Penn National Gaming Selects Daikin McQuay RoofPak and Magnitude HVAC Systems for LEED Certification

Size: px
Start display at page:

Download "Penn National Gaming Selects Daikin McQuay RoofPak and Magnitude HVAC Systems for LEED Certification"

Transcription

1 CASE STUDY Casino Facility at a Glance Name & Location Hollywood Casino Toledo, OH Owner Penn National Gaming Inc. Building & Size Main gaming - 177,000 ft 2 Lower service - 167,000 ft 2 Issue Increase HVAC energy efficiencies for a large facility Penn National Gaming Selects Daikin McQuay RoofPak and Magnitude HVAC Systems for LEED Certification Solution (21) Daikin McQuay RoofPak systems with energy recovery (3) Daikin McQuay Magnitude centrifugal chiller systems Result LEED silver certification pending Daikin McQuay HVAC systems contribute to significantly greater energy performance than conventional cooling systems The ability to provide savings in energy costs and meet a fast-track construction schedule were critical factors in the selection of Daikin McQuay HVAC equipment for Penn National Gaming s Hollywood Casino in Toledo, Ohio. The HVAC equipment contributes significantly to the casino, which is expected to earn the U.S. Green Building Council s Leadership in Energy and Environmental Design (LEED ) New Construction (NC) certification at the Silver level. Final Cut restaurant - one of five restaurants within the casino, including a sports bar and an entertainment lounge

2 A Unique Set of Challenges for Casinos Every casino combines a variety of building uses under one roof. These include kitchens, offices, entertainment venues, restaurants and lounges, as well as surveillance areas. Significant planning goes into the code-intensive environment of casino design which must meet strict safety requirements for items such as sophisticated fire systems. Each facility inherently brings a unique set of challenges and technical requirements. PNG s Hollywood Casino - situated on 44-acres and second of only a few planned for Ohio PNG Casino LEED Certification One of Few Wyomissing, Pennsylvania-based Penn National Gaming Inc., the nation s third-largest gaming company, owns many gaming and racing facilities with a focus on slot machine entertainment. The building of the Hollywood Casino, which opened to the public on May 29, 2012, was a high-profile project given its distinction as the second of only a few planned casinos in the state and its unique status as an expected LEED-certified casino, one of only a few in the United States. We worked closely with the Northwestern Ohio Building and Construction Trades Council on the project. When they presented to us the challenges and benefits of making this a LEED project, we dedicated our resources to learn more about LEED, says John Rauen, vice president of Development at Penn National Gaming. As a result of the LEED endeavor, we re turning over a highly efficient building to our operators which will benefit them for years to come. John Rauen, v.p. of Development Penn National Gaming Penn National Gaming quickly saw the benefits of undertaking the LEED certification process in terms of how a sustainable building benefits the environment as well as energy savings. We engaged the right people and put together the right plan. As a result of the LEED endeavor, we re turning over a highly efficient building to our operators which will benefit them for years to come, Rauen says, noting Toledo Gaming Ventures LLC, the company s wholly-owned subsidiary, operates the facility.

3 The Hollywood Building at a Glance The main casino level spans 177,000 sq. ft. and includes 2,000 slots, 60 table games and a 20-table poker room in the gaming area, in addition to 5 restaurants which include a sports bar and an entertainment lounge. The lower service level, at 167,000 sq. ft. includes administration, employee areas, and a 276-space valet parking garage. In addition, a five-level parking deck, adjacent to the facility, contains 2,450 parking spaces. The casino features 21 Daikin McQuay rooftop air handler units and three single-compressor centrifugal chillers which provide heating and cooling for the entire building and support the facility s sustainable design. Other energy-saving design features of the facility include high efficiency pumps, boilers, a building automated control system, variable speed heat pumps, and significant use of LED lighting. In addition, between 85 and 90 percent of cement, drywall, wood, cardboard, and steel were made from recycled material. All of these elements support the building s LEED certification. The Building Team Facilities Manager - Don Rahman, PNG, Wyomissing, PA MEP & Structural Contractor - GEM Inc., Walbridge, OH General Contractor - Rudolph/Libbe Inc. Walbridge OH Mech./Controls Eng. - Concord Atlantic Engineers Inc., Pleasantville, NJ Plumbing/Elect. Eng. - Kuhlman Design Group Inc. St. Louis, MO LEED Consultant - The Collaborative Inc. Toledo, OH Architect - Urban Design Group, Atlanta, GA Rooftops/Chillers Supplier - Daikin McQuay Minneapolis, MN Equipment Reps. - TriState HVAC Equip., West Conshocken, PA & Wadsworth Slawson Northwest, Perrysburg, OH 21 Daikin McQuay RoofPak rooftop air handling units incorporating energy recovery wheels provide air to 344,000 sq. feet of space Urban Design Group provided architectural services on the project and has worked with Penn National Gaming on a number of facilities. The architectural firm called in the services of Concord Atlantic Engineers, Inc. (CAE) for the mechanical engineering design of the new facility. CAE recommended use of Daikin McQuay HVAC equipment based on its energy-saving features and past performance on other projects with Penn National Gaming. We have a comfort level with McQuay based on other projects we ve done and their ability to meet fast-track construction schedules goes hand in hand with that, says Anthony Caucci, P.E., vice president/director of mechanical engineering at CAE in West Atlantic City, New Jersey. GEM Inc. provided the mechanical and electrical installation work on the HVAC systems, and building plumbing and electrical which included lighting and low-voltage systems. In addition, GEM Inc. erected more than 1,600 tons of structural steel as well as the decorative steel used in the building. All firms credit assistance by TriState HVAC Equipment, as the main HVAC representative in overseeing the specification, procurement details, and logistics of the Daikin McQuay equipment for the building. We have a comfort level with McQuay based on other projects we ve done and their ability to meet fast-track construction schedules goes hand in hand with that. Anthony Caucci, P.E., v.p./director of Mech. Eng. Concord Atlantic Engineers

