TABLE OF CONTENTS. Environmental Review Report Napanee Generating Station. Page No. ACRONYMS AND ABBREVIATIONS... AC-1 UNITS OF MEASUREMENT...
|
|
- Martin Harrison
- 5 years ago
- Views:
Transcription
1 TABLE OF CONTENTS ACRONYMS AND ABBREVIATIONS... AC-1 UNITS OF MEASUREMENT... U-1 1. PROJECT OVERVIEW Introduction Purpose and Need for the Undertaking Project Proponent Facility Description Environmental Assessment Requirements NGS Permits and Approvals Project Time Frame Report Organization DESCRIPTION OF THE EXISTING ENVIRONMENT Introduction Atmospheric Environment (Air Quality) Climate and Meteorological Data Near Surface Temperature Precipitation Stability Wind Direction and Speed Fogging and Cloud Cover Mixing Height Air Quality Site specific CAC Measurements Historical Ambient Monitoring Data Noise Location of Receptors Establishing Background Sound Levels Sound Levels Lighting NGS Site Geology and Soils Physiography NGS Site Geology Bedrock Surface and Groundwater Surface Drainage Groundwater Aquatic Environment Proximate Shoreline Configuration and Bathymetry Currents Aquatic Environment Resources DRAFT October 2013 i Napanee Generating Station
2 Thermal Regime Substrate Water Quality Sediment Quality Aquatic Macrophytes Benthic Macroinvertebrates Fisheries Resources Aquatic Avifauna Significant Species Terrestrial Environment Vegetation Communities and Species Surrounding Area NGS Site Flora Surrounding Area NGS Site Birds Surrounding Area NGS Site Amphibians and Reptiles Surrounding Area NGS Site Mammals Surrounding Area NGS Site Species at Risk Surrounding Area NGS Site Landscape Connectivity Surrounding Area NGS Site Socio-Economics County of Lennox and Addington Hospital Social Services Tourism Water Uses Town of Greater Napanee Demographic Profile Employment and Income Educational Institutions Recreational Opportunities Sandhurst Loyalist Township Demographic Profile Employment and Income DRAFT October 2013 ii Napanee Generating Station
3 Bath Amherst Island (Emerald) Traffic Existing Road Network Existing Traffic Volumes and Intersection Operations Future Baseline Traffic Volumes Summer Baseline Intersection Operations Summer Intersection Operations Peak Construction Traffic Summer Baseline Intersection Operations Summer Intersection Operations NGS Maintenance Traffic Archaeology Stage 1 Archaeological Assessment Stage 2 Archaeological Assessment Aboriginal Interests PROJECT DESCRIPTION Facility Description NGS Operation Natural Gas Power Systems Site Layout and Process Water and Wastewater System Water Supply and Water Treatment Wastewater Collection, Treatment, and Discharge Site Preparation Demolition of Existing Buildings Clearing of Vegetation Grading Erosion and Sediment Control Plan Stormwater Management Plan Land-Use and Drainage Patterns SWM Facility Features Water Quality Control Measures Water Quantity Control Measures Construction Activities Construction of NGS Site Utilization during Construction Water Availability Site Restoration and Landscaping Activities Safety Emergency Response Decommissioning Permits and Approvals Permit To Take Water DRAFT October 2013 iii Napanee Generating Station
4 3.8.2 Environmental Compliance Approval (ECA) (Air and Noise) Point Of Impingement Standards End-of-Stack Standards Ambient Air Quality Criteria Noise Approvals Environmental Compliance Approval (ECA) (Industrial Sewage) Municipal Permits Official Plan, Amendments and Minor Variances Site Plan Approval Building Permits Other Authorizations Ministry of Transportation Cataraqui Region Conservation Authority Aeronautical Obstruction Clearance (Transport Canada) Transboundary Air ASSESSMENT AND MANAGEMENT OF ENVIRONMENTAL EFFECTS Approach to the Assessment of Environmental Effects Screening Criteria Check List Air Quality Effects During Construction Effects During Operation Sources of Atmospheric Emissions Operating Scenarios Emission Rates for Conventional Pollutants Emission Rates for VOCs, PAHs and Metals Modelling Methodology Modelling Results Noise and Vibration Effects During Construction Sources of Construction Noise and Vibration Regulatory Requirements - Construction Noise and Vibration Blasting Noise and Vibration Assessment Effects During Operation Sources of Operational Noise Regulatory Requirements Operations Definitions Sound Level Limits Noise Assessment Lighting Construction Operational Bedrock Geology, Physiography and Soils Effects During Construction Effects During Operation DRAFT October 2013 iv Napanee Generating Station
