1 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BUS RAPID TRANSIT (BRT) PHASE 1B CORRIDOR IMPROVEMENTS Federal Project No. CML 5008(148) City Project No. PW1515 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA Date Issued: May 24, 2018 Date Proposals Due: June 19, 2018 at 3:00 p.m. Late Submittals Will Not Be Accepted

2 1.0 INTRODUCTION The City of Stockton (City) is requesting proposals from professional consultants to provide professional engineering services to prepare the design documents for the Bus Rapid Transit (BRT) Phase 1B project. 2.0 BACKGROUND Staff applied for the Congestion Mitigation and Air Quality (CMAQ) Improvement Program Funds and secured funding to modify and upgrade the existing traffic signals to facilitate a BRT service along a 1.61-mile stretch along Pacific Avenue, Madison Street, Fremont Street, Center Street, Miner Street and Sutter Street. The project will give San Joaquin Regional Transit District (SJRTD) buses priority toward providing on-time express transit service along the route (Attachment A Vicinity Map). The route is an extension of the existing BRT 1 route from Pacific Avenue/Alpine Avenue intersection through the Miracle Mile area and Stockton Arena/Ball Park area. BRT 1 has been very successful with ridership levels that required adding articulating (higher capacity) buses. As a separate project, SJRTD will build bus stop improvements along the route. The selected consultant will need to coordinate with SJRTD representative where the two projects overlap. The route is mostly a north/south oriented facility that carries over 20,000 cars per day within the congested link. The corridor has three congested periods: AM, Mid-day, and PM. Pacific Avenue is a two-lane facility with one lane in each direction in the business district. Madison Street is a four-lane roadway with two lanes in each direction. Miner is a four-lane facility with two lanes in each direction. Left-turn lanes are provided at all major intersections along the route. 3.0 PROJECT DESCRIPTION The BRT 1B project will provide Transit Signal Priority (TSP) for buses on Pacific Avenue, Madison Street, Fremont Street, and Center Street, Miner Avenue, and Sutter Street corridors. A total of 13 intersections will be improved along the route, the removal of a traffic signal and installation of a roundabout at the intersection of Miner Avenue and San Joaquin Street (near Downtown Transit District) will be constructed as a separate project. The project will install TSP systems, Emergency Vehicle Priority (EVP), and Pan Tilt Zoom (PTZ) cameras at each intersection, coordinate signal timing, as well as upgrade traffic signal controllers with software and service traffic signal controller cabinets where required, and upgrade or install new communication equipment. The project will include the installation of pole-mounted TSP control devices at each signalized intersection to help buses stay on schedule. The latest Emergency Vehicle Priority (EVP) technology (same device as used for TSP) will be installed to provide rightof-way ability (green lights) to emergency vehicles to respond more quickly and safely to emergency calls. PTZ closed circuit cameras (CCTV) will be installed within the corridor mounted on existing signal poles. New TSP controller cards will be placed within the existing controller cabinets and new controller cabinets will be installed where needed.

3 Signal timing will be coordinated to optimize the TSP feature, which will also help reduce vehicle collisions, resulting in significant savings in collision costs. The consultant must be familiar with the Caltrans Local Assistance Program Guidelines (LAPG) and Procedures Manual (LAPM). This project may require the expertise of a multi-discipline team consisting of transportation, civil, and other required discipline to complete the full range of required services. The consultant shall also provide system integration tasks during the construction phase of the project and coordinate the work with contractor. The consultant shall structure a proposal which accomplishes the objectives of the project. The consultant must be familiar with the Siemens Central System (TACTICS) and Siemens Controller Software (SEPAC). The selected consultant will need to coordinate with SJRTD representative where the two projects overlap for conduit installation between traffic signal cabinet and the bust stop shelter. The consultant will also need to coordinate with the selected consultant for the Miner Avenue Complete Streets project where the two projects overlap due to traffic signal removal at San Joaquin Street and Miner and Signal Modifications along Miner Avenue. 4.0 SCOPE OF WORK The Consultant shall provide preliminary and final engineering services leading to the completion of plans, specifications, and estimates for construction and/or installation of the desired improvements. The consultant shall also provide design support services during the construction phase of the project. The Consultant is encouraged to team with local consultants as much as possible to accomplish all tasks necessary to complete the project. If a subcontract for work or services to be performed exceeds $25,000, the subcontract must contain all required provisions of the prime contract. Prevailing wages will apply if the services to be performed will involve land surveying (such as flag persons, survey party chief, rodman or chainman), materials sampling and testing (such as drilling rig operators, pile driving, crane operators), inspection work, soils or foundation investigations, environmental hazardous materials and so forth. Consultants are encouraged to include items that are felt necessary for this project. The work will include, but is not limited to the following tasks: 4.1 Background Research The consultant shall review collision reports, sight distance, approach speed, truck volume, grade, need of advance warning signs and flashers, and other geometrical and operational characteristics for the project. The consultant shall meet and work with all pertinent utilities to identify utility conflicts, coordinate utility plan reviews, conduct necessary coordination meetings, and locate designed improvements as required to facilitate utility relocations. The consultant shall coordinate with all utilities in accordance with Caltrans "Manual on High and Low Risk Underground Facility within Highway Rights of Way." The objective is to eliminate any conflicts encountered during construction, which would pose construction delays or claims. The Consultant will need

