BARFIELD BEND POTOMOLOGY STUDY UPDATE MISSISSIPPI RIVER Hydraulics and Hydrology Branch. July 1996

Size: px
Start display at page:

Download "BARFIELD BEND POTOMOLOGY STUDY UPDATE MISSISSIPPI RIVER Hydraulics and Hydrology Branch. July 1996"

Transcription

1 BARFIELD BEND POTOMOLOGY STUDY UPDATE MISSISSIPPI RIVER Hydraulics and Hydrology Branch July 1996 I. Purpose. The purpose of this report is to update investigations pertaining to overbank scour at Barfield Bend made as presented in the February 1986 report "Overbank Scour Problem at Barfield Bend Arkansas, Mississippi River Miles 89-87". This report update will assess the following: I) potential for additional top bank scour at Barfield Bend, 2) potential for adverse hydraulic impacts of overbank flow on main-line levee, 3) potential formation of a cutoff across Barfield Bend, 4) impacts of the Nebraska Point dike field on overbank flow lines, 5) impacts of stone closure degradation during overbank events, and 6) benefits of recent tree screen improvements (Figure 1-1 ). II. General. Conclusions from the 1986 report summarized that there was no threat to the main line Mississippi River levee (at that time), that the top bank control should be maintained throughout the Barfield revetment by maintaining the scour closures, and that a monitoring program be utilized to evaluate the situation with subsequent overbank flow periods. Federal actions recommended in the 1986 report were to monitor the location and to maintain the top bank controls. Local interests actions recommended in the 1986 report included degrading the abandoned private levee and establishment of a tree screen along top bank and around each ofthe scour holes. The Memphis District Corps of Engineers has maintained the scour closures and continued a monitoring program as recommended. Local interests have completed a tree screen around the scour holes as the previous report recommended. None of the private levee has been degraded to date. Iii.. Analysis. Analysis ofpotential for additional top bank scour at Barfield Bend consisted of analyzing overbank flow measurements made during several flood events and historical growth rates ofthe scout holes (Figure 111-1) as plano metered from aerial photography. No significant trends could be identified from the data to indicate excessive overbank scour should be expected in the future.. Local scour will likely continue where the private levee breaches had originally occurred and where the scour holes were closed by placement 'of riprap. The closures were constructed to approximately 3 feet above natural ground elevations in the surrounding overbank and about 4 feet below the private levee grade. The closures, therefore, function as weirs during higher

2 stages and focus flow energy in a relatively small area. With little tail water on the closures when first overtopped, the scour holes have continued to grow during past flood events. Since historic growth of the scour holes has been limited, however, formation of a cutoff across Barfield Bend appears unlikely in the near future. Degradation of the riprap closures during overbank flow conditions tends to increase the flow energy through and over the closures. The increased energy results in increased scour rates until repair can be completed. Sour holes 1 and 3, where natural depressions occur in the floodplain topography, convey a greater percentage of flow during overbank events, and top bank scour at these locations and along the resulting flow paths has been the greatest. These lower areas exhibited the highest observed velocities for the overbank flow. Negative effects on the main line levee were determined to be minimal when evaluating velocities measured in the overbank near the levee. Water surface elevations for pre and post Nebraska Dike field were computed for frequency discharges on the Mississippi River using HEC-2. As expected, the dike field in concert with the entire channel improvement program, has improved channel capacity over time and a reduction in Water surface elevations has resulted. Increased channel capacity results in less discharge being conveyed in the overbank areas. Table III-1 indicates computed reductions in water surface elevations with the dike field in place since A decrease in Water surface elevations is also supported by downward shifts in specific gage records and discharge rating curves downstream of Caruthersville, Missouri in recent years. Evaluation of buffer strips created by tree screen plantings were qualitative since several years growth will be required to fully establish the stand. However, vegetative cover between the trees in the interim will decrease the potential for soil movement until the trees begin to grow and mature. A mature stand of trees will significantly increase the resistance to flow resulting in decreased soil movement. IV. Summary. Following are a list of conclusions from observations and analyses completed. A. The Mississippi River main line levee is not presently threatened by overbank scour or overbank flows at Barfield Bend. B. The potential for additional top bank scour at Barfield Bend is primarily a localized problem exaggerated by concentration of f.low through the rip rap closures constructed at scour holes 1 U through 5. Additional scour holes will form should the private levee fail at other locations. Private levee failure at other locations is probable since several locations were observed where overtopping has eroded part of the levee section. C. Riprap closures constructed approximately 3 feet above the natural ground elevations increase the amount of flow energy to be dissipated and the duration of the higher flow energy (tailwater takes longer to develop) as flow overtops the closures. The higher energy increases the potential for downstream scour and for failure in the riprap cfosure. Failures in the riprap closures focus even greater flow energy into the overbank areas accelerating the

