Halsion making buildings work for everyone. MEP utility pod guide
|
|
- Ami Greene
- 5 years ago
- Views:
Transcription
1 Halsion making buildings 1 MEP utility pod guide
2 With the need for construction projects to be rolled out in less time than ever, Pre-Fabrication of key components has never been greater to for fill key programme targets. This seemingly complex task, can now be carried out in relative simplicity, with the right team with the building services engineering knowledge. This guide is to explain, step by step, how Halsion Building Services Engineers can for fill your targets, for low cost, less risk and in a timely manner.
3 Benefits of Pre-Fabricated MEP Utility Cupboards Installation of MEP Components within the Utility pods within our factory An environment that benefits: Less man hours on site reducing risk of accidents. Mock up of a utility cupboard can be undertaken for a pod to be approved by the client and all other parties before mass production takes place. Better quality control inspected, tested and signed off before site delivery for final installation. Consistency of installation teams carry out specific tasks (Mechanical, Electrical & Public Health as required). Reduce risk of potential clashes with other services when the pods reach their final destination. Speed from initial project discussions to the first pods being delivered and in installed to their locations on site can be tailored to suit specific programmes. Cost effective.
4 Typical Options for MEP Utility Cupboards: POD shell inclusive of frame, ply lining and white rock finish. Pipe Pipe lagging Drainage, (HepvO traps for condensate) Valve assembly Heat interface unit (HIU) Mechanical whole house ventilation units (MHVR s) Incoming cut out and fuse Distribution board MCB s/rcd s Dado trunking TV connection box BT connection box Cable for utility cupboard circuity All accessories/outlets Protection & wrapping All standard equipment listed above can be changed to suit specific design criteria. Below are some typical BIM created installation drawings.
5 The Typical Creation of A MEP Utility Cupboard: The pod design is approved via specifications, technical submittals & design drawings. The steel frame is fabricated, ply wood fixed to the frame to enable the MEP equipment to be fastened to and white rock finish is applied. At this point, MEP equipment is ready to be installed within the Pod. The first piece of equipment to be installed is the MHVR. Mechanical Whole House Ventilation Unit. In this case a Nuaire MrXBox which has the ability to have the air directions swapped, thus making it a very versatile unit. Next, we start the pipe installation. The HIU (Heat Interface Unit/Boiler. The Underfloor Heating Manifold. First elements of the drainage. In this photograph, the external casing of the HIU is removed, so the pipe connections can be tested.
6 Where possible, pipe is prefabricated, before being fixed to the inside of the pod. This is for speed and also to stop (where copper pipe is utilised and therefore soldered) any burns occurring on the white rock finished surface. The boosted cold water meter assembly is also installed with integral pressure reducing valve. On the right hand side of this Pod is also a cold water feed for a washing machine. Electrical Installation starts 3 compartment dado trunking is installed. Consumer unit BT connection unit Switches, Sockets & Accessories
7 Here we can see the nearly complete MEP Utility Cupboard. Mechanical & Electrical final connections are made & tested. The HIU external cover is fitted. Pipe is finished, pressure tested and then capped ready for shipping.
8 The Pre-Fabricated MEP Utility Cupboards are inspected before being wrapped for transit to site. When the pods arrive at site, pre-installed lifting eyes are utilised to crane the pod to the appropriate level of the building. The site crane is booked in advance for the pod delivery. Pods are unloaded on to a lifting platform and using a pallet truck, wheeled to either a holding area on the level or to their final setting out point.
9 Here a MEP Utility Cupboard has been located in its final position on the floor. The equipment to serve, in this case a 1 bedroom apartment, is starting to be first fixed to the pod. This includes: Incoming pipe from the buildings energy centre. Drainage to a local soil stack. Duct. Electrical, incoming SWA cabling to the consumer unit, Data & TV. External to the pod, the apartment is constructed. Plasterboard case added to the pod frame. The floor is formed. External switches added. Ceiling ties erected.