4 to coordinate with the City to the maximum extent possible to route this information to utility companies. Consultant must show all existing utilities that will be impacted or cause impact by the proposed project. Consultant will need to prepare Utility A, B, and C letters and provide copies of utility correspondence for City files. The consultant is responsible for arranging and coordinating with all utility companies, within the project sphere, to resolve any utility issues. 4.2 Environmental Services The Consultant shall prepare and submit all environmental documents/reports from beginning of the PS&E to the end of the construction phase of the project, including environmental clearance according to the Caltrans Local Assistant Procedures Manuals (LAPM) and Local Programs Procedures (LPPs). The Preliminary Environmental Study (PES) will be submitted by the City. The consultant shall prepare and submit all reports required to clear NEPA. The consultant shall prepare and submit the construction Request for Authorization (RFA) package, Award Package to low bidder, Post- Construction Package according to the Local Assistant Procedures Manuals (LAPM) and Local Programs Procedures (LPPs). The construction RFA must be submitted to Caltrans District 10 office prior to May 2019 (internal City review by April 2019). NEPA clearance must be secured before construction RFA can be submitted. 4.3 Plans, Specifications, and Estimate (PS&E) The City will provide available as-built signal plans for each signalized intersection to be used as base maps. The consultant shall coordinate with SJRTD representatives regarding conduit installation between traffic signal cabinet and the bus stop shelter. Using the as-built drawings for each intersection, the consultant shall prepare complete PS&E documents for the installation of traffic signal equipment and other pertinent improvements. The PS&E shall be prepared according to City s standards and current CA MUTCD, as appropriate. Prepare a base map showing existing information to facilitate the design of all the necessary improvements. The base map limits shall be sufficient to cover all necessary improvements within the project area. Based on existing base map information, some surveying work may be required to complete the plans. Based on existing electrical conduit percent fill, new conduits may be required to be installed to accommodate the new wiring. Some intersections may require complete modification to accommodate the TSP for buses. Prepare improvement plans for signals, striping, electrical, and civil details. Provide six (6) sets of plans (24 x36 ), specifications, and engineer estimate at the 50%, and 95% phases to the City for review and comments. With each stage, the review comments from the previous stage shall be itemized and a written response to each shall be prepared in a comment matrix. The original red-line mark-up from the reviewing agency shall be returned with the succeeding submittal. After the 95% submittal review by staff, a check print (at 100%) shall be sent for editorial purposes prior to plotting on mylars. Final

5 submittal shall include: construction Request for Authorization (RFA) package; one set of mylar final design plans with specifications and final engineer's estimate; and AutoCAD format drawing files on CD disk. Final P S & E submittal is due within ninety (90) working days after the date of Authorization to Proceed. After completion of the construction, the red lines, provided by the contractor, shall be as-built on mylars. As part of the system integration task, the consultant will be responsible to coordinate and work with the contractor to establish communication between the TSP system and City s existing Opticom Central Management Software (CMS), traffic signal controller and TACTICS, and video camera, in TMC. The consultant shall prepare a RFA package for the City to submit to the DLAE office for construction authorization. 4.4 Coordination/Meetings The consultant shall attend meetings with City staff as needed to finalize the design. The consultant shall attend a pre-construction meeting, a post-construction meeting, and meet and assist staff during construction as required. The consultant shall prepare and submit all forms and reports required by Caltrans LAPM and LPP s from the beginning, starting with environmental clearance and ending with project completion. The consultant is responsible for arranging and coordinating with all utility companies within the project to resolve all utility issues. The selected consultant will need to coordinate with SJRTD representative and with the selected consultant for the Miner Avenue Complete Street Improvements Project. The consultant shall prepare and provide a comprehensive schedule to reflect the timeframe for each Task of the proposed scope of work, utilizing the latest version of Microsoft Project. The project schedule shall show the tasks, duration, milestones, assignments, critical paths, and other relevant data. The project schedule shall be maintained and updated monthly throughout the PS&E phase of the project. 4.5 Preserving and Perpetuating Survey Monuments The Consultant shall identify, list, tie out/perform construction staking of survey monuments, and show existing survey monuments on construction plans. Consultant shall file all pre-construction Corner Records or Records of Survey with San Joaquin County and submit a copy to the City. The Corner Records or record of Survey shall show monuments within the area of construction reasonably subject to removal or disturbance not shown on a recent record document. The Consultant shall include language in the PS&E package to preserve all monumentation affected by the work being performed in accordance with Section 8771 of the Professional Land Surveyors Act in the Business and Professionals Code of the State of California.

6 4.6 Design Support and System Integration A. Design Support The consultant shall be available to respond to clarifications required during bidding and construction phase of the project. The consultant shall review submittals, request for information, and change orders during construction. To complete the design, any necessary design modifications during construction are the responsibility of the consultant at no cost to the City. Consultant shall prepare record as-built drawings upon project completion. The work will include, but is not limited to the following: Bidding Support Respond to Request for Information (RFI)/Clarifications during Bidding and Construction Review Submittals, assist staff in reviewing contract change orders, and prepare project addenda Attend meetings as needed Assist the City Inspector with specific design issues during construction Prepare record drawings (As-Builts) B. System Integration The The system integration shall include Priority Control Central Management software to interface with the discriminator at each signalized project location via the City s communication network. The consultant is required to collect data (postconstruction) to prepare basic intersection signal timing plans, time-of-day traffic signal coordination plans, fine tuning of low priority bus parameters and other controller parameters, and project documentation. The consultant shall develop a signal timing plan for the route. The result of the signal timing plan shall be documented on Time Space Diagrams (TSD), where applicable. The TSDs shall indicate the green bands, phase numbers, vehicle movements, intersection name, split allocations and offsets for each intersection and the cycle length for the plan. Working as an extension of City staff, the consultant shall implement the traffic signal timing plans, and fine tune and verify the early green and extended green at each signalized intersection. The consultant shall work with SJRTD and City staff to determine appropriate values for parameters that will determine whether or not a priority request is implemented. The consultant shall combine the before study information (prior to implementation of the new equipment and optimized timings) with the after study information. A before and after study shall be delivered by the consultant. The system integration shall include, but is not limited to the following: Collect data (Post Construction) to develop and implement basic intersection signal timing plans, time-of-day traffic signal coordination plans, fine tuning of low priority bus parameters and other controller parameters, and project documentation. Conduct and prepare a Before study report.

