1 PART III PRE-FEASIBILITY STUDY FOR MASANG-2 HEPP

2 CHAPTER 16 PROJECT SITE CONDITION 16.1 LOCATION The Masang-2 Hydroelectric Power Project (hereinafter referred to as the project ) is situated approximately at 0 5 to 0 10 of the south latitude and to of the east longitude on the upper course of the Masang River. The project is administratively located in Agam Regency (Kabupaten), West Sumatra Province. The project is located approximately 30 km northwest of Bukit Tinggi city, 100 km northwest of Padang city, the capital city of west Sumatra. Main structures such as intake weir, waterway and powerhouse are located in Palembayan Subdistrict (Kecamatan). Administrative map of Agam Regency is as seen in Figure Source: Agam Regency Figure Administrative Map of Agam Regency JICA Project for the Master Plan Study of 16-1 August, 2010

3 16.2 TOPOGRAPHY Physiographically the project site is located at the central Barisan system, which consists of a number of NW-SE trending block mountains. The Masang River originates from Mt. Marapi (El. 2,891.3m) and runs between these NW-SE trending block mountains. Around the project site the river flows to northwest, subparallel to Great Sumatra Fault System. The major tributaries flowing into the Masang river are Sianok, Guntung and Alahanpanjang rivers. The project is sited between the confluence of Sianok and Guntung rivers, which is the most upstream of the Masang river, and the confluence of Masang and Alahanpanjang rivers. In this pre-feasibility study, topographic survey was conducted at the Masang-2 project area to obtain topographic maps and cross sections of the following quantities. Table Summary of Topographic Survey Conducted Survey Item Quantity Remarks 1. Topographic mapping on 1:10,000 scale 30 km 2 Project area 2. Topographic mapping on 1:2,000 scale 4.0 km 2 Main project structure sites 3. River cross section survey 10 km 16.3 GEOLOGY GENERAL The project consists mainly of a weir, sand trap, intermediate pond, connection tunnel, headrace tunnel, surge tank, penstock, and powerhouse. The geological investigations at the pre-feasibility stage were conducted to evaluate project site geology and seismic geology. The section summarizes the geological conditions of the project site while Volume IV Supporting Report (2) details the results of the preliminary geological investigation and evaluations conducted at the prefeasibility study REGIONAL GEOLOGY The regional stratigraphy of the project site, as shown in Figure , begins with the Carboniferous to Permian. These rocks and those of the Miocene intrusive rocks compose the bedrocks of the region. The Quaternary rocks, consisting mainly of pumiceous tuff and andesite from the volcanic activity of the Maninjau Volcano unconformably overlie extensively the older formations. The recent sediments, represented by alluvium, are of limited occurrence. The major geological structure is the Sumatran Fault Zone (SFZ), also called Great Sumatra Fault System (GSF), one of the most seismically active zones in Indonesia. The SFZ, generally parallel to the Sunda trench, results from the partitioning of oblique plate convergence into normal convergence at the trench and represents right-lateral strike-slip faulting. According to Sieh and Natawidjaja (2000), JICA Project for the Master Plan Study of 16-2 August, 2010

4 the SFZ, totally 1,900 km long, is highly segmented and can be subdivided into 19 major segments on the basis of its geomorphic and topographical expressions. The major segment of the SFZ in the proximity of the project site is the Sianok segment (0.7 o S to 0.1 o N), which, approximately 90 km long, runs from the northeast shore of Lake Singkarak along the southwest flank of the volcano Marapi around the project site. Several local NE-SW and NW-SE fault systems are also distributed in the general area of the project site. The NW-SE fault systems, which are parallel to the SFZ, may be subsidiary to the SFZ Source: Modified from Geological Map of the Padang Quadrangle, Sumatra, 1:250,000 Qal Alluvial deposits of silt, sand and gravel Qpt Pumiceous tuff and andesite of slightly consolidated glass, shards and pumice fragment Qmaj Andesite of Danau Maninjau caldera QTau Undifferentiated flows of lahars, fanglomerate and other colluvial deposits Pl Permian limestone rocks with some thin intercalations of slate, phyllites and quartzite Ps Permian metamorphic rocks of phyllite, slate and mica greywacke Figure Regional Geological Map SEISMICILITY The project site is located close to the SFZ, one of the most seismically active zones in Indonesia. Accordingly seismic consideration needs to be conducted for structural design of the project. Seismic hazard assessment was conducted by using probalistic approach, local seismic design code and through review of some similar projects within Sumatra. JICA Project for the Master Plan Study of 16-3 August, 2010

5 The design seismic coefficients obtained are summarized in Table The design seismic coefficient through probabilistic analysis is consistent with that from Indonesia Seismic Map. They are both parallel to those of existing similar projects within Sumatra. Accordingly in view of the type of structures under consideration, construction cost and the safety and environmental consequences of failure the design seismic coefficient for the prefeasibility study is recommended conservatively to be 0.15 for design of the weir and intermediate pond dike. Table Summary of Obtained Design Seismic Acceleration Approach Design seismic coefficient Remarks 1. Existing similar projects Probabilistic method Cornell formula 3. Indonesia seismic map Rock foundation Highly weathered tuff foundation GEOLOGICAL INVESTIGATION RESULTS The geological investigation for the pre-feasibility study consisted of geological mapping, seismic refraction survey, core drillings, in-situ and laboratory tests. The quantity of geological investigation conducted is summarized in Table The location of geological investigation is given in Figure Table Summary of Geological Investigation Conducted Survey Item Quantity Remarks 1. Geological mapping on 1:10,000 scale 25 km 2 Project area 2. Seismic refraction survey 6,920 m Main project structure sites 3. Core drilling 460 m 12 boreholes 4. Field permeability test 92 sections 5. Standard penetration test 55 times 6. Laboratory test for foundation rocks 10 samples 7. Laboratory tests for construction material 10 samples Source: JICA Study Team (1) Geological Mapping Geological mapping, as shown in Figure , indicates that three geological units are distributed in the project site; they are in the order of geological time from old to young 1) Limestone with some interbedded slate, 2) Greenstone and 3) Pumiceous tuff with some andesitic rock association. The limestone is exposed chiefly along the Masang River valley and at the southern part of the project site. The rock, locally intercalated with slate and sandstone, generally strikes N120E and dips 45 degrees toward northwest. The limestone at outcrops is generally gray to dark gray, hard, highly fractured and highly jointed. The weir for Plan B, the intermediate pond dike and the powerhouse would be founded on the rocks. The greenstone (serpentinite) is of limited occurrence, mainly in the southern part of the project site. The rock at outcrops is generally green to greenish grey, soft to extremely weak, highly fractured and sheared. JICA Project for the Master Plan Study of 16-4 August, 2010

6 Pumiceous tuff with some andesitic rock association is extensively distributed over the hill slopes within the project site. The pumiceous tuff can be subdivided into two rock types, fine-grained tuff and tuff breccia. The fine-grained tuff, generally yellowish brown to brown and slightly consolidated, consists of silt to sand and contains glass and pumice. On the other hand, the tuff breccia, which underlies the fine-grained tuff is brown to greenish gray, semi-consolidated and includes lots of andesitic and basaltic fragments. In addition, the recent alluvial and colluvial deposits are locally distributed in the project site. The alluvial materials contain a large quantity of subangular to rounded gravel and boulder of andesite. (2) Seismic Refraction Survey The interpreted seismic data indicate that four velocity layers underlie the project site. The inferred geological classification is summarized in Table below. Table Geological Classification of Seismic Units Seismic velocity (m/sec) Interpreted geological classification Layer thickness (m) Weir site B, ML-1 and ML Surficial deposits (talus, alluvial, etc.) ,400 Highly weathered/fractured limestone ,800 2,800 Moderately weathered/fractured limestone >4,300 Slightly weathered/fractured limestone - Weir site C, ML-3 and ML Surficial deposits (talus, alluvial, etc.) ,100 Highly weathered fine-grained tuff ,600 2,100 Moderately weathered tuff breccia ,200 3,600 Slightly weathered rocks - Inlet area of waterway route (Plan B/C), ML-5 and ML Surficial deposits (talus, alluvial, etc.) ,500 Highly weathered fine-grained tuff ,700 2,200 Moderately weathered tuff breccia ,800 4,600 Slightly weathered rocks - Intermediate pond dike site (Plan B/C), ML-7 to ML-11, L-5 and L Surficial deposits (talus, alluvial, etc.) ,100 Highly weathered/fractured limestone ,100 2,500 Moderate weathered/fractured limestone ,700 3,800 Slightly weathered/fractured limestone - Surge tank and powerhouse (Plan A/B/C), ML-12 to ML-14 and L-3 to L Surficial deposits (talus, alluvial, etc.) ,500 Highly weathered fine-grained tuff ,700 2,500 Moderately weathered limestone/ tuff breccia >4,600 Slightly weathered limestone - Connection tunnel (Plan B/C), L-1 and L Surficial deposits (talus, alluvial, etc.) ,000 1,200 Weathered fine-grained tuff ,700 2,700 Highly fractured limestone/weathered tuff breccia >3,300 Slightly weathered limestone - Source: JICA Study Team JICA Project for the Master Plan Study of 16-5 August, 2010

7 (3) Boring Investigation and Field Tests The boring investigation together with field permeability test was conducted to explore and evaluate the subsurface conditions of the project site. The results of boring investigation are summarized in Table The results of field permeability tests are given in Table below. The permeability in the foundation rocks is generally in the range of cm/se to cm/sec; thereby indicating moderately permeable foundation rocks. Table Summary of Boring Investigation Results Area Bore Location Geology Weathering/Fracturing Rock class MW-1 Right bank m alluvial/colluvial m Completely m D m tuff breccia m Highly m D/CL Weir site A MW-2 Riverbed 0-4.8m alluvial/colluvial 0-4.8m Completely 0-4.8m D m tuff breccia m Highly m D/CL MW-3 Left bank 0-9.8m alluvial/colluvial 0-9.8m Completely 0-9.8m D m tuff breccia m Highly m D/CL 0-7.4m Completely 0-7.4m D 0-7.4m alluvial/colluvial m Completely m D/CL MW-4 Right bank m limestone m Moderately m CM Weir site B m Completely m D/CL MW-5 Left bank Weir site C MW-6 Left bank Intermediate pond site Headrace route Surge tank site Powerhouse site MW-7 MW-8 MW-9 MH-1 MS-1 MP-1 Right bank Riverbed Left bank Plan A Plan A/B/C Plan A/B/C m alluvial/colluvial m limestone 0-4.0m alluvial/colluvial m tuff m tuff breccia 0-4.0m alluvial/colluvial m limestone 0-6.0m alluvial/colluvial m limestone 0-3.0m alluvial/colluvial m slate m alluvial/colluvial m tuff m tuff breccia m andesite 0-0.5m alluvial/colluvial m tuff m tuff breccia m andesite 0-3.0m alluvial/colluvial m limestone m Completely m Highly 0-4.0m Completely m Highly 0-4.0m Completely m Highly m Moderately 0-6.0m Completely m Moderately 0-3.0m Completely m Moderately m Highly m Completely m Moderately 0-0.5m Completely m Highly m Moderately 0-3.0m Completely m Highly m Moderately m D m D/CL 0-4.0m D m D/CL 0-4.0m D m D/CL m CM/CH 0-6.0m D m CM/CH 0-3.0m D m CM/CH m D/CL m D m CL/CH 0-0.5m D m D/CL m CM/CH 0-3.0m D m D/CL m CM/CH Table Summary of Permeability Test Results Area Geology Permeability (cm/se) Groundwater (depth-m) Weir site A Alluvial and colluvial deposits MW-1: 3.0m Weathered tuff breccia MW-3: 15.5m Weir site B Alluvial and colluvial deposits MW-4: 5.0m Fractured limestone MW-5: 14.5m Alluvial and colluvial deposits MW-6: No water Weir site C Weathered tuff Weathered tuff breccia Intermediate Alluvial and colluvial deposits MW-7: No water pond site Fractured limestone MW-9: No water Alluvial and colluvial deposits MH-1: No water Headrace route Weathered tuff Weathered tuff breccia Weathered andesite Source: JICA Study Team JICA Project for the Master Plan Study of 16-6 August, 2010

8 GEOLOGICAL AND GEOTECHNICAL CONDITIONS OF THE PROJECT SITE (1) Intake Weir Site Weir site A The site is located approximately 300 m downstream of the confluence between the Cuntung river and the Sianok river. The Masang River at the weir site shows U-shaped valley with a riverbed width of about 30 m. The geology of the weir site A, as shown in Figure , is composed of tuff breccia with alluvial and colluvial cover of about 10 m thick. The tuff breccia, especially its upper part was highly weathered into a poor quality of D class rock mass in Japanese Rock Classification Standard. Accordingly the weir foundation at the site will require deep excavation up to over 10 m deep to remove the overlying loose deposits and highly weathered tuff breccia or a combination of pile foundation to improve the bearing capacity of foundation rocks. Weir site B The site lies about 600 m downstream of the weir site A at the straight course of the river. The Masang River at the weir site shows wide V-shaped valley with a riverbed width of about 35 m. Figure shows the geological conditions of the weir site B. The thickness of the surficial deposits is in the order of 1 to 7 m. The underlying limestone is exposed in the riverbed and at the right abutment. From field reconnaissance and core observation the limestone is generally very hard and strong, moderately to highly fractured and can be classified into D to CL class rocks from Japanese Rock Classification Standard. In addition, the permeability of the fractured limestone is in the range of cm/sec to cm/sec and the limestone is thus considered to be moderately permeable rocks. Accordingly the foundation conditions at the weir are considered favorable with the weir structure founded in the limestone, however foundation treatment would be required to improve the permeability of the foundation rock. Weir site C the site is located further 500 m downstream of the weir site B. The Masang River at the weir site shows wide V-shaped valley with a riverbed width of about 30 m. The geology of the site, as shown in Figure , consists mainly of tuff, tuff breccia and limestone. The thickness of the highly weathered tuff and tuff breccia is over 30 m at the abutments. The underlying limestone crops out solely in the riverbed and is expected to be encountered at a depth of 35 to 40 m at the abutments. Because of poor quality of the weathered tuff and tuff breccia at the abutments, deep excavation or foundation treatment for the weir foundation would be required at the abutments. (2) Intermediate Pond Site The intermediate pond site is located at the lower course of a small stream, a tributary of the Masang River close to Kototinggi village. The width of the streambed at the pond site is about 5 m. The left abutment is a thin ridge and the right abutment is a mountainous hillslope. The geology of the intermediate pond site consists mainly of limestone and contains intercalated thin shale beds, as shown in Figure Alluvial and colluvial deposits as well as tuff locally overlie the limestone mainly along the stream valley. The thickness of these superficial layers is in the range of 1 to 4 m at the abutments and in the range of 1 to 6 m in the streambed. JICA Project for the Master Plan Study of 16-7 August, 2010

9 The limestone is generally hard, moderately fractured and jointed and can be classified as CM to CH class rock in Japanese Rock Classification Standard. On the other hand, the interbedded slate is moderately to highly fractured and sheared and can be classified as D to CM class rock. The limestone and interbedded slate at the intermediate pond site has moderate to low permeability with a permeability of cm/se to cm/sec. In addition, no groundwater was observed during borehole drilling around the abutments, indicating that groundwater level around the abutments was very low. Accordingly, the intermediate pond dike will be expected to be founded on the limestone, which is considered favorable in terms of bearing capacity. Leakage, however, would be likely to be encountered around the abutments and foundation rocks, especially from the right abutment of thin ridge. (3) Connection and Headrace Tunnels (Plan B) In Plan B it is planned to construct 1,060 m long connection culvert, 1,630 m long connection tunnel and 4,550 m long headrace tunnel along the left side of the Masang River. The connection and headrace tunnels will be located mostly in limestone interbedded with slate and locally in tuff and tuff breccia. No detailed geological data are available from the rock masses along the most part of the tunnel alignment at surface and at the tunneling depth. The geological conditions considered are based mainly on surface geological mapping and boring information obtained in the vicinity of the tunnel alignments, as shown in Figure As seen from Figure , the foundation of the connection and headrace tunnels is expected to mostly be CM to CH class sandstone and tuff as well as tuff breccia, and locally D to CL class rocks over several tens meters relating to the interbedded slate and highly fractured limestone. Consequently the general rock mass conditions are considered favorable from the viewpoint of tunneling and no major geological problems are to be expected during heading of the tunnels. (4) Surge Tank and Penstock Sites The surge tank and penstock areas are located at the left side of the Masng River immediately downstream of the confluence between the Masang River and the Alahan Panjang River. Here slope stability and foundation conditions are the major topics of the geological investigations. The boring investigation of MS-1 revealed that the tuff and tuff breccia, about 40-m thick, is highly weathered with a rock quality of D to CL class in Japanese Rock Classification Standard and the underlying moderately weathered andesite is moderately weathered with a rock quality of CM to CH class. The surge tank will be expected to be founded on moderately weathered andesite. Similarly, the penstock will be located on the hillslope underlain by highly weathered tuff and tuff breccia. The rocks are expected to be D to CL class rock mass in Japanese Rock Classification Standard. For the foundation of fix points of the penstock the foundation tuff might be very poor with a rock quality of D class. If such foundation condition would be encountered foundation treatment JICA Project for the Master Plan Study of 16-8 August, 2010

10 such as mortared rockbolts should be implemented to guarantee stable foundations. (5) Powerhouse Site The powerhouse is planned at the left bank of the Masang River. From field reconnaissance and boring investigation (MP-1), the overburden is about 1 to 3 m thick and the underlying limestone is very hard, highly to moderately fractured with a rock quality of D to CH class in Japanese Rock Classification Standard. The limestone, although highly fractured, is considered to have a sufficient bearing capacity for foundation support of the planned powerhouse. Accordingly, because the foundation limestone is hard and strong and the overburden is thin, no major foundation problems will be expected. The limestone in the foundation area is suitable for the founding of the powerhouse CONSTRUCTION MATERIALS The construction materials required for the construction of the project structures were fine and coarse aggregates, rock fill and impervious materials. At the prefeasibility study stage the field reconnaissance (geological mapping) together with limited laboratory tests was carried out to examine the possible source, quantity and quality of construction materials. (1) Sand Sand materials were needed for the fine aggregates of concrete, grout and mortar. Riverbed deposits around the Dukuh (SS-1 to SS-3), around the weir site (SS-4) and close to the powerhouse site (SS-5) were inspected. The Dukuh sites are in operation by local people. The alluvial deposits are predominately coarse sand with some gravel. The content of fines is zero to 2 % only. Table summarizes laboratory test results of the samples. Especially the absorption values of the alluvial sands are high and should be verified in a later survey stage if the materials are to be used in concrete. Table Summary of Laboratory Tests for Fine Aggregate Material Test Criterion SS-1 SS-2 SS-3 SS-4 SS-8 1. Specific gravity >2.5% Absorption <3.0% Soundness Na 2 SO % Mg 2 SO % 4. Soft particle <1.0% Source: JICA Study Team (2) Rock Quarry Several potential limestone quarries (RS-1 through RS-5) around the project site were observed mainly as concreter coarse aggregate for the construction of project. Table gives the results of JICA Project for the Master Plan Study of 16-9 August, 2010

11 laboratory tests. As seen from Table , the index properties are satisfactory for concrete aggregates except for compressive strength. The low strength values of the limestone quarries were presumably due to weathering because these samples were taken from surface outcrops. The strength property should be confirmed at next investigation stage. Table Summary of Laboratory Tests for Coarse Aggregate Material Test Criterion RS-1 RS-2 RS-3 RS-4 RS-5 1. Specific gravity >2.5% Absorption <3.0% Soundness Na 2 SO % Mg 2 SO % 4. Abrasion <40.0% UCS >500kg/cm Notes: 1) UCS = Unconfined compressive strength, 2) 1 kgf/cm2 = 98.1kN/m2 (kpa). Source: JICA Study Team GEOLOGUCAL SUMMARY The preliminary geological and geotechnical investigations conducted at the pre-feasibility study stage indicate that the topographical and geological conditions of the project site are suitable for the development of the project. The mainly investigation results are summarized as follows: - The basement rocks of the project site are Permian limestone rocks with some thin intercalations of slate. The limestone rock is extensively covered by Quaternary tuff and tuff breccia from the volcanic activity of the Maninjau Volcano. - In comparison with the weir sites A and C the weir site B is more suitable for founding of the weir construction because at the site the overburden is shallow and the foundation rock of limestone is hard and strong enough to support the planned weir foundation. - The intermediate pond site was favorable in terms of bearing capacity; however the permeability and leakage of the foundation rocks should be considered especially leakage from the right abutment of thin ridge. - The planned connection and headrace tunnels would be expected to be founded mostly on CM to CH class rock masses. No major geological problems are to be expected at tunneling. - Limestone quarry sites around the project site appeared available in quality and quantity as potential construction material sources but the strength characteristics should be confirmed at next survey stage. - The project site is located in a region of high seismic activity close to the active Great Sumatra Fault, which is the major seismic source around the project site. The design seismic coefficient for the per-feasibility study of the Masang-2 project is recommended conservatively to be 0.15 for design of the weir and intermediate pond dike. JICA Project for the Master Plan Study of August, 2010

12 Figure Location of Geological Investigations JICA Project for the Master Plan Study of August, 2010

13 Figure Geological Map with Location of Sampling for Construction Materials JICA Project for the Master Plan Study of August, 2010

14 Figure Geological Section of the Weir Axis Alternative A JICA Project for the Master Plan Study of August, 2010

15 Figure Geological Section of the Weir Axis Alternative B JICA Project for the Master Plan Study of August, 2010

16 Figure Geological Section of the Weir Axis Alternative C JICA Project for the Master Plan Study of August, 2010

17 Figure Geological Section of the Intermediate Pond Axis JICA Project for the Master Plan Study of August, 2010

18 Figure Geological Section along the Connection and Headrace Tunnel Alignment Alternative B JICA Project for the Master Plan Study of August, 2010