10 The installation of the MEP Utility Cupboard is nearly complete. Plastered and mist coated. It awaits the final flooring added, it s door and second fix of external accessories. It has been tested in situ, signed off by the client. Below is a finished apartment These apartments benefit from - Air conditioning, underfloor heating, separate metered water & heating supplies, individual metered Electrical Data, TV supplies. All options can be catered for, to approved specifications and cost. At low risk, quality controlled, quickly and cost effectively.
JUNIPER CRESCENT AND GILBEYS YARD. 11. Mechanical and electrical services strategy
JUNIPER CRESCENT AND GILBEYS YARD 11. Mechanical and electrical services strategy 16 Mechanical and Electrical Services Strategy for Camden Goods Yard On behalf of One Housing Group 7 th September 2017
More informationReliance House Investors Report. IR11 September 2018
Reliance House Investors Report IR11 September 2018 Extension & Conversion of Reliance House to Create 139 Luxury Apartments The 3 storey extension, refurbishment, adaptation and the sub-division works
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationMSP Modular Building System
Temporary & Emergency Residential Accommodation State of the art design & building technology Multiple Applications Residential, Hotel, Care Home, Student Accommodation Multiple Applications Residential,
More informationSaraswathi. Floor Plans
1 / 15 Saraswathi Saraswathi is situated in a posh yet serene locality in Besant Nagar, a stone s throw away from Elliots Beach. The property covers 3 grounds and houses 8 apartments in a spacious 3 BHK
More informationPlant, Construction & Business NVQs
Plant, Construction & Business NVQs We offer a wide range of National Vocational Qualifications (NVQs). NVQs are qualifications that allow you to prove your competence in the workplace. You will have the
More informationNational Occupational Standards Developer s pack for Passive Fire Protection (Construction)
National Occupational Standards Developer s pack for Passive Fire Protection (Construction) Project 2016 (COSVR350, COSVR351, COSVR352, COSVR353, COSVR354, COSVR355, COSVR356, COSVR357, COSVR358) To be
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationDRY CONSTRUCTION SYSTEMS
DRY CONSTRUCTION SYSTEMS Adrienn LEPEL BUTE Dry construction systems Prefabricated elements assembly on site Minimal use of water dry construction systems Assembled partitions Suspended ceilings Raised
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More information11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...
Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART
More informationInnovation Construction CIC: B2B Event on MiC
Innovation Construction CIC: B2B Event on MiC Presented by Dragages Hong Kong Limited / Dragages Singapore Pte. Limited 06 November 2018 Dragages Hong Kong Introduction ABIGAIL TAM Business Development
More informationINTRODUCTION. We feel pleasure to introduce ourselves as manufacturers and suppliers of multifarious industrial storage systems and cable tray.
T M MFG. & TRADING CORPORATION Super Market Display Rack, Wall Mounted Display System, Slotted Angle Steel Rack, Mezzanine Floor, Heavyduty Pallet Rack, library Stack Rack, Mobile Rack/Compactor, Plastic
More informationThe Merits of Structural Steelwork
B309 12pp Final 11/12/02 11:14 AM The Merits of Structural Steelwork Page 2 The Purpose of this Reference Manual The guide, which has been prepared by BCSA, should be used in discussions with clients and
More informationCarter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications
Carter's Oshkosh (SIS) #1185 - The Center at Pearland Parkway - Pearland, TX 77581 - Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words
More informationUtility Cabinet System (UCS)
(UCS) The Ultimate in Stainless Steel Modular Walls UCS: Eliminates the need and the costs of constructing a traditional wall Provides easier access and faster installation of the utilities compared to
More informationReceiving your order: Ambor Structures Container Unloading Guide
Receiving your order: Ambor Structures Container Unloading Guide Ambor Structures is happy to provide logistical support for your tower orders. Once shipping arrangements have been made, Ambor will be
More informationMONK. Monk Conveyors Limited CONVEYORS
ASSEMBLY WORKSTATIONS ERGONOMIC layout improves productivity and work flow LOW COST due to the simple design and the use of our own extrusion and conveyors MODULAR construction - standard sections up to
More informationEXPANDABLE DWELLING SYSTEM FOR CHEAP AND FAST ERECTION AND DISMANTLING
EXPANDABLE DWELLING SYSTEM FOR CHEAP AND FAST ERECTION AND DISMANTLING Pavel Truksa Summary Our idea consists in providing the simplest possible unfolding structures, in particular for temporary housing.
