2 February 26, 2018 Mr. Mark Allen Allen Engineering, LLC 2 Willowbrook Lane Mendon MA, Sent Via allenengineering@comcast.net RE: Wetland Review Macy Estates Off of Monique Drive Plat 29 Lot 108 Bellingham, MA SAGE Project No. W084 Dear Mr. Allen: As requested, SAGE Environmental, Inc. (SAGE) investigated for the presence of wetlands in relation to the limits of disturbance (LOD) proposed in redevelopment plans referenced as Definitive Subdivision Plan for Macy Estates off Monique Drive in Bellingham, MA The closest component of the project to any identified or mapped wetland feature, is the stormwater system on the northeast of the property. Prior to visiting the property, SAGE investigated all available research methods to establish a preliminary understanding of the area. The intent of this investigation was a Site reconnaissance for potential wetland resources that may fall within jurisdictional proximity of the project LOD. This report is not intended to deem the property free of wetlands or serve as a complete resource delineation. National Wetland Inventory (NWI) maps and MassDEP online wetlands database (Oliver) depicted two mapped wetland systems on the western portion of the parcel where the proposed development is planned (Attachment 1). These wetlands are classified as PFO1E, and PUBHh (Cowardin et al. 1979). A breakdown of these classifications is provided in the following table. ENVIRONMENTAL, HEALT H & SAFETY SERVICES A RMISTICE BLVD., P A W T U C K E T, R I M Y L E S S T A N D I S H B L V D., T A U N T O N, M A P OST OFFICE SQUAR E, BOSTON, MA S A G E - E N V I R O. C O M
3 National Wetland Inventory Wetland Classifications Claasification System Class Sub-Class WaterRegime Special Modifiers Approximate Distance from LOD PFO1E Palustrine 1 PUBHh (P) Palustrine (P) Forested (FO) 2 Unconsolidated Bottom (UB) 5 Broad- Leaved Deciduous 3 (1) N/A Seasonally Flooded (E) 4 Permanenetly Flooded (H) 6 N/A Diked/Impounded (h) 7 Field reconnaissance, measurements and discussions with the project engineer identified that the two above mapped wetlands and their associated jurisdictional boundaries are located well outside the proposed project LOD. One unmapped isolated wetland was identified nearest to the proposed development(s) LOD. This wetland was flagged during this investigation as wetland series WF-1 through WF-8 and is located approximately 110 feet southwest of the project(s) LOD. The wetland appears to have a shallow bottom with heavy leaf litter deposits, approximately inches of standing water, partially defined banks, and evidence of hydrophytic vegetation (Carex spp.) growth within the basin. It appears that this feature has the characteristics of a potential vernal pool. This wetland is depicted on the attached drawing (Attachment 2). Review of the current United States Geological Survey (USGS) maps identified a small stream to the east of the Site. This stream feature is located just off the property and its Riverfront Jurisdictional boundary (200 feet) is well outside the project LOD. Soil Maps and reports provided by Natural Resources Conservation Service (NRCS) were also reviewed. Upland soils at the site are identified as Merrimac-Urban land complex, 0 to 8 percent slopes, and Hinckley loamy sand, 3 to 8 percent slopes. One hydric soil, Swansea muck, 0 to 1 percent slopes, was identified to be present on the eastern side of the Site and associated with wetland PFO1E. Review of the development plans show that proposed development and LOD boundaries are located within the areas identified as upland soils. Based on SAGE s assessment, it appears that all proposed project components are outside jurisdictional boundaries, including Bordering Vegetated Wetlands (BVW) and River Front Areas. It is of SAGE s opinion that filing of a Notice of Intent is not warranted for 343 Feet 247 Feet 2 S:\ J O B S \ W \ W W \ W O F F M O N I Q U E D R., B E L L I N G H A M, M A \ C O R R E S P O N D E N C E \ W _ W E T L A N D L E T T E R O F F I N D I N G S _ F I N A L. D O C
