1 Appendix A Terms of Reference Correspondence PLANNING & ENGINEERING INITIATIVES LTD.

2 Overview Terms of Reference Scoped Environmental Impact Study Westside Developments, City of Waterloo (for lands known as the Owen Property) The following Terms of Reference have been prepared by PEIL to direct the research and preparation of EIS to supplement existing environmental investigations including Subwatershed Studies for Subwatersheds 313, 309, and the Owen Properties Scoped Subwatershed Study. These Terms of Reference have been based on the original findings of the Studies noted above and will provide more detailed information to allow for the establishment and level of significance of various features on site and appropriate buffers for their protection. These Terms of Reference are in compliance with and will address the issues described in the EIS policies contained in both the City of Waterloo Official Plan and the Regional Official Plan Policies. They will also have regard for the GRCA Wetlands Policies. Introduction This outline is intended to direct the Environmental Impact Assessment (EIS) research, environmental assessment and EIS report preparation in compliance with the comments received from the GRCA (letter of Aug 26/03), the Region (May 27/03 report to EEAC) and City of Waterloo (Sept 2/03 and July 28/03). Figure A attached to this TOR shows the specific features to be assessed in the completion of the EIS Report. These features will be reviewed in the context of the approved Subwatershed Studies (Final Subwatershed Management Plan 309/313, April 1996, and the Owen Property Scoped Subwatershed Study, January 1999,) and more detailed on-site investigations will be undertaken in order to define appropriate buffers for existing features. Figures B.6.6a and B.6.b from Final Subwatershed Management Plan 309/313 have also been attached to provide an overview of the constraint levels established for the developing lands. The environmental assessment and subsequent Report will be structured under the following headings: Description of the Development A summary of the nature and the extent of the proposed development; Description of the alternative forms that the development might take; A detailed location map showing proposed development and the natural heritage / natural hazard features of the site; Preliminary concept grading plan and stormwater management plan Owen Property EIS Terms of Reference Page 1

3 Preliminary concept for road fabric A summary of relevant reports and studies completed for or including the site related to natural heritage including but not limited to Subwatershed Studies (Final Subwatershed Management Plan 309/313, April 1996 and the Owen Property Scoped Subwatershed Study, January 1999). Description of Features and Functions The location and distribution of any natural habitat corridors and linkages; The location and distribution of any provincially, regionally or locally significant plant species; The location and extent of any wetlands or other documented environmental features; Identification of any native wildlife inhabiting the area; The quality and state of succession of the vegetative communities; A characterization of the hydrology and hydrogeology of the site; A characterization of the topography and soils of the area; The identification of any environmental sensitivities suspected or known to exist in the area based on previous reports / studies; Confirmation of the boundaries previously identified of all environmental features (wetlands, ESPA, etc.) based on the detailed studies carried out as part of this EIS. Identification of Potential Impacts This section will document the potential impacts of the development on the natural heritage/natural hazard features and their ecological functions. Issues to be addressed include: removal of vegetation and the effects this could be expected to have on hydrology, sedimentation and slope stability. The proposed extent of vegetation removal will be shown; potential changes to water attributes (quality, temperature) of surrounding watercourses (eg. Monastery Creek and tributaries); proposed alteration of fish habitat; grading of the area and resultant implications for erosion and sedimentation; effect of altered hydrology and hydrogeology resulting from grading for building sites, road construction and installation of services. Identification and Recommendation of Mitigation Measures This section will identify the actions necessary to avoid and / or mitigate the potential negative impacts on the natural heritage area and its ecological functions. This section will include: Owen Property EIS Terms of Reference Page 2

4 identify and recommend the preferred development alternative to avoid and mitigate negative environmental impacts; identify and recommend measures necessary to protect and maintain the identified ecological functions of vegetation / woodlots / wetlands / watercourses; identify and recommend measures for the preservation of significant vegetation communities, special habitats and specimen trees on the site; identify and recommend drainage, erosion and sedimentation control measures; identify, confirm and / or recommend appropriate buffers from the development for the various environmental features; identify and recommend stewardship opportunities related to the proposed development and the remaining lands (such as individual lot tree management plans). Scope of Work: The description of features and functions will include inventory and assessment of vegetation communities and wildlife in the study area. Existing natural heritage features and functions (Ecological Land Classification vegetation communities, wildlife habitat, linkage functions, wetlands, significant species) will be depicted on maps and summarized in the context of the proposed development and associated future land use. Vegetation Community Inventory & Assessment Dougan & Associates Assessment of vegetation communities will include a review and summary of background information coupled with field inventories (2 seasons). During field reconnaissance, existing vegetation communities will be mapped as polygons onto aerial photographs and biophysical data will be collected from all natural and cultural communities (e.g plantations, meadows). The data will be used for analysis of constraints and impacts, and to classify the communities according to the Ecological Land Classification System for Southern Ontario (ELC). The Ontario Wetland Evaluation System (OWES) for southern Ontario will be used to delineate wetland boundaries. Habitat characterization will include: Habitat structure assessment with description of dominant species in each canopy layer; Soil profile description and assessment of moisture regime; Assessment of slope and drainage conditions; Assessment of botanical quality, disturbances and habitat sensitivity; Documentation of significant species. Wildlife Inventory & Assessment - Dougan & Associates Wildlife studies will incorporate review of available wildlife information, supplemented by Owen Property EIS Terms of Reference Page 3