7 Transfer existing traffic signal controllers database to the new controller (M60) for each signalized intersection. Update databases base on field fine tuning of the traffic signal coordination time-of-day plans. Coordinate with City s staff and the SJRTD to develop/implement and test TSP parameters and timings. Assist staff to establish communicate between TMC and project traffic signal controllers, CCTV, and Opticom discriminator. Assist the City and SJRTD with the verification testing and running of the TSP parameters and detection zones, and fine tuning of the TSP arrival times for optimal bus and traffic signal operations. Attend meetings as needed. Coordinate and cooperate with contractor and City inspectors throughout the process toward a fully functioning system. Prepare and submit a Before and After study report. 4.7 As-built Drawings The Consultant shall prepare record drawings upon project completion (red-lines from contractor). The Consultant shall mark up the original mylar sheets with revisions made during construction. As-built record drawings shall reflect all changes to all improvements constructed. Electronic files of the as-built drawings (in standard pdf format) and AutoCAD (dwg) shall be provided in addition to the original as-built mylars. 5.0 PROJECT GENERAL INFORMATION 5.1 Proposal Submissions Proposals shall be submitted no later than 3:00 PM on June 19, 2018 to: ROSA ALVAREZ CITY OF STOCKTON PUBLIC WORKS DEPARTMENT 22 E. WEBER AVENUE, ROOM 301 STOCKTON, CA The proposal should be firmly sealed in an envelope which will clearly be marked on the outside with BUS RAPID TRANSIT PHASE 1B for the City of Stockton (FEDERAL PROJECT NO. CML 5008(148)/CITY PROJECT NO. PW1515). Late Proposals will not be accepted. 5.2 Acceptance or Rejection of Proposal The City reserves the right to negotiate an agreement with the firm submitting the highestranking proposal. Also, the City reserves the right to reject any and all proposals or to

8 waive any irregularity in a proposal if it is deemed to be in the best interest of the City. Failure to submit all requested information could be grounds to reject the proposal. 5.3 Proposal Questions and Requests for Clarification Any question or request for clarification shall be submitted in writing to: Rosa.Alvarez@stocktonca.gov Requests for clarification shall be submitted at least five (5) business days prior to the proposal due date. If a response warrants an addendum to the RFP, such addendum will be posted on bidflash at least two days prior to the proposal due date. It is the proposer s responsibility to check the website for any addendums or responses to questions. The website address is as follows: Causes for Disqualification Any of the following may be considered cause to disqualify a proposal: A. Evidence of collusion among proposers B. Any attempt to improperly influence any member of the evaluation panel C. A proposer s default or breach of contract in previous work that resulted in termination of that agreement and/or D. Existence of any lawsuit, unresolved contractual claim, or dispute between proponent and the City. E. Not registered with Department of Industrial Relations (when prevailing wages apply) 5.5 Licensing Requirements Any professional certifications or licenses that may be required are the sole cost and responsibility of the proposer. A City of Stockton business license is required. Please contact the City of Stockton Business License Customer Service at (209) Insurance Requirements The proposer must obtain and maintain the required insurance. Proposer should review Attachment B, Instructions to Proposers for information regarding insurance, Indemnification, Disadvantaged Business Enterprises, prevailing wages, etc Failure to comply with the Instructions to Proposers may be grounds for rejection. 5.7 Disadvantaged Business Enterprises The requirements for federally funded projects including Disadvantaged Business Enterprise (DBE) apply to this project. The DBE goal for this project is 15%. Proposers

9 are requested to submit Caltrans form 10-O1 with their proposals. Form 10-O2 must be submitted at the conclusion of cost negotiations. See Attachment B, Instructions to Proposers for a description of the DBE Program and required forms. Any questions regarding the DBE program should be directed to Miguel Mendoza, DBE Compliance Officer, at (209) or Miguel.mendoza@stocktonca.gov. 5.8 Federal Program Requirements The requirements for federally funded projects will apply to this Request for Proposals, and the Proposers will be required to submit all required forms. See Attachment E, Federal Aid Consultant Contract Provisions for copies of currently required forms. Forms can also be found on Caltrans website: Department of Industrial Relations Please refer to Attachment B, Instructions to Proposers, for registration requirements with the Department of Industrial Relations Product Ownership Any documents resulting from the performance of work in the contract will become property of the City. This includes all work performed by sub consultants. 6.0 REQUIRED PROPOSAL CONTENT The proposal shall contain the following, at a minimum: Cover Letter Executive Summary Project Team Project Understanding and Approach Examples of experience with similar types of work Detailed Work Plan References Schedule Cost Proposal (separate sealed envelope) Federal Forms The body of the technical proposal shall not exceed 25 double-sided pages (8-½ x 11 ) with a minimum font size of 10 with each page numbered. Proposer shall submit four (4) bound sets of the proposal and an electronic pdf copy. The maximum allowable length is exclusive of any folder, cover, federal forms, or section dividers. 6.1 Cover Letter