3 ) rate and magnitude of the scour holes. D. The lower overbank topography downstream of scour holes 1 and J-(and to a lesser extent 4 and 5) collects overbank flow and acts as primary drainage paths for the majority of overbank discharges. Flow along these paths is affected by the roadway perpendicular to the flow. E. The risk for formation of a cutoff across Barfield Bend is low given that the top bank control will be maintained by Federal actions. F. Dike field construction at Nebraska Point, and for the channel improvement project in general, has lowered water surface elevations and reduced overbank discharges. G. Tree screen improvements will increase resistance to overbank scour in the future, but will have a lesser, although still positive, immediate effect. V. Recommendations. Following are recommendations for reducing maintenance ofthe closures and for reducing top bank scour at Barfield Bend. Figure V -1 provides locations and further description of recommended work. A. Continue overbank monitoring program to ensure main line levee integrity. B. Degrade abandoned private levee from scour hole 1U downstream to scour hole 5. Degradation of the levee will permit flow to enter the overbank unifom1ly and substantially reduce scour potential. As stated in the 1986 report, no major scour problems were identified at Barfield Bend prior to construction of the private levee and its subsequent failure in C. Degrade riprap closures to ground elevations consistent with overbank elevations around each scour hole. Flow will then enter the overbank in a more uniform fashion thereby reducing the amount ofenergy to be dissipated. D. Raise the county roadway that runs near top bank at locations (where the highest velocities have been observed) to create a tevel road profile and uniform flow across the roadway. A 5 foot wide tree screen and grassed area should also be established on the downstream side ofthe road to further dissipate flow energy as it crosses the road. E. Protect the downstream perimeter of the existing scour holes with riprap to minimize their elongation during future overbank flow events. F. Place rip rap at active scour areas around the perimeter of the scour holes.

4 TABLE Water Surface Elevation Comparisons from HEC-2 for Pre-Nebraska Point Dike Construction and Post Nebraska Point Dike Construction Conditions Mississippi River Barfield Bend Potomology Study Update RM July Year Exceedance Frequency 5 Year Exceedance Frequency 1 Year Exceedance Frequency Water Surface Elevations (ft.) Water Surface Elevations (ft.) Water Surface Elevations (ft.) (1) (2) (2)- (1) (3) (4) (4)-(3) (5) (6) (6) - (5) Approximate River MileAHP Description Pre-Nebraska Dikes Post- Nebraska Dikes Delta (-is lower) (+ is higher) Pre-Nebraska Dikes Post- Nebraska Dikes Delta (-is lower) (+is higher) Pre-Nebraska Dikes Post- Nebraska Dikes Delta (-is lower) (+ is higher) Surveyed section Crossing Below Tamm Bend 1 Dike Below Tamm Bend 2 Dike Surveyed section Below Tamm Bend 3 Dike Crossing Surveyed section Crossing Island 25 1 Dike Surveyed section Island 25 2 Dike Crossing Forked Deer 1 Dike Surveyed section i. -- I 71189G 1 33 AM

5 ... )....: QA!L! - 1 ) DISCHARGE RANGE TOMATO Q!SARI"! ELO I"'t NT I"OKfO DEER I S.LAHO o"' t s it,f CEST GAGE L,)Cl.TI..,5 t r ' '""'1 to'"' MISSISSIPPI RIVER AND TRIBUTARIES MONITORING PLAN

6 . Qf.L -Ill NEMASKA NT ORIGINALLY CONSTRUCTED PRIVATE LEVEE TOMATO BAIH'I ELO POl NT FKED Df.f. I SLAHO MISSISSIPPI RIVER AND TRIBUTARIES PRIVATE LEVEE ORI<?INAL CONSTRUCTION )