5 field assessments, including a breeding bird survey and spring amphibian surveys. The presence of species will be based on actual observations as well as the examination of signs such as scats, castings, and tracks. The habitat assessment will include an assessment of the type, structure and quality of vegetative habitats for wildlife use, and the presence of corridors and linkage features to nearby habitats. Hydrogeologic Investigation Naylor & Associates Naylor & Associates will review the Scoped Subwatershed Report (1999) and the work of CH2M Gore & Storrie to confirm the recommendations provided in that report and provide any additional recommendations. Specific Environmental Features The specific features have been identified based on constraint levels indicated on the attached figures B.6.6a and B.6.6B from the Final Subwatershed Management Plan 309/313. (refer to Figure C): 1C. Plantation defined as CL 2 in the Owen Properties Scoped Subwatershed Study (SSWS). The EIS will determine the function of this feature; 2C. Seepage area defined as CL 2 in the SSWS. The EIS will determine the function of this feature; 3C. Wetland edge defined as CL 1 in the SSWS. The EIS will verify the location of the buffer and the setback determined in the SSWS. Prepared by Patrick Donnelly Senior Environmental Planner October 6/03 Sandro Bassanese & Andy Kroess Planning & Engineering Initiatives Ltd. Owen Property EIS Terms of Reference Page 4

6

7

8

9

10

11

12

13

14

15

16

17

18

City of Mississauga Environmental Impact Studies Terms of Reference 2002

City of Mississauga Environmental Impact Studies Terms of Reference 2002 City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and

More information

Environmental Implementation Report (EIR) Environmental Impact Study (EIS)

Environmental Implementation Report (EIR) Environmental Impact Study (EIS) Environmental Implementation Report (EIR) Environmental Impact Study (EIS) Terms of Reference 2018 1 Table of Contents 1. Introduction... 3 2. Content of an EIR/EIS... 5 2.1. Executive Summary... 5 2.2.

More information

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines

Golf Course and Recreational Facilities Best Management Guidelines. Regional Official Plan Guidelines Golf Course and Recreational Facilities Best Management Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document

More information

ENVIRONMENTAL IMPACT STUDY TERMS OF REFERENCE

ENVIRONMENTAL IMPACT STUDY TERMS OF REFERENCE ENVIRONMENTAL IMPACT STUDY TERMS OF REFERENCE Revised January 1, 2008 TABLE OF CONTENTS 1.0 Introduction 1.1 Background Pg. 3 1.2. Intent of the EIS TOR Pg. 3 1.3 Natural Heritage Features and Hazardous

More information

Golf Course and Recreational Facilities Best Management Guidelines

Golf Course and Recreational Facilities Best Management Guidelines Golf Course and Recreational Facilities Best Management Guidelines JUNE 2012 Legislative & Planning Services Sustainable Communities. Economic Opportunities. Transparent Government Prepared with the assistance

More information

LUNARLIGHT LP Post Construction Monitoring Report LunarLight Solar Project

LUNARLIGHT LP Post Construction Monitoring Report LunarLight Solar Project LUNARLIGHT LP Post Construction Monitoring Report LunarLight Solar Project A Monitoring Report in accordance with the commitments outlined in the project Natural Heritage Assessment. i Table of Contents

More information

Appendix E : Guidelines for Riparian Buffer Areas

Appendix E : Guidelines for Riparian Buffer Areas Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations

More information

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study

COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY & MANAGEMENT PLAN South Albion Bolton Community Plan Employment Needs & North Hill Commercial Lands Study Part A Study Components Background Information Review

More information

Meeting Agenda. City of Guelph Environmental Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4. Item 5. Next Meeting:

Meeting Agenda. City of Guelph Environmental Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4. Item 5. Next Meeting: Meeting Agenda City of Guelph Environmental Advisory Committee June 13, 2018 City Hall, Meeting Room C From 7:00 to 9:00 p.m. Meeting Chair: Colin Oaks Agenda Items Welcome to all Item 1, 2 and 3 Item

More information

ENVIRONMENTAL IMPACT STUDY (EIS) TERMS OF REFERENCE & SUBMISSION STANDARDS

ENVIRONMENTAL IMPACT STUDY (EIS) TERMS OF REFERENCE & SUBMISSION STANDARDS The Otonabee Region Conservation Authority 250 Milroy Drive, Peterborough, Ontario, K9H 7M9 Phone: 705-745-5791 Fax: 705-745-7488 email: otonabeeca@otonabeeconservation.com ENVIRONMENTAL IMPACT STUDY (EIS)

More information

ENVIRONMENTAL IMPACT STATEMENT (EIS) GUIDELINES

ENVIRONMENTAL IMPACT STATEMENT (EIS) GUIDELINES ENVIRONMENTAL IMPACT STATEMENT (EIS) GUIDELINES Revised March 2015 City of Hamilton These Guidelines describe the purpose, and information requirements for preparing an Environmental Impact Statement (EIS).