5 4.6 Surface and Ground Water Quality and Hydrology Effects During Construction Surface Water Hydrology and Quality Groundwater Hydrology and Quality Effects During Operation Stormwater Management Wastewater Management and Disposal On-site Incidents and Spills Thermal Loadings Groundwater Hydrology and Quality Aquatic Environment Effects During Construction Effects During Operation Effects from Impingement and Entrainment (I & E) Effects from Thermal Discharge Terrestrial Environment Effects During Construction Removal of Vegetation and Wildlife Habitat Disruption of Connectivity Blasting and Vehicular Noise Deposition of Dust Effects During Operation Bird Strikes Disturbance to Wildlife due to Noise Socio Economics Effects During Construction Existing Land Uses Community Character Local Businesses, Institutions and Public Facilities Recreation, Cottaging or Tourism Community Services and Infrastructure Effects During Operation Existing Land Uses Community Character Aesthetics Local Businesses, Institutions and Public Facilities Recreation, Cottaging or Tourism Community Services and Infrastructure Traffic Effects During Construction Increase in Traffic During Construction NGS Site Access Effects During Operation Increased Traffic During Operation Archaeology and Built Heritage Effects During Construction DRAFT October 2013 v Napanee Generating Station
6 Effects During Operation Aboriginal Interests Effects on Aboriginal Interests Human and Ecological Health Difference Between a Risk Assessment and a Health Study Risk Assessment Process How the Analysis was Performed Predicted Human Health Risks Ecological Assessment Chemical Interactions Biological Risks Certainty of Results COMMITMENT TO MITIGATION AND IMPACT MANAGEMENT Summary of Impacts, Mitigation and Net Effects Monitoring PUBLIC AND AGENCY CONSULTATION Consultation Program Consultation Goals, Objectives and Principles Broad-Based Communication Tools and Activities Preliminary Consultation Project Commencement Identification of Stakeholders Project Website Media Communication Project Mailouts Local Community Liaison Representative and Outreach Office Open Houses Open House Public Tour of Halton Hills Generating Station Jobs Information Session Focussed Activities with Specific Groups Site Neighbours Municipal and County Elected Officials and Staff Trades, Businesses, Vendors, Unions, and Prospective Employees Local Environmental and Community Interest Groups Regulatory Agencies Aboriginal Communities Open House for Alderville First Nation Open House for Mohawks of the Bay of Quinte Architectural and Landscaping Advisory Committee Summary of Comments, Questions and Responses Publication Of The Draft Environmental Review Report DRAFT October 2013 vi Napanee Generating Station
7 7. ENVIRONMENTAL ADVANTAGES AND DISADVANTAGES REFERENCES DRAFT October 2013 vii Napanee Generating Station
8 LIST OF TABLES Table 2.1 Kingston Airport Climate Normals ( ) Table 2.2 Stability Class Distribution NGS (CALMET) ( ) Table 2.3 Climate Normal Reduced Visibility and Cloud Cover at Kingston Airport ( ) Table 2.4 Summary of the 1-Hour NGS Air Monitoring (February 13 th June 30 th ) Table 2.5 Summary of Monitoring Data at the NGS and MOE Belleville and Kingston (February 13 March 31) Table 2.6 Summary of Representative CAC Baseline Concentrations Near the NGS Table 2.7 Summary of Representative PAH and VOC Baseline Concentrations at Point Petre NAPS STATION (64601) Table 2.8 Summary of Acceptable Meteorological Parameters Table 2.9 Summary of Monitoring Data and Appropriate Criteria Table 2.10 Surficial Sediment Particle Size and Classification Type Table 2.11 Fish Species Recorded in the Local Area Table 2.12 Aquatic Avifauna Species Recorded in the Local Area Table 2.13 Vegetation Communities on the NGS Site Table 2.14 Modifications to Classification of Cultural Meadow in Lee et al. (1998) Table 2.15 Breeding Birds Recorded within the NGS Site Table 2.16 Mammals Observed within the NGS Site Table 2.17 Total Labour Force by Occupation (2006) Table 2.18 Top Public Employers Table 2.19 Top Private Sector Employers Table 3.1 Chemical Storage, Use, and Fate Table 3.2 NGS Effluent Monitoring Table 3.3 Effluent Treatment Collection Table 4.1 Screening Criteria Table 4.2 