1 ASFPM 2014 Annual Conference Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014

2 Agenda Overview and Background Hydrology Hydraulics: Unsteady HEC-RAS and FLO-2D Input Data Results Conclusions 2

3 The Congaree River Watershed

4 Project Background Project area consists of several Levee Systems just DS of the fall line of the Piedmont and Sandhill geographic region in Columbia, SC Drains over 7,000 square miles Majority of agricultural levee system was built from the 60 s to the 70 s National Levee Standards were formalized in the 1980 s Main Levee has never overtopped but did breach in

5 Ring Levee Main Levee Farm Levee Congaree River Levee System 5

6 Areas of Interest Main Levee Wateree Watershe d Heathwood Hall School Riverland Park City of Columbia WWTP Congaree River Middle Savannah Watershe d 6

7 Project Background City of Columbia built sewer plant in the 1960s Heathwood Hall School built in the 1960 s Both rely on levee for protection Accurate modeling is essential 7

8 Congaree River Levee Typical River Side of Levee 8

9 Congaree River Levee Typical River Side of Levee 9

10 Project Details River transitions from Piedmont to Sandhills Geographic Region through downtown Columbia Modeling Impacts Typical Cross sections 10

11 Piedmont Region Shallow, rocky channel Hilly with thin clay soils Can have Cliff-like channels Typically narrow floodplains contained in or near channel Elevations from 375 1,000 feet 11

12 Piedmont Region 12

13 Sandhills Region Smooth, sandy channel Sandy with silt and clay soils Wide flat floodplains Elevations from feet 13

14 Sandhills Region 14

15 Hydrology Flood Frequency Analysis (Bulletin 17B) USGS gage station Congaree River at Columbia ( ) Entire available period of record ( ) unregulated and regulated flow conditions Adjustments made to account for the effects of regulation on unregulated flows 100-year discharge: 286,000 cfs 500-year discharge: 414,500 cfs Ignored discharges contributed by the drainage area along the modeled reach of the River 15

16 Hydraulics Data Unsteady HEC-RAS FLO-2D Topographic Data (LiDAR) N-value (aerial imagery) Bridges across the Congaree River (survey) Levees (LiDAR) Channel Geometry (survey + LiDAR) Major Road Embankments (LiDAR) 16

17 Hydraulics Additional Data needed for more accurate 2-D modeling Smaller Road Embankments Bridges and Culverts Tributaries Area and width reduction factors Streets Cell Size: 250 ft 17

18 100-year Floodplain Unsteady HEC-RAS Levees 18

19 100-year Floodplain Unsteady HEC-RAS 19

20 100-year Floodplain Unsteady HEC-RAS 20

21 100-year Floodplain Velocity Grid FLO-2D 21

22 100-year Floodplain FLO-2D & HEC-RAS 22

23 Final 100-year Floodplain FLO-2D & HEC-RAS 23

24 BFEs HEC-RAS Zone AE (Elev 129.6) Zone AE (Elev 129.6) Zone AE (Elev 129.6) Zone AE (Elev 126.8) 24

25 Variability in WSEL Zone AE (Elev 129.6) Zone AE (Elev 129.6) Zone AE (Elev 126.8)

26 Flow Pattern near I year vs 500 year 286,00 cfs 414,500 cfs 26

27 Without Levee Simulation FLO-2D mapping and HEC-RAS Storage Area Designations 27

28 Conclusions 2-D simulation assisted in o differentiating areas of ineffective flow and storage in HEC-RAS model in the vicinity of Interstate 77 o Identifying ineffective flow areas behind the levee for HEC-RAS model o Identifying ineffective flow areas on the left overbank further downstream from Interstate 77 Overall, 2-D simulation provided a sound basis for making engineering judgments associated with 1-D simulation Showed general flow pattern and variation in water surface elevations across HEC-RAS cross sections that may assist with mitigation planning 28

29 Questions? 29

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No Urban Study Rocky Branch Watershed Columbia, South Carolina Prepared for: City of Columbia 1136 Washington Street Columbia, SC 29217 Prepared by: AMEC Environment & Infrastructure, Inc. 720 Gracern Road

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Tiffany Coleman, PE Senior Project Engineer Stantec/STARR September 10, 2015 How

More information

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

Hydrologic Calibration:

