1 December 7, 2012 Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE 2042 Salt Lake City, UT Dear Dr. Pomeroy, The following document is the final report of the Red Butte Hydrologic Modeling Project as per your request. The report contains a summary of the work completed, a discussion of findings, and ideas for improving and expanding this modeling effort. Our team is pleased with the model we have produced. The extensive field data collection has paid off, and the model has proven quite accurate when compared to other studies and flooding accounts provided by both Salt Lake City and the County. We are excited to submit our work for review and several members of our team are even looking forward to continuing the improvement of this model in your class next semester. We hope that the following document adequately represents the amount of time and effort that each member of our team has put forth over the last 4 months. Regards, Austin Orr CME 119 Back wall Facing Window, Green Chair Salt Lake City, UT austin.orr@utah.edu

2 Red Butte Creek Hydrologic Modeling Final Report 2012 Project Contributors: Fernanda Lobo Lindsay Minck Zach Magdol Austin Orr Kristianne Sandoval

3 Executive Summary This report documents the efforts to create a working model of the heavily urbanized river system that flows adjacent to the University of Utah Campus as it transitions from a protected natural watershed into one that is affected by the urbanization of Salt Lake City. In order to accurately simulate this river section, an extensive field survey was conducted to obtain river cross section and hydraulic feature data. This survey included 4 site visits, collection of over 30 cross sections, documentation of river features, and hundreds of person-hours. Preliminary results of the HEC-RAS model were found to be accurate. The model indicated roadway overtopping at the 900 South crossing during the 10yr storm event, largely due to the small culvert beneath the road. The flooding modeled is consistent with both the SL County report and site observations. The model correctly predicted the section of the river with the highest velocity, a section in Miller Park that was observed to have a concrete structure to secure the earthen slope because of actual bank erosion. The following is a list of key points: Thorough field studies yielded highly detailed observations throughout study area The model successfully reproduces known creek dynamics River system failures including roadway overtopping and excessive flow velocities occurred in more highly urbanized regions The model provides useful foundation for future planning level analysis Recommended future modeling efforts include inline detention to simulate the actual system capacity for storage. In addition, simulating unsteady flow behavior by including runoff hydrographs for the storm water outfalls would improve the accuracy and functionality of this model as a predictive tool.

4 Table of Contents Executive Summary... 2 Table of Contents... 3 Table of Figures... 4 Table of Tables... 4 Introduction & Background... 5 Methodologies... 6 Cross Section and Culvert data... 6 Geographical Representation Data... 7 Runoff Analysis... 7 Model Building Improvements and Recommendations Modeling Improvements Conclusion References Appendix 1.1 Red Butte Creek Overview Appendix 1.2 Urban Drainages Appendix 1.3 Miller Park Reach Appendix 1.4 Sunnyside Park Reach Appendix 1.5 Foothill Dr. to Connor Road Reach Appendix 1.6 Connor Road to Red Butte Gardens Reach Appendix 2 Field Notes and Observations Appendix 3 Culverts Appendix 4 Results Summary Appendix 5 Schedule... 43

5 Table of Figures Figure 1. Watershed used in StreamStats analysis... 8 Figure 2. Plan view of modeled portion of Red Butte Creek with river stations geo-referenced to aerial photography Figure 3. Culvert station 2.05 (E 900 South bridge) water surface profile for 5 year storm event Figure 4. Photo of upstream end of E 900 South culvert Figure 5. Modified 900 South culvert (4 foot pipe) with water surface profile for 100 year event Figure 6. Photo of Sunnyside Drive culvert inlet Figure 7. Water surface profile at Sunnyside Drive culvert for 10 year storm event Figure 8. Rating curve for river station Figure 9. Upstream view of river station 1.7 in Miller Park with retaining wall on left bank Table of Tables Table 1. Cost estimate from SL County study... 6 Table 2. Flow values for several return periods estimated by StreamStats... 8 Table 3. Rational Method flow volumes for urban drainages... 9 Table 4. Example cross section information for river station Table 5. Manning s n values used to estimate channel roughness Table 6. Flow in Red Butte Creek including urban runoff peak flow for steady flow analysis... 13

6 Introduction & Background The purpose of this project is to create, validate, and analyze a HEC-RAS model for Red Butte Creek between Red Butte Gardens and 1600 East. The Hydrologic Engineering Center River Analysis System (HEC-RAS) is a computer model released in 1995, developed by the United States Army Corps of Engineers (USACE) for use in river flow and floodplain analysis. According to its website, the stated goal of the Hydrologic Engineering Center (HEC) is to support the nation in its water resources management responsibilities. To this end, engineers use HEC-RAS for urban planning to assess the potential risk of flooding of waterways and determine how to mitigate this risk (Haestad Methods, 2007). HEC-RAS can be used to calculate water surface profiles, evaluate floodway encroachments, and determine the effects of obstructions such as bridges, culverts, and dams (HEC-RAS User s Manual, 2010). The goal in the development of a HEC-RAS model for Red Butte Creek is to not only provide a tool that could be used for all of the aforementioned in understanding the dynamics of the system, but to create a model for eventual use in prediction of the effect of planned changes in the current storm water management system of the adjacent contributing drainage areas. The section of Red Butte Creek analyzed in this project represents the first section of the river that is affected by urbanization. Red Butte Creek originates in a protected natural research area in the Wasatch Mountains just east of the University of Utah campus. As the creek flows through the campus and into Salt Lake City it transitions from this protected natural environment into a highly urbanized one. An aerial map of the region is shown in Appendix 1.1.The creek is constrained by encroaching urbanization as it flows through campus and Salt Lake City, eventually connecting with the Jordan River and then the Great Salt Lake. Red Butte Creek has been significantly altered by the increase in impervious surfaces that come with urbanization, by Red Butte Dam and its controlled releases, and by downstream water rights diversions. Precipitation that is naturally infiltrated and slowly released to the creek as ground water flows, now enters in surges causing dramatic flow fluctuations and the degradation of channel banks. Stormwater runoff heavy with sediment, nutrients, metals, and other pollutants, enters without the natural treatment provided by soils and vegetation. In 2008 Salt Lake City passed the Riparian Corridor Ordinance which resulted in funding for detailed studies of four city creeks included Red Butte Creek. Bio-West, Inc was selected to perform this study and completed the Salt Lake City Riparian Corridor Study in This study identified several issues affecting riparian function in Red Butte Creek, including invasive species, terrace erosion, and limited tree cover (BIO-WEST, 2010). From this study we were able to identify locations of river features that could not be directly accessed or may have gone unnoticed during field visits (e.g. locations of all stormwater outfalls). A determination was made, via queries to Salt Lake City and County employees, that the most current municipal model of Red Butte Creek was not only outdated but also only partially functional. This model was built in HEC-2, a predecessor to HEC-RAS, in The model and accompanying report titled Drainage Master Plan Report for 1300 South Outfall Area were 5

