURAL FRAME Imperial House is an 8 storey office building with a single basement built in 1913. The building is a steel-framed structure with concrete floors spanning between

More information

TWO Dublin Airport Central Accommodation Schedule. TWO Dublin Airport Central Ground Floor

TWO Dublin Airport Central Accommodation Schedule. TWO Dublin Airport Central Ground Floor TWO Accommodation Schedule TWO Ground Floor FLOOR SQM SQ Ft FIVE,856. 9,979 FOUR,856. 9,979 THREE,856. 9,979 TWO,856. 9,979 ONE,856. 9,979 GROUND*,593.3 7,50 54 55 TOTAL 0,873.8 7,045 Gross Internal Area

More information

get THE BRIGHTON VIBE. SUMMARY Specification.

get THE BRIGHTON VIBE. SUMMARY Specification. get THE BRIGHTON VIBE. SUMMARY Specification. SUMMARY SPECIFICATION THE BRINELL BUILDING Occupancy General Occupancy: 1:8 sq m Means of escape: 1:6 sq m Internal climate: 1:8 sq m Lift provision: 1 person

More information

WELCOME TO 99 BISHOPSGATE. noun A KINDLY GREETING OR RECEPTION. adj GLADLY RECEIVED. verb GREET RECEIVE MEET ACCEPT REGARD

WELCOME TO 99 BISHOPSGATE. noun A KINDLY GREETING OR RECEPTION. adj GLADLY RECEIVED. verb GREET RECEIVE MEET ACCEPT REGARD 99 BISHOPSGATE WELCOME noun A KINDLY GREETING OR RECEPTION adj GLADLY RECEIVED verb GREET RECEIVE MEET ACCEPT REGARD syn APPRECIATED INVITED HONOURED FAVOURABLE CORDIAL TO 99 BISHOPSGATE ARRIVAL RECEPTION

More information

OFFICE DEVELOPMENT COOIL SMITHY, BRADDAN

OFFICE DEVELOPMENT COOIL SMITHY, BRADDAN OFFICE DEVELOPMENT COOIL SMITHY, BRADDAN BLOCKS A, B & C FOR SALE OR TO LET CONTACT PLANNING APPROVED Telephone - 01624 693300 Mobile - 07624 480881 Email - arace@.com Dandara are pleased to announce that

More information

SUMMARY SPECIFICATION DESIGN CONFIGURATION AND CRITERIA. Ofice Level Toilet Ablutions. Design Life. Grids. Public Ablutions at Ground Floor Level

SUMMARY SPECIFICATION DESIGN CONFIGURATION AND CRITERIA. Ofice Level Toilet Ablutions. Design Life. Grids. Public Ablutions at Ground Floor Level SUMMARY SPECIFICATION The Wings office development is designed to provide approximately 27,000m 2 of high quality office space in a twin tower configuration. The ground floor contains a series of entry

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Refurbishment of. Thorpe Park, Leeds

Refurbishment of. Thorpe Park, Leeds Refurbishment of 3200 Thorpe Park, Leeds Outline Specification Summary Specification The building is to be substantially refurbished to provide a new entrance approach with glass lobby, communal entrance

More information

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red Plant Areas External plant must meet the following noise suppression requirement as adopted by the Landlord: 1. Air handling units 45db measured at 3metres from source. 2. Heat rejection plant 45db measured

More information

FloorGlazeTM.

FloorGlazeTM. FloorGlazeTM INDEX: 1. Typical applications for fire-rated floors. 2. The FloorGlaze range of glass floors. 3. Dimensions- F60 and F30. 4. Performance specifications. 5. FloorGlaze details. Price on application:

More information

BUILDING SPECIFICATIONS

BUILDING SPECIFICATIONS BUILDING SPECIFICATIONS FOUNDATION AND STRUCTURE Foundations using reinforced concrete slabs, according to the data of the geotechnical study, complying with building standard CTE-DB-SE-C. Concrete walls

More information

Technical Specification

Technical Specification 10 STRATTON STREET Technical Specification 01 Technical Specification 01. INTRODUCTION 1.1 GENERAL This Outline Specification is intended to describe the works of refurbishment undertaken to provide Category

