1 REGANOSA LNG TERMINAL LA CORUNA SPAIN Jochen Kaspar Project Manager Andreas Hambücker Senior Process Engineer Tractebel Gas Engineering GMbH ABSTRACT In 2005, Spain was consuming 34 BCM of gas. From this yearly consumption, 65 % of the NG in Spain was LNG. This figure will increase up to 70 % within the next coming years. Consequently, Spain is the biggest European LNG Importer with 20 BCM, and the third at world scale ( after Japan and Korea). Within this growing market, an LNG Terminal was introduced in 2000 in the Spanish Energy plan, to provide LNG to the North-West of Spain, in order to provide gas to the area of Galicia. The Reganosa LNG terminal will contribute for 9% of the Spanish LNG import. Several locations have been investigated and decision was made to schedule the location at Mugardos,, near the existing installations of Forestal. Contract was awarded to TGE Gas Engineering, in January The construction area was available, late This terminal will have a berth capacity for m3 LNG carriers, initially 2x m3 full containment LNG storage tanks, ( with room for two more), and LNG vaporization utilizing heat from seawater, with a submerged combustion vaporizer as back up. Installed send out capacity is Nm3/h. The project, realized on a compact site of only 9 ha, will receive its first cargo in spring The plant will be operational in summer PO-05.1

2 Introduction The Spanish market has been propelled by greater natural gas use for power generation. In 2005, natural gas consumption in Spain rose to 34 BCM, a growth of 17.6% over the 2004 figure. In 2005, 65% of the NG consumed in Spain was LNG, while in the future; this figure will even grow to over the 70%. This is a confirmation of what the Ministry of Energy of Spain scheduled several years ago. The growing dependence on foreign energy in Spain was a cause of concern for the safety supply. On top of it, the interconnections shortage with European energy networks (Energy Island) means that supply of LNG became a predominant role. For that reasons, the ten years Energy plan includes several existing LNG Terminals, and consider to extend those and a new LNG terminal, to supply gas to the Northwest of Spain was added to the list. Reference is made to the Spanish transport network. Figure 1 indicates the location of the LNG terminals, their send out capacity, their existing storage capacity and the scheduled extension. Background In 1999, REGANOSA, was set up to develop a terminal in Mugardos, in the area of Ferrolterra. The final selected area was the industrial site near the existing installations of Forrestal. PO-05.2

3 In 2000, the beginning of the Promoter s Association among the new potential members took place, in order to analyze the technical and economical viability of the Reganosa project. In March, 2001, the Member s Agreement which establishes the government regime and regulates the relations among the REGANOSA parties was signed. Figure 2 clarifies the actual shareholder structure % 5% Likewise, there was a commitment signed, to install new combined cycle plants in As Pontes and Sabon (800 MW in each location). Figure 3 details the location of both power plants and the associated gas network. PLANTA DE REGASIFICACIÓN DE MUGARDOS CCGT AS PONTES CCGT SABON R.B.G. ENAGAS CCGT MEIRAMA PO-05.3

4 The objective of the project was to cover about 9% of the Spanish gas network in See figure 4. Total contribution to the system 9% of the national gas demand 4,6% 4,4% Año 2007 Resto de demanda del Sistema Gasista Nacional Producción REGANOSA consumida en Galicia Producción REGANOSA consumida en el resto de España 91,00% Fuente: MINECO Presentation of the project In 2001, REGANOSA started with an international tender for the selection of the EPC Contractor. The contract was awarded end 2002 to TGE Gas Engineering, (formerly Tractebel Gas Engineering, an affiliate of the Group Suez-Tractebel S.A.) In the meantime, REGANOSA started with the authorization process and filled the permits in order to allow start of construction works by December The total project cost, as scheduled of today is around 400M. See figure 5: PO-05.4

5 Total Estimated Investment: 394,316 M Red de Gasoductos 16% Gastos generales a distribuir 4% Intereses intercalarios 5% Instalaciones portuarias 7% Terminal de G.N.L 68% Terminal de G.N.L. Instalaciones portuarias Red de Gasoductos Gastos generales a distribuir Intereses intercalarios Characteristics of the plant This terminal will have a berth capacity for m³ LNG carriers. Unloading capacity will be m³/h. The storage capacity, within 2 full containment tanks is 2 x m³. Vaporization of the gas will be realized, utilizing the heat of the seawater. A back-up submerged combustion vaporizer is installed, with a total capacity of 3 times 160t/h The nominal capacity of gas send out is Nm³/h, with an installed peak capacity of Nm³/h. In order to optimize the limited surface area available, a ground burner has been installed instead of an elevated flare. Figure 6 clarifies the operational mode, Cistern loading Seawater Intake Seawater Outtake Carrier unloading system Discharge LNG Line Vapour Return Line 6 0 to n / to n Seawater Vaporizers (ORV) Natural Gas Sistemas de Medida, Regulación y Odorización Connection to Piping Network Boil-Off Compressors High Presure Pumps Submerged Combustion Vaporizer (SCV) LNG Tanks 2 x 150,000 m3 Reliquifier while figure 7 shows the overall plot plan. PO-05.5

6 We draw the attention to the limited surface area available, being 9 ha,which was forcing the engineering team to optimize and compromise between safety criteria as per EN 1473 and plant maintenance and operability. Figures 8 and 9 highlight the overall 3 D model view of the project, and the specific process area around the tanks. PO-05.6