4 this project as it is current configured. SAGE does recommend that proper soil erosion, sediment controls and best management practices are established throughout all phases of construction. Straw wattles and/or hay bale and silt fence barriers should be appropriately sited at the project LOD, to mitigate potential stormwater and/or sediment transport to downgradient resource areas during construction and earth disturbance. Should you have any questions pertaining to this information, please do not hesitate to contact the undersigned. We appreciate the opportunity to have provided our services. Sincerely, SAGE Environmental, Inc. Jeffrey D Arrigo Jeffrey D Arrigo Project Manager Wetland Scientist JD:alm Attachments 1 Palustrine: The Palustrine System includes all nontidal wetlands dominated by trees, shrubs, persistent emergents, emergent mosses or lichens, and all such wetlands that occur in tidal areas where salinity due to ocean-derived salts is below 0.5 ppt. It also includes wetlands lacking such vegetation, but with all of the following four characteristics: (1) area less than 8 ha (20 acres); (2) active wave-formed or bedrock shoreline features lacking; (3) water depth in the deepest part of basin less than 2.5 m (8.2 ft) at low water; and (4) salinity due to ocean-derived salts less than 0.5 ppt. 2 Forested: Characterized by woody vegetation that is 6 m tall or taller. 3 Broad-Leaved Deciduous: Woody angiosperms (trees or shrubs) with relatively wide, flat leaves that are shed during the cold or dry season; e.g., black ash (Fraxinus nigra). 4 Seasonally Flooded/Saturated: Surface water is present for extended periods (generally for more than a month) during the growing season, but is absent by the end of the season in most years. When surface water is absent, the substrate typically remains saturated at or near the surface. 5 Unconsolidated Bottom: Includes all wetlands and deepwater habitats with at least 25% cover of particles smaller than stones (less than 6-7 cm), and a vegetative cover less than 30%. 6 Permanently Flooded: Water covers the substrate throughout the year in all years. 7 Diked/Impounded: These wetlands have been created or modified by a man-made barrier or dam that obstructs the inflow or outflow of water. 3 S:\ J O B S \ W \ W W \ W O F F M O N I Q U E D R., B E L L I N G H A M, M A \ C O R R E S P O N D E N C E \ W _ W E T L A N D L E T T E R O F F I N D I N G S _ F I N A L. D O C
5 ATTACHMENT 1
6 78 _ ^ ^ Site Location _ Legend 343 FT. Elevation Contour (Feet) Swansea muck, 0 to 1 percent slopes MassDEP Wetland Inventory Soil Classification Swansea Muck, 0 to 1% slopes Hinckley sandy loam 3 to 8% slopes 81 Hinckley sandy loam, 3 to 8 percent slopes 247 FT Feet Data Provided by MassGIS March 30, 2017 Orthoimagery provided by Site Plan 75 Off Monique Drive Bellingham, Massachusetts Date: 02/23/2018 Job #: W084 Created By: ALM 78 Figure
7 ATTACHMENT 2
8
WETLAND DELINEATION REPORT
WETLAND DELINEATION REPORT WHITMORE LAKE LOT WASHTENAW COUNTY, MICHIGAN JULY 2015 PREPARED FOR: WASHTENAW COUNTY PARKS AND RECREATION 2230 SOUTH PLATT ROAD ANN ARBOR, MICHIGAN 48104 PREPARED BY: THE MANNIK
More information7.6 Wetlands, Riparian and Littoral Habitats
7.6 Wetlands, Riparian and Littoral Habitats 7.6.1 Overview Yuba County Water Agency This section discusses wetland, riparian and littoral habitats in the vicinity 1 of Yuba County Water Agency s (YCWA
More informationSECTION 3 NATURAL RESOURCES
SECTION 3 NATURAL RESOURCES The natural environment plays a large role in planning for future development. Environmental conditions, such as topography, wetlands, floodplains, and water bodies, can often
More informationPrepared by: Rummel, Klepper & Kahl
WETLAND DELINEATION REPORT Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, Pennsylvania Prepared for: PennDOT District 6-0 Prepared by: Rummel, Klepper
More informationA. General Information. B. Determinations
Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131,
More informationPublic Notice. Public Notice No. Date: Closing Date: US Army Corps LRL mad 6 Apr May 2018 of Engineers Louisville District
Public Notice Public Notice No. Date: Closing Date: US Army Corps LRL-2016-1083-mad 6 Apr 2018 7 May 2018 of Engineers Louisville District Please address all comments and inquiries to: U.S. Army Corps
More informationI THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018
I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018 Definition Regulatory Definition - Those areas that are inundated
More information1 ECOLOGICAL INTEGRITY
NH METHOD FOR THE EVALUATION OF FRESHWATER WETLANDS (revised December, 2) ECOLOGICAL INTEGRITY. Are there land uses in the wetland s watershed that could degrade water quality in the wetland? a. Less than
More informationChapter 10 Natural Environment
Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,
More information16.0 Water Quality Management Criteria for Developed Land