19 16.4 METEOROLOGY AND HYDROLOGY Meteorological Records and Hydrological Records are collected from Meteorological Climatological and Geophysical Agency (Badan Meteorologi Klimatologi dan Geofisika: BMKG), Research Institute for Water Resources Development under Ministry of Public Works (Pusat Penelitian dan Pengembangan Sumber Daya Air: PUSAIR, formerly DPMA), and engineering reports on various hydropower development projects. The location map of the stations is shown in Figure The availability of data is summarized in Figure and Figure The catchment area of Masang-2 HEPP intake weir site is shown in Figure METEOROLOGICAL DATA Climatic data such as air temperature, relative humidity, wind velocity, sunshine duration have been observed at the Tabing-Padang station, which is collected from BMKG. Pan-evaporation has been observed at the Lubuk Sikaping and the Tanjung Pati stations. Pan-evaporation data is collected from Masang-3 HEPP report. (1) Air Temperature The average monthly mean air temperature at the Tabing-Padang station in the period of 1971 to 2002 is summarized below. Unit: Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean As seen, the mean annual air temperature at the Tabing-Padang station is 26.1ºC on an average. There is a slight seasonal change ranging 25.7ºC in August or September to 26.6ºC in May. (2) Relative Humidity The average monthly relative humidity at the Tabing-Padang station in the period of 1971 to 2002 is summarized below. Unit: % Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean As well as the monthly pattern of mean air temperature, there is no significant change of relative humidity throughout the year. The annual mean relative humidity in the period of at the Tabing-Padang station is 82.5 % and there is a slight seasonal change ranging from 81.1% in January to 84.6 % in November. JICA Project for the Master Plan Study of August, 2010

20 (3) Sunshine Duration The average monthly mean sunshine duration at the Tabing-Padang station in the period of 1971 to 2002 is summarized below. Unit: % Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean As seen, the mean annual sunshine duration at the Tabing-Padang station is 52.7 % on an average. The maximum duration of 61.7 % and the minimum one of 40.4 % occur in June and November, respectively. Sunshine duration generally decreases with an increase of rainfall. The highest sunshine duration therefore occurs in June in the dry season. (4) Wind Velocity The average monthly mean wind velocity at the Tabing-Padang station in the period of 1971 to 2002 is summarized below. Unit: m/sec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean Mean annual wind velocity at the Tabing-Padang station is 1.1 m/sec ranging from 0.9m/sec in June and 1.3 m/sec in January, February or March. The wind velocity records collected from Masang-3 HEPP reports in the period of 1971 to 1989 are around 1 m/sec, but the others collected from BMKG in the period of 1990 to 2002 are around 0.1 m/sec. (5) Evaporation Pan evaporation records are available at the Lubuk Sikaping station and the Tanjung Pati station. The average monthly mean pan evaporation at the Lubuk Sikaping and the Tanjung Pati stations is summarized below. Station Name: Lubuk Sukaping ( ) Unit: mm/day Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean Station Name: Tanjung Pati ( ) Unit: mm/day Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean The ruling factors of pan evaporation may be air temperature and relative humidity, namely evaporation rate varies season to season following to mainly the variation of humidity. As seen in the above table, the seasonal variation of pan evaporation is generally small throughout the year, because there is no great seasonal variation of relative humidity. JICA Project for the Master Plan Study of August, 2010

21 RAINFALL DATA There are 13 rainfall gauging stations in and around the Masang River basin. The location map of these stations is shown in Figure Also the data availability at these stations is shown in Figure The rainfall gauging stations are operated and maintained under BMKG. Monthly rainfall records are collected in Masang-3 HEPP and HPPS2, besides daily rainfall records are collected from BMKG in this study. PLN formerly had own hydrological observation network (PLN-LMK Observation Network). Currently most of these stations have broken down, after regional office of PLN took responsibility for maintenance which the central office of PLN had taken. (1) Monthly Rainfall Data The monthly distributions of mean annual rainfall are illustrated below. Rainfall(mm) Rainfall(mm) Rainfall(mm) Maninjau: 3,199 mm ( ) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Koto Tinggi: 2,638 mm ( ) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Suliki: 2,440 mm ( ) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec JICA Project for the Master Plan Study of August, 2010

22 Rainfall(mm) Jambak: 3,797 mm ( ) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec As seen above, the annual mean rainfall at these stations ranges from 2,000 mm to 4,600 mm per year. It might be said that there exists little seasonality in the Masang River basin receiving rainfalls throughout the year. (2) Hourly Rainfall Records Hourly rainfall records are available at the Gunung Melintang, Maninjau, Sungai Talang Barat, Solok Bio-Bio, Muara Paiti, Patir, Puar Datar and Halaban Dua rainfall gauging stations. Hourly rainfall records are collected to determine the rainfall pattern for the flood analysis. Hourly rainfall records of more than 50 mm were selected for estimating the characteristics of relatively heavy rainfall RUNOFF RECORDS (1) Water Level Gauging Station (AWLR Station) Only one water level gauging station has been installed in the Masang River basin. The station name is the Sipisang AWLR station located in the north of Palembayan town. The catchment area of the station is described as 458 km 2 in the records from 1975 to 1992, and as km 2 in the records from 1993to On this study, the catchment area of the station is measured as 475km 2 based on 1:50,000 scale map. Besides, the catchment area of Masang-2 HEPP intake weir site is measured as 443km 2. The Sipisang AWLR station is operated by the regional office of the River Bureau under the Ministry of Public Works (Balai Pengendalian Sumber Daya Air: BPSDA). (2) Runoff Records The daily runoff records are collected from PUSAIR in Bandung and the daily water level records are collected from BPSDA in Bukit Tinggi. The daily runoff records are available from 1975 to 2008 except in 1988, 1989, 1994, 2002, 2003 and The average monthly mean runoff in the period of is summarized below. JICA Project for the Master Plan Study of August, 2010

23 Station Name: Sipisang ( ) Unit: m3/s Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean As seen, the annual mean runoff at the Sipisang AWLR station is 21.9m 3 /s or 1,455mm in terms of the annual runoff depth, which is computed by dividing the annual accumulated runoff volume by the catchment area of the gauging station LOWFLOW ANALYSIS (1) General Approach The continuous long-term runoff data for a time period of more than 20 years at the proposed intake weir site is normally required for evaluating an optimum development scale of the project through power output computation. Further, it is highly expected that the runoff data should be of high accuracy because measurement on economic viability of project is highly dependent on the reliability of available runoff records. On the Masang-2 HEPP, daily runoff records are required because the type of hydropower development scheme is runoff type. As described in the previous chapter, the daily runoff records are available from 1975 to 2008 except in 1988, 1989, 1994, 2002, 2003 and Furthermore, the remaining observation years still include data-missing periods. Therefore, it is necessary to supplement the runoff records at the Sipisang station by infilling of missing data. On the other hand, the monthly basin mean rainfall at the Sipisang station can be estimated for the period between 1973 and Thus the runoff data at the Sipisang station can be supplemented and expanded for the period of 1973 to 1993 by constructing a rainfall-runoff simulation model. Along this line, the Tank Model Method is applied in this study as a rainfall-runoff model, the model parameters of which are calibrated by using rainfall and runoff records available in the period of 1982 to Firstly, the reliability of the available runoff records at the Sipisang station for using calibration is evaluated by means of runoff coefficient and annual rainfall loss. Then lowflow analysis by the Tank Model Method is carried out to simulate 21-year long-term monthly runoff data at the Sipisang station. Finally the daily runoff data at the Masang-2 intake weir site is estimated with 14-year simulated monthly data and 7-year observed daily data. The outline of lowflow analysis is described below. JICA Project for the Master Plan Study of August, 2010

24 Test of Consintency of Rainfall Records Monthly Runoff Records at Sipisang Estimation of Monthly Basin Mean Rainfall Scrutiny of Runoff Records : ( Reliability Check ) - Runoff Coefficient - Annual Rainfall Loss - Consistency of Records ( ) Establishment of Rainfall - Runoff Simulation Model ( Tank Model Method ) Calibration of Model Parameters ( ) Supplementation & Expansion of Monthly Runoff Records by Tank Model ( ) Estimation of Long-Term Daily Runoff at Masang-2 Intake Weir Site ( ) Daily Runoff Records ( 1976, , 1991 ) (2) Estimation of Missing Data The observed rainfall records at all of the selected stations include several data interruptions. For the purpose of supplementing the missing rainfall records, the simple regression analysis on the monthly basis are carried out among the selected stations. Missing data at a station is supplemented by another station with linear regression equation which has the highest correlation coefficient. (3) Test of Consistency of Rainfall Records The method of testing rainfall records for consistency is the double-mass curve technique. Double-mass analysis tests the consistency of the record at a station by comparing its accumulated annual or seasonal precipitation with the concurrent accumulated values of mean precipitation for a group of surrounding stations. The corrected rainfall is determined by the following equation. P CX = PX ( M C / M a ) where, P CX : Corrected rainfall at any time period at station x (mm) P X : Original recorded rainfall at any time period at station x (mm) M C : Corrected slope of the double-mass curve M : Original slope of the double-mass curve a JICA Project for the Master Plan Study of August, 2010

25 The monthly rainfall records at the following stations are adjusted for the following periods. Maninjau Station: 1979 to 1993 Suliki Station: 1988 to 1993 (4) Estimation of Basin Mean Rainfall at the Sipisang AWLR Station The basin mean rainfall at the Sipisang AWLR station is estimated by applying the Thiessen Method using the corrected data. The records of selected rainfall gauging stations are divided in two periods considering data availability. Case1 (1973 to 1986): Maninjau, Koto Tinggi, Suliki Case2 (1987 to 1993): Koto Tinggi, Suliki, Jambak The tables below show the computed Thiessen coefficients for estimating basin mean rainfall at the the Sipisang AWLR station. Case1 ( ) Maninjau Koto Tinggi Suliki Case2 (1987 to 1993) Koto Tinggi Suliki Jambak The estimated annual basin mean rainfall is 2,507mm. (5) Evaluation of Runoff Records at the Sipisang AWLR Station The Sipisang AWLR station is selected as a key stream gauge station for predicting the long-term runoff at the proposed Masang-2 intake weir site, because it is the only gauge located in the Masang River. The evaluated period of runoff records is determined to be 5 years from 1982 to 1986, because both rainfall and runoff records are available in this period for calibration of Tank Model parameters. 1) Relationship between Annual Basin Mean Rainfall and Annual Runoff Depth at the Sipisang AWLR Station The annual basin mean rainfall at the Sipisang AWLR station is estimated for the period of 1982 to On the other hand, the annual runoff depth of Masang River at the Sipisang station is computed by dividing the annual runoff volume by its drainage area of 475 km 2 for the same period as above. The established relationship between annual basin mean rainfall and annual runoff depth at the Sipisang station is as follows. JICA Project for the Master Plan Study of August, 2010

26 Year Annual Rainfall (mm) Annual Runoff Depth Annual Rainfall Loss Runoff Coefficient ,207 1, ,430 1,253 1, ,314 1,233 1, ,339 1,318 2, ,615 1,449 1, ,029 1,450 1, ,030 1,326 1, ,027 2, Average 2,749 1,438 1, The difference between the annual basin mean rainfall and annual runoff depth is the so-called evapotranspiration loss or annual rainfall loss. The annual rainfall loss is analyzed for major rivers in Sumatra in HPPS2 as presented in Table It is therefore found that the annual rainfall loss normally falls in a range of 700 to 1,500 mm a year which varies according to altitude, natural vegetation, seasonal distribution of rainfall, etc. As seen above, the rainfall loss at the Sipisang station varies from 800mm to 2,000mm. From the hydrological point of view, the rainfall loss usually varies in a small range. Therefore it is estimated that rainfall data or runoff data has some errors. The basin mean rainfall is adjusted based on the following consideration. The annual runoff depth is likely to be constant rather than the basin mean rainfall, with small variations of 1,200 to 1,500 mm. The observed record in 1993 is eliminated because it might contain errors due to malfunctioning of water level recorder. Maninjau, Koto Tinggi, Suliki, Jambak rainfall gauging stations which are used for estimating basin mean rainfall are located outside the Masang River basin. This fact implies that the estimated basin mean rainfall might inevitably contain some error to some extent. The estimated annual basin mean rainfall in 1976, 1984 and 1991 are thus adjusted such that the annual rainfall loss becomes 1,251mm, which corresponds to the mean annual rainfall loss in 1982, 1983, 1985 and The adjusted relationship between annual basin mean rainfall and annual runoff depth at the Sipisang station is given below. JICA Project for the Master Plan Study of August, 2010

27 Year Annual Rainfall (mm) Annual Runoff Depth Annual Rainfall Loss Runoff Coefficient ,626 1,375 1, ,430 1,253 1, ,314 1,233 1, ,568 1,318 1, ,615 1,449 1, ,029 1,450 1, ,577 1,326 1, Average 2,594 1,343 1, ) Double Mass Curve Analysis Based on the adjusted annual basin mean rainfall and annual runoff depth at the Sipisang station, the double mass curve is constructed as given below. Accumulated Runoff Depth (mm) 10,000 5, ,000 10,000 15,000 20,000 Accumulated Basin Mean Rainfall (mm) As shown above, the annual basin mean rainfall and annual runoff depth are plotted on a straight line, satisfactorily showing the hydrological consistency ready for Tank model analysis to be discussed in the next section. (6) Tank Model 1) Concept of Tank Model Method The Tank Model simulation method is widely applied for estimating river runoff from rainfall data. The Tank Model Method has been successfully applied for low-flow analysis in various water resources development projects in Indonesia. Basic concept of Tank Model The basic idea of Tank Model is very simple. Consider a tank having a hole at the bottom and another hole at the side as illustrated below. JICA Project for the Master Plan Study of August, 2010

28 When the tank is filled with water, the water will be released from the holes as shown in the above. In the tank model simulation, it is considered that the water released from the side hole corresponds to runoff from a stream, and the water from the bottom hole goes into the ground water zone. The depth of water released from a hole is given by the following tank equation. Q = α H where, Q : Runoff depth of released water (mm) α : Coefficient of hole H : Water depth above the hole (mm) Applied Tank Model For the purpose of natural runoff simulation, four by four (4 4) tanks combined in series are used. The top tank receives the rainfall as inflow to the tank, while the tanks below get the supply from the bottom holes of the tank directory above. The aggregated outflow from all the side holes of the tanks constitutes the inflow in the river course. To effectively trace dry conditions in the basin, several modifications are made on the basic model. The model is firstly facilitated with a structure to simulate the moisture content in the top tank. This sub-model is composed of two moisture-bearing zones, which contain moisture up to the capacities of saturation. Between the two zones, the water transfers as expressed below. T 2 = TC( XP / PS XS / SS) where, T 2 : Transfer of moisture between primary and secondary zones (if positive, transfer occurs from primary to secondary, and vice versa) TC : Constant XP : Primary soil moisture depth JICA Project for the Master Plan Study of August, 2010

29 PS : Primary soil moisture capacity XS : Secondary soil moisture depth SS : Secondary soil moisture capacity When the primary soil moisture is not saturated and there is free water in lower tanks, the water goes up by capillary action so as to fill the primary soil moisture with the transfer speed T1 as given below. T1 = TB(1 XP / PS) where, T 1 : Transfer of the water from lower tank with capillary action TB : Constant There are many tank model parameters such as hole coefficients of each tank, and height of side holes of each tank. These parameters cannot be determined mathematically. Therefore, these parameters are subject to determination through trial-and-error calculations comparing the calculated runoff with the actually observed runoff. 2) Input Data for Calibration Model The applied model and simulation condition for calibration are given below. The period for calibration set from 1982 to 1986 because there are continuously rainfall records and runoff records. Number of Tanks 4 4 Calculation Time Interval 1 month Calculation Period 1982 to 1986 Observed Runoff at Sipisang Station 1982 to 1986 Basin Mean Rainfall at Sipisang Station 1982 to 1986 Monthly Average Evaporation at Lubuk Sikaping 1979 to 1985 The pan evaporation record at the Lubuk Sikaping station is applied. The pan coefficient of 0.7 is applied for estimating evapotranspiration in the basin. The average monthly pan evaporation is given below. Station Name: Lubuk Sukaping ( ) Unit: mm/day Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Mean ) Calibration Results Through several trial-and-error calculations, the best coincidence between the simulated and observed runoff at the Sipisang station is obtained under the tank parameters as follows. JICA Project for the Master Plan Study of August, 2010

30 Hole Coefficient Height of Hole (mm) β α1 α2 H1 H2 Tank Tank Tank Tank The rainfall-runoff relationship of the simulated runoff is examined compared with the observed runoff as summarized below. Annual Annual Runoff Depth Annual Rainfall Loss Rainfall (mm) (mm) Runoff Coefficient Year (mm) Observed Simulated Observed Simulated Observed Simulated ,430 1,254 1,203 1,177 1, ,314 1,233 1,143 1,081 1, ,635 1,314 1,241 1,321 1, ,615 1,449 1,400 1,166 1, ,029 1,450 1,697 1,579 1, Average 2,605 1,340 1,337 1,265 1, As seen above, the average runoff coefficient and rainfall loss of the simulated runoff are derived to be 0.51 and 1,268 mm, respectively. On the other hand, hydrological indices of the observed runoff at the Sipisang station are 0.52 and 1,265 mm. These derived hydrological indices are judged to be in the hydrologically reasonable range. (6) Prediction of the Long-Term Runoff at the Sipisang AWLR Station The tank model with the calibrated parameters in the above is applied to generate the monthly runoff at the Sipisang station dating back to the period of 1973 to 1993 by use of the estimated monthly basin mean rainfall. The rainfall-runoff relationship of simulated runoff is summarized below. JICA Project for the Master Plan Study of August, 2010

31 Year Annual Rainfall (mm) Annual Runoff Depth (mm) Annual Rainfall Loss (mm) Runoff Coefficient Observed Simulated Observed Simulated Observed Simulated ,213-1,188-1, ,622-1,255-1, , ,208 1, , ,215-1,010-1, ,203-1,071-1, , , , , ,797-1,403-1, ,430 1,254 1,377 1,177 1, ,314 1,233 1,159 1,081 1, ,635 1,314 1,245 1,321 1, ,615 1,449 1,401 1,166 1, ,029 1,450 1,697 1,579 1, ,674-1,410-1, ,231-1, , , ,516-1,184-1, ,030 1,326 1,538 1,704 1, ,874-1,821-1, ,027-1,646-1, Average 2,474-1,251-1, As seen in the table, the average runoff coefficient and rainfall loss of the simulated runoff are derived to be 0.50 and 1,222 mm, respectively. These hydrological indices are judged to be within the hydrological reasonable range. (7) Daily Flow Duration Curve For Masang-2 HEPP, daily runoff data is required for power output computation because the type of scheme is runoff type. Nevertheless, it is difficult to collect long-term daily rainfall and runoff data in Masang River basin and the monthly runoff records are supplemented and extended with Tank Model method. So the combination of daily observed runoff and simulated monthly runoff is used for setting the daily flow duration curve. The value of simulated monthly runoff data is regarded as simulated daily runoff in same amount. The condition of data is summarized below. Time Interval Daily Observed Daily Runoff 1976, 1982 to 1986, 1991 Simulated Monthly Runoff 1973 to 1975, 1977 to 1981, 1987 to 1990, 1992, 1993 (8) Long-Term Runoff at the Masang-2 Intake Weir Site The long-term daily runoff at Masang-2 intake weir site for 21 years in the period of 1973 to 1993 is estimated from the predicted long-term daily runoff at the Sipisang station by using the following equation. The flow duration curve as shown in Figure , is drawn by arranging the discharges in JICA Project for the Master Plan Study of August, 2010

32 descending order and assigning probabilities to each discharge. Q D = QW ( AD / AW ) where, Q D : Runoff at Masang-2 intake weir site (m 3 /sec) Q : Runoff at Sipisang AWLR station (m 3 /sec) W A D : Catchment area at Masang-2 intake weir site (=443km 2 ) A : Catchment area at Sipisang AWLR station (=475km 2 ) W (9) Water Level Observation and Discharge Measurement The field investigation of 3 month water level observation and 30 times discharge measurement was carried out from 2010 October 6 th to 2011 January 7 th by the sub-contractor. Location of the observation is at the Masang-2 intake weir site (St.1) and the Sipisang AWLR station (St.2). H-Q rating curve is established on the basis of observed water level and discharge, and hydrograph is established on the basis of observed water level and H-Q rating curve. Hydrograph is illustrated in Figure Consequently, the average water level is 0.75m and the average runoff is m 3 /s calculated with H-Q rating curve. The Equation of H-Q rating curve is given below. Q = ( H ) 2 where, Q : Runoff (m 3 /sec) H : Water level (m) The observed average runoff is about 15% of probability on the duration curve shown in Figure FLOOD ANALYSIS (1) General Approach Flood analysis is carried out to estimate the probable floods with various return periods as well as the probable maximum flood (PMF) at the Masang-2 intake weir site which are basically required for design of spillway and diversion facilities, and determination of dam height. For estimating the probable floods, the unit hydrograph method is applied, which synthesizes the various probable runoff hydrographs from the probable basin mean rainfalls based on the relationship between unit of basin mean rainfall and its runoff, that is the so-called unit hydrograph. It is generally agreed that the unit hydrograph method is applied for catchment areas less than 3,000 km 2. In this study, the Soil Conservation Service (SCS) unit hydrograph, which is empirically developed in USA Department of the Interior is used, because no hourly flood hydrograph is available at the JICA Project for the Master Plan Study of August, 2010

33 Sipisang AWLR station to construct the unit hydrograph. The general approach of flood analysis is outlined below. (2) Rainfall Analysis 1) Depth-Area-Duration (DAD) Analysis DAD analysis is carried out to examine the following relationships. Relationship between rainfall depth and duration (DD Analysis) Relationship between rainfall depth and area (DA Analysis) a) Depth-Duration (DD) Analysis Generally, heavy rainfall occurs intensively in a short duration and sporadically in a limited area. Hourly rainfall records exceeding 50 mm within 12 hours were selected for estimating the hourly rainfall hyetograph of heavy storm rainfall which might cause flood. The rainfall duration of selected 63-storm rainfall is arranged. Among the storm rainfalls bigger than 50mm, 6-hour of rainfall duration covers 63% of all. Besides, 6-hour of rainfall duration covers 80% of all among the storm rainfalls bigger than 100mm. So, the design rainfall duration time is estimated as 6-hour, which represents the characteristics of the storm rainfalls in Masang River basin. JICA Project for the Master Plan Study of August, 2010

