1 APPENDIX I I. BASIC INFORMATION FORM 1 S. Item Details 1 Name of the project/s Addition of 3 KLPD Demo Pilot Plant within premises of existing 30 KLPD Molasses Distillery of Shreenath Mhaskoba Sakhar Karkhana Ltd. and request for exemption of EIA/EMP under Clause 7(ii) of EIA notification, Sr. in the schedule 5 (g) Distilleries 3 Proposed capacity/area/length/ tonnage to be handled/command area/lease area/number of wells to be drilled Installation of new 3 KLPD demonstration plant within the premises of existing distillery of Shreenath Mhaskoba Sakhar Karkhana Ltd. processing Non Food Biomass mainly Bagasse to ethanol. The plant will operate in batch mode and total Ethanol production capacity will not exceed 30 KLPD at any time. The existing capacity of plant has following units: i) Sugar Plant: 3,500 TCD ii) Molasses based Distillery Plant : 30 KLPD iii) Cogeneration Power Plant : 10 MW iv) Captive Power Plant: 3 MW Total area approval for construction: Sq m (20 Acres) on non agricultural land (As per mentioned on द ड - प र दर उपव भ ग प र दर approval copy) क र. ए न ए / ए स आ र / ७३/ २०१४ (प र दर २९/११/२०१४).. refer annex 1 Area required for Installation of new 3 KLPD demonstration plant is 8094 Sq m (2 acres) of existing premises The existing plant has obtained environmental clearance on 15/12/2014 [File J-11011/19/2012-IA II (I)] refer annex-2 4 New/Expansion/Modernization Installation of new 3 KLPD demonstration plant within the premises of Shreenath Mhaskoba Sakhar Karkhana Ltd. The plant will operate in batch mode for 3-5 days a month and total Ethanol production capacity will not exceed 30 KLPD at any time. 5 Existing Capacity/Area etc. 30 KLPD Total area Sq m (20 Acres) 6 Category of Project i.e. A or B Category - A 7 Does it attract the general condition? If yes, Yes please specify. 8 Does it attract the specific condition? If yes, please specify 9. Location Shreenath Mhaskoba Sakhar Karkhana Ltd. Patethan, ABC TECH LABS INDIA PVT. LTD., MUMBAI 1
2 (18 36'16.43"N, 74 13'49.60"E)... refer annex -3 Plot/Survey/Khasra Gat 225/1 & 225/2 New 3 KLPD Plant will be installed on Gat 225/2 of Mauje Rahu Village Rahu Tehsil Daund District Pune State Maharashtra 10 Nearest railway station/airport along with distance in kms. Pune Railway Station: Around 50 KM, Pune Airport: Around 50 KM distance from project site 11 Nearest Town, city, District Headquarters Pune city - around 50 Kms along with distance in KMs. 12 Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given Patethan village Panchayat. At/Post- Rahu, Tal.: Daund, Dist.: Pune, Pin code Name of the Applicant M/s Shreenath Mhaskoba Sakhar Karkhana Ltd. Mr. Pandurang A. Raut, Executive Chairman & Managing Director 14 Registered Address M/s Shreenath Mhaskoba Sakhar Karkhana Ltd., Meghdoot building, 2nd floor, behind Bharat Petrol Pump, Lokhandi pool lane, opposite Akashwani Centre, Hadapsar, Pune , Mahrashtra, India 15 Address for correspondence: M/s Shreenath Mhaskoba Sakhar Karkhana Ltd., Name of Contact Person Designation (Owner/Partner/CEO) Address Meghdoot building, 2nd floor, behind Bharat Petrol Pump, Lokhandi pool lane, opposite Akashwani Centre, Hadapsar, Pune , Mahrashtra, India Mr. Pandurang A. Raut Executive Chairman & Managing Director M/s Shreenath Mhaskoba Sakhar Karkhana Ltd., Meghdoot building, 2nd floor, behind Bharat Petrol Pump, Lokhandi pool lane, opposite Akashwani Centre, Hadapsar, Pune , Mahrashtra, India Pin Code smskl@rediffmail.com smsklho@rediffmail.com Telephone Fax - 16 Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. The proposed new plant is a very small 3KLD capacity demonstration pilot plant. It will be installed in the existing Distillery premises. 17 Interlinked Projects 3 KLPD Demo Pilot Plant is interlinked with existing 30 KLPD Distillery. The plant will operate in batch mode and total Ethanol production capacity will not exceed 30 KLPD at any time. 18 Whether separate application of interlinked The proposed new 3 KLPD Demo Pilot Plant is an addition ABC TECH LABS INDIA PVT. LTD., MUMBAI 2
3 project has been submitted? within the existing 30 KLPD Molasses Distillery of Shreenath Mhaskoba Sakhar Karkhana Ltd. The existing plant has obtained environmental clearance on 15/12/2014 [File J-11011/19/2012-IA II (I)] 19 If yes, date of submission The existing plant has obtained environmental clearance on 15/12/2014 [File J-11011/19/2012-IA II (I)] 20 If no, reason 21 Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22 Whether there is any Government Order/Policy relevant/relating to the site? 23 Forest land involved (hectares) 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case (c) Order/directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist confirmation 1.1 Permanent or temporary change on land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/ No Details thereof (with approximate quantities /rates, wherever possible) with source of information data The proposed new plant is a very small 3KLD capacity demonstration pilot plant. It will be installed in the existing Distillery premises. Hence there would be no specific significant change in the local land use, land cover or topography. As the proposed 3 KLPD plant will be installed within the premises of existing distillery. There will be no clearance of vegetation and buildings in the proposed area. 1.3 Creation of new land uses? Pre-construction investigations e.g. bore houses, soil testing? 