7 An overall air picture of the actual status of the project is attached in figure 10. PO-05.7

8 Potential project extension Taken into account the growing LNG market in Spain, REGANOSA envisages to extent the project already in 2007 with 2 additional vaporizers of 160t/h and 2 additional storage tanks of m³. The land is available for this future extensions and the tie- in s included into the base contract. PO-05.8

LNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus

LNG Terminal in Świnoujście. Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus LNG Terminal in Świnoujście Mutual Joint Visit Workshop for Seveso Inspections 26 September 2017, Nicosia, Cyprus Contents 1. Polskie LNG COMPANY PRESENTATION 2. LNG supply chain 3. Key technical parameters

More information

INTEGRATION OF A NEW CCGT PLANT AND AN EXISTING LNG TERMINAL AT BARCELONA PORT Abstract ID Number: 155

INTEGRATION OF A NEW CCGT PLANT AND AN EXISTING LNG TERMINAL AT BARCELONA PORT Abstract ID Number: 155 INTEGRATION OF A NEW CCGT PLANT AND AN EXISTING LNG TERMINAL AT BARCELONA PORT Abstract ID Number: 155 Authors: Rafael Peiró Ripoll, Foster Wheeler Iberia, S.A., Spain Joaquín Gil Abad, Foster Wheeler

More information

DAMIETTA LIQUEFACTION PROJECT

DAMIETTA LIQUEFACTION PROJECT DAMIETTA LIQUEFACTION PROJECT José Javier Fernández Martínez Executive Vice President Business Development and Trading Union Fenosa Gas Madrid, Spain jjfernandez@unionfenosa.es ABSTRACT In the second half

More information

Extraction The gas is extracted from fields by drilling wells and installing extraction pipes

Extraction The gas is extracted from fields by drilling wells and installing extraction pipes LNG terminals Enagás, world leader in LNG terminals With eight regasification plants, Enagás is one of the companies with more LNG terminals in the world. We pioneer the development, maintenance and operation

More information

LNG R E F E R E N C E P R O J E C T S. Phone: +49(0) GOC Engineering GmbH Bachovenstr. 8; Sinzig, Germany

LNG R E F E R E N C E P R O J E C T S. Phone: +49(0) GOC Engineering GmbH Bachovenstr. 8; Sinzig, Germany R E F E R E N C E P R O J E C T S LNG Engineering GmbH Bachovenstr. 8; 53489 Sinzig, Germany Phone: +49(0)26429939300 info@goce.de; www.goce.de /REF_LNG LNG Carrier Costing Study Australia BHP-Melbourne

More information

Newsletter Nº 2 1Q 2017

Newsletter Nº 2 1Q 2017 Newsletter Nº 2 COORDINATOR Study of social perception of LNG During the months of January and February, Folia Consultores have carried out a social perception study within Core LNGas hive project in order

More information

OVERVIEW OF THE SPANISH NATURAL GAS MARKET IN YEAR 2008

OVERVIEW OF THE SPANISH NATURAL GAS MARKET IN YEAR 2008 OVERVIEW OF THE SPANISH NATURAL GAS MARKET IN YEAR 2008 1. CONSUMPTION Provisional figures for 2008 show that total demand for natural gas in Spain has reached 450 TWh, about 38.6 bcm (408 TWh in 2007).

More information

OUTLINE OF MIZUSHIMA LNG RECEIVING TERMINAL AND MAIN CHARACTERISTIC OF EQUIPMENT COST REDUCTION

OUTLINE OF MIZUSHIMA LNG RECEIVING TERMINAL AND MAIN CHARACTERISTIC OF EQUIPMENT COST REDUCTION OUTLINE OF MIZUSHIMA LNG RECEIVING TERMINAL AND MAIN CHARACTERISC OF EQUIPMENT COST REDUCON Kenichi Tadano Senior Engineer Yoshifumi Numata Engineering Manager Daisuke Wada Engineer Chiyoda Corporation

More information

BASIC DESIGN OF PYEONGTAEK LNG RECEIVING TERMINAL-II OF KOREA GAS CORPORATION LA CONCEPTION DE BASE DU TERMINAL METHANIER PYEONGTAEK-II

BASIC DESIGN OF PYEONGTAEK LNG RECEIVING TERMINAL-II OF KOREA GAS CORPORATION LA CONCEPTION DE BASE DU TERMINAL METHANIER PYEONGTAEK-II BASIC DESIGN OF PYEONGTAEK LNG RECEIVING TERMINAL-II OF KOREA GAS CORPORATION LA CONCEPTION DE BASE DU TERMINAL METHANIER PYEONGTAEK-II Youngsoon Sohn Youngmyung Yang Insoo Yoon Sunghee Choi Gunhyung Choi

More information

OPEN SEASON second capacity enhancement. 03 february 2011

OPEN SEASON second capacity enhancement. 03 february 2011 OPEN SEASON second capacity enhancement of the Zeebrugge LNG terminal BINDING PHAse: OFFER DESCRIPTION 03 february 2011 Contents 1. The Project 7 2. Services offer 13 3. REGULATION AND TARIFF 16 4. Allocation

More information

Uncertainties on future demand and supply The gas market s role in providing flexibility

Uncertainties on future demand and supply The gas market s role in providing flexibility Uncertainties on future demand and supply The gas market s role in providing flexibility Carmen Vindel Sánchez Director of International Regulation November 2014 Índice 1. Supply & Demand of Natural Gas

