1 1.0 INTRODUCTION 1.1 PROJECT DESCRIPTION Enbridge Gas Distribution Inc. ("Enbridge") is proposing to construct up to a total of approximately 37 kilometres (km) of natural gas pipelines at different nominal pipe sizes (NPS) and pressure systems, in the City of Kawartha Lakes (CKL), and the Township of Brock in the Regional Municipality of Durham (Durham Region), Ontario, to serve the Community of Fenelon Falls (the Project ). The proposed pipelines will be located within existing road allowances in the Study Areas and is expected to operate at a pressure up to 400 psi in some sections along the pipeline route and less than 20% of the specified minimum yield strength (SMYS). Two separate Study Areas were identified for the reinforcement pipeline and the distribution pipelines as depicted in Appendix A, Figure No. A-1. These segments and the proposed routes are described below: Segment 1: also known as the Sunderland Reinforcement Segment (RS) will consist of approximately 8 km of NPS 6-inch steel extra high pressure (XHP) pipeline. The proposed pipeline will originate near the intersection of Highway 7/12 and Regional Road 10/Brock Concession Road 6 in the Community of Sunderland. The pipeline will travel east along Brock Concession Road 6, north on Simcoe Street, east along Farmstead Road, and terminate at Station Road, southeast of the Hamlet of Manilla, where it ties into an existing Enbridge NPS 6- inch pipeline. The reinforcement pipeline will run parallel to Enbridge s existing NPS 4-inch pipeline. Segment 2: also known as the Distribution Pipeline to Fenelon Falls Segment (DPFF) will originate approximately 1.2 km north of the intersection of Highway 7 and Taylor's Road in Oakwood. The pipeline will run north along Taylor's Road, continue east along Quaker Road, north along Eden Road and then east along Cambray Road/County Road 9 to rejoin Highway 35. From this point the TPFF will travel north to the Community of Fenelon Falls. The pipeline will terminate near the intersection of Bond Street and Colborne Street/ County Road 121, for a total of approximately 29 km of a combination of NPS 6-inch and 4-inch extra high pressure (XHP) steel, and NPS 6-inch high pressure (HP) polyethylene natural gas pipeline. Enbridge retained Stantec Consulting Ltd. (Stantec) to undertake an environmental study of the construction and operation of the proposed natural gas pipelines. The environmental study included a route evaluation and selection process that was designed to identify the proposed route alternatives with the least potential environmental and socio-economic impact. 1.1

2 1.2 ENVIRONMENTAL STUDY Objectives A multidisciplinary team of environmental planners and scientists from Stantec conducted the environmental study. Enbridge provided environmental support and engineering expertise throughout the study, as required. The environmental study was undertaken in accordance with the Ontario Energy Board s (OEB) Environment al Guidelines for t he Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ont ario, 6t h Edition (OEB Environmental Guidelines) (2011). The study was also undertaken to meet the requirements of relevant federal and provincial environmental guidelines and regulations. The principal objective of the environmental study is to confirm a preferred route from an environmental and socio-economic perspective. Another objective of the environmental study is to outline various environmental mitigation and protection measures for the construction and operation of the Project, while meeting the intent of the OEB Environment al Guidelines (2011). To meet these objectives, the environmental study was prepared to: Undertake a route evaluation process. Confirm a preferred route that minimizes potential environmental impacts. Complete a detailed review of environmental and socio-economic features along the preferred route and assess the potential environmental impacts of the Project on these features. Establish mitigation and protective measures that may be used to minimize or eliminate potential environmental and socio-economic impacts of the Project. Develop a consultation program to receive input from interested and potentially affected parties. Identify supplemental studies, monitoring and contingency plans Process The environmental study was divided into the following three main phases: Phase I: Inventory mapping and mapping of existing conditions; identification of route options. Phase II: Identification of preliminary preferred routes. Phase III: Confirmation of the route and preparation of this environmental report (ER). 1.2

3 The maps produced during the route evaluation and selection process are located in Appendix A and the maps of existing conditions are located in Appendix C. The following is a description of the steps involved in the various Project phases and also provides background on the extensive stakeholder engagement and engineering design carried out by Enbridge to arrive at the pipeline segment Study Areas that are the subject of this ER. Phase I: Inventory and Mapping of Existing Conditions; Identification of Route Options The environmental study began with delineating the Study Areas for each pipeline segment (Section 2.2) and notifying relevant federal and provincial agencies and authorities, municipal personnel, special interest groups, First Nation communities and Métis Nation of Ontario (MNO). Environmental features and conditions in the Study Areas were mapped and characterized using relevant published literature, maps and digital data. Geographically based environmental features were incorporated onto a series of digital base maps. Discussions with relevant agencies and municipalities provided information essential for compiling the existing conditions inventory and mapping. Route options within each pipeline segment were generated based on the routing objectives, Study Areas, and environmental and socio-economic constraints and opportunities identified in Section 2.3. To assist in the generation of route options, Enbridge and Stantec conducted multiple site visits, interpreted aerial photography, and mapped existing environmental and socio-economic constraints and opportunities. Phase II: Identification of Preliminary Preferred Routes The preliminary preferred routes were identified through a quantitative and qualitative comparative evaluation of the route options, as described in Section 2.4. Information Sessions were held to provide interested and potentially affected parties with an opportunity to comment on the Project, the route evaluation and selection process, and the preliminary preferred routes (Section 3). The original preliminary preferred route presented to stakeholders and the public through a newspaper notification in December 2013 and an Information Session in January 2014 included a pipeline from Lindsay to Fenelon Falls only. In 2014, the project was put on hold, pending the feasibility of expanding natural gas to Fenelon Falls. The project was re-introduced in September 2015 and in addition to the pipeline to Fenelon Falls, Enbridge also proposed to build a new pipeline south of Lindsay (between Bethany Hills Road and River Road) to reinforce the existing natural gas distribution network, referred to as the Fenelon Falls Reinforcement. A second round of Information Sessions was held in October 2015 in the communities of Lindsay and Fenelon Falls to re-introduce the project and to allow interested and potentially affected stakeholders to comment on the project proposal. 1.3

