May 2004 Subject Index I-1 - A -
|
|
- Hilary Fleming
- 5 years ago
- Views:
Transcription
1 SUBJECT INDEX SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004
2
3 May 2004 Subject Index I-1 - A - Acceptance (Project) Inspection, Final , Payment, Final Access, Construction Vehicles Adjustments, Claims Admixtures (PCC) Aggregate Asphalt Surfacing , Base Course, Cement Stabilized Aggregate , Base Course, Graded Aggregate , Base Course, Hot-Mix Asphalt Aggregate Base Course, Permeable Aggregate Base Course, Hot-Mix Sand Asphalt Hot-Mix Asphalt Portland Cement Concrete Reuse of (Excavation) Sampling and Testing Procedures...C.3 Subbase, Soil-Aggregate Underdrains , 801 Agreements Landowner , , , Utilities , Agricultural Lime , , Soils Testing , , Air Percent Voids in HMA , Quality and Burning Waste Temperature (Concrete Patching) Alteration Plans and Work Quantities , Aluminum Sign Blanks (Permanent) Anchors, Guardrail , Animal Habitats, Protection of Anti-Stripping Materials (HMA) Approval (Contract) Arch Culverts, Structural Plate Pipe , , 715 Archeological Sites Areas, Determining and Estimating... Appendix D Army Corps of Engineers Permit As-Built Plans , Asphalt Base Course Mixture , Binder, Performance Graded , , , Binder Content , , C.6 Cold-Mix Asphalt...404, 405 Curb...721
4 I-2 Subject Index May 2004 Hot-Mix Asphalt Hot-Poured Sealant (PCC Pavement) Plant Inspector Recycled Asphalt Pavement Roofing Shingles Asphalt Materials Asphalt Surfacing , Hot-Mix Asphalt Sampling and Testing Procedures...C.6 Asphalt Pavements Asphalt Prime Coat Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Base Course, Coquina Shell , Base Course, Graded Aggregate , Base Course, Sand-Clay , Hot-Mix Asphalt Subbase, Cement Modified Subbase, Soil-Aggregate Asphalt Surfacing Double Treatment Single Treatment Triple Treatment Asphalt Tack Coat , Assembly Pipe, Structural Plate Steel Members, Structural Assessment Archeological and Historical Sites Environmental Impacts Hazardous Waste Impact Structures and Obstructions (Removal) Attenuator, Impact Permanent Portable Authority of the Engineer Partnering Automobiles (SCDOT) Award (Contract)...103, B - Backfilling Culverts , Underdrains Barriers and Barricades (Traffic) Permanent , Temporary , , Base Course Cement Stabilized Aggregate
5 May 2004 Subject Index I-3 Cement Stabilized Earth Coquina Shell Graded Aggregate Hot-Mix Asphalt Aggregate Hot-Mix Sand Asphalt Inspection Summary , PCC Pavements , Permeable Aggregate Sand-Clay Structure of Basins, Sediment Control Batching (PCC) BCA Lines Bearings, Elastomeric , , 724 Bedding (Culvert) , Bidding (Proposal) Bidders, Disqualification of Requirements and Conditions Binder Content Analysis , , C.6 Performance Graded (Material) , , , Blanks, Aluminum Sign (Permanent) Blasting , Block, Concrete Masonry Blockouts, Guardrail BMP (Water Quality Control) Bolts (Structural Steel) , Bonds (Contract) Boring Piles Underdrains Borrow Excavation, Roadway and Drainage Pit (Sampling, Testing, Erosion) , Box Culverts , 722 Brick Masonry Bridge Clearing and Grubbing Damage Dry-Run Depth Checks , Appendix D Excavation, Structural Expansion and Contraction Maintenance , Railing Rehabilitation, Deck Removal of Structures Surveying Brushing (Painting for Structural Steel) Building Structures, Removal of
6 I-4 Subject Index May 2004 Burning (Waste) Operations Air Quality Safety and Health Burying (Waste) on Right-of-Way C - Cable, Guardrail Cage (Reinforcement), Drilled Shafts Cancellation (Contract) , Caps (Piles) Cards (Sample Identification) , Appendix B Casing (Reinforcement) Catch Basins Cement (Portland) Base Course, Cement Stabilized Aggregate...308, , , Base Course, Cement Stabilized Earth...307, , Concrete...701, , , Pavement, Concrete , Sampling and Testing Procedures...C.5 Structures, Concrete Subbase, Cement Modified...301, , , Centerline (Re-Establishment) Certification Contractor Permits (Removal of Structures) HMA Personnel HMA Plant and Equipment Materials (Final) Nuclear Density Gauges PCC Personnel PCC Plant and Equipment Project Personnel Sampling and Testing Personnel , C.1.2 Shaft and Pile Personnel , , , Traffic Control Devices (Work Zone) Change Orders Approval of Claims Classification of Concurrence, Contractor Extension, Contract , Item Quantity and Price Reason Codes (Defined) SiteManager Changes to Plans or Work Quantities Channels (Excavation) Character (Contractor) Charter (Partnering), Team Check Samples ,
7 May 2004 Subject Index I-5 Chipping (Erosion Control), Wood Claims Architect-Engineer Liability Change Orders Contractor Claims Legal Responsibility for Classification of Soil Clay, Pipe Cleaning Final Project Clean Up Joints in PCC Pavement Steel Surfaces for Painting Clear Zone Clearances, Measuring... Appendix D Clearing and Grubbing Agreements and Permits Bridge Sites Contract (Extension/Review) Embankment Areas Erosion Control , Excavation Areas Intersections and Interchanges Marking Protected Items / Areas Removal and Disposal , , , Right-of-Way Roadway Salvageable Materials Surveying and Staking Closure Lane Project Coarse Aggregate (HMA) Cofferdams (Structure Excavation) Cold-Mix Asphalt Intermediate Course Surface Course Communications During HMA Paving During PCC Paving Compaction Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Base Course, Coquina Shell Base Course, Graded Aggregate Base Course, Sand-Clay Concrete Vibration/Consolidation , , Culverts (Backfilling and) Embankment Soil Subbase, Cement Modified