7 obtained from Salt Lake County. As the title suggests, this study specifically looked at the drainage areas contributing to one outfall along the Jordan River, with the goal of determining necessary systems improvements. Red Butte Creek is one of the Jordan River tributaries analyzed in this study. In this analysis HEC-1, which is another USACE model used for simulating runoff, was used in conjunction with HEC-2 to determine peak discharge rates for the 5, 10, and 10-year floods in order to determine existing drainage problems. This study specifically looked at the portion of Red Butte Creek from the Jordan River outfall to just east of Sunnyside Park, south of the Utah State Veteran s Affairs Building. The report found four main issues for the 10-year flood including overtopping at Sunnyside Avenue, overtopping at 900 south, capacity problems with the Red Butte conduit (west of 1100 east), and street flooding on Yalecrest Drive and Sunnyside Avenue. Solutions were recommended at a total cost of $903,000. See Table 1 for details regarding these recommendations. Table 1. Cost estimate from SL County study Methodologies Cross Section and Culvert data More than 30 cross sections have been surveyed by the team over a series of 4 visits to the publically accessible sections of Red Butte Creek within the section of interest shown in Appendix 1.1. The only area in which the creek is not well characterized is the section that runs through property owned by the Utah State Department of Veteran s Affairs (VA). This area was thus characterized primarily by its length and the assumption that its upstream and downstream cross sections are representative of the entire section. This also happens to be a section of the river where several stormwater outfalls contribute to the creek as discovered in the review of the SLC Riparian Corridor Study Save for the section owned by the VA, all culverts, diversion, and in-stream features such as waterfalls and foot bridges were also documented directly during field visits. Culvert dimensions, length estimates, and an understanding for existing flood mitigation features throughout the section have been collected and summarized in Appendix 2. 6

8 Geographical Representation Data Maps of the Red Butte Creek area were created in ArcMap 10 using the field data collected and the use of data available through the Utah Automated Geographic Reference Center (AGRC). The suite of maps created for this project is located in Appendix 1. Data was directly obtained for aerial photography, topography, stream location, stream gauge location and dam location. This data was input into maps of the Red Butte Creek and then manipulated where necessary to attain data useful to this project. Aerial photography included as the background of this project is projected at 6-inches. It is High Resolution Orthophotography obtained in The high resolution of the photography is important for this project because visual accuracy was needed to coordinate data inputs with field observations. Lower resolution aerial photography (projected at 1-meter) was used as background for surrounding areas not affecting this project. Flow into the Red Butte Creek from urban drainage and watershed runoff was calculated using the Rational Method as described in the Runoff Analysis section of this report. Topographic data was used in order to correlate data for each watershed to the location of the outfall that discharges into the Red Butte Creek. The topography was delineated for each watershed and then the calculated flow was associated with the corresponding outfall. Data collected in the field located outfalls and the watershed runoff was connected to this data. The flow data associated with each watershed was then input to the HEC-RAS model at outfall locations. Topographic data was also used to more correctly locate the streambed. The stream file downloaded from the AGRC website maps all the streams in the state of Utah. The Red Butte Creek was singled out for this project and a smaller file was created to conserve data space and make working with the map easier. The file acquired shows the Red Butte Creek approximate location, however, this project requires a more detailed and accurate stream path. The topographic data was utilized to adjust the streambed to align with elevations. The field data was also used in this process to correlate existing features with the visual representation of the aerial photos. The resulting stream file reflects a more accurate representation and can be used for calculations for the HEC-RAS modeling. Runoff Analysis The model simulates a combination of steady state flows through the Red Butte Creek channel. In order to better understand the hydraulic function of this channel across a variety of likely scenarios, flows have been estimated for three 24hr rainfall events: 5 year, 10 year, and 100 year. It is necessary to combine the inflows from the natural watershed with the periodic inflows resulting from urban stormwater runoff. These estimations were treated as two separate analyses whose superposition yields the flow values for model input. The United States Geological Survey (USGS) online tool StreamStats was used to determine 5- year, 10-year, and 100-year flows at the east end of Red Butte Creek, just below Red Butte Gardens. StreamStats uses watershed characteristics and regression equations from gaged stream 7

9 sites to estimate flow statistics at un-gaged sites. Figure 1 shows the StreamStats delineated watershed and Table 2 for the values calculated by StreamStats based on this watershed. There are two gage sites on Red Butte Creek. The first, managed by the USGS, is located upstream of Red Butte Reservoir. The second, managed by Salt Lake County Public Works, is located at 1600 East and Bonneview Drive. Figure 1. Watershed used in StreamStats analysis Table 2. Flow values for several return periods estimated by StreamStats Runoff from the urbanized areas that abut the creek was estimated using the Rational Method: Q = cubic feet per second (cfs) C = runoff coefficient (unit less) i = rainfall intensity (in/hr) A = contributing area (sqft) 8 Q = CiA