More information

SCRCA SECTION 28 WETLAND POLICY

SCRCA SECTION 28 WETLAND POLICY April 21, 2016 SCRCA SECTION 28 WETLAND POLICY SCRCA Policies and Procedures of Administration of Section 28 Regulations Wetland Policies Definitions section (Source: Section 28 CA Act) Development means:

More information

WHITE TAIL CROSSING SUBDIVISION CITY OF WATERLOO

WHITE TAIL CROSSING SUBDIVISION CITY OF WATERLOO Doug Owen Construction WHITE TAIL CROSSING SUBDIVISION CITY OF WATERLOO PRELIMINARY STORMWATER MANAGEMENT REPORT DECEMBER 4, 2008 IBI GROUP PRELIMINARY STORMWATER MANAGEMENT REPORT Doug Owen Construction

More information

ENVIRONMENTAL IMPLEMENTATION REPORT AND FUNCTIONAL SERVICING STUDY FOR THE GRAYDON BANNING AND SHEVCHENKO LANDS NORTH OAKVILLE SIXTEEN MILE CREEK

ENVIRONMENTAL IMPLEMENTATION REPORT AND FUNCTIONAL SERVICING STUDY FOR THE GRAYDON BANNING AND SHEVCHENKO LANDS NORTH OAKVILLE SIXTEEN MILE CREEK ENVIRONMENTAL IMPLEMENTATION REPORT AND FUNCTIONAL SERVICING STUDY FOR THE GRAYDON BANNING AND SHEVCHENKO LANDS NORTH OAKVILLE SIXTEEN MILE CREEK Prepared by Stonybrook Consulting Inc. Bird and Hale Limited

More information

Environmental Impact Assessment Guidelines. Regional Official Plan Guidelines

Environmental Impact Assessment Guidelines. Regional Official Plan Guidelines Environmental Impact Assessment Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning.

More information

ENVIRONMENTAL IMPACT STUDY GUIDELINES

ENVIRONMENTAL IMPACT STUDY GUIDELINES ENVIRONMENTAL IMPACT STUDY GUIDELINES Version 1 September, 2012 Section 1 Environmental Impact Study Overview TABLE OF CONTENTS What is an Environmental Impact Study (EIS) and What is its Purpose?.....................................

More information

Guidelines for the Preparation of Environmental Impact Studies

Guidelines for the Preparation of Environmental Impact Studies City of Guelph Guidelines for the Preparation of Environmental Impact Studies Version 1 June 2017 Foreword and acknowledgements This guideline has been developed by the City of Guelph to support and assist

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for

More information

Site Plan and Subdivision Review

Site Plan and Subdivision Review Site Plan and Subdivision Review Municipal Land Use Framework Environmental Resource Inventory Master Plan Zoning Land Use Regulation Ordinance requirements for each zone Lot size, setbacks parking, cluster

More information

Bowmanville Marsh. Enniskillen Conservation Area BOWMANVILLE/SOPER CREEK WATERSHED EXISTING CONDITIONS REPORT INTRODUCTION

Bowmanville Marsh. Enniskillen Conservation Area BOWMANVILLE/SOPER CREEK WATERSHED EXISTING CONDITIONS REPORT INTRODUCTION Bowmanville Marsh Enniskillen Conservation Area BOWMANVILLE/SOPER CREEK WATERSHED EXISTING CONDITIONS REPORT INTRODUCTION FINAL - December 2011 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 STUDY AREA AND

More information

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:

The following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act: Interim TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management

More information

PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY

PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY PRINCE GEORGE NATURAL AREAS AND THE EFFECTS OF CLIMATE CHANGE: CASE STUDY Natural Areas in Prince George The City of Prince George is dominated by natural, undeveloped areas within city limits and in adjacent

More information

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy

How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy How to avoid getting bogged down by the Nova Scotia Wetland Conservation Policy for the Environmental Services Association of Nova Scotia By Krista Hilchey Wetland Specialist, Nova Scotia Environment To

More information

Peer review of submittal documents for the Fairhaven Highlands Project as they relate to Plants and Animals