1.5 Construction works? It includes Excavation works, Foundation works, Erection of Vessels, Installation of machinery, Fabrication, Brick works Masonry works. 1.6 Demolition works? 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures The construction works will be as per the proposed project ABC TECH LABS INDIA PVT. LTD., MUMBAI 3
4 or earthworks including linear layouts. structures, cut and fill or excavations 1.9 Underground works including mining - or tunneling? 1.10 Reclamation works? Dredging? Offshore structures? Production and manufacturing Mentioned in the Project Description Report (Attached as processes? annexure-4) Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? The storage of raw materials/goods will be done at the existing plant premises as indicated in Plot Plan (Attached as annexure-5). KLPD The wastes will be treated as follows: i) The Spent Wash generated from Distillation section shall be passed through Solid-Liquid Separation to separate the suspended solids such as lignin rich wet cake and the Spent liquor. ii) The lignin rich wet cake shall be used as fuel for the existing boiler. It shall be mixed with the primary fuel and shall be incinerated in the boiler to generate steam and power. iii) The Spent liquor shall be sent to biomethanation plant and the biogas produced will be sent to existing boiler and the biomethanated spent wash shall be recycled to fulfill the process requirement and the balance quantity shall be treated in secondary treatment (RO) plant. The treated water shall be used as make up water for cooling tower and the RO reject will be sent to existing composting yard to achieve zero liquid discharge. No additional space is required for Bio composting of reject generated from 3 KLPD Demo Pilot Plant Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No No extra manpower will be required in the operational phase. Housing facilities has been already provided for all the workers in the existing plant ABC TECH LABS INDIA PVT. LTD., MUMBAI 4
5 pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the Hydrology of watercourses or aquifers? 1.22 Stream crossings? 1.23 Abstraction or transfers of water Surface Water: 300 CMD, from Bhima River refer annex-6 from ground or surface waters? The proposed new 3 KLPD Demo Pilot Plant will require: 10 CMD of fresh water in construction phase CMD of fresh water during operation phase. This demand of water for new 3 KLPD Demo Pilot Plant will be fulfilled from the existing sanctioned water source 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? - Transport of materials for construction purpose will be fulfilled by hiring transportation facilities from near by villages. As the proposed capacity of new plant is only 3 KLPD; No extra man power will be required in the operational phase. Housing facilities has been already provided for all the workers in the existing plant 1.29 Introduction of alien species? 1.30 Loss of native species or genetic diversity? 1.31 Any other actions? 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist confirmation Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Project will be constructed in existing project premises This land is already Non Agricultural identification Surface Water: 300 CMD, from Bhima River refer annex The proposed new 3 KLPD Demo Pilot Plant will require: 10 CMD of fresh water in construction phase CMD of fresh water during operation phase. This demand of water for new 3 KLPD Demo Pilot Plant will be ABC TECH LABS INDIA PVT. LTD., MUMBAI 5
6 fulfilled from the existing sanctioned water source KLPD 2.3 Minerals (MT) 2.4 Construction material stone, Cement 8500 Bags (50 kg) approx aggregates, sand / soil (expected Sand 2000 m3 source MT) Aggregates 900 m3 Bricks nos. Steel 50 Tons approx 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Power requirement during construction (for 7 months) = KW Power requirement per hour during operation = KW Steam 24 TPD Source of Power for 3 KLPD Demo Pilot Plant - 10 MW Cogeneration power plant installed at the existing facility. Source of Steam for 3 KLPD Demo Pilot Plant 72 TPH capacity Boiler at the existing facility. Fuels used for own bagasse and biogas (450m 3 /hr) from distillery During Power failure kva DG set (1 ) 2.7 Any other natural resources (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Proposed unit will take safety measures for storage / transportation / handling of materials. Yes Personal Protective Equipments (PPE) will be provided to all the labours, Industrial Hygiene are maintained. Medical health check ups are regularly conducted ABC TECH LABS INDIA PVT. LTD., MUMBAI 6