Auxiliary Boiler Compliance with MOE Guideline A Table 4.3 Dew Point Heater Compliance with MOE Guideline A-9 for NO x Table 4.4 Emission Rates Used to Develop Scenarios Table 4.5 Emission Rates for VOCs, PAHs and Metals Table 4.6 Summary of Incremental Modelling Results for Conventional Contaminants for all Scenarios Table 4.7 Summary of Incremental Maximum Modelling Results for Conventional Table 4.8 Contaminants Summary of Incremental Modelling Results for Conventional Contaminants at Nearby Residential Receptors Table 4.9 Cumulative Concentrations for Conventional Contaminants Table 4.10 Cumulative Concentrations for VOCs and PAHs Table 4.11 Cumulative Concentrations for VOCs and PAHs Table 4.12 MOE Blasting Noise and Vibration Cautionary Limits DRAFT October 2013 viii Napanee Generating Station
9 LIST OF TABLES (Cont'd) Table 4.13 Blasting Noise Assessment Results Table 4.14 Blasting Vibration Assessment Results Table 4.15 Minimum Values of One Hour Leq by Time of Day Table 4.16 Noise Source Group Summary Table 4.17 Predicted Sound Levels at Points of Reception Pre-Packaged and Original Design Mitigation Table 4.18 Predicted Sound Levels at Points of Reception With Additional Mitigation Table 4.19 Contaminant Concentrations & Loadings from the NGS (Cooling Tower Blowdown) Table 4.20 Contaminant Loadings from the NGS (Quenched Cooling Tower Blowdown) Table 4.21 Flow Rate of Operating Scenarios Table 4.22 Concentrations of Contaminants (mg/l) Table 4.23 Summary of Discharge Scenarios Table 4.24 Summary of Distances of ΔT Isotherms from Discharge Channel Outlet for Three Seasonal Periods Table 4.25 Vegetation Communities to be Removed Table 4.26 Estimated Changes to Breeding Birds Table 4.27 Estimated Noise Levels at Terrestrial Receptors Table 4.28 NGS Operation Worker Trip Generation Table 5.1 Summary of Potential Effects, Mitigation and Net Effects Table 5.2 NGS Environmental Monitoring Summary Table 6.1 Summary of Stakeholder Comments and Questions Table 7.1 Advantages and Disadvantages of the NGS DRAFT October 2013 ix Napanee Generating Station
10 LIST OF FIGURES Figure 1.1 NGS Site within Lennox GS Property Figure 1.2 Location of NGS Intake and Discharge Figure 1.3 Details of the Environmental Screening and Review Process Figure 1.4 Project Schedule Figure 2.1 Location of Lennox GS Property Boundary and NGS Site within the Local Area Figure 2.2 Wind Rose Extracted from CALMET Meteorological Data File ( ) and Observations from Kingston ( ) Figure 2.3 Hourly NO 2 Measurements at the NGS Figure 2.4 Location of the Point Petre Monitoring Station and NGS Site Figure 2.5 Noise Receptor and Monitoring Locations Figure 2.6 Continuous Sound Level Monitoring Data at Receptor POR Figure 2.7 Continuous Sound Level Monitoring Data at Receptor POR Figure 2.8 Light Pollution from an Outdoor Luminaire Figure 2.9 Surface Drainage Features on the NGS Site Figure 2.10 NGS Local Area and Site Area Figure 2.11 Current Monitoring Sites Figure 2.12 Depth-Averaged Current Rose at Station C9 and C21, Late Fall 2012 Winter Figure 2.13 Depth-Averaged Current Rose at Station C9 and C21, Spring Figure 2.14 Depth-Averaged Current Rose at Station C9 and C21, Summer Figure 2.15 Temperature Logger Sites Figure 2.16 Seasonal Average Temperature Data for Lennox GS Intake ( ) Figure 2.17 Continuous Water Temperature Data Station T Figure 2.18 Continuous Water Temperature Data Station T Figure 2.19 Surficial Sediment Sample Locations Figure 2.20 Examples of Rocky Substrate at 5 m Water Depth Figure 2.21 Example of Rocky and Finer Sediment Substrate at 10 m Water Depth Figure 2.22 Example of Fine Sediment Substrate at 20 m Water Depth Figure 2.23 Nearshore Water Sample Locations Figure 2.24 Lennox GS Forebay and Discharge Channel Water Sample Locations Figure 2.25 Surficial Sediment Sample Locations Figure 2.26 Benthic Macroinvertebrate Sample Locations Figure 2.27 Gillnetting Locations Figure 2.28 Lennox GS Forebay Fish Community Sampling Sites Figure 2.29 NGS Construction Footprint Figure 2.30 NGS Site Ecological Land Classification Mapping Figure 2.31 Terrestrial Features Found in the NGS Site Figure 2.32 Communities NGS Site Area Figure 2.33 Study Road Network and Intersections Figure 2.34 Existing 2013 Summer Traffic Volumes DRAFT October 2013 x Napanee Generating Station