4 McQuay and its representatives were a very big help because we had to get specifications for the HVAC units in line very quickly, says Matt Mitchell, LEED AP BD+C, and project manager with Urban Design Group in Atlanta, noting, CAE spent a lot of time with McQuay representatives to get the details and work through them. Getting the McQuay rooftop units manufactured and shipped was completed in one of the fastest timeframes of the whole project. Mitchell says collaboration was essential to complete the project successfully. There wasn t time to make decisions without everyone s input and buy-in which necessitated group decisions. It wouldn t have worked to make individual decisions and then find out later equipment had to be modified. The casino is conveniently located off of I-75 on the banks of the Maumee River and is situated on a brownfield site. Architects and engineers had the complicated task of determining the location of the building on the 44-acre site while meeting all environmental requirements, says Dan Stark, P.E., project manager, with GEM Inc., in Walbridge, Ohio. Digging only 10 feet into the existing ground was one such requirement. McQuay and its representatives were a very big help because we had to get specifications for the HVAC units in line very quickly... Matt Mitchell, project mgr., Urban Design Group Ground was broken for the project in August 2010 and construction was completed in mid-march 2012 three weeks earlier than the targeted completion date. While not considered an official design/build or design/assist delivery method, construction of the casino progressed rapidly, despite record snowfalls in the winter of 2010/2011. Stark notes construction caught up with the design during the early construction phase of pile driving We had to make sure the areas we worked on next were completed from the engineering design perspective and ready to install before we worked on it, he says. In total, some 94 contracting firms were hired for the project, which included more than 2,100 union tradespeople. Situated close to the river and meeting environmental requirements on a brownfield site presented additional challenges for the casino s construction HVAC Configuration The HVAC design includes the Daikin McQuay rooftop air handlers and water-cooled chillers, cooling towers and pumps, all which significantly contribute to the energy savings. The McQuay rooftop units and the McQuay variable-speed chillers heavily offset the large energy consumption of a casino, Caucci says. The three chillers are housed in a separate steel-enclosed packaged chiller plant with cooling towers, located adjacent to the building. The main HVAC systems use a four-pipe system with Daikin McQuay variable-air-volume (VAV) rooftop air handler units that have total energy recovery wheels. The 21 rooftop units are situated on the roof of the casino building. In addition, 276 VAV boxes, located in the building ductwork, control individual thermostatic-controlled HVAC zones within the building. The VAV boxes contribute to the LEED requirement to control air flow, Stark says. Two separate boiler rooms one in the mechanical mezzanine level and one at the service level contain a total of four boilers. We did a supply air temperature reset on the McQuay rooftop units to save on piping and boiler usage. The system uses gas heat in the rooftop units to an advantage on the casino floor, Caucci says, adding, Of course most rooftop air handling-units have a supply-air reset, but we programmed additional logic in the system to warm air up in lieu of reheat coils on the large gaming floor. Some of the perimeter zone VAV boxes have reheat coils to ensure heating if the main units deliver cold air.

5 A Daikin McQuay RoofPak unit is rigged and lifted off a delivery truck for placement on the casino s rooftop HVAC Installation The 21 Daikin McQuay rooftop units were installed on a just-in-time, staged basis over a three-week period in June A large crane was mobilized in three areas to lift the rooftop units in three batches onto the building. The delivery of the units were all coordinated to minimize costs. We lifted the units off the trucks from three different pick points. Each week, the crane had to be moved and reassembled in each area, Stark says. The enclosed chiller plant was also assembled on a justin-time basis as equipment and materials were delivered in the fall of Teams put together the pre-fabricated building in sections with each of the three chillers in its own packaged chiller plant, Stark says. The cooling towers are situated on top of the water-cooled chiller plants in a single structure, which was assembled within two weeks. of the casino, says John H. Melville, Daikin McQuay representative with TriState HVAC Equipment, in West Conshohocken, Pennsylvania. The rooftop air handlers and chillers, as well as all other HVAC equipment such as the cooling towers and pumps, were easily integrated with the casino s Metasys building automation system (BAS) by Johnson Controls using BACnet open standard protocol. The Daikin McQuay HVAC equipment features unit controllers with the Open Choices feature that is compliant with all standard BAS communication protocols. GEM Inc. oversaw the LEED-required flush-out and commissioning of the HVAC system, which was done on a staged basis. The service level/back-of-the-house flushout occurred in November 2011 and the gaming level in April One of the selling features that makes the McQuay equipment attractive for Penn National Gaming is its seamless integration with the building automation system A Daikin McQuay pre-fabricated modular central plant (MCP) complete with cooling tower and Magnitude chiller system