34 40 of selected 63-storm rainfall have smaller duration time than 6-hours. The average of the 40 storm rainfalls is estimated as the design rainfall pattern.. The design distribution of hourly rainfall is shown below. Time (hour) Cumulative Rainfall Depth 0% 47% 78% 87% 95% 99% 100% Incremental Rainfall Depth 0% 47% 31% 9% 8% 4% 1% b) Depth-Area (DA) Analysis Generally, heavy rainfall occurs intensively in a short duration and sporadically in a limited area. Therefore the average depth of storm rainfall (basin mean rainfall) is likely to be smaller than the point depth of storm rainfall. In general, relation between point rainfall depth and average area is expressed by an exponential equation given by the following equation. P b n = P exp[ ka ] 0 where, P b : Average rainfall depth over an area A (mm) P 0 : Maximum point rainfall at the storm center (mm) A : Area in question (km 2 ) k, n : Constants for a given area The above equation is the so-called Horton s Equation. Constants k and n usually vary according to the given rainfall duration such as 1 hour, 6 hours, 12 hours, 1 day, etc. These constants are to be obtained through rainfall analysis based on the isohyetal maps of various major rain storms occurred in the river basin in question. However, the exact determination of P 0 is practically impossible, because it is very unlikely that the rain storm center coincides with a rainfall gauging station. To estimate the basin mean rainfall from the point rainfall, the area reduction factor showing the ratio of basin mean rainfall to point rainfall is introduced as expressed below. P b = f a P 0 where, P b : Basin mean rainfall (mm) P 0 : Point rainfall (mm) f : Area reduction factor a If the Horton s equation is applied, the area reduction factor under the given rainfall duration is given by the following equation. f a = exp[ ka n ] JICA Project for the Master Plan Study of August, 2010

35 However the available rain storm records in the Masang River basin are insufficient for reliable determination of the area reduction factor. The preliminary estimation of the design area reduction factor is carried out based on the following three approaches. Firstly, the area reduction factor is estimated as 0.63 under the catchment area of 443 km 2 for the Masang-2 intake weir site by applying the Horton s equation assuming that constants of k and n are 0.1 and 0.25, respectively. These constants have been widely and empirically applied in tropical rain forest area. A 443 (km2) k 0.1 n 0.25 fa 0.63 Secondly, the estimated design area reduction factors are examined in several other projects. The following design area reduction factors are based on the rainfall analysis using the observed rain storm records. Project Name Catchment Area Area Reduction (km2) Factor Besai HEPP (D/D in 1990) Malea HEPP (F/S in 1984) 1, Tampur-1 HEPP (F/S in 1984) 2, Musi HEPP (F/S in 1984) Cibuni-3 (F/S in 1984) 1, Masang-3 HEPP (Pre F/S in 1999) Thirdly, the relation between the daily point rainfall and the daily basin mean rainfall around the Masang River basin is analyzed to estimate the area reduction factor of the river basin. The selected rainfall stations are the Payakumbuh and Maninjau stations. A basin mean rainfall derives from an arithmetic average of an annual maximum daily rainfall of a target station and daily rainfall of another station at the same day. The average of ratios between basin mean rainfalls and annual maximum daily rainfalls of target stations is estimated as the area reduction factor. Usually, it is considered that the rainfall intensity in hyetal areas increases with the depth of point rainfall. However, the area reduction factor showing the ratio of area rainfall to the maximum point rainfall varies from 0.5 to 0.8 for the area rainfall amount. Further, the area reduction factor does not always increase with the enlargement of the point rainfall. On the other hand, the design area reduction factors examined in several hydropower projects varies from 0.4 to 0.5. In due consideration above, the design area reduction factor is conservatively determined to be JICA Project for the Master Plan Study of August, 2010

36 2) Probable Point Rainfall Out of the available rainfall records around the Masang River basin, the annual maximum 1-day rainfall records are available at the Payakumbuh rainfall gauging station.the rainfall records at the Payakumbuh station have recording periods between 1951 and 1993 with some interruptions in recording. The probable point rainfalls at the station with several return periods are estimated through frequency analysis using the Gumbel and Log Normal distributions as summarized below.. Return Period Probable Point Rainfall (mm) (years) Gumbel LN Average The probable point rainfall is estimated as the average of the probable rainfalls by the Gumbel and Log Normal distributions, because the estimated frequency curves by the Gumbel and Log Normal distributions have similar shapes. 3) Probable Maximum Precipitation (PMP) Generally three (3) approaches are used for estimating the probable maximum precipitation (PMP) as follows. Meteorological (theoretical) approach in consideration of the upper physical limit of moisture source Statistical approach which is empirically developed by Dr. Hershfield from the rainfall records in the United States of America Historical approach by examining the historical maximum one over occurred in the area of interest The available basic climatological data such as dew point, humidity, wind velocity in Masang-2 catchment area for the first meteorological approach are insufficient for the time being. Further, no historical rain storm records are also so far available. Therefore, PMP is estimated by the simple statistical Hershfield method using a series of the JICA Project for the Master Plan Study of August, 2010

37 annual maximum daily rainfall records. This method is widely applied in the basin where rainfall records are available but other basic climatological records are hardly obtainable. The Hershfield s equation is expressed as follows. X = X + K S m n m n where, X m : Extreme value of 24-hour rainfall (PMP) (mm) X : Adjusted mean annual maximum rainfall (mm) n K : Statistical coefficient n m S : Adjusted standard deviation of a series of annual maximum rainfall As seen in the above equation, PMP in question is assumed to be given as the adjusted mean annual maximum rainfall in question plus the K m times the standard deviation of a series of annual maximum rainfall in question. The PMP is estimated by applying a series of annual maximum rainfall in the Masang river basin. The calculation process is as follows. Computation of Statistical Parameters The mean annual maximum rainfall (X n ) and its standard deviation (S n ) are calculated to be 96.1 mm and 47.1 mm, respectively. Concurrently with the above, X n-m and S n-m are estimated at 91.6 mm and 38.2 mm, which are computed after excluding the maximum rainfall in the series of rainfall data. These statistical parameters are used for several adjustment necessary computing X n and S n. Adjustment of X n and S n for Maximum Observed Event The adjustment factors of X n (f x1 ) and S n (f s1 ) for the maximum observed rainfall shall be obtained from the Hershfield s adjustment curves. Applying the values of X n, X n-m, S n and S n-m, adjustment factors are obtained 97 % for f x1 and 89 % for f s1, respectively. Adjustment of X n and S n for Sample Size The adjustment factors of X n (f x2 ) and S n (f s2 ) for the length of record shall be obtained from the adjustment curves. The obtained factors of f x2 and f s2 are % and %, respectively. Statistical Coefficient K m JICA Project for the Master Plan Study of August, 2010

38 The statistical coefficient K m shall be obtained from the empirical K m curves. Applying the mean annual maximum rainfall at the Payakumbuh station (X n ) is 96.1 mm, the Km value is obtained to be Adjustment for Fixed Observational Time Intervals Rainfall observation has been carried out on the daily basis at the Payakumbuh station. Since the recorded daily rainfall is computed based on the single fixed observation time interval (say 8 a.m to 8 p.m), the PMP value yielded by the statistical procedure should be increased multiplying by the adjustment factor (f o ). Applying that the number of observation units is equal to 1, the f o value is obtained to be 113 %. Computation of PMP at the Payakumbuh Station The adjustment mean annual maximum rainfall (X n ) is finally given as follows. X X n = f X 1 f X 2 n In addition, the adjusted standard deviation of a series of annual maximum rainfall (S n ) is given as follows. S S n = f S1 fs 2 n The unadjusted point PMP (X m ) is computed as follows. X = X + K S m n m n Finally, the point PMP is adjusted using the adjustment factor f o as follows. PMP = f O X m As seen, the point PMP at the Payakumbuh station is estimated to be 852 mm. 4) Basin Mean Rainfall Applying the design area reduction factor of 0.5, the probable basin mean 1-day rainfalls with various return periods as well as PMP at the Masang-2 intake weir site are estimated as follows. JICA Project for the Master Plan Study of August, 2010

39 Return Period (years) Probable Rainfall (mm) PMP (3) Hydrograph Analysis 1) Unit hydrograph Since no flood hydrographs are available for the present flood analysis, the unit hydrograph is developed by means of the SCS (Soil Conservation Service) synthetic hydrograph method. The SCS method was developed by analyzing a large number of basins with varying geographic locations. Unit hydrographs were evaluated for a large number of actual watersheds and then made dimensionless by dividing all discharge ordinates by the peak discharge and the time ordinates by the time to peak. An average of these dimensionless unit hydrographs was computed. a) SCS Unit Hydrograph The SCS unit hydrograph is derived from the flood concentration time and unit basin rainfall. The unit hydrograph is constructed for a unit rainfall of 1 mm. The peak discharge of the unit hydrograph is calculated as follows. q = 0.208AQ / p t p where, q p : Peak discharge (m 3 /sec) A : Basin area (km 2 ) Q : Total volume of the unit hydrograph (=1mm) t p : Time to peak (hours) SCS has determined that the time to peak ( t p ) and rainfall duration ( D ) are related to time of concentration ( t c ) as follows. t = p 2 tc / 3 D = t c JICA Project for the Master Plan Study of August, 2010

40 b) Flood Concentration Time The flood concentration time is defined as the time of travel from the most remote point in the catchment to the forecast point. The flood concentration time can be estimated by the formula of Kirpich as follows. t c = 3.97 L S where, t c : Flood concentration time (min) L : Maximum length of travel of water (km) S : Average slope (=H/L, where H is the difference in elevation between the remotest point in the basin and the outlet) c) SCS Unit Hydrograph Calculation With a maximum length of travel ( L ) of 49km, the concentration time ( t c ) was found to be about 6.2 hours. With a catchment area ( A ) of 443 km 2, the peak flow ( q ) is found to be 22.3 m 3 /sec/mm. A 443 km 2 Q 1 mm L km t c 6.2 hours q p 22.3 m 3 /s/mm 4.1 hours t p p 2) Probable Flood Hydrograph at Masang-2 Intake Weir Site The probable flood hydrographs including PMF at the Masang-2 intake weir site are derived by convolution of the probable basin mean rainfall, PMP with the design rainfall hyetograph and the unit hydrograph. The base flow is determined to be 14 (m 3 /s) from the average rainy-season discharge records at the Sipisang AWLR station, and the rainfall loss is assumed to be 47 %. The computed probable flood hydrographs as well as PMF are shown in Figure The probable design flood discharges with various return periods together with PMF are collected from various hydropower projects in Sumatra as presented in Table ) Creager s Coefficient for Probable Floods at Masang-2 Intake Weir Site Creager s coefficient for probable flood is computed by the following equations. JICA Project for the Master Plan Study of August, 2010

41 Q = ( ) C ( A) p a a = 0.894( A) where, Q p : Peak discharge of probable flood (m 3 /sec) C : Creager s coefficient A : Catchment area (km 2 ) The Creager s coefficients corresponding to the various return periods and PMF for the Masang-2 HEPP are enumerated in the table below. T Q C (year) (m3/s) PMF Figure and Figure shows the relationship between probable flood peak discharges with return periods of 2, 20, 100, 200 years as well as PMF and catchment area for the Masang-2 HEPP and other water resources development projects in the whole Sumatra. The Creager s curves are illustrated using the Creager s coefficients of the Masang-2 intake weir site calculated in above. The probable floods at the Masang-2 HEPP are well plotted in reasonable range of design floods in Sumatra. 4) Probable Floods at the Masang-2 Regulating Pond Site The time of concentration ( t c ) at the Masang-2 Regulating Pond is calculated as 0.17 hour with the same method as the Masang-2 intake weir site. Probable floods at the Masang-2 Regulating Pond are estimated with the Creager s coefficients of the Masang-2 intake weir site, because short time interval rainfall records like 10-minutes do not exist in Masang River basin. A 1 km 2 L 1.3 km 0.17 hours t c The results of flood analysis are estimated as follows. JICA Project for the Master Plan Study of August, 2010

42 Intake Pond T Q C Q (year) (m3/s) (m3/s) PMF ) Probable Floods at the Masang-2 Power House Site The Alahanpanjang River and the Masang River join together at the upstream of the Masang-2 Power House site. At the power house site, probable floods seem to be controlled by floods from the Masang River, because the catchment area of the Alahanpanjang River basin is smaller than the Masang River basin. So, Probable floods at the Masang-2 power house site are estimated with the Creager s coefficients of the Masang-2 intake weir site as same as the regulating pond. The catchment area of the power house site is 919.5km 2. The results of flood analysis are estimated as follows. Intake PH T Q C Q (year) (m3/s) (m3/s) PMF (4) Water Level Observation and Discharge Measurement As mentioned in the chapter of lowflow analysis, the field investigation of 3 month water level observation and 30 times discharge measurement was carried out from 2010 October 6 th to 2011 January 7 th by the sub-contractor. Consequently, the maximum water level is 2.01m and the maximum runoff is m 3 /s calculated with H-Q rating curve in extrapolation. The Equation of H-Q rating curve is given below. JICA Project for the Master Plan Study of August, 2010

43 Q = ( H ) 2 where, Q : Runoff (m 3 /sec) H : Water level (m) SEDIMENT ANALYSIS (1) General Sedimentation analysis is preliminarily carried out to estimate the denudation rate in the Masang River basin. The sedimentation load is herein predicted based on the estimated runoff and the sediment discharge rating curve at the intake weir site. The rating curve is established based on the in-situ sampling records obtained through the field investigation conducted in the course of the study. The field investigation was carried out at the Masang-2 intake weir site and Sipisang AWLR station. The sediment transport in the Masang River is judged to be higher than other rivers in the Sumatra. The denudation rate showing the expected average annual erosion rate in a river basin is generally influenced by the topography (soil condition, river gradient), deforestation of the land in the basin, rainfall intensity, etc. In addition, the design denudation rates adopted in other water resources or hydropower development projects in Sumatra are collected for comparison purposes. (2) Suspended Load Sampling A total of thirty (30) suspended load samplings were carried out at the intake weir site where discharge measurements were taken. The samples were taken to a laboratory for further analysis. The sieve analysis results of samples are shown in Figure (3) Suspended Load Rating Curve The laboratory analysis results of the samples show the total suspended sediment concentration which is the combination of both dissolved and undissolved sediment. The total suspended load is found from the following formula. Q = C S Q W where, Q S : Suspended load (ton/day) C : Total suspended sediment concentration (mg/l) Q : Flow discharge (m 3 /s) W Several results are considered unreliable because they show very low concentration or very high concentration. Therefore these unreliable results will not be used in the determination of the suspended load rating curve. The values of Qs are plotted against their respective Qw values to determine the suspended load rating curve. On the basis of the estimated sediment discharge at the intake weir site, JICA Project for the Master Plan Study of August, 2010

44 the suspended load rating curve is established as shown in Figure The rating curve equation is given below. S QW Q = If the flow discharge Qw is known, the suspended load sediment Qs can be estimated. (4) Total Sediment Load The annual suspended load sediment yield is simulated by applying the above rating curve to the simulated daily runoff at the intake weir site. The catchment area of the Masang-2 intake weir site is 443km 2. Substituting runoff data, the average annual suspended load sediment at the intake weir site is estimated at 369,749 ton. The density of sediment in appearance can be calculated by the following equation. γ = ( 1 V ) γ where, γ : Density of sediment (ton/m 3 ) V : Void ratio of sediment γ : Unit weight of sediment (=2.65ton/m 3 ) Assuming a void ratio of 60 % in sedimentation, the density of sediment is found to be 1.06 ton/m 3. Hence, the annual suspended load sediment is estimated at 348,820 m 3. The sediment load transport into an intake weir generally consists of suspended load and bed load. It is generally accepted that it might be difficult to accurately measure the bed load in a natural river. Usually, the rate of bed load transport is empirically estimated at 10 to 30 % of the total suspended load. The rate of bed load transport is estimated as 10% of the total suspended load, because 10% is usually applied in Indonesia. Consequently, the mean annual sediment inflow volume into the Masang-2 intake weir is estimated to be 383,702 m 3, which is equivalent to a denudation rate of 0.87 mm per year. For comparison purpose, design denudation rates of various schemes around the project site are presented in the following table. JICA Project for the Master Plan Study of August, 2010

45 Project Name Project Stage Province Catchment Area Denudation Rate (km2) (mm/year) Masang-3 Pre-F/S W. Sumatra Bt. Tonggar W. Sumatra Bt. Bayang-1 Pre-F/S W. Sumatra Bt. Bayang-2 Pre-F/S W. Sumatra Kotapanjang D/D Riau 3, Kampar River Basin F/S Jambi Upper Indragiri River Basin Jambi Middle Indragiri River Basin Jambi Merangin-2 D/D Jambi 1, Merangin-5 Pre-F/S Jambi 2, Lake Kerinci Jambi 1, Source: Masang-3 HEPP, As seen in the above table, the design denudation rates vary from 0.34 to 0.72 mm/year. The assumed denudation rate of 0.87 mm/year at the Masang-2 intake weir site might not be in the appropriate range. Referring to the geology report in this study, there is place of gravel pit in the upstream of Masang River, and gravel extraction is seems to be carried out frequently. The samples of suspended load might be influenced by the gravel extraction. The gravel extraction might not be continuously carried out, so the design denudation rate of the Masang-2 intake weir should be estimated without influence of the gravel extraction in upstream. Nevertheless, it is difficult to estimate the volume of sediment yield from the gravel pit. The grain size distributions of the samples are consists of mainly fine size grain smaller than 0.1mm, of which falling velocity is slow. It is estimated that the fine size grain has small influence to the sedimentation in the intake weir. Consequently, the design denudation rate of the Masang-2 intake weir is estimated as 0.5mm/year which is the middle of design denudation rates in other projects. The design annual sediment inflow volume into the Masang-2 intake weir is estimated to be 221,500m 3 /year WATER QUALITY ANALYSIS Water quality is important because it is linked to the availability of water for various uses. Specifically, for the Masang-2 HEPP it is important for the well being of hydraulic machinery, other equipment and hydraulic structures used in the project. The laboratory test for water quality was carried out through the field investigation under the current study to identify the content of various chemical elements contained in the water in the Masang River. Water sampling is carried out three (3) times in total at the Masang-2 intake weir site. The samples were taken to a laboratory for further analysis. The laboratory test results are presented in Table The table shows that the ph of the water in the Masang River is around 8. It is therefore judged that the water in the Masang River will have no JICA Project for the Master Plan Study of August, 2010

46 adverse effect on turbine and metal for hydropower use, because adverse effect is expected to occur under the ph value smaller than 4.5. JICA Project for the Master Plan Study of August, 2010

47 Table Annual Rainfall Loss of Various River Basins in Sumatra No. Station River Gauge ID Catchment Basin Annual Annual Annual Runoff Observation Name Basin Area Mean Mean Runoff Rainfall Coeff. Period Rainfall Runoff Depth Loss (km 2 ) (mm) (m 3 /sec) (mm) (mm) 1 Lhok Nibong Kr. Jambu Aye ,583 2, ,209 1, Stabat S. Wampu ,870 3, ,685 1, Lb. Sipelanduk Bt. Pane , ,082 1, Lb. Bendahara S. Rokan ,325 2, ,342 1, Tj. Ampalu Bt. Kuantan ,215 2, ,105 1, Sungai Dareh Bt. Hari ,452 3, ,197 1, Muara Inum Bt. Hari ,455 3, ,332 1, Martapura A. Musi ,260 2, ,666 1, Banjarmasin W. Tl. Bawang , ,921 1, Kunyir W. Sekampung , ,663 1, Kp. Darang Kr. Aceh ,081 2, , Tui Kareng Kr. Teunom ,403 3, ,413 1, Hp. Baru Bt. Toru ,773 2, ,466 1, Air Batu Bt. Indrapura , , Air Gadang Bt. Pasaman ,339 3, , Despetah A. Musi , , Source : Sectoral Report Vol. 2 : Hydrology, Hydro Inventory Study, July 1997 JICA Project for the Master Plan Study of August, 2010

48 Table Probable Floods under Various Schemes in Sumatra Catchment Probable Peak Discharge (m3/sec) No Scheme River Province Area Return Period (year) (km2) ,000 10,000 PMF 1 Tampur-1 Kr. Tampur D.I. Aceh 2,025 2,870 3,590 7,470 2 Teunom-1 Kr. Teunom D.I. Aceh 900 2,300 3,120 8,390 3 Aceh-2 Kr. Aceh D.I. Aceh 323 1,030 1,470 3,510 4 Lawe Alas-4 Lawe Alas D.I. Aceh 5,705 2,500 4,250 12,500 5 Peusangan-4 Kr. Peusangan D.I. Aceh 945 1,600 6 Lake Laut Tawar Kr. Peusangan D.I. Aceh ,670 7 Residual Basin-1 Kr. Peusangan D.I. Aceh ,020 8 Jambu Aye Kr. Jambu Aye D.I. Aceh 3,890 1,939 2,331 3,800 4,850 9 Rubek Kr. Jambu Aye D.I. Aceh Residual Basin-2 Kr. Peusangan D.I. Aceh Lalang S. Belawan N. Sumatera Tembakau S. Percut N. Sumatera Lausimeme S. Percut N. Sumatera Helvetia S. Deli N. Sumatera Namobatang S. Deli N. Sumatera Baru S. Serdang N. Sumatera Pulau Tagor S. Ular N. Sumatera 1, , Karai S. Ular N. Sumatera Brohol S. Padang N. Sumatera Rampah S. Belutu N. Sumatera Renun A. Renun N. Sumatera , Wampu S. Wampu N. Sumatera 1,570 2, Limang S. Wampu N. Sumatera Sipan Sihaporas Sipan Sihaporas N. Sumatera , Batang Bayang-1 Bt. Bayang W. Sumatera Batang Bayang-2 Bt. Bayang W. Sumatera Muko-Muko Bt. Antokan W. Sumatera Masang-3 Bt. Masang W. Sumatera 993 1,136 2,204 2,878 3,168 3,851 4,854 10, Merangin-5 Bt. Merangin Jambi 2,597 1,970 2,460 5, Lake Kerinci Siulak Jambi ,538 2,177 2,464 3,102 4,092 13, Batang Hari Bt. Hari Jambi 4,452 1,937 4,192 5,603 6,205 7, Batang Hari (Alt.) Bt. Hari Jambi 3,825 1,664 3,602 4,814 5,331 6, Kiri-1 Bt. Kampar Riau 1,187 2,537 7, Kiri-2 Bt. Kampar Riau 552 1, Kapoernan Bt. Kampar Riau 699 2, Kotapanjang Bt. Kampar Riau 3,337 1,183 1,624 8,000 11, Upper Sinamar Bt. Indragiri Riau 3,180 3,180 8, Sukam Bt. Indragiri Riau 360 1, Lower Kuantan Bt. Indragiri Riau 7,453 10, Ombilin Bt. Ombilin Riau 1, Musi (Intake Dam) A. Musi S. Sumatera ,010 1, Musi (Regulation Dam) A. Musi S. Sumatera Martapura Way Komering S. Sumatera 4,260 1,300 1,900 2,200 2,300 2,700 6, Lematang-4 A. Lematang S. Sumatera 1,321 1,870 2,430 5, Mine Mouth Steam Plant A. Lematang S. Sumatera 3,667 6, Ketaun-1 A. Ketaun Bengkulu ,070 7,140 Masang-2 Bt. Masang W. Sumatera ,198 1,341 4,344 Source: Hydro Inventory Study, Sectral Report Vol.2 Hydrology, July Masang-3 HEPP, JICA Project for the Master Plan Study of August, 2010