More information

Green FSRU for the future

Green FSRU for the future Green FSRU for the future Presentation at GREEN4SEA Athens April 6 th 2016 Dr. John Kokarakis Vice President Technology & Business Development, Africa, S. Europe Hellenic, Black Sea & Middle East Zone

More information

LNG QUALITY AND THE UK GAS MARKET

LNG QUALITY AND THE UK GAS MARKET 23 RD World Gas Conference LNG QUALITY AND THE UK GAS MARKET Main author M. J. Winstanley, BP Gas Power and Renewables UK ABSTRACT The changes in the LNG business since the first commercial cargos back

More information

Enagás. Leaders in natural gas infrastructures and operation

Enagás. Leaders in natural gas infrastructures and operation Enagás Leaders in natural gas and operation Enagás is the Technical Manager of the Spanish Gas System and leader in the transmission, regasification and storage of natural gas in Spain. It is also accredited

More information

LNG TERMINALLING PROGRAMME.

LNG TERMINALLING PROGRAMME. LNG TERMINALLING PROGRAMME Based on Article 203 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks www.fluxys.com TABLE OF CONTENTS TABLE

More information

LNG TERMINALLING PROGRAMME.

LNG TERMINALLING PROGRAMME. LNG TERMINALLING PROGRAMME Based on Article 203 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks www.fluxys.com TABLE OF CONTENTS 1 INTRODUCTION...

More information

PERP Program LNG Receiving Terminals New Report Alert

PERP Program LNG Receiving Terminals New Report Alert PERP Program LNG Receiving Terminals New Report Alert February 2007 Nexant s ChemSystems Process Evaluation/Research Planning program has published a new report, LNG Receiving Terminals (05/06S12). To

More information

OLT Offshore LNG Toscana Alessandro Fino CEO

OLT Offshore LNG Toscana Alessandro Fino CEO Small Scale to large Market Strategies & Technologies towards the Mediterranean Area "La logistica primaria per la distribuzione del GNL" OLT Offshore LNG Toscana Alessandro Fino CEO 1 OLT Shareholders

More information

LNG RECEPTION TERMINAL: OPERATING ASPECT OF RE- GASIFICATION SYSTEM INCLUDING LNG COLD UTILIZATION

LNG RECEPTION TERMINAL: OPERATING ASPECT OF RE- GASIFICATION SYSTEM INCLUDING LNG COLD UTILIZATION LNG RECEPTION TERMINAL: OPERATING ASPECT OF RE- GASIFICATION SYSTEM INCLUDING LNG COLD UTILIZATION TERMINAL DE RECEPTION GNL: ASPECT DE L EXPLOITATION DE DIFFERENTS SYSTEMES DE REGAZEIFICATION, Y COMPRIS

More information

2009 Japan-Russia Energy and Environment Dialogue in Niigata S3-9 NOMURA ERINA

2009 Japan-Russia Energy and Environment Dialogue in Niigata S3-9 NOMURA ERINA November 11, 2009 INPEX CORPORATION Our Business Overview of Naoetsu LNG Receiving Terminal Construction Schedule of Naetsu LNG Receiving Terminal History INPEX CORPORATION Established in 1966 Japanese

More information

COMMISSION OPINION. of XXX

COMMISSION OPINION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION OPINION of XXX pursuant to Article 3(1) of Regulation (EC) No 715/2009 and Article 10(6) of Directive 2009/73/EC - Spain - Certification

More information

GNL Mejillones, GenCo oriented

GNL Mejillones, GenCo oriented GNL Mejillones, GenCo oriented Jean-Michel Cabanes CEO congreso internacional Cigré tuturos desafíos para el sector eléctrico chileno Santiago, November 23 rd, 2015 key issues for flexibility 1. multi-service

More information

LNG TERMINALLING PROGRAMME

LNG TERMINALLING PROGRAMME LNG TERMINALLING PROGRAMME Based on Article 203 of the Royal Decree of 23 December 2010 on the Code of Conduct regarding access to natural gas transmission networks TABLE OF CONTENTS 1 INTRODUCTION...

More information

ISO Grain LNG:

ISO Grain LNG: ISO 50,001 @ Grain LNG: Managing energy in an energy-intensive environment Written by: Gregg Dadson Plant Performance Engineer National Grid Grain LNG IGEM Young Persons Paper Competition 2014 ABSTRACT

More information

OUTLOOK OF THE SPANISH NATURAL GAS SECTOR IN 2009

OUTLOOK OF THE SPANISH NATURAL GAS SECTOR IN 2009 OUTLOOK OF THE SPANISH NATURAL GAS SECTOR IN 2009 1. DEMAND Provisional figures for 2009 show that total demand for natural gas in Spain has dropped to 402 Twh, 34.6 BCM (450 TWh in 2008). These figures,

More information

PLATTS LNG CONFERENCE HOUSTON, TX. February 2017

PLATTS LNG CONFERENCE HOUSTON, TX. February 2017 PLATTS LNG CONFERENCE HOUSTON, TX February 2017 AES Corporation: A Global Leading Power Company Safe Harbor Disclosure Certain statements in the following presentation regarding AES business operations

More information

LNG supply Chain From the LNG receiving terminal to the LNG truck TrainMoS II

LNG supply Chain From the LNG receiving terminal to the LNG truck TrainMoS II LNG supply Chain From the LNG receiving terminal to the LNG truck TrainMoS II Madrid, November 4 th 2015 Jesus Losada Maseda (Project Manager) Laurent Moriceau (European Affairs) Index: Company presentation