4 Following the 2015 notification, several meetings/discussions were held with the Ontario Ministry of Transportation (MTO) to address their concerns with the proposed routes south and north of Lindsay. Due to the MTO s expansion plans on Highway 35 south and north of Lindsay, the starting point of the proposed pipeline to Fenelon Falls was moved east of Angeline Street, near Highway7/35 and Lindsay Street intersection, and the pipeline was extended to Bobcaygeon, terminating near County Road 36 and Meadowlark Crescent. The addition of the extension of the pipeline to Bobcaygeon is consistent with the Ontario Government and Enbridge s goal to expand natural gas infrastructure to more communities in rural and northern Ontario. In addition, two reinforcement pipelines were proposed east of Highway 35, south of Lindsay along the municipal road network. A Notice of Project Change was then published in the local newspapers in November 2015 and provided to the revised Project contact list, describing the proposed routing changes (Section 3). A third round of Information Sessions was held in December 2015 in the communities of Lindsay and Bobcaygeon to allow potentially affected and interested stakeholders to comment on the revised preliminary preferred routes. Feedback received from stakeholders following the newspaper publication and the Information Sessions identified potential issues and concerns within the area of Highway 7/35 in Lindsay and the reinforcement pipeline sections south of Lindsay, particularly along Highway 35/115, and at Wild Turkey Road and Wilmont Road. Based on subsequent discussions with stakeholders and further analysis of the existing natural gas pipeline network, Enbridge made changes to the preliminary preferred pipeline routes from Lindsay to Fenelon Falls and to the reinforcement alignments south of Lindsay. The DPFF will now will originate approximately 1.2 km north of the intersection of Highway 7 and Taylor's Road in Oakwood, and will include a reinforcement pipelines near Sunderland, in the Townships of Brock, respectively. However, the expansion to Bobcaygeon is no longer part of this Project. A second Notice of Project Change was then published in the local newspapers in April 2016 and provided to the revised Project contact list, describing the proposed routing changes (Section 3). A fourth round of Information Sessions was held in April 2016 in the communities of Fenelon Falls and Sunderland to allow interested and potentially affected stakeholders to comment on the latest revisions to the preliminary preferred routes. Prior to the publication of each Notice, the revised Study Areas were re-delineated, the Project contact list revised and environmental features and conditions in the revised Study Areas were mapped and characterized. Following the 2016 Information Sessions, Enbridge determined through a detailed systems analysis that the Victoria Corners Reinforcement Segment will no longer be required to service the DPFF and therefore it has been removed from any further review in this ER. 1.4

5 Phase III: Confirmation of the Route; Environmental Report Based on feedback received during the consultation program (Section 3) and the evaluation of the alternatives, preferred routes were confirmed for the reinforcement and distribution sections. Phase III concluded with the preparation of this ER as well as Environmental Alignment Sheets to identify where site-specific mitigation and protective measures are recommended along the preferred routes (see Appendix D) The Environmental Report The environmental study has relied on technically sound and consistently applied procedures that are replicable and transparent. The ER, which documents the environmental study, will form the foundation for future environmental management activities related to the Project. The ER is organized into the following sections: 1. : provides a description of the Project and the environmental study. 2. Route Evaluation and Selection: provides an overview of the pipeline route evaluation and selection process and confirmation of the preliminary preferred routes as the preferred routes. 3. Consultation Program: describes the consultation program. 4. Impact Identification, Assessment and Mitigation: describes the existing conditions, predicts potential effects and impacts, recommends supplemental studies, mitigation and protective measures, and considers net impacts. 5. Cumulative Effects: provides an analysis of potential cumulative effects associated with the proposed Project. 6. Monitoring and Contingency Plans: describes monitoring and contingency plans to address potential environmental impacts of the proposed Project. 7. Conclusion: provides a discussion and consideration of the potential environmental impacts associated with the proposed Project. The ER also includes references and appendices for documentation The OEB Regulatory Process Once complete, the ER will be circulated to the Ontario Pipeline Coordinating Committee (OPCC) for their review and comment. The OPCC is an inter-ministerial committee that includes provincial government ministries, boards, and authorities with potential interest in the construction and operation of hydrocarbon transmission and storage facilities. The ER will accompany a future Enbridge Leave-to-Construct application to the OEB for the proposed Project. While the ER illustrates the general location of the preferred route, detailed design will be undertaken by Enbridge to determine the exact location of the running lines. 1.5

6 Detailed design will also be influenced by supplemental studies and site-specific requests from landowners and agencies. Information on the engineering and other matters will be included in the application to the OEB, along with additional required information. Upon receiving the application, the OEB will hold a public hearing. Communication about the hearing will include notices in local newspapers and letters to directly affected landowners, both of which will outline how the general public and landowners can get involved with the hearing process. If after the public hearing the OEB finds the Project is in the public interest it will approve construction of the Project. The OEB normally attaches conditions to a Project it approves. Enbridge must comply with these conditions of approval at all stages of the Project Additional Regulatory Processes Enbridge will also be required to obtain additional permits and approvals from federal and provincial agencies, including municipalities, and these are outlined in Table 1.1 below. This ER will serve to support these permit and approval applications. 1.6