10 Rainfall intensity was determined using the NOAA Atlas 14 and is shown in Table 3. The calculation for contributing inflow from this type of analysis assumes a worst case scenario in which each runoff area is contributing its instantaneous peak flow for each respective storm. Flow modeling of this type is necessary for a steady state analysis of the potential for flooding in the channel. The necessary area information was determined using GIS ArcMap 10 and estimating which outfall to route the runoff water based on topography. GIS was also used to assign area weighted runoff coefficients between for impervious surfaces that contribute to each outfall. The map used for these steps is shown in Appendix 1.2 Urban Drainages. The flow calculated using the rational method was added cumulatively to the baseflow estimated using StreamStats at the uppermost station. Table 3 contains a summary of the urban drainage area, C value, storm intensity, and resulting flow volume. Table 3. Rational Method flow volumes for urban drainages Urban Area 24 hr storm intensity 24 hr storm peak flow C Drainage ID i-5 i-10 i-100 Q-5 Q-10 Q-100 sqft in/hr in/hr in/hr cfs cfs cfs 0 248, , , , , , , , , , , , , , , , , , , , A future HEC-RAS model could more accurately simulate each event by using a hydrograph to characterize each contributing basin inflow for both the natural watershed above Red Butte Gardens and for stormwater inputs from the urbanized areas. 9

11 Model Building The first step in creating a HEC-RAS model is to draw the reaches, which must be drawn upstream to downstream. One reach was used to model Red Butte Creek for this project, with no tributaries. Creek lengths and distances between cross sections were determined using aforementioned aerial photography and mapping data. The data needed to characterize each cross section was acquired during a series of site visits and field surveys. An example of the necessary information for a single cross section for this model is shown in Table 4. The location of this cross-section is shown in Appendix 1.3 Miller Park Reach and in Figure 2. Manning s n values were determined from field observations and tables provided in the HEC-RAS user s manual (see Table 5). Table 4. Example cross section information for river station 2 Down Stream Reach Length Reach Name River Station Miller Park Lower 2 Mannin's n Station (x) Elevation LOB Channel ROB Six culverts were including in the model. Culvert cross section sizes were determined from field measurements. Approximate length, upstream and downstream invert elevation, distance from upstream cross section, and roadway high chord were determined using Google Earth. HEC-RAS requires two upstream and two downstream cross sections immediately adjacent to each culvert. The dimensions for the nearest up and downstream field measured cross sections were used. Manning s n values and entrance loss coefficients were determined from tables in the HEC-RAS user s manual;; all culverts are concrete with square edges not mitered to the slope so a n value of and a loss coefficient of 0.5 were used. 10

12 Table 5. Manning s n values used to estimate channel roughness Results Steady Flow Results Figure 2 shows a plan view from HEC-RAS of the entire surveyed section of Red Butte Creek. River stationing begins at the upstream end (station 5.6) and ends downstream (station 1.1) over a total channel length of approximately 9500 feet (1.8 miles). A total of 6 culverts are included in the model as well. Appendix 3 shows the upstream and downstream channel cross sections and photos. 11

13 Figure 2. Plan view of modeled portion of Red Butte Creek with river stations geo-referenced to aerial photography 12

14 The 5, 10 and 100 year storm events including stormwater inflows at river stations along the surveyed reach were analyzed. Table 6 is a summary of the steady flow input data. Critical depth was used as the upstream and downstream boundary condition. When using this condition, HEC- RAS calculates the critical depth at each river station and uses this for determining the water surface profile. Mixed flow states (i.e., subcritical and supercritical) were analyzed. Normal flow and known water surface elevation boundary conditions could also be used in the future to analyze steady flow. Table 6. Flow in Red Butte Creek including urban runoff peak flow for steady flow analysis Steady Flow Profiles Sta. 5 yr cfs 10yr cfs 100yr cfs * *Baseflow according to StreamStats at Sta. 5.6 Appendix 4 shows the full data output tables for the steady flow analysis. An important model result is flooding at the E 900 South bridge. Figure 3 shows the water surface profile plot at this culvert. There are many factors leading to overtopping at the culvert. The culvert is a 2 foot circular pipe culvert which is much smaller than the other culverts in the model. The small culvert size backs water up at the upstream end to a depth great enough to flow over the roadway in the model. This most likely would not occur in reality. There is a large floodplain directly before the culvert which is not modeled. Figure 4 shows a photo of the upstream end of the culvert. While surveying this culvert, debris and flood damage was observed. 13

15 RBC Model Revised Plan: Plan 05 12/4/2012 Red Butte Creek Red Butte Creek8 Legend EG 5-yr Crit 5-yr WS 5-yr 4660 Ground 4650 Elevation Main Channel Distance Figure 3. Culvert station 2.05 (E 900 South bridge) water surface profile for 5 year storm event The HEC-2 model produced by the county also showed overtopping at the 900 South culvert. It is likely that this seldom happens in reality because: (1) the flows at this section of Red Butte Creek are significantly less than upstream because of the water right in Sunnyside Park and (2) the floodplain at the upstream end of the culvert may detain a large storm flow before overtopping. The cross section surveyed at the upstream end of the culvert only covers approximately 50 feet horizontally. A larger cross section should have been surveyed to more appropriately model the floodplain. An improvement to the model could be extending cross section data at river station 2.1 and using the ineffective flow function in HEC-RAS. Ineffective flow allows the user to model sections of channel where the downstream velocity approaches zero. In the case of the 900 South culvert, a large inline detention storage area could be modeled using this function and including more data. 14