6 Significant LEED Contributor Adds Melville: The energy recovery wheels in the McQuay rooftop units are big contributors to the lowered energy consumption of the HVAC equipment compared to conventional systems. The rotating energy recovery wheels, built into each rooftop air handling system, draw outside air across one-half of the wheel while drawing exhaust air across the other half., This process transfers sensible and latent energy between the ventilation and exhaust air, allowing heat to be recovered during the winter months and allowing for free cooling during the summer months. The energy recovery wheels in the McQuay rooftop units are big contributors to the lowered energy consumption of the HVAC equipment compared to conventional systems. John Melville, Tri-State HVAC Equipment Energy modeling and analysis by CAE calculated a percent energy savings in electricity and gas consumption above the ASHRAE baseline for the entire facility including the site. The ASHRAE energy model uses historical weather data for Toledo and factors all aspects of the facility such as insulation, roofing, lighting, interior loads, and mechanical equipment, Caucci says. To this end, LEED Silver NC certification of the facility is expected after the building has been in operation one year. CAE is overseeing rebates from the local utility company on behalf of Penn National Gaming, expected to total over $100,000 for equipment purchases which include the Daikin McQuay chillers with variable frequency drives (VFD), chiller pumps, and fans. % HVAC Energy Savings Across Overall Facility Savings Daikin McQuay rooftop units and chillers: 18.4% Cooling towers 5% Pumps 5.3% Total HVAC energy savings 28.7% Energy recovery wheels in the Daikin McQuay RoofPak units contributed significantly to the building s energy savings Energy analysis by CAE also found the cooling equipment the Daikin McQuay rooftop units and chillers contributed 18.4 percent of the overall energy savings of the facility. The heat rejection equipment, or cooling towers, contributed 5 percent and the pumps contributed 5.3 percent. Other energy-saving elements include lighting, domestic water heaters, boilers, insulation and construction materials, Caucci says. Daikin McQuay has supplied HVAC equipment involving several Penn National Gaming properties. Recent projects include the Hollywood Casino in Perryville, Maryland and the Hollywood Casino in Joliet, Illinois, which includes a 100-room hotel and casino in a land-side pavilion in addition to a barge-based casino. In Perryville, which opened in 2010, Daikin McQuay supplied nine RoofPak units and 10 Maverick packaged heating and cooling rooftop units. Daikin McQuay supplied eight RoofPak units and 10 Maverick packaged heating and cooling rooftop units for the Joliet land-based facility which was rebuilt and opened in Skylights adorn a grand drive-up entrance at Hollywood Casino 2012 McQuay International The following are tradenames or registered trademarks of their respective companies: BACnet from ASHRAE; Alerton Controls; and MicroTech, OpenChoices, RoofPak, Magnitude from Daikin McQuay 2F 4086 (07/12)

EnergyPro Building Energy Analysis. Single-story School Building

EnergyPro Building Energy Analysis. Single-story School Building EnergyPro Building Energy Analysis Single-story School Building EnergyPro Building Energy Analysis for a single-story school bulding Project Scope The purpose of the EnergyPro energy model was to evaluate

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

EnergyPro Building Energy Analysis. Nine-story Office Building

EnergyPro Building Energy Analysis. Nine-story Office Building EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy

More information

Grunenwald Science and Technology Building

Grunenwald Science and Technology Building Grunenwald Science and Technology Building Clarion University- Clarion, PA AE 482 Mechanical Project Proposal: Proposal for Alternative Designs Shane Helm The Pennsylvania State University Architectural

More information

GATES-HILLMAN CENTERS

GATES-HILLMAN CENTERS GATES-HILLMAN CENTERS CARNEGIE MELLON UNIVERSITY CASE STUDY ENERGY EFFICIENCY CARNEGIE MELLON UNIVERSITY Carnegie Mellon University looked to SEMCO to provide solutions for their energy efficiency goals.