More information

GUIDANCE ON LNG BoG MONITORING

GUIDANCE ON LNG BoG MONITORING 23 rd May 2017 GUIDANCE ON LNG BoG MONITORING 1 PURPOSE This paper provides guidance to the verifier and the company for the on-onboard monitoring of boil off gas (BoG) and recording of data for the purpose

More information

LNG REGASIFICATION PLANTS: CRYOGENIC ORC TO ENHANCE THE EFFICIENCY OF LNG TERMINALS

LNG REGASIFICATION PLANTS: CRYOGENIC ORC TO ENHANCE THE EFFICIENCY OF LNG TERMINALS REGASIFICATION PLANTS: CRYOGENIC ORC TO ENHANCE THE EFFICIENCY OF LNG TERMINALS LNG Anton Marco Fantolini LNG Technology Projects MGR Salvatore De Rinaldis Innovation Dpt. Luca Davide Inglese LNG Dpt.

More information

The role of Underground Storage in Spain s Gas System

The role of Underground Storage in Spain s Gas System The role of Underground Storage in Spain s Gas System 6 th Meeting of the UNECE Gas Centre Task Force Group on Supply, Infrastructure and Markets Paris, 26 April 2012 1 Contents 1. Demand evolution in

More information

LNG Perspective. IBC Working Committee Duisburg. MAN Energy Solutions - Russia. th, 2019

LNG Perspective. IBC Working Committee Duisburg. MAN Energy Solutions - Russia. th, 2019 LNG Perspective IBC Working Committee Duisburg Januarz January, 29 the th, 29 2019 th, 2019 MAN Energy Solutions - Russia LNG Export LNG import Introduction Trend: LNG increases the availability of gas

More information

Greece the New Energy Hub of South Eastern Europe: The evolving new Pipeline Projects in the region & their importance

Greece the New Energy Hub of South Eastern Europe: The evolving new Pipeline Projects in the region & their importance Greece the New Energy Hub of South Eastern Europe: The evolving new Pipeline Projects in the region & their importance Konstantinos E. Maroulis, General Manager Director of Gas Transmission, Administration

More information

Japan s LNG Utilization and Environmental Efforts

Japan s LNG Utilization and Environmental Efforts Japan s LNG Utilization and Environmental Efforts Toshihide KANAGAWA Deputy General Manager Production Technology Sec. Gas Technology Dept. The Japan Gas Association Polar Alaska (November 4, 1969) Contents

More information

Chilean NG Industry IGU LNG Committee Viña del Mar

Chilean NG Industry IGU LNG Committee Viña del Mar Chilean NG Industry IGU LNG Committee Viña del Mar 21st March 2018 About us Natural Gas Association Chile (AGN) We are a trade association that was formed in 2002, to foster the development of the natural

More information

LNG Terminal on the Island of Krk OPEN SEASON PROCESS PAPER BINDING PHASE

LNG Terminal on the Island of Krk OPEN SEASON PROCESS PAPER BINDING PHASE LNG Terminal on the Island of Krk OPEN SEASON PROCESS PAPER BINDING PHASE Prepared in July 2015 Table of Contents 1. Introductory Note... 1 2. Technical Overview of the LNG Terminal... 1 3. Modified LNG

More information

A World of Solutions Visit LNG Regasification NOT FOR PRINT DISTRIBUTION

A World of Solutions Visit  LNG Regasification NOT FOR PRINT DISTRIBUTION A World of Solutions Visit www.cbi.com LNG Regasification Comprehensive LNG Regasification Solutions For more than 50 years, CB&I has been a leader in the design and construction of LNG facilities. CB&I

More information

KOGAS s Technical Capability and Plan on Off-shore Plant Business

KOGAS s Technical Capability and Plan on Off-shore Plant Business KOGAS s Technical Capability and Plan on Off-shore Plant Business 2017. 11. 1 Tony S. H. Kim Off-Shore Plant Development Team Overseas Plant Business Group Korea Gas Corporation. All rights Reserved Page

More information

1 Our business model. model. Activities_ 11 Geographies_ 14

1 Our business model. model. Activities_ 11 Geographies_ 14 1 Our business model 1 Our business model Activities_ 11 Geographies_ 14 10 Annual Report 2017 Activities Enagás, a midstream company with almost 50 years' experience and independent European TSO (Transmission

More information

Enagás Carbon Footprint

Enagás Carbon Footprint Enagás Carbon Footprint 2013 Contents 1. Enagás' profile... 3 1.1. Enagás' business activities... 3 1.2. Scope of operations... 5 1.3. Organisation... 6 2. Commitment to combating climate change... 7 3.

More information

ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA)

ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA) ELIGIBILITY CRITERIA FOR QUALIFICATION OF EPC CONTRACTORS FOR LNG TERMINAL AT GANGAVARAM, VISAKHAPATNAM, ANDHRA PRADESH (INDIA) Petronet LNG Limited intends to undertake International Competitive Bidding

More information

Dry Flexicycle power plants a closed loop combined cycle with unique operational flexibility

Dry Flexicycle power plants a closed loop combined cycle with unique operational flexibility Power-Gen Middle East 2014 Dry Flexicycle power plants a closed loop combined cycle with unique operational flexibility Mr. Risto Paldanius, Director, Business Development, Wärtsilä Power Plants Mr. Kristian