49 Table Water Quality Analysis of Masang River No Water Quality Parameter Unit Sample-1 Sample-2 Sample-3 Date 2010/10/ /11/ /12/25 Weather Clear Cloud Cloud 1 ph Temperature Total Hardness mg/l Temporary Hardness mg/l Suspended Matter mg/lit Total Solid mg/lit Ignition Residue mg/lit Permanganate Value as O2 mg/lit Carbonates as CaCO3 mg/lit Bicarbonates as CaCO3 mg/lit Calcium (Ca) mg/lit Magnesium (Mg) mg/lit Sodium (Na) mg/lit Potassium (K) mg/lit Iron (Fe) mg/lit Manganese (Mn) mg/lit < Copper (Cu) mg/lit < Turbidity NTU Color Pt-Co-Unit kol 10 kol 20 Electric Conductivity µ/cm Aluminum (Al) mg/lit Silica (SiO2) mg/lit Lead (Pb) mg/lit Arsenic (As) mg/lit Ammonium (NH4) mg/lit <0.02 < Albuminoid mg/lit <0.1 <0.1 < Nitrites (NO2) mg/lit Nitrates (NO3) mg/lit Sulfities (SO3) mg/lit < Sulfates (SO4) mg/lit Chlorides (Cl) mg/lit Phosphates (PO4) mg/lit <0.002 < Oxygen (O2) mg/lit Carbon Dioxide (CO2) mg/lit P-value as CaCO3 mg/lit <0.02 < M-Value as CaCO3 mg/lit JICA Project for the Master Plan Study of August, 2010

50 Figure Location Map of Meteo-Hydrological Stations JICA Project for the Master Plan Study of August, 2010

51 Daily Rainfall Records BMG HPPS2 No. Station Name ID ID 1 Maninjau 52B Year Remarks 2 Limau Purut 52C Padang Panjang Bukit Tinggi Baso 54A Padang Mangatas 54C Payakumbuh Koto Tinggi 56A Suliki 56B Kota Baharu Bonjol 58C Jambak 58F Lubuk Sikaping Source: BMKG Monthly Rainfall Records BMG HPPS2 No. Station Name ID ID 1 Maninjau 52B Year Remarks 2 Limau Purut 52C Padang Panjang Bukit Tinggi Baso 54A Padang Mangatas 54C Payakumbuh Koto Tinggi 56A Suliki 56B Kota Baharu Bonjol 58C Jambak 58F Lubuk Sikaping Source: HPPS2 Report, Masang-3 HEPP Report, BMKG Figure Availability of Climatic Records (1/2) JICA Project for the Master Plan Study of August, 2010

52 Daily Runoff Records DPMA HPPS2 No. Station Name ID ID Remarks 1 Bt. Masang Sipisang years Source: Pusair Bandung Year Daily Water Level Records DPMA HPPS2 No. Station Name ID ID 1 Bt. Masang Sipisang Source: BPSDA Bukit Tinggi Year Remarks Monthly Runoff Records DPMA HPPS2 No. Station Name ID ID 1 Bt. Masang Sipisang Source: HPPS2 Report, Masang-3 HEPP Report, Pusair Bandung. Year Remarks Air Temperature BMG HPPS2 No. Station Name ID ID 1 Tabing-Padang Source: BMKG Relative Humidity BMG HPPS2 No. Station Name ID ID 1 Tabing-Padang Source: BMKG Sunshine Duration BMG HPPS2 No. Station Name ID ID 1 Tabing-Padang Source: BMKG Wind Velocity BMG HPPS2 No. Station Name ID ID 1 Tabing-Padang Source: BMKG Year Year Year Year Remarks Remarks Remarks Remarks Pan Evapolation Management No. Station Name Body 1 Lubuk Sikaping BMG 2 Tanjung Pati P3SA Source: Masang-3 HEPP Report, 1999 : Complite Data : Incomplite Data Year Remarks Figure Availability of Climatic Records (2/2) JICA Project for the Master Plan Study of August, 2010

53 B. A. Alahanpanjang Power House Site B. Masang Sipisang AWLR station B. Masang S. Guntung Masang-2 Basin 443km 2 Masang-2 Intake Weir Site B. Sianok Figure Catchment Area of Masang-2 Intake Weir based on 1:50,000 map JICA Project for the Master Plan Study of August, 2010

54 Probability Estimated Runoff (%) (m3/s) 0% % % % % % % % % % % % % % % % % % % % % 6.32 Average Masang-2 Intake Weir Site Probability of Exceedence Runoff (m3/s) Figure Flow Duration Curve of Estimated Daily Runoff at Masang-2 Intake Weir Site JICA Project for the Master Plan Study of August, 2010

55 2.0 Maximum Water Level 2.01m 2010/11/26 6: Water Level (m) 1.0 Average Water Level 0.75m 0.5 Minimum Water Level 0.55m 2010/12/ /10/1 2010/10/ /10/ /11/ /11/ /12/ /12/ Maximum Runoff m3/s 2010/11/26 6: Runoff (m3/s) Average Runoff m3/s Discharge Measurement Estimated Runoff with H-Q Rating Curve Minimum Runoff m3/s 2010/12/ /10/1 2010/10/ /10/ /11/ /11/ /12/ /12/30 Figure Result of Water Level Observation and Hydrograph Calculated with H-Q Rating Curve JICA Project for the Master Plan Study of August, 2010

56 Time (hour) PMF Discharge (m3/s) Figure Probable Flood Hydrographs at Masang-2 Intake Weir Site JICA Project for the Master Plan Study of August, 2010

57 100,000 Probable Maximum Flood Flood Peak Discharge (m3/s) 10,000 1, PMF C=92 Masang-2 PMF ,000 10, ,000 Catchment Area (km2) 100,000 Return Period = 200 year Flood Peak Discharge (m3/s) 10,000 1, C=28 Masagn ,000 10, ,000 Catchment Area (km2) Figure Relationship between Probable Peak Discharge and Catchment Area in Sumatra (1/2) JICA Project for the Master Plan Study of August, 2010

58 10,000 Return Period = 100 year Flood Peak Discharge (m3/s) 1, C=25 Masagn ,000 10, ,000 Catchment Area (km2) 10,000 Return Period = 2 year Flood Peak Discharge (m3/s) 1, C=10 Masagn ,000 10, ,000 Catchment Area (km2) Figure Relationship between Probable Peak Discharge and Catchment Area in Sumatra (2/2) JICA Project for the Master Plan Study of August, 2010

59 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Grain Size (mm) Intake06-Okt-10 Intake06-Okt-10 Intake06-Okt-10 Intake09-Okt-10 Intake09-Okt-10 Intake09-Okt-10 Intake22-Okt-10 Intake22-Okt-10 Intake22-Okt-10 Intake25-Okt-10 Intake25-Okt-10 Intake25-Okt-10 Intake05-Nop-10 Intake05-Nop-10 Intake05-Nop-10 Intake21-Nop-10 Intake21-Nop-10 Intake21-Nop-10 Intake25-Nop-10 Intake25-Nop-10 Intake25-Nop-10 Intake05-Des-10 Intake05-Des-10 Intake05-Des-10 Sipisang21-Des-10 Sipisang21-Des-10 Sipisang21-Des-10 Sipisang25-Des-10 Sipisang25-Des-10 Sipisang25-Des-10 % Figure Sieve Analysis of Suspended Load JICA Project for the Master Plan Study of August, 2010

60 Adopted Not Adopted 100,000 Suspended Load, Qs (ton/day) 10,000 1, y = x Runoff, Qw (m3/s) Figure Suspended Load Rating Curve JICA Project for the Master Plan Study of August, 2010

61 16.5 POWER SYSTEM CONDITION Figure presents data for the power system in the vicinity of potential sites as of 2011, 2019, and 2027, using the estimated indicators for power demand formulated in Chapter 3. In this figure, the figures in the circular symbols indicate the peak power (upper row) and base power (lower row, in parentheses) at each substation (bulk supply point). The potential site located on the northern shore of Lake Maninjau is situated outside the 150kV loop system encircling Padang, another big consumption center. The nearest major demand center is Bukit Tinggi. However, Bukit Tinggi is connected to the aforementioned 150kV system, and the loop system is scheduled to be connected to the 275kV system at Payakumbuh and Kiliranjao in Connection to this system will presumably also resolve the problem of voltage drop at Payakumbuh and Padang Luar. For this area, the forecast envisions base power of 121 MW as compared to peak power of 201 MW 1in 2019, and corresponding figures of 218 and 363 MW in The power sources in this area able to make a direct contribution to base power are PLTA Maninjau (4 x 17 MW), which is connected to GI Maninjau, and PLTA Batang Agam (3 x 3.5 MW), which is connected to GI Payakumbuh. Considering the capacity factors 2 of each source, the available power inclusive of this potential would be about 71 MW. This would make it difficult to secure the power for this system shown in the figure in its entirety. Assuming improvement of the power supply and quality at Payakumbuh and Padang by connection to the 275kV system, and limiting the system scope of the base power secured by this hydropower source to the GI Simpang Empat - GI Maninjau section, the available power inclusive of this potential would be about 65 MW, and make it possible to secure most of the system base power required in GI Simpang Empat is a bulk supply point on the northern end supporting the power demand in the far northern part of West Sumatra Province. It may be anticipated to become a source that is also required for eliminating the prospective problem of voltage drop in the distribution system connected to it. 1 The diversity factor was excluded from consideration. 2 Hydropower :60% is applied. JICA Project for the Master Plan Study of August, 2010

62 Year 2011 Simpang Empat 21.9 Masang2 Maninjau MW Padang Luar MW Ke Kota Padang Year 2019 Simpang Empat 45.3 (27.2) Masang MW Maninjau (14.1) (39.7) (39.6) Padang Luar MW Ke Kota Padang Year 2027 Simpang Empat 81.6 (49.0) Masang MW Maninjau (25.2) (71.6) (72.0) Padang Luar MW Ke Kota Padang Source: JICA Study Team by reference to RUPTL Figure Power system condition around potential site (Masang-2) JICA Project for the Master Plan Study of August, 2010

63 Chapter 17 Plan Formulation CHAPTER 17 PLAN FORMULATION 17.1 BASIC CONDITIONS AND ASSUMPTIONS FOR OPTRIMIZARTION STUDY (1) Original Scheme The Masang-2 project site is located about 15 km north of Lake Maninjau and 90 km north of Padang city in West Sumatra Province. The Masang-2 scheme was originally formulated as a run-of-river type hydropower development project capable of daily peak generation. In the original plan, the peaking generation was considered possible by effect of a storage reservoir created by diversion weir on main stream of the Masang river. The original layout is as shown in Figure Source: HPPS-2 (1999) Sectoral Report Vol. 11 Figure Original Layout of Masang-2 Scheme Main features of the original scheme are as follows: Average annual runoff: 25.5 m 3 /s Reservoir Full Supply Level (FSL): El m Reservoir Minimum Operation Level (MOL): El m JICA Project for the Master Plan Study of 17-1 August, 2011

64 Chapter 17 Plan Formulation Active storage volume of reservoir: 0.6 mil. m 3 Headrace tunnel (diameter x length): D3.9 m x 6,700 m Penstock (diameter x length): D3.1 m x 500 m Powerhouse, tail water level: El m Power and energy generation, Max. plant discharge: 33.2 m 3 /s Average net head: m Installed capacity: 39.6 MW Annual energy production: GWh (2) Alternative Powerhouse Site Using the original layout as a basis for the current optimization study, site reconnaissance in the Masang-2 project site was conducted. During the preliminary review of the layout, it was revealed that the river bed elevation at powerhouse site on the 1/50,000 map available at that time is several 10 meters higher than the originally estimated tail water elevation. Also by the provisional rough measurement by a hand GPS device at the site reconnaissance, the river bed elevation seemed about 20 m higher than the tail water level indicated in the original design. Such higher river bed level at the powerhouse site unfavorably results in reduction of power output by more than 15%. It is understood that the original Masang-2 powerhouse site was selected in initial phase of HPPS-2 on the basis of a temporary plan of the downstream Masang-3 scheme of which the reservoir FSL was set at El. 200 m. In the later phase of the HPPS-2, Pre F/S was conducted for themasang-3 scheme and its reservoir FSL was lowered to El. 167 m to avoid submergence of vast farm land and populated town on the upstream tributary (Alahanpanjan river). The Masan-3 scheme is a hydropower project with 90 m high dam. However, its dam site is located within the natural reserve range. Implementation of the Masang-3 project seems unrealistic. In view of this situation, it is decided to shift the powerhouse site 2.3 km downstream in the current study. The planned new site is just below the junction of the Masang river with the Alahanpanjan river. By this shifting, the available water head for power generation increases by more than 50 m. Therefore, the idea of locating powerhouse on the original site is abandoned in the current study. (3) Alternative Options for Intake Site The original intake site (named Plan A) is located 500 m downstream from the junction of two rivers, i.e. Masang and Guntung rivers. Topographic survey works and geological investigations by the JICA team were started at the original intake site. However, it was revealed during the initial exploratory drilling that the original intake site is covered with weak volcanic sediment layer of more than 20 m thick at the river bed. Such thick and weak layer causes difficulty of intake weir construction and increase of construction cost. To find more favorable intake sites, further reconnaissance was conducted along the downstream river course. In the reconnaissance, rock outcrop was found on river bed at a sharp bend of river in a range JICA Project for the Master Plan Study of 17-2 August, 2011

65 Chapter 17 Plan Formulation of 0.5 to 1.0 km downstream from the original intake site. The rock outcrop was considered to have sufficient strength for supporting intake weir. This river stretch was selected as alternative intake sites (named Plans B and C). (4) Flow Regulation Pond for Daily Peak Generation In the original HPPS-2 plan, it was proposed to create a storage reservoir (0.6 mil. m 3 ) on the main stream by a 20 m high diversion weir in order to regulate river flow for daily peak generation. However, the upper Masang and Guntung river basins are covered with volcanic materials. River slope upstream of the intake site is steep and the Guntung river bed is filled with big boulders and sand/gravel. The river water contains considerable amount of volcanic silt and sand due to ground surface erosion. It is foreseen that, even if a daily regulation reservoir is created on the main stream, it will soon be filled with sediments. For flushing of deposited sediments to recover the original storage capacity, the reservoir water level has to be lowered periodically down to reservoir bottom and much of inflow water has to be discharged downstream without utilizing it for generation. This means that generation operation has to be interrupted frequently for the sediment flushing operations. In addition, it is foreseen that if river bed boulders in the upstream reaches are washed out by flood flows into the reservoir, flushing-out of accumulated boulders from the reservoir is extremely difficult. Therefore, the idea of creating a reservoir (or pond) on the main stream is abandoned in the current study. Instead of creating main stream reservoir, it is planned to build an intermediate regulation pond on the route of waterway utilizing natural creek or relatively flat land existing between the intake and the powerhouse. However, as the natural creek depression is not enough to create a large pond sufficient for daily flow regulation, it is necessary to excavate the hill ground around the creek. (5) Restriction of Peak Generation Duration The duration of peaking generation depends on daily load curve in the regional power system. The future daily peak load duration in Sumatra is estimated to be 4 to 7 hours a day. The power plant for longer peak duration and higher generation output requires larger water storage capacity of regulation pond. In case of the Masang-2, land topography along and around the route of waterway is relatively steep and does not suite to build large storage pond. Closing of a small natural creek on the waterway route by embankment cannot make a pond having sufficient storage capacity because of steep terrain slope. In addition to the creek closing embankment, large scale excavation is required for creating a sufficient capacity pond. However, due to relatively steep terrain slope, scale of excavation becomes excessively large in comparison with the pond storage volume. In consideration of such topographic restriction, the peak duration time is fixed to be 4 hours a day for all alternatives. This duration is considered to be the minimum limit for the practical system operation. (6) Penstock Line JICA Project for the Master Plan Study of 17-3 August, 2011

66 Chapter 17 Plan Formulation Surface slope of the hill between surge tank and the powerhouse is not so steep. Construction of surface type penstock is relatively easy though anticipated base rock surface is deep. Most of forest cover is production forest. Environmental impact caused by penstock line construction seems less serious. (7) Topographic Data In the initial phase of the current study, only a map with scale of 1/50,000 was available for layout study. In the later phase, the following new maps prepared by local survey subcontractor of the JICA team were made available for optimization study. One 1/10,000 map covering whole project area (intake to powerhouse), made by photogrammetric mapping utilizing available satellite images. Four 1/2,000 maps respectively covering a 1.5 km stretch around the original intake site, a downstream alternative intake site area, intermediate pond area and a powerhouse area, which were all made by field survey works. It is recognized that there are large elevation differences between the old 1/ map and newly surveyed map. The elevation information indicated in the new maps is used for the optimization study. Therefore, elevation figures shown in the designs of HPPS-2 are revised on the basis of the new maps. (8) River Runoff Stream flow series of the Msang river is analyzed on daily basis in the foregoing Chapter 16. Long term average runoff (inflow) at the original intake site is estimated at m 3 /s. Firm runoff (95% dependable inflow) estimated is m 3 /s. (9) River Maintenance Flow If river water is fully diverted at intake weir to power waterway, the river just downstream of the intake weir becomes dry. To preserve natural environment of the downstream reaches, inflow at the intake weir needs to be partly released downstream. Rate of the required minimum downstream flow is decided to be 0.2 m 3 /s per 100 km 2 of catchment area above the intake weir. This rate is applied to other hydropower projects constructed or being constructed in Sumatra. Since the catchment area of Masang-2 intake site is approximately 445 km 2, the required minimum flow is decided to be 0.89 m 3 /s (>0.2 x 445/100). Two large tributaries join the main stream within about 1 km stretch downstream of the intake site B. One of them is a right tributary Belukar river covering catchment area of 7 km 2, which joins the main stream at immediate downstream of the intake site B. The other is a left tributary Banban river covering catchment area of 15 km 2, joining at 1 km downstream from the intake site B. It is estimated that those tributaries drain water of 0.16 m 3 /s and 0.34 m 3 /s, respectively to the main stream on the 95% dependability. At least 0.50 m 3 /s comes from the tributaries in the 1 km stretch. This effect of JICA Project for the Master Plan Study of 17-4 August, 2011

67 Chapter 17 Plan Formulation inflow is reflected on the requirement of minimum flow release from the intake weir SELECTION OF OPTIMAL DEVELOPMENT LAYOUT (1) Alternative Layout Plans Three alternative layout plans are taken up for optimization study. Layouts of them are shown in Figure PLAN A PLAN B PLAN C Masang-2 HEPP Alternative Layouts Source: JICA Study Team Figure Alternative Layout Plans of Masang-2 Scheme Main features of each alternative plan are described in the following table: Alternatives Plan A Main Features The intake site is identical to that in the original HPPS-2 layout. Full Supply Level (FSL) at intake is El. 358 m. Tail Water Level (TWL) at powerhouse is El. 142 m. Gross head between the intake and the powerhouse is 216 m. Adverse geology is encountered in the intake site. Depth of soft overburden is more than 20 m at river bed. Concrete pile foundation is required in the intake weir and JICA Project for the Master Plan Study of 17-5 August, 2011

68 Chapter 17 Plan Formulation intake structures. Total length of headrace waterway (intake to surge tank, except pond) is 7.40 km. Daily peak generation is made possible by a regulation pond created on small natural creek by excavation. Pond storage capacity is limited. Plan B Intake site is shifted downstream by 0.5 km from the Plan A site. Geology at the foundation is relatively good. Lime stone rock is exposed in river bed. FSL at intake is El. 344 m. TWL at powerhouse is El. 142 m. Gross head between the intake and the powerhouse is 202 m. Total length of headrace waterway (intake to surge tank, except pond) is 7.24 km. An upstream 1 km long waterway is cut-and-cover culvert. Underground tunnel works are reduced. Daily peak generation is made possible by a regulation pond created on small natural creek by excavation. Pond storage capacity is limited. Plan C Intake site is shifted further downstream by 1 km from Plan A site. Geology at the foundation is marginally good. Rock is exposed in the river bed. FSL at intake is El. 333 m. TWL at powerhouse is El. 142 m. Gross head between the intake and the powerhouse is 191 m. Total length of headrace waterway (intake to surge tank, except pond) is 6.90 km. An upstream 0.5 km long waterway is cut-and-cover culvert. Length of waterway is 340 m shorter than Plan B. Daily peak generation is made possible by a regulation pond created on small natural creek by excavation. Pond capacity is limited. (2) Maximum Plant Discharge and Required Pond Capacity In the development scale optimization study in the succeeding Section 17.3, the discharge of 32.0 m 3 /s is selected as the optimal maximum plant discharge. This plant discharge is also applied herein for all alternative layouts. It is noted that this maximum plant discharge is decided taking into account the restriction by the pond storage capacity. This means that the firm runoff is not fully used for peak generation and part of the firm runoff is used for off-peak generation even in drought time. The required active storage capacity in the daily regulation pond is calculated by: V = 3600 T max ( Q ) Q f Where, V = Required active storage volume in pond (m 3 ) T = Peaking time (hours/day) Q max = Maximum plant discharge for generation (m 3 /s) Q f = Firm discharge for generation = 95 % dependable discharge (m 3 /s) (3) Design Input Data Basic input data for designing each Plan are listed in the following table: JICA Project for the Master Plan Study of 17-6 August, 2011