10 The letter shall be signed by an official with the authority to negotiate and contractually bind the firm with the City of Stockton. Provide name, title, address, , and telephone number for this officer. Describe any subcontract arrangements or licensing agreements. Include any potential conflict of interest. 6.2 Executive Summary The Executive Summary shall include a summary of the proposal, emphasizing the approach to be taken and including a work plan, schedule, and description of the capabilities of the Consultant and sub consultants. The summary should convey an understanding of the purpose of the project and the services required for performance. 6.3 Project Team Describe your team organization including the qualifications of the prime consultant and any sub consultants. Provide an organizational chart of the proposed team structure. The following should be addressed: Demonstrate the firm s experience in each of the areas of expertise needed to successfully complete the project. This should include a description of prior experience in working with public agencies, including working with City staff. Provide references with emphasis on the completion of projects related to pedestrian improvements with similar challenges (provide list with proposal). Ability for project team to perform the proposed work within the time limits of the project, considering their current and projected workload and assignments. Ability to provide quality control of all deliverables and be responsive to all issues in a timely manner. Provide project team resumes 6.4 Project Understanding and Approach Describe your approach to meeting the project goals and objectives. 6.5 Examples of experience with similar types of work Provide examples of projects similar in scope and size to this project. 6.6 Detailed Work Plan Provide a proposed work plan for development and implementation of the program as described in the Scope of Work. Describe how the team will complete each task without simply repeating the listed tasks. Alternative approaches to the project can be submitted if a rationale is given for the suggested changes. 6.7 References

11 Provide three client references for the firm, two of which are familiar with the project manager and key personnel. This shall include the name, company, contact information, and description of related work that was provided to the client. 6.8 Schedule Prepare and submit a schedule describing the time required to complete each task in the scope. The schedule shall include construction activities. Show phases, durations, milestones, assignments, critical paths, and other relevant data. The Consultant is encouraged to develop additional project schedule details and suggest changes within the basic constraints of the program. The schedule shall be provide in Microsoft Project schedule. The schedule shall be updated periodically. 6.9 Cost Proposal Proposer shall submit a cost proposal in a separate sealed envelope clearly labeled Cost Proposal. See Attachment D for a Sample Cost Proposal (Local Assistant Procedures Manual Exhibit 10-H). If 10-K is required, it must be submitted with the cost proposal in the sealed envelope. 7.0 PROPOSAL EVALUATION The Consultant Selection process will follow the timeline shown below Event Date Post Request for Proposals May 24, 2018 Written Questions submitted by June 12, 2018 Response to Written Questions June 15, 2018 Proposals Due June 19, 2018 Negotiations July 2, 2018 City Council Approval September 18, 2018 Dates are tentative. 7.1 Proposal Evaluation The selection committee will evaluate all proposals. This is a qualification based selection, so ranking will be in accordance with the attached Evaluation Scoring Sheet (See Attachment C). Proposer shall submit a cost proposal in a separate sealed envelope clearly labeled Cost Proposal. 7.2 Negotiations City staff will begin negotiations with the highest ranked firm. If an agreement cannot be reached after a reasonable period of time, as determined by the City, Then the City will terminate negotiations with the number one ranked firm and negotiations will be opened with the second ranked firm. The compensation discussed with one prospective Consultant will not be disclosed or discussed with another Consultant.

12 The selected consultant will be expected to enter into a Professional Services Contract with the City. Proposers should direct their attention to Attachment B, Instructions to Proposers for the most current insurance and indemnification language. It is expected that the successful proposer will accept these terms without modification. The contract shall not be in force until the Council approves the contract and the City manager signs it. Work performed before the issuance of a Notice to proceed cannot be paid by the City. ATTACHMENTS: Attachment A Vicinity Map Attachment B Instructions to Proposers Federally Funded Contracts Attachment C Evaluation Scoring Sheet Attachment D Sample Cost Proposal (Exhibit 10-H in Local Assistance Manual) Attachment E Federal Aid Consultant Contract Provisions

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202

More information

Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County

Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County Request for Proposals Triennial Performance Audit of Public Transit Systems and The Council of Governments in San Joaquin County April 09, 2018 Responses Due Date/Time April 30, 2018 before 4:00 PM Pacific

More information

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project VILLAGE OF LISLE REQUEST FOR QUALIFICATIONS ( RFQ ) #1267 ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project DUE BY: FEBRUARY 5, 2018 @ 11:00

More information

PETALUMA HISTORICAL LIBRARY AND MUSEUM Project # C

PETALUMA HISTORICAL LIBRARY AND MUSEUM Project # C REQUEST FOR PROPOSALS CITY OF PETALUMA, CALIFORNIA PETALUMA HISTORICAL LIBRARY AND MUSEUM Project # C16201304 KEY ELEMENTS & ACTIVITIES Complete Comprehensive Analysis & Scope Development Complete Design

More information

Request for Qualifications Statements

Request for Qualifications Statements Request for Qualifications Statements BND WATER DISTRIBUTION AND WASTEWATER TREATMENT ENGINEERING STATEMENTS ENGINEERING DESIGN SERVICES FOR BND WATER DISTRIBUTION AND WASTEWATER TREATMENT The Brownsville

More information

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process:

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process: 01-08-19 Posting Date FRA-33-3.70 Smart Technology Connected Vehicle Roundabout Application Project PID No. 109356 City of Dublin Response Due Date: 01-24-19 Communications Restrictions Please note the

More information

PIEDMONT TRIAD AIRPORT AUTHORITY

PIEDMONT TRIAD AIRPORT AUTHORITY PIEDMONT TRIAD AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) for ON-CALL ENVIRONMENTAL CONSULTANT SERVICES at the PIEDMONT TRIAD INTERNATIONAL AIRPORT (GSO) The Piedmont Triad Airport Authority (PTAA)

More information

Transit Return on Investment (ROI) Study Request for Proposals (RFP)

Transit Return on Investment (ROI) Study Request for Proposals (RFP) Transit Return on Investment (ROI) Study Request for Proposals (RFP) Table of Contents 1. Introduction... 1 2. Scope of Services... 1 3. Project Schedule... 5 4. Evaluation Criteria... 5 5. Submission

More information

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design Request for Proposals Hillsdale Pedestrian/Bicyclist Bridge Design Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 JUNE 13, 2013 The City of San Mateo (CITY) is accepting

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning

More information

Request for Proposals for Enterprise Resource Planning System Replacement Consultants Mariposa County, CA

Request for Proposals for Enterprise Resource Planning System Replacement Consultants Mariposa County, CA I. Introduction Request for Proposals for Enterprise Resource Planning A. Purpose Mariposa County ( County ) is requesting proposals from qualified and experienced firms or individuals to provide consulting

More information

Request for Proposal (RFP 13-02)

Request for Proposal (RFP 13-02) Request for Proposal (RFP 13-02) for Preparation of Scoping and Project Report, Environmental Document, Plans, Specifications and Estimate for I-680 North Segment Express Lane Conversion Posted on website

More information

SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS. (Boilerplate language, map and other contract language to be added on approval of Board)

SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS. (Boilerplate language, map and other contract language to be added on approval of Board) October 17, 2017 SADDLE CREEK CSD LANDSCAPE ARCHITECT REQUEST FOR PROPOSALS (Boilerplate language, map and other contract language to be added on approval of Board) PROPOSAL SUBMITTALS DUE NOVEMBER 17,

More information

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS OLYMPIA, WASHINGTON REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS REQUEST FOR QUALIFICATIONS AND QUOTES (RFQQ) RELEASE DATE: April 13, 2017 PRE-PROPOSAL MEETING: Date: April 24, 2017

More information

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 08/28/17 Posting Date UNI/FRA-NW 33 Smart Mobility Corridor Project Implementation of the Advanced Transportation and Congestion Management Technologies Deployment Program Grant Project Management Consultant

More information

REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA

REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for engineering design services

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY

REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY REQUEST FOR PROPOSALS AND STATEMENT OF QUALIFICATIONS IMPACT FEE STUDY June 1, 2018 The City of Rhome is now accepting sealed Request for Proposals and Statement of Qualifications (RFQ) for New Water &

More information

Request for Proposals. 42nd Avenue Pump Station Rehabilitation. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

Request for Proposals. 42nd Avenue Pump Station Rehabilitation. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 42nd Avenue Pump Station Rehabilitation Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 May 24, 2015 The City of San Mateo (City) is accepting proposals to select a qualified

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS FOR COMPENSATION STUDY Proposals Due: November 3, 2016, 4:00 PM 1.0 OBJECTIVE SECTION 1 SUBMITTAL PROCEDURES & DEADLINE The City of Signal Hill is seeking proposals from qualified

More information

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ)

PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) PROFESSIONAL CONSULTANT SERVICES REQUEST FOR QUALIFICATIONS (RFQ) MARCH 2018 INTRODUCTION AND BACKGROUND The City of Keller is in search of the most qualified firms to provide professional expertise and

More information

The deadline for submittal of proposals is 4:00 PM, Pacific Time, January 8, 2014.

The deadline for submittal of proposals is 4:00 PM, Pacific Time, January 8, 2014. CITY OF BAINBRIDGE ISLAND, WASHINGTON REQUEST FOR PROPOSALS CLASSIFICATION AND COMPENSATION STUDY INTRODUCTION The City of Bainbridge Island, Washington invites proposals from qualified consulting firms

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

The Development of the PASSENGER TRANSPORTATION FUNDING STUDY

The Development of the PASSENGER TRANSPORTATION FUNDING STUDY Request for Proposal for: The Development of the PASSENGER TRANSPORTATION FUNDING STUDY January 2, 2009 STATE OF IOWA DEPARTMENT OF TRANSPORTATION Section 1 General Information 1.1 Introduction This study

More information

Issued: December 3, Submission Deadline: December 21, 2018, 12:00 PM

Issued: December 3, Submission Deadline: December 21, 2018, 12:00 PM REQUEST FOR QUALIFICATIONS (RFQ) WEBSITE REDESIGN Issued: December 3, 2018 Submission Deadline: December 21, 2018, 12:00 PM South Bayside Waste Management Authority (SBWMA) / RethinkWaste Attention: Julia

More information

VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES JULY 2015

VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES JULY 2015 VILLAGE OF GLENDALE, OHIO REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING SERVICES I. INVITATION JULY 2015 The Village of Glendale requests firms submit proposal and qualifications for ongoing Civil Engineering

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements

Request for Proposals For Wastewater Treatment Plant Expansion and other Plant Improvements For Wastewater Treatment Plant Expansion and other Plant Improvements By the City of Tracy April 31, 2017 Response Due: Wednesday, May 31, 2017 @ 3:00 PM City of Tracy Development Services Attention: Ripon