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping PAGE 415 Part 9 External works 9.2 Drives, paths and landscaping Part 9 External works Chapter CONTENTS SCOPE Clause DESIGN Design standards D1 1 Statutory requirements D2 1 Garage foundations D3 1 Garage

More information

The offices have been designed to LEED V4 Gold standard which includes: S CH ED U L E O F ACCOMO DAT I O N

The offices have been designed to LEED V4 Gold standard which includes: S CH ED U L E O F ACCOMO DAT I O N The Reflector THE SP ECI FI C AT I O NS The offices have been designed to LEED V4 Gold standard which includes: Building Management System Secure car parking for cars and bicycle spaces, bicycle storage

More information

West & North Yorkshire Chamber of Commerce. Serviced offices project, Bradford. Information for contractor Expressions of Interest

West & North Yorkshire Chamber of Commerce. Serviced offices project, Bradford. Information for contractor Expressions of Interest West & North Yorkshire Chamber of Commerce Serviced offices project, Bradford Information for contractor Expressions of Interest Background West & North Yorkshire Chamber of Commerce (the Chamber) plans

More information

Unitised Curtain Wall Beaded

Unitised Curtain Wall Beaded Unitised Curtain Wall Beaded Glazed Frame Unitised Curtain Wall Reference Brand: Sapa Building System Elegance 72 GF GENERAL DESCRIPTION Unitised curtain wall system using glazing beads for glass retention.

More information

Section : 100 TRESHOLD STAIRS DEPARTMENT NGL HALLWAY TOWARDS MUSEUM FFL DISABLED WC FEMALE WC MALE WC FFL 95.

Section : 100 TRESHOLD STAIRS DEPARTMENT NGL HALLWAY TOWARDS MUSEUM FFL DISABLED WC FEMALE WC MALE WC FFL 95. Section 3-3 1 : 100 TRESHOLD STAIRS DEPARTMENT NGL 100.000 FEMALE WC DISABLED WC MALE WC HALLWAY TOWARDS MUSEUM FFL 98.100 FFL 95.400 GROUND WATER COLLECTIONAND PUMP ROOM LOWER DOORS TO AUDITORIUM LOWER

More information

BUILDING CONSTRUCTION HANDBOOK. Ninth edition. Roy Chudley. and. Roger Greeno. O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK

BUILDING CONSTRUCTION HANDBOOK. Ninth edition. Roy Chudley. and. Roger Greeno. O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK BUILDING CONSTRUCTION HANDBOOK Ninth edition Roy Chudley and Roger Greeno O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK notations CONTENTS Preface to ninth edition xi Part One General Built environment

More information

glass interiors BALUSTRADES CATALOG

glass interiors BALUSTRADES CATALOG glass interiors BALUSTRADES CATALOG 2018 glass interiors The company Glasimo combines the family glassmaking traditions with modern processing technologies. The foundation of Glasimo is supported by 25

More information

Sample Questions for Paper 4 Building Services & Environmental Controls

Sample Questions for Paper 4 Building Services & Environmental Controls Basic Principle 1. Which of the following is fundamental in preventing the spread of legionnaires disease in building services installations? A. Using CFC refrigerants for chiller plants B. Using single-stack

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

Modular System Advantages

Modular System Advantages Modular System Advantages The Modular System advantages can be summarised as follows: Truly Modular Off-site build Competitive cost Multi-storey capability Fits any shape, any size Fast programme completions

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

Product Data Sheet (rev c 16/7/15) Product: BENCHMARK Roofliner System

Product Data Sheet (rev c 16/7/15) Product: BENCHMARK Roofliner System APPLICATION The BENCHMARK Roofliner system is to be used as an insulated composite roof deck under site applied single-ply membranes or fully supported or self-supported aluminium, copper, zinc and stainless

More information

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT Net Height of Typical Floors (Floor tiles to ceiling) = 290 cm 2 2 REV BY APP DESCRIPTION THIS DRAWING IS A COPYRIGHT. DO NOT FROM THE DRAWING. THE CONTRACTOR AND HIS SUBCONTRACTORS ARE TO VERIFY ALL P.O.Box:

More information

AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA NIGERIA ARCHITECTURAL DRAWINGS FOR TENDER

AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA NIGERIA ARCHITECTURAL DRAWINGS FOR TENDER AFRICAN DEVELOPMENT BANK, NIGERIA FIELD OFFICE, ABUJA NIGERIA ARCHITECTURAL DRAWINGS Lagos: 45 M/Muhammed Int/Airport Road, Tinuose House, Tel: (0)4527294, 4522977, 774500 AUGUST, 29.37m XRAY MACHINE 5

More information

Technical Specifications

Technical Specifications Technical Specifications Brief Building Overview Level 35 Area Overview (subject to survey) Level 34 Level 33 > High Rise 8,445sqm > Low Rise 10,670sqm > Total NLA 19,370sqm Level 32 Level 31 Level 30

More information

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT NEW FACILITY FOR ADULT BASIC EDUCATION AND VOCATIONAL TRAINING By Leigh Hartl Student Number: 207514952 A Report Submitted in Partial Fulfilment of the Requirements

More information

Residential Plan Review for New One and Two Family Dwellings

Residential Plan Review for New One and Two Family Dwellings The following is a list of items that are normally included in a set of construction drawings for one and two family dwellings. The items in bold depict those items that will be reviewed for during the

More information

Construction Studies Theory - Higher Level

Construction Studies Theory - Higher Level 2014. M76 Coimisiún na Scrúduithe Stáit State Examinations Commission Leaving Certificate Examination, 2014 Construction Studies Theory - Higher Level (300 marks) Friday, 13 June Afternoon, 2:00 to 5:00

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

March 2018 Progress. Work Completed, Week Ending 3/23/18:

March 2018 Progress. Work Completed, Week Ending 3/23/18: March 2018 Progress Work Completed, Week Ending 3/23/18: Continued draft curtains and liner panels. Continued running power to hangar doors. Continued installation of bath accessories in the gang bathrooms.

More information

Kingspan Day-Lite Kapture Data Sheet

Kingspan Day-Lite Kapture Data Sheet Light + Air UK & Republic of Ireland Kingspan Day-Lite Data Sheet KS700DLK, KS1400DLK, KS0DLK 2 Kingspan Day-Lite KS700DLK, KS1400DLK, KS0DLK Application KS700DLK, KS1400DLK, KS0DLK & KS2750DLK rooflights

More information

Volume 1. Barts Square, London EC1 Retail 9 Information Pack. Retail 9. March 2017

Volume 1. Barts Square, London EC1 Retail 9 Information Pack. Retail 9. March 2017 Volume 1 Retail 9 Barts Square, London EC1 Retail 9 Information Pack March 2017 2 BARTS SQUARE, LONDON EC1 - RETAIL 9 INFORMATION PACK Contents 1. DESIGN CRITERIA 4 1.1 THE DEVELOPMENT 4 1.2 STRUCTURE

More information

The HKIE Structural Examination Written Examination

The HKIE Structural Examination Written Examination The HKIE Structural Examination Written Examination Section 2: Design Questions (80% of the Written Examination) Date: 28 November 2014 (Friday) Time: 12:00 nn - 06:00 pm Answer ONE question only Question

More information

HIDD HEIGHTS PROGRESS REPORT

HIDD HEIGHTS PROGRESS REPORT HIDD HEIGHTS PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate Investment

More information

Contact Details: Phone Fax . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method:

Contact Details: Phone Fax  . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method: BCA Section J- Energy Efficiency Deemed- to- Satisfy Provisions Assessment Sheet 1. Project Overview Client Name: Address: Contact Person: Contact Details: Phone Fax Email Project: Work Description: New

More information

Disability Access Audit Checklist

Disability Access Audit Checklist Disability Access Audit Checklist Date : 1/2/2016 Name of Building : Scartho medical centre N/A Yes No 1. Is there any car parking on site or in the vicinity? 2. Is there any designated parking for disabled

More information

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such

More information

Fabrications, Safety & Lighting Solutions. Product Data Sheet. Kingspan Day-Lite Klick KS500 DLKK