More information

Mechanical Systems Project Proposal

Mechanical Systems Project Proposal Mechanical Systems Project Proposal December 15, 2006 Table of Contents 1.0 Executive Summary... 2 2.0 Building Background... 3 3.0 Proposal Objectives... 5 4.0 Initial Considerations... 6 5.0 Proposed

More information

Applying Geothermal Technology for Large Scale Projects

Applying Geothermal Technology for Large Scale Projects Jeff Urlaub, PE MEP Associates, LLC jeffu@mepassociats.com 715.832.5680 Engineering Future Focused Solutions Applying Geothermal Technology for Large Scale Projects Breakout Session Category (e.g. Residential)

More information

Georgetown University New Science Center

Georgetown University New Science Center Georgetown University New Science Center Final Thesis Proposal PENN STATE UNIVERSITY Prepared For: Dr. William P. Bahnfleth Department of Architectural Engineering Prepared By: Kevin M Edstrom Mechanical

More information

Thesis Proposal for Berks Classroom and Lab Building

Thesis Proposal for Berks Classroom and Lab Building Thesis Proposal for Berks Classroom and Lab Building Berks Classroom and Lab Building Berks Campus Reading, PA Authored by Julia Broskey Mechanical Option Prepared for Dr. William P. Bahnfleth PE 11 January

More information

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT ENERGY AND ENVIRONMENT The University has committed to approaching new building construction and major renovations with an emphasis on Life Cycle Cost (LCC). Part of this approach is a focus on maximizing

More information

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat VRF System) (* Source: http://kr.lgeaircon.com/) Commercial Air-Conditioning Engineering Study ES-MultiVWaterIV_EnergyAnalysis-08-14

More information

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Residential-Building Energy-Modeling Engineering Study VRF-ES-BH-001-US 012E03 Executive Summary Contents

More information

AE 481W Thesis Proposal

AE 481W Thesis Proposal AE 481W Thesis Proposal I I Advisor: Dr. Treado UNIVERSITY OF CALIFORNIA SAN DIEGO RADY SCHOOL OF MANAGEMENT LA JOLLA, CA TABLE OF CONTENTS Executive Summary.3 Mechanical System Overview..4 Design Objectives,

More information

how to read an energy model

how to read an energy model how to read an energy model Kohler Ronan, LLC is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported

More information

ENGINEERING. Edition No. 20 April 2004

ENGINEERING. Edition No. 20 April 2004 Edition No. 20 April 2004 ENGINEERING S Y S T E M S O L U T I O N S T his is the first in a series of Engineering System Solutions issues devoted to applying HVAC technology in Green Buildings and maximizing

More information

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel  Mechanical Option EADQUARTERS 707 N. Calvert St. Mechanical System Renovation Construction Management & Lighting/Electrical Breadths Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT AND MANAGER that offers comprehensive management throughout the project, from concept to completion, yielding the greatest possible benefit to the owner. IPS will offer uncolored

More information

Gerald R. Ford Museum

Gerald R. Ford Museum Gerald R. Ford Museum Grand Rapids, Michigan Executive Summary Building and Plant Energy Analysis Report: Part I Brendan J. Cullen The Pennsylvania State University AE Senior Thesis Mechanical Option September

More information

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering LEED Commissioning and Actual Energy Use John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering AIA Quality Assurance Learning Objectives 1. Why Best Practice and Fundamental Commissioning are

More information

Energy Strategies That Work Case Studies

Energy Strategies That Work Case Studies Energy Strategies That Work Case Studies Jean Ascoli, Architect, CEM, Program Director for New Construction Smart Energy Design Assistance Center University of Illinois, Urbana Champaign of Homeland Security

More information

Building Energy Efficiency Analysis for a High School

Building Energy Efficiency Analysis for a High School Building Energy Efficiency Analysis for a High School (LG Multi V III VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BH-002-US 013A30 Executive Summary Contents Executive Summary...2

More information

Building Energy Efficiency Analysis for a High School

Building Energy Efficiency Analysis for a High School Building Energy Efficiency Analysis for a High School (LG Multi V Water II VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BF-002-US 013A16 Contents Executive Summary...3 Introduction...4

More information

Hotels: Water and Energy

Hotels: Water and Energy Hotels: Water and Energy Agenda 01 Introduction 05 Hotel System Options 02 Company Overview 06 Hotel Energy Conservation 03 Hotel Energy & Water Use 07 Hotel Project Examples 04 Design Philosophy Introduction

More information

Sound HVAC Choices for Sustainable Design. Julian de Bullet

Sound HVAC Choices for Sustainable Design. Julian de Bullet PLEASE MUTE CELL PHONES Sound HVAC Choices for Sustainable Design Julian de Bullet Director of Industry Relations McQuay International ASHRAE Distinguished Lecturer 703-395-5054 1 2 Rising?? What Is Sustainability?

More information

TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify,

TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial

More information

Geothermal Systems. The Good, The Bad, and The Ugly. Presentation by. John Bender, P.E. MWSK Geothermal Inc.