11 LIST OF FIGURES(Cont'd) Figure 2.35 Future Background 2016 Summer Traffic Volumes Figure 2.36 Future Total 2016 Peak Construction Summer Traffic Volumes Figure 2.37 Future Background 2025 Summer Traffic Volumes Figure 2.38 Future Total 2025 Maintenance Period Summer Traffic Volumes Figure 2.39 Stage 1 Archaeological Assessment for the NGS Site and Lands to be used for Temporary Site Access Figure 3.1 Process Diagram for the NGS Figure 3.2 Artist s Preliminary Rendering of the NGS Figure 3.3 NGS Site Plan Figure 3.4 NGS Water Flow Diagram Figure 3.5 Water Balance (Summer Peak Conditions) Figure 3.6 Water Balance (Summer Hot and Dry Unfired) Figure 3.7 Site Grading and Drainage Plan Figure 3.8 Erosion and Sediment Control Plan Figure 3.9 Pre-Development Site Conditions Figure 3.10 Post-Development Conditions - Site Layout, Land-Use and SWM Facility Figure 4.1 Location of Specific Receptors Figure 4.2 Building and Stack Configuration Used for CALPUFF Modelling Figure 4.3 Day-Time Sound Level Contour Pre-packaged and Original Design Mitigation (Normal Operations) Figure 4.4 Evening Night-Time Sound Level Contour Pre-packaged and Original Design Mitigation (Normal Operations) Figure 4.5 Day-Time Sound Level Contour Additional Mitigation (Normal Operations) Figure 4.6 Evening Night-Time Sound Level Contour Additional Mitigation (Normal Operations) Figure 4.7 Maximum Surface Concentrations of Total Phosphorus from Scenario I Figure 4.8 Maximum Surface Concentrations of Total Phosphorus from Scenario II Figure 4.9 Vegetation Communities to be Removed Figure 4.10 NGS Site Trip Distribution Figure 4.11 Future Total 2016 Peak Construction Summer Traffic Volumes Figure % NGS Site-generated Entrance Traffic Volumes Figure 4.13 Future Total 2025 Maintenance Period - Summer Traffic Volumes Figure 4.14 Risk Quotients Associated with Total Maximum Exposure to Short-Term Concentrations of Gaseous Air Pollutants for Residential Receptors DRAFT October 2013 xi Napanee Generating Station
12 LIST OF FIGURES(Cont'd) Figure 4.15 Figure 4.16 Maximum Hazard Quotients Associated with Total Exposure to Short-Term Concentrations of Gaseous Air Pollutants at the Maximum Concentration Location Total Incremental Lifetime Cancer Risks at Maximum Concentration Location Figure 4.17 Total Incremental Risk Quotients at Maximum Concentration Location LIST OF PHOTOGRAPHS Photograph 2.1 Round Goby Caught By Angling in Lennox GS Forebay Photograph 2.2 Lennox Hydro Wetland, Photograph 2.3 Common Snapping Turtle Nesting Area Lennox GS Lagoons Photograph 2.4 Osprey nest in the Surrounding Area Photograph 2.5 Purple Martin Colony in Surrounding Area (Lennox GS property) Photograph 2.6 Cultural Meadow (CUM1-1G) on NGS Site July Photograph 2.7 Cultural Meadow (CUM1-1LS) on Limestone Screenings NGS Site July Photograph 2.8 Cultural Thicket on NGS Site July Photograph 2.9 Shallow Marsh on NGS Site July Photograph 2.10 Pre-contact Projectile Point Recovered During Stage 2 Archaeological Assessment Pedestrian Survey of the NGS Site DRAFT October 2013 xii Napanee Generating Station
T a b l e o f C o n t e n t s
T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2
More informationSouth Landfill Annual Cover Rate Screening Criteria Checklist
South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationMactaquac Project. Final Comparative Environmental Review (CER) Report. August 2016
Mactaquac Project Final Comparative Environmental Review (CER) Report August 2016 Prepared For: New Brunswick Power Corporation P.O. Box 2040, 515 King Street Fredericton, NB E3B 5G4 Prepared By: Stantec
More informationEAGLE S NEST PROJECT
A Federal/Provincial Environmental Impact Statement/Environmental Assessment Report Draft Copy December 20, 2013 VOLUME 1 EXECUTIVE SUMMARY PAGE EXECUTIVE SUMMARY... 1-1 1 INTRODUCTION... 1-1 1.1 PROJECT
More informationNAPANEE GENERATING STATION PROJECT DESCRIPTION
Executive Summary NAPANEE GENERATING STATION PROJECT DESCRIPTION Prepared For: Canadian Environmental Assessment Agency Prepared By: TransCanada and SENES Consultants October 2013 SENES Consultants Specialists
More informationTerms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report
The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO
More informationWaste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening
Welcome Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the Please take a few moments to browse the display material and talk to our staff and consultants.