7 Table 1.1: Summary of Potential Permits/Regulatory Requirements Permit/Approval Administering Agency Description FEDERAL PERMITS/APPROVALS Clearing of vegetation in accordance with the Migratory Bird Convention Act, 1994 (MBCA) Review and authorization under the Fisheries Act,1985 Review and Authorization under the Navigation Protection Act, 1985 (NPA) Environment Canada Fisheries and Oceans Canada (DFO) Transport Canada (TC) Environment Canada does not require a permit to be issued for vegetation clearing, however, precautions need to be made so that no breeding birds or their nests are harmed or destroyed during the bird nesting season. Nest sweeps will be required at a maximum of 7 days prior to vegetation removal during the bird nesting season, (e.g., April 1 to August 31), as per the MBCA. Following determination of final crossing methods, a fish habitat impact screening (self-assessment) may be needed to determine if DFO review/authorization will be required. The proposed method for pipeline water crossings (i.e. horizontal directional drilling) will likely not require authorization provided measures to avoid causing serious harm to fish and fish habitat are followed during construction. These measures include completing the work during the appropriate timing window(mnrf designated construction windows note that In-water work is permitted from July 1 to March 14 for warm water crossings and from July 1 to September 15 for cold water crossings), installation of appropriate sediment and erosion control measures (i.e., silt fencing around disturbed areas, development of a contingency plan, etc.). If these measures are followed, a project of this nature is considered to be low risk to fish and fish habitat and can proceed without DFO review. TC confirmed that Fenelon River is a scheduled waterway. Works taking place on a scheduled waterway may fall under the Minor Works Order (Order). The Order exempts certain minor works from the application and formal authorization process under the NPA. A self-assessment should be completed to determine if the works falls within one of the exempted classes of minor works under the Order. A Notice of Works form should be completed if the works do not meet the criteria set forth in the Order. 1.7

8 Table 1.1: Summary of Potential Permits/Regulatory Requirements Permit/Approval Administering Agency Description In-water and Shoreline Works Permit under the Historic Canals Regulations, 2009 PROVINCIAL PERMITS/APPROVALS Approval under the Ministry of Infrastructure Public Work Class Environmental Assessment (Class EA) Development Permits under Ontario Regulation 182/06 for Kawartha Conservation Authority (KCA) and Ontario Regulation 179/06 for Lake Simcoe Region Conservation Authority (LSRCA)(Regulation of Development, Interference with Wetlands and Alterations to Shorelines and Watercourses), as per the Conservation Authorities Act, 1990 Register water taking activities on the Environmental Activity and Sector Registry (EASR) or Permit to Take Water (PTTW) as per the Ontario Water Resources Act, 1990 Parks Canada (PC) Ministry of Economic Development, Employment and Infrastructure (MEDEI)/Infrastructure Ontario (I O) KCA, LSRCA Ministry of the Environment and Climate Change (MOECC) Required for works within the Trent Severn Waterway (TSW) (i.e., Fenelon Riv er). Required to obtain an easement on MEDEI-owned/IO-managed lands. This will be determined during detailed design (e.g. Hydro One transmission corridor easements). Required for works within KCA and LSRCA Regulated Areas. If dewatering of more than 50,000 litres (L) per day but less than 400,000 L per day is required, the activity can be registered on the EASR. Should construction dewatering exceed 400,000 L/day, a Permit to Take Water (PTTW) will be required from the MOECC. Species at Risk Overall Benefit Permit under the Endangered Species Act, 2007 (ESA 2007) Ministry of Natural Resources and Forestry (MNRF) Consultation would be required with the MNRF to determine if a permit is required under the ESA 2007 permitting process. This permitting would be required for any protected species under the ESA. 1.8

9 Table 1.1: Summary of Potential Permits/Regulatory Requirements Permit/Approval Administering Agency Description Archaeological clearance under the Ontario Heritage Act(OHA) Review of Built Heritage and Cultural Landscape under the OHA Encroachment Permit under the Public Transportation and Highway Improvement Act, 1990 Crossing Approval MUNICIPAL PERMITS/APPROVALS Tree Cutting Notification Road Use Agreement Ministry of Tourism, Culture, and Sport (MTCS) M TCS M TO Hydro One Networks Inc. (Hydro One) CKL, Township of Brock, Durham Region CKL, Township of Brock, Durham Region As indicated in Section 9 (1)(a) of the ESA 2007, No person shall, kill, harm, harass, capture or take a living member of a species that is listed on the Species at Risk in Ontario List as an extirpated, endangered or threatened species. An archaeological assessment is required to identify areas of archaeological potential prior to any ground disturbances and/ or site alterations. The completed archaeological assessment reports are forwarded to the MTCS for review. The M TCS Heritage Checklist was completed to determine if protected heritage properties are present within the Study Areas. If identified, a Heritage Impact Assessment is required to determine the effects of the Project on heritage resources and provide methods to mitigate the impacts, if any. Required for works within a provincial highway right-of-way (RoW) (i.e. the Highway 35 corridor). Required for crossing Hydro One s electric transmission corridor. Needed if removal of trees for construction will occur on municipally managed lands. Required to lconduct pipeline construction activities within the municipal road allowance. Noise By-law Exemption Permit CKL, Township of Brock Required if construction activities will occur during the prohibited times outlined in the CKL Noise By-law and Township of Brock Noise By-law PP. 1.9

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.