8 I-6 Subject Index May 2004 Subbase, Soil-Aggregate Compaction (HMA) Density (Acceptance), Control Strip Density (Acceptance), Theoretical Density (Verification), Control Strip Density (Verification), Theoretical Equipment Inspection , Concrete Block Masonry Curb and Gutter, Etc Drilled Shafts and Piles Guardrail Applications Portland Cement Prestressed , Sampling and Testing Procedures...C.5 Slope Protection , Structures, Concrete Concrete (Barriers) Permanent Temporary , , Concrete (Culverts) Pipe , Box, Precast Concrete (Pavement) Cracks, Routing and Sealing Grinding and Texturing Joints, Cleaning and Resealing Patching Cones (Work Zone Traffic Control) Conference Pre-Bid Preconstruction Partnering , , Pre-Pour (Concrete) , Conformance Review, Environmental Connections (Structural Steel) Consolidation, Concrete Vibration , , Constructability Review Containment (Spills) On-Site , Contract Award and Execution of , Bond Requirements for Cancellation of Award Conformity with Coordination with Default and Termination of Deferral and Cancellation of Execution and Approval of Extension of Failure to Execute
9 May 2004 Subject Index I-7 Intent of Subletting of Termination of Contract Time Charging of (SiteManager Diaries) Determination and Extension of Contraction, Bridge Expansion and Contractor (Cooperation) , Control of Material Traffic Work Control Strip (HMA Density) , Conversion Factor Tables Coverage (Tank Capacity/App. Rate)... Appendix D Inches to Decimal Feet... Appendix D Quantity Per Dept of Cylindrical Tanks... Appendix D Surface Area Per Road Width... Appendix D US Customary to Metric... Appendix D Cooperation Between Contractors By Contractors During Paving , Environmental Intra-Departmental Preconstruction with Utilities Coquina Shell Base Course Compaction Finishing Hauling and Placement Materials Prime Coat Application Sampling and Testing Spreading Thickness Check Weather Counterproposals (Bidding) Cracks, Routing and Sealing (PCC) Crane Safety Crossing, Highway-Railroad Contract Extension Improvements Cross-Sections (Survey) Crusher-Run Material (HMA) Culverts Backfilling and Compaction , Earthwork Field Adjustments Foundation and Bedding
10 I-8 Subject Index May 2004 Joining Sections Materials Placement Precast Box Pre-Pour Conference / Checklist Re-Laid Safety Staking and Utilities , , Structural Plate Pipe Trench Excavation Trenchless Method Curb and Gutter Asphalt Concrete Erosion Control Structures Curing Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Materials (Concrete Structures) Materials (PCC Pavement) PCC Pavement (Construction) PCC Pavement (Patching) Structures (Concrete) Subbase, Cement Modified Cut Sections Erosion Control Underdrain Locations Cutting and Splicing, Piles D - Daily Work Reports Contractor Equipment Tab Contractor Tab Daily Staff Tab Information Tab SiteManager Work Items Tab Damage by Contractor Protection and Restoration , Danger, Imminent Debris, Disposal of Deck (Concrete), Bridge Dry-Run Depth Check , Appendix D Joint Strip Seal Rehabilitation Default (Contract) Deferral (Contract) Deletion of Roads and Sections
11 May 2004 Subject Index I-9 Delineation Guardrail Work Zone Traffic Control Delivery (Pavement Mixture) HMA Pavement PCC Pavement Design General Features HMA Mixture , PCC Mixture , Detention Ponds (Stormwater) Detours Scope of Work Work Zone Traffic Control Diaries Approval of Changing Status SiteManager Time (Contract), Charging of Discovery, Late Archeological and Historical Sites Hazardous Materials / Waste Disposal/Disposition Burying on Right-of-Way Clearing and Grubbing , , Hazardous Materials / Waste Materials Found on the Work Non-Hazardous Waste Off Right-of-Way Structures and Obstructions , 202 Disputes (Claims) Disqualification (Bidders) District Asphalt Manager District Construction Engineer District Engineering Administrator , Ditches , Documentation As-Built Plans Clearances... Appendix D Constructability Review Forms...Appendix A Geological and Boring HMA Paving , , Injuries and Fatalities Preconstruction Conference Project Records , Sampling and Testing , , , Appendix B Surveying , Waste Disposal Dowel Bars ,
12 I-10 Subject Index May 2004 Dragging (Asphalt Surfacing) Drains, Pipe Slope , 803 Drawings, Working , 725 Drift Pins (Structural Steel) Drilled Shafts and Piles Boring Log Certification, Personnel , Concrete Placement Drilling Operation Equipment and Explosives Installation Plan Materials Pre-Drilling (Driven Piles) Reinforcement Cage/Steel Casing Staking and Utilities Driven Piles Certification, Personnel , Cutting and Splicing Encasement (Steel Piling) Equipment Excavation and Embankment Index Piling and Load Tests Installation Plan Location and Orientation Materials Penetration Precautions Pre-Drilling Preparation Staking and Utilities Water Jetting Driveway (Concrete) Driving (Safety Policy), Motor Vehicle Drop Hammers Drop Inlets Drop-Off (Lane and Shoulder) Dry-Run Depth Checks (Deck Pours) , Appendix D - E - Earth Cement Stabilized Earth Base Course Earthwork Mechanically Stabilized Earth Wall EEO Procedures (Federal-Aid) Elastomeric Bearings , 724 Electrically Welded Shear Studs Electronic Biding System Eliminated Items Embankment Clearing and Grubbing
13 May 2004 Subject Index I-11 Construction Excavation (Roadway and Drainage) Formation and Compaction Foundation In-Place Materials Pile Driving Reuse of Excavated Materials Sampling and Testing Structures (Over and Around) Embedded Features (Structures) Emergency Archeological / Historical Sites (Late Discovery) Hazardous Waste (Late Discovery) , Imminent Danger Injuries and Fatalities Medical Treatment (Safety Policy) Nuclear Density Gauges (Procedures) Road Conditions (Reporting) Encasement (Steel Piling) Encroachment, Right-of-Way End Terminals , Engineer, Authority of Environmental Animal Habitats Archeological and Historical Sites Assessment and Coordination Conformance Review Erosion and Sediment Control , 816 Forest Protection Hazardous Materials / Waste Noise, Construction NPDES Permit (Section 402) Painting (Structural Steel) Spills US Army Corps Permit (Section 404) Waste and Debris (Non-Hazardous) Wetlands Equipment Character of Drilling (Shafts and Piles) Excavation Painting (Structural Steel) Pavement Marking PCC Plant and Paving , , Pile Driving Procurement and Disposition Safety Stationary Plant (Base Course) Surveying