Geothermal Systems. The Good, The Bad, and The Ugly. Presentation by. John Bender, P.E. MWSK Geothermal Inc. The Good, The Bad, and The Ugly Presentation by John Bender, P.E. MWSK Geothermal Inc. Growing market for MEP firms Equipment vendors Used on my LEED projects Energy Savings Sustainability Reduces Carbon

More information

Energy Modeling for LEED Using ASHRAE/ANSI Appendix G CENTRAL PENNSYLVANIA CHAPTER OF ASHRAE March 31, 2011

Energy Modeling for LEED Using ASHRAE/ANSI Appendix G CENTRAL PENNSYLVANIA CHAPTER OF ASHRAE March 31, 2011 Energy Modeling for LEED Using ASHRAE/ANSI 90.1-2004 Appendix G CENTRAL PENNSYLVANIA CHAPTER OF ASHRAE March 31, 2011 Presented by Cam Fitzgerald, Energy Opportunities, Inc., a 7group company Copyright

More information

Redland Tech Center Rockville, MD. Shawn Pepple Construction Management April 14, 2009

Redland Tech Center Rockville, MD. Shawn Pepple Construction Management April 14, 2009 Rockville, MD Redland Tech Center Project Overview Two office buildings with stand alone parking garage Building II: 9 levels; 210,240 SF Building III: 6 levels; 136,430 SF Parking Garage: 6 levels; 310,600

More information

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the

More information

White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO ENERGY BUILDINGS

White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO ENERGY BUILDINGS BOULDER CHICAGO NASHVILLE SALT LAKE CITY SAN FRANCISCO SPRINGFIELD, MO WASHINGTON, DC 2540 Frontier Avenue, Suite 100 Boulder, Colorado 80301 303.444.4149 White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO

More information

MASSEY HOFFMAN ARCHITECTS

MASSEY HOFFMAN ARCHITECTS Green is Simply Good Practice How Good Design Strategies and Construction Practices can Achieve a LEED for Homes Certification Often it seems that the motivation for building green comes from the desire

More information

SUSTAINABILITY An Energy & Emissions Case Study

SUSTAINABILITY An Energy & Emissions Case Study SUSTAINABILITY An Energy & Emissions Case Study 1 Energy & Emissions Case Study WASHINGTON UNIVERSITY IN ST. LOUIS has a history of responsibly investing resources to increase the efficiency of our operations

More information

Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain

Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain Brian D. Kelley, RA David J. Meyer, PE, LEED AP BD+C David R. Norton Best Practices The Eastern Regional Association

More information

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program COMMERCIAL LOAD ESTIMATING Load Estimating Level 3: Block and Zone Loads Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design,

More information

David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal

David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Proposal David H. Koch Institute for Integrative Cancer Research Massachusetts Institute of Technology Cambridge,

More information

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Address 666 Burrard St, Vancouver Management QuadReal Property Group Type of Building Office Year of Construction 1984 Number

More information

Rebel commercial packaged rooftop systems

Rebel commercial packaged rooftop systems Rebel commercial packaged rooftop systems Advanced technologies propel performance and energy savings to uncommon levels 3-28 tons Capitalize with 43% more energy savings If you are a commercial building

More information

Rebel commercial packaged rooftop systems

Rebel commercial packaged rooftop systems Rebel commercial packaged rooftop systems Advanced technologies propel performance and energy savings to uncommon levels 3-28 tons Rebel features and benefits 18 13 6 5 3 6 4 43% Energy Savings 5 11 12

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

What s My Baseline? ASHRAE

What s My Baseline? ASHRAE 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116,part 2). For personal use only. Additional reproduction,

More information

AVOIDING 2015 MINNESOTA ENERGY CODE VIOLATIONS

AVOIDING 2015 MINNESOTA ENERGY CODE VIOLATIONS AVOIDING 2015 MINNESOTA ENERGY CODE VIOLATIONS Commercial Energy Codes Support Program Pilot Russ Landry, PE, LEED AP Megan Hoye, LEED AP Pilot Program Support This project is supported by a grant from

More information

AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER. MICHAEL HALLENBECK, PE, CEM Southland Industries

AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER. MICHAEL HALLENBECK, PE, CEM Southland Industries AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER MICHAEL HALLENBECK, PE, CEM Southland Industries BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY

More information

University of Minnesota Duluth Civil Engineering Building

University of Minnesota Duluth Civil Engineering Building Energy Data Attachment University of Minnesota Duluth Civil Engineering Building LEED Energy Modeling The energy modeling for LEED NC 2.2 was performed against ASHRAE 9.1-24 Appendix using equest version

More information

AXA Headquarters Case Study

AXA Headquarters Case Study AXA Headquarters Case Study THE CONCEPT PROMOTING SUSTAINABLE URBAN DEVELOPMENT IN THE HEART OF MILAN The new 19.000 m 2 development, now under construction in Milan, is a refurbishment of an existing

More information

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits

Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits AEP Ohio Customer Seminar Implementing Low-Cost Energy Savings Projects & Conducting Energy Audits Presented by: Julie Birchfield Customer Manager Energy Optimizers, USA May, 2018 Test your Energy IQ 11

More information

The New Student Housing Building at The Mount St. Mary s s University Emmitsburg,, Maryland

The New Student Housing Building at The Mount St. Mary s s University Emmitsburg,, Maryland The New Student Housing Building at The Mount St. Mary s s University Emmitsburg,, Maryland Erik Shearer Mechanical Presentation Outline Project Background Current Mechanical Systems Mechanical Alternatives