More information

NATIONAL PLAN FOR THE LIQUEFIED NATURAL GAS DEVELOPMENT

NATIONAL PLAN FOR THE LIQUEFIED NATURAL GAS DEVELOPMENT KINGDOM OF MOROCCO MINISTRY OF ENERGY, MINES, WATER AND ENVIRONNENT LNG Terminal Gas to Power :CCGT NATIONAL PLAN FOR THE LIQUEFIED NATURAL GAS DEVELOPMENT Road Map PRESS BRIEFING BY DR. ABDELKADER AMARA

More information

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) The LNG Terminal

More information

4 th ERGEG Workshop on TYNDP

4 th ERGEG Workshop on TYNDP Statement of producers and stakeholders on scenarios used in the study ENAGÁS views 4 th ERGEG Workshop on TYNDP Luis Ignacio Parada / Enagás 14 th June 2010 1 Index LNG in Europe LNG in Spain and interconnection

More information

LNG R&D for the Liquefaction and Regasification Processes

LNG R&D for the Liquefaction and Regasification Processes LNG R&D for the Liquefaction and Regasification Processes Author: Marcello De Falco, Associate Professor, University UCBM Rome (Italy) 1.Theme description Liquefied Natural Gas (LNG) is used for transporting

More information

EFQM Good Practice Competition 2014

EFQM Good Practice Competition 2014 EFQM Good Practice Competition 2014 Creative Customer Solutions Registration form Contact person Fernando Impuesto Nogueras Job Title Commercial & Logistics Director Organisation ENAGAS S.A. Street Paseo

More information

REN- Redes Energéticas Nacionais, SGPS, S.A. REN- Redes Energéticas Nacionais, SGPS, S.A. EN- Redes REN Energéticas Nacionais, SGPS, S.A.

REN- Redes Energéticas Nacionais, SGPS, S.A. REN- Redes Energéticas Nacionais, SGPS, S.A. EN- Redes REN Energéticas Nacionais, SGPS, S.A. Redes Energéticas Nacionais, SGPS, S.A REN- REN- EN- Redes REN Energéticas Nacionais, SGPS, S.A. Presentation to xxxx Presentación Institucional Presentation to xxxx Presentation to xxxx Presenting REN

More information

The Spanish Gas Industry Antoni Peris, President

The Spanish Gas Industry Antoni Peris, President The Spanish Gas Industry Antoni Peris, President 1AIE Madrid, 14 th October, 2008 Main figures Gas natural network Market operation Prospective 2 Main figures Gas natural network Market operation Prospective

More information

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations

Petronet LNG Ltd., India. LNG Terminal Design- Major Design Considerations Petronet LNG Ltd., India LNG Terminal Design- Major Design Considerations OVERVIEW 1. What is LNG and LNG Chain 2. Project Development & Site Selection 3. Studies Required 4. Marine Facilities 5. Storage

More information

ENERGY VULNERABILITIES IN EUROPE

ENERGY VULNERABILITIES IN EUROPE ENERGY VULNERABILITIES IN EUROPE EUROPEAN ENERGY SECURITY: GAS FOCUS Dr. Eloy Álvarez Pelegry Director de la Cátedra de Energía. Orkestra - Instituto Vasco de Competividad. F. Deusto Paris, 30th November

More information

CORE LNGas hive: Project Presentation

CORE LNGas hive: Project Presentation CORE LNGas hive: Project Presentation Coordination: Vigo, 28 June 2017 Index About Enagás Why LNG in ports and cities? The CORE LNGas hive project About Enagás A midstream company Leader in natural gas

More information

Siemens Solar Energy. Buenos Aires, November 2011 By Rolf Schumacher R2 Siemens AG All rights reserved

Siemens Solar Energy. Buenos Aires, November 2011 By Rolf Schumacher R2 Siemens AG All rights reserved Siemens Solar Energy Buenos Aires, November 2011 By Rolf Schumacher 2010-03-04-R2 Siemens has the answers to your burning questions 1 Why Solar / Renewable Energy? 2 What are the different technologies?

More information

BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT

BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT BASED ON EXPERIENCE TGE GAS ENGINEERING EVOLUTION OF SAFETY DESIGN FOR CRYOGENIC TANKS REVAMP VS. NEW BUILT Page 1 CONTENT Overview on the services and experience of TGE Gas Engineering GmbH Examples of

More information

Submerged Motor LNG Pumps In Send-Out System Service. Unique pumps for unique duty...

Submerged Motor LNG Pumps In Send-Out System Service. Unique pumps for unique duty... A pump is a pump, right? Not exactly, given all the variations on the theme. Take, for example those pumps primarily used for transfer of liquefied natural gas (LNG) and other liquefied gases. They re

More information

Executive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin

Executive Summary. Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin Executive Summary Engineering Report of the: Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin index 01 INTRODUCTION page 4 02 GENERAL DESCRIPTION OF THE PROJECT

More information

Cogeneration in District Heating Systems

Cogeneration in District Heating Systems Cogeneration in District Heating Systems Carlos J. Renedo, Jaime Peredo, Alfredo Ortiz and Delfín Silió Department of Electric and Energy Engineering ESTI Industriales y Teleco, University of Cantabria,

More information

Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas

Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas 23 rd World Gas Conference, Amsterdam 2006 Evolution of an LNG Terminal: Senboku Terminal of Osaka Gas Main author Toshiro Otsuka Japan TABLE OF CONTENTS 1. Abstract 2. Body of Paper 3. List Tables 4.