Peer review of submittal documents for the Fairhaven Highlands Project as they relate to Plants and Animals 5309 Shilshole Avenue NW Suite 200 Seattle, WA 98107 206.789.9658 phone 206.789.9684 fax www.adolfson.com memorandum date to from cc subject Vikki Jackson, Northwest Ecological Services, LLC Lara Thoreson

More information

Headwater Drainage Features

Headwater Drainage Features Headwater Drainage Features Their Natural Functions and an Interim Guideline for their Evaluation, Classification and Management Susan Jorgenson (CVC) & Laura Del Giudice (TRCA) Urban development within

More information

Plant, Wildlife and Wetland Assessment

Plant, Wildlife and Wetland Assessment WSU Project Site Plant, Wildlife and Wetland Assessment approximately 38 acres of the site would be in retained natural area, including passive use portions of the park and smaller natural areas in other

More information

AEGD Subwatershed Study & Stormwater Master Plan (SWMP) Implementation Document

AEGD Subwatershed Study & Stormwater Master Plan (SWMP) Implementation Document City of Hamilton Airport Employment Growth District AEGD Subwatershed Study & Stormwater Master Plan (SWMP) Final Report April 2017 Version 2.2 55 Regal Rd, Unit 3 Guelph, Aquafor ON Beech Ltd. N1K 1B6

More information

1. Declarations of Pecuniary Interest under The Municipal Conflict Of Interest Act

1. Declarations of Pecuniary Interest under The Municipal Conflict Of Interest Act Media Release: Friday, November 23, 2018, 4:30 p.m. Regional Municipality of Waterloo Ecological and Environmental Advisory Committee Agenda Monday, November 26, 2018 Dinner: 5:30 p.m. Meeting: 6:00 p.m.

More information

Natural Systems Planning Primer

Natural Systems Planning Primer Natural Systems Planning Primer Lise.Guevremont@ottawa.ca Amy.Macpherson@ottawa.ca Land Use and Natural Systems Unit Planning and Growth Management November 2015 1 Welcome Policy Framework Development

More information

Town of Sandown Wetland Evaluation Report

Town of Sandown Wetland Evaluation Report Town of Sandown Wetland Evaluation Report Prepared for: Town of Sandown, NH Conservation Commission August 2008 Prepared by: 122 Mast Road, Suite 6, Lee, NH 03861 with assistance from TABLE OF CONTENTS

More information

RE: Modifications to Suncor Energy Adelaide Wind Project Location

RE: Modifications to Suncor Energy Adelaide Wind Project Location Ministry of Natural Resources Ministère des Richesses naturelles Renewable Energy Operations Team 300 Water Street Peterborough, Ontario K9J 8M5 October 23, 2012 Suncor Energy Products Inc. 150 6th Avenue

More information

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY

Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY Oshawa Creek Watershed Management Plan EXECUTIVE SUMMARY The Central Lake Ontario Conservation Authority (CLOCA) has recognized the need to prepare comprehensive management strategies for all of its watersheds.

More information

UNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements

UNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements COMPLETE APPLICATION CHECKLIST Jan 2016 UNDERGROUND UTILITY CROSSING (TRENCHLESS) The following checklist has been compiled to assist the applicant in preparing their application for approval pursuant

More information

How Much Habitat Is Enough? How Much Disturbance is Too Much?

How Much Habitat Is Enough? How Much Disturbance is Too Much? How Much Habitat Is Enough? How Much Disturbance is Too Much? Jocelyn Sherwood Canadian Wildlife Service - Ontario January 27 th, 2017 Page 2 April 19, 2017 Page 3 April 19, 2017 Grasslands Forest Wetlands

More information

Environmental Impact Study Saginaw Subdivision City of Cambridge

Environmental Impact Study Saginaw Subdivision City of Cambridge GUIDING SOLUTIONS IN THE NATURAL ENVIRONMENT Environmental Impact Study Saginaw Subdivision City of Cambridge Prepared For: Saginaw Developments Corporation Prepared By: Beacon Environmental Limited Date:

More information

TRCA Environmental Impact Statement Guidelines

TRCA Environmental Impact Statement Guidelines Oct 2014 These guidelines are not meant to be exhaustive but present the typical requirements of the TRCA and are subject to change. INTRODUCTION 3 Purpose of an EIS 3 EIS REVIEW PROCESS 5 Step 1: Initial

More information

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting

More information

Prepared for: Walton Development and Management Inc. Suite 4610, 199 Bay Street P.O. Box 407 Commerce Court Postal Station Toronto, Ontario, M5L 1G3

Prepared for: Walton Development and Management Inc. Suite 4610, 199 Bay Street P.O. Box 407 Commerce Court Postal Station Toronto, Ontario, M5L 1G3 Prepared for: Walton Development and Management Inc. Suite 4610, 199 Bay Street P.O. Box 407 Commerce Court Postal Station Toronto, Ontario, M5L 1G3 Prepared by: Stantec Consulting Ltd. 49 Frederick Street