7 3.5 Any other causes 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. Information/Checklist confirmation Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Excavated earth during construction shall be stored and reused for leveling and plantation purpose. 4.2 Municipal waste (domestic and or There will be no additional domestic Water consumption, since commercial wastes) existing facilities will be used 4.3 Hazardous wastes (as per Hazardous Use of used / spent oil in existing boiler as fuel Waste Management Rules) 4.4 Other industrial process wastes. 1. The lignin rich wet cake shall be used as supplementary fuel for the existing boiler. It shall be mixed with the primary fuel in the boiler to generate steam and power. 2. RO reject will be sent to existing composting yard to achieve zero liquid discharge 3. Excess biomass & sludge is removed from the bottom of biodigester intermittently and sent to existing bio composting. 4.5 Surplus product. 4.6 Sewage sludge or other sludge from As per point no. 4.4 above effluent treatment. 4.7 Construction or demolition wastes. 4.8 Redundant machinery or equipment. 4.9 Contaminated soils or other materials Agricultural wastes Other solid wastes. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. Information/Checklist confirmation Yes Information/Checklist confirmation 5.1 Emissions from combustion of fossil There will be small amount of exhaust from the vehicles fuels from stationary or mobile engage in transportation. sources. All the vehicles are designed to comply BS-3 Norms 5.2 Emissions from production processes. Biogas generated will be burned as fuel in existing Boiler or will be flared. 5.3 Emissions from materials handling Dust extraction for raw material handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odour from handling of materials including construction materials, sewage and waste. 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources 6. Generation of Noise and Vibration, and Emissions of Light and Heat: systems will be provided for the new 3 KLPD demo pilot plant During Construction phase, it shall be negligible. Dust may rise during transport of material and construction activity. The dust emissions shall be mitigated by water spraying on the roads within the plant premises. Very Small Quantity of solid waste is envisaged during construction period. Odor will not be generated. ABC TECH LABS INDIA PVT. LTD., MUMBAI 7
8 S. Information/Checklist confirmation Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Noise from rotary, pumps, motors, equipment, shall be maintained within permissible limit. 6.2 From industrial or similar processes Noise shall be maintained within permissible limit. 6.3 From construction or demolition Noise shall be maintained within permissible limit. 6.4 From blasting or piling 6.5 From construction or operational Noise shall be maintained within permissible limit. traffic 6.6 From lighting or cooling systems Noise shall be maintained within permissible limit. 6.7 From any other sources 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. Information/Checklist confirmation Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or Use of used / spent oil in existing boiler as fuel spillage of hazardous materials 7.2 From discharge of sewage or other There will be no additional discharge of effluents. The entire effluents to water or the land effluents will be treated at ETP facility of the existing plant (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water 7.4 From any other sources 7.5 Is there a risk of long term buildup of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist confirmation Yes Details thereof (with approximate quantities/rates, wherever 8.1 From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances 8.2 From any other causes Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? possible) with source of information data Risk assessment and Disaster Management Plan has been carried out at and prepared for existing plant. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/Checklist confirmation Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting cities, ancillary development or development stimulated by the project which ABC TECH LABS INDIA PVT. LTD., MUMBAI 8
