1 Oweninny Power Ltd. Chapter 19 Hydrology and Sediment Copyright ESB International Limited, all rights reserved.

2 Table of Contents 19. HYDROLOGY AND SEDIMENT INTRODUCTION RECEIVING ENVIRONMENT Site Characterization Water Balance Flooding Cutaway Bog Rehabilitation Sensitive Receptors POTENTIAL IMPACT OF THE DEVELOPMENT Working in Cutaway Peatland Windfarm Activities MITIGATION Approach Water Quantity Sediment Control Access Tracks Turbines, Substations and Buildings Hardstanding Borrow pit Peat Repository Batching plant Tree Felling Other Construction Settlement Control Measures MONITORING AND MAINTENANCE DURING CONSTRUCTION Monitoring Operational Phase Decommissioning Phase CUMULATIVE IMPACTS CONCLUSIONS List of Tables Table 19-1: Catchments and Turbines 19.3 Table River Risk and Design Rainfall Return Periods Hydrology and Sediment iii

3 List of Plates Plate 19-1: Area Prior to Rewetting 19.5 Plate 19-2: The Same General Area as Plate 19-2, In Plate 19-3: Typical Stone Check Dam in a Drainage Ditch List of Figures Figure 19-1: Oweninny Site And Main River Catchments Figure 19-2: Oweninny Site Hydrology Figure 19-3: Water Level Recession Curve Figure 19-4: River Sub-Catchments Figure 19-5: Sample Of The Wind Farm Layout Showing Drainage Arrangement Figure 19-6: Lough Dahybaun Catchment Figure 19-7: Relationship Of Oweninny Wind Farm Site to Freshwater Pearl Mussel Records on the Deel River Figure 19-8: Borrow Pit And Drainage Figure 19-9: Peat Deposition Area Figure 19-10: Batching Plant And Substation 1 Drainage Hydrology and Sediment iv

4 19. HYDROLOGY AND SEDIMENT INTRODUCTION Sediment loss and water management within the site are critical to protecting the water environment. Historically peat harvesting on the site gave rise to peat sediment loss from bare peat areas leading to downstream increases in suspended matter and sediment deposition. The rate of surface runoff at high flows was reduced by provision of additional storage within the drained areas of the peat bog. With the introduction of a sediment control system, comprising settlement lagoons and subsequent implementation of a bog rehabilitation plan by Bord na Mona, peat sediment loss has reduced significantly and water clarity is now good as reported by Inland Fisheries Ireland, see Chapter 10. It is important that activities associated with Oweninny wind farm do not result in any significant loss of sediment to the receiving rivers and that they complement the rehabilitation measures undertaken on the site, particularly during construction. This section of the EIS considers the potential impacts relating to surface water hydrology and sediment loss from the construction areas. The assessment is based primarily on: Contoured Light Detection and Ranging (LiDAR) Mapping and OSi Aerial Photography 1, Bord na Mona Oweninny Bog Rehabilitation Plan 2, CIRIA, The SuDS Manual C697, Planning for SuDS C687, SUDS Best Practice Manual C523, Site handbook for the construction of SUDS C698, Control of water pollution from linear construction projects C648 and Designing for exceedance in urban drainage C635 3, EPA river maps and catchments (EPA ENVision environmental mapping system and EPA Hydrotool 4,5 1 Osi Aerial Photography, Osi Mapviewer. 2 Bord na Móna, Oweninny Bog Rehabilitation Plan, CIRIA: The SuDS Manual C697, Planning for SuDS C687, SUDS Best Practice Manual C523, Site handbook for the construction of SUDS C698, Control of water pollution from linear construction projects C648, Designing for exceedance in urban drainage C635,. CIRIA C532 Control of Water Pollution from Construction Sites C532 and Design of Flood Storage Reservoirs B14. 4 EPA ENVision environmental mapping system, 5 EPA Hydrotool, Hydrology and Sediment 19.1

5 OPW and Mayo Co. Co. Flood hazard mapping and preliminary flood risk assessment 6,7,8, RECEIVING ENVIRONMENT Site Characterization The site is located on a catchment boundary between three catchments, the Oweninny/Owenmore (A), the northeastern Owenmore (B) and the Moy (C), see Figure The Oweninny River drains the central part of the site. The Oweninny river is fed by the Srahmeen river and Knockmoyle Stream from the west and by numerous small tributary streams from the east (Fiddaungal, Fiddaunnaglogh, Fiddaunnameenabane, Fiddauncam and the Fiddaunnamuinggeery) before entering the Oweninny wind farm site. The Owenniny is joined by the Sheskin Steam which drains the forested south-eastern slopes of Slieve Fyagh and also forms the site s internal boundary with the O Boyles Bog area. The Oweninny and the Fiddaunnamuingeery form part of the site boundary. The Sruffaunnamuingabatia, which drains the Bellacorick Iron Flush SAC area within the site, flows westwards and joins the Oweninny river. The Oweninny is also joined by the Muing River which drains Lough Dahybaun within the site. The Owenmore drains a catchment of approximately 332 km 2 before entering the sea at Tullaghan Bay. The Oweninny flows southwards, externally to the site and effectively dividing the site in two before joining the Owenmore turning westwards after Bellacorick Bridge and paralleling the N59. The Owenmore is joined at this location by the Altanabrocky river flowing northwards from the Nephin Mountains. The north-eastern part of the site is drained by small tributaries (Fiddaunfura) which rise in Shanvodinnaun and flow eastwards to the main easterly flowing river, also named the Owenmore. This river rises in the townlands of Cluddaun and Shanetra to the north of the site before flowing eastwards becoming the Cloonaghmore River before entering the sea at Rathfran Bay which is within Killala Bay. It is also referred to as the Palmerstown River. The Cloonaghmore River drains a catchment of approximately 132 km 2 before entering the sea at Rathfran Bay. The south-eastern part of the site drains to tributaries of the Shanvolahan River (Fiddaunagosty, Shanvolahan and Fiddauntooghaun) before entering the Deel River which drains to Lough Conn and eventually joins the River Moy at Ballina before entering the sea at Killala Bay. The River Moy drains a catchment of approximately 1,966 km 2 before entering the sea at Killala Bay. The area of the Shavolahan catchment before it enters the Deel River is approximately 23.7 km 2. ault.aspx 6 Mayo Co Co, Strategic Flood Risk Assessment for the Draft Mayo County Development Plan OPW Flood Hazard Mapping, 8 OPW National Preliminary Flood Risk Assessment, Hydrology and Sediment 19.2