More information

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)

17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) LNG INCIDENT IDENTIFICATION UPDATED COMPILATION

More information

Chapter 2 The Evolution of the Demand for Primary Energy and Electricity in Spain

Chapter 2 The Evolution of the Demand for Primary Energy and Electricity in Spain Chapter 2 The Evolution of the Demand for Primary Energy and Electricity in Spain In the past, electricity production in Spain was most dependent on coal, but it transitioned quite rapidly to gas after

More information

Utilization of Atmospheric Heat Exchangers in LNG Vaporization Processes:

Utilization of Atmospheric Heat Exchangers in LNG Vaporization Processes: Utilization of Atmospheric Heat Exchangers in LNG Vaporization Processes: A comparison of systems and methods Tom Dendy SPX Thermal Equipment & Services Rajeev Nanda Technip, USA April 7, 2008 Presented

More information

(FSRU/FSU) POWER PLANT LARGE SMALL LNG CARRIER UNIT STORAGE AND POWER PLANT TERMINAL JETTY LNG FILLING SMALL

(FSRU/FSU) POWER PLANT LARGE SMALL LNG CARRIER UNIT STORAGE AND POWER PLANT TERMINAL JETTY LNG FILLING SMALL [ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] WÄRTSILÄ - YOUR SHORTER ROUTE TO THE GAS AGE LEGEND WÄRTSILÄ OFFERING F L O AT I N G S T O R A G E & ( R E G A S I F I C AT I O N ) U N I T (FSRU/FSU) O I

More information

DADOS IBÉRICOS 2017 IBERIAN DATA

DADOS IBÉRICOS 2017 IBERIAN DATA DADOS IBÉRICOS IBERIAN DATA ENERGY BALANCE ktep 1 16 1 16 Primary Energy Consumption 22 6 21 684-2% 122 236 123 242 1% Oil 9 447 9 17-3% 2 434 4 633 4% Coal 3 29 2 848-13% 13 686 442-24% Natural Gas 4

More information

Transparency Workshop Brussels, 14 September 2010

Transparency Workshop Brussels, 14 September 2010 Hellenic Natural Gas Transmission System Operator Transparency Workshop Brussels, 14 September 2010 Hellenic Gas Transmission System Operator (DESFA) SA DESFA was established in March 2007 after the completion

More information

LNG IMPORT TERMINALS RECENT DEVELOPMENTS

LNG IMPORT TERMINALS RECENT DEVELOPMENTS LNG IMPORT TERMINALS RECENT DEVELOPMENTS Janusz Tarlowski John Sheffield M. W. Kellogg Ltd United Kingdom Charles Durr David Coyle Himanshu Patel KBR Houston, Texas Abstract There has been a recent renewal

More information

Transportation and regasification infrastructures

Transportation and regasification infrastructures Transportation and regasification infrastructures Snam Rete Gas is the market leader in the Italian natural gas transportation and regasification sector and the only Italian operator that regasifies liquefied

More information

Dynamic Simulation: a Tool for Advanced Design and Operating Behaviour Prediction

Dynamic Simulation: a Tool for Advanced Design and Operating Behaviour Prediction A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 57, 2017 Guest Editors: Sauro Pierucci, Jiří Jaromír Klemeš, Laura Piazza, Serafim Bakalis Copyright 2017, AIDIC Servizi S.r.l. ISBN 978-88-95608-48-8;

More information

South Korea s 10th Long-term Natural Gas Supply/Demand Plan (Summary)

South Korea s 10th Long-term Natural Gas Supply/Demand Plan (Summary) South Korea s 10th Long-term Natural Gas Supply/Demand Plan (Summary) Yoo Moonjong * Summary On December 31, 2010, the South Korean Ministry of Knowledge Economy released the 10th long-term natural gas

More information

Gas to Power in Spain

Gas to Power in Spain Gas to Power in Spain 16th Anual session of the Working Party UNECE Geneva, January 24th 2006 1 The Gas Natural Group 2 A leading multinational Group in the energy sector which operates across the entire

More information

Greenalia Biomass Power Curtis Teixeiro, S.L.U. is seeking to borrow up to 125 million to build, start up, and operate a 49.9 MW biomass plant, along

Greenalia Biomass Power Curtis Teixeiro, S.L.U. is seeking to borrow up to 125 million to build, start up, and operate a 49.9 MW biomass plant, along Greenalia Biomass Power Curtis Teixeiro, S.L.U. is seeking to borrow up to 125 million to build, start up, and operate a 49.9 MW biomass plant, along with the feed-in lines, substations, and other installations

More information

BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT

BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT BASED ON EXPERIENCE TGE GAS ENGINEERING EPC EXECUTION OF BOREALIS ETHANE TANK PROJECT www.tge-gas.com 24/10/2016 Page 1 CONTENT Overview on the Services and Experience of TGE Gas Engineering GmbH Project

More information

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL International Gas Union Research Conference 2011 ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL Youngchul.Eum Seunghyuk.Kim Kyoungmin.Doh MunKeun.Ha SAMSUNG HEAVY INDUSTRIES, Geoje-Si, Gyeongsangnam-do,

More information

Pipeline or LNG? A consumer/marketer view.