9 could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after use of the site, which could have an impact on environment Set a precedent for later -- developments 9.4 Have cumulative effects due to -- proximity to other existing or planned projects with similar effects. III Environmental Sensitivity S. Areas Yes Aerial distance (within 15 km) Proposed project location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes Aerial distance from Project Site sensitive for ecological reasons - Bhima river = 3 KM Wetlands, watercourses or other Mula Mutha river = 6.5 KM water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters 5 State, National boundaries 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas 7 Defense installations 8 Densely populated or built-up area 9 Areas occupied by sensitive manmade land uses(hospitals, schools, Bhambarde School =15.5 KM places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) ABC TECH LABS INDIA PVT. LTD., MUMBAI 9
10 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) The proposed project area of Pune District comes under ZONE- III (Moderate Zone). The occurrence of Landslides & flooding is absent in the proposed project area. Disaster management Plan has been prepared by SMSKL. The offsite & onsite emergency plan is periodically reviewed. (IV). Proposed term of reference for EIA studies I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date:-. Place: Signature of the applicant ABC TECH LABS INDIA PVT. LTD., MUMBAI 10
APPENDIX I. (See paragraph-6) FORM 1
(I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage
More informationFORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006
FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion
More informationFORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra
FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL
More informationAPPENDIX I. (See paragraph-6) FORM 1
(I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral
More informationMolvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No
Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to
More informationForm -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-
Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI
More informationAPPENDIX I. (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command
More informationFORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik
FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga
More informationFORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram
FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE
More informationUPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.
Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment
More informationFORM-I for seeking clearance for project attracting CRZ notification
AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location
More informationFORM 1 BASIC INFORMATION S.NO.
FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/
More informationAPPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.
More informationM/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I
FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya
More informationFORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai
FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command
More informationAPPENDIX - I (See paragraph 6) FORM 1
APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the
More informationAppendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN
Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA
More information(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number
More informationAPPENDIX I (See paragraph 6) Form 1 (I) Basic Information
APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar
More informationProposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)
FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage
More informationAPPENDIX- I FORM- 1. (I) Basic Information:
(I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)
More informationFORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju
FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION
More informationSri.T.N.Balasubramanya
Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As
More informationFORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)
FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number
More informationNo 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,
More informationAPPENDIX I (See paragraph 6) FORM 1
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage
More informationAPPENDIX I. (See paragraph-6) FORM 1
(I) Basic Information APPENDIX I (See paragraph-6) FORM 1. Item Details 1 Name of the Project/s M/s Cane Agro Energy India Limited 2 S.. in the Schedule 5(g) 3 Proposed capacity/area/length/tonnge to be
More informationForm I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens
Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat
More informationSubmitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.
Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra
More informationAPPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease
More informationFORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE
FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,
More informationProject: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I
FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining
More informationAPPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease
More informationFORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationSand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1
FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity
More informationUPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)
UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally
More informationFORM 1 (Application for Environment Clearance)
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental
More informationFORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.
FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As
More informationFORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.
FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,
More informationDetails required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)
Details required for submitting Fresh EC Application (Category B2 Projects: Mining of Minor Minerals) 1. Project Sector (Non-Coal Mining) 2. Project Type (New, Expansion, Modernization) If Project Type
More informationFORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationUPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas
UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar
More informationFOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR
FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH
More information.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s
.APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification
More informationFORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item
More information(I) Basic Information:
(I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased
More informationREPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR
REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of
More informationProposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1
Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,
More informationAPPENDIX I. (See Paragraph 6) FORM 1
APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command
More informationM/S Overseas Min Tech Consultants, Jaipur 1
(I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:
More informationFORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.
FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:
More informationMOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR)
UPDATED FORM 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE, NEW DELHI MOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR) [AMENDMENT IN ENVIRONMENTAL CLEARANCE] VILLAGE : FIROZPUR HAFIZ
More informationRevised FORM - I & PRE-FEASIBILITY REPORT
Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,
More informationAppendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN
Appendix I Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 27/1990 ( R ) 53/2009 PROPOSED PRODUCTION
More informationFORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.
(I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total
More informationAPPENDIX I. (See paragraph 6) FORM 1
Form-1 & Project Feasibility Report for Mopar Limestone Mine (13.25 hect) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. No. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr.
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage
More informationA 'N 'E B 'N 'E C 'N 'E D 'N 'E
Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled
More informationITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT
Application for Extension of Environmental Clearance (EC) UPDATED (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic
More informationAnnexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by
Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - Construction of Beach Resort
More informationAPPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease
More informationProposed Multiplex & Commercial Complex FORM I
I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Multiplex cum Commercial Complex 2 no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 13,218.80
More informationJAI MAA SHARDA STONE CRUSHING
JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M.. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry
More informationAPPENDIX I. (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project Mopar Limestone Mine 2. Sr. in the Schedule 1-A 3. Proposed capacity/area/length/tonnage to be handles/command
More informationM/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District
Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli
More informationAPPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease
More informationAmbey Mahila Swa Sahayata Samuh President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.
Ambey Mahila Swa Sahayata Samuh +91-9617439314 President. Smt. Tuleshwari Vill- Gangikot Post: Gangikot Teh.- Surajpur Dist: Surajpur (C.G.) To, The Member Secretary, SLEIAA (State Level Environment Impact
More informationFORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.
FORM 1 (Submitted to Ministry of Environment, Forests & Climate Change) BY SRI LAKSHMI GAYATRI HOSPITAL (P) LTD. Proposed at: SY. NO. 306, BACHUPALLY VILLAGE, QUTHABULLAPUR MANDAL, RANGAREDDY DISTRICT,
More informationHaridarshan Residency ( Row Type House & School Building )
Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:
More information30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa
2012 Development of Viper Island as a high class tourist destination in A&N Islands with various recreational and entertainment activities Form 1 Form 1 & TOR 30 TPH Fertilizer Blending unit for Customized
More informationUPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT
UPDATED FORM I Of 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT APSEZ, Atchutapuram, Visakhapatnam district, Andhra Pradesh By RAIN CALCINER LIMITED Prepared By B.S.
More informationMs.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu
Application for Prior (Environmental Clearance) Transfer of EC- Form 1 For Transfer of EC from Ms.K.M.Altaf Kouser to Ms.Thriveni Earthmovers Private Limited Over an Extent of 4.838 Hectares of Road Metal
More informationApplication Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu
Form 1 as per EIA tification 2006 for Chockampatti Earth Quarry of Thiru.T.Poosai Durai, Chockampatti Village, Kadayanallur Taluk, Tirunelveli District, Tamil Nadu State. Application Form for Obtaining
More informationApplication for Prior Environmental Clearance (EC)
Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information
More information9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.