6 Table 19-1 summarises the three main river catchments and the extent of proposed turbines and access tracks in each. Table 19-1: Catchments and Turbines Catchment Draining to Area sq km No of Turbines Owenmore (Oweninny) Tullaghan Bay Cloonaghmore (Owenmore) Rathfran Bay Deel (Shanvolahan) River Moy 1, The area is an Atlantic blanket peatland, comprising largely drained cutaway bog but with significant areas of rehabilitated cutaway and also remnant bog. The peat deposits generally vary in depth from 0.5m to 3.5m but 80% of the construction area has a depth less than one metre. Glacial till occurs in places and this generally underlies the peat. Small areas of glacial sand and gravel deposits are also present, particularly in the south and east of the site. Finally, alluvial deposits are shown to be present along the course of the Oweninny/Owenmore River. There are natural rivers within the site as shown in Figure 19.2 and the area is drained by a network of manmade drainage ditches Water Balance Long term rainfall and evaporation data was sourced from Met Éireann. The long-term (30- year) annual average rainfall (AAR) for the Oweninny/Owenmore Catchment of 187 sq km, to immediately downstream of the site, is 1,554mm. The closest synoptic station where the average potential evapotranspiration (PE) is recorded is at Belmullet, Co. Mayo, located approximately 32km west of the site. The long term average annual PE for this station is 518mm/year. The effective annual average rainfall (ER) represents the water available for runoff or groundwater recharge and is the rainfall less the actual evapotranspiration. To determine Actual Evaporation (AE), a standard crop factor of 1.3 has been regularly applied to blanket bog settings in Ireland were the surface of the bog is dominated by sphagnum. However, at the Bellacorick site there is little or no sphagnum and a value of 1.3 would overestimate AE here. A conservative estimate of 1.1 is used for the Bellacorick site which equates to an AE of 570mm/year.The ER for the site is estimated at 984mm. During the months April to October, there is very little runoff or recharge. Most of the effective rainfall at field scale occurs in the Winter months. There are no longterm recording surface water flow gauging stations in or near the site. In the 1950s and 1960s however, three water level gauging stations associated with the original Power Station recorded levels in the rivers for a short period and flows were measured at one of these, in the Owenmore River downstream of the site. These provide an indication of the surface water response at the time. Anecdotal observations at Oweninny during harvesting agree with field measurements of blanket peatland drainage made in a neighbouring bog at Hydrology and Sediment 19.3

7 Glenamoy 9, which concluded that flood runoff was reduced in frequency and amount, and summer flow of streams was increased. The bog rehabilitation programme would have reversed this process to some extent. A water level recession curve measured in 1962, prior to peat harvesting, is shown in Figure for the channel downstream of the site. This plot indicates some storage in and around the peat and possibly in the underlying groundwater. More recently, an investigation of groundwater at the Bellacorick Iron Flush SAC area within the site recorded water tables, phreatic pressures and flows where links between surface and groundwater were identified, see Chapter 18. Flows estimated using the EPA Hydrometric System (Hydrotool), also suggest a relatively fast runoff, which is a characteristic of blanket peatlands. This estimation method does not account for the cutaway nature of the site, with rewetting and revegetation, explicitly. This rehabilitation has stabilised the sediment. The objective is to minimise any potential impact on this water balance of the site Flooding The Office of Public Works (OPW) compiles Flood Hazard Maps which record known historic flood locations for the entire country 7. They are also in the process of preparing flood hazard maps based on a risk assessment. Flood Hazard Maps are tools used to assist with the management of development in floodplains and other areas at risk from tidal, fluvial or surface water flooding. OPW has prepared a national Preliminary Flood Risk Assessment Report 8. Mayo County Council has prepared a flood risk assessment of its county development plan 6 in line with requirements of the Regional Planning Guidelines 2010 to Although there are no recorded incidences of flooding at or near the site, this would relate to local roads and houses. The area is a peatland where surface flooding is of course commonplace. Flood Risk Assessment reports have been prepared of each substation, for the operation and maintenance building and for the visitor centre, see Appendix 15. They conclude that the developments comply with the principles of The Planning System and Flood Risk Management - Guidelines for Planning Authorities, November 2009" Cutaway Bog Rehabilitation A Cutaway Bog Rehabilitation Plan has been implemented on the site. This involved detailed consultations with relevant agencies, authorities and affected parties to arrive at an implementation procedure to ensure minimum impact to the environment. There are a significant number of features of the rehabilitation within the site that will benefit a Sustainable Drainage System (SuDS) approach to surface water management for the development. These are: 9 Burke, W. 1967: Principles of drainage with special reference to peat. Irish Forestry 24,1 7. Hydrology and Sediment 19.4

8 Vegetated Filter Strips Existing Wetland Existing Surface Ponds Vegetated Drainage Channels Existing Settlement Ponds. Typical landuse and surface hydrology is illustrated in Plate 19-1 and Plate 19-2 below, where the impact of the bog rehabilitation plan can be seen. Plate 19-1: Area prior to rewetting Plate 19-2: The same general area as Plate 19-1, in A comprehensive assessment of the impact on fisheries arising from peat silt discharges from Bord na Móna bogs in North Mayo prepared by Inland Fisheries Ireland indicated that 10 Ref. Wilson D, Farrell C, Mueller C, Hepp S, and Renou-Wilson F Rewetted industrial cutaway peatlands in western Ireland: a prime location for climate change mitigation? Mires and Peat, Volume 11 (2013), Article 01, Hydrology and Sediment 19.5

9 significant peat loss to waters occurred from bare peat areas within the site in the past but these have reduced significantly due to the bog rehabilitation works undertaken by Bord na Móna since The current water status is considered acceptable Sensitive Receptors Flow disruption or sediment loss to any of the receiving rivers would pose a significant risk. In addition to fisheries risk throughout the river system, five areas in particular are considered for special attention. Shanvolahan-Deel River An area in the southeast of the site is particularly important as it drains to the Deel (Shanvolahan) River, which supports freshwater pearl mussel populations in downstream reaches. Lough Dahybaun The catchment area of Lough Dahybaun, located within the site, has been delineated from detailed LIDAR data, see Figure Geoheritage of Oweninny River The only geoheritage feature within the environs of the site is the geomorphology of the banks of the Oweninny River itself, as it traverses through the central part of the site. Iron Flush The Surface Water Groundwater interaction at the Iron Flush SAC within the site was investigated in 2012 and is reported in Chapter 18 of the EIS. Bog Remnants There are small areas of relatively undisturbed bog within the site POTENTIAL IMPACT OF THE DEVELOPMENT Working in Cutaway Peatland Water and sediment management in and around the site has been the subject of international research over many years, from the 1960s 9 to The experience gained in the area will be employed throughout the project, allowing a SUDS design which is site-specific and suited to the well-humified peat. Initially, water tables were lowered at the site by constructing shallow drainage ditches of 0.75m depth there was no benefit at greater depths. The ditches needed to be at a very close interval of 4.5m as the well-humified peat is impermeable except in the pores near the surface. In the cutaway bog, peat banks remain vertical and the water table can be about 100mm below the surface. Drainage work in a windfarm would normally pro-actively drain working areas and direct all flow and sediment within a designed drainage network. There is usually sufficient depth of outfall nearby all construction areas. However, in the undulating cutaway peat area of Oweninny, slopes are generally very low, some areas are flat and the likely outfall is a considerable distance from many construction areas. Although a drainage system was Hydrology and Sediment 19.6