Pipeline or LNG? A consumer/marketer view. Pipeline or LNG? A consumer/marketer view. Investment Energy Summit Greece, Cyprus, Israel Athens, March 28, 2012 Panayotis Kanellopoulos Managing Director, M&M GAS CO 1 M&M GAS CO M&M Gas Co founded in

More information

PANEL: STANDARDS, CERTIFICATION, REGULATORY FRAMEWORK AND PUBLIC POLICY

PANEL: STANDARDS, CERTIFICATION, REGULATORY FRAMEWORK AND PUBLIC POLICY PANEL: STANDARDS, CERTIFICATION, REGULATORY FRAMEWORK AND PUBLIC POLICY Scope of discussion, background and guiding questions November 14 th, Cuernavaca, Morelos, México 1 6. Standards, certification,

More information

Gas Natural Fenosa Company profile

Gas Natural Fenosa Company profile Gas Natural Fenosa Company profile June 2017 Gas Natural Fenosa is a pioneer in gas and electricity integration, with 170 years of history 1 The largest integrated gas and electricity company in Spain

More information

SPANISH REGULATED SCENARIOS FOR RENEWABLE ENERGY AND CSP PLANTS

SPANISH REGULATED SCENARIOS FOR RENEWABLE ENERGY AND CSP PLANTS SPANISH REGULATED SCENARIOS FOR RENEWABLE ENERGY AND CSP PLANTS D. Bullejos, J. Llamas and M. Ruiz De Adana E.P.S.C. University of Cordoba. Ctra. Madrid-Cádiz Km., Córdoba, Spain E-Mail: bullejos@uco.es

More information

Safety of LNG-Shipping around Ports and Terminals

Safety of LNG-Shipping around Ports and Terminals Safety of LNG-Shipping around Ports and Terminals Jos T.M. van Doorn and Johan H. de Jong, MARIN Introduction The design of port lay-outs and terminals suitable for LNG-carriers has to meet exceptionally

More information

Coordination: CORE LNGas Hive

Coordination: CORE LNGas Hive Coordination: CORE LNGas Hive Index OBJETIVES OF THE ACTION GOALS KEY ASPECTS PARTNERS SCOPE PROJECT STATUS Objectives of the action DEVELOPMENT OF LNG BUNKERING REGULATION AND NORMATIVE DEVELOPMENT IN

More information

CORE LNGas hive + HIVE2 PUERTO DE TARRAGONA Jornada de divulgación del uso del GNL en un entorno portuario.

CORE LNGas hive + HIVE2 PUERTO DE TARRAGONA Jornada de divulgación del uso del GNL en un entorno portuario. CORE LNGas hive + HIVE2 PUERTO DE TARRAGONA Jornada de divulgación del uso del GNL en un entorno portuario http://www.corelngashive.eu/ About Enagas A midstream company Leader in natural gas and LNG infrastructures

More information

LNG Business In India

LNG Business In India LNG Business In India 2016 Topics Gas Demand / Supply Balance in India. Sector wise demand & sensitivity to price. Pricing of LNG ( Henry Hub, NBP, Long term ) Pipeline Infrastructure. Regasification Terminal

More information

Region 4 Liquefied Natural Gas Ports. Onshore and Offshore LNG Ports March 2007

Region 4 Liquefied Natural Gas Ports. Onshore and Offshore LNG Ports March 2007 Region 4 Liquefied Natural Gas Ports Onshore and Offshore LNG Ports March 2007 Types of LNG Carrier The Matthew enters Boston harbor. Types of LNG Terminals (Side-by-Side and Turret) Types of LNG Terminals

More information

'Post-combustion capture from natural gas combined cycle plants'

'Post-combustion capture from natural gas combined cycle plants' 'Post-combustion capture from natural gas combined cycle plants' IMechE -18 th May 2010 Mathew Hunt, Business Development Manager PCC Group Pramurtta Majumdar Specialist Engineer PCC Group THE DOOSAN FAMILY

More information

Yokogawa Corporation of America Receives Analyzer Systems and Shelters Order from Freeport LNG

Yokogawa Corporation of America Receives Analyzer Systems and Shelters Order from Freeport LNG PRESS RELEASE Yokogawa Corporation of America 12530 West Airport Blvd. Sugar Land, TX 77478 (800) 888-6400 Contact Us FOR IMMEDIATE RELEASE Date: August 8, 2016 Contact Phone: (800) 888-6400 Release #:

More information

Infrastructure. Services

Infrastructure. Services May 2018 Infrastructure Andres DR Colon, Panama In operation since 2003 LNG tank capacity 160,00m 3 serves: AES Andres 319MW and AES DPP 358 MW CCGT plants 3 party power plants >70 industrial clients,

More information

LNG Import Facility Infrastructure Options

LNG Import Facility Infrastructure Options LNG Import Facility Infrastructure Options Mangesh Patankar (Head of Business Development Galway Group) 28 th April 2016 www.galwaygroup.com Agenda Introduction to Galway Group Types of Regas terminals

More information

Process Diagnosis of LNG Regasification Terminal Pipeline

Process Diagnosis of LNG Regasification Terminal Pipeline Process Diagnosis of LNG Regasification Terminal Pipeline Seogsoon Kim, Youngsoon Sohn R & D Division, Korea Gas Corporation Incheon, Korea ABSTRACT Gas production capacity requirement to Pyeong-Taek LNG

More information

Lars Odeskaug - TORP CEO

Lars Odeskaug - TORP CEO Lars Odeskaug - TORP CEO Agenda Introduction TORP s EasyLNG Regas Terminal Solution LNG Vaporizers Compliance Alternative Klaipeda Lay-Outs Schedule LNG Ship Bunker Station & Road Depots 2 30 Years of

More information

Titles and Descriptions of Training Materials

Titles and Descriptions of Training Materials 1 Titles and Descriptions of Training Materials The training materials are designed as a learning resource and career development resource for the individual employee. Training materials should be supplied

More information

2019 LPG Loading Master & LPG Terminal Operations - 3 days

2019 LPG Loading Master & LPG Terminal Operations - 3 days 2019 LPG Loading Master & LPG Terminal Operations - 3 days Session 1. Skills and Knowledge Evaluation Examine through brief interaction existing knowledge of the attendees to identify which areas need

More information

VANZETTI MULTIPURPOSE LNG REFUELING STATIONS Results of the first operational year: benchmark for a successful network development.