Fabrications, Safety & Lighting Solutions. Product Data Sheet. Kingspan Day-Lite Klick KS500 DLKK Fabrications, Safety & Lighting Solutions Kingspan Day-Lite KS500 DLKK Applications Kingspan Day-Lite is a secret-fix wall light system typically suited for vertical applications. Featuring an innovative

More information

Session 2: A methodology for measuring embodied carbon. Sean Lockie, Director, Faithful and Gould

Session 2: A methodology for measuring embodied carbon. Sean Lockie, Director, Faithful and Gould Session 2: A methodology for measuring embodied carbon Sean Lockie, Director, Faithful and Gould RICS Methodology to calculate embodied carbon Sean Lockie, Faithful+Gould RICS 2 guides Methodology to calculate

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

FEDERATION TOWER MOSCOW DIFFERENT ROOM CLIMATES UNDER ONE ROOF

FEDERATION TOWER MOSCOW DIFFERENT ROOM CLIMATES UNDER ONE ROOF FEDERATION TOWER MOSCOW DIFFERENT ROOM CLIMATES UNDER ONE ROOF Oliver Baumann 1, and Claudius Reiser 1/2 1 Ebert & Baumann Consulting Engineers, Washington, D.C. 2 Ebert-Ingenieure GmbH &Co. KG, Munich,

More information

GypLyner IWL Independent wall lining system

GypLyner IWL Independent wall lining system Independent wall lining system Photograph courtesy of Philip Brier 0 Independent wall lining system independent wall lining is a lightweight, nonloadbearing drylining which is erected independently of

More information

AMS MU800 Matrix Curtain Walling

AMS MU800 Matrix Curtain Walling SPECIFICATION AMS MU800 Matrix Curtain Walling The AMS MU800 Matrix mullion drained curtain walling system offers unique architectural design features combined with market leading weather performance.

More information

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation

More information

tall buildings sustainable & practical design approach case study: 20 fenchurch street cibse regional seminar birmingham 8 february 2012

tall buildings sustainable & practical design approach case study: 20 fenchurch street cibse regional seminar birmingham 8 february 2012 tall buildings sustainable & practical design approach case study: 20 fenchurch street presented by vince ugarów group director hilson moran cibse regional seminar birmingham 8 february 2012 building performance

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Summary Specification (Issue 02)

Summary Specification (Issue 02) Summary Specification (Issue 02) Client EPISO 3 Westside S.a.r.l Project Westside (Blocks C and D) Property Report Date 04 April 2016 File Reference Prepared By Westside, London Road, Hemel Hempstead,

More information

AIRCOOL VENTILATORS FURTHER INFORMATION

AIRCOOL VENTILATORS FURTHER INFORMATION .................................................. CI/SfB (57.7) Xy Uniclass L7563 January 2015 FURTHER INFORMATION................................................................... Services Passivent

More information

Quality specifications for my home

Quality specifications for my home Quality specifications for my home by 7 Benefits of a dospuntos home 2 Quality specifications Casa Banderas 01 02 Outside: Before you go in: Façades Your home will have a ceramic brick façade finished

More information

The Alcalá Residential Development combines the peace and quiet of a residential area with the convenience of living in the city.

The Alcalá Residential Development combines the peace and quiet of a residential area with the convenience of living in the city. Your new life starts here In Parque Almunia, one of the areas in Granada with the most growth, Inmobiliaria Osuna is building a development for you that is unique in its specifications, amenities, location

More information

MIDDLE PARK Braddan, Isle of Man

MIDDLE PARK Braddan, Isle of Man MIDDLE PARK Braddan, Isle of Man INTRODUCTION Planning Permission The land is within an area zoned in the Local plan for industrial use. Planning permission for the development has been granted under application

More information

Volume 1. Barts Square, London EC1 Retail 8 Information Pack. Retail Unit 8. March 2017

Volume 1. Barts Square, London EC1 Retail 8 Information Pack. Retail Unit 8. March 2017 Volume 1 Retail Unit 8 Barts Square, London EC1 Retail 8 Information Pack March 2017 2 BARTS SQUARE, LONDON EC1 - RETAIL 8 INFORMATION PACK Contents 1. DESIGN CRITERIA 4 1.1 THE DEVELOPMENT 4 1.2 STRUCTURE