69 Chapter 17 Plan Formulation Design Input Data Description Unit Plan A Plan B Plan C 1. Catchment area above intake weir km Average river runoff m 3 /s Firm runoff (95% dependable) (q) m 3 /s Min. downstream flow release from intake (qr) Inflow from tributaries in 1 km stretch Total min. river flow at 1 km downstream m 3 /s m 3 /s m 3 /s Firm discharge for generation (Qf) = q - qr m 3 /s Daily peaking time (T) hours Max. plant discharge (Qp) m 3 /s Intermediate pond, active storage req d (V) m 3 322, , , Intermediate pond, water surface area ha (4) Designed Features Designed features of principal facilities in each plan are presented in the following table: Designed Features of Principal Facilities Description Unit Plan A Plan B Plan C 1. Intake Weir (Un-gated concrete weir) Height (below overflow crest) FSL 2. Connection Culvert (free-flow flume with box shape) Internal section size (W x H) Length 3. Connection Tunnel (free-flow tunnel with horse-shoe section) Diameter Length 4. Intermediate Pond FSL MOL Drawdown 5. Headrace Tunnel (pressure flow tunnel with circular section) Diameter Length 6. Penstock (underground inclined shaft type) Pipe diameter Length m El. m JICA Project for the Master Plan Study of 17-7 August, 2011 m km m km El. m El. m m m km m m None = = x x Powerhouse Type Surface type Surface type Surface type

70 Chapter 17 Plan Formulation Tail water level El. m Generating Equipment Installed capacity (total of 2 units) Max. plant discharge Rated net head MW m 3 /s m (5) Construction Cost Construction cost of each Plan is estimated by applying the estimation basis described in Chapter 19. The estimated costs excluding contingencies are as follows: 1. Civil Works Intake facilities Water way Intermediate pond Penstock and powerhouse Sub-total Construction Costs Estimated for Each Plan Unit: US$ million Description Plan A Plan B Plan C Mechanical & Electrical Works Preparatory and Environmental Works Engineering and Land Costs TOTAL (6) Power Generation Calculation For each Plan, power generation calculation is carried out applying the flow duration curves derived from the 21-year low flow analysis ( ) in Section Daily average discharge duration curve applied is shown in Figure Because there is no significant difference of the catchment areas of the three Plans ( km 2 ), the same river flow duration curve is applied for all three Plans. Discharge (m3/s) Masang-2: Plans A, B and C Natural River Flow Inflow to Intake Probability of exceedence (%) Source JICA Study Team Figure Daily Average Discharge Duration Curve JICA Project for the Master Plan Study of 17-8 August, 2011

71 Chapter 17 Plan Formulation All three plans are capable of peaking generation for 4 hours a day by the effect of intermediate pond having the storage capacity of 322,000 m 3. However, due to difference of working water head, the Plan A is highest in generation output and the Plan C is lowest. The results of generation calculation are as follows: Results of Power Generation Calculation Description Unit Plan A Plan B Plan C a. Maximum power output MW b. 95% dependable power output (4-hour peak) MW c. Annual average energy production GWh d. Plant factor (*) % Remarks (*) : PF= (c/8.76)/a (7) Economic Comparison All three Plans are operated by mixed generation mode, i.e., 4-hour peak and 20-hour off-peak generations. Benefits of the peak time power and energy are evaluated applying generation cost of gas-turbine power plant suitable for peaking generation. Benefits of the off-peak time power and energy are evaluated applying generation cost of coal-fired thermal power plant suitable for base load operation. Those thermal generation costs are explained in Chapter 14 and are summarized below. Gas turbine generation cost for peak time benefit: Power: US$/kW Energy: US$/kWh Coal-fired plant generation cost for off-peak time benefit: Power: US$/kW Energy: US$/kWh Total outputs obtained by the generation calculations are separated to peak time output and off-peak time output. The equations for separation, which are explained in Chapter 14, are as follows: Output Power (kw) Energy (kwh/year) Peak time output 24P E /365 = 24 T T(24P E /365) = x T Off-peak time output TP + E /365 = 24 T 24( TP + E /365) = x T Remarks: P = Peak output (dependable), kw E = Annual energy production, kwh T = Peaking hour (hours/ day) Power and energy outputs of each Plan and their benefits are calculated in the following table. Construction cost of each Plan is annualized by applying the capital recovery factor (=0.1009) based JICA Project for the Master Plan Study of 17-9 August, 2011

72 Chapter 17 Plan Formulation on discount rate of 10% and project life of 50 years. Economic Comparison of Alternative Layouts Description Unit Plan A Plan B Plan C 1. Power and energy outputs separated Peak time: Power kw 31,100 29,500 26,800 Energy kwh/y 45.4x x x10 6 Off-peak time: Power kw 23, ,200 Energy kwh/y 209.6x x x Annual generation benefit Peak time: Power M US$ ,58 Energy M US$ ,12 Off-peak time: Power M US$ Energy M US$ Total annual benefit (B) M US$ Annual cost Annualized construction cost M US$ (Total cost x ) Annual O&M cost (0.5% of total cost) M US$ Total annual cost (C) M US$ Net annual benefit (B-C) M US$ The layout Plan B is most economical among the three Plans as the net benefit is highest. The second economical layout is Plan C of which the net benefit is about 86% of Plan B. The net benefit of Plan A is much less than those of Plans B and C. (8) Engineering Assessment The Plans A, B and C are further assessed from the engineering point of view as presented in the table below. At the later phase of the current study, it was revealed that an IPP small hydro project (Guntung project) is in progress around the Masang-2 intake area. Its intake facility proposed is on the Guntung river located 1.2 km upstream of the Plan A intake site. Its proposed powerhouse site is located near to the Plan B intake site. The Guntung project having generation capacity less than 10 MW is under planning stage at present. Impact of this IPP project to the Masang-2 project is also evaluated in the same table. JICA Project for the Master Plan Study of August, 2011

73 Chapter 17 Plan Formulation Alternative Assess Point Engineering Assessment of Each Plan O: Superior to the other Plans : Relatively superior X: Inferior Engineering Assessment Judgment Plan A Technical Access to the intake site from the existing road is about 0.3 km long. It is shorter than other Plans Environmental Adverse geology is encountered at intake site. Thick volcanic soft overburden covers the river bed at intake site. Base rock surface is as deep as 20 m. Costly concrete pile foundation is necessary for intake weir and sand trap. Due to the adverse geology, temporary river diversion for intake construction is difficult. Large scale excavation of right bank is necessary for constriction of temporary by-pass channel. If the Guntung project is realized, most of water of the Guntung river will by-pass the Plan A intake. Inflow to the Plan A intake probably decreases to 2/3 or less of the present estimate. This results in unrecoverable reduction of project economy. It is necessary to procure partly the existing paddy fields on both banks for construction of intake facilities. River length where water flow diminishes due to water diversion at intake to power tunnel is about 8.5 km up to the junction with Alahan Panjang river. While the river water is not used by riparian people for farming and living, water release from intake to downstream river is required to preserve environment. Waterway from intake to surge tank is underground structure. Environmental impact to animals is minimized. All structures including intake facilities, waterway and powerhouse are located outside protection forest. Because of peaking generation, river water level downstream of powerhouse largely fluctuates, particularly in drought month. Warning system (siren, etc.) for riparian people will be required. Plan B Technical For access to the intake site, a new road from the existing road is necessary on the right bank. But, its length is only about 1.2 km. At the intake site, lime stone rock is exposed in river bed. This facilitates construction of temporary diversion facilities. Consequently, construction cost and time for intake facilities is reduced. The IPP Guntung powerhouse tailrace will be located between Plan A and Plan B intake weir sites. Even if the Guntung project is realized, there is no reduction of water flow to the Plan B intake. Connection culvert downstream of sand trap is open-air structure. By this, underground tunnel work on critical path is reduced.. Environmental Large farm land is not in the intake weir site. Procurement of farm land is little. River length where water flow diminishes due to water diversion at intake to power tunnel is about 8.0 km up to the junction with Alahan Panjang river. While the river water is not used by riparian people for farming and living, water release from intake to downstream river is required to preserve environment. X X O JICA Project for the Master Plan Study of August, 2011

74 Chapter 17 Plan Formulation Alternative Assess Point Engineering Assessment Waterway from intake to surge tank, except connection culvert, is underground structure. Environmental impact to animals is minimized. All structures including intake facilities, waterway and powerhouse are located outside protection forest. Because of peaking generation, river water level downstream of powerhouse largely fluctuates, particularly in drought month. Warning system (siren, etc.) for riparian people will be required. Plan C Technical For access to the intake site, a new road from the existing road is necessary on the right bank. But, its length is only about 1.2 km. At the intake site, weathered rock is exposed in river bed. This facilitates construction of temporary diversion facilities. Consequently, construction cost and time for intake facilities is reduced. The IPP Guntung powerhouse tailrace will be located between Plan A and Plan B intake weir sites. Even if the Guntung project is realized, there is no reduction of water flow to the Plan C intake. Connection culvert downstream of sand trap is open-air structure. By this, underground tunnel work on critical path is reduced.. Environmental River length where water flow diminishes due to water diversion at intake to power tunnel is about 7.5 km up to the junction with Alahan Panjang river. While the river water is not used by riparian people for farming and living, water release from intake to downstream river is required to preserve environment. Waterway from intake to surge tank, except connection culvert, is underground structure. Environmental impact to animals is minimized. All structures including intake facilities, waterway and powerhouse are located outside protection forest. Because of peaking generation, river water level downstream of powerhouse largely fluctuates, particularly in drought month. Warning system (siren, etc.) for riparian people will be required. Judgment Plan A is environmentally inferior because the existing paddy filed is partly occupied by the intake facilities. The Plans B and C are environmentally more superior than the Plan A. From the environmental point of view, there is no significant difference between the Plans B and C. Plan B is technically most superior because relatively sound base rock is exposed in the intake site and construction of the intake facilities is easy. Intake site for the Plan A is inferior since the foundation geology is bad. Rock exposed in the Plan C intake site seems to be in deeply weathered condition. The Plan C is therefore second superior among three Plans. (9) Selection of Optimal Development Layout Based on the foregoing economical comparison and engineering assessment, the Plan B is selected as the most optimal development layout for the Masang-2 HEPP. JICA Project for the Master Plan Study of August, 2011

75 Chapter 17 Plan Formulation 17.3 SELECTION OF OPTIMAL DEVELOPMENT SCALE (1) Selected Layout Plan In the above Section 17.2, the Plan B was selected as the optimal development layout. The overall layout of the Plan B is detailed in Drawing M-010 and presented in Figure Source: JICA Study Team Figure Selected Layout of Masang-2 HEPP (2) River Runoff As applied for generation calculations in Section 17.2, the catchment area at the intake weir of the Plan B is 444 km 2 and the river runoff is m 3 /s on average (Year ). The river runoff in terms of 95% dependable runoff is m 3 /s. For the river maintenance purpose, discharge of at least 0.39 m 3 /s is released from the intake weir to the downstream reaches. Net discharge of 9.66 m 3 /s is usable as the 95% dependable discharge for generation. In a 1.2 km stretch downstream from the intake weir, the minimum river flow increases to 0.89 m 3 /s owing to inflow of 0.50 m 3 /s from relatively large tributaries. This minimum flow satisfies the widely applied requirement of 0.2 m 3 /s per 100 km 2 of catchment area. (3) Development Scale Alternatives As mentioned in Section 17.2 (4) and (5), the daily peaking time is limited to 4 hours since there is topographic restriction in building large capacity regulation pond on the waterway route. Therefore, the Masang-2 scheme is designed for semi-peak generation even at the time of the firm discharge (95% dependable). If the pond capacity is large enough, peak generation output is increased and generation operation is limited to peak time only, i.e. no off-peak time generation at the time of firm runoff. To seek the optimal generation capacity, four alternatives of maximum plant discharge are taken up taking into account the different water utilization factors (F). The F is calculated by Qave / Qmax where Qave is long term average flow for generation (=17.71 m 3 /s) and Qmax is maximum plant JICA Project for the Master Plan Study of August, 2011

76 Chapter 17 Plan Formulation discharge. Those alternatives are as follows: Alternative Factor F Qmax (m 3 /s) (4) Economic Diameter of Tunnel and Penstock Regarding the power waterway, smaller diameter tunnel (or penstock) is lower in construction cost but the generation output contrarily decreases due to increased head loss in waterway. Optimal (economical) diameter of tunnel (or penstock) is selected hereunder. By this selection, annualized construction cost and reduced annual generation benefit are combined for each tunnel diameter and a certain diameter at which the combined cost becomes lowest is selected to be the economical diameter of the tunnel. Loss of head in the tunnel (or penstocks) is calculated for several different diameters combined with various maximum plant discharges. Reductions of generation output (kw and kwh) corresponding to such loss head is calculated. The reduced generation outputs are converted to reduced benefits by applying the same method as described in Section 17.2 (7). As to each different diameter tunnel, the annualized construction cost and the reduced benefit are combined to make a total of annual cost and annual loss of benefit. On the other hand, the construction cost of tunnel (or penstock) is estimated for each different diameter. For the connection culvert extended along the river bank from the intake sand trap to the connection tunnel inlet, box shape concrete flume is applied. The culvert is constructed by cut-and-cover method. For the connection tunnel between the connection culvert end and the intermediate pond, standard horse-shoe section is applied since such tunnel type is economical because the flow in tunnel is free flow and internal water pressure is low. For the headrace tunnel between the intermediate pond and the surge tank, circular section is applied since flow in the tunnel is pressure flow and its internal pressure is relatively high. For the penstock line between the surge tank and powerhouse, surface type penstock is selected since the ground surface slope is not so steep and surface penstock is more economical than the under ground penstock. The penstock pipe is laid in open trench excavated. Calculated results of economic diameters are illustrated in Figure Selected diameters of tunnels and penstock and size of culvert are listed below. Max. Plant Discharge (m 3 /s) Waterway Connection culvert (L = 1.06 km) Selected section size (w x h) 3.9 x x x x Connection tunnel (L = 1.63 km) JICA Project for the Master Plan Study of August, 2011

77 Chapter 17 Plan Formulation Selected economical diameter Headrace tunnel (L = 4.55 km) Selected economical diameter Penstock pipe (L = 695 m) Selected economical diameter Culvert, Connection Tunnel & Headrace Tunnel Penstock Pipe Economic diameter (m) Plant max. discharge (m3/s) Source: JICA Study Team Figure Economic Diameters of Tunnels and penstock Required thickness of tunnel concrete lining is estimated to be 10% of the tunnel internal diameter. Penstock pipe just downstream of the surge tank is laid in horizontal tunnel of which excavation diameter is decided so as to make a 0.6 m wide gap between pipe surface and excavated tunnel surface. The gap is completely backfilled with concrete after installation of the penstock pipe. (5) Design of Other Facilities The intake weir is a concrete weir with height of about 10 m above the deepest foundation in the river bed. The weir has a 40 m wide ungated overflow type spillway of which crest elevation is equal to the Full Supply Level (FSL) of m asl. A sand flushing sluice is provided on left bank side of the spillway near intake for flushing sediment deposited in front of intake entrance. Intake structure is located on lest bank side of the weir. Trash rack with rake is provide at the intake entrance of which size is decided so that the flow velocity at the entrance is 1 m/s at the maximum. Incoming water at the intake is led to the sand trap facility located just downstream of the intake. The sand trap is a settling basin with rectangular cross section. The basin size is decided so that the flow velocity in the basin becomes 0.3 m/s at the maximum so as to settle sand particles larger than 0.5 mm. The basin is separated to double lanes by a center wall so that flushing of deposited sediment is conducted one by one without stopping water flow in either one of the lanes. At the downstream bay of the sand trap, a river outlet facility is provided for releasing the river maintenance flow of 0.39 m 3 /s. The downstream end of the sand trap is joined to the connection culvert. JICA Project for the Master Plan Study of August, 2011

78 Chapter 17 Plan Formulation A small natural creek crossing the waterway route is closed by a dike to create the intermediate pond. The water diverted from the intake is stored in the pond for daily peak generation at the powerhouse. However, the creek valley is narrow and insufficient for storing the required volume of water. Therefore, it is necessary to excavate the ground around the creek to ensure the required storage capacity. Required active storage volume of the pond varies with the peaking time and calculated by the following equation. V = 3600T ( Q Q ) max f where, V = Required active storage volume of pond (m 3 ) T = Peaking time (hours) Q max = Maximum plant discharge (m 3 /s) Q f = Diverted firm discharge (m 3 /s) In order to always keep free flow state in the connection culvert and tunnel, the pond water level has to be lower than the sand trap water level by the head loss. The required water level difference depends on the head loss in connection culvert and tunnel. The head loss varies with the discharge in the culvert and tunnel. The full supply level (FSL) of the pond is decided taking into account the head loss at the maximum tunnel discharge being equal to the maximum plant discharge. Storage Volume and Water Levels of Pond Description Unit Max. Plant Discharge (m 3 /s) Required active storage volume MCM FSL at Intake Weir El. m Waterway head loss between intake and pond m Water Level of Pond FSL MOL El. m El. m Drawdown m The dike to close the creek is rockfill embankment with clay core. Storage volume ensured by closure of the creek with the embankment dike is about 0.14 MCM only. The required storage volume in excess of 0.14 MCM has to be ensured by excavation of the ground around the creek. Relation between excavation volume and resulted storage volume is shown in Figure As seen in this Figure, huge excavation is required for ensuring the required storage capacity. Excavation Volume (MCM) Pond Storage Volume Ensured by Excavation (MCM) Figure Excavation Volume vs Resulted Storage Capacity JICA Project for the Master Plan Study of August, 2011

79 Chapter 17 Plan Formulation A surge tank of vertical shaft type with a bottom orifice port is provided at the downstream end of the headrace tunnel before connecting to the penstock. Size of the surge tank is decided by up-surging and down-surging oscillation analysis. They are listed below: Surge Tank Diameters and Water Levels Description Unit Max. Plant Discharge (m 3 /s) Diameter of surge tank m Highest up-surging WL Lowest down-surging WL El. m El. m Top of the tank is decided to be 3 m higher than the up-surging water level. Invert level of the headrace tunnel beneath the surge tank is decided to be 10 m lower than the down-surge water level Powerhouse is above-ground type concrete construction. A tailrace is a short open channel extended from the powerhouse to the river bank edge. Size of powerhouse is estimated on the basis of data of the other similar powerhouse projects. Capacity of generating equipment for each Alternative is calculated as follows: Generating Equipment Description Unit Max. Plant Discharge (m 3 /s) Max. head loss after pond 2. Rated net head 3. Installed capacity (total of 2 units) m m MW (7) Construction Cost Construction cost of each alternative is calculated on the basis of work quantities calculated for each alternative and unit prices referred to in Chapter 19. The results are in the following table: 1. Civil Works Intake facilities Waterway Intermediate pond Penstock and Powerhouse Sub-total Construction Costs Estimated for Each Alternative Unit: US$ million Items Max. Plant Discharge (m 3 /s) Installed capacity (MW) Mechanical & Electrical Works Preparatory and Environmental Works Engineering and Land Costs JICA Project for the Master Plan Study of August, 2011

80 Chapter 17 Plan Formulation TOTAL (8) Power Generation Calculation Similarly to paragraph (6) of the forgoing Section 17.2, power generation calculation is carried out for each Alternative applying the same flow duration curve for the Plan B. Daily average turbine discharge duration curves of all alternatives are illustrated in Figure River flow at intake 63 MW 57 MW 52 MW Discharge (m3/s) Daily average turbine discharge 48 MW Natural river flow Probability of exceedence (%) Source: JICA Study Team Figure Duration Curves of Daily Discharges The results of the generation calculations are as follows: Results of Power Generation Calculation Description Unit Max. Plant Discharge (m 3 /s) Max. power output 2. 95% dependable output (4 hours) 3. Annual energy production 4. Plant factor MW MW GWh % (9) Economic Comparison All alternatives are operated by mixed generation mode, i.e., peaking generation for 4 hours and off-peak generation for 20 hours. Benefits of peak time generation and off-peak time generation are evaluated separately as explained in paragraph (7) of the foregoing Section Total generation output of each alternative is separated to peak time output and off-peak time output as explained in the JICA Project for the Master Plan Study of August, 2011

81 Chapter 17 Plan Formulation said paragraph. Power outputs and energy productions of each alternative and their benefits are calculated in the following table. Construction cost of each alternative is annualized by applying the capital recovery factor of Economic Comparison of Alternative Development Scales Description Unit Max. Plant Discharge (m 3 /s) Installed capacity MW Power and energy outputs Peak time: Power Energy Off-peak time: Power Energy 3. Annual generation benefit Peak time: Power Energy Off-peak time: Power Energy Total annual benefit (B) 4. Annual cost Annualized construction cost (Total cost x ) O&M cost (0.5% of total cost) Total annual cost (C) kw kwh/y kw kwh/y M US$ M US$ M US$ M US$ M US$ M US$ M US$ M US$ 42, x , x , x , x , x , x , x , x Net annual benefit (B-C) M US$ Variation of the net annual benefit with the installed capacity is graphically shown in Figure Benefit - Cost (M US$) 5 52 MW (4-hour peak) Installed Capacity (MW) Source: JICA Study Team Figure Development Scale Optimization Result JICA Project for the Master Plan Study of August, 2011

82 Chapter 17 Plan Formulation (10) Selection of Optimal Development Scale As seen in the above Figure , the annual net benefit (B-C) increases with increase of plant capacity. However, the benefit reaches the maximum at around the plant capacity of 52 MW (4-hour peaking mode). Further increase of the plant capacity results in reduction of the net benefit. Therefore, the 52 MW plant capacity by the maximum plant discharge of 32 m 3 /s is selected as the optimal development scale. A 52 MW peak generation for at least 4 hours is possible even in the drought year with 95% dependability. JICA Project for the Master Plan Study of August, 2011