More information

Headwater Drainage Feature Assessment:

Headwater Drainage Feature Assessment: Prepared for: Jim Dougan, MSc Principal & Senior Ecologist DOUGAN & ASSOCIATES Ecological Consulting & Design 77 Wyndham Street South, Guelph, ON, N1E 5R3, Headwater Drainage Feature Assessment: In Support

More information

Maitland Valley WATERSHED

Maitland Valley WATERSHED Maitland Valley WATERSHED Report Card 2018 Maitland Conservation has prepared this report card as a summary of the state of your forests, wetlands, and water resources. WHERE ARE WE? We are one of 36 Conservation

More information

Riparian Vegetation Protections. Heritage Tree Protection

Riparian Vegetation Protections. Heritage Tree Protection PLACER Protections in place: Oak Tree Retention/ Replacement Requirements General Plan Language Specific Voluntary Rural Design require preservation of native trees and groves through replacement and dedication

More information

Biological Resources and Development Permitting

Biological Resources and Development Permitting Public Information County of Ventura Resource Management Agency Planning Division 800 South Victoria Avenue, Ventura, CA 93009 805 654-2488 www.vcrma.org/divisions/planning Biological Resources and Development

More information

Urban Design Manual 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY. Definitions. Air Photo: Standards General Vegetation Overview:

Urban Design Manual 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY. Definitions. Air Photo: Standards General Vegetation Overview: 4242424242421 13.0 LANDSCAPE AND NATURAL FEATURES TREE MANAGEMENT POLICY The complete City of Kitchener Tree Management Policy may be obtained from the Community Services Department. The following is a

More information

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH

STORMWATER MANAGEMENT REPORT DRAFT PLAN OF CITY OF GUELPH Debrob Investments Limited STORMWATER MANAGEMENT REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH PRELIMINARY NOVEMBER 2, 2011 I B I G R O U P P R E L I M I N A R Y Debrob Investments Limited

More information

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25

Community Services and Utilities & Environmental Protection Report to UE The SPC on Utilities and Environment Page 1 of April 25 Community Services and Utilities & Environmental Protection Report to UE2007-15 The SPC on Utilities and Environment Page 1 of 2 2007 April 25 ENVIRONMENTAL RESERVE SETBACKS SUMMARY/ISSUE This report recommends

More information

Watershed. Rigaud River Report Card. Grades: Forest Conditions Wetland Conditions Surface Water Quality

Watershed. Rigaud River Report Card. Grades: Forest Conditions Wetland Conditions Surface Water Quality Watershed Report ard Grades: + onditions Wetland onditions Surface Water Quality This Watershed Report ard outlines the environmental information for the watershed as of 2006. The information provides

More information

CHAPTER 8: ENVIRONMENTAL MANAGEMENT POLICIES

CHAPTER 8: ENVIRONMENTAL MANAGEMENT POLICIES TOWNSHIP OF WELLESLEY OFFICIAL PLAN page 74 of 133 CHAPTER 8: ENVIRONMENTAL MANAGEMENT POLICIES Jurisdiction over environmental matters is divided among different levels of government. Effective environmental

More information

GUIDING SOLUTIONS IN THE NATURAL ENVIRONMENT

GUIDING SOLUTIONS IN THE NATURAL ENVIRONMENT GUIDING SOLUTIONS IN THE NATURAL ENVIRONMENT May 14, 2018 BEL 216078 Melinda Bessey, Development Planner Lake Simcoe and Region Conservation Authority 120 Bayview Parkway Newmarket, ON L3Y 3W3 Re: Response

More information

BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL

BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL BMPs to Conserve Wooded Areas 31 BMPs TO CONSERVE WOODED AREAS AT THE SUBDIVISION LEVEL Audience This section is primarily directed toward: local units of government, landowners and developers, builders

More information

STANLEY FARM SUBDIVISION

STANLEY FARM SUBDIVISION STANLEY FARM SUBDIVISION SERVICING OPTIONS AND STORMWATER MANAGEMENT REPORT BRIEF CITY OF OTTAWA PREPARED FOR: STANLEY FARM DEVELOPMENTS PREPARED BY: (November 2014 - Revision 0) LOT 9, CONCESSION 5 WATER

More information

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

CATEGORY a protection of the natural environment, its ecosystems and biodiversity. 29. ENVIRONMENTAL DEVELOPMENT PERMIT AREA CATEGORY a protection of the natural environment, its ecosystems and biodiversity. The requirement to obtain an environmental development permit is cited in Section