Hydrologic Calibration: Hydrologic Calibration: UPDATE OF EFFECTIVE HYDROLOGY FOR MARYS CREEK October 2010 Agenda Background Hydrologic model Calibrated rainfall Hydrologic calibration 100 year discharges, Existing Conditions

More information

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination

More information

Title Advanced Hydraulic Modeling to Support Emergency Action Plans

Title Advanced Hydraulic Modeling to Support Emergency Action Plans Title Advanced Hydraulic Modeling to Support Emergency Action Plans Abstract Freese and Nichols, Inc. (FNI) developed an Emergency Action Plan (EAP) for a Levee Improvement District (LID) located in a

More information

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

Risk MAP Exploratory Innovation Projects. ASFPM 2017: Kansas City, MO Tuesday, May 2, 2017

Risk MAP Exploratory Innovation Projects. ASFPM 2017: Kansas City, MO Tuesday, May 2, 2017 Risk MAP Exploratory Innovation Projects ASFPM 2017: Kansas City, MO Tuesday, May 2, 2017 Project Themes and Focus Explore Build Finish 2 What are these Innovation Projects? A project (data analysis, research,

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

Beaver Brook Flood Study

Beaver Brook Flood Study Alternatives Analysis Beaver Brook Flood Study Pelham, New Hampshire PREPARED FOR Town of Pelham 6 Village Green Pelham, NH 03076 PREPARED BY 101 Walnut Street PO Box 9151 Watertown, MA 02471 617.924.1770

More information

DRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by:

DRAINAGE STUDY CROWS LANDING INDUSTRIAL BUSINESS PARK. Stanislaus County. Prepared by: DRAINAGE STUDY FOR CROWS LANDING INDUSTRIAL BUSINESS PARK Stanislaus County Prepared by: March, 2017 Revised November, 2017 Table of Contents EXECUTIVE SUMMARY... 1 1. INTRODUCTION... 2 2. HYDROLOGY...

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for Dam Failure Analysis (Final) Olivotti Lake Dam Lincoln County, Wisconsin Report prepared for Houle Enterprises, LLC Oshkosh, Wisconsin Report prepared by www.meadhunt.com July 2012 Table of Contents Table

More information

Cherokee County Future Conditions Floodplain Development

Cherokee County Future Conditions Floodplain Development TECHNICAL MEMORANDUM Cherokee County Future Conditions Floodplain Development Prepared for: Prepared by: Geoff Morton, P.E., County Engineer Cherokee County Richard Greuel, P.E.,, Inc. Richard Taylor,

More information

Technical Memorandum No River Geometry

Technical Memorandum No River Geometry Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.5 River Geometry Task: Collection and Analysis of River Geometry Data To: PRWFPA Staff Working Group Prepared by: J. Schaaf

More information

Hey and Associates, Inc.

Hey and Associates, Inc. Hey and Associates, Inc. Table 1: 100-Year Study Existing Conditions Discharges and Elevations vs. FIS Results Location Existing FIS Q (cfs) Existing FIS Elevation Existing XP- SWMM Q (cfs) Existing XP-SWMM

More information

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS

TECHNICAL GUIDANCE and CASE STUDY for INEFFECTIVE FLOW and CONVEYANCE SHADOW AREAS Utilities electric stormwater wastewater water 700 Wood St. PO Box 580 Fort Collins, CO 80522 970.221.6700 970.221.6619 fax 970.224.6003 TDD utilities@fcgov.com fcgov.com/utilities TECHNICAL GUIDANCE and

More information

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia What to Expect When You re Expecting A LOMR Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia Thursday, June 4 th, 2015 Agenda 1 Why File a Letter Of Map Revision (LOMR)? 2 Basic Requirements and Common

More information

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS

PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS 1 255 255 255 237 237 237 217 217 217 200 200 200 Part 1: Summary of Floodplain Analysis for Los 0 Angeles 163 131 River239 110 112

More information

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location

More information

COOPERATING TECHNICAL PARTNER INFORMATION EXCHANGE. First Order Approximations

COOPERATING TECHNICAL PARTNER INFORMATION EXCHANGE. First Order Approximations COOPERATING TECHNICAL PARTNER INFORMATION EXCHANGE First Order Approximations WELCOME ASFPM Mapping and Engineering Standards Committee CTP Sub committee Co chairs: Amanda Flegel, PE, CFM; Illinois State