10 installed during peat extraction in most areas, this drainage system was largely revoked by the bog rehabilitation programme Windfarm Activities Potential impacts that are typically associated with wind farm developments may include the following: Unmanaged erosion and sediment deposition generated from ground disturbance could cause modification to stream channel morphology, potentially smothering habitats and impacting on aquatic flora and fauna, especially fish. Water abstracted for drinking can also be affected by sediment. Any alteration of natural flows or subsurface hydrogeological patterns could disturb the water regime, particularly floods and droughts, unless properly managed. The development of new access tracks across existing rivers has the potential to obstruct water flow. Poorly designed drainage on unstable areas may increase the risk of landslide. The potential impacts apply primarily during construction if the flow paths are interrupted or redirected. General disturbance of the vegetation cover during construction has the potential for short-term generation of high suspended sediment loads in rivers draining the area. This potential for an increased sediment loading will be short-term and will reduce as vegetation in disturbed areas re-establishes. Potential impacts may also arise in respect of increased sediment loading resulting from any dewatering of excavated areas. The potential impacts can be mitigated by careful drainage design. The historic planting of commercial coniferous forests in parts of the site at Oweninny has modified the hydrology of these planted areas of the site. Further potential alteration could arise from clearfelling in these areas. While the permanent removal of mature forests from large areas of the site could result in increased runoff directly into local rivers, the felling plan to facilitate the wind farm project proposal are not considered significant in relation to what is envisaged in the overall forest management plan. As part of the wind farm development, a number of existing river crossings (e.g. across the Muing and Sruffaunnamuinggabatia rivers) and culverted crossings across smaller streams will require upgrading. Potential impacts could result from disturbance of the river bed and flow constriction. Foul effluent from kitchens and washrooms will be treated and discharged to ground through appropriately designed proprietary treatment and percolation areas. Rainwater harvesting will be provided at offices and excess surface runoff from roofs will be lead to soakaways MITIGATION Approach The approach to surface water management for Oweninny Wind Farm Project integrates with Hydrology and Sediment 19.7

11 the methods already agreed with the environmental authorities for bog rehabilitation at Oweninny. These methods are tailored to the characteristics of the site and to the specific properties of the peat, and they form part of a suite of techniques used in the Oweninny Bog Rehabilitation Plan and in Sustainable Drainage Systems (SuDS). The bog rehabilitation programme at Oweninny is based on three measures aimed at encouraging re-vegetation of the site and stabilising it to minimise suspended solids loading to receiving rivers: undisturbed buffer areas alongside rivers; rewetting of areas by blocking drains; and ploughing of a small number of areas with little or no peat to promote revegetation. The objective of the wind farm hydrology and sediment control design is to replicate these natural drainage patterns within the project. The following design philosophy has therefore been adopted: Limit the impermeable fraction of the development, with particular attention to sensitive locations. Re-direct upslope clean surface water around structures and providing first stage treatment to construction/operation water locally at structures to remove and isolate contamination at source. Thereafter, spread surface runoff across the surface to maximise the benefits of the existing site characteristics through use of buffer zones and rehabilitation areas. Surface water generated on the development area will predominantly continue to drain as it would under pre-development conditions. Access tracks and structures are generally located on relatively high areas and on local watershed boundaries, away from rivers. The system is a diffuse system. First-stage local treatment is provided throughout the site in settlement ponds and lagoons, with the type of pond and lagoon designed on the basis of the bog rehabilitation and SuDS features available and on the risk to the nearest river. In very sensitive areas, the number of turbines is minimised and additional settlement SuDS measures are proposed Water Quantity The development has been minimised to the extent possible: The footprint of the development (areas of tracks, cranepads, borrow pits, substations, visitor interpretive centre and batching plant) will occupy approximately 0.45% of the upper Oweninny/Owenmore catchment after it passes through the site. The footprint of the development will occupy approximately 0.67% of the upper Cloonaghmore/Owenmore catchment after it passes through the site. The footprint of the development will occupy and approximately 0.35% of the upper Deel/Shanvolahan catchment after it passes through the site. These figures reduce significantly as the catchment extends further downstream. The localised footprint areas associated with the tributaries sub catchment areas, see Figure 19-4, vary from 0.0% to 3.9%, and the highest percentage occurs in the Muing river Hydrology and Sediment 19.8

12 catchment with all others ranging from 0.0% to 1.9%. Excluding the stone access tracks, which are not impervious, the percentages range from 0.0% to 3.1%. Although runoff from constructed areas will form a relatively high percentage runoff, this can be compared to the high percentage runoff of the existing peat bog, as compared say to mineral soils. Hence there is no significant increase in runoff and local first-stage treatment at each structure will deal with the same local runoff as occurs at present. At isolated areas of bare earth, where peat was completely removed, the link between surface runoff and groundwater is highly disturbed, leading to springs and local surface pathways. Again, the local water balance will be preserved by local first-stage treatment and second-stage treatment on the bog surface. This approach does not require special measures to deal with extreme rainfall events. It facilitates access to and operation of the electrical substations, wind turbines metorological masts and other buildings within the development during very extreme events. Hence the potential impact for the footprint area is related to sediment rather than flow Sediment Control Sediment control structures and associated local drainage will be constructed prior to the main construction at each site. An Erosion and Sediment Control Plan has been prepared for the site and will be fully implemented, see Appendix 16. Sediment loss from the site is particularly important to all rivers draining the site given their important salmonid nature. It is also particularly important in the area that drains to the Deel River, which supports freshwater pearl mussel populations in downstream reaches, some 8km distance. This receiving water has very high sensitivity to sediment loss from the site. Sediment loss to the receiving rivers would also pose a significant risk to salmonid spawning areas and juvenile fish. The control of flow and sediment within the existing regime will ensure that the present buffer to runoff and sediment loss within the site is preserved. The only geoheritage feature within the environs of the site is the geomorphology of the banks of the Oweninny River. No works are proposed on the river banks, with the exception of the replacement or upgrading of the existing river crossing within the site. It is not anticipated that this upgrade will affect the river bank substantially beyond the extent of the existing crossing and is unlikely to present a significant risk. The layout design for the development has minimised the area to be disturbed by construction through rationalising the access track network serving turbine locations and locating turbine hardstandings and access tracks in areas of shallow peat depths. Proposals to manage the potential for erosion of sediment and the control of activated sediment are set out herein and will be incorporated into the Construction Environmental Management Plan which will be a requirement for site construction. Settlement Lagoons and Ponds Settlement ponds and/or lagoons are the main features proposed for first-stage treatment at each structure, followed by second-stage SuDS measures between the structure and the nearest river. The second stage will also control sediment and they include spreading flow across the peat surface and/or into large artificial ponds and wetlands. Hydrology and Sediment 19.9