More information

CHAPTER 10 CRITICAL DRAINAGE AREAS

CHAPTER 10 CRITICAL DRAINAGE AREAS CHAPTER 10 CRITICAL DRAINAGE AREAS Contents 10.0 INTRODUCTION 10-1 10.1 IDENTIFICATION OF CRITICAL DRAINAGE AREAS 10-1 10.1.1 Site Physical Attributes 10-2 10.1.2 Protection of Fish & Wildlife Habitat

More information

CVC Wetland Restoration Strategy

CVC Wetland Restoration Strategy CVC Wetland Restoration Strategy Overview Strategy Development Process Methodology & Analysis Modules Strategic Units & Results Strategy Integration in CVC Programs Strategy Development Wetland Restoration

More information

6. Net Effects of the Alternative Methods 6-1

6. Net Effects of the Alternative Methods 6-1 Table of Contents 6. 6-1 6.1 Net Effects Methodology... 6-1 6.1.1 Evaluation Criteria and Indicators... 6-2 6.1.2 Key Design Considerations, Future Baseline Conditions &... 6-2 6.1.3 Maximum Impact / Worst-Case

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

CREEK RESTORATION/EROSION PROTECTION WORKS. General Submission Requirements

CREEK RESTORATION/EROSION PROTECTION WORKS. General Submission Requirements COMPLETE APPLICATION CHECKLIST Jan 2016 CREEK RESTORATION/EROSION PROTECTION WORKS The following checklist has been compiled to assist the applicant in preparing their application for approval pursuant

More information

Strength. Performance. Passion. Paris Pit CAP. September 25, 2012

Strength. Performance. Passion. Paris Pit CAP. September 25, 2012 Strength. Performance. Passion. Paris Pit CAP September 25, 2012 2012 Holcim 2012 (Canada) Holcim (Canada) Inc. Inc. Agenda Introductions Minutes from Last Meeting Dufferin Paris Pit - General Update Holcim

More information

Alberta Wetland Assessment and Impact Report Directive

Alberta Wetland Assessment and Impact Report Directive Alberta Wetland Assessment and Impact Report Directive June 2017 Title: Number: Program Name: Water Policy Branch Effective Date: June 1, 2015 This document was updated on: Disclaimer: June 1, 2017 This

More information

CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN

CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Michigan Department of Environmental Quality July 2011 Purpose The Grand

More information

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA-2004-1223 Introduction This mitigation statement was prepared as an attachment

More information

Appendix D: Spatial Analysis & Initial Planning investigation

Appendix D: Spatial Analysis & Initial Planning investigation Appendix D: Spatial Analysis & Initial Planning investigation IV- D Appendix D: Spatial Analysis Process And Initial Resource Analysis (Source: Arroyo Seco Watershed Restoration Feasibility Study, Summary

More information

IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention

IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention IMPLEMENTATION GUIDELINE NO. 19 Vegetation Retention Date of Council Resolution This guideline was adopted by Council on 12 December 2007 and takes effect on 19 December 2007, in accordance with section

More information

TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING...

TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING... TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING... 1 5.1 Planning Framework... 1 5.1.1 Sustainable Forest Management Planning... 1 5.1.2 Five-Year Operating Plan... 1 5.1.3 Annual Operating Plans... 3

More information

3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION

3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION 3. SHIRLEY S BROOK / WATTS CREEK SUBWATERSHED STUDY COMMITTEE RECOMMENDATION That Council endorse the Shirley s Brook/Watts Creek Subwatershed Study (September 1999) as the technical document to guide

More information

Town of Fremont Wetland Evaluation Report

Town of Fremont Wetland Evaluation Report University of New Hampshire University of New Hampshire Scholars' Repository PREP Reports & Publications Institute for the Study of Earth, Oceans, and Space (EOS) 9-2007 Town of Fremont Wetland Evaluation

More information

WATERSHED. Maitland Valley. Report Card 201

WATERSHED. Maitland Valley. Report Card 201 Maitland Valley WATERSHED Report Card 201 The Maitland Valley Conservation Authority has prepared this report card as a summary on the state of our forests, wetlands, surface water, and ground water resources.

More information

Town of Perth Landfill Expansion Environmental Screening

Town of Perth Landfill Expansion Environmental Screening Town of Perth Landfill Expansion Environmental Screening Public Information Centre Thursday September 29, 2016 4:00 to 6:00 p.m. and 7:00 to 9:00 p.m. Perth Town Hall Main Floor Welcome to the Public Information

More information

CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS)

CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS) CLAIR-MALTBY MASTER ENVIRONMENTAL SERVICING PLAN (MESP) & COMPREHENSIVE ENVIRONMENTAL IMPACT STUDY (CEIS) 1 PROBLEM/OPPORTUNITY STATEMENT Problem The City of Guelph is undertaking the Clair-Maltby Secondary