VANZETTI MULTIPURPOSE LNG REFUELING STATIONS Results of the first operational year: benchmark for a successful network development. VANZETTI MULTIPURPOSE LNG REFUELING STATIONS Results of the first operational year: benchmark for a successful network development. NGV 2011 BERLIN Workshop: LNG, the Immediate Alternative for Road Transport

More information

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017

Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Dominion Cove Point Export Project Platts 16 th Annual Liquefied Natural Gas February 9, 2017 Note to Investors This presentation contains certain forward-looking statements, including projected future

More information

PROGNOST for LNG applications Machine Protection and Online Condition Monitoring 32 F IEC61508:2010

PROGNOST for LNG applications Machine Protection and Online Condition Monitoring 32 F IEC61508:2010 PROGNOST for LNG applications Machine Protection and Online Condition Monitoring 32 F 3 IEC61508:2010 Content LNG applications... 4 LNG Carrier fuel gas compressors... 5 Monitoring Rotating Equipment...

More information

Flexibilities of LNG Storage in Lined Rock Cavern (LRC) with High Operating Pressure

Flexibilities of LNG Storage in Lined Rock Cavern (LRC) with High Operating Pressure Flexibilities of LNG Storage in Lined Rock Cavern (LRC) with High Operating Pressure Do-Youn Kim, Ph. D. Process Engineer Joseph H. Cho, Ph. D., P. E. Director of Gas Tech. Center Sang-Woo Woo General

More information

Case study: Enagás. Claudio Rodríguez Suárez Gas Assets General Manager

Case study: Enagás. Claudio Rodríguez Suárez Gas Assets General Manager Case study: Enagás Claudio Rodríguez Suárez Gas Assets General Manager Geneva, 27 th March 2017 Enagás: 45 years experience A midstream company Leader in natural gas and LNG infrastructures Major International

More information

Reliability, Ageing and Life Extension of Liquefied Natural Gas (LNG) Installations. Presented By: Jonathan Lauck GIIGNL and SUEZ LNG NA

Reliability, Ageing and Life Extension of Liquefied Natural Gas (LNG) Installations. Presented By: Jonathan Lauck GIIGNL and SUEZ LNG NA of Liquefied Natural Gas (LNG) Installations Presented By: Jonathan Lauck GIIGNL and SUEZ LNG NA Introduction The world wide growth of the LNG Industry has not only pushed the development and construction

More information

KHI Activity for Hydrogen Supply Chain

KHI Activity for Hydrogen Supply Chain Deutsch-Japanisches Wirtschaftsforum KHI Activity for Hydrogen Supply Chain Hydrogen Project Development Center Corporate Technology Division Kawasaki Heavy Industries, Ltd. 0 Kawasaki Heavy Industries

More information

OPERATING INFORMATION SYSTEM FOR LNG FACILITIES Sanggyu Lee, R&D Division, KOGAS Young-myung Yang, R&D Division, KOGAS

OPERATING INFORMATION SYSTEM FOR LNG FACILITIES Sanggyu Lee, R&D Division, KOGAS Young-myung Yang, R&D Division, KOGAS OPERATING INFORMATION SYSTEM FOR LNG FACILITIES Sanggyu Lee, R&D Division, KOGAS Young-myung Yang, R&D Division, KOGAS 1. INTRODUCTION Natural gas is a naturally occurring mixture of hydrocarbon and non-hydrocarbon

More information

POWER PLANTS UPDATE. Wärtsilä Capital Markets Day

POWER PLANTS UPDATE. Wärtsilä Capital Markets Day POWER PLANTS UPDATE CHRISTOPH VITZTHUM, GROUP VICE PRESIDENT 1 Agenda 1. Demand drivers 2. s competitive advantages 3. New market focus and positioning 4. Why is it different this time? 2 The demand drivers

More information

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems

LNG Systems for Marine Application. LNG Reliquefaction & LNG Regasification. Oil & Gas Systems LNG Systems for Marine Application LNG Reliquefaction & LNG Regasification Oil & Gas Systems LNG reliquefaction plant arrangement for a Q-flex membrane tanker Reliquefaction system for LNG Carriers Hamworthy

More information

Comparison of Spherical and Membrane Large LNG Carriers in Terms of Cargo Handling

Comparison of Spherical and Membrane Large LNG Carriers in Terms of Cargo Handling Comparison of Spherical and Membrane Large LNG Carriers in Terms of Cargo Handling Kiho Moon,, Daejun Chang, Donghun Lee Myung-Bae Kim, Ho-Jong Ahn, and Jong-Pil Ha Hyundai Heavy Industries Co., Ltd. HIGHLIGHTS

More information

Wind Energy in Spain 2003

Wind Energy in Spain 2003 R E N E W A B L E E N E R G Y Wind Energy Wind Energy in Spain 2003 (Updated May 2004) Current Status and Prospects Wind Energy in Spain 2003 (Updated May 2004) Current Status and Prospects Title of publication:

More information