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

LUXALON. Other Luxalon products. QuadroCladn. Sandwich Wall. Multiple Panel Façade. Sun Louvres. Ceilings and Soffits

LUXALON. Other Luxalon products.   QuadroCladn. Sandwich Wall. Multiple Panel Façade. Sun Louvres. Ceilings and Soffits QuadroClad n Other Luxalon products QuadroCladn Sandwich Wall Multiple Panel Façade Sun Louvres Ceilings and Soffits Luxaclair Sealed Blinds Hunter Douglas Construction Elements BV Bellsize Close Walsall

More information

Via Parque Alicante BUILDING SPECIFICATIONS

Via Parque Alicante BUILDING SPECIFICATIONS WE BUILD YOUR HOUSE, SO YOU CAN MAKE IT A HOME Via Parque Alicante BUILDING SPECIFICATIONS f\ acciona Inmobiliaria First impressions do count 01. FAÇADE Facing brick façade to feature two colours, depending

More information

Curtain Wall Stick System (Capped)

Curtain Wall Stick System (Capped) Curtain Wall Stick System (Capped) Stick Construction Capped Curtain Wall Reference Brand: Sapa Building System Elegance 52 ST GENERAL DESCRIPTION Grid based thermally insulated curtain wall system with

More information

Outline Building Specification

Outline Building Specification Outline Building Specification CONTENTS Section 1 Section 1.1 Section 1.2 Section 1.3 Section 2 Section 2.1 Section 2.2 Section 2.3 Section 2.4 Section 2.5 Section 2.6 Section 2.7 Section 2.8 Section 2.9

More information

Product Data Sheet. QuadCore Karrier. Applications

Product Data Sheet. QuadCore Karrier. Applications Applications The Quad Karrier system is face fixed, provides the support, thermal and weathering functions to the Benchmark facades. The panel can be laid horizontally or vertically. Suitable for all building

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

ONE BREWERY WHARF, LEEDS

ONE BREWERY WHARF, LEEDS ONE BREWERY WHARF, LEEDS Client : Project Manager : Structural Engineer : Contractor : Glazing Contractor : Value : Rushbond Group plc Richard Boothroyd & Associates Robinson Consulting Ltd GB Building

More information

Technical Description For MK-CTX Office Cabins

Technical Description For MK-CTX Office Cabins Technical Description For MK-CTX Office Cabins Inside Length 5860 mm Width 2240 mm Height 2340 mm Outside Length 6055 mm Width 2435 mm Height 2591 mm Weight 1924 kg In General: The following description

More information

Container City I & II Trinity Bouy Wharf London England

Container City I & II Trinity Bouy Wharf London England Container City I & II Trinity Bouy Wharf London England Container City I Built in 2001, in 5 months Originally 3 stories providing 12 work studios across 4800 sq. ft. High demand required the addition

More information

HELLA Sonnen - und Wetterschutztechnik GmbH. Contribution within the framework of BREEAM certification. Management. Date:

HELLA Sonnen - und Wetterschutztechnik GmbH. Contribution within the framework of BREEAM certification. Management. Date: HELLA Sonnen - und Wetterschutztechnik GmbH Contribution within the framework of certification Date: Manufacturer: Products: 27.08.2014 HELLA Sonnen - und Wetterschutztechnik GmbH Outdoor Blind / Venetian

More information

Communal 51 Ceiling Systems by Vogl

Communal 51 Ceiling Systems by Vogl 33 commercial connections LIMITED Sound and thermal insulation specialists Communal 51 Ceiling Systems by Vogl Designed to meet Regulations Northern Ireland Regulation 51 Part G 2012 Republic of Ireland

More information

7. MATERIALS AND TECHNICAL INVESTIGATION

7. MATERIALS AND TECHNICAL INVESTIGATION 67 7. MATERIALS AND TECHNICAL INVESTIGATION Materials were chosen to provide minimal long-term maintenance. Hardwearing materials on ground floor levels were chosen to withstand the wear and tear of children