Activities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process. 10.0 Table 10-1 represents a preliminary list of anticipated permits and approvals required to implement the Project and additional details regarding each anticipated permit/approval including the agency

More information

ONTARIO ENERGY BOARD. IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B, and in particular, s.

ONTARIO ENERGY BOARD. IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B, and in particular, s. Exhibit 2 Page 1 of 4 ONTARIO ENERGY BOARD IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15, Schedule B, and in particular, s.90 thereof; AND IN THE MATTER OF an Application by NOVA

More information

Summary of Proposed Changes to the Technical Guide to Renewable Energy Approvals

Summary of Proposed Changes to the Technical Guide to Renewable Energy Approvals Summary of Proposed Changes to the Technical Guide to Renewable Energy Approvals Purpose The Ministry of the Environment and Climate Change (MOECC) is proposing a number of revisions and updates to the

More information

Imperial s Sarnia Products Pipeline

Imperial s Sarnia Products Pipeline Imperial s Sarnia Products Pipeline Waterdown to Finch Project Community Information Session Imperial s Waterdown to Finch Project Important infrastructure to the Greater Toronto and Hamilton Area (GTHA).

More information

SEATON MUNICIPAL TRANSFORMER STATION PROJECT. CLASS ENVIRONMENTAL ASSESSMENT Draft Environmental Study Report

SEATON MUNICIPAL TRANSFORMER STATION PROJECT. CLASS ENVIRONMENTAL ASSESSMENT Draft Environmental Study Report SEATON MUNICIPAL TRANSFORMER STATION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Draft Environmental Study Report Page intentionally left blank. SEATON MUNICIPAL TRANSFORMER STATION PROJECT CLASS ENVIRONMENTAL

More information

Public Information Centre

Public Information Centre Vineland West Private Water System Municipal Class Environmental Assessment Public Information Centre Tuesday, July 12, 2016, 6 to 8 p.m. Vineland Research and Innovation Centre, Rittenhouse Hall Welcome!

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

UNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements

UNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements COMPLETE APPLICATION CHECKLIST Jan 2016 UNDERGROUND UTILITY CROSSING (TRENCHLESS) The following checklist has been compiled to assist the applicant in preparing their application for approval pursuant

More information

Stage 1 Technical Memorandum

Stage 1 Technical Memorandum Appendix A Stage 1 Technical Memorandum 2016 Google TECHNICAL MEMORANDUM One River Master Plan Environmental Assessment: Stage 1 Work Plan PREPARED FOR: COPY TO: PREPARED BY: Ashley Rammeloo, City of London

More information

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines Golf Course and Recreational Facilities Best Management Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document

More information

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study

Welcome. Public Information Event. Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Welcome Public Information Event Dufferin Sanitary Trunk Sewer (STS) System Improvements Municipal Class Environmental Assessment Study Please sign in to be added to the study mailing list and receive

More information

407 TRANSITWAY. Planning & Preliminary Design

407 TRANSITWAY. Planning & Preliminary Design FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was

More information

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Initiative TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: D10-20/RT SUBJECT: PROPOSED

More information

3.1 Conservation Authorities Act

3.1 Conservation Authorities Act 3 Legislative Foundation 3 Legislative Foundation 3.1 Conservation Authorities Act 12 3.1.1 Objects of a Conservation Authority 12 3.1.2 Powers of a Conservation Authority 12 3.1.3 Regulations of a Conservation

More information

Environmental Planning/Environmental Technical Specialty

Environmental Planning/Environmental Technical Specialty Planning/ Specialty No. Phase/Task Methodology Deliverables Reference Manuals 1. Background Data Collection Review correspondence, photos, reports, historical records, site data Summary and specialty reports

More information

The Canal and Mitchell Lakes, Talbot River, and Whites Creek Subwatershed Plan. Implementation Plan:

The Canal and Mitchell Lakes, Talbot River, and Whites Creek Subwatershed Plan. Implementation Plan: The Canal and Mitchell Lakes, Talbot River, and Whites Creek Subwatershed Plan Implementation Plan: 2016-2021 Contents Background... 2 Prioritizing the recommendations... 2 Canal Lake and Mitchell Lake,

More information

REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT

REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT SASKATCHEWAN WATER CORPORATION BUFFALO POUND NON-POTABLE WATER SUPPLY SYSTEM EXPANSION PROJECT Introduction

More information

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities

More information

South Canal Bank Road and South Canal Reconstruction at Highway 400 Presentation for MTO Executive Review January 30, 2018

South Canal Bank Road and South Canal Reconstruction at Highway 400 Presentation for MTO Executive Review January 30, 2018 South Canal Bank Road and South Canal Reconstruction at Highway 400 Presentation for MTO Executive Review January 30, 2018 2014 2017 K. Smart Associates Limited By Kenn Smart P. Eng. Background South Canal

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction

Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Town of Whitchurch-Stouffville Bethesda Side Road Reconstruction Date: Wednesday, April 26, 2017 Time: 3:00 pm to 5:00 pm and 7:00 pm to 8:00 pm 1 Your input is appreciated. You are encouraged to review

More information

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3 Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #3 Prepared for: Windlectric Inc. 354 Davis Road, Oakville, ON L6J 2X1 Prepared by: Stantec Consulting Ltd.