83 Chapter 18 Preliminary Design CHAPTER 18 PRELIMINARY DESIGN 18.1 DESIGN CONDITIONS HYDROLOGICAL CONDITIONS Long term low flow analysis for the Masang-2 project is conducted in the Section The hydrological conditions related to the preliminary design are listed below: Description Unit Intake Weir Interm t Pond Powerhouse Catchment area km Average river runoff m 3 /s = = 95% dependable runoff m 3 /s = = Design flood (200-yr flood) m 3 /s 1, ,939 Construction flood (2-yr flood) m 3 /s Sediment inflow m 3 /yr 222, = MINIMUM DOWNSTREAM FLOW (RIVER MAINTENANCE FLOW) At the intake weir, river water except in flood time is fully diverted to the power tunnel. However, to maintain minimum flow condition in the river reaches downstream of the weir, the water of 0.39 m 3 /s at the maximum is released from the intake weir to the downstream river. This rate is decided so as to meet the criteria of 0.2 m 3 /s per 100 km 2 of catchment area at the point about 1 km downstream of the weir site (444km 2 /100km 2 x 0.2m 3 /s = 0.89m 3 /s). This criteria is already applied to the some other on-going or completed hydropower projects in Sumatra. In the 1 km downstream stretch from the weir site, relatively large tributaries having total catchment area of 22 km 2 join the main Masang river. The required minimum river flow at that point is 0.89 m3/s. A natural flow coming from the tributaries is 0.50 m 3 /s with 95% dependability and this flow is combined with the flow (0.39 m 3 /s) released from the intake weir PLANT DISCHARGE The generating plant is operated as a 4-hour peak and 20-hour off-peak generation mode depending of available daily river flow. However, as mentioned in Section 17.3, the maximum plant discharge is decided to be 32.0 m 3 /s taking into account the limited pond storage capacity. Any river flow up to this JICA Project for the Master Plan Study of 18-1 August, 2011

84 Chapter 18 Preliminary Design rate is diverted to the power waterway at the intake. All waterway structures are designed for this discharge MAIN CIVIL STRUCTURES INTAKE WEIR The intake weir is located 1 km downstream from the confluence of Masang river (Batang Sianok) with Guntung river (Batang Guntung). This location is selected taking into account the following: Relatively hard base rock is exposed in the river bed and both abutments. Since the rock conditions are good, constriction of the intake weir and sand trap structures is easy and not costly. An IPP powerhouse of the on-going Guntung project will be located 150 m upstream of the Masang-2 intake site. Shifting of the intake to upstream site interferes with the IPP project. The intake weir is concrete weir with un-gated overflow spillway. The crest elevation of the spillway is set at El m. This elevation is regarded as the Full Supply Level (FSL) for the power intake. As the river bed elevation at the weir is around El. 337 m, the height of weir above river bed is 7 m. This height is required to keep the water depth necessary at intake entrance. The selected spillway overflow width is 40 m so as to suit the river channel topography. Overflow depth of the design flood (1,341 m 3 /s) is preliminarily estimated at 6.0 m, in which effect of high velocity approach flow in the upstream channel is taken into account. Design flood water level at the upstream side of weir is thus estimated at El m. The estimated rating curves are shown in Figure Masang-2 Intake Weir H-Q Curve 200-yr flood = 1,341 m3/s Elevation (m asl) Intake Weir Spillway H-Q Spillway crest El m Intake Weir Tailwater H-Q River bed El. 337 m ,000 1,200 1,400 Discharge (m3/s) Source: JICA Study Team Figure Estimated Discharge Rating Curve at Intake Weir JICA Project for the Master Plan Study of 18-2 August, 2011

85 Chapter 18 Preliminary Design As it is foreseen that base rock surface is not deep, non-overflow section on both abutments is built with concrete. For required free-board of the non-overflow section, an estimated wave run-up height of 0.3 m, safety allowance for concrete dam of 0.5 m are taken into account. The top elevation (Z) of the non-overflow section on both abutments is decided at El m by the following calculation: Z = Flood WL = = m say m A 5.0 m wide sand flushing sluice is provided on left bank side of the weir. Sill elevation of the sluice is set at El m at the weir axis in order to flush sand deposits accumulated in front of intake entrance. A concrete channel with steep slope is extended upstream to facilitate sand flushing operation. A service gate and a maintenance stoplog are provided in the sluice. Size of them is W5.0 m x H4.0m. It is expected that the sluice is capable of discharging 120 m 3 /s when the gate is full open under water level at FSL. Upstream river water level is lowered in short time and sediment flushing by natural flow is performed smoothly. The river outlet facility is provided at the sand tarp downstream end. This location is selected so as to minimize abrasion damage on the outlet pipe and valves. It is foreseen that natural river water before sand trapping contains much abrasive sand. When the intake is completely closed, whole river water is discharged from the weir by overflow. Design of the intake weir is shown in Drawing M INTAKE AND SAND TRAP The intake is located on right bank side of the intake weir. Intake entrance structure is equipped with trash rack and raking machine. Depth of incoming flow on trash rack sill is decided to be as shallow as 3.0 m to minimize entering of sediment load in the river. Trash rack size is decided so that velocity of the incoming flow at the trash rack is 1.0 m/s at maximum. Since the maximum plant discharge is 32.0 m 3 /s, width of trash rack is 11.0 m in total of 2 entrance bays. Incoming flow is guided by double box type free-flow channels to the intake gates and then to the sand tarp. The intake gate is W3.8 m x H4.3 m of which sill elevation is El m. The sand trap is double lane settling basin with rectangular cross section. By use of the double basins, it is able to drain sediment deposit in the basin one by one and to continue generation operation even during sediment draining. The design flow-through velocity in the basin is decided to be 0.3 m/s at the maximum plant discharge. Particle size of sand to be removed is 0.5 mm or greater by applying usual practice. Dimensions of the settling basins are decided by the following equation. h L > A u v Where, L = Required length of settling basin (m) JICA Project for the Master Plan Study of 18-3 August, 2011

86 Chapter 18 Preliminary Design Α = h -= v = u = Coefficient to compensate turbulent effect in the basin Depth of settling basin (m) Vertical settling velocity of sand particle varying depending on size (m/s) Flow-through velocity in the basin (=0.3 m/s) The depth h is decided to be 5.6 m to avoid submergence of sediment drain outlets during draining. The settling velocity v for sand particle size of 0.5 mm is 0.07 m/s. Coefficient A is estimated at 2. Thus, the required basin length is 48 m. To restrict the flow-through velocity u to below 0.3 m/s, the required flow area is m (= 32.0/0.3). As the basin depth is 5.6 m, the required basin width is 19 m in total, i.e, two lanes of 9.5 m wide basin. The incoming water flow in excess of the flow capacity of the downstream connection tunnel is removed by spillage flowing over side walls of the basin. Top elevation of the walls is El m. The downstream end of each basin is closed by stoplogs so that the sediment draining can be done while continuing generation operation. Sediment accumulated in the basins is periodically flushed through sediment flushing culverts (one for each basin) extended from the bottom of basin s downstream end to the river bank edge. Size of the flushing gate is 1.5 m by 1.5m. The river outlet facility consisting of 2 sets of pipe conduit and closure valve is provided in the wall on the river side in the basins downstream bay. To discharge water of 0.39 m 3 /s by each set, diameter of the pipe and valve is set at 0.3 m. Total head loss in the intake and sand trap is estimated to be 0.2 m. Design of the intake and sand tarp is shown in Drawing M CONNECTION CULVERT The connection culvert is extended from the downstream end of the sand trap to the entrance of connection tunnel. The culvert is box shape concrete flume with total length of 1.06 km. Flow in the culvert is free flow state. Top cover slab is provided to avoid entering of eroded debris or tree leaves into the flume. The culvert is constructed by cut-and-cover method. The size of internal section is W3.75 m and H4.15 m. The longitudinal slope is 1/1,200 to allow the maximum discharge of 32.0 m 3 /s. The maximum water depth (uniform flow) in the culvert is estimated at 3.75 m. Air space of at least 0.4 m is left between the flow surface and the culvert crown. The culvert has to cross over the large creek (Aek Bamban) at the downstream end of the culvert. For crossing the creek, the culvert is constructed as a box type bridge supported by four vertical concrete piers spaced at 20 m. Just after crossing the creek, the culvert is jointed to the connection tunnel. JICA Project for the Master Plan Study of 18-4 August, 2011

87 Chapter 18 Preliminary Design CONNECTION TUNNEL The connection tunnel is extended from the downstream end of the connection culvert to the intermediate pond. The tunnel length is 1.63 km. Flow in the tunnel is free flow state. The selected tunnel section is standard horse-shoe shape since the internal water pressure is low. Its diameter is 3.75 m as selected as an economic diameter in the Section 17.3 (4). The required tunnel slope is 1/700 at the maximum discharge of 32.0 m 3 /s. The maximum water depth (uniform flow) in the tunnel is estimated at 3.38 m. Air space of at least 0.38 m is left between the flow surface and the tunnel crown. Total of water level drop between the sand trap and the pond is estimated at 3.9 m including outlet loss. At the outlet of the tunnel, an open channel with width of 12 m is extended down to El m aiming at protection of the pond slope against erosion by tunnel outflow. It is foreseen that, as the tunnel passes through relatively firm rock, heavy rock support such as steel ribs and thick shotcrete cover with wire mesh will be required only in short stretches for tunnel construction. Route and typical section of the tunnel are shown in Drawing M INTERMEDIATE POND The required active storage volume of the pond is 322,000 m 3 as mentioned in Section 17.3 (5). The FSL of the pond is decided to be El m taking into account the water level drop in the intake, sand trap and connection tunnel at the time of maximum discharge. The pond is created on a small natural creek by closing it with rockfill embankment and by excavating the ground around the creek. Location of the closure embankment is selected so as to maximize the storage capacity. To satisfy the storage volume requirement, it is necessary to largely excavate the ground around the creek. The water level drawdown in the pond is set at 10 m at the maximum in drought time. The water surface area required in the excavated part of the pond is approximately 2 ha. The curves of pond storage capacity area including excavated part is shown in Figure JICA Project for the Master Plan Study of 18-5 August, 2011

88 Chapter 18 Preliminary Design Wtaer Surface Area (ha) FSL = Elevation (m) MOL = Volume Area 325 Active Storage Storgae Volume (MCM) Figure Source: JICA Study Team Storage Capacity and Area Curves of Intermediate Pond The pond water level varies on the daily basis due to water use for daily peak generation. The maximum drawdown will be 10.0 m, which will seldom occur in the drought year. Sediment inflow for 100 years is estimated at 45,000 m 3. The pond has a dead space sufficient in volume for storing whole sediment inflow for 100 years. The creek closure structure is rockfill type embankment with central clay core. The foundation of the embankment is the weathered rock. Rock materials excavated for enlarging pond space are used for the embankment. Aiming at slope stabilization on pond perimeter, horizontal drain holes drilled into hill slope around the pond are tentatively planned. Those drain holes will be effective to stabilize the slope at the time of fast drawdown of water level. Detailed slope stability analysis will be required in the future study. Design flood inflow from the pond catchment is 15.2 m 3 /s (200-year flood). The other inflow from the connection tunnel is 32.0 m 3 /s at the maximum. An overflow type spillway is provided on the right abutment of the closure embankment. The spillway has a 25 m long overflow weir of which crest elevation is equal to the pond FSL (El m). The spillway is capable of discharging 47.2 m 3 /s (= ) under 1.0 m overflow depth. The design flood water level is thus El m. For required free-board of the closure embankment (pond dike), an estimated wave run-up height of 0.35 m, safety allowance for embankment dam of 1.5 m and clay core protection cover layer of 0.25 m are taken into account. The top elevation (Z) of the pond dike is decided to be El m by the following calculation: Z = Flood WL = = m JICA Project for the Master Plan Study of 18-6 August, 2011

89 Chapter 18 Preliminary Design For emergency withdrawal of pond water in the future, bottom outlet facility is provided in a foundation culvert laid on the deepest foundation. The culvert having D-shape section (W2.2m x H2.5m) can be used as a temporary diversion facility during construction. A 0.4 m diameter steel pipe is laid in the culvert from concrete plug below clay core to downstream end of the culvert. A stop valve is installed at the upstream end of pipe and a service valve is installed at the downstream end of the pipe. The pond structures are shown in Drawings M-013 and M HEADRACE TUNNEL The headrace tunnel is extended from the intermediate pond to the surge tank. The tunnel length is 4.55 km. Flow in the tunnel is pressure flow state. The selected tunnel section is circular shape since the internal water pressure is relatively high. Its diameter is 3.75 m as selected as an economic diameter in the Section 17.3 (4). At the upstream end of the tunnel in the pond, an intake tower is provided to accommodate a trash rack with raking equipment and a tunnel closure gate. The size of tarshrack is decided to be W5.5 m x H5.9 m so that the flow velocity at the tarshrack is 1.0 m/s at the maximum. The tunnel invert elevation just downstream of the intake tower is set at El m in order to provide sufficient intake submergence below the pond MOL for avoiding air suction into the tunnel. The tunnel invert level at the surge tank is set at El m to avoid air suction into the tunnel from surge tank during down-surging. Total loss of head in the tunnel is estimated at 8.9 m at the maximum plant discharge. Losses due to friction, intake trash rack and tunnel bends, etc. are included. It is foreseen that most part of the tunnel passes through firm lime stone except some short stretches passing weak rock. Heavy rock support such as steel ribs and thick shotcrete cover with wire mesh will be required only for such weak rock area. Route and typical section of the tunnel is shown in Drawing M SURGE TANK A surge tank is provided between the headrace tunnel and the penstock to avoid excessive pressure rise in the waterway system and to supplement or absorb water flow during transient operation of turbines. Simple vertical surge tank with a bottom orifice is adopted. The size of surge tank is decided by provisional surging wave analysis. Selected diameter of the surge tank is 8.5 m. Estimated maximum up-surge level and the minimum down-surge level are El m and El m, respectively. Top of surge tank is set at El. 364 m and bottom of surge tank (headrace tunnel) is set at El 305 m. Height of the tank is thus 59 m. JICA Project for the Master Plan Study of 18-7 August, 2011

90 Chapter 18 Preliminary Design PENSTOCK Surface type penstock is adopted taking into account site topography. A steel penstock pipe is laid in horizontal tunnel downstream of surge tank and then in an open trench excavated on hill slope down to powerhouse site. The pipe diameter is decided to be 3.1 m from the surge tank end to the downstream Y-branch as selected in the Section 17.3 (4). The Y-branch is located nearby the powerhouse, i.e. 25 m upstream from the powerhouse center. The two pipes after Y-branch to the turbine inlets have diameter of 1.8 m. The upper 190 m long horizontal part is embedded in the tunnel extended from the surge tank bottom and laid at El 304 m. Along the penstock pipe in the open trench, a stairway is provided for penstock inspection. Penstock line is shown in Drawings M POWERHOUSE The powerhouse to accommodate two 26 MW generating equipment is above-ground type and located on the left bank of the Masang river and at 300 m downstream from the confluence with the Alahan Panjang river. Normal river water level estimated from the field topographic survey is El. 141 m and river bank edge elevation is around El. 150 m. The selected site is relatively flat and wide in topography and suitable for locating powerhouse and switchyard. Hard rock (lime stone) is exposed on the river bank wall at the powerhouse site. The foundation condition seems suitable for the powerhouse. The powerhouse is a reinforced concrete building. Two units of main generating equipment and their auxiliaries are accommodated in the building. Machine erection bay and control/office bay are also included in the powerhouse. Tailrace is an excavated open channel extended from the powerhouse to the river bank edge. During construction of powerhouse substructure, insitu rock on the tailrace channel will be left unexcavated for the purpose of coffering. A 150 kv outdoor switchyard is located on east side of the powerhouse premises. The tail water level for the generating equipment is provisionally fixed to be El m. The turbine setting level is set at El m. The water level of the design flood (200-year flood) at the powerhouse site is assumed at El. 149 m. The ground formation elevation around the powerhouse is set at El. 150 m. It is necessary to review the river water level in the future detailed study The powerhouse design is shown in Drawing M PROJECT FEATURES The principal features of the project are summarized in the following table. JICA Project for the Master Plan Study of 18-8 August, 2011

91 Chapter 18 Preliminary Design Project Features in Preliminary Design of Masang-2 HEPP Description Unit Principal Features 1 Location West Sumatra Province 2 Hydrology Catchment area km2 444 Average annual runoff at intake m 3 /s % dependable runoff m 3 /s Intake Weir Type Ungated concrete weir FSL=Weir crest elev. El. m Height (overflow section) m 7 Active storage volume None 4 Intake & Sand Trap Intake Type Horizontal inlet with screen Sand trap type Double settling basins Max. discharge diverted m 3 /s Connection Culvert Type Concrete flume with box section (free flow) Internal section size x Length m W3.75 x H4.15 x L 1,060 6 Connection Tunnel Type Horse-shoe section, free flow type Connection tunnel, diameter x length m D3.75 x 1,630 7 Intermediate Pond Type Creek excavated and closed by embankment FSL El. m MOL El. m Water surface area ha 4.0 Gross storage volume MCM 0.50 Active storage volume MCM Drawdown m Headrace Tunnel Type Circular section, presuure flow tunnel Headrace tunnel, diameter x length m D3.75 x 4,550 9 Surge Tank Type Vertical cylindrical shaft Diameter x Height m D8.5 x Penstock Type Surface type Steel pipe diameter x length m D3.1 x 677 Pipes after Y-branch D1.8 m x 17 m x 2 nos 11 Powerhouse Type Above-ground type Building structure Reinforced concrete Tailrace Open Channel Tail water level El. m Generating Equipment Installed capacity (total) MW 52 Number of units nos. 2 Gross head below pond m Rated head m Max. plant discharge m 3 /s 32.0 Peaking oeration time hr/day 4 Annual energy production GWh 240 JICA Project for the Master Plan Study of 18-9 August, 2011

92 Chapter 18 Preliminary Design 18.3 HYDRO-MECHANICAL WORKS The hydro-mechanical works comprise steel gates, stoplogs, trash racks, valves and penstock pipes. Their operation devices, hoists, hydraulic systems, raking machine, etc. are also included in the works. However, water turbines for generating equipment and their mechanical auxiliaries including turbine inlet valves are not included in the hydro-mechanical works. The hydro-mechanical works preliminarily designed are described below. Size, WxH (m) Q ty Acting water head (m) (1) Intake Weir, Sand Flushing Gate Type: Rope hoisted fixed wheel gate 5.0 x (2) Intake Weir, Sand Flushing Stoplog Type: Rope hoisted slide panels 5.0 x (3) Intake, Trash Rack With raking equipment 5.5 x (4) Intake, Entrance Closure Gate Type: Rope hoisted fixed wheel gate 3.8 x (5) Intake, Entrance Stoplog Type: Rope hoisted slide panels 3.8 x (6) Sand Trap, Sediment Darin Gate Type: Motor drive spindle gate 1.5 x (7) Sand Trap, End Stoplog Type: Rope hoisted slide panels 4.2 x (8) Sand Trap, River Outlet Valve Type: Cast steel spindle valve φ (9) Connection Culvert, Inlet Gate Type: Rope hoisted fixed wheel gate 3.75 x (10) Connection Tunnel, Outlet Stoplog Type: Rope hoisted slide panel 3.75 x (11) Pond, Bottom Outlet Control Valve Type: Steel hydraulic valve φ (12) Pond, Bottom Outlet Maintenance Valve Type: Steel hydraulic valve φ (13) Pond, Bottom Outlet Conduit Type: Steel pipe laid in culvert φ JICA Project for the Master Plan Study of August, 2011

93 Chapter 18 Preliminary Design (14) Penstock pipe Type: Steel pipe laid on trench φ3.1 1 Static 221 φ Static 221 (15) Powerhouse, Draft Tube Stoplog Type: Rope hoisted slide panel 3.5 x GENERATING EQUIPMENT GENERAL Masang-2 hydropower project is run of river type with intermediate pond and has capacity of 4 hours peak operation and maximum output of 52MW, using net head of 178.8m and discharge of 32m 3 /s. Vertical shaft type of Francis turbine (maximum output : 26MW), 3 phase synchronous generator (maximum capacity : 28.1MVA), oil supply system, compressed air supply system, water supply system, drainage system, switching device such as circuit breaker, control equipment, station service transformer and traveling crane are to be installed in the powerhouse. HDWiz (developed by J-Power, based on existing hydropower plant data around the world) has been used for the designing of the electrical equipment UNIT CAPACITY AND NUMBER OF UNIT Generally, for the turbine generator, a large unit capacity is said to be more economical merits of scale. However, optimum unit capacity of the turbine generator is determined in consideration of influence to the power system, development timing and transportation restriction. Nevertheless, unit capacity and number of unit has been decided taking following items into consideration. a. Influence of the unit capacity to the power system b. Transportation route and weight restriction c. The level of current manufacturing technology d. The reliability and flexibility of maintenance and operation e. Discharge variation between wet season and dry season As for the subject A of the influence of the unit capacity to the power system, neither 26MW 2 units nor 52MW 1 unit will affect great influence to the power system in case of tripping of turbine generator because power system capacity of Sumatra is more than 3,600MW. JICA Project for the Master Plan Study of August, 2011

94 Chapter 18 Preliminary Design Therefore, there is not any special consideration to the influence of the unit capacity to the power system. Regarding the subject b of transportation route and weight restriction, main transformer (1 unit option) of 60t is estimated the heaviest electrical equipment for the project. There is already existing paved national road in the suburbs of the project site and construction purpose road to be built to the project site. Therefore, there is no any special problem for the transportation. Necessity of reinforcement or replacement of bridge shall be examined in the next detailed design stage. As per the subject c of the level of current manufacturing technology, both 1 unit and 2 units option can be made by electrical equipment manufacturer around the world. Regarding the subject d of the reliability and flexibility of maintenance and operation, 2 units option has an advantage over because one of the unit can be operated in case of another unit is in stop condition such as fault or maintenance. Finally, as for the discharge variation between wet season and dry season, there is not any serious problem during wet season. However, during dry season, turbine will be operated less than 30% rated output and consequently it will cause serious problem to the turbine such as cavitation and vibration. Therefore, 2 units option has a great advantage over the discharge variation. According to result of the above comparison, 26MW 2 units has been determined for the Masang-2 hydropower project taking especially the reliability and flexibility of maintenance and operation and discharge variation between wet season and dry season into consideration TURBINE (1) Turbine Output Rated turbine output at rated effective head of 178.8m and rated discharge of 16m 3 /s per unit can be calculated as follow; Pt = 9.8 Hn Qt ηt = =. 26,000 kw where Pt : Rated turbine output per unit(kw) Hn : Rated effective head(m) Qt : Rated water discharge per unit(m 3 /s) ηt :Turbine efficiency(%) (2) Type of Turbine Generally, type of turbine can be determined by close relation between effective head and turbine output. Vertical shaft Francis type turbine can be selected taking Masang-2 s effective head and JICA Project for the Master Plan Study of August, 2011