14 I-12 Subject Index May 2004 Traveling Plant (Subbase) Work Zone Traffic Control Equipment (HMA) Compaction , , , Hauling Miscellaneous Paving , , Plant , Erection (Structural Steel) Erosion and Sediment Control Clearing and Grubbing , Curb and Gutter Cut and Fill Sections Drainage Profiles Excavation (Borrow Pit) Excavation (Roadway and Drainage) Facilities, Permanent Facilities, Temporary Facilities, Types of Facilities, Unscheduled Grading and Drainage Haul Roads Inspections (Scheduled) , Legal Reference Materials Notice of Intent / Termination , NPDES Lines and Areas , Sediment Basins/Detention Ponds Stormwater Pollution Prevention Plan Subbase and Base Course Surface Course Wood Chips, Use of Escalation (Partnering), Issue Estimates Approval Deletion Final (Generation of) Interim (Generation) Routing SiteManager Utilities Evaluation (Partnering), Team Excavation Borrow Excavation Bridge Excavation Clearing and Grubbing Cofferdams Culverts (Trench) Ditches and Channels Embankment Construction Erosion and Sediment Control ,
15 May 2004 Subject Index I-13 Foundation Seals Materials, Equipment, Pits, Haul Roads , Muck Excavation Pile Foundations Resetting Items Reuse of Materials , , Roadway and Drainage Excavation Rock Excavation Sampling and Testing Structure Excavation Surveying and Staking Underdrains (Trench) Execution (Contract) Approval of Failure to Expansion Joints and Devices , Explosives , Extension (Contract) Authorization Change Orders Highway-Railroad Grade Crossings Municipal-State Highway Projects Time (Contract) Extra Work , F - Fabric, Geotextile Rip Rap and Slope Protection Silt Fence and Filter Underdrains (Pipe) Fabrication Prestressed Concrete Structural Steel Partnering Workshops Preconstruction Conference Failure (Contract), Schedule , Falsework Concrete Structures , Guardrail Structural Steel , , Timber Structures Federal-Aid Projects Federal Participation Final Inspection and Acceptance Labor Regulations Fence New Construction Resetting Silt Fence
16 I-14 Subject Index May 2004 Fertilizer (Seeding) Application , Erosion Control Materials Field Adjustment (Pipe Culverts) Field Investigation (Arch./Hist.) Field Investigation (Haz. Waste) , Field Laboratory Field Notes (Survey) , Field Review (Underdrains) Field Test Notification (Guardrail) Field Welding (Structural Steel) Fill Clearing and Grubbing (Embankment) Erosion Control (Fill Sections) Flattening Fill Slopes Flowable Locating Underdrains for Fill Sections Filler, Mineral (HMA) Filter (Fabric and Materials) Rip Rap and Slope Protection Silt Fence / Filter Fabric (Erosion Control) Underdrain (Pipe) Final Cleaning Up HMA Pavement Surface Acceptance Inspection and Acceptance , Invoice (Utilities) Materials Certification Payment and Acceptance Project Records and As-Built Plans Fine Aggregate (HMA) Finishing Base Course, Cement Stabilized Earth Base Course, Coquina Shell Base Course, Sand-Clay Concrete Structures , , PCC Pavement , , Subbase, Cement Modified Subbase, Soil-Aggregate Fixed-Form Paving (PCC) Flaggers (Work Zone Traffic Control) Flashing Lights (Railroad Crossings) Flattening Fill Slopes Float Finishing, Fixed-Form (PCC) Flowable Fill Followers (Driving Piles) Force Account Work Forest Protection Forms Concrete Curb and Gutter, Etc
17 May 2004 Subject Index I-15 Concrete Structures , for Project Documentation...Appendix A PCC Paving (Fixed-Form ) PCC Paving (Slip-Form ) Proposal (Bidding) Formula, Job Mix (HMA) , Drilled Shafts and Drilled Piles Driven Piles Embankment Pavement (Subgrade) Pipe Culverts Seals (Structure Excavation) Friction Course, Open-Graded (HMA) G - Gabions Materials Placement of Galvanization (Guardrail) Gates (Railroad Crossings) General Design Features Geotextiles/Geosynthetic Materials Rip Rap and Slope Protection Silt Fence/Filter Fabric (Erosion Control) Types of Underdrains (Pipe) Gradation Analysis (HMA) Grade (Survey) Graded Aggregate Base Course Compaction Hauling and Placement Materials Prime Coat Application Sampling and Testing Smoothness Check Spreading Thickness Check Weather Grading (Erosion Control) Granular Filter Material Rip Rap and Slope Protection Underdrains (Pipe) Gravel (Reuse of Excavated) Grinding (PCC Pavement) Groundcover Guarantee Materials Proposal (Bidding) Guardrail
18 I-16 Subject Index May 2004 Field Test Notification Installation of Rails Post Installation Removal and Resetting Slopes and Staking Traffic Transitions and Delineation Guardrail (Barrier) Permanent Temporary , , Guardrail (Materials) Blockouts Cable Concrete/Reinforcing Steel End Terminals/Anchors Fasteners Galvanization Posts Rails H - Habitats (Animal), Protection of Hammers (Pile Driving) , Handling Materials Hardware (Fasteners) Guardrail Timber Structures Haul Roads , , Hauling Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Base Course, Coquina Shell Base Course, Graded Aggregate Base Course, Sand-Clay HMA Mixtures PCC Mixtures , , Hazardous Materials / Waste Compliance (Contractor) Emergency Response Field Investigation Field Marking Impact Assessment Late Discovery of On-Site Containment and Storage Permits and Submittals Removal Spills Transport and Disposal Types of Heads (Pile Driving)