13 First-stage treatment has been designed to provide initial detention for the settlement of solids activated during local earthworks, based on their contributing area and rainfall for the particular risk assessed for the specific structure location. A peat particle settlement velocity of m/s 11 and a standard pond width of 8m were chosen, allowing ease of maintenance. Rainfall return periods of 10, 30 and 100 years have been applied to different areas of the site in accordance with identified risk to rivers, that is, depending on: the number and quality of subsequent measures of surface water treatment available following discharge from the pond, and on the proximity of the pond to a local river. The required pond length was calculated from this. The rainfall for these return periods were obtained from Met Eireann 12, and runoff flow rates for these return periods were derived using the Rational Formula with a runoff coefficient (C v ) of 0.70 which is consistent with the upper limit of the range recommended for stripped ground. A ten-minute design duration is appropriate for all structures, apart from the large peat repository where thirty minute duration was applied to a pond that will serve half of the site. A conservative instantaneous time of entry is assumed. Ponds comply with CIRIA Guidance C648. Six types of ponds have been designed and, depending on their location within the site, they have been sized for different return periods, in accordance with Table Table River Risk and Design Rainfall Return Periods Location relative to River and Number of Subsequent Treatment Measures Rainfall Return Period years Peak Rainfall intensity mm/10min River in close proximity and 1 subsequent SuDS treatment measure River nearby and 1 to 2 subsequent SuDS treatment measures Large distance to nearest river and 2 or more subsequent SuDS treatment measures About 50% of eroded peat particles are finer than 0.2mm in diameter with 10% finer than 0.035mm Error! Bookmark not defined.. The pond hydraulic and sediment design criteria are: Standard dimensions of base width 5m, top width 8m, depth 2m (water depth 1.5m) and side slopes 1:0.75 were chosen to suit a standard 12 tonne excavator with a 1.5m jib extension. Lengths are then varied to suit risk and load. This excavator can clean the pond from both sides with minimum disturbance. 11 Mulqueen, J, Rodgers, M, Marren N and Healy, M.G. Erodibility of Hill Peat. Irish Journal of Agricultural and Food Research 45: , Met Eireann, Estimation of Extreme Rainfall Depths. Hydrology and Sediment 19.10

14 Discharge will be via a 450mm diameter twin-wall pipe with a flap valve installed, to provide isolation during cleaning. In the five very sensitive areas near the Shanvolahan River, Lough Dahybaun, Oweninny channel, Iron Flush and Bog Remnants, a piped inlet with a manually operated flap valve will be installed on the settlement pond. This valve can be closed preventing incoming flow in the event of an environmental incident, thus protecting the pond. At structures that are a long way from rivers and with extensive subsequent surface treatment, the first-stage treatment settlement pond may be replaced altogether by an artificial SUDS lagoon. Such a lagoon would be larger than a designed settlement pond, it would be fitted to the local topography allowing for continuous wetting to suit the bog rehabilitation plan. It will allow inlet and outlet flows across a wider area. Swales A swale is an open gently sloping grassed drainage channel. A swale may be used to collect and convey drainage water to the lagoons and special ponds, trapping sediment and enhancing filtration. Check Dams Check dams are small temporary barriers that will be constructed across larger areas of concentrated flow at structures. Their purpose is to reduce the velocity and to slow the rate of runoff. In steeper parts of site, check dams will be placed in the drainage channels, effectively creating ponding which will assist in sediment removal, see Plate Plate 19-3: Typical stone check dam in a drainage ditch Hydrology and Sediment 19.11

15 Access Tracks The process of rewetting through drain blocking on the site has detained surface water on site thereby creating wetted areas and the conditions required for native peatland vegetation to establish. This is also very effective at trapping peat silt particles. Early stage rehabilitation areas are characterised by many small deep ponds, many larger shallow ponds and exposed peat surface areas. Access track drainage will be directed onto the peat surface and to these pond areas where feasible, providing for treatment and attenuation of surface water generated on access tracks. Some mature wetland areas offer substantial benefits to surface water drainage. Significant detention and attenuation of runoff can be achieved. Drainage from the locations of turbines and associated development areas has been carefully selected to avoid the ecologically significant bog remnant areas. Consequently the surface water drainage proposals associated with these areas will have no hydrological impact on these ecologically important areas of the site. Access tracks will be above the existing ground level where peat is shallow, that is, across 80% of the site. They will have a camber in both directions. Where peat excavated for the access track construction is sidecast there will be gaps left in this side cast peat to allow surface water flow paths through to the surrounding area. Where possible, the access tracks have been strategically positioned on watersheds so as to allow runoff in both directions. However, in the limited areas where the natural overland flow paths are interrupted by the line of the access track, regular culverts/ drainage paths will be provided so that the access tracks do not interfere with the natural hydrology of the site. These drainage paths will have check dams at regular intervals on any access trackside drains where the longitudinal access track gradient exceeds 10%. This will further promote treatment and detention of surface water runoff from the access track. Surface cross drains will be installed on tracks that are particularly steep and have long gradients. Access tracks will be below existing ground level, where peat depths in excess of one metre cannot be avoided, that is, across 20% of the site to the east. Temporary local drainage will be installed to allow construction of the track sub-base. The final track will camber to both sides and be provided with a v-notch drain at both sides. This drain will follow the longitudinal fall in the track until the access track level is again above the surrounding ground level. At this point, finger drains perpendicular to the access track will discharge runoff from the access track over surrounding lower lying ground. Should a low point of the access track and consequently the drains coincide with the access track level below existing ground, the access trackside drain will diverge from the access track in the direction of nearest lower ground. Check dams will be provided at regular intervals on any access trackside drains where the longitudinal access track gradient exceeds 10%. This will further promote treatment and detention of surface water runoff from the access track. Hydrology and Sediment 19.12