More information

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION

Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION 1 Contents Introduction 3 Delegation to the NEB 3 Assessments and regulatory guidance 4 Provincial requirements

More information

Chapter 4. Airport Authority Governance, Statutes and Policies

Chapter 4. Airport Authority Governance, Statutes and Policies Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest THANK YOU for attending this Open House We want to hear from you www.nextbridge.ca Purpose of the Open House We are here to provide you

More information

The Ministry of Natural Resources and Forestry and Municipal Planning Lake Links

The Ministry of Natural Resources and Forestry and Municipal Planning Lake Links The Ministry of Natural Resources and Forestry and Municipal Planning Lake Links October 21, 2017 Lyn Garrah District Planner MNRF 1 Kemptville Presentation Outline Ontario s Planning System MNRF s role

More information

PROJECT SUMMARY. 1. NOVA Chemicals requests approval from the OEB pursuant to Section 90(1)(c)

PROJECT SUMMARY. 1. NOVA Chemicals requests approval from the OEB pursuant to Section 90(1)(c) Tab A Page 1 of 6 PROJECT SUMMARY 1. NOVA Chemicals requests approval from the OEB pursuant to Section 90(1)(c) of the OEB Act for leave to construct approximately 4 km of hydrocarbon (natural gas liquids

More information

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4 Prepared for: Windlectric Inc. 2845 Bristol Circle Oakville ON L9H 7H7 Prepared by: Stantec Consulting Ltd.

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for

More information

SEATON MUNICIPAL TRANSFORMER STATION. Welcome to our Public Information Centre

SEATON MUNICIPAL TRANSFORMER STATION. Welcome to our Public Information Centre Welcome to our Public Information Centre Delivering Power to Your Community Hydro One Networks Inc. s (Hydro One) transmission system carries high-voltage electricity across the province to local distribution

More information

4.0 ROUTE SELECTION PROCESS

4.0 ROUTE SELECTION PROCESS 4.0 ROUTE SELECTION PROCESS 4.1 GENERAL The evaluation method addresses the objectives of the Ontario Energy Board Environmental Guidelines for the Location, Construction and Operation of Hydro Carbon

More information

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON

Date: Time: Location: Thursday, March 15, :00 p.m. to 8:00 p.m. Nobleton Arena Programs Room 15 Old King Road Nobleton, ON TOWNSHIP OF KING TH 15 SIDEROAD RECONSTRUCTION From Highway 27 To Concession 8 Municipal Class Environmental Assessment Schedule B Project Information Session Date: Time: Location: Thursday, March 15,

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: Interim TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management

More information

City of Mississauga Environmental Impact Studies Terms of Reference 2002

City of Mississauga Environmental Impact Studies Terms of Reference 2002 City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and

More information

EAST-WEST TIE TRANSMISSION PROJECT

EAST-WEST TIE TRANSMISSION PROJECT Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening Welcome Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the Please take a few moments to browse the display material and talk to our staff and consultants.

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

MEMORANDUM OF UNDERSTANDING

MEMORANDUM OF UNDERSTANDING MEMORANDUM OF UNDERSTANDING between The Regional Municipality of Niagara The Town of Fort Erie The Town of Grimsby The Town of Lincoln The City of Niagara Falls The Town of Niagara-on-the-Lake The Town

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

Town of Perth Landfill Expansion Environmental Screening

Town of Perth Landfill Expansion Environmental Screening Town of Perth Landfill Expansion Environmental Screening Public Information Centre Thursday September 29, 2016 4:00 to 6:00 p.m. and 7:00 to 9:00 p.m. Perth Town Hall Main Floor Welcome to the Public Information

More information

NOTICE OF MINOR AMENDMENT CLASS ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES OF THE MINISTRY OF NORTHERN DEVELOPMENT AND MINES UNDER THE MINING ACT

NOTICE OF MINOR AMENDMENT CLASS ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES OF THE MINISTRY OF NORTHERN DEVELOPMENT AND MINES UNDER THE MINING ACT NOTICE OF MINOR AMENDMENT CLASS ENVIRONMENTAL ASSESSMENT FOR ACTIVITIES OF THE MINISTRY OF NORTHERN DEVELOPMENT AND MINES UNDER THE MINING ACT The Ministry of Northern Development and Mines has proposed

More information

APPENDIX A-5: Public Information Centre. PIC #1b. Documents

APPENDIX A-5: Public Information Centre. PIC #1b. Documents APPENDIX A-5: Public Information Centre PIC #1b Documents Appendix A-5 Welcome to our Public Information Centre Delivering Power to Your Community Hydro One Networks Inc. s (Hydro One) transmission system

More information

Chapter 10 Commitments to Future Action

Chapter 10 Commitments to Future Action Chapter 10 Commitments to Future Action 407 TRANSITWAY WEST OF HURONTARIO STREET TO EAST OF HIGHWAY 400 MINISTRY OF TRANSPORTATION - CENTRAL REGION TABLE OF CONTENTS 10. COMMITMENTS TO FUTURE ACTION 10-1

More information

SemCAMS Area Project Description

SemCAMS Area Project Description REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22499-D01-2017 June 7, 2017 Decision 22499-D01-2017 Proceeding 22499 Application 22499-A001 June 7, 2017 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta

More information

Reference Guide for Fish and Mussel Species at Risk Distribution Maps. A Referral Review Tool for Projects Affecting Aquatic Species at Risk