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian

More information

Presentation Overview

Presentation Overview Little Dry Creek Restoration Deep River Flood Risk Management Final Presentation to LCRBDC June 10, 2015 Presentation Overview Project Overview & Background Information Data Collection Model Development

More information

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado

More information

DESIGN DOCUMENTATION REPORT APPENDIX C HYDROLOGY AND HYDRAULICS

DESIGN DOCUMENTATION REPORT APPENDIX C HYDROLOGY AND HYDRAULICS January 8, 2016 WP-42I FINAL SUBMITTAL DESIGN DOCUMENTATION REPORT APPENDIX C HYDROLOGY AND HYDRAULICS Fargo-Moorhead Flood Risk Management Project In-Town Levees Mickelson Levee Extension WP-42I Engineering

More information

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation Agenda Project

More information

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

Wapato Access Feasibility Study

Wapato Access Feasibility Study Wapato Access Feasibility Study David Gorman, PE Michael Rounds, PE August 5, 2011 Lower Columbia River Estuary Partnership (LCREP) Non-profit two state public-private initiative Primary Responsibility:

More information

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.

More information

Application for a Dam Permit Ash Basin No. 1

Application for a Dam Permit Ash Basin No. 1 Application for a Dam Permit Ash Basin No. 1 for the Sunbury Generating Station Shamokin Dam, Pennsylvania submitted to Commonwealth of Pennsylvania Department of Environmental Protection Bureau of Waterways

More information

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS Coldstream Park Stream Corridor Restoration and Preservation Consent Decree SEP Prepared for Lexington-Fayette Urban County Government Division of Water

More information

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS U.S. Army Corps of Engineers, Chicago District Hydraulics and Environmental Engineering Section 17 March

More information

FEMA/USACE Coordination Plan

FEMA/USACE Coordination Plan FEMA/USACE Coordination Plan Project: Fargo-Moorhead Metropolitan Feasibility Study ND Diversion Channel with upstream staging Federal Plan (Authorized WRRDA 2014) Project Design: Project Reach: U.S. Army

More information

LANIER COUNTY, GEORGIA

LANIER COUNTY, GEORGIA LANIER COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number Lanier County LAKELAND, CITY OF 130120 LANIER COUNTY (UNINCORPORATED AREAS) 130555 Effective: December 17, 2010 FLOOD INSURANCE

More information

Climate and Land Use Consequences to 100-Year Flooding

Climate and Land Use Consequences to 100-Year Flooding Climate and Land Use Consequences to 100-Year Flooding Robert Roseen D.WRE, PE, PhD, Ann Scholz, PE, CPSWQ, Thomas Ballestero, PhD, PE, PH, UNH Stormwater Center Nebraska Post- Construction Stormwater

More information

Are Flood Stages Rising? Our Fault or Mother Nature s?!

Are Flood Stages Rising? Our Fault or Mother Nature s?! Are Flood Stages Rising? Our Fault or Mother Nature s?! ASFPM National Conference June 4, 2014 Presented by: Siavash Beik, PE, CFM, D.WRE Peggy Shepherd, P.E., CFM Christopher B. Burke Engineering, LLC

More information

HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT

HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT Relicensing Study 3.2.2 HYDRAULIC STUDY OF TURNERS FALLS IMPOUNDMENT, BYPASS REACH AND BELOW CABOT Initial Study Report Summary Northfield Mountain Pumped Storage Project (No. 2485) and Turners Falls Hydroelectric

More information

Technical Memorandum Nos. 3.3 and 3.4 Project Hydraulics and Operating Strategy Floodplain Boundaries Mapping PRWFPA Staff Working Group

Technical Memorandum Nos. 3.3 and 3.4 Project Hydraulics and Operating Strategy Floodplain Boundaries Mapping PRWFPA Staff Working Group PAJARO RIVER WATERSHED FLOOD PREVENTION AUTHORITY Phase 3: Conceptual Design of Soap Lake Preservation Project Phase 4a: Design Level Mapping Technical Support Technical Memorandum Nos. 3.3 and 3.4 Task:

More information

FLOOD CHARACTERISTICS

FLOOD CHARACTERISTICS simple yet widely accepted modeling approach that uses a constant flow to represent a flooding event, and it is currently the most common tool used for FIS efforts. Modeling for the FM Diversion project

More information

Little Sugar Creek and Briar Creek Subbasin, Mecklenburg County, NC. Hydraulic Analyses - HEC-RAS Models

Little Sugar Creek and Briar Creek Subbasin, Mecklenburg County, NC. Hydraulic Analyses - HEC-RAS Models Little Sugar Creek and Briar Creek Subbasin, Mecklenburg County, NC Hydraulic Analyses - HEC-RAS Models Submitted by NCBELS No. F-0679 I Table of Contents 1.0 Introduction... 4 2.0 Hydrologic Analysis...