16 Turbines, Substations and Buildings Hardstanding An open drainage ditch will be located on the down slope side(s) of each of the turbine hardstanding development areas. Where possible this drainage ditch will be profiled as a swale with side slopes of 1:3. This drainage ditch/ swale will be easily maintainable from the edges of the hardstanding and will discharge to first-stage treatment in a dedicated settlement pond/lagoon, an example is shown in Figure The type of settlement pond/lagoon at each location has been selected on the basis of the sensitivity of the area. Finally, discharge from the first-stage treatment system will be overland for further treatment on the surface. Peat excavated for the construction of the hardstanding will be placed in an adjoining area of the hardstanding so that runoff from this area will also be routed through the specific water first-stage treatment measures at the hardstanding. The particular sensitive areas are considered next. Lough Dahybaun The design of the wind farm layout has examined the catchment and there is a suitable location for a turbine and crane hardstand, with 1.2 km of access track. The access track will be constructed along the existing railway line which minimises sediment disturbance, see Figure Additionally this access track forms a physical barrier separating the wind turbine construction area from the lake. The construction area is located approximately 950m from the lake and no direct discharge from the construction site to drainage flowing to the lake will occur. The construction site drainage will be directed to a settlement pond/lagoon and subsequently to overland flow as indicated previously. In addition a large artificial lagoon, previously installed by Bord na Móna as part of the Oweninny peat harvesting operations, is located between the access track and Lough Dahybaun and will provide additional settlement for solids. All existing land drains in this area will be audited and check dams installed as required. Fiddaunatooghaun Stream (Shanvolahan/Deel Catchment) Seven wind turbine construction sites and access trackways are located within the upper watershed area of the Fiddaunatooghaun stream catchment. An existing railway embankment, which was part of the Bord na Móna peat harvesting operations, forms a physical barrier between six of the turbines and the small first and second order streams in the upper catchment. One turbine site, T110, is within 100m of a small stream feeding into the Fiddaunatooghaun. This is located on bare earth by design where all peat has been removed. The drainage from this turbine passes through a settlement pond / lagoon and subsequently to an existing Bord na Móna silt pond within the stream before entering the Fiddaunatooghaun. The construction site is approximately 8km from the nearest freshwater pearl mussel recorded population which is located at the confluence of the Deel and Shanvolahan rivers see Figure Hydrology and Sediment 19.13

17 Geoheritage of Oweninny River No works are proposed on the river banks, with the exception of the replacement or upgrading of the existing river crossing within the site. It is not anticipated that this upgrade will affect the river bank substantially beyond the extent of the existing crossing and is unlikely to present a significant risk. Bellacorick Iron Flush The layout surrounding the Iron Flush is discussed in Chapter 18 where construction is considered in detail. There will be no significant impact. Bog Remnants Particular attention was given to keeping turbines away from significant bog remnants, to the extent possible and away from replacement siltation areas and riparian zones. Nearly all bog remnants have been avoided except in a small number of cases where minor incursions occur due to the necessity of the wind resource design and where existing Bord na Móna roads and paths were already established Borrow pit Investigation of the site has indicated that materials suitable to support construction are available on site. These materials will be won through the excavation of a shallow borrow pit which may be inundated by groundwater. It is intended that the working of the pit will take place through the water table in a water filled excavation, i.e. no pumping of groundwater will take place to facilitate excavation. Excavated material will be dredged and left to dry on the storage area adjacent to the site before being loaded onto trucks, see Figure The gravel storage area will be drained to a settlement pond/lagoon and then to overland flow for approximately 450m to a small tributary of the Sruffaunnamuingabatia river Peat Repository In Phase 3 of the project, peat will be excavated from areas, such as deep peat areas, that are not suitable for sidecasting of peat. This may arise due to the depth of peat in certain locations or due to proximity to sensitive receptors. The peat that is not sidecast will be placed in a peat repository that will be constructed on an area of cutaway bog with a designed local runoff and sediment control structure followed by diffuse dispersion on the surrounding peat surface. The peat deposition area is enclosed on three sides by the existing Bellacorick wind farm access tracks. A new access track on the remaining westerly side, between T70 and T83, will be constructed as part of the Oweninny development which will form a boundary some 150m from the Muingamolt River. Internal access tracks within the repository area will be constructed to facilitate peat deposition. The peat respository area will be drained through the access tracks to a settlement pond system with subsequent overland flow to a large existing Bord na Móna artificial pond, see Figure Batching plant The concrete batching plant location will be drained northwestwards through a settlement pond/lagoon and then through overland flow to a flat area comprising cutover bog with some Hydrology and Sediment 19.14

18 exposed gravels and an extensive area of cutover bog with high cover of rushes, see Figure The settlement pond/lagoon is located approximately 900m from a tributary of the Oweninny River flowing through the central section of the site. A water body formerly known as Lough Nagappal is located about 117m south of the batching plant site but the topography is such that natural gradients will not allow any discharge to the lake. The direction of overland flow from the batching plant is westerly and not southerly and no impact on this water body will occur Tree Felling The impact of commercial timber harvesting on stream flow regimes has been studied in the past. Robinson et al presents a study of flow changes in four nested catchments in mid- Wales with increase of total annual flows 13. Similar flow increases up to 30% were observed on 100% clearfell sites 14. The results indicated that partial felling produced little increase in peak flows. In a similar study in the Burrishule catchment in 15, slight peak flow increase was observed in two sub-catchments after harvesting. However, statistical analysis indicated that the increase was not significant. The study further confirmed that the impact of harvesting on the peak flow was small. Similar studies across Europe 16, found that the impact of forest harvesting on extreme flows was relatively small and difficult to detect in the North West European conifers. In some areas of felling, it may be possible to block existing forestry drainage networks at intervals in order to slow the rate of runoff to the drains. The forest plantation areas at Oweninny will not be felled until post 2020, as stated in the Forest Management Plan for the area. The requirement for clearfelling to facilitate construction along access tracks and as keyhole felling at turbine and crane stand locations will not arise until Phase 3 of the project. This is likely to coincide with the main felling plan. If it does not, approximately 1.4% of the present forest plantation will be clearfelled to accommodate the development; otherwise the area will be felled as part of the felling plan. The forest plantation in these areas was planted in the late 1980 s and early 1990 s and is drained directly to the rivers with no intervening buffer zone as occurs with more recent forest plantation areas. Modern forest practice undertaken in accordance with the Forest Service Guidelines will be implemented. In practice this will result in the restructuring of the drainage to prevent direct flow to the river systems through development of riparian buffer zones. Runoff should also decline naturally as re-vegetation of the felled areas and buffer zones 13 Robinson, M. and Dupeyrat, A. (2005). Effects of commercial forest felling on streamflow regimes at Plynlimon. Hydrological Processes 19: Johnson R The forest cycle and low river flows: a review of UK and international studies. Forest Ecol. Manag. 109: Xiao, L, Robinson, M, Rodgers, M, O Connor, M, O Driscoll, C, Asam, Z. UNESCO IHP Irish National Hydrology Conference Impact Of Blanket Peat Forest Harvesting On Stream Flow Regime A Case Study In The Burrishoole Catchment, Co Mayo. 16 Robinson M., et al Studies of the impact of forests on peak flows and baseflows: a European perspective. Forest Ecol. Manag. 186: Hydrology and Sediment 19.15