More informationFinal Environmental Impact Statement Volume 1 Cricket Valley Energy Project
Volume 1 Cricket Valley Energy Project Dover, Dutchess County, New York July 2012 Lead Agency: New York State Department of Environmental Conservation 625 Broadway Albany, New York 12233 Applicant: Cricket
More informationTable 2. Revised Table 2.2-4: FEIS MSCIP Channel Alternatives Comparison Table Alternatives No Action (200x36) DEIS Alternatives (DMMP Multi-Use Alternative 2A) FEIS Revised Alternatives (DMMP Multi-Use
More informationBEFORE THE OHIO POWER SITING BOARD
BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Table of Contents Page No. List of Figures... xii List of Tables... xiii List of Appendices...xv
More informationRegional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study
Welcome to the Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study September 23, 2009 Please Sign In and take an Information Brief
More informationPort Granby Project ENVIRONMENTAL ASSESSMENT STUDY REPORT EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Introduction Low-level radioactive waste and associated marginally contaminated soils at Port Granby are part of historical industrial activities in the Port Hope area. Since the 1930s,
More informationComparative Evaluation Option #1 & Option #2
Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: Original Dated October 1, 2010 Hants County Aggregate Quarry Extension Project Municipal Enterprises Ltd., Proponent Hants County, Nova Scotia The Hants
More informationList of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...
BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Blue Creek Wind Farm Amendment Table of Contents Text sections that have been updated for
More informationTable of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction
Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS
More informationEnvironmental Impact Statement for the Slave Falls Tramway Conversion Project
Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT
More informationAmherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4
Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Prepared for: Windlectric Inc. 2845 Bristol Circle Oakville ON L9H 7H7 Prepared by: Stantec Consulting Ltd.
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationAssessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture
Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million
More informationEnvironmental Assessment Approval. Alton Natural Gas Storage Project
Approval Approval Date: Original Dated December 18, 2007 Alton Natural Gas Storage Project Alton Natural Gas Storage LP, Proponent Colchester County, Nova Scotia Alton Natural Gas Storage (the Undertaking
More informationContents. Non-Technical Summary. 1. Introduction. 2. Policy, Regulatory and Administrative Framework. 3. Impact Assessment Methodology
Contents Non-Technical Summary Units and Abbreviations 1. Introduction 1.1 Introduction... 1-2 1.1.1 Overview of 3D Seismic Survey... 1-2 1.1.2 Other BP Exploration and Production Activities in the SWAP
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper
More informationmethods consist of: activities of The physical the Project surveying; stockpiling; grading; piling and turbine delivery; distribution line; operation
3.0 SCOPE OF THE ASSESSMENT The following section provides the scope of the Project and its assessment as well as the used for the environmental assessment. methods 3.1 Scope of the Project and Assessment
More informationTable of Contents. Green Line Extension Project. Draft Environmental Impact Report/Environmental Assessment and Draft Section 4(f) Evaluation
Table of Contents Acronyms and Abbreviations Secretary s Certificate on the EENF Executive Summary 1 Introduction and Background... 1-1 1.1 Introduction... 1-1 1.2 Project Summary... 1-2 1.3 Permits and
More informationTown of Perth Landfill Expansion Environmental Screening
Town of Perth Landfill Expansion Environmental Screening Public Information Centre Thursday September 29, 2016 4:00 to 6:00 p.m. and 7:00 to 9:00 p.m. Perth Town Hall Main Floor Welcome to the Public Information
More informationAmador County General Plan Final Environmental Impact Report
ENVIRONMENTAL IMPACT REPORT FINAL JULY 2016 Amador County General Plan Final Environmental Impact Report Prepared for: Amador County 810 Court Street Jackson, CA 95642 Contact: Susan Grijalva Planning
More informationAppendix M. Criteria, Measures and Indicators for Effects Assessment
Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,
More informationEIS TABLE OF CONTENTS
EIS TABLE OF CONTENTS GLOSSARY OF TERMS... GL-1 Glossary and Abbreviations... GL-1 Units... GL-14 EXECUTIVE SUMMARY... ES-1 INTRODUCTION... ES-1 PROJECT PROPONENTS... ES-1 LOCATION... ES-1 PROJECT DESCRIPTION...