More information

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of

More information

JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS

JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS Jackson County JACKSON COUNTY, GEORGIA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER ARCADE, CITY OF 130597 BRASELTON, TOWN OF 130343 COMMERCE, CITY OF 130212 HOSCHTON, CITY OF 130344 JACKSON

More information

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0 HYDROLOGIC & HYDRAULIC STUDY REPORT OCTOBER 2007 Prepared For: Prepared By:

More information

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps City of Corpus Christi Downtown 2D Mapping Effort Brandon Hilbrich, PE, CFM Jake Fisher, PE, CFM Curtis Beitel, PE, CFM 2016 HDR, Inc., all rights reserved. Overview Project Background Information Modeling

More information

Characterizing the Soap Lake Floodplain CHAPTER 2

Characterizing the Soap Lake Floodplain CHAPTER 2 Characterizing the Soap Lake Floodplain CHAPTER 2 CHAPTER 2 CHARACTERIZING THE SOAP LAKE FLOODPLAIN This chapter provides some background on Soap Lake including a general description of the Lake location,

More information

HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER. by Misganaw Demissie and Nani G. Bhowmik

HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER. by Misganaw Demissie and Nani G. Bhowmik SWS Contract Report 335 HYDROLOGIC AND HYDRAULIC ANALYSES OF THE HENNEPIN CANAL FROM LOCK 27 TO THE ROCK RIVER by Misganaw Demissie and Nani G. Bhowmik Prepared for the Illinois Department of Conservation

More information

Who s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou

Who s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou Houston Geological Society Presents An Informational Workshop Flooding and Floodplains in the Houston Area: Past, Present, and Future: Part 1 Presented May 18, 2018 Dr. William R. Dupre Professor Emeritus

More information

MRG Bernalillo to Belen GRR

MRG Bernalillo to Belen GRR MRG Bernalillo to Belen GRR Appendix H Hydrology and Hydraulics July 2017 Albuquerque District South Pacific Division Rio Grande Floodway Bernalillo to Belen, Mt. View - Isleta to Belen Unit Bernalillo

More information

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas TFMA Spring Conference May 23, 2007 Modernization of High Hazard Dams in Austin, Texas City of Austin Glen Taffinder, P.E. Stormwater Pond Dam Safety

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

SUMMARY OF BACKGROUND INFORMATION REVIEWED

SUMMARY OF BACKGROUND INFORMATION REVIEWED TO: FROM: Mark Lobermeier, PE Ismael Martinez, PE Brad Woznak, PE, PH, CFM Tim Diedrich, PE DATE: RE: Kinni Corridor Plan - Hydrologic & Hydraulic Analysis Summary SEH No. RIVER 138553 14.00 This draft

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Old Mill School Stream Restoration

Old Mill School Stream Restoration Project Overview This conceptual plan restores and stabilizes two consecutive reaches of a highly incised and unstable stream and reconnects them with the floodplain. The restoration reaches are part of

More information

Hypothetical Flood Computation for a Stream System

Hypothetical Flood Computation for a Stream System US Army Corps of Engineers Hydrologic Engineering Center Hypothetical Flood Computation for a Stream System December 1968 Approved for Public Release. Distribution Unlimited. TP-12 REPORT DOCUMENTATION

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

Alternatives for Willow Creek Flood Mitigation Study

Alternatives for Willow Creek Flood Mitigation Study Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek

More information

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood

More information

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Project Summary: - Hydrologic Models Phase 2 Underway Nearly Completed (Park/Pembina EOY) - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall Phase

More information

Floodplain Development

Floodplain Development Floodplain Development Floodplain Regulations State: Part 31 of Public Act 451 Local: Federal: Building Codes, Zoning and Floodplain Management Ordinances National Flood Insurance Program Floodplain:

More information

Dam Breach Study and Flood Inundation Mapping

Dam Breach Study and Flood Inundation Mapping Malheur Reservoir and Willow Creek Dam #3 NID# OR00390 Malheur County, Oregon Dam Breach Study and Flood Inundation Mapping February 2010 Prepared for: State of Oregon Water Resources Department 725 Summer

More information

WALKER COUNTY, GEORGIA

WALKER COUNTY, GEORGIA WALKER COUNTY, GEORGIA AND INCORPORATED AREAS Walker County Community Name Community Number CHICKAMAUGA, CITY OF 130181 LAFAYETTE, CITY OF 130182 LOOKOUT MOUNTAIN, CITY OF 130448 ROSSVILLE, CITY OF 130183

More information

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation Airport Master Plan Floodplain Report Prepared by: Prepared for: Illinois Department of Transportation July 10, 2013 Table of Contents Topic Page Number Cover Sheet... Cover Sheet Table of Contents...

More information

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012 PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello

More information

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E. \ Memorandum SSPEED Center at Rice University Department of Civil & Environmental Engineering 6100 Main MS-317 Houston, Texas 77005-1827 sspeed.rice.edu tel: 713-348-4977 To Andy Yung, P.E. CFM; Lane Lease,

More information

Appendix VI: Illustrative example

Appendix VI: Illustrative example Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

ENGINEERING REPORT. Blair Lane to Blairmont Drive Drainage Improvements. PREPARED FOR: City of Lebanon Engineering Department

ENGINEERING REPORT. Blair Lane to Blairmont Drive Drainage Improvements. PREPARED FOR: City of Lebanon Engineering Department engineers planners surveyors environmental scientists landscape architects ENGINEERING REPORT Blair Lane to Blairmont Drive Drainage Improvements PREPARED FOR: City of Lebanon Engineering Department PREPARED

More information

Hydraulic Modeling with HY-8

Hydraulic Modeling with HY-8 Hydraulic Modeling with HY-8 Linda Hansen PE, PWS MI Dept. of Environmental Quality Water Resources Division UP District Floodplain Engineer Today s Outline What is HY-8? Best Applications & Limitations

More information

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP

Technical Memorandum No. 8 June 3, 2013 Page 2. FEMA Floodplain Mapping Flood Elevations at WWTP Page 2 FEMA Floodplain Mapping Flood Elevations at WWTP Existing Flood Control Facilities The City of Davis WWTP is located immediately north of the Willow Slough Bypass and west of the Yolo Bypass (see

More information

OCONEE COUNTY, GEORGIA

OCONEE COUNTY, GEORGIA OCONEE COUNTY, GEORGIA AND INCORPORATED AREAS Oconee County Community Name Community Number *BISHOP, TOWN OF 130620 *BOGART, CITY OF 130490 NORTH HIGH SHOALS, TOWN OF 130368 OCONEE COUNTY 130453 (UNINCORPORATED

More information

Appendix D. August Technical Memorandum Channel Capacity Report, 2017 Restoration Year

Appendix D. August Technical Memorandum Channel Capacity Report, 2017 Restoration Year Appendix D Levee Capacity Evaluation of Geotechnical Middle Eastside Bypass (Reach 4A, Sand Slough Connector Channel, Upper and Middle Eastside Bypass) Study Area August 2015 Technical Memorandum Channel

More information

COLUMBIA COUNTY, GEORGIA

COLUMBIA COUNTY, GEORGIA COLUMBIA COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number COLUMBIA COUNTY 130059 (UNINCORPORATED AREAS) GROVETOWN, CITY OF 130265 HARLEM, CITY OF 130266 COLUMBIA COUNTY Effective:

More information

Computer Determination of Flow Through Bridges

Computer Determination of Flow Through Bridges US Army Corps of Engineers Hydrologic Engineering Center Computer Determination of Flow Through Bridges July 1970 Approved for Public Release. Distribution Unlimited. TP-20 REPORT DOCUMENTATION PAGE Form

More information

DAWSON COUNTY, GEORGIA

DAWSON COUNTY, GEORGIA DAWSON COUNTY, GEORGIA AND INCORPORATED AREAS Dawson County COMMUNITY NAME COMMUNITY NUMBER DAWSON COUNTY 130304 (UNINCORPORATED AREAS) DAWSONVILLE, CITY OF 130064 SEPTEMBER 26, 2008 FLOOD INSURANCE STUDY