19 occurs. While the permanent removal of mature forests from large areas of the site could result in increased runoff directly into local rivers, the known and possible changes to the current felling plan to facilitate the wind farm project proposal are not considered significant in relation to what is envisaged in the overall forest management plan Other Construction Settlement Control Measures Additional temporary lagoons and if necessary settlement ponds will be constructed around the site should the need for these be identified. Portable propriety settlement systems will be used in conjunction with at risk activities in particular locations as required. Temporary wheel wash facilities will be provided and utilised for heavy goods vehicles leaving the site. Runoff from this area will enter a dedicated lagoon. In areas of significant crossfall, clean water runoff drains up to 0.5m deep will direct flow to peat surface areas away from the works. This will provide a significant reduction of the volumes of potentially discoloured run-off that would otherwise require treatment MONITORING AND MAINTENANCE DURING CONSTRUCTION Monitoring There will be no new point discharges to rivers from the developmentsite. Monitoring points will be set up at the outlet of those sediment control points located closest to rivers. The predominant test will be for suspended solids. Turbidity will also be tested for and recorded. Other tests can be added should there be any indication of other types of pollutants arising from construction activities on the site. Peat extractions in sensitive locations will be secured in advance of predicted rainfall. In the unlikely event of works being unavoidably close to rivers, vehicular and equipment access will be restricted to working surfaces / pads as appropriate and bogmats or other surface protection used as required. Procedures for maintenance of windfarm hydrology will include the following measures: A programme of regular cleaning, maintenance and inspection of the site runoff treatment system will be adopted to ensure it functions correctly. Sediment protection measures will be regularly inspected, and any collected sediment will be cleared out in dry weather to ensure maximum capacity can be maintained. Lagoons will be checked for leakage, particularly following periods of heavy rainfall. Travel paths of surface water run-off to downstream receptors will be examined. Growing vegetation will be left in place at ditches as this will aid in the filtering of some of the sediments. The key lagoons and designed settlement ponds will be assessed and restored at the end of construction. Hydrology and Sediment 19.16

20 A drainage management protocol will be incorporated into the management procedures for the operation of the wind farm. The development will form part of a Windfarm Environmental Management System certified to ISO This includes a draft Construction Environmental Management Plan (CEMP), incorporating the Erosion and Sediment Control Plan which describes water management measures to control water runoff and drain hardstandings and other structures during the construction phase. It integrates local water management with the existing bog restoration plan and it is designed to minimise the potential for effects on surface water, groundwater, soils and subsurface water quality. Also included is an Incident Plan to be followed should a pollution event occur. This draft plan will be updated following receipt of planning approval with the planning conditions, if any, that relate to environmental management of flows and sediment. Appropriate construction and operation personnel working on the site will be trained in its use Operational Phase As the windfarm will be developed in phases, parts of the site will remain under construction as phase 1 and phase 2 become operational. For the operational phases of the wind farm: The programme of regular cleaning, maintenance and inspection of the site runoff treatment system will continue to be adopted to ensure it functions correctly. This will include inspection of the sediment protection measures, and removal and disposal of any collected sediment as described for the construction phase Lagoons will continue to be checked for leakage, particularly following periods of heavy rainfall and routes to surface waters reviewed. The revegetation of bare earth areas associated with ditches and swales will be monitored to determine if additional action is required. The key lagoons and designed settlement ponds will continue to be assessed. A drainage management protocol will be incorporated into the management procedures for the operation of the wind farm Decommissioning Phase The decommissioning will be undertaken in accordance with a detailed decommissioning plan for the site agreed with the planning authority. The existing Bellacorick windfarm will be decommissioned before construction of the final part of phase 3 of the proposed development. Decommissioning of the Oweninny wind farm will give rise to some limited ground disturbance and no requirement for any additional drainage. The wind farm is expected to be operational for a minimum period of twenty five years during which time the impact of the bog rehabilitation programme will be almost fully realised with large areas of bare peat revegetated. It is expected that any drainage channel and settlement ponds created as part of the sediment control measures will also have become revegetated. Decommissioning will involve covering over with peat material all foundations, crane hardstands and access tracks unless any of this infrastructure is required on site. As this has the potential to generate Hydrology and Sediment 19.17

21 sediment through surface flow, an assessment of the effectiveness of the existing drainage system to control sediment in runoff will be made at that time and if warranted, an updated drainage control system will be designed and agreed with the planning authority. Decommissioning can also take place over an extended time period, minimising the extent of areas at any one time which could generate sediment-laden runoff. Impacts during the decommissioning period are expected to be insignificant CUMULATIVE IMPACTS The nature of the diffuse drainage system, designed and integrated with the bog rehabilitation programme, will mitigate the potential for accumulation of surface runoff and sediment in the site CONCLUSIONS The hydrology and sediment control system on the windfarm development is designed to be sustainable using SuDS techniques and integrating with the bog rehabilitation plan. Drainage from the structures is compatible with rewetting of the bog. The percentage runoff in the river catchments draining the site will not be significantly changed. Clearfelling of mature forest can result in a local higher water table, which is aligned with the rewetting programme of bog rehabilitation. The potential increase in sediment, particularly during construction, has been factored into the design of the SuDS system, based primarily on designed first-stage treatment at structures using local settlement lagoons and ponds, followed by spreading flow across the peat surface, wetlands and existing ponds. It is worth noting that the drainage regime at the site is already a modified one, with its natural hydrology having been amended by peat extraction and by commercial forests. Hydrology and Sediment 19.18

22 LIST OF REFERENCES Ref. 1 Osi Aerial Photography, Osi Mapviewer. Ref. 2 Bord na Mona, Oweninny Bog Rehabilitation Plan, Ref. 3 CIRIA: The SuDS Manual C697, Planning for SuDS C687, SUDS Best Practice Manual C523, Site handbook for the construction of SUDS C698, Control of water pollution from linear construction projects C648, Designing for exceedance in urban drainage C635,. CIRIA C532 Control of Water Pollution from Construction Sites C532 and Design of Flood Storage Reservoirs B14. Ref. 4 EPA ENVision environmental mapping system, Ref. 5 EPA Hydrotool, ol%2fdefault.aspx Ref. 6 OPW Flood Hazard Mapping, Ref. 7 OPW National Preliminary Flood Risk Assessment, Ref. 8 Mayo Co Co, Strategic Flood Risk Assessment for the Draft Mayo County Development Plan Ref.11 Met Eireann, Estimation of Extreme Rainfall Depths. Ref. 9 Hydroenvironmental Services, Oweninny Windfarm, Report on Investigation of Iron Flush SAC, Ref. 10 Burke, W. 1967: Principles of drainage with special reference to peat. Irish Forestry 24, a: Aspects of the hydrology of blanket peat in Ireland. Hydrology of marsh-ridden areas. Proceedings of the Minsk symposium, June IAHS Studies and Reports in Hydrology, 19. Paris: Unesco Press, b: Effect of drainage on the hydrology of blanket-bog. Irish Journal of Agricultural Research 14, Ref. 11 Mulqueen, J, Rodgers, M, Marren N and Healy, M.G. Erodibility of Hill Peat. Irish Journal of Agricultural and Food Research 45: , 2006 Robinson, M. and Dupeyrat, A. (2005). Effects of commercial forest felling on streamflow regimes at Plynlimon. Hydrological Processes 19: Ref. 12 Johnson R The forest cycle and low river flows: a review of UK and international studies. Forest Ecol. Manag. 109: 1-7. Ref. 13 Xiao, L, Robinson, M, Rodgers, M, O Connor, M, O Driscoll, C, Asam, Z. UNESCO IHP Irish National Hydrology Conference Impact Of Blanket Peat Forest Harvesting On Stream Flow Regime A Case Study In The Burrishoole Catchment, Co Mayo. Hydrology and Sediment 19.19