19 May 2004 Subject Index I-17 Health and Safety Burning Operations Contractor Responsibility HMA Activities Imminent Danger Inspection Duties Poisonous Plants Reporting Injuries and Fatalities Safety Meetings SCDOT Responsibility Tall Timbered Regions High Water Table (Underdrains) High-Strength Bolts (Structural Steel) Highway Patrol, South Carolina Highway-Railroad Crossings Contract Extension Property (RR), Pipeline on Surveys (Location) Traffic Control Devices , , Historical Sites HMA (Base, Hot-Mix Asphalt Aggregate) Materials Sampling and Testing Weather HMA (Base, Hot-Mix Sand Asphalt) Materials Sampling and Testing Weather HMA (Base, Permeable Aggregate) Materials Sampling and Testing Weather HMA (Intermediate) HMA (Pavement Courses) Certification (Technician) Final Inspection Job Mix Design , Laboratory Laydown / Compaction Lot Numbering Materials, Aggregate Materials, Anti-Stripping Materials, Asphalt Materials, Recycled Notification of Production Production and Hauling , Quality Control Plan Safety Testing (Acceptance) Testing (Quality Control)
20 I-18 Subject Index May 2004 Testing (Verification) Troubleshooting HMA (Surface, Hot-Mix Asphalt) HMA (Surface, Thin-Lift Seal) Hot-Poured Asphalt Sealant (PCC) Hydraulic Construction (Embankment) I - IA Sampling and Testing Final Progress Purpose of Record Maintenance Responsibilities for Results Comparison (QC to IA) Schedule Identification Cards (Sample) , Appendix B Imminent Danger Impact Assessment Archeological and Historical Sites Environmental Hazardous Materials/Waste Impact Attenuator Permanent Temporary (Work Zone) Incidental Construction Index Piling Initiation, Project Inlets (Pipe Culvert) In-Place Embankment Density Analysis (HMA) , Inquiries, Media Insects (Quarantine Regulations) Inspection (Project), Final , Inspector, Authority and Duties of , Insurance (Contractor), Liability Integrity, Personnel Intent (Contract) Intent (Erosion Control), Notice of Interchanges (Clearing and Grubbing) Intermediate Course (Asphalt) Cold-Mix Asphalt Hot-Mix Asphalt Internet, SCDOT Intersections (Clearing and Grubbing) Interviews (Federal-Aid Projects) Intranet, SCDOT Invoice (Utilities), Final Irregular Proposals (Bidding)
21 May 2004 Subject Index I-19 Issue Escalation Process (Partnering) J / K - Jetting (Driven Piles), Water Job Mix Formula (HMA) , , Joining (Pipe Culvert Sections) Joints Cleaning and Resealing (PCC) Construction (Base Courses) , , , Construction (HMA) Construction (PCC Pavement) Deck Strip Seal (Structures) Expansion and Sealant (Structures) , Longitudinal (HMA) Sealing (PCC Pavement) , , L - Labor Regulations (Federal-Aid) DBE Quarterly Reports EEO and OJT Procedures Interviews (Contractor Personnel) Payroll Transcripts Laboratory Central (SCDOT) District (SCDOT) Field HMA Plant Inspection Landowner Agreements , Lane (Traffic) Closure Drop-Offs Laws, Observation of Leads (Pile Driving) Legal Rights, No Waiver of Liability Claims (Architect-Engineer) Insurance (Contractor) Personnel (Public Officials) Third Party Licensing Licenses Nuclear Density Gauges Lift Thickness (Compaction) Coquina Shell Base Course Graded Aggregate Base Course HMA Pavement Sand-Clay Base Course
22 I-20 Subject Index May 2004 Lime (Agricultural) , Limitation of Operation Lines (Survey) BCA Centerline Construction NPDES , Load Restriction Load Tests (Driven Piles) Loading and Hauling (HMA) , Local Materials Sources Locating Culverts (Pipe) Piles Underdrains Log (Drilled Shafts and Piles), Boring Longitudinal Joint Plan (HMA) Lot Numbering (HMA) Low Shoulder, Correction of M - Maintenance (Road and Bridge) , Manholes Manual, Construction , Markers Pavement (Permanent Raised)...605, Right-of-Way Survey (Protection of) Markings, Pavement Application Application Restrictions Equipment Marking Plan (HMA) Materials , Surface Preparation Temporary , , Mass Concrete Placement Materials Asphalt Materials Certification (Final) Concrete Curb and Gutter, Etc Concrete Structures Control of Materials Culverts (Pipe) Embankment In-Place (Hauled-In) Erosion Control Found on the Work Guarantee Handling of Markings (Permanent), Pavement
23 May 2004 Subject Index I-21 On-Hand (Payment for) Patented (Legal) Piles and Shafts , Plant Inspection Portland Cement Concrete Prestressed Concrete Quality of Salvageable Materials , Sampling and Testing Requirements Seeding Signing (Permanent) Sodding Source of Sprigging Storage of Structural Steel , , Timber Structures Unacceptable Underdrains (Pipe) Work Zone Traffic Control Materials (Base Course) Cement Stabilized Aggregate Cement Stabilized Earth Coquina Shell Graded Aggregate Hot Mix Asphalt Aggregate Hot-Mix Sand Asphalt Permeable Aggregate Sand-Clay Materials (Excavation) Materials and Borrow Pits , , 203.2, Reuse, Surplus and Select , , , Unsuitable, Removal of Materials (Guardrail) Anchors and Terminals Blockouts Cable Concrete/Reinforcing Steel Fasteners Galvanization Posts Rail Sections Materials (HMA Pavement Courses) Aggregate Anti-Stripping Asphalt , Recycled Materials (Laboratory) Central (SCDOT) District (SCDOT)
24 I-22 Subject Index May 2004 Field HMA Plant Inspection Materials (PCC Pavement) Curing Joint Sealant , Patching Pavement Structure PCC Mix Materials (Sampling and Testing) Aggregates...C.3 Asphalt Materials...C.6 Concrete and Cement...C.5 General Procedures...C.7 Soils...C.4 Materials (Slope Protection) Concrete Gabions Rip Rap Materials (Subbase) Cement Modified Soil-Aggregate Measurement and Payment Measurement of Quantities Mechanically Stabilized Earth Wall Media Inquiries Median, Concrete Medical Treatment (Safety Policy) Meetings Constructability Review Partnering Pre-Bid Conference Preconstruction Conference Pre-Pour Conference (Concrete Structures) Pre-Pour Conference (Pipe Culverts) Safety Meetings Merchantable Timber , Methods, Character of Milling (HMA RAP Projects) Mineral Aggregate / Filler (HMA) Mixing Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth , Base Course, Coquina Shell Base Course, Graded Aggregate Base Course, Hot-Mix Asphalt Aggregate Base Course, Hot-Mix Sand Asphalt Base Course, Permeable Aggregate Base Course, Sand-Clay Portland Cement Concrete , Subbase, Cement Modified