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

Invitation to Negotiate

Invitation to Negotiate Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of

More information

PENNSYLVANIA TURNPIKE COMMISSION

PENNSYLVANIA TURNPIKE COMMISSION PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION MANAGEMENT FIRM Construction Inspection / Project Management Services Six Lane Widening, Mileposts 326-333 Montgomery County

More information

REQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS

REQUEST FOR PROPOSALS YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS REQUEST FOR PROPOSALS GUTHRIE MEMORIAL LIBRARY ENVELOPE REHABILITATION YORK COUNTY, PENNSYLVANIA TABLE OF CONTENTS Table of Contents Section 1: Background...... 2 Section 2: Scope of Services... 2 Section

More information

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013 FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.

More information

CONSTRUCTION MANAGEMENT SERVICES

CONSTRUCTION MANAGEMENT SERVICES DrAFTDRAFTdd EXHIBIT 1 CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR QUALIFICATIONS () SELECTION PROCESS School District of Lee County, Florida TABLE OF CONTENTS 1. INTRODUCTION 1 Lobbying 2 2. REQUEST

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

Item No. 13 Town of Atherton

Item No. 13 Town of Atherton Item No. 13 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI COMMUNITY SERVICES DIRECTOR DATE: APRIL

More information

CITY OF PASCO REQUEST FOR PROPOSAL TO PROVIDE SERVICES FOR THE Urban Forestry Plan and Urban Forest Inventory

CITY OF PASCO REQUEST FOR PROPOSAL TO PROVIDE SERVICES FOR THE Urban Forestry Plan and Urban Forest Inventory DEPARTMENT OF Administrative and Community Services 525 N Third Avenue Pasco, WA 99301 Phone 509.543.5757 Fax 509.543.5758 CITY OF PASCO REQUEST FOR PROPOSAL TO PROVIDE SERVICES FOR THE 2018 Urban Forestry

More information

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW Pursuant to Education Code section 17406 and Public Contract Code section 20111.6, the Manhattan Beach Unified School District

More information

REQUEST FOR PROPOSALS AUDIT

REQUEST FOR PROPOSALS AUDIT REQUEST FOR PROPOSALS 2017-18 AUDIT PROFESSIONAL AUDIT SERVICES ANNUAL FINANCIAL STATEMENT PROPOSAL DEADLINE DATE Tuesday, February 6, 2018 at 3:00pm SUBMIT PROPOSAL TO: Ahmad Sheikholeslami Chief Business

More information

ADMINISTRATIVE DIRECTIVE #CS-04

ADMINISTRATIVE DIRECTIVE #CS-04 HILLSBOROUGH COUNTY Office of the County Administrator ADMINISTRATIVE DIRECTIVE #CS-04 SUBJECT: EFFECTIVE DATE: UTILITY COORDINATION PROCEDURES FOR HILLSBOROUGH COUNTY CONSTRUCTION PROJECTS WITHIN COUNTY

More information

Fair Oaks Water District

Fair Oaks Water District Fair Oaks Water District Request for Proposal To develop a set of construction drawings, construction specifications and bid documents for a Skyway Well in Fair Oaks. (FOWD Job #C19WTSTSTHD) Prepared by:

More information

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m. Information Technology 625 Center Street Oregon City OR 97045 Ph (503) 657-0891 fax (503) 657-7892 REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION Date Due: Friday, September

More information

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS I. INTRODUCTION The East Rutherford School District is planning to hold a referendum on December 12, 2017 that incorporates facility

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Section 200 Design Process and Quality Management. Electrical Engineering Centre

Section 200 Design Process and Quality Management. Electrical Engineering Centre Section 200 Design Process and Quality Management Electrical Engineering Centre April 2013 TABLE OF CONTENTS 200 DESIGN PROCESS AND QUALITY MANAGEMENT 201 INTRODUCTION TO DESIGN PROCESS... 1 201.1 ABOUT

More information

Highway / Utility Guide

Highway / Utility Guide Oregon Department of Transportation Highway Division Right of Way Section Highway / Utility Guide Railroad & Utilities Unit Right of Way Section STATEMENT OF PURPOSE It is important to understand that

More information

City of Dawson Creek Request for Proposals No

City of Dawson Creek Request for Proposals No City of Dawson Creek Request for Proposals No. 2011-29 SANITARY SEWER MASTER PLAN The City of Dawson Creek is requesting proposals for the creation of a Sanitary Sewer Master Plan. All contract documents

More information

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station

City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station City of Santaquin REQUEST FOR PROPOSALS For Engineering Services for the East Side Booster Pump Station The City of Santaquin (the City ) hereby requests competitive proposals from qualified consultants

More information

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms

More information

Organizational and Compensation Review Project (RFP No. CO ADMIN-01-19)

Organizational and Compensation Review Project (RFP No. CO ADMIN-01-19) REQUEST FOR PROPOSAL ISSUE DATE: January 9 th, 2019 Organizational and Compensation Review Project (RFP No. CO ADMIN-01-19) for the MUNICIPALITY OF SHUNIAH CLOSING: February 5, 2019 at noon EST At the

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL

REQUEST FOR QUALIFICATIONS ARCHITECTURAL REQUEST FOR QUALIFICATIONS ARCHITECTURAL and ENGINEERING CONSULTING SERVICES FOR CAPITAL RENEWAL AND REPLACEMENT PROJECTS SQ # 10565 MIDDLESEX COUNTY COLLEGE 2600 WOODBRIDGE AVENUE EDISON, NEW JERSEY 08818

More information

Request for Letter of Interest (Electronic Submittal Required)

Request for Letter of Interest (Electronic Submittal Required) Request for Letter of Interest (Electronic Submittal Required) Skyline Drive Engineering Design and Right-of-Way Acquisition October 2017 Page 1 of 10 Overview: Consultant selection is a Qualification-Based

More information

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood The Quinault Indian Nation (QIN) is pleased to present a Request for Proposal and

More information

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC.