23 Ref. 14 Robinson M., et al Studies of the impact of forests on peak flows and baseflows: a European perspective. Forest Ecol. Manag. 186: Hydrology and Sediment 19.20

24 Oweninny Wind Farm Figure 19-1: Oweninny site and main river catchments Hydrology and Sediment 19.21

25 Figure 19-2: Oweninny site hydrology Hydrology and Sediment 19.22

26 Water Level mod Sep Oct Oct Oct Oct-62 Figure 19-3: Water level recession curve Hydrology and Sediment 19.23

27 Figure 19-4: River sub-catchments Hydrology and Sediment 19.24

28 Figure 19-5: Sample of the wind farm layout showing drainage arrangement Hydrology and Sediment 19.25

29 Figure 19-6: Lough Dahybaun Catchment Hydrology and Sediment 19.26

30 Figure 19-7: Relationship of Oweninny wind farm site to Freshwater Pearl Mussel Records on the Deel River Hydrology and Sediment 19.27

31 Figure 19-8: Borrow pit and drainage Hydrology and Sediment 19.28

32 Figure 19-9: Peat Deposition Area Hydrology and Sediment 19.29

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 20. Indirect and Interaction of Impacts

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 20. Indirect and Interaction of Impacts Oweninny Wind Farm Oweninny Power Ltd. Chapter 20 Indirect and Interaction of Impacts Copyright ESB International Limited, all rights reserved. TABLE OF CONTENTS 20. INDIRECT AND INTERACTION OF IMPACTS

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

20 INDIRECT AND INTERACTION OF IMPACTS

20 INDIRECT AND INTERACTION OF IMPACTS 20 INDIRECT AND INTERACTION OF IMPACTS 20.1 INTRODUCTION The EU Guidelines for the Assessment of Indirect and Cumulative Impacts as well as Impact Interactions states that Including an assessment of the

More information

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 2. Description of Project

Oweninny Wind Farm. Oweninny Power Ltd. Environmental Impact Statement. Chapter 2. Description of Project Oweninny Power Ltd. Chapter 2 Description of Project Copyright ESB International Limited, all rights reserved. Table of Contents 2. DESCRIPTION OF PROJECT 2.1 2. 1 BACKGROUND 2.1 2. 2 THE DEVELOPERS 2.1

More information

Rising Sun. Scaffold Hill. Flood Risk Assessment

Rising Sun. Scaffold Hill. Flood Risk Assessment Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS

SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS SCOTTISH ENVIRONMENT PROTECTION AGENCY PREVENTION OF POLLUTION FROM CIVIL ENGINEERING CONTRACTS: GUIDELINES FOR THE SPECIAL REQUIREMENTS Version 2 June 2006 1. Purpose These Guidelines are supplementary

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Chapter 10 Natural Environment

Chapter 10 Natural Environment Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

BMP #: Infiltration Basin

BMP #: Infiltration Basin Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

Filter Tube Barriers (Instream)

Filter Tube Barriers (Instream) Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting ALABAMA S BEST MANAGEMENT PRACTICES Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods. 1 FACTSHEET INTRODUCTION World Water Day, on 22 March every year, is about focusing attention on the importance of water. This year s theme, Nature for Water, explores nature-based solutions (NBS) to the

More information

Windfarm Impacts on South Galway Flooding

Windfarm Impacts on South Galway Flooding Windfarm Impacts on South Galway Flooding Letter of Complaint to ESB 7 th April 2017 South Galway Flood Relief Committee Overview South Galway over the past 20 years has suffered a number of severe flooding

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

15. HYDROLOGY, HYDROGEOLOGY & WATER QUALITY

15. HYDROLOGY, HYDROGEOLOGY & WATER QUALITY 15. HYDROLOGY, HYDROGEOLOGY & WATER QUALITY Additional information relevant to Section 15 is presented in Appendix I in Volume 2 of 3 of the EIS. 15.1 RECEIVING ENVIRONMENT 15.1.1 Background and Objectives

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Training on Roads for Water and Resilience

Training on Roads for Water and Resilience Training on Roads for Water and Resilience 1 DRAINAGE FROM UNPAVED ROADS Outline 3 1. 2. 3. 4. 5. 6. 7. Introduction Important considerations Drainage management Surface drainage features Subsurface drainage

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

GRASS-LINED CHANNEL (acre) CODE 840

GRASS-LINED CHANNEL (acre) CODE 840 NATURAL RESOURCES CONSERVATION SERVICE ILLINOIS URBAN MANUAL PRACTICE STANDARD GRASS-LINED CHANNEL (acre) CODE 840 (Source: NC Erosion and Sediment Control Field Manual) DEFINITION A natural or constructed

More information

10 WATER QUALITY, FISHERIES AND AQUATIC ECOLOGY

10 WATER QUALITY, FISHERIES AND AQUATIC ECOLOGY 10 WATER QUALITY, FISHERIES AND AQUATIC ECOLOGY 10.1 INTRODUCTION The rivers of North Mayo, particularly the Moy and its tributaries, are a major tourist attraction for both domestic and foreign anglers.

More information

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation

Suffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

Constructed Wetland Pond T-8

Constructed Wetland Pond T-8 Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands

More information

WATERSHED. Maitland Valley. Report Card 201

WATERSHED. Maitland Valley. Report Card 201 Maitland Valley WATERSHED Report Card 201 The Maitland Valley Conservation Authority has prepared this report card as a summary on the state of our forests, wetlands, surface water, and ground water resources.

More information

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators Page 1 of 5 STREAMLINES A Newsletter for North Carolina Water Supply Watershed Administrators Volume 2, Number 2 May 1997 Non-Point Source (NPS) Pollution This issue of Streamlines provides basic information

More information

Sustainable Catchment Area Management Planning (SCAMP NI)

Sustainable Catchment Area Management Planning (SCAMP NI) CIEEM Conference 24 th November 2014 Sustainable Catchment Area Management Planning (SCAMP NI) a more environmentally sustainable approach to improving water quality Roy Taylor Catchment Manager Presentation

More information

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA)

Natural Flood Management. Measures & Multiple Benefits. Steve Rose (JBA) Natural Flood Management Measures & Multiple Benefits Steve Rose (JBA) Definitions Natural Flood Management - NFM (SEPA): A range of techniques that aim to reduce flooding by working with natural features

More information

Very slight to negligible limitations no special land management practices required.