More informationNoront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017
Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern
More informationIntroduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and
Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from
More information14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring
14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring An effective monitoring program provides results to: indicate whether the facility is working as expected and that the assumptions used in the assessment
More informationOverview of the Environmental Assessment Process and Study Organization
This Report documents the Environmental Assessment (EA) undertaken by Clean Harbors Canada Inc. (Clean Harbors) to provide additional landfill disposal capacity for hazardous waste at the existing Lambton
More informationDRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION
DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION APPENDIX 4 Analysis Framework 4-1: CEQR Technical Area Guide DRAFT ENVIRONMENTAL IMPACT STATEMENT AND DRAFT SECTION 4(f) EVALUATION
More informationCommunity Liaison Committee Meeting #1 Wednesday, March 25, 2015
TransCanada s Napanee Generating Station (NGS) Community Liaison Committee Meeting #1 Wednesday, March 25, 2015 1 Meeting Agenda Greetings Introduction of CLC Members Who is TransCanada? Napanee Generating
More information5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:
5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the
More information1. Introduction
TABLE OF CONTENTS SEPA EIS FACT SHEET EIS SUMMMARY DRAFT ENVIRONMENTAL IMPACT STATEMENT List of Tables List of Figures List of Acronyms 1. Introduction... 1-1 1.1. Project Overview...1-1 1.2. Purpose and
More informationGolf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines
Golf Course and Recreational Facilities Best Management Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document
More informationPOINTE DU BOIS MODERNIZATION PROJECT
POINTE DU BOIS MODERNIZATION PROJECT CONSTRUCTION OF NEW FACILITIES AT PRESENT SITE AND DECOMMISSIONING OF EXISTING FACILITIES ENVIRONMENTAL ASSESSMENT DRAFT SCOPING DOCUMENT Submitted By Manitoba Hydro
More informationEnvironmental Impact Assessment Report
Environmental Impact Assessment Report Volume I (Main Document) Residential Development at Barnhall Leixlip Co. Kildare on behalf of Ardstone Homes Ltd. December 2017 Volume I (Main Document) December
More informationDraft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were
More informationPublic Information Centre
Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!
More informationOttawa-Trussler Area Sewage Facility Class Environmental Assessment
Welcome to the Ottawa-Trussler Area Sewage Facility Class Environmental Assessment Public Open House May 7, 2013 September 25, 2013 Welcome The purpose of this second Public Open House is to: Present the
More information6 Risk assessment methodology
Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management
More informationWelcome Mohawks of the Bay of Quinte
Welcome Mohawks of the Bay of Quinte Napanee Generating Station Open House Napanee Generating Station (NGS) Open House Objective: Introduce the proposed NGS, the Environmental Review process and the NGS
More informationWellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement
Wellington Dock Planning Application, Liverpool Non-Technical Summary for Environmental Statement INTRODUCTION United Utilities PLC (UU) has applied for planning permission for an extension to Liverpool
More informationThe Halifax Harbour Solutions Project Provision of Sewage Treatment
The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised
More informationTABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement
TABLE OF CONTENTS 1 INTRODUCTION 1-1 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Project Summary 1-1 1.1.3 Land Tenure, Development Application Area, Tenements and Zoning 1-7 1.1.4
More informationAPPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval
APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic
More informationWelcome. About the Proponent. About the Proposed Project. The Proposed Project is now in the Regulatory Review period of the schedule.
Welcome Thank you for attending this Open House for the British Columbia Environmental Assessment Office (EAO) Pre-Application Public Comment Period. The B.C. Ministry of Transportation and Infrastructure
More informationInglewood Oil Field Specific Plan Project Draft Environmental Impact Report
Draft Environmental Impact Report SCH No. 2015101030 Prepared for: City of Culver City Planning Division 9770 Culver Boulevard Culver City, California 90232 Prepared by: Psomas 225 South Lake Avenue Suite
More informationAmherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3
Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3 Prepared for: Windlectric Inc. 354 Davis Road, Oakville, ON L6J 2X1 Prepared by: Stantec Consulting Ltd.