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

GREEN BUILDINGS Innovative Urban Solutions

GREEN BUILDINGS Innovative Urban Solutions GREEN BUILDINGS Innovative Urban Solutions Tysons Sustainability Summit 9 th Annual DCS GreenWeek Presented by: Kevin D. Cahill, PE, CPD, LEED AP June 12, 2015 [ LEED 15 NET-ZERO Gold ] in design 129

More information

Mechanical Systems Proposal

Mechanical Systems Proposal Mechanical Systems Proposal Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option December

More information

SENIOR THESIS FINAL PROPOSAL

SENIOR THESIS FINAL PROPOSAL Submitted 12/10/2010 Construction Management Advisor: Dr. Robert Leicht [The following report presents a detailed overview of the research topics to be done on the Office Renovation Building. A series

More information

Thesis Proposal. Freetown Elementary School

Thesis Proposal. Freetown Elementary School Thesis Proposal Freetown Elementary School Glen Burnie, MD Matthew R. Buda The Pennsylvania State University Architectural Engineering Mechanical Option Advisor: Dr. Treado Table of Contents Executive

More information

AAON. Energy and Economics

AAON. Energy and Economics Energy and Economics AAON Analysis Program AAON Energy and Economics Analysis Program The AAON Energy and Economics Analysis Program (AAON EEAP) is a tool for AAON sales representatives, consulting engineers,

More information

Design Standard Sustainability

Design Standard Sustainability Design Standard Sustainability Purpose Educational institutions have the ability to influence the ideals and principles of our future decision makers; as such, East Side Union High School District (ESUHSD)

More information

Better By Design Energy Efficiency in Needham s Public Construction Projects

Better By Design Energy Efficiency in Needham s Public Construction Projects Better By Design Energy Efficiency in Needham s Public Construction Projects Green Needham Monday, November 26 th, 2012 7:00PM Needham Public Library Energy Efficiency in Town Projects Presenters tonight

More information

Mechanical Product Overview

Mechanical Product Overview Mechanical Product Overview The founding principles of Price have never changed business integrity, first class service, innovation and a commitment to people. PURPOSE BUILT FOR YOUR APPLICATION Whether

More information

EMD SERONO RESEARCH CENTER EXISTING

EMD SERONO RESEARCH CENTER EXISTING EMD SERONO RESEARCH CENTER EXISTING BILLERICA, MA SHIYUN (SHARON) CHEN MECHANICAL AE SENIOR THESIS Building System Dedicated Outdoor Air System/ Systems Breadth Building Design Team Building: EMD Serono

More information

Technical Report 2: Building and Plant Energy Analysis

Technical Report 2: Building and Plant Energy Analysis Technical Report 2: Building and Plant Energy Analysis Berks Classroom and Lab Building Berks Campus Reading, PA Authored by Julia Broskey Mechanical Option Prepared for Dr. William P. Bahnfleth PE Contents

More information

Save with Business Programs and Services

Save with Business Programs and Services Business Programs and Services Change the current way you use energy and make your bill even lower. Save with Business Programs and Services Learn about energy-saving programs, services and rebates available

More information

Submitted to. Texas A&M University - Kingsville The Texas A&M University System. Submitted by. Yeqiao Zhu John Bryant Dan Turner David Claridge

Submitted to. Texas A&M University - Kingsville The Texas A&M University System. Submitted by. Yeqiao Zhu John Bryant Dan Turner David Claridge ESL-TR-99/12-07 Report of Energy Efficiency Study and Metering/Utilities Profile for Electricity Deregulation at the Texas A&M University - Kingsville (TAMU-K) Kingsville, Texas Submitted to Texas A&M

More information

Thesis Proposal. 201 Rouse Boulevard. The Navy Yard Philadelphia, PA 19112

Thesis Proposal. 201 Rouse Boulevard. The Navy Yard Philadelphia, PA 19112 201 Rouse Boulevard January 17, 2013 1 of 14 Thesis Proposal 201 Rouse Boulevard The Navy Yard Philadelphia, PA 19112 201 Rouse Boulevard January 17, 2013 2 of 14 Table of Contents Executive Summary Building

More information

Variable Frequency Drives

Variable Frequency Drives 10 Energy According to the U.S. Department of Energy, buildings use 39% of the energy and 74% of the electricity produced each year in the United States. The Energy & Atmosphere category encourages a wide

More information

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP AIA Quality Assurance

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario

The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario Visionwall Technologies Inc. 14904-123 Avenue Edmonton, Alberta, Canada T5V 1B4 Tel: 403 451 4000 Fax:

More information

NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency. August 21, 2013

NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency. August 21, 2013 NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency August 21, 2013 0 Moderator Jim Huber, NEBB Vice President and President of Complete Commissioning Jim Huber is the President of Complete

More information

SMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses

SMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses SMART HVAC & LIGHTING SYSTEMS Savings From Two Major C&I End Uses September 21, 2016 PRESENTATION OVERVIEW Why this focus? Significant savings potential Smart controls coupled with more efficient technologies