7 ) AMDtfL l Ill NEMAS KA 1"1 NT ) RESTORED PRIVATE LEVEE WITH SETBACKS AROUND SCOUR HOLES TOMATO BARI"I ELD f"'l NT MISSISSIPPI RIVER AND TRIBUTARIES PRIVATE LEVEE RECONSTRUCTED LEVEE AFTER 1976 REPAIRS

8 - HW 152 Gage fftiijeffllrte:s=t;stf!e::r i! ,:-; i i 1 i --i +! - I - i - ; i- 1--i z --L I..:..-_:. -.. I,!. -1 : "II. -! -! _L.. r" I I '.. I ' I I I ' _J :r, ,- l t -!-...[ r:.; -;.:---- I-- 5 j l_ L 1 LJ L_L_j,J..._I :_) --+-=-1---r:_ --l r =r +l =r-t-r-=t- _-:. -- -_ ---r-i= =r--j=r---t- =rtt=r-= ==r.=f+="= I ', ' L. 1 r, j_. 1 ' 1 '".J j - r- --l -r--l--- -.\ - r---j--j- --I --r---j--:- -r I --r.o I 1--i -1= - -J-= J-_:- L_ +--r--1- J t---t-- --t--+-r---r r t- - - r r -- --J---rT -r- -- t----t-r-- -}--r -r- -r- o ---- _1_--±--_ _,.L..._I_ L '-- ---L-. 1, I I r- 1 I r-- I I...J ' _, ;---;---r-- --: !- --:--r r- ;- -jr--t---r- --t i-i t -t --r--t--t r- -r-- 1 t-- ---t -t-r---f- --:--1--t-r---j Year 9 (cs-...looo) - 2is-; cfs I cis i cfs

9 - HW158 Gage 4. I 1 ' , - f -- 1 r--- I! l --:---j r---+-= l --i---. j _j _ I I -- ± :=t=t F- -- r-:--1--r--+- t- --- r--_[ t--r i I - --r- =I_,_ --r " J r I T I I++ t- I r t - t--l- 1- i-- - r-- i--+--r t- -t-+-t-r- -- -\ =1:-+-+--t=- =tl_ -f- tl l=i I I...-:" I I ' -,... I I I I I I I I I, -j ==i-=-f-- -T--r--: -r-: r =--=:=-=-y 3 ' I.. I I I i I.,..., v I I I_ 1--L -tt=-c--+- J- j r _j -- --o.. t=--,_7 --t-t- _J T - ---r L-- L ] _t.f-+-- -i-l-f J --+--f-+-f-- L=HJ_- _j Ltt=--r-- -c--- ftt" -t-=t- -+ -"'!.. t- t ' ];-.; -- t _.:,.._ '-"--L. --,- r,=t_ L t-- I i.. --t-- :.t-"- - ;---.:-.f'-... L.._ + --r f-..t -_: ; --l--i--1- -t -t r --- t r---1--r--t-- r-t--r-- r---i t--1-" l-+- '- '. I r:=:1- I - 1 j II - - j_ I 1 - I -+--t--+-, r I - I T-- I-. I I=+ -J_ I _j - - t I I ' I I ' 1 -I I -,_ 1 --r--r- J ' -- I j J I,- -- I 1 I l- j c-,_ - r-- 1 I t-- I c '..-r -t:""'j- : '- I -: I -L j f-l- i- c; -t--.j -j r j - '"- i, J -t t..- --f r I_ - L -1 r:-_ z_ 2. I ' ' t I I I r 1 1 -t-- I.. L ;. I I g, -r=' j -+ -t---j. - +-f' 11--j - --f-- :-+ 1- L_l ± f-_ --!-+--t--1'- _..(..-\_-}-=+ Vi -- -L--: [ l-- -[--:_- r----f-l ' - ---; r--""'1"'" i _J _ -- -f i -T '-- --r r-+= r----r- 15 -J--1--r :- --;--1- : r--- r--f-[-r- -- -:--t-- -- [-t--: --t t- - --r-+--j-; t =1-' H--i- ---t--l i--- -t--+-_j -- L_lJ--1- -;-"-t '...,.... -=!;--;t-..::.l" t -I- -t-...j- -t-- -t ;- +- f ,.;..+ -,'--' -r F--t i--r- - >---.T -..,...f.; -±;; -r=!-,-----:::t-t_ L i- i - j- -r t --i I -+ I r : - : r- - f"-rl- ::-\ -- r j I! I I I I I I I I I I I, I I.. I I I I. :- j ----, -. I t= - ji -- r \-- --r- r j_i t ,..., ;-;;f.-.1;-j-,.l;;; -: , - I - --j _, f t , -t j-1 t :-- :---+-t----=i r-i =±-; : - -t---r- r- f- -- f-- -t-- +--r--: i-r-+ -t- -1-r H---t---c L-! L.j L_j_ l--f--j ! -f =t- --r--t r_j - --L _L i---:- l i-j r---r-- --t-- r-] h-,-t-r--r _L_L-t-- J. -J -.-.f------l L --t I I I ' I J I I I! I I.o ---t--+--r 1-- ;--! ---i T -:- - r T-r-+- -t-+t=-i-- -- ;--- -r--- =1=-++ I (c.:h y.. joool -=-2i:iot;-JI I -II - I 4 cfs 1 - 'll - 6 cfs 1 [!I_ 8 cfs j I Year