More information

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

TIFT COUNTY, GEORGIA AND INCORPORATED AREAS. Tift County. Revised: September 29, 2010 FLOOD INSURANCE STUDY NUMBER 13277CV000A

TIFT COUNTY, GEORGIA AND INCORPORATED AREAS. Tift County. Revised: September 29, 2010 FLOOD INSURANCE STUDY NUMBER 13277CV000A TIFT COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number Tift County OMEGA, CITY OF 130552 TIFT COUNTY (UNINCORPORATED AREAS) 130404 TIFTON, CITY OF 130171 TY TY, CITY OF 130172 Revised:

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

Red River Flooding. June 2015 Caddo and Bossier Parishes. Presented by: Richard Brontoli RRVA, Executive Director

Red River Flooding. June 2015 Caddo and Bossier Parishes. Presented by: Richard Brontoli RRVA, Executive Director Red River Flooding June 2015 Caddo and Bossier Parishes Presented by: Richard Brontoli RRVA, Executive Director Kiwanis Club of SE Shreveport May 2, 2018 Where the Rain Falls Matters I-30 versus I-20 Caddo

More information

Upper San Jacinto River Regional Watershed Flood Mitigation Plan Preliminary Scope of Services. July 2, 2018

Upper San Jacinto River Regional Watershed Flood Mitigation Plan Preliminary Scope of Services. July 2, 2018 INTRODUCTION BACKGROUND Upper San Jacinto River Regional Watershed Flood Mitigation Plan Preliminary Scope of Services In August 2017, Hurricane Harvey struck the Texas coast, bringing a historic amount

More information

4/28/17. Size of Floods - Hydrograph Depicts flood data from gaging station; Hydrographs usually show Q vs. time

4/28/17. Size of Floods - Hydrograph Depicts flood data from gaging station; Hydrographs usually show Q vs. time GEOL 118 Final Exam Format similar to exams 1 and 2 Covers Lectures #27 40 (Global Climate Change I - Meteorite Impacts III) #35 Floods - II (Size, Prediction, Urbanization, Mitigation) 8:00, Thursday,

More information

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County.

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County. Hydrologic and Hydraulic Report For S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek Silver Spring Township Cumberland County August 13, 2003 Prepared For Pennsylvania

More information

Bear Creek Dam and Reservoir NID# OR Douglas County, Oregon

Bear Creek Dam and Reservoir NID# OR Douglas County, Oregon Bear Creek Dam and Reservoir NID# OR00614 Douglas County, Oregon FINAL Dam Breach Study and Flood Inundation Mapping March, 2009 Prepared for: The City of Drain, Oregon 129 West C Avenue Drain, OR 97435

More information

Abstract. What is big data? Successfully overcoming big data and big analysis challenges for the California Central Valley Hydrology Study

Abstract. What is big data? Successfully overcoming big data and big analysis challenges for the California Central Valley Hydrology Study Successfully overcoming big data and big analysis challenges for the California Central Valley Hydrology Study At left: San Joaquin River Basin reservoir operation model schematic. The model includes 35

More information

Climate and Land Use Consequences to 100-Year Flooding

Climate and Land Use Consequences to 100-Year Flooding Climate and Land Use Consequences to 100-Year Flooding Presented by: Ann Scholz, PE, CPSWQ Grad Student, University of New Hampshire Robert Roseen & Thomas Ballestero, UNH Stormwater Center Michael Simpson,

More information

Skagit River Basin Skagit River Flood Risk Management Study DRAFT REPORT HYDRAULIC TECHNICAL DOCUMENTATION. US Army Corps of Engineers.

Skagit River Basin Skagit River Flood Risk Management Study DRAFT REPORT HYDRAULIC TECHNICAL DOCUMENTATION. US Army Corps of Engineers. Skagit River Basin Skagit River Flood Risk Management Study DRAFT REPORT HYDRAULIC TECHNICAL DOCUMENTATION US Army Corps of Engineers.,i, HYDRAULICS TECHNICAL DOCUMENTATION TABLE OF CONTENTS 1.0 Background...

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

Hydraulic and Sediment Transport Modeling Strategy

Hydraulic and Sediment Transport Modeling Strategy Appendix B Hydraulic and Sediment Transport May 2014 Technical Memorandum Channel Capacity Report September 2014 San Joaquin River Restoration Program Hydraulic and Sediment Transport The San Joaquin River