More information

ECOLOGY BUILDING SOCIETY HQ Environmental Specification

ECOLOGY BUILDING SOCIETY HQ Environmental Specification ECOLOGY BUILDING SOCIETY HQ Environmental Specification Building Design Objectives: to create an inspiring attractive building which will be a pleasure to work in over the years, to demonstrate sustainable

More information

Value Benefits of Modular Construction in Building Extensions

Value Benefits of Modular Construction in Building Extensions Value Benefits of Modular Construction in Building Extensions SPEED OF INSTALLATION Extensions to existing buildings using modular units can be constructed in less than 50% of the time required for conventional

More information

building movement solutions MECHANICAL, SEAL AND METAL EXPANSION JOINTS car park solutions VEXCOLT

building movement solutions MECHANICAL, SEAL AND METAL EXPANSION JOINTS car park solutions VEXCOLT building movement solutions MECHANICAL, SEAL AND METAL EXPANSION JOINTS car park solutions VEXCOLT contents of car park solutions Product Page No. Introduction Access 3 Traffic Load & Contact Area 4 Traffic

More information

YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE

YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE YORK PASSIVE CHILLED BEAMS ENGINEERING GUIDE Contents YORK Passive Chilled Beams 3 CB-PBE-YK / CB-PBR-YK Performance Data 5 CB-PBE-YK Dimensions 7 CB-PBR-YK Dimensions 8 Specifications 9 2 YORK Passive

More information

PRODUCT BROCHURE. Copyright Brital Ltd. 1.

PRODUCT BROCHURE. Copyright Brital Ltd. 1. Copyright 2012. Brital Ltd. 1. PRODUCT BROCHURE Introduction Brital Ltd was initially established to design and market aluminium curtain wall systems and façade systems in the Gulf region of the Middle

More information

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW.

AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW. AIR BARRIER DESIGN PRINCIPLES AN OVERVIEW www.stromatech.com AIR BARRIER DESIGN PRINCIPLES Building Regulations Approved Document Parts L1A & L2A currently requires that new buildings have to achieve a

More information

Specification Clauses for Revolution 54. K30: Panel Partitions. 1 November Specifications. Optima Products Ltd

Specification Clauses for Revolution 54. K30: Panel Partitions. 1 November Specifications. Optima Products Ltd Specification Clauses for Revolution 54 K30: Panel Partitions 1 November 2016 Specifications 054700 K30 Panel Partitions (Single Glazed) Revolution 54 130 RELOCATABLE PARTITION SYSTEM (Insert description

More information

Total Parking Solutions: From Lowest or Basement Levels to Roof Top Decks

Total Parking Solutions: From Lowest or Basement Levels to Roof Top Decks Contact the Flooring Specialist +91 44 4017 6600 india@flowcrete.com Total Parking From Lowest or Basement Levels to Roof Top Decks Multi-storey car parks are unique buildings, one in which all elements

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

THE TREASURE TOWER PROGRESS REPORT

THE TREASURE TOWER PROGRESS REPORT THE TREASURE TOWER PROGRESS REPORT About the Project: Project Developer Title of Project Project Reference Design & Supervision Consultant Interior Design Consultant Main Contractor Bin Faqeeh Real Estate

More information

BUDGET ESTIMATE - ISSUE No. 2

BUDGET ESTIMATE - ISSUE No. 2 REPAIRS & ESSENTIAL UPGRADING WORK AT WINGERWORTH PARISH HALL NEW ROAD, WINGERWORTH DERBYSHIRE, S42 6TB BUDGET ESTIMATE - ISSUE No. 2 OCTOBER 2016 GENERAL NOTES Patrick Meeds & Associates were asked to

More information

CWCT CURTAIN WALL INSTALLATION HANDBOOK

CWCT CURTAIN WALL INSTALLATION HANDBOOK The CWCT is sponsored by: CWCT CURTAIN WALL INSTALLATION HANDBOOK Ove Arup & Partners Bovis Lend Lease Ltd Comar Architectural Aluminium Systems Ltd Council for Aluminium in Building Kawneer UK Ltd Pilkington