16 Figure 4. Photo of upstream end of E 900 South culvert A modification was made to analyze flooding at this point the culvert size was changed from a 2 foot pipe to a 4 foot pipe and resulted in no overtopping for all three storm events. This is a costly solution and is not recommended, but it was analyzed in the model to visualize the water surface profile if a larger culvert had been installed. Figure 5 shows the water surface profile for the 100 year event with a 4 foot culvert at 900 South that shows that it does not overtop. RBC Model Revised Plan: Plan 05 12/4/2012 Red Butte Creek Red Butte Creek8 Legend EG 100-yr Crit 100-yr 4660 WS 100-yr Ground 4650 Elevation Main Channel Distance Figure 5. Modified 900 South culvert (4 foot pipe) with water surface profile for 100 year event 15

17 Another exciting result from the steady flow analysis can be seen at the Sunnyside Drive culvert. This is also a location of high flooding as observed during the survey. The culvert is a 48 inch reinforced concrete pipe. Salt Lake County modified this inlet prior to 1993 by adding a 42 inch circular metal pipe and vertical drop upstream of the original culvert in an effort to use the upstream floodplain as a detention area. Then in 1993 the County recommended constructing a detention basin at this location to increase storage from 7 to 19 acre-ft. Further research into the exact modifications and what the storage capacity is at this point is a future step that will improve the model and understanding of its results. Figure 6 shows a photo of the culvert inlet as it exists now (December 2012). The HEC-RAS model results in the formation of a hydraulic jump downstream of the Sunnyside Drive culvert (Figure 7). As with the 900 South culvert, survey observations validate the model results. The channel downstream of the Sunnyside Drive culvert is concrete, rectangular and narrow for approximately 100 feet before transitioning back to a natural channel. During the survey, water staining was observed on this concrete wall and a possible jump was observed. This hydraulic jump is caused by a downstream condition, the transition from a smooth to a rough channel. As displayed in the water surface profile in Figure 7, the flow is supercritical through the Sunnyside culvert and then jumps to subcritical approximately 40 feet downstream of the culvert outlet. The 100 year storm event does not produce a hydraulic jump at this location because the velocity is high enough for the flow to remain supercritical throughout the smooth to rough transition. Figure 6. Photo of Sunnyside Drive culvert inlet 16

18 RBC Model Revised Plan: Plan 05 12/4/2012 Red Butte Creek Red Butte Creek8 Legend EG 10-yr 4675 Crit 10-yr WS 10-yr Ground 4670 Elevation Main Channel Distance Figure 7. Water surface profile at Sunnyside Drive culvert for 10 year storm event Rating curves are another useful model output to visualize the results. For example, the hydraulic jump discussed above occurs just upstream of river station 2.4. The rating curve for this station (Figure 8) shows the water surface elevation vs. flow. This is a unique station because the maximum water surface does not occur at the peak flow for the same reason the hydraulic jump does not occur at the peak flow. RBC Model Revised Plan: Plan 05 12/4/ Legend W.S. Elev W.S. Elev Q Total (cfs) Figure 8. Rating curve for river station

19 The highest velocity observed is at river station 1.7 in Miller Park during the 100 year storm event. The velocity is feet per second (fps). River station 1.7 is approximately 250 feet downstream of the 900 South culvert. The photo in Figure 9 shows this location. The left bank is a concrete wall most likely installed to mitigate erosion and incising caused by high velocities. Currently there is a County project being done in Miller Park to restore native riparian vegetation in order to stabilize the banks. This further validates the HEC-RAS model and points to its usefulness in predicting likely locations of erosion, hydraulic jumps, and culvert overtopping. Figure 9. Upstream view of river station 1.7 in Miller Park with retaining wall on left bank Overall the model has performed as expected and the results have generally represented and validated survey observations and information collected during the literature review. Potential improvements to the model include: extending cross sections to incorporate floodplains, using the ineffective flow function in HEC-RAS, inputting inline storage area data, and completing the model for omitted sections of Red Butte Creek (e.g., between 1600 East and 1100 East and upstream of Red Butte Gardens). 18

20 Improvements and Recommendations Modeling Improvements The Montgomery Watson (SLC utilities) report addresses the fact that although there are no formal detention basins within the study section of Red Butte Creek, there is storage created at roadway crossings due to the elevated roadway relative to the creek bed. This report identifies five road crossing detention areas at 1300 East, 1500 East, 900 South, Sunnyside Avenue, and Foothill Drive and the relative volumes. The accuracy of the HEC-RAS model can be improved by adding in-line storage at roadway crossings. The analysis performed for this document modeled the inflows as maximum steady state contributions as result of three different 24hr storm events. To increase the accuracy of the simulation, hydrographs can be input at each of these outfall locations to better represent each event scenario in an unsteady flow condition. In addition, a future analysis could include simulations of shorter but more intense storm events (e.g., 3hr storm) to simulate a flooding scenario of even greater magnitude. When these changes are made, statistics from the Salt Lake County Gage at 1600 East the HEC- RAS modeled could be used to calibrate this model. Since new monitoring is being initiated as part of the iutah research effort calibration. This verification of the model would ensure the accuracy of any future analysis and improve its potential usefulness as a planning tool. Conclusion The HEC-RAS model created in this project for the section of Red Butte Creek from Red Butte Gardens to 1600 east can be used for simple analysis and planning. Moving forward the model can be refined and improved, to assist with future efforts to improve the health of the creek, overall water quality, and system sustainability through the implementation of green infrastructure for storm water control. Although the model should be further calibrated the preliminary results are promising and have been validated by observation. Overall the model showed more flooding and erosion prone areas in the downstream section of RBC. This is a reasonable result given the increase in impervious surfaces that leads to creek impairments such as incision and erosion, culvert overtopping, and bank instability. As discussed, the Sunnyside Drive and the 900 South culverts are areas of concern. Upstream changes to mimic natural hydrology, improvements to these physical structures, and increasing the capacity for inline storage could possibility mitigate these problems. This model can be used in determining the effects and benefits of future planning and decisions. 19