More informationWaterfront. Floor Plans
Waterfront Spread over 4.33 acres and joined by an additional 4 acres of green belt, Waterfront is an exquisite upscale residential complex overlooking the lake at Kazhipattur Village with 115 high end
More informationCRANE LOADING PLATFORMS
CRANE LOADING PLATFORMS www.samsonequipment.co.uk INTRODUCTION Samson Equipment Ltd have over 50 years combined experience in the cranes and lifting industry and have drawn on this expertise to offer a
More informationDALAL FLAT PACK MODULAR UNITS
DALAL FLAT PACK MODULAR UNITS TECHNICAL SPECIFICATIONS MATERIAL Floor Roof Walls Doors Windows Electrical Works Main and Secondary Galvanized steel framing. Marine Plywood with PVC for dry areas and Cement
More informationDIRTT. dirtt.net. DIRTT Stands for Doing It Right This Time. We are revolutionizing 21 st century construction by building better.
DIRTT DIRTT Stands for Doing It Right This Time. We are revolutionizing 21 st century construction by building better. The key to DIRTT s flexibility and success is technology. By utilizing 3D technology
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS
ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS UNLOADING HANDLING ASSEMBLING Preface This instruction book is for your crews. Distribute it to help them safely unload and handle
More informationNational Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].
National Master Specification (NMS) Section 07 21 16 BLANKET INSULATION Publisher: Spex.ca Page 1 Approved: 2014-12-31 Part 1 General 1.1 RELATED REQUIREMENTS.1 Section [ ]. 1.2 REFERENCES.1 CSA Group.1
More informationInteriors TNF. by INEXA. Wet Units. Craftsmen to the world s finest ships
Interiors by INEXA Craftsmen to the world s finest ships TNF Wet Units TNF Wet Units TNF WET UNITS The TNF Wet Units are made with a special focus on details to ensure that form, function and durability
More informationPrefabricated Wet Units WET UNITS 88
WET UNITS 88 Prefabricated Wet Units With many years of experience and specialized competence, Norac AS offer fully fitted wet units. The Norac modular wet units are ideal for marine accommodations, from
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION
More informationA. Provide and install a factory made, wood framed, storage building. B. Building Construction Type: IBC Type V-B Wood Frame.
Farmington, Missouri Project Number M1801-0l PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide and install a factory made, wood framed, storage building. B. Building Construction Type: IBC Type V-B Wood
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationJORACK. Storage Solutions from Design to Installations.
JORACK Storage Solutions from Design to Installations Profile Jorack, the range of Industrial racks from Josts is a perfect storage solution for all types of items, as the design allows the span to be
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationDr. Ahmed Hussien Elyamany 2017 Questions
Questions Question 1 (25 Marks): Select the best answer from the available choices for each of the following: 1. Cranes may be used for 2. cranes consist of a carrier and superstructure equipped with a
More informationMaking space work for you...
Making space work for you... www.uaeshelving.com WE SPECIALISE IN Slotted Angle Shelving Drive-in Pallet Racking Bolt-Free Shelving Shuttle Racking Medium Duty Long Span VNA (Very Narrow Aisle) Mobile
More informationContents. Introduction 5. CantiDeck System 6. Fixed Flush CantiDeck 8. Super Roller CantiDeck 10. Specifications 12.