10 { '"" '" L COTTCNW """' '\ COTTONWOOD...w2 S!H(2 SCOUR HOLE # 14 SCOUR HOLE # 1,:;-;; '_ J. \ \ 'Oo'O :... -N NO <:}Joc.\ c;l)\ % '; v oo'v >A() '1. \)\S,,'._ c' 1_,", os\ o' () c,\ (:, ' -'..- ooo"l\ ":> --a\ () oz+'" \:.. '-t: o"'\ ()' (). 'v\ o<,.''" COITONWOOD TREESCREEN TREES PLANTED ON 1 FT. X 1 FT. CENT RS S''f'r'"J 1'\'\\, c,' <1) I...; i D I v $ <o-;:vo ;;,;:v "') ; o "')' (J ' -"' " ',_,... PU"'""'ENT # TltE NWY M MPHlS DISTlOCT, CORPS OF IHEERS f ,..., nlllfolua& NVEI'I (2W'UIIELII.fi\''Dii.Hl BARFIELD BEND, ARKANSAS POTOMOLOGY STUDY UPDATE FIGURE J

11 u Q\1<-E NU r; :'(r.-\ ' % 17 r::\j'j \ () 1 \)\+-s o'l " X ) o-,'l SCOUR HOLE # 1 \. o\jx\j "..- \Of oo_,.ocl \ pat\\ +\) f\"' af'l.---- pt\11' oz..-<;_ \s, 2 <::>'?:Jo'D \-\. ax(), :...- C) '-' \)x... a: l (!)?J rn <:: rn -1 rn z -1 \'- c.' X v Lowest Road Elevations )44+ ary Aow -f>ath for Scour Hole # "- ::) V) i- "J _,;;, rt I oec:x.to DeMtNENT Of THE NWr MEMPHIS DISTRICT, CORPS Of EHGIN EIIS (J IMIS8ISSIPt'1 JWH BARAELD...nHUSS&: POTOMOLOGY STUDY FIGURE MILE aw... IMMOVW HT BEND,ARKANSAS UPDATE 1 OltAIING 11. I 1 i,-, SHUT 1 OF 1

12 LJ \ o"e " I \ ()-'() () 'J. 7' "7 5 Foot Tree Screen and Grassed Ar.. SCOUR HOLE # 1 Along Perimeter of Scour Hole -N _ ()11\ '(.. oo" 'o \'+-<(,_ " \) '1..,""'" -) -o X()... c :J '1 --' \ s' J 2 "or. <oo<o egrde Clo.ure Elevation to Nat. Ground _K Along Perimeter of Seour Hole '%. "<(. ""9...,..,. o--o"' \ "=> oz."'<;_c,\ ""o (),+ \..\ oo'o \..\ \)c,_,x 5 Foot Tree Screen and Grassed Area-?J rn <::: rn --< :z. -L " 3111\"'oo \ HOLE # 3 Degrade Closure Elevation to Net. Ground Along Perlm;Jter-of Scour Hole ( v,' o, I>." "'>"' "" Degr-ade Closure Elevation to Net. Ground " () ' A..<\; "') A..C) $ "') (J c) A..().,_,;:; "') () sctffi M...,NVBI DEI"Ain'M NT Of TliE NtN( MEMPHIS DISllUCT, CORPS OF ENGINEERS WEMPHIS, nhnu611! BARAELD BEND,ARKANSAS POTOMOLOGY STUDY UPDATE AGURE V-1 [ ,_ SHEE'T1-1