FORM I I. BASIC INFORMATION Item Details 1 Name of the project Proposed construction of residential building by M/s. CASA GRANDE AXIOM PRIVATE LIMITED. 2 no. in the schedule 8 (a) 3 Proposed area Area
More informationRenewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project
1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information
More informationFORM-I. Environmental Clearance (EC)
FORM-I Environmental Clearance (EC) FOR M/S. Mahanth mica mines (MICA, QUARTZ & FELDSPAR MINES) Léase Area : 47.01 Acres/ 19.05 Ha Sy.. 140/P, 142, 143/P & 139/3 Kalichedu (V), Sydapuram (M), SPSR Nellore
More informationRATNAAKAR SHELTER LLP
FORM 1 Slum Rehabilitation Scheme Aventus Heights At C.T.S 1A (pt) of village Deonar, Taluka Kurla, at Plot 49, Survey no.93 (pt.), Road 5/6 Shivaji Nagar, Govandi East, Mumbai- 400 043. By M/s. RATNAAKAR
More informationFORM 1. Basic Information. Sl. No.
(I) Basic Information FORM 1 Sl.. Item Details 1. Name of the project/s Dimensional Stone Useful For Cubes & Kerbs Quarry Of M/s. R.R Stones Private Limited 2. S.. in the schedule Item- 1(a) Mining of
More informationFORM I (OPENCAST LATERITE MINE ha)
SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara
More informationFORM Name of the project/s Amendment in Existing Environmental Clearance to
(1) Basic Information FORM-1 Sl. Item Details 1. Name of the project/s Amendment in Existing Environmental Clearance to Convert Existing Underground MS storage Tanks 2 X 200 KL (Tk3 & Tk4) to store Ethanol
More informationAnnexure-IV. Form-I for seeking clearance for project attracting CRZ notification
Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - CRZ Clearance for Resort project
More informationAPPLICATION (FORM-I) FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE FOR UMRER OC UMRER AREA, WCL. EC Capacity 3.50 MTPA EC ML Area 944.
APPLICATION () FOR EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE (As per gazette notification SO no 1530(E) dated 06/04/2018) FOR UMRER OC UMRER AREA, WCL EC Capacity 3.50 MTPA EC ML Area 944.65 ha
More informationFORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project
FORM 1 Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project At C.S. 990 situated at 243-G Patthe Bapurao Marg (Falkland Road), at Girgaon, Division D ward, Mumbai 400 004.
More informationFORM 1 Riverbed Sand Mining Project
FORM 1 Riverbed Sand Mining Project At Gata. 117ध, 1306म ( Kuda River) Village: Gujarauliya, Beltikar, Tehsil: Naugarh, District: Siddharthnagar, Submitted by M/s Baburam Construction Address-1769 B-5
More informationFORM 1 Riverbed Sand/Morrum / Mining Project
FORM 1 Riverbed Sand/Morrum / Mining Project At Khand. 19/3 (River Betwa) Village: Tikapur, Tehsil: Maudaha District:Hamirpur, Uttar Pradesh Submitted by Suresh Chandra Gupta S/o Narayan Das Gupta R/o-60
More information556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,
I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Residential Development Royal Nesto by K. K. Chandrasekar, Krishna Kishor, B. Paranthaman Sethupathi, Paulvannan,
More informationHIMALAYA MINES & MINERALS SURVEY NO. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I
HIMALAYA MINES & MINERALS SURVEY. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I SUBMITTED BY Sri K. Narsi Reddy House No. 2-7-618, Excise Colony,
More informationFORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)
FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment tification, 2006) BOULDER, GRAVEL AND SAND MINING PROJECT At Village Kiratpur