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC. Page 1 of 8 ADDENDUM #2 RFQ 15-01-194 Red Line BRT Design Services. February 17, 2015 To: All Vendors of Record RE: Addendum #2 All vendors are to accept the information contained herein as the official

More information

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations

More information

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016 I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia RFQ Information Meeting - November 9, 2016 Krishna Potturi, PE Project Manager Suril Shah APD Project

More information

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,

More information

Northeast Ohio Areawide Coordinating Agency NOACA 1299 Superior Avenue Cleveland, Ohio (216)

Northeast Ohio Areawide Coordinating Agency NOACA 1299 Superior Avenue Cleveland, Ohio (216) Northeast Ohio Areawide Coordinating Agency NOACA 1299 Superior Avenue Cleveland, Ohio 44114-3204 (216) 241-2414 www.noaca.org Request for Proposals (RFP) for Consultant for Air Quality Public Education

More information

REQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA

REQUEST FOR PROPOSALS FOR. Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA REQUEST FOR PROPOSALS FOR Site Civil Services for the Iowa River Landing Arena CITY OF CORALVILLE IOWA City of Coralville Iowa Coralville, IA Page 1 of 6 Please review and provide response to this letter

More information

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY LOWER SAUCON TOWNSHIP Released on July 21, 2016 Police Operations Study REQUEST FOR PROPOSAL ( RFP ) 1. PURPOSE OF THE STUDY The Township of Lower Saucon

More information

OUTAGAMIE COUNTY REQUEST FOR BID FOR HAULING SERVICE OF RECYCLABLE PLASTIC BALES FOR THE DEPARTMENT OF RECYCLING & SOLID WASTE

OUTAGAMIE COUNTY REQUEST FOR BID FOR HAULING SERVICE OF RECYCLABLE PLASTIC BALES FOR THE DEPARTMENT OF RECYCLING & SOLID WASTE OUTAGAMIE COUNTY REQUEST FOR BID FOR HAULING SERVICE OF RECYCLABLE PLASTIC BALES FOR THE DEPARTMENT OF RECYCLING & SOLID WASTE Due Date: August 3, 2017 1.0 Overview The Outagamie County Department of Recycling

More information

TASK 1 Interchange Justification for US 52 in Lawrence County, Ohio

TASK 1 Interchange Justification for US 52 in Lawrence County, Ohio REQUEST FOR PROPOSALS SPECIFICATIONS KYOVA Interstate Planning Commission Group 1: Lawrence County, Ohio US 52 Interchange Project PID: 104526 June 5, 2017 The KYOVA Interstate Planning Commission is seeking

More information

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD

PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD PUBLIC NOTICE MARYLAND DEPARTMENT OF TRANSPORTATION NOTICE TO ARCHITECTS & ENGINEERS TRANSPORTATION PROFESSIONAL SERVICES SELECTION BOARD REQUEST FOR PROFESSIONAL SERVICES The Secretary of the Maryland

More information

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES REQUEST FOR QUALIFICATIONS CITY ENGINEERING SERVICES QUALIFICATION SUBMITTAL DATE: Monday, February 18, 2019 RFQ Number 2019-01 City of McLendon-Chisholm 1371 W. FM 550 McLendon-Chisolm, Texas 75032 972-524-2077

More information

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Replacement of Manual Trolley Switch System Phase 1

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Replacement of Manual Trolley Switch System Phase 1 CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS This is an Invitation for Bids (IFB) for the following public work: Replacement of Manual Trolley Switch System Phase

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

REQUEST FOR PROFESSIONAL SERVICES

REQUEST FOR PROFESSIONAL SERVICES REQUEST FOR PROFESSIONAL SERVICES The City of Lander is currently soliciting proposals from consultants who can offer a complete and accurate assessment of the condition of the City of Lander s street

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS Village of La Grange Phase II Design Engineering Services for Submission Deadline: No later than 10:00 am on October 19, 2018 Published on: October 5, 2018 on the Village of

More information

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Presidio Trolley Coach Facility - Presidio Bus Lifts

CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS. Presidio Trolley Coach Facility - Presidio Bus Lifts CITY AND COUNTY OF SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY INVITATION FOR BIDS This is an Invitation for Bids (IFB) for the following public work: Presidio Trolley Coach Facility - Presidio Bus Lifts

More information

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE

REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE REQUEST FOR PROPOSALS FOR PROFESSIONAL ENGINEERING SERVICES FOR DESIGN OF RECHARGE BASIN ON VICTORIA SITE General Provisions Western Municipal Water District (WMWD) requests a qualified Design Consultant

More information

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT DATED FEBRUARY 19, 2015 REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK DATE ISSUED: January 10, 2018 DEADLINE FOR WRITTEN

More information

I-74 Final Design Request For Proposal

I-74 Final Design Request For Proposal Dear Consultants: Introduction I-74 Final Design Request For Proposal Iowa Department of Transportation (In cooperation with Illinois Department of Transportation) October 5, 2007 The Iowa Department of