Introduction 5 CantiDeck System 6 Fixed Flush CantiDeck 8 Super Roller CantiDeck 10 Contents. Specifications 12 Configurations 14 Other Solutions 24 Case Study 32 Custom 34 Consultancy 36 Associated Products
More informationHi-Point TM off-site roof system
CI/SfB (27) Xh September 2006 Kalzip Ltd Hi-Point TM off-site roof system Benefits Hi-Point... off-site roof system with the benefits built-in A superior, simple and safer method of roof construction Health
More informationINNASOL HEAT POD THE READY-MADE BIOMASS SOLUTION FOR COMMERCIAL BUILDINGS
INNASOL HEAT POD THE READY-MADE BIOMASS SOLUTION FOR COMMERCIAL BUILDINGS INNASOL HEAT POD: THE SMART HEATING SOLUTION FOR COMMERCIAL BUILDINGS Renewable heating systems are here to stay. Clean, cost effective
More informationElectric Service Standards
V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationVacuum Lifting. Lifting with Vacuum - Vacu Easy Lift. High Speed Lifting - Vacu Cobra
Lifting with Vacuum - Vacu Easy Lift Kockums has over 25 years experience in the engineering and building of the TAWI Vaculift. No two applications are ever the same and each system is built to meet the
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More information2016 CDM Smith All Rights Reserved July 2016 SECTION STEEL ROOF DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 31 23 STEEL ROOF DECK A. Furnish all labor, materials, equipment and incidentals required and install steel roof deck complete as shown on the Drawings and
More informationSECTION TRESPA ATHLON SOLID COMPOSITE CASEWORK
SECTION 064115 TRESPA ATHLON SOLID COMPOSITE CASEWORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Solid composite casework. 1.02 RELATED SECTIONS A. Documents affecting work in this section includes but is
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationFranklin Hall Renovation TABLE OF Document Indiana University Bloomington
VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationNational Association of Home Builders. Panelized Homes. Custom Designs, Your Building Solution.
National Association of Home Builders Panelized Homes Custom Designs, Your Building Solution www.nahb.org/panel What is a Panelized Home? Today s builders and buyers recognize that building a new home
More informationA. Access doors and frames are part of an access door and frame allowance.
SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationOWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA
OWNER-BUILDER? A HOMEOWNER S GUIDE TO BUILDING PERMITS AND INSPECTIONS FOR PROJECTS IN ARROYO GRANDE, CALIFORNIA PREPARED BY: CITY OF ARROYO GRANDE BUILDING AND LIFE SAFETY DIVISION Under the Direction
More informationTAILOR-MADE PREFABRICATED SOLUTIONS
TAILOR-MADE PREFABRICATED SOLUTIONS WELCOME At Packaged Plant Solutions we re dedicated to creating the highest quality prefabricated modular solutions, from packaged plant rooms and energy centres to
More informationPrefabricated bathrooms Maximise your project. A smarter way of building.
Prefabricated bathrooms Maximise your project. A smarter way of building. Prefabricated bathrooms High quality. Right price. We provide the market with high-quality bathrooms produced under controlled
More informationA. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars
SECTION 04850 (04 40 00) MSI PRECAST STONE VENEER SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. MSI Precast Stone Veneer for exterior and interior vertical surfaces. 1.2 RELATED SECTIONS Specifier Notes:
More information2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 36 00 COMPOSITE STEEL FLOOR DECK A. Furnish all labor, materials, equipment and incidentals required and install composite steel floor deck complete as shown
More informationINNOVATIVE OFF-SITE MANUFACTURING
INNOVATIVE OFF-SITE MANUFACTURING STONEWARE JOINERY METAL FABRICATION BATHROOM PODS PADDINGTON ENCOMPASSING BESPOKE STONEWARE, HIGH QUALITY JOINERY, ARCHITECTURAL METALWORK AND BATHROOM POD PRODUCTION
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationConstruction Standards PAGE
Construction Standards PAGE 095113-1 SECTION 095113 - PART 1 - GENERAL 1.1 M.S.U. ISSUES 1. It the intent of MSU that all joint sealants used on its projects will comply with LEED NC 3 Credit Requirements
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1
More informationAdvantages. - They are quick, clean and. sizes, floor types and construction systems mean the mezzanines can be adapted to meet specific client needs.
Mezzanine Floors Mezzanine floors enable the working height of a space to be utilised to its full potential by doubling or tripling the surface area. They can be designed as storage areas, changing rooms
More informationTABLE OF CONTENTS Public Safety Building
DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary
More informationC. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.
SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationMuyang Steel Silo. June 2011
Muyang Steel Silo June 2011 Content 1. 2. Company Profile Silo Introduction 3. Auxiliary System 4. Silo Engineering Company Profile Muyang silo products could be sorted into two categories: Lipps Silo
More informationModular Protection Systems
A Safe factory is a Productive one. Modular Protection Systems Safety Standards EN ISO 14120 - ISO 14122-3 - EN ISO 12100-1 EN ISO 13857 - EN 349 - ISO 13854 - EN ISO 10218-2 EN ISO 14119-2006/42/EC Machinery
More informationCardok Carlift Data Sheet
CARDOK CARLIFT with Hydraulic scissors Installation to replace an access ramp Fast, Silent, Discreet, Design, High-Tech Dimensions: (Built to measure, all dimensions can be changed and adapted upon request
More informationSECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work
More informationThe World of. Focus on the Value. Environmental dredging. Watermaster production & After sales. Smart solution for hard work
The World of N E W S L E T T E R 2 0 0 9 Smart solution for hard work Focus on the Value Environmental dredging Watermaster production & After sales Contents Focus on the Value 2 Focus on the Value Environmental
More informationSECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS
SECTION 13 00 50 INSTALLATION OF PART 1 GENERAL 1.1 GENERAL A. Furnish and install all tools, supplies, materials, equipment, appurtenances, and labor necessary for the installation, testing, and placing
More informationEuropean Responsible Care Awards 2008
European Responsible Care Awards 2008 Project Description: Use Of Pre-Assembled Volumes to significantly reduce Working at Height on the construction of a new Production Facility Submitted By: Colin Dykes
More informationINDIVIDUAL SOLUTIONS FROM A SINGLE SOURCE A large variety of products and systems for warehouses, factories and workshops
Extract of the general catalogue, CHAPTER F INDIVIDUAL SOLUTIONS FROM A SINGLE SOURCE A large variety of products and systems for warehouses, factories and workshops GENERAL CATALOGUE Modular shelving
More informationCardok Carlift with Rigid Chains Data Sheet
Credit: SERAPID/LinkLift system CARDOK CARLIFT with Rigid chains technology Very fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp Dimensions:
More informationSWIFT SOLUTION TO YOUR EVERY STORAGE PROBLEM ENTERPRISES.
SWIFT ENTERPRISES SOLUTION TO YOUR EVERY STORAGE PROBLEM www.swiftpk.com INTRODUCTION When it comes to storage and handling we can do the lot. Swift Enterprises has grown to become one of the country s
More informationElectrical Craft Helper (Class Code 3799) Task List. Installation
Electrical Craft Helper (Class Code 3799) Task List Installation 1. Assists in the installation of electrical equipment, power, lighting, and control circuits in water works installations and structures.
More informationSECTION LIGHTING. A. Section Basic Electrical Materials and Methods
SECTION 16500 LIGHTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide lighting fixtures of sizes, types and ratings as indicated; complete with, but not necessarily limited to, housings, lamps, lamp holders,
More informationUNITOWER: Tower Storage System A Space-Saving Storage Solution for Bar Stock, Sheet Metal, Pallets and much more.
UNITOWER: Tower Storage System A Space-Saving Storage Solution for Bar Stock, Sheet Metal, Pallets and much more. UNITOWER: Large Storage Capacity on Small Foot Print. The storage system for more efficiency.
More informationBN SENA SPECIALIST HOSPITAL
BN SENA SPECIALIST HOSPITAL Page1 Table of content: 1. PROJECT OVERVIEW... 3 1.1 PROJECT DESCRIPTION.... 3 1.2 PROJECT GENERAL INFORMATION... 4 1.3 SCOPE OF THE WORK..... 4 1.4 PROJECT DASHBOARD STATUS....
More informationInsulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer
Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer Submitted to: Partnership for Advancing Technology in Housing U.S. Department of Housing and Urban Development Washington,
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationBN SENA SPECIALIST HOSPITAL
BN SENA SPECIALIST HOSPITAL Page1 Table of content: 1. PROJECT OVERVIEW... 3 1.1 PROJECT DESCRIPTION.... 3 1.2 PROJECT GENERAL INFORMATION... 4 1.3 SCOPE OF THE WORK..... 4 1.4 PROJECT DASHBOARD STATUS....