More information

Ontario Municipal Board Commission des affaires municipales de l Ontario

Ontario Municipal Board Commission des affaires municipales de l Ontario Ontario Municipal Board Commission des affaires municipales de l Ontario ISSUE DATE: February 19, 2016 CASE NO.: PL091167 PROCEEDING COMMENCED UNDER subsection 17(40) of the Planning Act, R.S.O. 1990,

More information

Vegetative Buffer Regulations to Protect Water quality

Vegetative Buffer Regulations to Protect Water quality Vegetative Buffer Regulations to Protect Water quality Robert Jontos, PWS, CPESC Land-Tech Consultants, Inc. Environmental Scientists and Engineers Connecticut Association of Conservation and Inland Wetland

More information

SECTION 10: WETLANDS PROTECTION

SECTION 10: WETLANDS PROTECTION SECTION 10: WETLANDS PROTECTION 10-1 INTENT AND PURPOSE A. Intent 1. The City finds that wetlands serve a variety of beneficial functions. Wetlands maintain water quality, reduce flooding and erosion,

More information

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common 1 Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common projects Plan Organization how to read the plan Next

More information

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS TABLE OF CONTENTS 1.0 INTRODUCTION... 1-1 Riparian Corridor Study and Management Plan Goals... 1-1 Study Area... 1-2 Importance and Functions of Riparian Corridors... 1-2 Habitat for Mammals, Birds, and

More information

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek

Public Information Centre No. 2 June 15, :00 8:00 pm. Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Public Information Centre No. 2 June 15, 2017 6:00 8:00 pm Valley Park Community Centre (GYM B) 970 Paramount Drive Stoney Creek Please complete the sign-in sheet and review display materials. The project

More information

Environmental Resource Inventories. What are ERIs? Significance of information How to use them

Environmental Resource Inventories. What are ERIs? Significance of information How to use them Environmental Resource Inventories What are ERIs? Significance of information How to use them Environmental Resource Inventory - ERI Compiled by the environmental commission Information about the natural

More information

Pennichuck Brook Watershed Buildout Analysis December 2003

Pennichuck Brook Watershed Buildout Analysis December 2003 INTRODUCTION The Pennichuck Brook watershed (Figure 1) includes approximately 17,700 acres within the communities of Amherst, Hollis, Merrimack, Milford and Nashua and is the primary drinking water supply

More information

The District of Maple Ridge Stream Protection Regulation Guidelines. Watermark Technologies Canada

The District of Maple Ridge Stream Protection Regulation Guidelines. Watermark Technologies Canada The District of Maple Ridge Stream Protection Regulation Guidelines Watermark Technologies Canada Outline 1. Overview On Maple Ridge GPS Stream Mapping & Inventory Information System 2. Information System

More information

How Much Habitat is Enough?

How Much Habitat is Enough? How Much Habitat is Enough? Canadian Wildlife Service 2017 Third Edition Page 2 April 19, 2017 Grasslands Forest Wetlands Riparian & Watershed Page 3 April 19, 2017 Significant impairment in stream At

More information

Join the Conversation!

Join the Conversation! Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Transit Project Assessment(TPA) Process Public Consultation Centre (PCC) No.1 November 18, 2015 November 19, 2015 Join the Conversation!

More information

DIRECTIONS FOR STRATEGY DEVELOPMENT

DIRECTIONS FOR STRATEGY DEVELOPMENT DIRECTIONS FOR STRATEGY DEVELOPMENT CHAPTER 9 This chapter is designed to identify issues which may be considered during the development of a watershed strategy. In the previous Don, Humber, and Rouge

More information

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element

More information

Regional Master Plan Consistency Report 1/8/2010

Regional Master Plan Consistency Report 1/8/2010 of 47 11:31 AM Regional Master Plan Consistency Report Prepared by State of New Jersey Highlands Water Protection and Planning Council 100 North Road (Route 513), Chester, NJ 07930 Telephone: (908) 879-6737

More information

Town of Cochrane Policy

Town of Cochrane Policy Town of Cochrane Policy Policy No.: Policy Title: Approval Date: Revision Date: Department: 1502-02 Wetland Conservation September 11, 2006 September 23, Planning and Engineering Services Introduction

More information

Forest Stewardship Program

Forest Stewardship Program Forest Stewardship Program James Starr, Forest Management 06/2003 Purpose of Forest Stewardship Program is to assist private forest landowners in more actively managing their forest and related resources;

More information

Risk = Hazard x Consequence

Risk = Hazard x Consequence Tolko Industries Ltd. Cariboo Woodlands Forest Stewardship Plan Major Amendment 26 Watershed Hydrology 1. Introduction: The Cariboo Chilcotin Land Use Plan (CCLUP) and current Tolko Forest Stewardship