John Remus Assessment of Conceptual Nonstructural Alternative

John Remus Assessment of Conceptual Nonstructural Alternative John Remus Assessment of Conceptual Nonstructural Alternative Assessment of Conceptual Nonstructural Alternative Levee Setbacks along the Missouri River (Lower L-575 / Upper L-550 and Lower L-550) Missouri

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

Prepared for Urban Drainage and Flood Control District

Prepared for Urban Drainage and Flood Control District BERM FAILURE TECHNICAL ANALYSES SOUTH PLATTE GRAVEL PIT EVALUATION CRITERIA Prepared for Urban Drainage and Flood Control District Wright Water Engineers, Inc. January 2013 121-030.000 TABLE OF CONTENTS

More information

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014 Agenda Overview and Background Hydrology

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Boonville, MO to Jefferson City, MO Pilot Study 2008 modeling summary & path forward. MRFTF 4 Jan 2011

Boonville, MO to Jefferson City, MO Pilot Study 2008 modeling summary & path forward. MRFTF 4 Jan 2011 Missouri River Flow Corridor Boonville, MO to Jefferson City, MO Pilot Study 2008 modeling summary & path forward MRFTF 4 Jan 2011 1 Flood of 2007: Scientists, government officials and environmentalists

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

Hey and Associates, Inc.

Hey and Associates, Inc. Hey and Associates, Inc. Table 1: 100-Year Study Existing Conditions Discharges and Elevations vs. FIS Results Location Existing FIS Q (cfs) Existing FIS Elevation Existing XP- SWMM Q (cfs) Existing XP-SWMM

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE

COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE K.2.1 General Requirements The design and construction of slope protection works may be required for several types

More information

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...

More information

APPENDIX B PROJECT DESCRIPTION AND ALTERNATIVE ANALYSIS

APPENDIX B PROJECT DESCRIPTION AND ALTERNATIVE ANALYSIS APPENDIX B PROJECT DESCRIPTION AND ALTERNATIVE ANALYSIS INTRODUCTION The Chesapeake Energy Center (Station), owned and operated by Virginia Electric and Power Company dba Dominion Virginia Power (Dominion),

More information

Appendix D - Evaluation of Interim Solutions

Appendix D - Evaluation of Interim Solutions Appendix D - Evaluation of Interim Solutions D.1 Introduction The implementation of long-term improvements is projected to take 5 to 8 years. To reduce the number of years of flooding impacts, the partner

More information

Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring

Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006 (Rev

More information

Appendix J Hydrology and Hydraulics

Appendix J Hydrology and Hydraulics Appendix J Hydrology and Hydraulics Marsh Lake Dam Ecosystems Restoration Feasibility Study Hydraulics & Hydrology Appendix January 2011 Contents List of Figures iii List of Tables iii I. General 1 II.

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.

More information

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

3.5 Hydrology & Hydraulics

3.5 Hydrology & Hydraulics 3.5 Hydrology & Hydraulics 3.5.1 Purpose The purpose of this section is to provide results from the analysis and assessment of the impact of the proposed Carmichael Rail Alignment (Option 11 Revision 1)

More information

Missouri River Recovery Program Shallow Water Habitat Accounting Summary Report. Kansas City District Omaha District 2014

Missouri River Recovery Program Shallow Water Habitat Accounting Summary Report. Kansas City District Omaha District 2014 Missouri River Recovery Program Shallow Water Habitat Accounting Summary Report Kansas City District Omaha District 2014 THIS PAGE INTENTIONALLY LEFT BLANK Contents 1.0 Introduction... 1 1.1 Overview...

More information

Hydraulic Modeling with HY-8

Hydraulic Modeling with HY-8 Hydraulic Modeling with HY-8 Linda Hansen PE, PWS MI Dept. of Environmental Quality Water Resources Division UP District Floodplain Engineer Today s Outline What is HY-8? Best Applications & Limitations

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Earth Dikes and Drainage Swales

Earth Dikes and Drainage Swales Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS ISSUE DATE: December 15, 2015 EXPIRATION DATE: January 15, 2016 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS Availability of Draft Environmental Assessment and Draft Finding of No Significant Impact REPLY

More information

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location

More information

Technical Memorandum Channel Capacity Report 2018 Restoration Year

Technical Memorandum Channel Capacity Report 2018 Restoration Year Technical Memorandum Channel Capacity Report 2018 Restoration Year 1 Table of Contents 2 1.0 Executive Summary... ES-1 3 4 2.0 Introduction... 1 5 2.1 Objective... 2 6 2.2 CCAG Roles and Responsibilities...