25 May 2004 Subject Index I-23 Subbase, Soil-Aggregate Mobilization , Moisture Content Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Base Course, Coquina Shell Base Course, Graded Aggregate Base Course, Sand-Clay Soils Subbase, Cement Modified , Motor Vehicles (SCDOT) Muck (Unsuitable Soil) , Mulch (Seeding) , Municipal-State Highway Projects N - Navigable Waters Neoprene Sealant (PCC Pavement) Nitrogen (Seeding) , Noise (Construction) Notes (Survey), Field , Notice of Intent (Erosion) Notice of Termination (Erosion) Notification Field Test (Guardrail) HMA Production Public Utilities Noxious Plants (Quarantine Regs) NPDES Erosion Control Lines , Permit (Section 402) Nuclear Density Gauges O - Obstructions, Removal of Assessment Bridges and Culverts , Buildings , Scope Underground Storage Tanks OJT Procedures (Federal-Aid) Open-Graded Friction Course (HMA) Opening to Traffic (Legal) Organization (SCDOT) Overhaul Overhead Structure Work
26 I-24 Subject Index May P - Pads, Elastomeric Bearing Painting (Structural Steel) Brushing and Rolling Cleaning Surfaces Environmental and Safety Materials and Equipment Spraying Partial Payments Partnering Costs Facilitation Issue Escalation Leadership and Management Program Oversight Project Requirements Team Charter Team Evaluation Workshops , Patching (PCC Pavement) Adjacent Concrete Base Course Curing Dowel/Tie Bar Installation Joint Sealing Materials Mix Design Patch Area Placement/Consolidation Preparation Removal Surface Texturing Weather Patents (Legal) Patrol, South Carolina Highway Pavement Markings Application Restrictions , Equipment Materials , Surface Preparation Temporary Pavement Structure Base Structure Pavement Subgrade Foundation Surface Structure Payment Eliminated Pay Items Material-On-Hand Payment, Partial
27 May 2004 Subject Index I-25 Payment, Scope of Quantities, Compensation for Altered Quantities, Measurement of Payroll Processing (SiteManager) Transcripts (Federal-Aid Projects) Penetration (Piles) Performance Graded Asphalt Binder Base Course, Hot-Mix Asphalt Aggregate Base Course, Hot-Mix Sand Asphalt Base Course, Permeable Aggregate HMA Mixtures Permits Army Corps of Engineers (Section 404) Clearing and Grubbing Environmental Excavation Hazardous Materials/Waste Legal NPDES (Section 402) Removal of Structures Piles (Drilled) Boring Log Certification, Personnel , Concrete Placement Drilling Operation Equipment and Explosives Installation Plan Materials Pre-Drilling (Driven Piles) Reinforcement Cage and Steel Casing Staking and Utilities Piles (Driven) Certification, Personnel , Cutting and Splicing Encasement (Steel Piling) Equipment Excavation and Embankment Index Piling and Load Tests Installation Plan Location and Orientation Materials Penetration Precautions Pre-Drilling Preparation Staking and Utilities Water Jetting Pins (Structural Steel), Drift Pipe
28 I-26 Subject Index May 2004 Construction on RR Property Culverts , 714 Erosion Control Slope Drains Structural Plate Survey Underdrains , 802 Pits (Borrow and Material) Erosion Control Excavation Sampling and Testing , Survey Plans Alteration of As-Built Conformity with Contract Coordination with Drilled Shaft Installation Plan Examination of HMA Paving Plan HMA Quality Control Plan Longitudinal Joint and Marking Plan Mass Concrete Placement Plan Pile Installation Plan Shop Plans and Working Drawings , 725 Stormwater Pollution Prevention Plan Traffic Control Plan Utilities Plants Trees, Shrubs, Vines and Groundcover Noxious (Quarantine Regulations) Poisonous Points and Tips (Driven Piles) Ponds, Stormwater Detention Ponds Portland Cement Base Course, Cement Stabilized Aggregate...308, , , Base Course, Cement Stabilized Earth...307, , Concrete...701, , , Pavement, Concrete , Sampling and Testing Procedures...C.5 Structures, Concrete Subbase, Cement Modified...301, , , Portland Cement Concrete Batching and Mixing Mix Design Mix Materials Personnel Certification Plant and Hauling Equipment QC/QA Responsibilities Quality and Temperature Control
29 May 2004 Subject Index I-27 Sampling and Testing , C.5 Portland Cement Concrete Pavement Communications Consolidation (Vibration) Crack Routing and Sealing Curing Equipment Finishing Joints , , 504 Materials , Mix Delivery Mix Production and Hauling Patching Paving , , Preconstruction Conference QC/QA Requirements Reinforcing Steel Rideability Safety Subbase and Base Course Surface Grinding and Texturing Thickness Portland Cement Concrete Structures Posts Guardrail , Signs Power Hammers (Driven Piles) Precast Concrete Box Culverts Preconstruction Activities (Overview) Partnering Preconstruction (Conference) Attendees of Coordination and Scheduling Minutes of Meeting Purpose of Pre-Drilling (Driven Piles) Pre-Pour Conference Concrete Structures Culverts (Pipe) Prequalification, Contractor Preservative Treatment (Wood) Prestressed Concrete...704, Prime Coat Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Base Course, Coquina Shell , Base Course, Graded Aggregate , Base Course, Sand-Clay , Hot-Mix Asphalt
30 I-28 Subject Index May 2004 Subbase, Cement Modified Subbase, Soil-Aggregate Prior Rights (Utilities) Priority Testing (Material Samples) Profiles Drainage (Erosion Control) Survey Program Manager Progress, Failure to Maintain Project Development Examination (Bidding) Final Inspection and Acceptance , Final Records and As-Built Plans Initiation Preconstruction Activities (Overview) Property Agreements, Landowner Merchantable Timber Preservation Private Property (Uses) , Railroad Property Encroachment Responsibility (SCDOT) Restoration Right-of-Way (Furnish) Right-of-Way Encroachment Proposal Consideration Counterproposal Delivery Forms Guarantee Irregular Opening Preparation Return Withdrawal Prosecution of the Work Protection Animal Habitats Archeological and Historical Sites Assessment and Coordination Conformance Review Erosion and Sediment Control , 816 Forest Protection Hazardous Materials / Waste Items and Areas (Clearing & Grubbing) Noise, Construction NPDES Permit (Section 402) Painting (Structural Steel) Private Property , , ,