Reference Guide for Fish and Mussel Species at Risk Distribution Maps. A Referral Review Tool for Projects Affecting Aquatic Species at Risk Reference Guide for Fish and Mussel Species at Risk Distribution Maps A Referral Review Tool for Projects Affecting Aquatic Species at Risk Conservation Authority Edition v 1.0 2007 v2.0 released December

More information

SECTION 4.0 REGULATORY ENVIRONMENT

SECTION 4.0 REGULATORY ENVIRONMENT SECTION 4.0 REGULATORY ENVIRONMENT TABLE OF CONTENTS PAGE 4.0 REGULATORY ENVIRONMENT... 4-1 4.1 FEDERAL... 4-1 4.1.1 Canadian Environmental Assessment Act (CEAA)... 4-1 4.1.2 Fisheries Act... 4-1 4.1.3

More information

Municipal Class EA Process

Municipal Class EA Process Purpose of Tonight s Meeting INTRODUCTION This is the first Public Information Centre (PIC) to present information on the Class Environmental Assessment (EA) Study for a new operations centre. The following

More information

Class Environmental Assessment for Waterpower Projects

Class Environmental Assessment for Waterpower Projects Class Environmental Assessment for Waterpower Projects November 2015 - Sixth Edition www.owa.ca Class Environmental Assessment for Waterpower Projects November 2015 Sixth Edition Prepared by: Ontario Waterpower

More information

MINISTRY OF TRANSPORTATION. Environmental Reference for Contract Preparation

MINISTRY OF TRANSPORTATION. Environmental Reference for Contract Preparation MINISTRY OF TRANSPORTATION Version: February 2007 MINISTRY OF TRANSPORTATION Part of the Environmental Standards and Practices ISSUED BY: PROVINCIAL AND ENVIRONMENTAL PLANNING OFFICE MINISTRY OF TRANSPORTATION

More information

Licence Applications: Natural Environment Report Standards. Lands & Waters Aggregate & Petroleum Resources March 15, 2006

Licence Applications: Natural Environment Report Standards. Lands & Waters Aggregate & Petroleum Resources March 15, 2006 Subject: Policy No.: New: Ministry of Natural Resources Ministère des Richesses naturelles Licence Applications: Natural Environment Report Standards A.R. 2.01.07 Yes Compiled by Branch: Section: Date

More information

Section 6 Table of Contents. List of Tables. List of Figures

Section 6 Table of Contents. List of Tables. List of Figures Section 6 Table of Contents 6. The Study Area... 6-3 6.1 Study Area Environment... 6-3 6.1.1 Natural Environment... 6-3 6.1.2 Socio-Economic... 6-4 6.1.3 First Nations Communities... 6-4 6.1.4 Economic

More information

Appendix A. Terms of Reference Correspondence PLANNING & ENGINEERING INITIATIVES LTD.

Appendix A. Terms of Reference Correspondence PLANNING & ENGINEERING INITIATIVES LTD. Appendix A Terms of Reference Correspondence PLANNING & ENGINEERING INITIATIVES LTD. Overview Terms of Reference Scoped Environmental Impact Study Westside Developments, City of Waterloo (for lands known

More information

Ten Steps to Implementing ROW LID

Ten Steps to Implementing ROW LID connecting drops the Ten Steps to Implementing ROW LID a presentation to TRIECA 2016 Implementing LID on a Watershed Basis and Making a Difference: A 10 Step Process March 24, 2016 John Nemeth, CET Infrastructure

More information

BARRIE AREA TRANSMISSION UPGRADE

BARRIE AREA TRANSMISSION UPGRADE BARRIE AREA TRANSMISSION UPGRADE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY REPORT Report Number: 590-CLEA-18- -2 BARRIE AREA TRANSMISSION UPGRADE CLASS ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL STUDY

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Endangered Species Act,

Endangered Species Act, Endangered Species Act, 2007 101 2017 Ontario West Municipal Conference Friday, November 24 th, 2017 Kathryn Markham, Management Biologist Aylmer District, MNRF Overview The Endangered Species Act, 2007

More information

May 8, 2017 EASB File #: Transaction #:

May 8, 2017 EASB File #: Transaction #: Ministry of Environment Environmental Assessment and Stewardship Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 May 8, 2017 EASB File #: 2016-022

More information

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival Proposed Liberty Village Natural Gas Pipeline Project Public Open House Please sign-in at the registration table upon arrival Feel free to approach any team member to discuss the project Share your thoughts

More information

Solar Krafte Utilities Inc.

Solar Krafte Utilities Inc. Decision 23323-D01-2018 August 21, 2018 Alberta Utilities Commission Decision 23323-D01-2018 Proceeding 23323 Application 23323-A001 August 21, 2018 Published by the: Alberta Utilities Commission Eau Claire

More information

PETERBOROUGH UTILITIES COMMISSION

PETERBOROUGH UTILITIES COMMISSION ENVIRONMENTAL STUDY PROJECT SUMMARY OTONABEE RIVER WATERMAIN CROSSING PETERBOROUGH UTILITIES COMMISSION DMW Project No. 07-2679 December 2012 As Amended August 2013 TABLE OF CONTENTS 1.0 INTRODUCTION AND

More information

Trafalgar Road Improvements Environmental Assessment (EA) Georgetown, Ontario Natural Heritage Characterization Report. Prepared for: Halton Region