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: CULVERT DESIGN SPECIFIC SUBJECT: COUNTERSINKING AND LOW FLOW CONSIDERATIONS

More information

JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS ISSUE DATE: February 23, 2018 EXPIRATION DATE: March 25, 2018 JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS Availability of draft Environmental Assessment, draft Finding of No Significant Impact, and

More information

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS U.S. Army Corps of Engineers, Chicago District Hydraulics and Environmental Engineering Section 17 March

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project

Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project US Army Corps of Engineers Zac Corum, PE, Hydraulic Engineer Travis Ball, PE, CFM, Hydraulic Engineer Seattle District

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Upper Mississippi River Floodplain Island Restoration Details

Upper Mississippi River Floodplain Island Restoration Details Upper Mississippi River Floodplain Island Restoration Details Mississippi Makeover Meeting Citizens Advisory Group December 1, 2009 Hastings City Hall Community Room Scot Johnson Minnesota Department of

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

Missouri River Degradation (Lower 498 River Miles)

Missouri River Degradation (Lower 498 River Miles) BUILDING STRONG Missouri River Degradation (Lower 498 River Miles) for Mid-America Regional Council and U.S. Army Corps of Engineers Stakeholder Meeting March 5, 2009 BUILDING STRONG Reconnaissance Study

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

Breach Analyses of High Hazard Dams in Williamson County

Breach Analyses of High Hazard Dams in Williamson County Breach Analyses of High Hazard Dams in Williamson County John R. King 1, P.E., Kim Patak 2, P.E., Blaine Laechelin 3, E.I.T. Abstract The Upper Brushy Creek WCID operates 23 dams in the Upper Brushy Creek

More information

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93 Development of a Stage-Discharge Rating for Site 330 - Van Bibber Creek at Route 93 Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN. Bremo Power Station CCR Surface Impoundment: North Ash Pond INFLOW DESIGN FLOOD INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Bremo Power Station CCR Surface Impoundment: North Ash Pond Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo

More information

Beaver Brook Flood Study

Beaver Brook Flood Study Alternatives Analysis Beaver Brook Flood Study Pelham, New Hampshire PREPARED FOR Town of Pelham 6 Village Green Pelham, NH 03076 PREPARED BY 101 Walnut Street PO Box 9151 Watertown, MA 02471 617.924.1770

More information

Floodplain Development

Floodplain Development Floodplain Development Floodplain Regulations State: Part 31 of Public Act 451 Local: Federal: Building Codes, Zoning and Floodplain Management Ordinances National Flood Insurance Program Floodplain:

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES

HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES HYDRAULIC CONNECTIVITY (HC) ENGINEERING & HYDRAULICS PERSPECTIVES Presented at the UMRR HREP Team Meeting September 28, 2016 Jon Hendrickson Regional Technical Specialist, Eco-Hydraulics & WQ USACE, Mississippi

More information

MVP 17.3 WATER BAR END TREATMENT SIZING AND DETAILS 1/22/18

MVP 17.3 WATER BAR END TREATMENT SIZING AND DETAILS 1/22/18 MVP 17.3 WATER BAR END TREATMENT SIZING AND DETAILS 1/22/18 The purpose of this detail is to document the methodology developed to size the length of the water bar end treatments to ensure flow leaving

More information

Community Erosion Assessment Kipnuk, Alaska 26 January 2009

Community Erosion Assessment Kipnuk, Alaska 26 January 2009 Community Erosion Assessment Kipnuk, Alaska 26 January 2009 1. Community: Kipnuk, Alaska Figure 1: Kipnuk Location & Vicinity Map 2. Community Profile Summary: Kipnuk is an unincorporated village of 664

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Scour Analysis and Countermeasure Design

Scour Analysis and Countermeasure Design Scour Analysis and Countermeasure Design for UNION STREET RAILROAD BRIDGE (Trail Connection Project) Key No. 11085 ODOT, Region 2 Local Agency On-Call ATA 23456 WOC 1 City of Salem, Urban Development HDR

More information

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County.