More informationK O N E C TA C AV I T Y W A L L LO G S Y S T E M
K O N E C TA C AV I T Y W A L L LO G S Y S T E M Presented by New Forest Log Cabins Ltd *Square Log painted example Making Wood a way of Living Welcome to the KONECTA Cavity Wall Log System! New Forest
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But
More informationAccess panels - Products
www.british-gypsum.com Gyproc Access panels plasterboard accessories and decorative products Gyproc Profilex Access Panels Manufactured by Artex-Rawlplug, part of BPB, Profilex Access Panels are purposedesigned
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation
More informationNational Occupational Standards Developer s pack for Specialist Installation Occupations (Construction)
National Occupational Standards Developer s pack for Specialist Installation Occupations (Construction) Project 2016 COSVR683, COSVR684 PART TWO OPTION 4: Loading Bay Equipment (Installation and Maintenance)
More informationW A R E H O U S E S O L U T I O N S
SOLUTIONS Superlative use of your warehouse space Let us help you design your success maximize space and increase productivity If you are looking to repurpose, design or fit-out your warehouse, ABW MARK
More informationCardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:
CARDOK CARLIFT with Rigid chains technology Very fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built
More informationtough by design. custom by choice kellyklosure.com Building innovative steel structures since 1968
tough by design. custom by choice. 800-228-7230 kellyklosure.com Building innovative steel structures since 1968 built well. built by you. Customized for a gritty power plant or an air-conditioned office,
More informationStructural Breadth Study
Structural Breadth Study Connection Redesign Structural Breadth Study Connection Redesign Existing EIFS Connection The expansion project is a steel frame structure with concrete slab on deck. There is
More informationFULLY AUTOMATIC SPRING-ACTUATED
PALLETPAL LEVEL LOADERS These are the products that revolutionized manual pallet loading and unloading in the United States PalletPal Level Loaders are simple devices that will automatically maintain a
More informationExhibitor Information. etc.venues 155 Bishopsgate EC2M 3YD
Exhibitor Information etc.venues 155 Bishopsgate EC2M 3YD Introduction We would like to officially welcome you to etc.venues located on the first floor of 155 Bishopsgate, in the heart of the City of London.
More informationProject Description & Brief
Project Description & Brief The scope of this project includes the supply, delivery, and installation, testing, commissioning and training of a GN tray vacuum sealing machine at SATS Inflight Catering
More informationSECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification
More informationFRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6
PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA
More informationSWIFT S-POD & S-PACE DISTRIBUTORS. The possibilities are endless CARAVANS MOTORHOMES HOLIDAY HOMES MADE TO MAKE YOU
DISTRIBUTORS To find your nearest Swift Approved Partner WWW.SWIFTMYSPACE.CO.UK CARAVANS MOTORHOMES HOLIDAY HOMES MADE TO MAKE YOU SEE THE FULL SWIFT GROUP RANGE SWIFTGROUP.CO.UK FIND A DEALER PART OF
More informationInspection Report(CLC)
Inspection Report(CLC) PRODUCT DESCRIPTION O-cn-0915056 (Re-Inspection after O-cn-0914894 performed on 01-14-2012) Product Name: Steel Metal Desk Inspection location: TianJin, China Inspection date: 12-31-2011
More informationREQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS
REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building
More informationGENERAL MECHANICAL SYSTEM REQUIREMENTS
CHAPTER 13 GENERAL MECHANICAL SYSTEM REQUIREMENTS SECTION M1301 GENERAL M1301.1 Scope. The provisions of this chapter shall govern the installation of mechanical systems not specifically covered in other
More informationPizza Factory Bakery Project Planning in Safety Improvements. Highest Quality Lowest Cost
Pizza Factory Bakery Project Planning in Safety Improvements Overview of project Phase 1 Installation of freezer farm Phase 2 Demolition of unused rooms & reorganisation of factory layout Removal of redundant
More information