More information

August 31, To Whom It May Concern:

August 31, To Whom It May Concern: August 31, 2017 To Whom It May Concern: The Aerotropolis Atlanta Community Improvement Districts (AACIDs) is soliciting Statements of Qualifications (RFQ) from qualified firm(s) or organization(s) to develop

More information

Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES

Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES Request for Proposals CONTRACTED LANDSCAPE ARCHITECTURE SERVICES Issued October 18, 2017 DEADLINE Noon Wednesday, November 15, 2017 CONTACT: KRISTINA HANDT CITY ADMINISTRATOR 3800 Laverne Ave N Lake Elmo,

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN June 4, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627 DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# 433056-4-12-01 Ad # 19627 Qualification Requirements for Type of Work 99.0 I. Purpose II. Rail Services III. Administration

More information

Allegheny County Sanitary Authority (ALCOSAN)

Allegheny County Sanitary Authority (ALCOSAN) Allegheny County Sanitary Authority (ALCOSAN) REQUEST FOR QUALIFICATIONS for PROFESSIONAL SERVICES WET WEATHER PLANT EXPANSION CONSTRUCTION MANAGEMENT CAPITAL PROJECT NO. S 430 January 2018 1.0 INTRODUCTION

More information

LAKELAND AREA MASS TRANSIT DISTRICT (LAMTD) Office of Purchasing and Contracts P.O. Box 1687, Lakeland Florida AMENDMENT OF SOLICITATION

LAKELAND AREA MASS TRANSIT DISTRICT (LAMTD) Office of Purchasing and Contracts P.O. Box 1687, Lakeland Florida AMENDMENT OF SOLICITATION LAKELAND AREA MASS TRANSIT DISTRICT (LAMTD) Office of Purchasing and Contracts P.O. Box 1687, Lakeland Florida 33802 AMENDMENT OF SOLICITATION 1. SOLICITATION No. 12-006 2. AMENDMENT No. 1 3. EFFECTIVE

More information

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery

October 19, 2017 Shailendra G. Patel, PE, DBIA Division Administrator, Alternative Project Delivery General Engineering Consultant Services for I-64 Hampton Roads Bridge-Tunnel Expansion Project Hampton Roads District RFP No. HRD-20171013 Optional Pre-Proposal Conference October 19, 2017 Shailendra G.

More information

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW PROSPECTIVE MEP SUBCONTRACTORS FOR LEASE-LEASEBACK PROJECTS, 2018 I. BACKGROUND AND OVERVIEW Pursuant to Education Code section 17406 and Public Contract Code section 20111.6, all prospective first tier,

More information

Dates/Times: p.m. Pacific Time.

Dates/Times: p.m. Pacific Time. Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,

More information

REQUEST FOR QUALIFICATIONS ADDENDUM. Rail feasibility-level revenue and cost forecast, and legal regulatory draft

REQUEST FOR QUALIFICATIONS ADDENDUM. Rail feasibility-level revenue and cost forecast, and legal regulatory draft SEVEN COUNTY INFRASTRUCTURE COALITION REQUEST FOR QUALIFICATIONS ADDENDUM Rail feasibility-level revenue and cost forecast, and legal regulatory draft Deleted: alignment, Deadline April 5, 2018, 3:00 p.m.

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0027-12-134 SPECIAL PROVISION 000--2823 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting

Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC # RFQ Information Meeting Odd Fellows Road Interchange at US Route 29/460 and Road Improvements UPC #105515 RFQ Information Meeting Raina Rosado, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC July 11,

More information

RFQ Drainage Ditching and Culvert Replacement

RFQ Drainage Ditching and Culvert Replacement RFQ 2016-26 Drainage Ditching and Culvert Replacement The City of Dawson Creek requests quotes for drainage ditching and replacement of culverts in the area of 7 th Street and 122 nd Avenue. All contract

More information

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders Issued: November 15, 2017 Closing Date and Time: January 16, 2018, at 2:00 pm Project Summary The City of Eagle Point is requesting

More information

STAFF REPORT I. BACKGR~ Community Development Department

STAFF REPORT I. BACKGR~ Community Development Department STAFF REPORT Date: March 04, 2014 To: Steven A. Preston, FAICP, City Manager From: Daren Grilley, PE, City Engin~ Community Development Department By: Algis J. Marciuska, PE, Senior Civil Engineer ~ Subject:

More information

Request for Proposal Simulation-Based Learning Competition

Request for Proposal Simulation-Based Learning Competition International Council on Hotel, Restaurant, and Institutional Education February 1, 2018 Request for Proposal Simulation-Based Learning Competition RFP#2018-SIM-101 Your firm is invited to submit a proposal

More information

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process:

Please note the following policy concerning communication between Consultants and Pike County Engineer during the announcement and selection process: 01-28-19 Posting Date PIK-CR50-3.40 PID No. 108463 Pike County Response Due Date: 03-08-19 Communications Restrictions Please note the following policy concerning communication between Consultants and

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES

More information

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014 REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES Issue Date: April 30, 2014 Due Date: June 6, 2014 In order to be considered, proposals must be signed and returned via email to rwhitmore@wested.org

More information

City of Eagle Point 2017 Paving Instruction to Bidders

City of Eagle Point 2017 Paving Instruction to Bidders City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for

More information

REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT The Reno-Tahoe Airport Authority (RTAA) Reno, Nevada, is seeking

More information