31 May 2004 Subject Index I-29 Slope Spills Stakes and Markers US Army Corps Permit (Section 404) Waste and Debris (Non-Hazardous) Wetlands Public Convenience and Safety Notifications Officials (Personal Liability) Relations , Pulverization (Earth Base) Q - Qualification Letters, Prohibition of Quality Control / Quality Assurance Comparison of QC and IA Tests HMA Pavement Courses Material Quality PCC Pavement Portland Cement Concrete QC Sampling and Testing Quantities Acceptance of (Small) Alteration of (Construction) Compensation for (Altered) Interpretation of Measurement of Quarantine (Plants and Insects) R - Rail Sections (Guardrail) , Railing, Bridge Railroad-Highway Crossings Contract Extension Property (RR), Pipeline on Surveys (Location) Traffic Control Devices , , Raised Pavement Markers (Permanent) Recycled Asphalt Pavement (RAP) Milling Projects Stockpiles Reflective Sheeting (Signs) Construction Signs Permanent Signs Rehabilitation Bridge Deck Cleaning and Resealing Joints (PCC)
32 I-30 Subject Index May 2004 Crack Routing and Sealing (PCC) Grinding and Texturing (PCC) Patching (PCC Pavement) Reinforced Concrete Pipe Reinforcement Cage (Drilled Shafts) Reinforcing Steel , , 703, Re-Laid Culverts Relocation of Structures and Items Removal of Falsework and Forms (Structures) Fixed Forms (PCC Pavement) Guardrail Hazardous Materials/Waste Items During Clearing and Grubbing Removal of Concrete (PCC Patching) Unsuitable Material (Muck Excavation) Removal of (Structures) Assessment Bridges and Culverts , Buildings , Scope Underground Storage Tanks Resealing Joints (PCC Pavement) Resetting Guardrail Items (During Excavation) Resident Construction Engineer , 105.1, Restoration of Roadway Surface Retaining Wall, Earth Right-of-Way Burying Debris Clearing and Grubbing Encroachment Furnishing Markers Rights (Legal), No Waiver of Rights (Utilities), Prior Rights of Materials Found on Work Rigid Pavements Rip Rap Materials Placement Road/Roadway Clearing and Grubbing Damage Deletion of Excavation Haul Road , Maintenance , Opening Section to Traffic Restoration of Surface
33 May 2004 Subject Index I-31 Rock Excavation Roller/Rolling Pattern and Speed (HMA Compaction) Rolling (Asphalt Surfacing) Rolling (Paint for Structural Steel) Vibratory Roller (HMA Compaction) Roofing Shingles, Asphalt (HMA) Routing and Sealing Cracks (PCC) Rubble Masonry Rumble Strips (HMA Pavement) S - Safety Burning Operations Contractor Responsibility Cranes (Concrete Structures) Culvert Construction HMA Activities Imminent Danger Inspection Duties Painting Structural Steel PCC Pavement Construction Pile Driving Poisonous Plants Public Reporting Injuries and Fatalities Safety Meetings Sampling and Testing...C.2 SCDOT Policy SCDOT Responsibility Tall Timbered Regions Salvageable Materials , Sample Identification Cards Completed Examples...B.3 Final Reporting Unit...B.2.2 Form 907 Instructions...B.1.1 Form 907-A Instructions...B.1.2 Form 907-B Instructions...B.1.3 Inspector Duties...B.1 Laboratory Responsibilities...B.2 Test Unit...B.2.1 Sampling and Testing Base Course, Cement Stabilized Aggregate Base Course, Cement Stabilized Earth Base Course, Coquina Shell , Base Course, Graded Aggregate , Base Course, Hot-Mix Asphalt Aggregate Base Course, Hot-Mix Sand Asphalt Base Course, Permeable Aggregate
34 I-32 Subject Index May 2004 Base Course, Sand-Clay , Certification (Materials), Final Certification, Personnel , C.1.2 Check Samples Embankment Excavation Independent Assurance Laboratory Inspection Portland Cement Concrete Priority Testing Purpose... C.1.1 Quality Control Quantities (Small), Acceptance of Records Maintenance Reports (Test Results) Safety...C.2 Shipping Samples Subbase, Cement Modified Subbase, Soil-Aggregate Subgrade Sampling and Testing (HMA) Acceptance (Plant) Acceptance (Roadway) Aggregate Quality Control (Plant) Quality Control (Roadway) Verification (Plant) Verification (Roadway) Sampling and Testing (Procedures)... C.1.3 Aggregates...C.3 Asphalt Materials...C.6 Concrete and Cement...C.5 General...C.7 Soils...C.4 Sand, Reuse of Excavated Material Sand-Clay Base Course Compaction Finishing Hauling and Placement Materials Prime Coat Application Sampling and Testing Spreading Thickness Check Weather Sanitary Health Provisions Scarification , Scope of Payment Work Seal/Sealant/Sealing
35 May 2004 Subject Index I-33 Crack Routing and Sealing (PCC) Deck Joint Strip Seal Foundation Seals (Structure Excavation) Hot-Poured Asphalt Sealant (PCC) Joint Sealant Materials (Structures) Joint Sealants (PCC Pavement) Joint Sealing (PCC Pavement Patching) Joint Sealing (PCC Pavement) Neoprene Sealant (PCC Pavement) Silicone Sealant (PCC Pavement) Thin-Lift Seal Course (HMA) Secondary Highways (Maintenance) Sediment Control Basins Seeding Erosion Control Lime, Fertilizer and Nitrogen , Materials Mulch and Tackifier Seedbed Seedbed Select Material (Slopes) Testing (Soil), Agricultural Select and Surplus Material Sewers Sheeting (Signs), Reflective Construction Signs Permanent Signs Shingles, Asphalt (HMA) Shop Plans Control of Work Prestressed Concrete Structural Steel Structures Shoulder Correction of Low Drop-Offs (Work Zone) Reuse of Excavated Material Shoulders and Slopes Shrubs, Planting Sidewalks , 720 Signals (Railroad Crossing), Flashing Signs Permanent Railroad Temporary , Silicone Sealant (PCC Pavement) SiteManager (Use of) Change Order Processing Daily Work Reports (Inspectors) Diaries (RCE)
NOTICE. Registration Form and Notice of Needed Revisions
CONSTRUCTION MANUAL SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 NOTICE Registration Form and Notice of Needed Revisions Complete and return this registration form to receive revisions to this
More informationDIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS
OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition
CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards
More informationTABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER
Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB
More informationMay 2004 Construction Forms A-i. Table of Contents APPENDIX A CONSTRUCTION FORMS... A-1. SCDOT Construction Form Description Table...
APPENDIX A Construction Forms SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Construction Forms A-i Section Table of Contents Page APPENDIX A CONSTRUCTION FORMS... A-1 SCDOT Construction
More informationSignificant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work
1 SIGNIFICANT CHANGES IN CDOT's 2017 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION The following are significant changes from the 2011 Standard Specifications Book to the new 2017 Standard Specifications
More informationERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007
ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 Sheet 1 of 7 GENERAL The Kansas Department of Transportation STANDARD SPECIFICATIONS FOR STATE ROAD AND
More informationMinimum Sample and Test Requirements (MSTR)
South Dakota Department of Transportation Minimum Sample and Test Requirements (MSTR) Table of Contents Page 1. Asphalt Construction:... 1 1.1 Asphalt Concrete, Hot Mix... 3 A. Aggregate, Composite...
More informationMaine Turnpike Authority
Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00
More informationITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES
AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationPAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.
PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS
More informationPUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR
99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR TABLE OF CONTENTS 99.1. ADMINISTRATION AND GENERAL REGULATIONS...2 99.1.1. Title...2
More informationBids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59
General Info Number: PROJECT NO. 43-19-07 Description: BRIDGE REHABILITATION AND 3RD LANE WIDENING OHIO TURNPIKE OVER AI CREEK M.P. 47.4, OHIO TURNPIKE OVER S.R. 64 (N. MAIN ST.) M.P. 47.5 MILEPOST 46.50
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationExcavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.
Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING
More informationMAY 11, 2017 T-MC-107A & T-MC-107B1
Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05
More informationMaine Turnpike Authority
Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman
More informationFEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96
General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE
More informationElectrical Work. NOV Embankments Over Swamps and Compressible Soils
GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification
More informationMERCED COUNTY CAMPUS PARKWAY SEGMENT 2
MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item
More informationMaine Turnpike Authority
PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationSECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section
02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used
More informationMay 2004 Earthwork 200-i. Table of Contents 200 GENERAL GUIDELINES PRECONSTRUCTION CONSIDERATIONS
DIVISION 200 Earthwork SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Earthwork 200-i Section Table of Contents Page 200 GENERAL GUIDELINES...200-1 200.1 PRECONSTRUCTION CONSIDERATIONS...200-1
More informationSECTION GENERAL EXCAVATION
02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationSECTION PAYMENT PROCEDURES
SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationDECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids
General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus
More informationNorth Harris County Regional Water Authority TABLE OF CONTENTS. CONTRACT DOCUMENTS Section No. Title
TABLE OF CONTENTS CONTRACT DOCUMENTS 00001 Inside Title Page 00003 Table of Contents 00004 List of Drawings 00020 Invitation to Bid 00100 Instructions to Bidders 00300 Bid 00500 Agreement 00610 Construction
More informationSECTION EXCAVATION AND FILL
SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN
P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross
More informationCITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST
CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST Abbreviations AB 1-3 Section 11 Purpose and Definitions 11-1 Purpose PD 1 11-2 Construction Practice PD 1 11-3 Definitions PD 1 Section 12 Construction Area
More informationCITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***
00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007
ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 07-ER-1-R18 Sheet 1 of 10 GENERAL The Kansas Department of Transportation STANDARD SPECIFICATIONS FOR STATE
More informationIndex to Technical Specifications
Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation
More informationUNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer
More informationTHE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION
THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2
More informationTOWN OF HOLLIS, NEW HAMPSHIRE
TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall
More informationSECTION STORM DRAINAGE
SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation
More informationSection 403. DRAINAGE STRUCTURES
403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads
More informationAPPENDIX A MEASUREMENT AND PAYMENT
P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged
More informationSUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????
SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority
PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION
More informationVirginia Department of Transportation. Inspection Manual. March Construction Division VDOT GOVERNANCE DOCUMENT
VDOT Virginia Department of Transportation Inspection Manual March 2018 Construction Division VDOT GOVERNANCE DOCUMENT TABLE OF CONTENTS INTRODUCTION...2 DEFINITIONS... 2 RESPONSIBILITY AND COMMITMENT
More informationMay 2004 Asphalt Pavements 400-i. Table of Contents 401 HOT-MIX ASPHALT PAVEMENT DESCRIPTION OF WORK
DIVISION 400 Asphalt Pavements SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION May 2004 May 2004 Asphalt Pavements 400-i Section Table of Contents Page 401 HOT-MIX ASPHALT PAVEMENT...401-1 401.1 DESCRIPTION
More informationPLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION
PLAN PREPARATION GUIDE CHAPTER 3 QUANTITY COMPUTATIONS AND INFORMATION SECTION DESCRIPTION PAGE 1 General Quantities 3-1 2 Maintenance of Roadway and Drives 3-1 3 Liquid Asphalt Binder in Paving Mixture
More informationSECTION ASPHALT PAVING AND SURFACING
SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting
More informationMANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:
MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationCounty of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS
County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 27 CURBS, GUTTERS, SIDEWALKS, AND DRAINAGE STRUCTURES 27-1 GENERAL Concrete curbs, gutters, sidewalks,
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationSPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work
2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of
More information50 lbs (23 kg) of + #8 (+2.36 mm) material plus 50 lbs (23 kg) of pile run material.
5.5 REQUIRED SAMPLE SIZES 1. SCOPE This section covers the size of samples to be submitted to the s and Research Center for testing. The sample sizes listed are minimums and in special cases the Engineer
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More informationSECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section
02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole
More informationSECTION EARTHWORK
SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting
More informationRESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION
RESIDENT ENGINEER S MANUAL 2014 SPECIFICATIONS ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSTRUCTION DIVISION FOREWORD The Construction Industry is continually changing. New technology, materials,
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION
CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall
More informationTable of Contents for Guide Specifications
Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationOKLAHOMA TURNPIKE AUTHORITY JUNE 7, 2018 SCHEDULE OF BID ITEMS EOC JP 26422(10) INTERCHANGE AT I-40
PART A - ROADWAY - EOC 2461 201(A) CLEARING AND GRUBBING LSUM 1.00 $500,000.00 $500,000.00 202(A) UNCLASSIFIED EXCAVATION CY 651,706.00 $4.00 $2,606,824.00 202(D) UNCLASSIFIED BORROW CY 7,500.00 $8.00
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationPROPOSED REGULATION OF THE STATE CONTRACTORS BOARD. LCB File No. R May 14, Section 1. NAC is hereby amended to read as follows:
PROPOSED REGULATION OF THE STATE CONTRACTORS BOARD LCB File No. R090-08 May 14, 2008 EXPLANATION Matter in italics is new; matter in brackets [omitted material] is material to be omitted. AUTHORITY: 1,
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationREQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE
REQUEST FOR BIDS 1. RECEIPT OF BIDS The Town of Freeport will receive sealed Bids, clearly marked and addressed to: Bid for Culvert Replacement Project 2015-1, Freeport Town Engineer, Town Hall, 30 Main
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationA. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).
SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish
More informationCONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER
CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationMANUAL OF INSTRUCTIONS MATERIALS DIVISION COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION
MANUAL OF INSTRUCTIONS MATERIALS DIVISION COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION TABLE OF CONTENTS Chapter I - GENERAL INSTRUCTIONS...1 SECTION 101 PURPOSE AND SCOPE OF MANUAL...1 SECTION
More informationCITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS
TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE
More informationSECTION 503 TEMPORARY PAVEMENT RESTORATION
SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with
More informationSOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004
SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current
More informationINDEX A Abbreviations... 2 Acceptability of materials and work Acceptance, final Access to the work... 35, 66, 91 Accommodations for publi
INDEX A Abbreviations... 2 Acceptability of materials and work... 36 Acceptance, final... 48 Access to the work... 35, 66, 91 Accommodations for public traffic... 129 Additives: concrete, pavement... 835
More informationLump Sum L.S. (15") EA
Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E
More informationSECTION ASPHALT CONCRETE
SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare
More informationSECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS
SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material
More informationKansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:
Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION
More informationSPECIAL SPECIFICATION 6664 Level (3) Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,
More informationSPECIAL SPECIFICATION 6666 Charter Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,
More informationCHAPTER 3 EXCAVATIONS
7-3-1 7-3-1 CHAPTER 3 EXCAVATIONS SECTION: 7-3-1: Permit Requirements 7-3-2: Bond Required 7-3-3: Subject and Excluded Excavations 7-3-4: Standards 7-3-5: Protection of Public 7-3-6: Relocation and Protection
More informationSPECIAL SPECIFICATION 6658 Time Warner Communications System
2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable
More informationPennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56
PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 Additional Fees Additional fees may be charged by PennDOT consistent with Sections 411 and 420 of the State Highway Law and Regulations 441.4(d)
More information