95 Chapter 18 Preliminary Design turbine output into consideration. (3) Runner Material Stainless steel anti-corrosion type such as 13 chrome high nickels stainless steel is recommended to be applied for the runner material. Surface of runner and wear ring shall be coated (hard or soft) in case of water quality. Detailed coating method shall be specified in the next detailed design stage. (4) Turbine Center Elevation Turbine center elevation can be determined based on the draft head (Hs), which in turn, also can be decided by the cavitation coefficient of the turbine related to the optimum turbine specific speed (Ns). Hs can be calculated as -2.38m by using the above relation. Therefore, the turbine center elevation is m. (5) Effective Head Effective head can be calculated by gross head (192.9m) friction loss of waterway. As a result of calculation, loss of head is 14.1m, effective head is 192.9m-14.1m=178.8m. (6) Size of Runner Designing of turbine runner is to determine the principal dimensions of the turbine and weight of the turbine. According to the study result, maximum diameter of runner is estimated 1.7m and weight of turbine is 4tons. However, the actual size of runner shall be offered from the turbine manufacturer in the next detailed design stage. (7) Rated Revolving Speed Specific speed (Ns) of Francis type turbine generally is between 70 to 300 m-kw. Ns 123 m-kw is obtained by calculating the relation between the effective head and specific speed previously adopted for similar projects. With this in mind, the revolving speed of the turbine is obtained as 500 min -1, based on the specific speed of Ns 123m-kW. (8) Turbine Aeration System Aeration piping system for the runner and draft tube shall be studied in the next detailed design stage. (9) Penstock and Inlet Valve One (1) line penstock is bifurcated into two (2) pipes for 2 units and connected to inlet valves. The Inlet Valve will be of the by plane Valve type with a diameter of approximately 1.6 m. JICA Project for the Master Plan Study of August, 2011

96 Chapter 18 Preliminary Design GENERATOR A three phase alternating current synchronous generator with vertical shaft rated capacity of 28.1MVA and power factor of 90% lag is selected. (1) Type of Generator Type of generator can be determined by revolving speed and generator capacity and normal type is adopted for the Masang-2 project taking generator capacity and revolving speed into consideration. (2) Rated Generator Capacitor Rated generator capacity can be calculated from the rated turbine output, power factor and generator efficiency as follows; Pg = Pt ηg / p.f (kva) = 26, / 0.90 =. 28,100kVA where Pg : Rated generator capacity(kva) Pt : Rated turbine output per unit(kw) ηg : Generator efficiency(%) p.f : Power factor(%), lag As the results of above calculation, the rated generator capacity is 28,100kVA. (3) Insulation and Cooling Method F class is adopted for insulation of the stator and rotor, and enclosed hood, air cooled type with water heat exchanger system is applied to the cooling system. (4) Generator Rating Principal specifications of the generator are as follows; Rotation direction Counter clockwise from view of generator top Rated revolving speed 500min -1 Rated capacity 28.1MVA Rated power factor 0.90 Rated voltage 11.0kV Rated frequency 50Hz Excitation method Brushless excitation JICA Project for the Master Plan Study of August, 2011

97 Chapter 18 Preliminary Design AUXILIARY EQUIPMENT (1) Oil Supply System Oil supply system for the inlet valve operation purpose and governor operation purpose are installed at each unit. The oil supply system is composed of oil pressure pump( regular use, stand by use), oil pressure tank, oil sump tank, oil leakage tank and control board. (2) Compressed Air Supply System Compressed air supply system (regular use, stand by use) for the generator brake, oil pressure tank and general uses are installed at the powerhouse. (3) Water Supply and Drainage System Water supply system for the cooling of turbine, generator bearing, generator cooler and oil supply system cooler are installed at the powerhouse. Water will be taken from drafty tube by water supply pump, and then supply to the each equipment through strainer and sand separator.. Water drainage pit shall be prepared at bottom of powerhouse and leakage water shall be drained by water drainage pump. (4) Parallel in Circuit Breaker There are two connection methods between generator and power system. One is low voltage synchronous system (connection point is low voltage side of main transformer) and another is high voltage synchronous system (connection point is high voltage side of main transformer). Regarding connection method of the Masang-2, low voltage synchronous system is applied in consideration of generator capacity, improvement circuit breaker and simplicity of station service power. (5) Control System Regarding control system, one-man control system is applied for control of turbine, generator, main transformer, auxiliary equipment, transmission line and control board and it can be located at control room in the powerhouse. (6) Station Service Transformer Station service transformer for the auxiliary equipment power source for the turbine, generator, main transformer, lighting, ventilation shall be installed at lower side of main transformer and supply the power to the each equipment. (7) Traveling Crane Maximum capacity of main hook is determined by the maximum weight of installed equipment and generator rotor is the heaviest equipment generally. JICA Project for the Master Plan Study of August, 2011

98 Chapter 18 Preliminary Design Masang-2 hydropower project, the generator rotor of 47 tons is estimated the heaviest equipment OUTDOOR SWITCHYARD EQUIPMENT AND TRANSMISSION LINE OUTDOOR SWITCHYARD EQUIPMENT FOR MASANG-2 (1) Main Transformer One (1) transformer per one (1) turbine generator is desirable from the point of view of the operation. However, one (1) transformer per two (2) turbine generator shall be applied for the Masang-2 hydropower project taking into improvement of transformer s reliability and reduction of construction cost consideration. Regarding location, the main transformer shall be located at outdoor switchyard which is adjacent place of powerhouse. Three-phase transformer is recommended to be adopted and to be designed taking into transportation restriction, efficiency and installation space consideration. Maximum weight of transformer (including trailer) is expected to be 100 tons and it can be transported to the project site. Main specification of the main transformer is shown as follows; Rated Voltage :Primary 11.0 kv :Secondary 150 kv Rated Capacity :Primary 56.2MVA :Secondary 56.2MVA Rated Frequency :50 Hz Rated Frequency :Outdoor type Cooling method :OFAF (Oil forced Air Forced ) (2) 150kV Outdoor Switchyard Equipment 150kV outdoor switchyard equipment shall be installed at adjacent of powerhouse same location as the main transformer. There are conventional type and Gas Insulated Switchgear type, the conventional type which is economical advantage shall be adopted from the point of view of the installation space and construction cost. JICA Project for the Master Plan Study of August, 2011

99 Chapter 18 Preliminary Design 150kV outdoor switchyard equipment consists of 150kV bus, circuit breakers, disconnecting switches, current transformer for protective relay/metering, voltage transformer for protective relay/metering, supporting insulator, stringing and steel structure. Whole single line diagram including generator, main transformer, bus and transmission line are shown as follows. Source: JICA Study Team Figure Single Line Diagram for Masang-2 JICA Project for the Master Plan Study of August, 2011

100 Chapter 18 Preliminary Design TRANSMISSION LINE Source: JICA Study Team based on RUPTL Figure Reference between Location of Masang-2 and Transmission Development Plan a) Voltage class applied Judging from the rated capacity of the generator, it would be appropriate to have a voltage of at least 150 kv for system access. b) System access point In the study of system access, a selection was made of methods based on the existing and planned transmission facilities indicated in RUPTL. The relative merits of each access method were assessed from four perspectives, as follows. The Study Team made a relative assessment of distance and topography, but made assessments with respect to environmental factors (forested tracts, natural preserves, etc.) and system operation only when there were prohibitive factors. Candidates Add Aspects Inc.(Maninjau Simpang Empat T/L) (Along vicinity of Masang River) GI Padang Luar GI Simpang Empat (Along vicinityof Masang River) Inc.(Maninjau Simpang Empat T/L) (Detour-route against Nature conservation(through protection forest)) T/L Construction Length 34kms 80kms 100kms 38kms Topography Natural conservation Environmental issues Forest class Resident imposition System Operation JICA Project for the Master Plan Study of August, 2011

101 Chapter 18 Preliminary Design 5-Add Inc..(Maninjau Simpang Empat T/L) (Detour-route against Nature conservation(through non-regulated area)) 54kms Add GI Simpang Empat (Detour-route against Nature conservation) 120kms - - Evaluation : Good Not good i) Transmission line construction Considering construction of a transmission line extension to the three aforementioned candidates (Candidate 1-3), extension along the Masang River would offer the shortest distance to the 150kV Maninjau-Simpang Empat for the route (entailing the shortest distance or the shortest route for extension that can basically be confirmed by map). If the route distance for Candidate 1 is assigned the value 1.0, it is estimated that that for Candidate 2 (access to GI Padang Luar) would be 2.2, and that for Candidate 3 (access to GI Simbang Empat), 3.0. In addition, Candidate 1 would allow a more unified and simpler construction method than the other candidates because the route would pass through on the village side. As for the topographical factors related to transmission tower construction, in the case of access to GI Padang Luar, there is a comparatively close road leading to Bukit Tinggi, and this would hold advantages for hauling materials and assuring a patrol route. At the same time, however, there is much undulation in the mountainous terrain, and this could make it difficult to take full advantage of this road. In the case of Candidate 3 (access to GI Simpang Empat), there is no straight-line route, and it was thought that the line would go down the Masang River, along the mountain on its northern side, like the 150kV transmission line feeder connection between Maninjau and Simpang Empat. This was given the highest rating. ii) Environmental aspect The prospective site of the power house is near the border between the regencies of Agam (Kabupaten Agam) and Pasaman (Kabupaten Pasaman), on the Agam side. The Masang River forms this border, but the river itself is in Pasaman. The shortest route would lie in extension of the transmission line from the Masang-2 power station along the Masang river to the village side. In this case, the line would cross the Batastinjaulau and Sinanggamaur mountains and the natural preserve along the Masang River. In reality, transmission line construction over this route would not be practicable. Therefore, it was decided to add a route to the GI Simpang Empat that detours to avoid this natural preserve to the list of study subjects as Candidate 6. The Study Team also decided to add two other routes (one passing through the protection forest and another that does not pass through the protection forest), consisting of feeder connection to the Maninjau-Simpang Empat 150kV transmission line, for the zone study subjects as Candidates 4 and 5. JICA Project for the Master Plan Study of August, 2011

102 Chapter 18 Preliminary Design iii) System operation Of the route zones for connection to the Maninjau - Simpang Empat 150kV transmission line, the table shows the increases in distance that would be entailed by the route through the protected forest area (Candidate 4), the route through a district without any forest-related constraints (Candidate 5), and the route for system access to GI Simpang Empat along the lines of Candidate 5 (Candidate 6). Once the line comes out on the village side in connection to the Maninjau - Simpang Empat 150kV transmission line, however, the terrain would be basically flat, and the transmission tower foundations and structures could be built virtually in line with the standard design. For this reason, selection of a route to the Maninjau - Simpang Empat 150kV transmission line free of any environmental constraints would presumably be preferable in the cost aspect to system access to GI Padang Luar (because the cost advantage would outweigh the extra line length). To make a comparison in respect of the supply-demand balance, it may be noted that RUPTL foresees a peak demand of 45.3 MW at GI Simpang Empat in If a feeder interconnection is made to the Maninjau - Simpang Empat 150kV transmission line with a maximum generated output of about 40 MW, most of this output would be consumed by GI Simpang Empat. Similarly, the 2019 peak power at GI Padang Luar is 66 MW, and most of the demand could be absorbed by this potential site. To draw a comparison in respect of power quality, connection of the potential site to GI Padang Luar would merely decrease the power flow from GI Payakumbuh to GI Padang Luar. There is also thought to be no problem as regards voltage, because GI Payakumbuh (a 275/150kV substation) has a close electrical distance with GI Padang Luar. On the contrary, interconnection of a hydropower station in close proximity to GI Simpang Empat, which would form the terminal system, could be expected to improve the voltage at GI Simpang Empat. In this respect, feeder connection to the Maninjau - Simpang Empat 150kV transmission line would bring substantial benefits. As for the type of transmission line and protection relay system, a parallel two-circuit line will be constructed for system access with GI Padang Luar. Judging from the rated capacity of the potential site, there would be no obstacles to the standard specifications (1 HAWK, 2 cct), and no problems as regards the protection relay system (distance or ground orientation). In the case of feeder connection to the Maninjau - Simpang Empat 150kV transmission line, the following three systems are conceivable. Four-circuit line, pi feeder connection Two-circuit line, pi feeder connection Feeder connection Because the four-circuit pi feeder connection would require a physical increase in the number of lines, it would entail a higher construction cost, but it would also enable construction without JICA Project for the Master Plan Study of August, 2011

103 Chapter 18 Preliminary Design modification of the current protection relay system on the Maninjau - Simpang Empat 150kV transmission line. The two-circuit pi feeder connection would reduce the construction cost by an amount commensurate with the two-circuit decrease, but could present difficulties in the aspect of system operation. Specifically, failure and suspension of supply between the potential site and the GI Simpang Empat 150kV transmission line would result in routing of the potential site output through GI Maninjau. This would not only be inefficient but also lengthen the electrical distance somewhat as regards the primary bus voltage (GI Maningua - GI Simpang Empat - potential site). This situation could require compensation for reactive power. Such problems are particularly liable to surface in the event of grid extension in the aforementioned northern terminal direction beginning from GI Simpang Empat. Feeder connection would result in three-terminal operation, and this would require a switch to a protection relay system that could protect the other terminals. Because the potential site and GI Maninjau could become the power source terminals, a carrier-type protection relay system would have to be installed, and this would complicate the power system operation somewhat. Operation of other terminals is not a part of system operation in Indonesia at present, and the installation must take account of factors such as an increase in the work load of system operators. Therefore, in extension of the grid toward the northern end of West Sumatra Province as noted above, a single transmission tower would be built to specifications permitting the installation of four circuits. Initially, it would be possible to operate with a two-circuit line pi feeder connection or to construct a standard tower (with installation of two circuits per tower) and an additional transmission line in anticipation of grid extension toward the northern end, for operation as a four-circuit pi feeder connection. Naturally, if grid extension toward the northern end is not a consideration, there would be no problem with a two-circuit pi feeder connection. As for the type of transmission line applied for this feeder connection, it could be the same as the Maninjau - Simpang Empat line (1 HAWK, 2 cct). Based on the above, an in-depth study was made of feeder connection to the Maninjau - Simpang Empat 150kV transmission line (both through the forest reserve area and through the area without environmental constraints) and GI Padang Luar system access, inclusive of the route zone 1. 1 The objective of this study is not a rigorous search for a single answer but an examination of all the possible candidate sites, unless a particular site offers overwhelming benefit and rationality. JICA Project for the Master Plan Study of August, 2011

104 Chapter 18 Preliminary Design GI Simpang Empat GI Simpang Empat GI Simpang Empat Potential site Potential site Potential site Masang 2 Masang 2 Masang 2 GI Maninjau GI Maninjau GI Maninjau c) Route zone Four-circuit line, pi feeder connection Two-circuit line, pi feeder connection Figure Types of Connection Feeder connection The figure below shows the route zone between the potential site and GI Padang Luar, and for feeder connection to the Maninjau-Simpang Empat 150-kV transmission line. Source: JICA Study Team Figure Route Zone (Masang-2) i) Technical perspectives on transmission lines and transmission towers There is an elevation difference of about 750 meters between the potential site and GI Padang JICA Project for the Master Plan Study of August, 2011

Hydrological Analysis for Masang-2 HEPP

Hydrological Analysis for Masang-2 HEPP Part 16 Hydrological Analysis for Masang-2 HEPP PART 16 HYDROLOGICAL ANALYSIS FOR MASANG-2 HEPP 16.1 METEOROLOGY AND HYDROLOGY Meteorological Records and Hydrological Records are collected from Meteorological

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

Supplemental Guide II-Delineations

Supplemental Guide II-Delineations Supplemental Guide II-Delineations Contents Source Water Protection Area Delineation... 1 Delineation Criteria for Systems Using Groundwater Sources... 2 Time of Travel... 4 Flow Boundaries... 4 Delineation

More information

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow Engineering Hydrology (ECIV 4323) CHAPTER FIVE Runoff Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib Overland flow interflow Base flow Saturated overland flow ١ ٢ 5.1 Introduction To Runoff Runoff

More information

Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand

Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand Research article erd Assessment of the Groundwater Quantity Resulting from Artificial Recharge by Ponds at Ban Nong Na, Phitsanulok Province, Thailand SIRIRAT UPPASIT* Faculty of Technology, Khon Kaen

More information

SOIL MOISTURE CHARACTERISTICS IN UPPER PART OF HINDON RIVER CATCHMENT

SOIL MOISTURE CHARACTERISTICS IN UPPER PART OF HINDON RIVER CATCHMENT SOIL MOISTURE CHARACTERISTICS IN UPPER PART OF HINDON RIVER CATCHMENT C. P. Kumar * Vijay Kumar ** Vivekanand Singh *** ABSTRACT Knowledge of the physics of soil water movement is crucial to the solution

More information

Module 2 Measurement and Processing of Hydrologic Data

Module 2 Measurement and Processing of Hydrologic Data Module 2 Measurement and Processing of Hydrologic Data 2.1 Introduction 2.1.1 Methods of Collection of Hydrologic Data 2.2 Classification of Hydrologic Data 2.2.1 Time-Oriented Data 2.2.2 Space-Oriented

More information

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering Alpha College of Engineering Fifth Semester B.E. Question Bank Hydrology and irrigation engineering UNIT 1: INTRODUCTION & PRECIPITATION 1.Explain in brief the different types of precipitation. 2.How do

More information

July 31, 2012

July 31, 2012 www.knightpiesold.com July 31, 212 Mr. Scott Jones Vice President Engineering Taseko Mines Limited 15th Floor, 14 West Georgia Street Vancouver, BC V6E 4H8 File No.:VA11-266/25-A.1 Cont. No.:VA12-743 Dear

More information

Overview of the Surface Hydrology of Hawai i Watersheds. Ali Fares Associate Professor of Hydrology NREM-CTAHR

Overview of the Surface Hydrology of Hawai i Watersheds. Ali Fares Associate Professor of Hydrology NREM-CTAHR Overview of the Surface Hydrology of Hawai i Watersheds Ali Fares Associate Professor of Hydrology NREM-CTAHR 5/23/2008 Watershed Hydrology Lab 1 What is Hydrology? Hydrology is the water science that

More information

Groundwater basics. Groundwater and surface water: a single resource. Pore Spaces. Simplified View

Groundwater basics. Groundwater and surface water: a single resource. Pore Spaces. Simplified View Groundwater and surface water: a single resource Santa Cruz River, Tucson Groundwater basics Groundwater is water found within the pore spaces of geologic material beneath the surface of the Earth. It

More information

NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM)

NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM) NUMERICAL ANALYSIS AND INVESTIGATION OF PIPING IN AN EARTH DAM FOUNDATION BY SOFTWARE SEEP / W (CASE STUDY OF KERMANSHAH EZGELEH EARTH DAM) *Seyyed Hossein Naghmehkhan Dahandeh Civil Engineering, Hydraulic

More information

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations 13 Conclusions and Recommendations 7166P02/Vol. II, Recommendations Table of Contents 13. Conclusions and Recommendations 13-1 13.1 Conclusions 13-1 13.2 Summary of Results of Feasibility Study 13-2 13.3

More information

Application of a Basin Scale Hydrological Model for Characterizing flow and Drought Trend

Application of a Basin Scale Hydrological Model for Characterizing flow and Drought Trend Application of a Basin Scale Hydrological Model for Characterizing flow and Drought Trend 20 July 2012 International SWAT conference, Delhi INDIA TIPAPORN HOMDEE 1 Ph.D candidate Prof. KOBKIAT PONGPUT

More information

NOTE ON WELL SITING AT CORNER OF CASTLE VALLEY DRIVE AND SHAFER LANE FOR TOWN OF CASTLE VALLEY, GRAND COUNTY, UTAH

NOTE ON WELL SITING AT CORNER OF CASTLE VALLEY DRIVE AND SHAFER LANE FOR TOWN OF CASTLE VALLEY, GRAND COUNTY, UTAH NOTE ON WELL SITING AT CORNER OF CASTLE VALLEY DRIVE AND SHAFER LANE FOR TOWN OF CASTLE VALLEY, GRAND COUNTY, UTAH Authors: Dr. Kenneth E. Kolm, Hydrologic Systems Analysis, LLC., Golden, Colorado and

More information

CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT

CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT Planning Area Boundary: The Central Assiniboine planning area covers the reach of the Assiniboine River from just

More information

2. SCOPE OF WORK Evolution of Plan of Study Hydrology ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT

2. SCOPE OF WORK Evolution of Plan of Study Hydrology ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT 2. SCOPE OF WORK 2.1. Evolution of Plan of Study The purpose of this feasibility study is to define all aspects of the Project in sufficient detail to support the State s decision process regarding project

More information

Background Information on the. Peace River Basin

Background Information on the. Peace River Basin Background Information on the Peace River Basin Resource Conservation & Development Department August 24 Background Physiography The Peace River drainage basin occupies large parts of Polk, Hardee, DeSoto,

More information

Watershed Characteristics: A Case Study of Wadi Es Sir Catchment Area / Jordan

Watershed Characteristics: A Case Study of Wadi Es Sir Catchment Area / Jordan ISSN: 2319-7706 Volume 4 Number 9 (2015) pp. 98-106 http://www.ijcmas.com Case Study Watershed Characteristics: A Case Study of Wadi Es Sir Catchment Area / Jordan Amany R. Ta any* Ministry of Water and

More information

Groundwater and surface water: a single resource. Santa Cruz River, Tucson

Groundwater and surface water: a single resource. Santa Cruz River, Tucson Groundwater and surface water: a single resource Santa Cruz River, Tucson 1942 1989 1 Groundwater basics Groundwater is water found within the pore spaces of geologic material beneath the surface of the

More information

Annex 5 - Hydropower Model Vakhsh

Annex 5 - Hydropower Model Vakhsh Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until

More information

Model-Simulated Ground Water Elevation at the Green Spot Site (MW-4) Baseline Scenario (1992 to 2002)

Model-Simulated Ground Water Elevation at the Green Spot Site (MW-4) Baseline Scenario (1992 to 2002) Big Bear Area Regional Wastewater Authority Analysis of Ground Water Flow Model Simulations for the Proposed Green Spot Artificial Recharge Site 6895 6885 6875 Model-Simulated Ground Water Elevation at