21 References Haestad Methods Water Solutions Floodplain Modeling Using HEC-RAS. Exton, PA:Bentley Institute Press. Bio-West, Inc Salt Lake City Riparian Corridor Study, Final Red Butte Creek Management Plan. Prepared for Salt Lake City Department of Public Utilities. US Army Corps of Engineers, Hydrologic Engineering Center HEC-RAS River Analysis System, User s Manual. Montgomery Watson Storm Drainage Master Plan of Salt Lake City for 1300 South Study Area. Prepared for Salt Lake City Department of Public Utilities US Army Corps of Engineers web page, Available from: 20

22 Appendix 1.1 Red Butte Creek Overview 21

23 Appendix 1.2 Urban Drainages 22

24 Appendix 1.3 Miller Park Reach 23

25 Appendix 1.4 Sunnyside Park Reach 24

26 Appendix 1.5 Foothill Dr. to Connor Road Reach 25

27 Appendix 1.6 Connor Road to Red Butte Gardens Reach 26

28 Appendix 2 Field Notes and Observations Reach Element River Sta. Notes Photographs Red Butte Gardens to Connor Road XS Red Butte Gardens to Connor Road XS Red Butte Gardens to Connor Road XS rocks on the bed vegetation in the LB plants in the RB Red Butte Gardens to Connor Road Waterfall 2 Red Butte Gardens to Connor Road Waterfall 1 Red Butte Gardens to Connor Road XS 3 rocks on the bed vegetation in the LB 5.3 the RB Red Butte Gardens to Connor Road XS 2 the bed vegetation in the LB 5.2 Erosion in the RB 27

29 Reach Element River Sta. Notes Photographs the bed Red Butte Gardens to Connor Road XS 1 leaves 5.1 trees and brenchs Red Butte Gardens to Connor Road Connor Road Bridge Connor Road to Foothill Drive Stormwate r Outfall 1 Connor Road to Foothill Drive XS Connor Road to Foothill Drive XS Connor Road to Foothill Drive Bridge Connor Road to Foothill Drive XS

30 Reach Element River Sta. Notes Photographs Connor Road to Foothill Drive Culvert 1 Connor Road to Foothill Drive XS Connor Road to Foothill Drive XS LB steep A few 1' boulders in Connor Road to Foothill Drive Stormwate r Outfall Connor Road to Foothill Drive Culvert 2 4 ft drop 6.5 ft height, 5.5 ft 18" SD large overflow coming Connor Road to Foothill Drive XS 3 LB steep Exposed roots on RB 4.3 uniform bed w/ Connor Road to Foothill Drive XS LB eroded narrow bed w/ 29

31 Reach Element River Sta. Notes Photographs 28" stormwater Connor Road to Foothill Drive Stormwate r Outfall 2 See photos (reference Connor Road to Foothill Drive XS 1 XS in tight meander LB flat and long 4.1 RB steep and eroded Bed is pebble - Connor Road to Foothill Drive Foothill Drive Culvert Large rectangular hieght = 6.5 ft width = 6 ft Connor Road to Foothill Drive Concrete Wall Obstruction Sunnyside Park VA Boundry Potential water right About 6 ft high, 12 ft Bridge just DS of Sunnyside Park Bridge steep and eroded LB Sunnyside Park XS

32 Reach Element River Sta. Notes Photographs LB and RB fairly Sunnyside Park XS Bed is cobble See photos (reference Sunnyside Park Water Right Sunnyside Park XS LB and RB fairly Bed is cobble Sunnyside Park XS LB eroded with grass Channel deepers, Sunnyside Park Debris Gate Remnants of debris See photos (reference Sunnyside Park XS 1 LB has low grade Large rock (2.5') in 3.1 RB much much Sunnyside Park Culvert Upstream end of See photos (reference 31

33 Reach Element River Sta. Notes Photographs Miller Park Upper Sunnyside Drive Culvert 4' circular culvert Miller Park Upper XS Miller Park Upper XS Miller Park Upper XS Miller Park Lower XS 8 Obvious flood Debris covering LB 1.8 Smooth exposed Debris and and Miller Park Lower Miller Park Lower XS 7 XS 6 Riprap along LB Large boulders (1.5') 1.7 Possible 3" SD Lots of debris 2 ft elevation drop RB concrete wall engineered channel 1.6 Lots of damage to Possible hydraulic 32

34 Reach Element River Sta. Notes Photographs Miller Park Lower XS Miller Park Lower XS Miller Park Lower XS 3 Large rock on RB Ivy covering all LB 1.3 Scattered medium Tight meander Miller Park Lower XS 2 Grassy RB Steep and eroded LB 1.2 Cobble in bed Miller Park Lower XS E gage location Concrete spillway 1.1 Downstream end of 33

35 Appendix 3 Culverts Elevation RS=5.05 Upstream (Culvert) Legend Ground Bank Sta Elevation RS=5.05 Downstream (Culvert) Station Elevation RS=4.55 Upstream (Culvert) Legend Ground Bank Sta RS=4.55 Downstream (Culvert) Elevation Station 34

36 Elevation RS=4.35 Upstream (Culvert) Legend Ground Bank Sta Elevation RS=4.35 Downstream (Culvert) Station Elevation RS=4.05 Upstream (Culvert) Legend Ground Bank Sta Elevation RS=4.05 Downstream (Culvert) Station 35

37 Elevation RS=3.05 Upstream (Culvert) Legend Ground Bank Sta Elevation RS=3.05 Downstream (Culvert) Station Elevation RS=2.05 Upstream (Culvert) Legend Ground Bank Sta Elevation RS=2.05 Downstream (Culvert) Station 36

38 Appendix 4 Results Summary Profile Output Table for 5, 10, 100 year storm with Critical Depth upstream and downstream boundary conditions River Station Profile Flow (cfs) Min Ch El W.S. Elev Vel. (ft/s) Area (sq ft) Top Width Fr # Crit Depth yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr Culvert yr