More information

Conservation, Open Space & Groundwater Recharge Element

Conservation, Open Space & Groundwater Recharge Element Conservation, Open Space & Groundwater Recharge Element GOAL 1 ESTABLISH AND MAINTAIN AN INTEGRATED AND URBAN-DEFINING OPEN SPACE NETWORK THAT PROTECTS AND CONSERVES KEY ENVIRONMENTAL FEATURES. Objective

More information

879 River Road Development Headwaters Drainage Assessment (HDA)

879 River Road Development Headwaters Drainage Assessment (HDA) 879 River Road Development Headwaters Drainage Assessment (HDA) July 2018 Prepared for Richcraft Homes July 2018 1.0 INTRODUCTION... 1 1.1 Background...1 1.2 Site Overview...2 2.0 METHODOLOGY... 5 3.0

More information

Shoreland Protection Innovative Model Ordinance

Shoreland Protection Innovative Model Ordinance Shoreland Protection Innovative Model Ordinance Southern New Hampshire Planning Commission September 14, 2007 Innovative Land Use Guide Training Presented By: Jack Munn, Senior Planner, SNHPC For Questions

More information

REGIONAL MUNICIPALITY OF WATERLOO ECOLOGICAL AND ENVIRONMENTAL ADVISORY COMMITTEE MINUTES

REGIONAL MUNICIPALITY OF WATERLOO ECOLOGICAL AND ENVIRONMENTAL ADVISORY COMMITTEE MINUTES REGIONAL MUNICIPALITY OF WATERLOO ECOLOGICAL AND ENVIRONMENTAL ADVISORY COMMITTEE MINUTES Tuesday, September 25, 2012 6:30 P.M. Room 110 150 Frederick Street, Kitchener, Ontario Present were: Chair J.

More information

I-3 THE IMPERVIOUS COVER MODEL

I-3 THE IMPERVIOUS COVER MODEL I-3 THE IMPERVIOUS COVER MODEL AT A GLANCE Imperviousness is a metric that represents the sum of roads, parking lots, sidewalks, rooftops, and other impermeable surfaces that prevents water from infiltrating

More information

TABLE OF CONTENTS. TOC-i

TABLE OF CONTENTS. TOC-i TOC-i TABLE OF CONTENTS 1.0 INTRODUCTION... 1-1 Riparian Corridor Study and Management Plan Goals... 1-1 Study Area... 1-2 Importance and Functions of Riparian Corridors... 1-2 Habitat for Mammals, Birds,

More information

RIPARIAN PROTECTION. Figure 4.4. Results of the riparian health assessment (Cows and Fish 2001).

RIPARIAN PROTECTION. Figure 4.4. Results of the riparian health assessment (Cows and Fish 2001). RIPARIAN PROTECTION A riparian area is the transition zone between aquatic and terrestrial ecosystems, where the presence of water supports the growth of water-tolerant vegetation and soils are modified

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

Environmental Impact Statement Guidelines

Environmental Impact Statement Guidelines Environmental Impact Statement Guidelines Last revised: October 2015 Ottawa.ca 3-1-1 TTY613-580-2401 Foreword to the City of Ottawa Environmental Impact Statement Guidelines City Council has approved the

More information

Stage 1 Technical Memorandum

Stage 1 Technical Memorandum Appendix A Stage 1 Technical Memorandum 2016 Google TECHNICAL MEMORANDUM One River Master Plan Environmental Assessment: Stage 1 Work Plan PREPARED FOR: COPY TO: PREPARED BY: Ashley Rammeloo, City of London

More information

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas The Executive Council of the Chesapeake Bay Program defines a Riparian Forest Buffer as "an area of trees, usually accompanied by shrubs and other vegetation,

More information

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture

Assessment of Landfill Footprint Alternatives West Carleton Environmental Centre. Option #4 Impact on Agriculture Assessment of Landfill Footprint Alternatives Figure 422 99 Option #4 Impact on Agriculture The net effects with respect to continued service to customers, the optimized site life/ capacity is 65 million

More information

Gray s Creek. Gray s Creek

Gray s Creek. Gray s Creek Gray s Creek 1 Grades F + Forest Conditions B Wetland Conditions C - Surface Water Quality This Watershed Report Card outlines the environmental information for the Gray s Creek watershed as of 2017. The

More information

City of Ottawa. Environmental Impact Statement Guidelines. 2 nd Edition April 2012

City of Ottawa. Environmental Impact Statement Guidelines. 2 nd Edition April 2012 DOCUMENT 1 City of Ottawa Environmental Impact Statement Guidelines 2 nd Edition April 2012 Planning and Infrastructure Portfolio Planning and Growth Management Department Policy Development and Urban

More information

Scope of Work Lower Arroyo Grande Creek Flooding Analysis

Scope of Work Lower Arroyo Grande Creek Flooding Analysis Scope of Work Lower Arroyo Grande Creek Flooding Analysis Overview Please note that the limits of work for the hydrologic and hydraulic analysis include the following: Detailed topographic surveys: flood