More information

Water Balance Assessment of the Roseires Reservoir

Water Balance Assessment of the Roseires Reservoir Kamalddin E. Bashar 1 and Mohanad O. Mustafa 2 1 UNESCO-Chair in Water Resources, Khartoum, Sudan 2 Ministry of Irrigation and Water Resources, Sudan Abstract Roseires Reservoir on the Blue Nile River

More information

Annex C. Hydrological Investigation

Annex C. Hydrological Investigation Annex C Hydrological Investigation Annex C hydrological invesigation Annex C HYDROLOGICAL INVESTIGATION Table of Contents Page C1 C2 C3 C4 Hydrological Investigation Carried out in the Feasibility Study

More information

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination CAB/2KTF/EET 1221/1413 Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination Course Code : CV 312 / CV 507 Course Name : Engineering Hydrology Time : 3 Hours ] [ Max. Marks

More information

GROUNDWATER POTENTIAL OF THE THIKA AREA, KENYA

GROUNDWATER POTENTIAL OF THE THIKA AREA, KENYA GROUNDWATER POTENTIAL OF THE THIKA AREA, KENYA SGL 413:PROJECT IN GEOLOGY Presented by: Muraguri Peter Njuguna Reg No. L13/21429/2008 Contents Study area Objectives Geology of the study area Hydrogeology

More information

Modelling of hydrological processes for estimating impacts of man's interventions

Modelling of hydrological processes for estimating impacts of man's interventions Hydrology of Warm Humid Regions (Proceedings of the Yokohama Symposium, July 1993). IAHS Publ. no. 216, 1993. 231 Modelling of hydrological processes for estimating impacts of man's interventions TAKESHI

More information

6. Hydrogeological zones and groundwater resources balance baseflow map of the Czech Republic. Jiri Sima

6. Hydrogeological zones and groundwater resources balance baseflow map of the Czech Republic. Jiri Sima 6. Hydrogeological zones and groundwater resources balance baseflow map of the Czech Republic Jiri Sima General content Regional hydrogeological units Groundwater resources assessment Water balancing background

More information

Recent Drought and Drought Prediction System Development in Korea

Recent Drought and Drought Prediction System Development in Korea IDI Introduction and Session Agenda Dr. Ali Chavoshian, IDI Secretariat, UNESCO/RCUWM-Tehran Recent Drought and Drought Prediction System Development in Korea Prof. Deg-Hyo, Bae, Sejong University, Seoul,

More information

1. Introduction. Keywords Groundwater, Vulbnerability, Aquifer, Aquitard, Vadose zone. Alsharifa Hind Mohammad

1. Introduction. Keywords Groundwater, Vulbnerability, Aquifer, Aquitard, Vadose zone. Alsharifa Hind Mohammad World Environment 2014, 4(1): 22-32 DOI: 10.5923/j.env.20140401.03 New Groundwater Vulnerability Index for the Main Aquifers in Central Catchment Area in Jordan and Validation of the Results Using NO 3

More information

HYDROLOGICAL IMPACTS OF IRAQI BADUSH DAM ON GROUNDWATER

HYDROLOGICAL IMPACTS OF IRAQI BADUSH DAM ON GROUNDWATER HYDROLOGICAL IMPACTS OF IRAQI BADUSH DAM ON GROUNDWATER AQEEL Al-ADILI 1, SALEH KHASAF 2 AND AWS AJAJ 3 1 University of Technology, P.O. Box; 4627, Baghdad, Iraq, e-mail; aqeeladili@hotmail.com 2 University

More information

RAINFALL RUN-OFF AND BASEFLOW ESTIMATION

RAINFALL RUN-OFF AND BASEFLOW ESTIMATION CHAPTER 2 RAINFALL RUN-OFF AND BASEFLOW ESTIMATION 2.1 Introduction The west coast of India receives abundant rainfall from the southwest monsoon. The Western Ghats escarpment (Sahyadri mountain range)

More information

A Case Study: Foundation Design in Liquefiable Site

A Case Study: Foundation Design in Liquefiable Site RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,

More information

General Groundwater Concepts

General Groundwater Concepts General Groundwater Concepts Hydrologic Cycle All water on the surface of the earth and underground are part of the hydrologic cycle (Figure 1), driven by natural processes that constantly transform water

More information

NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT

NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT JAPAN INTERNATIONAL COOPERATION AGENCY NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT THE UPGRADING FEASIBILITY STUDY ON THE DEVELOPMENT OF THE KULEKHANI III HYDROPOWER

More information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information Table of Contents Section Page 5.1 GENERAL... 5.1-1 5.1.1 Overview... 5.1-1 5.1.2 Investigation and Engineering Information... 5.1-2 5.2 PRELIMINARY GEOTECHNCIAL REPORTS... 5.2-1 5.2.1 Preliminary Geotechnical

More information

Chapter 2: Aquifers and groundwater

Chapter 2: Aquifers and groundwater Chapter 2: Aquifers and groundwater Groundwater movement through aquifers is driven by differences in groundwater levels or pressure and is controlled by how porous the material is that it passes through.

More information

Lecture 9A: Drainage Basins

Lecture 9A: Drainage Basins GEOG415 Lecture 9A: Drainage Basins 9-1 Drainage basin (watershed, catchment) -Drains surfacewater to a common outlet Drainage divide - how is it defined? Scale effects? - Represents a hydrologic cycle

More information

LIFE Project Number LIFE03 ENV/GR/ Layman s Report

LIFE Project Number LIFE03 ENV/GR/ Layman s Report LIFE Project Number LIFE03 ENV/GR/000213 LIFE PROJECT NAME Rehabilitation of abandoned bauxite surface mines using alumina red mud as filler (REFILL) Reporting Date 30-11-2006 The large open pit areas

More information

Typical set up for Plate Load test assembly

Typical set up for Plate Load test assembly Major disadvantages of field tests are Laborious Time consuming Heavy equipment to be carried to field Short duration behavior Plate Load Test Sand Bags Platform for loading Dial Gauge Testing Plate Foundation

More information

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire May 4, 2010 Name of Model, Date, Version Number Dynamic Watershed Simulation Model (DWSM) 2002

More information

INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION

INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION INTERPRETATIONS OF INSTRUMENTED BORED PILES IN KENNY HILL FORMATION S. S. Liew 1, Y. W. Kowng 2 & S. J. Gan 3 ABSTRACT This paper presents the results of two instrumented bored cast-in-situ test piles

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Evaluation The Water Availability in the Dengkeng River Due To Landuse and Climate Changes

Evaluation The Water Availability in the Dengkeng River Due To Landuse and Climate Changes E3S Web of Conferences 73, 03008 (018) Evaluation The Water Availability in the Dengkeng River Due To Landuse and Climate Changes Anik Sarminingsih 1, Dwi Siwi Handayani, Endro Sutrisno 3, Badrus Zaman

More information

6-5 Analysis of water storage state by the subsurface dam

6-5 Analysis of water storage state by the subsurface dam 6-5 Analysis of water storage state by the subsurface dam From the results of the study and the observation described above, an analysis of the water storage mechanism by the subsurface dam was carried

More information

5.5 Improving Water Use Efficiency of Irrigated Crops in the North China Plain Measurements and Modelling

5.5 Improving Water Use Efficiency of Irrigated Crops in the North China Plain Measurements and Modelling 183 5.5 Improving Water Use Efficiency of Irrigated Crops in the North China Plain Measurements and Modelling H.X. Wang, L. Zhang, W.R. Dawes, C.M. Liu Abstract High crop productivity in the North China

More information

Nam Sebangfay. Name: Sebangfay Serial No.: Lao 5 Location: Khammouane Province N 17 o E 105 o Basin Area: km 2

Nam Sebangfay. Name: Sebangfay Serial No.: Lao 5 Location: Khammouane Province N 17 o E 105 o Basin Area: km 2 Nam Sebangfay Map of River Table of Basic Data Name: Sebangfay Serial No.: Lao 5 Location: Khammouane Province N 17 o 29 48 E 105 o 25 42 Basin Area: 8 560 km 2 Length of the main stream: 190 km Origin:

More information

The Study of Reservoir Immersion of a Hydropower Station

The Study of Reservoir Immersion of a Hydropower Station 2017 2 nd International Conference on Architectural Engineering and New Materials (ICAENM 2017) ISBN: 978-1-60595-436-3 The Study of Reservoir Immersion of a Hydropower Station Shi You Zhang, Ai Guo Li

More information

Chakachamna Hydro. AEA Geothermal Conference

Chakachamna Hydro. AEA Geothermal Conference Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings

More information

Song Lake Water Budget

Song Lake Water Budget Song Lake Water Budget Song Lake is located in northern Cortland County. It is a relatively small lake, with a surface area of about 115 acres, and an average depth of about 14 feet. Its maximum depth

More information

Flood Analysis: Hydrologic Principles & Analysis. Charles Yearwood. Drainage Unit, Ministry of Public Works Sept 2007

Flood Analysis: Hydrologic Principles & Analysis. Charles Yearwood. Drainage Unit, Ministry of Public Works Sept 2007 Flood Analysis: Hydrologic Principles & Analysis. Charles Yearwood Drainage Unit, Ministry of Public Works Sept 2007 Research interest: Hydrologic data collection; Early warning systems; & Integrated flood

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116 (i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:

More information

CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater. Hydrologic cycle. Hydrologic cycle cont.

CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater. Hydrologic cycle. Hydrologic cycle cont. CHAPTER 13 OUTLINE The Hydrologic Cycle and Groundwater Does not contain complete lecture notes. To be used to help organize lecture notes and home/test studies. Hydrologic cycle The hydrologic cycle is

More information

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT Disclaimer: The hydrologic conditions presented in this

More information

RUNNING WATER AND GROUNDWATER

RUNNING WATER AND GROUNDWATER NAME RUNNING WATER AND GROUNDWATER I. Introduction In this exercise we will investigate various features associated with streams and groundwater. Our drinking water ultimately comes from either streams

More information

SEASONALLY FLOODED SALT FLATS. Enhanced Efficiency for Shallow Flooding as a Dust Control Measure

SEASONALLY FLOODED SALT FLATS. Enhanced Efficiency for Shallow Flooding as a Dust Control Measure SEASONALLY FLOODED SALT FLATS Enhanced Efficiency for Shallow Flooding as a Dust Control Measure Objectives Enhance the shallow flood measure for improved efficiency and control, expand its applicability

More information

Xayaburi Hydroelectric Power Project

Xayaburi Hydroelectric Power Project The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower- Mekong Basin, 21-22 22 October 2008 Xayaburi Hydroelectric Power Project TEAM Consulting Engineering

More information

Effects of irrigation on groundwater recharge under deep buried depth condition

Effects of irrigation on groundwater recharge under deep buried depth condition IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Effects of on groundwater recharge under deep buried depth condition To cite this article: DONG Qiguang et al 2017 IOP Conf. Ser.:

More information

Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin

Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin I. Nam Ngum River and Its Basin Nam Ngum River Basin is of vital importance to the Lao PDR, it is considered as the food house of

More information

Inside of forest (for example) Research Flow

Inside of forest (for example) Research Flow Study on Relationship between Watershed Hydrology and Lake Water Environment by the Soil and Water Assessment Tool (SWAT) Shimane University Hiroaki SOMURA Watershed degradation + Global warming Background

More information

Names: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency

Names: ESS 315. Lab #6, Floods and Runoff Part I Flood frequency Names: ESS 315 Lab #6, Floods and Runoff Part I Flood frequency A flood is any relatively high flow of water over land that is not normally under water. Floods occur at streams and rivers but can also

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental Industrial Health & Safety (613) 860-0923 210 Prescott Street P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE

More information

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis Assessment of the Restoration Activities on Water Balance and Water Quality at Last Chance Creek Watershed Using Watershed Environmental Hydrology (WEHY) Model M.L. Kavvas, Z. Q. Chen, M. Anderson, L.

More information

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT

STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT STANDARDS/MANUALS/ GUIDELINES FOR SMALL HYDRO DEVELOPMENT General Works Guidelines for Investigation of SHP Projects Sponsor: Ministry of New and Renewable Energy Govt. of India Lead Organization: Alternate

More information

Information Request 11

Information Request 11 Information Request 11 Information Request 11 11-1 Responses to Information Request 11 Response to Information Request 11a Response to Information Request 11b 11-2 11-6 Federal Review Panel Information

More information

3.2.3 Groundwater Simulation. (1) Purpose

3.2.3 Groundwater Simulation. (1) Purpose The Study on Water Supply Systems in Mandalay City and in the Central Dry Zone Part II Study for Mandalay City 3.2.3 Groundwater Simulation (1) Purpose Because the Central Dry Zone, Myanmar, including

More information

EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE

EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE A. LOUKAS*, AND L. VASILIADES Laboratory of Hydrology and Water Systems Analysis,, Volos, Greece *E-mail:

More information

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR:

STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON SIDE ROAD, ASHTON CITY OF OTTAWA, ONTARIO PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT ASPHALT AND CONCRETE PLANTS 891 JINKINSON

More information

PART IV WATER QUANTITY MONITORING, TECHNOLOGICAL ADVANCES AND CONCLUSIONS

PART IV WATER QUANTITY MONITORING, TECHNOLOGICAL ADVANCES AND CONCLUSIONS PART IV WATER QUANTITY MONITORING, TECHNOLOGICAL ADVANCES AND CONCLUSIONS 17.1 INTRODUCTION CHAPTER 17 Water Quantity Monitoring The Okanagan Study has revealed the need for an improved monitoring system

More information

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED Agenda Background Hydro-Geomorphic Modeling Methodology HEC-HMS Modeling How is the Model Used Background Proposition 50 Grant Funding

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

Geoenvironmental impact assessment of a landfill for solid chemical wastes

Geoenvironmental impact assessment of a landfill for solid chemical wastes ALOJZY SZYMAŃSKI, ZBIGNIEW LECHOWICZ, KAZIMIERZ GARBULEWSKI Department of Geotechnical Engineering, Warsaw Agricultural University SGGW, Poland Geoenvironmental impact assessment of a landfill for solid

More information

Ballard Phase I/Retrofit Supplemental Monitoring Plan

Ballard Phase I/Retrofit Supplemental Monitoring Plan MEMORANDUM Ballard Phase I/Retrofit Supplemental Monitoring Plan PREPARED FOR: Seattle Public Utilities PREPARED BY: CH2M HILL DATE: August 17, 2012 Introduction This memo summarizes the plans for and

More information

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream

What is runoff? Runoff. Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream What is runoff? Runoff Runoff is often defined as the portion of rainfall, that runs over and under the soil surface toward the stream 1 COMPONENTS OF Runoff or STREAM FLOW 2 Cont. The types of runoff

More information

ASSESSMENT OF UTILIZABLE GROUNDWATER RESOURCES IN A COASTAL SHALLOW AQUIFER

ASSESSMENT OF UTILIZABLE GROUNDWATER RESOURCES IN A COASTAL SHALLOW AQUIFER ASSESSMENT OF UTILIZABLE GROUNDWATER RESOURCES IN A COASTAL SHALLOW AQUIFER V. S. SINGH AND V. K. SAXENA National Geophysical Research Institute, Uppal Rd, Hyderabad, 500 007, India In the recent years

More information

ACRU HYDROLOGICAL MODELLING OF THE MUPFURE CATCHMENT

ACRU HYDROLOGICAL MODELLING OF THE MUPFURE CATCHMENT ACRU HYDROLOGICAL MODELLING OF THE MUPFURE CATCHMENT Table of Contents: 1 INTRODUCTION... 1 2 CONFIGURATION OF ACRU... 2 2.1 RAINFALL DATA... 4 2.2 SOILS... 7 2.3 LAND COVER INFORMATION... 9 2.4 STREAM

More information

DYNFLOW accepts various types of boundary conditions on the groundwater flow system including:

DYNFLOW accepts various types of boundary conditions on the groundwater flow system including: Section 6 Groundwater Flow Model A groundwater flow model was developed to evaluate groundwater flow patterns in the site area and to provide a basis for contaminant transport modeling. 6.1 Model Code

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

THE ABATEMENT PLAN. beneficial abatement plan. For the purpose of defining the pollution potential of surface waters

THE ABATEMENT PLAN. beneficial abatement plan. For the purpose of defining the pollution potential of surface waters THE ABATEMENT PLAN GENERAL PLAN Preventing surface waters from entering deep mine workings apparently offers the most beneficial abatement plan. For the purpose of defining the pollution potential of surface

More information

PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD

PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD PILE DESIGN METHOD FOR IMPROVED GROUND USING THE VACUUM CONSOLIDATION METHOD K Tomisawa, Civil Engineering Research of Hokkaido, Japan S Nishimoto, Civil Engineering Research of Hokkaido, Japan Abstract

More information

Appendix E: Bridge Site Information Summary

Appendix E: Bridge Site Information Summary BRIDGE MANUAL E - 1 APPENDIX E: BRIDGE SITE INFORMATION SUMMARY Appendix E: Bridge Site Information Summary Table of Contents Notes..E 3 Section 1: Basic Information..E 4 Section 2: River Data..E 8 Section

More information

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis

M.L. Kavvas, Z. Q. Chen, M. Anderson, L. Liang, N. Ohara Hydrologic Research Laboratory, Civil and Environmental Engineering, UC Davis Assessment of the Restoration Activities on Water Balance and Water Quality at Last Chance Creek Watershed Using Watershed Environmental Hydrology (WEHY) Model M.L. Kavvas, Z. Q. Chen, M. Anderson, L.

More information

Available online at ScienceDirect. Procedia Engineering 125 (2015 )

Available online at   ScienceDirect. Procedia Engineering 125 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 125 (2015 ) 263 269 The 5th International Conference of Euro Asia Civil Engineering Forum (EACEF-5) Evaluation of drainage channels

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

Urban Rainwater Harvesting Systems: Promises and Challenges

Urban Rainwater Harvesting Systems: Promises and Challenges TheWaterChannel Webinar #5 Urban Rainwater Harvesting Systems: Promises and Challenges By Vishwanath S Zenrainman@gmail.com www.ircsa.org www.rainwaterclub.org Thanks for coming. The webinar will begin

More information

Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds. ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya

Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds. ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya Unit 2: Geomorphologic and Hydrologic Characteristics of Watersheds ENVS 435: Watershed Management INSTR.: Dr. R.M. Bajracharya Watersheds are hydro-geologic units Water flow and cycling are basic and

More information

Water balance and observed flows in the Anllóns river basin (NW Spain).

Water balance and observed flows in the Anllóns river basin (NW Spain). Water balance and observed flows in the Anllóns river basin (NW Spain). M.ERMITAS 1 RIAL RIVAS, MANUEL ALÍ ÁLVAREZ ENJO 2 & FRANCISCO DÍAZ-FIERROS VIQUEIRA 3 Departamento de Edafoloxía e Química Agrícola,

More information

Land Subsidence Management in Japanese Deltas

Land Subsidence Management in Japanese Deltas Land Subsidence Management in Japanese Deltas July 28, 2017 Tomoyuki OKADA Director for International Coordination of River Engineering River Planning Division, Water and Disaster Management Bureau Ministry

More information

CHAPTER I. PURPOSE The purpose of the acid mine drainage study of the Redstone Creek Watershed and portions of the Uniontown Syncline was to:

CHAPTER I. PURPOSE The purpose of the acid mine drainage study of the Redstone Creek Watershed and portions of the Uniontown Syncline was to: CHAPTER I INTRODUCTION AUTHORITY The Pennsylvania Department of Environmental Resources, in response to the Commonwealth of Pennsylvania Legislative Act 443, "Land and Water Conservation and Reclamation

More information

CHAPTER ONE : INTRODUCTION

CHAPTER ONE : INTRODUCTION CHAPTER ONE : INTRODUCTION WHAT IS THE HYDROLOGY? The Hydrology means the science of water. It is the science that deals with the occurrence, circulation and distribution of water of the earth and earth

More information

Ground- Water in the Clark Fork Basin

Ground- Water in the Clark Fork Basin Well 19142: 6N 19W 7 BABC- Ravalli County Ground- Water in the Clark Fork Basin Tom Patton, John LaFave, and Larry Smith Montana Ground-Water Assessment September 27, 26 The Ground-Water Assessment Program

More information

Improvement of the national water balance feasibility of water balances per river basin

Improvement of the national water balance feasibility of water balances per river basin Improvement of the national water balance feasibility of water balances per river basin Report on Grant agreement No 50303.2010.001-2010.564 Cor Graveland & Kees Baas By: Water Accounts / Water Statistics

More information

4 EVAPORATION AND TRANSPIRATION

4 EVAPORATION AND TRANSPIRATION 4 EVAPORATION AND TRANSPIRATION Evaporation, the transfer of water from the basin surface to the atmosphere, is the main term facing rainfall input in the water balance equation. It is therefore an important

More information

Optimization of Supports in a Road Tunnel through Conglomerate during Construction

Optimization of Supports in a Road Tunnel through Conglomerate during Construction Optimization of Supports in a Road Tunnel through Conglomerate during Construction Tülin SOLAK, Temelsu International Engineering Services Inc., Turkey, tulin.solak@temelsu.com.tr Bülent ULUKAN, Temelsu

More information

July, International SWAT Conference & Workshops

July, International SWAT Conference & Workshops Analysis of the impact of water conservation measures on the hydrological response of a medium-sized watershed July, 212 212 International SWAT Conference & Workshops ANALYSIS OF THE IMPACT OF WATER CONSERVATION

More information

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT

PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT Ministry of Infrastructure and Transport PRE FEASIBILITY REPORT NUKULOA MICRO HYDRO POWER PROJECT Prepared by : Department of Energy August, 2013 [DOE] 1 Table of Contents Summary... 3 1. Geographical

More information

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam David M. Robison, P.G. Geotechnical and Dam Safety Section, Louisville District, U.S. Army Corps of Engineers

More information

Climate change impacts on water resources in the Upper Po basin

Climate change impacts on water resources in the Upper Po basin limate change impacts on water resources in the Upper Po basin Giovanni Ravazzani, Marco Mancini, hiara orbari, Alessandro eppi, Laura Boscarello, Giulia Ercolani Department of ivil and Environmental Engineering

More information