39 River Station Profile Flow (cfs) Min Ch El W.S. Elev Vel. (ft/s) Area (sq ft) Top Width Fr # Crit Depth yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr Culvert yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr

40 River Station Profile Flow (cfs) Min Ch El W.S. Elev Vel. (ft/s) Area (sq ft) Top Width Fr # Crit Depth yr yr yr Culvert yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr Culvert yr yr yr yr yr yr yr yr yr yr

41 River Station Profile Flow (cfs) Min Ch El W.S. Elev Vel. (ft/s) Area (sq ft) Top Width Fr # Crit Depth yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr Culvert yr yr yr yr yr yr yr yr yr

42 River Station Profile Flow (cfs) Min Ch El W.S. Elev Vel. (ft/s) Area (sq ft) Top Width Fr # Crit Depth yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr Culvert yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr yr

43 River Station Profile Flow (cfs) Min Ch El W.S. Elev Vel. (ft/s) Area (sq ft) Top Width Fr # Crit Depth yr yr yr yr yr yr yr yr yr yr yr

44 Appendix 5 RED BUTTE CREEK - PROJECT TIMESHEET 25-Sep 26-Sep 27-Sep 28-Sep 29-Sep 30-Sep 1-Oct 2-Oct 3-Oct 4-Oct 5-Oct 6-Oct 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct 23-Oct 24-Oct 25-Oct 26-Oct 27-Oct 28-Oct 29-Oct 30-Oct 31-Oct 1-Nov 2-Nov 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov 27-Nov 28-Nov 29-Nov 30-Nov 1-Dec 2-Dec 3-Dec 4-Dec 5-Dec 6-Dec 7-Dec TOTAL HOURS Phase 1: Existing and Initial Data 43 PROPOSAL DUE 10.5 Fernanda Lobo Zach Magdol Lindsay Minck 4 4 Austin Orr Kristianne Sandoval 0 1A: Collect and synthesize existing information and data DUE 17 Fernanda Lobo Zach Magdol Lindsay Minck Austin Orr Kristianne Sandoval B: Preliminary analysis of data gaps DUE 5 Fernanda Lobo 1 1 Zach Magdol 1 1 Lindsay Minck 1 1 Austin Orr 1 1 Kristianne Sandoval 1 1 1C: Acquire Flow Data DUE 1.5 Zach Magdol D: Collect field data at D/S section DUE 9 Zach Magdol 3 3 Austin Orr 3 3 Kristianne Sandoval 3 3 Phase 2: Red Butte Creek Evaluation A: Determine additional locations for field investigation DUE 5 Fernanda Lobo 1 1 Zach Magdol 1 1 Lindsay Minck 1 1 Austin Orr 1 1 Kristianne Sandoval 1 1 2B: Collect field data at U/S section DUE 30.5 Fernanda Lobo 2 2 Zach Magdol Lindsay Minck Austin Orr 5 5 Kristianne Sandoval C: Use topographical maps to analyze DUE 4 Fernanda Lobo 0 Zach Magdol 0 Lindsay Minck 0 Austin Orr 2 2 Kristianne Sandoval D: Determine appropriate data for HEC-RAS model DUE DUE 12 Fernanda Lobo 0 Zach Magdol Lindsay Minck 0 Austin Orr Kristianne Sandoval 1 1 Phase 3: Build Preliminary HEC-RAS Model A: Initial HEC-RAS model DUE 32 Fernanda Lobo Zach Magdol 2 2 Lindsay Minck 0 Austin Orr 2 2 Kristianne Sandoval 2 2 3B: Progress Report DUE 23.5 Fernanda Lobo Zach Magdol Lindsay Minck Austin Orr Kristianne Sandoval C: Flow Analysis DUE 2 Fernanda Lobo 0 Zach Magdol 0 Lindsay Minck 0 Austin Orr 2 2 Kristianne Sandoval 0 Phase 4: Analyze Impacts to Red Butte Creek A: Finalize HEC-RAS model DUE 20.5 Fernanda Lobo 0 Zach Magdol Lindsay Minck 0 Austin Orr 1 1 Kristianne Sandoval B: Determine impacts by model input manipulation DUE 5 Fernanda Lobo 0 Zach Magdol 4 4 Lindsay Minck 0 Austin Orr 0 Kristianne Sandoval 1 1 4C: Final Report DUE 37 Fernanda Lobo Zach Magdol Lindsay Minck Austin Orr Kristianne Sandoval Group Member Signatures Hours Austin Orr 47.5 Lindsay Minck 34.5 Zach Magdol 50.5 Fernanda Lobo 38 Kristianne Sandoval TOTAL

CLAY STREET BRIDGE REPLACEMENT

CLAY STREET BRIDGE REPLACEMENT HYDROLOGY /HYDRAULICS REPORT. EL DORADO COUNTY CLAY STREET BRIDGE REPLACEMENT Prepared by: Joseph Domenichelli Domenichelli & Associates 1107 Investment Blvd., Suite 145 El Dorado Hills, California 95762

More information

Prepared for: City of Jeffersonville. November Prepared by

Prepared for: City of Jeffersonville. November Prepared by JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington

More information

SECTION IV WATERSHED TECHNICAL ANALYSIS

SECTION IV WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It

More information

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER Prepared for: Struever Fidelco Cappelli LLC McLaren Project No. 6 August 28 TABLE OF CONTENTS. INTRODUCTION 2. SAW MILL RIVER: FEMA STUDY... 2..

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Dead River Prepared By AECOM Brian A.

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH Diversion Channel Outlet Hydraulic Modeling RAS and ADH 11 June 2012 1 Contents Introduction... 3 HEC-RAS modeling of Outlet... 3 Transition Structure Geometry... 3 ADH Modeling of Outlet and Floodplain...

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County.