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County. Hydrologic and Hydraulic Report For S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek Silver Spring Township Cumberland County August 13, 2003 Prepared For Pennsylvania

More information

- Site Location and Conditions. A. Project Location. B. Existing Conditions

- Site Location and Conditions. A. Project Location. B. Existing Conditions H&H Report - Site Location and Conditions Page 1 of 2 A. Project Location 1. Site Identification District County Mu nicipali ty 06 Bucks Hilltown (Twp) Site MINSI TRAIL S.R. 4019 Section 60M Segment 0050

More information

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 HYDROLOGIC & HYDRAULIC STUDY REPORT OCTOBER 2007 Prepared For: Prepared By:

More information

SANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID #

SANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID # SANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010095 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL

More information

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY

HYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

Technical Memorandum No River Geometry

Technical Memorandum No River Geometry Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf

More information

MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 SPRING VALLEY CASE STUDY

MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 SPRING VALLEY CASE STUDY MnDOT Flash Flood Vulnerability and Adaptation Assessment Pilot Project DISTRICT 6 SPRING VALLEY CASE STUDY NOVEMBER 2014 This document is part of a series of short reports based on the full Flash Flood

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

Feasibility Report with Integrated Environmental Assessment Harlow Island HREP. Appendix B2 Hydrology and Hydraulic Engineering

Feasibility Report with Integrated Environmental Assessment Harlow Island HREP. Appendix B2 Hydrology and Hydraulic Engineering Appendix B2 Hydrology and Hydraulic Engineering INTENTIALLY LEFT BLANK UPPER MISSISSIPPI RIVER RESTORATION SYSTEM FEASABILITY REPORT WITH INTEGRATED ENVIRONMENTAL ASSESSMENT HARLOW ISLAND HABITAT REHABILIATION

More information

ATTACHMENT C Design Analysis for Erosion Protection Cover for Piñon Ridge Tailing Cells

ATTACHMENT C Design Analysis for Erosion Protection Cover for Piñon Ridge Tailing Cells ATTACHMENT C Design Analysis for Erosion Protection Cover for Piñon Ridge Tailing Cells TAILING CELL CLOSURE DESIGN REPORT ENERGY FUELS RESOURCE CORPORATION PIÑON RIDGE PROJECT Summary The primary purpose

More information

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..

More information

4.2 Cherry Creek & Stillhouse Branch

4.2 Cherry Creek & Stillhouse Branch Section 4 Withlacoochee Basin 4.2 Cherry Creek & Stillhouse Branch 4.2.1 Introduction The information presented in this sub-basin plan for Cherry Creek and Stillhouse Branch is intended to provide the

More information

Dallas Floodway Improvements

Dallas Floodway Improvements TRINITY RIVER CORRIDOR PROJECT Dallas Floodway Improvements Refinement of the Balanced Vision Plan - Update to the Trinity River Committee 01-March March-2004 Status of the Urban Design Study As result

More information

LOW WATER CROSSINGS, fords, or drifts, as they

LOW WATER CROSSINGS, fords, or drifts, as they Chapter 9 For ords and Low-Water Crossings Keep the ford profile low, armor the driving surface, and protect against scour. LOW WATER CROSSINGS, fords, or drifts, as they are commonly called, can offer

More information

PROJECT SCREENING MATRIX: A User s Guide

PROJECT SCREENING MATRIX: A User s Guide Version 2.0 Page 1 of 7 November 9, 2010 PROJECT SCREENING MATRIX: A User s Guide BACKGROUND The Project Screening Matrix (Screening Matrix) is one of several tools that comprise the River Restoration

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers

DRAINAGE REPORT. Project Name: PG&E Gas Operations Technical Training Center Winters, CA. Date: February 4, Prepared by: BKF Engineers DRAINAGE REPORT Project Name: PG&E Gas Operations Technical Training Center Winters, CA Date: February 4, 2015 Prepared by: BKF Engineers Client: Pacific Gas & Electric Company This report has been prepared

More information

Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design

Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design January 22, 2013 S. Paige Baker, PE, MLE Presentation Outline

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION TABLE OF CONTENTS PAGE LIST OF FIGURES... i 1.0 PLANT OPERATION AND RESOURCES UTILIZATION... 1 1.1 PLANT OPERATION... 1 1.1.1 Adverse Flow... 1 1.1.2