Trafalgar Road Improvements Environmental Assessment (EA) Georgetown, Ontario Natural Heritage Characterization Report. Prepared for: Halton Region Trafalgar Road Improvements Environmental Assessment (EA) Georgetown, Ontario Natural Heritage Characterization Report Prepared for: Halton Region MMM Group Limited March 2016 3214006 NATURAL HERITAGE

More information

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming! Welcome to the Community Meeting for the Niagara Region Wind Project Thank you for coming! In early September we will host the first Public Open House under We are happy to share information about this

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 5

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 5 September 2013 Page 1 of 5 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of a water intake including: The supply and installation of pipe and appurtenances

More information

SAMPLE !( 13. ESS Features Heritage!( Archaeological Wildlife Birds and Habitat Soils and Terrain Permafrost Water Water Crossing

SAMPLE !( 13. ESS Features Heritage!( Archaeological Wildlife Birds and Habitat Soils and Terrain Permafrost Water Water Crossing ± 13 BURNTWOOD RIVER DOCUMENT PATH: G :\_GIS_PROJECT_FOLDER\00_HYDRO\111440054_BPIII_EPP\ARCMAP\ESS_N2\BPIII_CENVPP_N1N2N3N4C1SECTIONBASEMAP_MAPBOOK_BTB_STANTEC_20131201.MXD N2-Aqua-100 16 L2 N2-Wild-100

More information

UP Express Electrification Transit Project Assessment

UP Express Electrification Transit Project Assessment 7. Commitments and Future Work... 2 7.1 Implementation of Mitigation Measures & Compliance Monitoring... 2 7.2 Permits and Approvals... 2 7.3 Heritage and Archaeological Resources... 3 7.4 Stormwater Management...

More information

Ten Steps to Implementing ROW LID

Ten Steps to Implementing ROW LID connecting drops the Ten Steps to Implementing ROW LID UTRCA Symposium Low Impact Development: Opportunities for Municipalities Implementing LID on a Watershed Basis and Making a Difference: A 10 Step

More information

Lloydminster to Spruce Lake 138kV Transmission Line Projects

Lloydminster to Spruce Lake 138kV Transmission Line Projects Lloydminster to Spruce Lake 138kV Transmission Line Projects Preferred Corridor Presentation June 2017 SaskPower continues to invest in the province s electricity system to ensure we have the infrastructure

More information

2006, Queen s Printer for Ontario Printed in Ontario, Canada

2006, Queen s Printer for Ontario Printed in Ontario, Canada 2006, Queen s Printer for Ontario Printed in Ontario, Canada Single copies of this publication are available at no charge from the address noted below. Bulk orders may involve charges. Natural Resources

More information

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project

EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project EAO s Assessment of an Application for Certificate Amendment Prince Rupert Gas Transmission Project EA Certificate #E14-06 Amendment #4, Additional Construction Camps and Stand-by Compressor Units Requested

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2

TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2 TOWN OF INNISFIL 7 TH Line Improvements Municipal Class Environmental Assessment Schedule C PUBLIC OPEN HOUSE NO. 2 Date: Wednesday, March 28, 2018. Time: 4:00 p.m. to 7:00 p.m. Location: Town Hall Community

More information

Environmental Assessment Approval. Alton Natural Gas Storage Project

Environmental Assessment Approval. Alton Natural Gas Storage Project Approval Approval Date: Original Dated December 18, 2007 Alton Natural Gas Storage Project Alton Natural Gas Storage LP, Proponent Colchester County, Nova Scotia Alton Natural Gas Storage (the Undertaking

More information

CONSERVING OUR FUTURE

CONSERVING OUR FUTURE CONSERVING OUR FUTURE Proposed Priorities for Renewal May 2016 MINISTER S MESSAGE Last summer, my Parliamentary Assistant, MPP Eleanor McMahon, initiated a review of the Conservation Authorities Act seeking

More information

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING (AND ORDER UNDER SUBSECTION 12.4(3))

ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING (AND ORDER UNDER SUBSECTION 12.4(3)) ENVIRONMENTAL ASSESSMENT ACT SECTION 9 NOTICE OF APPROVAL TO PROCEED WITH THE UNDERTAKING (AND ORDER UNDER SUBSECTION 12.4(3)) RE: Proponent: EA File No.: An Environmental Assessment for the Rainy River

More information

Welcome to our Information Centre

Welcome to our Information Centre Welcome to our Information Centre Overbrook to Riverview Transmission Line Upgrade September 21 and 22, 2016 Purpose of the Information Centre Meet our project team and learn more about: The proposed project

More information

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In WELCOME Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In PURPOSE OF THIS MEETING Rankin Construction Inc. (RCI) and their design consultant

More information

Join the Conversation!

Join the Conversation! Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Transit Project Assessment(TPA) Process Public Consultation Centre (PCC) No.1 November 18, 2015 November 19, 2015 Join the Conversation!

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22781-D01-2017 Newell Solar Power Plant November 15, 2017 Alberta Utilities Commission Decision 22781-D01-2017 Newell Solar Power Plant Proceeding 22781 Application 22781-A001 November 15, 2017

More information

Cette publication est également disponible en français.

Cette publication est également disponible en français. O N T A R I O P R O T O C O L F I S H H A B I T A T P R O T O C O L 2008 The Fish Habitat Referral Protocol was produced by the multi-agency Aquatic Resources Management Advisory Committee (ARMAC), more

More information

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT

Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT Background Information & Mitigation Guidelines MANURE STORAGE IMPROVEMENTS and MORTALITY MANAGEMENT I. BACKGROUND FOR MANURE STORAGE AND HANDLING SYSTEMS Supplementary Information Form on sizing and safety

More information

LNG Canada Development Inc.