More informationInformation Requirements Table for Liquid Waste
Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry
More informationMohawk College Hamilton, ON. Project Description Report. Fennell Campus Wind Project
Mohawk College Hamilton, ON Fennell Campus Wind Project H336493-0000-07-124-0001 Rev. C September 24, 2010 Project Report Mohawk College Fennell Campus Wind Project September 24, 2010 Table of Contents
More informationAppendix C - Highway 400 Widening and Interchange Evaluation Summary Tables
Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General
More informationAmherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report
Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report Prepared for: Windlectric Inc. 2845 Bristol Circle Oakville ON L9H 7H7 Prepared by: Stantec Consulting Ltd.
More information6. Net Effects of the Alternative Methods 6-1
Table of Contents 6. 6-1 6.1 Net Effects Methodology... 6-1 6.1.1 Evaluation Criteria and Indicators... 6-2 6.1.2 Key Design Considerations, Future Baseline Conditions &... 6-2 6.1.3 Maximum Impact / Worst-Case
More informationGRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT
GRAND VALLEY WATER AND WASTEWATER SERVICING MASTER PLAN CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Wednesday, November 1, 2017 6:00 PM 8:00 PM Grand Valley District Community Centre Grand
More informationTransCanada Energy Ltd. Napanee Generating Station. Presentation to Council of the Town of Greater Napanee
TransCanada Energy Ltd. Napanee Generating Station Presentation to Council of the Town of Greater Napanee January 22, 2013 TransCanada Corporation (TSX/NYSE: TRP) Natural Gas Pipelines 57,000 km wholly
More information407 TRANSITWAY. Planning & Preliminary Design
FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was
More informationSan Ramon City Center Draft Subsequent EIR
San Ramon City Center State Clearinghouse Number 2007042022 Prepared for: City of San Ramon Planning/Community Development Department Planning Services Division 2222 Camino Ramon San Ramon, CA 94583 Prepared
More informationCity of Bishop. Environmental Checklist Form
City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.
More informationDesign-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In
WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant
More informationThe Project will be undertaken in line with a number of national laws and standards. Key local laws relating to ESIA include:
1 EXECUTIVE SUMMARY 1.1 CONTEXT OF THE PROJECT Myanmar UPA Company Limited ( MUPA or the Project Sponsor or the Project Proponent ) intends to develop a 200MW Combined Cycle Power Plant (CCPP) to supply
More informationWelcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016
Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of
More informationCombined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius
Combined Cycle Gas Turbine Power Plant Project at Fort George, Mauritius CONTENTS Chapter Description Page 1 NON-TECHNICAL SUMMARY 17 1 INTRODUCTION 18 2 PROPOSED PROJECT IN FORT GEORGE 18 3 METHODOLOGY
More informationCanada. Record of Proceedings, Including Reasons for Decision. Cameco Corp_o_ra_ti_o_n. Proponent
Canadian Nuclear Safety Commission Commission canadienne de sorete nucleaire Record of Proceedings, Including Reasons for Decision Proponent Cameco Corp_o_ra_ti_o_n _ Subject Comprehensive Study Report
More informationF3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
F3. Draft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis
More informationEnvironmental Screening Report Twin Creeks Landfill Proposed Fill Rate Increase. Waste Management of Canada Corporation
Environmental Screening Report Twin Creeks Landfill Proposed Fill Rate Increase Waste Management of Canada Corporation March 2017 Contents Executive Summary... 1 1 Project Description... 2 1.1 Introduction...
More informationDraft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements
JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN
More informationCOMPREHENSIVE STUDY REPORT BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT
COMPREHENSIVE STUDY REPORT BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT Prepared by: Canadian Nuclear Safety Commission March 2003 TABLE OF CONTENTS page 1.0 INTRODUCTION.. 1 2.0 BACKGROUND 1 2.1 Project.
More informationTable of Contents. City of Redlands - Redlands Crossing Center
City of Redlands - Redlands Crossing Center Executive Summary... ES-1 Section 1: Introduction...1-1 1.1 - Overview of the CEQA Process...1-1 1.2 - Scope of the EIR...1-5 1.3 - Organization of the EIR...1-8
More informationPotential Impacts and Mitigations from a Saline Discharge into Marine Environment
Meliadine Division Potential Impacts and Mitigations from a Saline Discharge into Marine Environment DECEMBER 2017 VERSION 1 Table 1: Potential Impacts and Mitigations Marine Environment Benthic Invertebrates
More informationDraft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project
Draft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project Table of Contents 1. BACKGROUND...5 1.1 CONTEXT...5 2.