More information

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS

APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS APPENDIX A HYDROLOGIC AND HYDRAULIC ANALYSIS GENERAL The Hydrologic and Hydraulic information presented in this appendix is provided as a supplement to the Dallas Floodway Extension General Re-evaluation

More information

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall SWM MD-378 Pond Checklist Training 10/17/07 Ken Wolfe Warren Johnson USDA, NRCS Frederick, Maryland ROLES AND RESPONSIBILITIES Small Pond Approval MDE, WMA, Dam Safety Division Authority (COMAR 26.17.04.03)

More information

STUDY 7.0 FISH PASSAGE

STUDY 7.0 FISH PASSAGE STUDY 7.0 FISH PASSAGE STUDY 7.0 FISH PASSAGE... 7-1 1. GOALS AND OBJECTIVES OF STUDY... 7-1 2. RELEVANT RESOURCE MANAGEMENT GOALS... 7-2 3. BACKGROUND AND EXISTING INFORMATION... 7-2 4. PROJECT NEXUS...

More information

Sediment Control Practices

Sediment Control Practices Sediment Control Practices SMP-05 Temporary Diversions, Berms or Ditches Symbol TD Description These temporary drains offer features such as conveyance for runoff down cut or fill slopes, subsurface drains

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

Webinar for the Natural Floodplain Function Alliance 18 November 2013

Webinar for the Natural Floodplain Function Alliance 18 November 2013 Moving toward Floodplain Restoration at Scale on the Illinois River and Upper Mississippi Basin: Valuing Ecosystem Services, Demonstrating Flood Reduction, and Policy Implications Webinar for the Natural

More information

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED

USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56

More information

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS Utilities electric stormwater wastewater water 700 Wood St. PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 fax 970.224.6003 TDD utilities@fcgov.com fcgov.com/utilities TECHNICAL GUIDANCE and

More information

LOS ANGELES RIVER 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #

LOS ANGELES RIVER 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010078 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: AUGUST 26, 2015 PERIODIC INSPECTION

More information

Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives

Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives Ducks Unlimited M&T Ranch / Llano Seco Intake Project Final Alternatives M&T Ranch / Llano Seco Intake Project Final Alternatives Draft Engineering Analysis Technical Memorandum Ducks Unlimited September,

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Extended Detention Basin Design

Extended Detention Basin Design Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention

More information

HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER. by Misganaw Demissie and Nani G. Bhowmik

HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER. by Misganaw Demissie and Nani G. Bhowmik SWS Contract Report 335 HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER by Misganaw Demissie and Nani G. Bhowmik Prepared for the Illinois Department of Conservation

More information

Exploring*Common*Ground*between*Agriculture*and*Ecological* Restora9on*in*Large;River*Floodplains

Exploring*Common*Ground*between*Agriculture*and*Ecological* Restora9on*in*Large;River*Floodplains Columbia Environmental Research Center River Corridor Habitat Dynamics Exploring*Common*Ground*between*Agriculture*and*Ecological* Restora9on*in*Large;River*Floodplains Robert Jacobson, Ph.D. Supervisory

More information

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID #

VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # 380510086 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY 8 JUNE 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE:

More information

Restoration of Abandoned Channels. Prepared for KICT, South Korea. Pierre Y. Julien, Ph.D. Seema C. Shah-Fairbank Jaehoon Kim

Restoration of Abandoned Channels. Prepared for KICT, South Korea. Pierre Y. Julien, Ph.D. Seema C. Shah-Fairbank Jaehoon Kim Restoration of Abandoned Channels Prepared for KICT, South Korea by Pierre Y. Julien, Ph.D. Seema C. Shah-Fairbank Jaehoon Kim Colorado State University April 2008 Statement of Work 1. Classification and

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

Strategies to Mitigate Scour Critical Structures

Strategies to Mitigate Scour Critical Structures U.S. Department of Transportation Federal Highway Administration Strategies to Mitigate Scour Critical Structures Dan Ghere Hydraulics Engineer (708) 283-3557 dan.ghere@dot.gov Support Material HEC 23,

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot

COON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot 17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with

More information

Case Study 1 Red Clover Rock Ford

Case Study 1 Red Clover Rock Ford Case Study Red Clover Rock Ford Location Northeastern California. Plumas National Forest. An unnamed tributary to Red Clover Creek in McReynolds Valley, 5 miles north of Lake Davis, CA. Forest Road 25N05,

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40

More information