S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek. Silver Spring Township Cumberland County. Hydrologic and Hydraulic Report For S.R. 0944, Section 015 (Wertzville Road) Bridge over the West Branch of Simmons Creek Silver Spring Township Cumberland County August 13, 2003 Prepared For Pennsylvania

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

SECTION III: WATERSHED TECHNICAL ANALYSIS

SECTION III: WATERSHED TECHNICAL ANALYSIS Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models... TABLE OF CONTENTS 1.0 Background... 1 2.0 Watershed Description... 1 3.0 Hydrology - HEC-HMS Models... 2 3.1 Hydrologic Approach... 2 3.2 Drainage Areas... 2 3.3 Curve Numbers... 2 3.4 Lag Times... 3 3.5

More information

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 2012 MIDAS CREEK PROJECT FINAL DESIGN REPORT SKR Hydrotech 4/11/2012 Executive Summary... 1 Section 1 Introduction... 1 Background Information... 1 Purpose of Study... 1 Scope of Work... 1 Section 2 Description

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

APPENDIX 4 ARROYO MODELING

APPENDIX 4 ARROYO MODELING APPENDIX 4 ARROYO MODELING The existing HEC-HMS model can serve as a baseline for further development and analysis of major arroyos in the city. The model would need to be updated and expanded to consider

More information

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Contents SITE LOCATION / DESCRIPTION... 3 WESTPOINTE STORMWATER MANAGEMENT PLAN... 3 THE ENCLAVE AT WESTPOINTE DETENTION POND... 3 Table

More information

Southeast Policy Area Drainage Study

Southeast Policy Area Drainage Study Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0

More information

Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring

Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Development of Stage-Discharge Ratings for Site 2240 Bear Creek at Cold Spring Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006 (Rev

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS 1 NEW JERSEY ASSOCIATION FOR FLOODPLAIN MANAGEMENT PRESENTATION FOR THE 10 TH ANNUAL CONFERENCE PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN

More information

III. INVENTORY OF EXISTING FACILITIES

III. INVENTORY OF EXISTING FACILITIES III. INVENTORY OF EXISTING FACILITIES Within the Growth Management Boundary, the existing storm drainage facilities are largely associated with development that has historically occurred in the ten drainage

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine Bridge Replacement Project Preliminary Hydraulic Study Lincoln, California BRLS-5089 (021) BRIDGE 19C 0059 Mcbean Park Drive at Auburn Ravine Prepared By: Prepared By: Date 11/25/2014 Thomas S. Plummer

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS

PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS PRELIMINARY HYDROLOGY/HYDRAULICS ANALYSES RESULTS Coldstream Park Stream Corridor Restoration and Preservation Consent Decree SEP Prepared for Lexington-Fayette Urban County Government Division of Water

More information

A Hydrologic Study of the. Ryerson Creek Watershed

A Hydrologic Study of the. Ryerson Creek Watershed A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Distribution Restriction Statement Approved for public release; distribution is unlimited. CECW-EH-Y Regulation No. 1110-2-1464 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Engineering and Design HYDROLOGIC ANALYSIS OF WATERSHED RUNOFF Distribution Restriction

More information

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93 Development of a Stage-Discharge Rating for Site 330 - Van Bibber Creek at Route 93 Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED Agenda Background Hydro-Geomorphic Modeling Methodology HEC-HMS Modeling How is the Model Used Background Proposition 50 Grant Funding

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

COTTONWOOD CREEK RECLAMATION PHASE I & II

COTTONWOOD CREEK RECLAMATION PHASE I & II COTTONWOOD CREEK RECLAMATION PHASE I & II COTTONWOOD CREEK RECLAMATION Stream Stabilization Approach to Urban Runoff Quality Cherry Creek Basin Water Quality Authority The Problem The Cherry Creek Reservoir

More information

DRAINAGE SUBMITTAL CHECKLIST

DRAINAGE SUBMITTAL CHECKLIST Project Name: Firm Name: Map ID: Engineer: Address: City: State: Zip: Phone Number: Fax Number: Property Owner: Address: City: State: Zip: Reviewed By: Date Received: Date Accepted for Review: The following

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM

APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM APPENDIX G DIVERSION AND PELICAN LAKE CUTOFF CHANNELS HYRAULICS AND BRIDGE TECHNICAL MEMORANDUM To: File Memo From: Matt Redington, P.E. Project: Watertown South Connector CC: Date: March 6, 2007; revised

More information

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS v. 11.0 WMS 11.0 Tutorial Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS Objectives Learn how to use several Hydraulic Toolbox calculators

More information

Stream Reaches and Hydrologic Units

Stream Reaches and Hydrologic Units Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation

More information

Cherokee County Future Conditions Floodplain Development

Cherokee County Future Conditions Floodplain Development TECHNICAL MEMORANDUM Cherokee County Future Conditions Floodplain Development Prepared for: Prepared by: Geoff Morton, P.E., County Engineer Cherokee County Richard Greuel, P.E.,, Inc. Richard Taylor,

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS TABLE OF CONTENTS 1.0 INTRODUCTION... 1-1 Riparian Corridor Study and Management Plan Goals... 1-1 Study Area... 1-2 Importance and Functions of Riparian Corridors... 1-2 Habitat for Mammals, Birds, and

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE

DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE PUBLIC MEETING March 8, 2017 LOGISTICS Meeting Agenda: Presentation (7:15 7:45 pm) [Auditorium]

More information

MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM

MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM MINNEHAHA COUNTY HIGHWAY DEPARTMENT CULVERT REPLACEMENT REQUEST FORM Instructions & Background Information (This page to be completed by Township personnel) The purpose of this form is to provide a means

More information

I. Welcome & Introductions WPAC History (Paul Racette, PEC)

I. Welcome & Introductions WPAC History (Paul Racette, PEC) Poquessing Creek Watershed ACT 167 STORM WATER MANAGEMENT PLAN Public Hearing July 10, 2012 I. Welcome & Introductions ---------- WPAC History (Paul Racette, PEC) Primary WPAC Members: Bucks County: Bensalem