More information

EBCx of the Connecticut Convention Center Complex

EBCx of the Connecticut Convention Center Complex EBCx of the Connecticut Convention Center Complex Presentation and Panel Discussion David Vallerie, Principal, Strategic Building Solutions May 20, 2014 AIA Quality Assurance The Building Commissioning

More information

1. How the research adds to the understanding of the area investigated

1. How the research adds to the understanding of the area investigated Final Scientific/Technical Report Project Title: CID #: Recipient: Eagan Civic Arena DE-EE0002807 Cherryl Mesko City of Eagan Minnesota 3830 Pilot Knob Road Eagan, MN 55122 cmesko@cityofeagan.com 651-675-5505

More information

IFMA Central Pennsylvania Chapter August 20, 2014

IFMA Central Pennsylvania Chapter August 20, 2014 IFMA Central Pennsylvania Chapter August 20, 2014 Facility Managers Roundtable: Sustainability Practices Alan Brunner, Project Manager for the Financer Department, PSECU Michele Sinadinos, Facility Manager,

More information

Gaige. Thesis Project Proposal. The. December 13 th, 2013 Matthew Neal, Mechanical Option Stephan Treado, Advisor. Proposed System Changes

Gaige. Thesis Project Proposal. The. December 13 th, 2013 Matthew Neal, Mechanical Option Stephan Treado, Advisor. Proposed System Changes The Gaige Technology and Business Innovation Building Penn State Berks, Reading PA Thesis Project Proposal Proposed System Changes Stephan Treado, Advisor Table of Contents Executive Summary... 2 Building

More information

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation 2900 Fairview Park Drive, Prepared By: Charles Haack Mechancial Option November 21, 2008 Prepared For: Dr. William P.

More information

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information LEED-CS 2. Certification Submittal Template OPTION 1: PERFORMANCE RATING METHOD I confirm that the energy simulation software used for this project has all capabilities described in EITHER section `G2

More information

Mechanical Project Proposal. Indoor Multi-Sport Facility. At Pennsylvania State University

Mechanical Project Proposal. Indoor Multi-Sport Facility. At Pennsylvania State University At Pennsylvania State University Christopher Van Campen December 05, 2002 Executive summary The proposed thesis is to alleviate the of its only major problem, not enough seating capacity for the spectators

More information

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard Wei Feng, Ke Huang, Mark Levine and Nan Zhou, Lawrence Berkeley National Laboratory Shicong Zhang, Lawrence Berkeley

More information

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM INCENTIVE ESTIMATOR HVAC USER GUIDE FLORIDA CUSTOM INCENTIVE PROGRAM CONTENTS 1. Getting Started... 2 2. Measure Tool Description... 3 2.1. Appropriate Use of the Tool... 3 2.2. Applicable Types of Air

More information

4043 N. Ravenswood Suite 207 Chicago, IL

4043 N. Ravenswood Suite 207 Chicago, IL Green is Simply Good Practice A Demonstration of How Good Design Strategies and Construction Practices Can Achieve a LEED for Homes Certification Often it seems that the motivation for being green comes

More information

Cold gold June 09

Cold gold June 09 Cold gold The Sports & Exhibition Authority of Pittsburgh and Allegheny County is hoping to have its new multipurpose arena, which will be home to the city s NHL franchise, certified as a LEED Gold building.

More information

Children s Hospital of Pittsburgh s Clinical Services Building Pittsburgh, PA

Children s Hospital of Pittsburgh s Clinical Services Building Pittsburgh, PA PLEASE SILENCE ALL CELL PHONES! Children s Hospital of Pittsburgh s Clinical Services Building Pittsburgh, PA PLEASE SILENCE ALL CELL PHONES! THANK YOU! THANK YOU! Final Thesis Presentation Gloria Brashear

More information

Planning for Biomed Facility Puts Energy Efficiency Under Microscope

Planning for Biomed Facility Puts Energy Efficiency Under Microscope Planning for Biomed Facility Puts Energy Efficiency Under Microscope Chilled beams, runaround-loop ERV system included May 19, 2014 By DAN VASTYAN, Common Ground, Manheim, Pa. HPAC Engineering Constructing

More information

NAHB s Recommendations on Critical 2015 ICC Code Change Proposals

NAHB s Recommendations on Critical 2015 ICC Code Change Proposals NAHB s Recommendations on Critical 2015 ICC Code Change Proposals NAHB is urging our members to get involved locally in the ICC code development process and schedule a meeting with your state and local

More information

Section 2: Estimating Energy Savings and Incentives

Section 2: Estimating Energy Savings and Incentives Section 2: Estimating Energy and Incentives 2.1 Estimating Energy and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 4 2.2.2 AC&R I - Split/Packaged

More information

Energy Reduction Strategy Through 2020

Energy Reduction Strategy Through 2020 Through 2020 Revised: August 2017 Executive Summary Auburn University is a land, sea and space grant university established in 1856. The university consists of 11,629,000 square feet on 1,840 acres and