Very slight to negligible limitations no special land management practices required. Land Capability Classes Land and Soil Capability Class 1 Class 1 Definition Very slight to negligible limitations no special land management practices required. On-site impact of land management practices

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Constructed Wetland Use in Nonpoint Source Control

Constructed Wetland Use in Nonpoint Source Control Constructed Wetland Use in Nonpoint Source Control Description Constructed wetlands are excavated basins with irregular perimeters and undulating bottom contours into which wetland vegetation is purposely

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose STANDARD FOR GRASSED WATERWAYS Definition A natural or constructed watercourse shaped or graded in earth materials and stabilized with suitable vegetation for the safe conveyance of runoff water. Purpose

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review

Unique ID: (from PFRA database) Location: Clonfert, Co. Galway. Stage 1: Desktop Review Location: Clonfert, Co. Galway Unique ID: 252906 (from PFRA database) Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: 197134 Northing: 221731 River / Catchment / Sub-catchment Un-named minor

More information

CHAPTER 2 EROSION CONTROL

CHAPTER 2 EROSION CONTROL CHAPTER 2 EROSION CONTROL 2.1 EROSION AND EROSION CONTROL Understanding Erosion Erosion occurs when soil particles are detached from the land surface and carried downslope by moving water. Figure 2.1-1

More information

These potential changes and their implications are outlined in Annex 1.

These potential changes and their implications are outlined in Annex 1. Guidance Note Hydropower Guidance Note: This Guidance Note has been prepared by Natural Resources Wales (NRW) to provide applicants for abstraction and impoundment licences for hydropower schemes with

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) Tararua District Council Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) NOTE: This is a draft ESCP in current preparation. Additional and updated information will

More information

Freight Street Development Strategy

Freight Street Development Strategy Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed

More information

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions. 18. Air The Project Air quality team prepared an Air Quality Assessment Report for the Project, which is included in Volume 3 (Part 1). The Report provides an assessment of air quality effects associated

More information

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C. Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter 62-340 F.A.C. What are Waters? 373.019 F.S. Definitions (20) Water or waters in the state means any and all

More information

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors Adverse effects as used in this section of the SOP means any adverse ecological effect on wetlands or areas of open water. Those effects, or impacts, include filling, excavating, flooding, draining, clearing,

More information

Definitions and outcomes of NWRM EU project

Definitions and outcomes of NWRM EU project Definitions and outcomes of NWRM EU project DG Environment Water Unit Lucia Bernal Saukkonen BUCHAREST 12 TH NOVEMBER 2014, WORKSHOP ON RIVER RESTORATION AND NWRM Overview Policy background Blueprint and

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

Methods of Streamflow Analysis

Methods of Streamflow Analysis 4 Methods of Streamflow Analysis CHAPTER 4 Streamflow Measurements Danielle M. Andrews Department of Crop and Soil Sciences, The Pennsylvania State University I. INTRODUCTION Perennial carries water all

More information

Natural Water Retention Measures

Natural Water Retention Measures Natural Water Retention Measures DG Environment Water Unit Lucia Bernal Saukkonen GIIR WORKING GROUP 19.11.2014 Current activities on NWRM Within the CIS: EU Policy document on NWRM Pilot project: Integration

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

16.0 Water Quality Management Criteria for Developed Land

16.0 Water Quality Management Criteria for Developed Land October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information

WATER AND THE HYDROLOGIC CYCLE

WATER AND THE HYDROLOGIC CYCLE WATER AND THE HYDROLOGIC CYCLE Summary Water is essential for the support of life and can be considered as a fundamental environmental good. Water is needed to support human habitation, grow crops and

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021)

ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE DR-0021) ATTACHMENT E.2 EMISSIONS TO SURFACE WATERS SITE SERVICES LAYOUT SHEET 1 OF 2 (IE0310818-30-DR-0021) SITE SERVICES LAYOUT SHEET 2 OF 2 (IE0310818-30-DR-0022) LOCATION OF EMISSION TO SURFACE WATER (IE0310818-22-DR-

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

Physiographic zones. and water quality

Physiographic zones. and water quality Southland Physiographic zones Central Plains Technical information Physiographic zones are part of the Water and Land 2020 & Beyond project that aims to maintain and improve water quality in the Southland

More information

This chapter describes the potential hydrological effects of the Project in terms of:

This chapter describes the potential hydrological effects of the Project in terms of: 19. Hydrology Overview The Project will result in changes to existing hydrology from land use changes and from changes to stream morphology. Hydrological and hydraulic modelling has been undertaken to

More information

TEMPORARY SEDIMENT TRAP CODE

TEMPORARY SEDIMENT TRAP CODE ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) ART 3 REGIONAL AND DISTRICT RULES»Chapter H: Auckland wide rules»4 Natural resources» 4.14 Stormwater management Introduction The roposed Auckland Unitary lan (notified 30 September 2013) This section

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:

More information

Agricultural/Rural Riparian Buffer Analysis

Agricultural/Rural Riparian Buffer Analysis Agricultural/Rural Riparian Buffer Analysis December 2014 Executive Summary The Agricultural/Rural Riparian Buffer Analysis was developed from a 2014 analysis of current requirements for the riparian areas

More information

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1 Updated: November 2010 Directive 74 Appendix C Requirement Approval: 8512D Submitted to SHELL CANADA ENERGY MRM DDA PLAN-UPDATE NOV

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Information Requirements Table for Liquid Waste

Information Requirements Table for Liquid Waste Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry

More information

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

ENVIRONMENTAL RESOURCE PERMIT APPLICATION ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

10.1 INTRODUCTION 10.1 DRAINAGE

10.1 INTRODUCTION 10.1 DRAINAGE CHAPTER 10 DRAINAGE 10.1 INTRODUCTION The drainage system manages both surface and subsurface water coming off the road surface and from the surrounding countryside. The purpose of the system is to ensure

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

E7. Taking, using, damming and diversion of water and drilling

E7. Taking, using, damming and diversion of water and drilling E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with

More information

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

Water sensitive urban design. Developing design objectives for urban development in South East Queensland Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1

More information

Design Features of Constructed Wetlands for Nonpoint Source Treatment. September 1995

Design Features of Constructed Wetlands for Nonpoint Source Treatment. September 1995 Design Features of Constructed Wetlands for Nonpoint Source Treatment September 1995 Brochure written by William W. Jones, School of Public and Environmental Affairs, Indiana University, Bloomington, Indiana.

More information

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist UMD Storm Water Program Construction Requirements Greg Archer, MBA Environmental Compliance Specialist Phase 2 Regulatory Overview Dec. 1999 EPA issues Phase 2 Federal Register Municipalities (MS4) from

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management