More information

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for

Dam Failure Analysis. Olivotti Lake Dam. Houle Enterprises, LLC. (Final) Oshkosh, Wisconsin. Lincoln County, Wisconsin. Report prepared for Dam Failure Analysis (Final) Olivotti Lake Dam Lincoln County, Wisconsin Report prepared for Houle Enterprises, LLC Oshkosh, Wisconsin Report prepared by www.meadhunt.com July 2012 Table of Contents Table

More information

APPENDIX H. Draft Storm Drainage Master Plan

APPENDIX H. Draft Storm Drainage Master Plan APPENDIX H Draft Storm Drainage Master Plan Folsom Sphere of Influence (SOI) DRAFT Storm Drainage Masterplan Prepared for: MacKay & Somps Civil Engineering, Inc. Prepared By: DOMENICHELLI & ASSOCIATES

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS

More information

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES C. Landon Erickson, P.E.,CFM Water Resources Engineer USACE, Fort Worth District April 27 th, 2017 US Army Corps of Engineers Overview Flood

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification Gregory J Daviero, PhD, PE, Principal Kevin Ruswick, PE, CFM, Associate May 2, 2014 Schnabel Engineering

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA American Journal of Water Resources, 2014, Vol. 2, No. 4, 99-105 Available online at http://pubs.sciepub.com/ajwr/2/4/3 Science and Education Publishing DOI:10.12691/ajwr-2-4-3 Estimating the 100-year

More information

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction Technical Memorandum Hydraulic Analysis Smith House Flood Stages 1.0 Introduction Pacific International Engineering (PIE) performed a hydraulic analysis to estimate the water surface elevations of the

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

Drainage Report. New Braunfels Municipal Airport. Master Plan Update 2005

Drainage Report. New Braunfels Municipal Airport. Master Plan Update 2005 Drainage Report Master Plan Update 2005 General The Texas Department of Transportation (TxDOT), Aviation Division, retained the consulting engineering team of Parkhill, Smith & Cooper, Inc. (PSC), to prepare

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation Airport Master Plan Floodplain Report Prepared by: Prepared for: Illinois Department of Transportation July 10, 2013 Table of Contents Topic Page Number Cover Sheet... Cover Sheet Table of Contents...

More information

Beaver Brook Flood Study

Beaver Brook Flood Study Alternatives Analysis Beaver Brook Flood Study Pelham, New Hampshire PREPARED FOR Town of Pelham 6 Village Green Pelham, NH 03076 PREPARED BY 101 Walnut Street PO Box 9151 Watertown, MA 02471 617.924.1770

More information

Extended Detention Basin Design

Extended Detention Basin Design Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention

More information

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b* The Effect of Land Changes Towards in Sg. Pandan Perwira Bin Khusairi Rahman 1,a* and Kamarul Azlan bin Mohd Nasir 1,b 1 Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia a * wirakhusairirahman@gmail.com,

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Final Drainage Report

Final Drainage Report Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite

More information

TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS

TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS Marcus M. Quigley, P.E., Project Engineer, GeoSyntec Consultants Steven P. Roy, Associate, GeoSyntec Consultants Lawrence Gil, North

More information

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL Horry County, South Carolina July 15, 2016 CONTENTS 1 Introduction... 2 2 Hydrology... 3 3 HEC-RAS Model... 7 3.1 Cross

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

State Standard. for. Stormwater Detention/Retention

State Standard. for. Stormwater Detention/Retention ARIZONA DEPARTMENT OF WATER RESOURCES FLOOD MITIGATION SECTION State Standard for Stormwater Detention/Retention Under the authority outlined in ARS 48-3605(a) the Director of the Arizona Department of

More information

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project IAFSM 2010 Annual Conference City of Rockford Keith Creek Greenway Flood Mitigation Project March 10, 2010 Introduction Problem Overview 1890 s Building of homes along Keith Creek 1920 s Home construction

More information

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

Cumulative Precipitation

Cumulative Precipitation Problem 1: Hyetograph Construction (4 pts) Use the rainfall information below to construct both the cumulative (inch) and incremental (in/hr) hyetographs. Note: the incremental hyetograph must be formatted

More information

Breach Analyses of High Hazard Dams in Williamson County

Breach Analyses of High Hazard Dams in Williamson County Breach Analyses of High Hazard Dams in Williamson County John R. King 1, P.E., Kim Patak 2, P.E., Blaine Laechelin 3, E.I.T. Abstract The Upper Brushy Creek WCID operates 23 dams in the Upper Brushy Creek

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

San Luis Obispo Creek Watershed Hydrologic Model Inputs

San Luis Obispo Creek Watershed Hydrologic Model Inputs Jeff Werst San Luis Obispo County Department of Public Works 1050 Monterey Street San Luis Obispo CA 93408 December 14, 2007 Subject: San Luis Obispo Creek Watershed Hydrology and Hydraulic Model Dear

More information

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No

Urban Study. Rocky Branch Watershed Columbia, South Carolina. June 1, Project No Urban Study Rocky Branch Watershed Columbia, South Carolina Prepared for: City of Columbia 1136 Washington Street Columbia, SC 29217 Prepared by: AMEC Environment & Infrastructure, Inc. 720 Gracern Road

More information

SUMMARY OF BACKGROUND INFORMATION REVIEWED

SUMMARY OF BACKGROUND INFORMATION REVIEWED TO: FROM: Mark Lobermeier, PE Ismael Martinez, PE Brad Woznak, PE, PH, CFM Tim Diedrich, PE DATE: RE: Kinni Corridor Plan - Hydrologic & Hydraulic Analysis Summary SEH No. RIVER 138553 14.00 This draft

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc. ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information