More information

Chapter 4. Analysis of Building Energy Performance

Chapter 4. Analysis of Building Energy Performance Chapter 4 Analysis of Building Energy Performance 128 4.1 Introduction This chapter deals with energy modeling and simulation of the baseline models for the buildings to assess energy performance of the

More information

Thesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin

Thesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin Thesis Proposal Photo by Fred Martin Clemson University Advanced Material Research Laboratory Anderson, SC David Anderson Mechanical Option Friday, December 15, 2006 Table of Contents 1. Executive Summary

More information

Technical Assignment 1

Technical Assignment 1 Dan Baker Construction Management Faculty Advisor: Dr. Riley Bed Bath & Beyond/ Christmas Tree Shops 300 Ikea Drive Paramus, New Jersey Technical Assignment 1 Table of Contents A. Site Plans and Vicinity

More information

Project Proposal Proposal for Investigation of Alternative Systems

Project Proposal Proposal for Investigation of Alternative Systems Project Proposal Proposal for Investigation of Alternative Systems 01.15.2010 Defense Media Activity Building Fort George G. Meade Penn State University Architectural Engineering Faculty Advisor: Dr. Treado

More information

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion Mechanical Systems Redesign Proposal Thesis Proposal Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth December 12, 2014 Revised: January 16, 2015 Revised:

More information

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies.

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies. Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs Valent is a business of Unison Comfort Technologies. When your HVAC system design calls for high-percentage or 100%

More information

Technical Development Program

Technical Development Program TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial

More information

Sugen Building 3 LEED-CI Pilot Project

Sugen Building 3 LEED-CI Pilot Project Sugen Building 3 LEED-CI Pilot Project Winner San Mateo County Sustainability Award 2006 SAMCEDA Award of Excellence, Environmental Action Category 2005 LEEDing Lab Completed in 2003, Sugen s Building

More information

Proposal: Mechanical System Redesign

Proposal: Mechanical System Redesign Proposal: Mechanical System Redesign The 959 Eighth Avenue 10019 Faculty Advisor: Dr. James Freihaut December 12, 2005 Table of Contents 1.0 Executive Summary 2.0 3.0 Proposal Obectives 4.0 Preliminary

More information

California State University, Sacramento February 24, 2010

California State University, Sacramento February 24, 2010 Leadership in Energy and Environmental Design (LEED) California State University, Sacramento February 24, 2010 Lower Operating Costs Reduce Energy Use Conserve Water Lower Maintenance Customer/Occupant

More information

THE KEMPER BUILDING 1 EAST WACKER DRIVE PHIL KEUHN SIEBEN ENERGY ASSOCIATES

THE KEMPER BUILDING 1 EAST WACKER DRIVE PHIL KEUHN SIEBEN ENERGY ASSOCIATES THE KEMPER BUILDING 1 EAST WACKER DRIVE BY PHIL KEUHN OF SIEBEN ENERGY ASSOCIATES CHAPTERfREGIONAL TECHNOLOGY A WARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable).,..(!)~8(}~lnerc[~i~~ii9in:~~).,...;;().

More information

Chilled Beams. The new system of choice?

Chilled Beams. The new system of choice? Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams

More information

Administration and Training Facility. Alberta Boilers Safety Association The pressure equipment safety authority

Administration and Training Facility. Alberta Boilers Safety Association The pressure equipment safety authority Administration and Training Facility Alberta Boilers Safety Association The pressure equipment safety authority Administration and Training Facility Alberta Boilers Safety Association The pressure equipment

More information

Coppin State University Physical Education Complex - Technical Report 2

Coppin State University Physical Education Complex - Technical Report 2 Coppin State University Physical Education Complex - Technical Report 2 Building and Plant Energy Analysis Report Kaylee M Damico Advisor: Dr. Jelena Srebric Location: Baltimore, MD Table of Contents Contents

More information

Energy Strategies That Work

Energy Strategies That Work Energy Strategies That Work Emmy Presenter s Riley, Building name Professional Energy Specialist Title (eg. architect/energy Illini Center specialist..) 10-10-12 Smart Energy Design Assistance Center (SEDAC),

More information

PACKARD HOUSE 2010 LEED-NC GOLD PENDING PROJECT HIGHLIGHTS

PACKARD HOUSE 2010 LEED-NC GOLD PENDING PROJECT HIGHLIGHTS PACKARD HOUSE 2010 LEED-NC GOLD PENDING PROJECT HIGHLIGHTS Urban infill on a previously developed site. The new building was built over an existing parking lot. Landscaping is composed of all native plants

More information

Modular Wood Framing Goes Vertical

Modular Wood Framing Goes Vertical Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported

More information

Commercial Building Envelope Air Leakage

Commercial Building Envelope Air Leakage Commercial Building Envelope Air Leakage Presented by: Matt Heron, P.E., Pie Consulting & Engineering Stu Reeve, Energy Manager, Poudre School District Kim DeVoe, Energy Services Engineer, Fort Collins

More information