LNG Canada Development Inc. LNG Canada Development Inc. Shell Centre 32 nd Floor 400 4 th Avenue SW PO Box 100, Station M Calgary AB T2P 2H5 Canada Submitted electronically to: compliance.conformite@ceaa-acee.gc.ca April 20, 2016

More information

PUBLIC INFORMATION CENTRE

PUBLIC INFORMATION CENTRE June 24, 2014 PUBLIC INFORMATION CENTRE MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B MUNICIPAL SERVICES FOR THE MARY LAKE ESTATES SUBDIVISION Buildings Municipal Infrastructure Transportation Industrial

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 8 September 2013 Page 1 of 8 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the construction of sewer and/or water pipeline or watermain crossings of rivers and other

More information

ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY. Town of Shelburne Long-Term Well for Additional Water Supply Project

ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY. Town of Shelburne Long-Term Well for Additional Water Supply Project ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY Town of Shelburne Long-Term Well for Additional Water Supply Project EXECUTIVE SUMMARY Introduction Project Summary In order to accommodate future growth

More information

INFORMATION ITEMS. Week Ending February 9, 2018 REPORTS INTERGOVERNMENTAL CONSULTATIONS CORRESPONDENCE BOARDS & COMMITTEES

INFORMATION ITEMS. Week Ending February 9, 2018 REPORTS INTERGOVERNMENTAL CONSULTATIONS CORRESPONDENCE BOARDS & COMMITTEES INFORMATION ITEMS Week Ending February 9, REPORTS 1. None INTERGOVERNMENTAL CONSULTATIONS 1. Establishment of a Regulation under the Safe Drinking Water Act, 2002 2. Proposed Methodology for Land Needs

More information

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY The Central Lake Ontario Conservation Authority (CLOCA) has recognized the need to prepare comprehensive management strategies for all of its watersheds.

More information

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA REPLV TO ATTENTION OF: DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT CORPS OF ENGINEERS P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-M April15, 2014 PUBLIC NOTICE NO. SAM-2014-00275-TMZ

More information

RECOMMENDATION. (b) that the Shift Communications Plan, attached hereto as Appendix B, BE RECEIVED;

RECOMMENDATION. (b) that the Shift Communications Plan, attached hereto as Appendix B, BE RECEIVED; TO: FROM: SUBJECT: CHAIR AND MEMBERS STRATEGIC PRIORITIES AND POLICIES COMMITTEE MEETING ON SEPTEMBER 18, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND

More information

Renewable Energy Development:

Renewable Energy Development: Renewable Energy Development: A Guide for Municipalities A publication of: The Renewable Energy Facilitation Office, Ministry of Energy Disclaimer: This document is to be used for informational purposes

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz and Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: February 23, 2009 Report No. ENG-014-09 Subject: Fifth Line Union Gas Pipeline for

More information

PROJECT FILE REPORT. Municipal Class Environmental Assessment for the Reed Bridge on Galway Road. County of Peterborough. Municipality of Trent Lakes

PROJECT FILE REPORT. Municipal Class Environmental Assessment for the Reed Bridge on Galway Road. County of Peterborough. Municipality of Trent Lakes 45 South Front Street Belleville, Ontario K8N 2Y5 Tel: (613) 966-4243 Fax: (613) 966-1168 PROJECT FILE REPORT Municipal Class Environmental Assessment for the Reed Bridge on Galway Road County of Peterborough

More information

In 2013, Gunnison sage-grouse was proposed for an "endangered" listing by the U.S. Fish and Wildlife Service under the Endangered Species Act.

In 2013, Gunnison sage-grouse was proposed for an endangered listing by the U.S. Fish and Wildlife Service under the Endangered Species Act. Gunnison County, CO Community Development Department 221 N. Wisconsin St. Ste. D Gunnison, CO 81230 (970) 641-0360 Website: www.gunnisoncounty.org Email: planning@gunnisoncounty.org Information Sheet:

More information

Table of Contents. List of Tables. Table 1. PIC #1 Dates, Times, and Locations... 9 Table 2. Summary of Comments Received

Table of Contents. List of Tables. Table 1. PIC #1 Dates, Times, and Locations... 9 Table 2. Summary of Comments Received Water and Wastewater Master Servicing Plan (MSP) Study Update Table of Contents 1. Background and Introduction... 2 1.1. Class EA Context... 5 2.... 8 2.1. Purpose... 8 2.2. Notifications... 8 2.2.1 Newspaper

More information

City of Kawartha Lakes Growth Management Strategy and Municipal Master Plan Project

City of Kawartha Lakes Growth Management Strategy and Municipal Master Plan Project and Municipal Master Plan Project EXECUTIVE SUMMARY VOLUME 1: VOLUME 2: VOLUME 3: VOLUME 4: VOLUME 5: GROWTH MANAGEMENT STRATEGY MUNICIPAL SERVICING ASSESSMENT TRANSPORTATION MASTER PLAN SOLID WASTE MANAGEMENT

More information

MOSLEY STREET URBANIZATION TH

MOSLEY STREET URBANIZATION TH Public Information Centre 1 (PIC 1) MOSLEY STREET URBANIZATION TH 45 BEACHWOOD ROAD TO STREET Class Environmental Assessment November 29, 2016 Welcome 2 This Public Information Centre will: establish channels

More information