More information

Residential Outline Specifications

Residential Outline Specifications Residential Outline Specifications September 2014 1. General a. Site i. Direct elevator access from parkade to residential floors ii. Separate commercial elevator access from parkade to 10th Street NW

More information

SPECIFICATION & PLANS

SPECIFICATION & PLANS SPECIFICATION & PLANS ANOTHER OUTSTANDING DEVELOPMENT BY THE HOWARD DE WALDEN ESTATE OFFERING 17,507 SQ FT OF MODERN OFFICES. FLOOR APPROXIMATE NIA SCHEDULE OF AREAS IPMS3 SQ FT NIA SQ M NIA SQ FT MEZZANINE

More information

ESSENTIAL TECHNICAL SPECIFICATIONS.

ESSENTIAL TECHNICAL SPECIFICATIONS. ESSENTIAL TECHNICAL SPECIFICATIONS FOUNDATIONS HA-25 reinforced concrete perimeter bracing, dimensions 60 x 40 cm + 10 cm of blinding concrete in accordance with CTE building regulations. The final foundations

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

Project Specifications

Project Specifications Project Specifications Unit 1, 2 & 3 / 1 Carmen Street, NEWPORT These specifications form part of the building contract. The owner shall therefore ensure that the project specifications are fully and accurately

More information

Office 3 St Paul s Place, Sheffield. Office Outline Specification. Rev P. July 2015

Office 3 St Paul s Place, Sheffield. Office Outline Specification. Rev P. July 2015 Office 3 St Paul s Place, Sheffield Office Outline Specification Rev P July 2015 CONTENTS 1.0 Introduction 2.0 Summary of Design Data 3.0 Design Standards 4.0 Statutory Undertakings 5.0 Substructure and

More information

Product Data Sheet. Product: Benchmark Wall Liner System

Product Data Sheet. Product: Benchmark Wall Liner System APPLICATION The Benchmark Wall Liner system is to be used as an insulated composite wall panel under site applied fully supported or self-supported aluminium, copper, zinc and stainless steel cladding

More information

PRM/KA/RERA/1251/446/PR/171230/002141

PRM/KA/RERA/1251/446/PR/171230/002141 PRM/KA/RERA/1251/446/PR/171230/002141 Strategically located near the Embassy Golf Links Business Park, Bangalore over looking the KGA Golf Course. Centrally located and easily accessible from all parts

More information

Aluminium SLIDING & BI-FOLD DOOR SYSTEMS

Aluminium SLIDING & BI-FOLD DOOR SYSTEMS Aluminium SLIDING & BI-FOLD DOOR SYSTEMS Bi-Fold 26Hi / 26Hi+ Systems High Performance Thermally Enhanced Bi-Folding Door At Carroll s Glass our thermal range of Bi-Folding doors are the perfect solution

More information

Responsibility Check List Sheet Item Description Responsibility Additional

Responsibility Check List Sheet Item Description Responsibility Additional Responsibility Check List Sheet Item Description Responsibility Additional A B C Sketch Brief Layout for the position of the mezzanine. Advise whether requirement to remove intermediate columns to provide

More information

SOLAR PHOTOVOLTAIC ENERGY

SOLAR PHOTOVOLTAIC ENERGY SOLAR PHOTOVOLTAIC ENERGY THE PHOTOVOLTAIC TECHNOLOGY PRODUCES CLEAN ELECTRICITY FROM SOLAR ENERGY 126 m 2 of photovoltaic modules are installed that generate about 12,000 kwh electricity per year, equivalent

More information

PRELIMINARY INSPECTION FRAMEWORK

PRELIMINARY INSPECTION FRAMEWORK PRELIMINARY INSPECTION FRAMEWORK 1. Oversite Striping of topsoil Forming site entrance Clearing off topsoil for service roadway Roadside drainage continued under entrance bay Any mature trees in vicinity

More information

Poor distribution & glare

Poor distribution & glare Light transmission The benefits of the use of natural daylight in buildings in respect of health & well-being, safety, productivity and energy savings are well documented. LIGHT TRANSMISSION Light that

More information