More informationNorthacre Renewable Energy
Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13
More informationComprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:
Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment
More informationAir Quality Assessment of the Canadian Pulp and Paper Industry. Gregory Crooks, M.Eng., P.Eng. July 14, 2009
Air Quality Assessment of the Canadian Pulp and Paper Industry Gregory Crooks, M.Eng., P.Eng. July 14, 2009 Study Overview Health Canada is currently conducting a study of the effects on human health of
More informationGeorgetown Water Storage Class Environmental Assessment Study
Georgetown Water Storage Class Environmental Assessment Study Public Information Centre Cedarvale Community Centre 181-185 Main Street South Thursday, September 4th, 2008 6:30 p.m. 8:30 p.m. Why are we
More informationDRAFT ENVIRONMENTAL IMPACT STATEMENT
DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR VILLAGE VIEW ESTATES VILLAGE OF WARWICK, ORANGE COUNTY, NEW YORK Garling Associates November 21, 2006 Date of Complete Filing: December 4, 2006 Village View, LLC
More informationTABLE OF CONTENTS PAGE SECTION
TABLE OF CONTENTS SECTION PAGE 1.0 EXECUTIVE SUMMARY... 1 1.1 Project Description... 1 1.2 Project Applicant... 1 1.3 Summary of Project Purpose and Need... 2 1.4 Summary of Proposed Alternative... 2 1.5
More informationGREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT
GREATER DUBLIN DRAINAGE PROJECT: PUBLIC CONSULTATION REPORT ON THE ISSUES TO BE CONSIDERED IN THE ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY DECEMBER 2013 EXECUTIVE SUMMARY 1. PROJECT BACKGROUND
More informationWelcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010
Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010 Objectives of Open House: Introduce Wainfleet Wind Energy Inc. and IPC Energy. Present an overview of Wainfleet Wind
More informationEnvironmental Assessment Approval
presented in the Registration Document. dispose of this Approval without the written consent of the Minister. The sale of a controlling interest of a business or a transfer of an approval following conditions
More informationF3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
F3. Final Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Air Quality & Odour Net Effects Analysis
More informationAPPENDIX C. Public Consultation Centre (PCC) Displays. Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3
APPENDIX C Public Consultation Centre (PCC) Displays Appendix C1 PCC#1 Appendix C2 PCC#2 Appendix C3 PCC#3 Appendix C1 PCC#1 Appendix C2 PCC#2 Township of Red Rock Class Environmental
More informationFactor Potential Effects Mitigation Measures
Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table
More informationDETROIT RIVER INTERNATIONAL CROSSING ENVIRONMENTAL ASSESSMENT. Armanda Street Residents Meeting. May 10 th, Meeting Outline
DETROIT RIVER INTERNATIONAL CROSSING ENVIRONMENTAL ASSESSMENT Armanda Street Residents Meeting May 10 th, 2006 1 Meeting Outline 1. Project Status 2. Generation and Assessment of Practical Alternatives
More informationC&B Alberta Solar Development ULC
Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017
More informationDraft Supplemental Environmental Impact Statement
Draft Supplemental Environmental Impact Statement December 2013 City of Seattle Department of Transportation 700 Fifth Avenue, Suite 3900 Seattle, WA 98124 TABLE OF CONTENTS Elliott Bay Seawall Project
More informationPNNL Darlington Nuclear Power Plant Project Review of Ontario Power Generation s Assessment of Cooling Towers for Condenser Cooling
PNNL-20206 Darlington Nuclear Power Plant Project Review of Ontario Power Generation s Assessment of Cooling Towers for Condenser Cooling February 2011 PNNL-20206 Darlington Nuclear Power Plant Project
More informationSantoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.
Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION
More informationWelcome. Welcome to our Open House for the. Kent Hills Wind Farm Expansion
Welcome Welcome to our Open House for the Kent Hills Wind Farm Expansion Please visit our displays providing information on this proposed expansion to New Brunswick s first wind farm. We have staff available
More informationV: PROJECT SCOPING & METHODOLOGY
V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities
More informationTechnical Guidance Document for Operational Environmental Management Plan (OEMP)
Technical Guidance Document for Operational Environmental Management Plan (OEMP) EAD-EQ-PCE-TG-06 Signature on Original Environment Quality Sector * Corporate Management Representative Secretary General
More informationCity of Mississauga Environmental Impact Studies Terms of Reference 2002
City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationChapter 4 Cumulative Effects
Chapter 4 This chapter reevaluates the likely level of cumulative effects to which the Elliott Bay Seawall Project could contribute, given the proposed changes to the project, and determines whether these
More information4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT
4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required
More information