October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any
More informationJune 14, 2017, by consultant; September 12, 2017, by USACE staff.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More information3.1 Affected Environment
Chapter 3 Earth This chapter of the Draft EIS examines geology and soil conditions to identify and characterize potential earth-related hazards associated with future development in the Sammamish Town
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationNEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012
NEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012 CONSTRUCTING A TEMPORARY ACCESS ROAD ACROSS AN ATLANTIC WHITE CEDAR ORGANIC BOG FOR THE PURPOSE OF MINING GRAVEL TEMPORARY BOG CROSSING
More informationTORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN
TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationGuidelines for Conducting and Reporting Hydrologic Assessments of Potential Wetland Sites
Wetlands Regulatory Assistance Program ERDC TN-WRAP-00-01 Guidelines for Conducting and Reporting Hydrologic Assessments of Potential Wetland Sites PURPOSE: This technical note provides guidance on performing
More informationSOIL & SITE RECONNAISSANCE
SOIL & SITE RECONNAISSANCE Austin North Tract Lawyers Road East Marshville, North Carolina Prepared for: Chris Miller, ALC, RF Carolinas Real Estate Operations Manager American Forest Management, Inc.
More informationSoil Resources Analysis Hurricane Ivan-RCW Expansion Project Conecuh National Forest
Soil Resources Analysis Hurricane Ivan-RCW Expansion Project Conecuh National Forest Current Conditions of Soil Resources: The project area is wide spread across the forest, the result of a large scale
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationSuffolk Downs Redevelopment. Appendix G: Stormwater Management Supporting Documentation
Suffolk Downs Redevelopment Expanded PNF Appendix G: Stormwater Management Supporting Documentation Suffolk Downs Redevelopment Phase 1 Stormwater Management Report Boston, Massachusetts 285402RP004 TABLE
More informationErosion and Sedimentation Pollution Control (ESPC) Plan Narrative
Model Poultry Burial E&S Plan (7-2-15) 1. GENERAL INFORMATION Name of project Name of person responsible Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Address Phone number Municipality
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationFieldDoc.org User Guide For 2017 NFWF Chesapeake Bay Stewardship Fund Applicants. Background 2. Step 1: Register for a FieldDoc account 3
FieldDoc.org User Guide For 2017 NFWF Chesapeake Bay Stewardship Fund Applicants Table of Contents (click to go to page) Background 2 Step 1: Register for a FieldDoc account 3 Step 2: Create the Project
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any
More informationDuwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites
Duwamish Waterway Self Guided Tour: Turning Basin Number Three and Terminal 105 Aquatic Habitat Restoration Sites Text and illustrations in the following pages include: (1) summary information describing
More informationConstructed Wetland Pond T-8
Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands
More informationUnit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices
Unit E: Basic Principles of Soil Science Lesson 7: Understanding Soil Erosion and Management Practices 1 Important Terms Accelerated erosion Conservation tillage Cover crops Diversion ditches Geologic
More informationPLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015
PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT
More informationErosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)
Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential
More information5.0 SURFACE WATER CONTROL MEASURES
5.0 SURFACE WATER CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell civil engineers, construction personnel, and environmental personnel walked both Newgate/Phelps Road
More informationAPPENDIX C REPRESENTATIVE HABITAT PHOTOGRAPHS
APPENDIX C REPRESENTATIVE HABITAT PHOTOGRAPHS 1304 119 Combined Vegetation and TES assesment 9a 10 8b 1,2 3a 6a 6b 11 9b 3b 4b 5c, 5d 4a 5b 8a 7b 5a Appendix C. Approximate Location of Representative Habitat
More informationPrepared For: Town of Castle Valley, Utah
HYDROLOGIC ASSESSMENT OF THE SURFACE WATER AND GROUNDWATER RESOURCES OF CASTLE VALLEY, UTAH: PART 2: HESA-BASED SITING OF CULINERY WELL FOR TOWN OF CASTLE VALLEY Authors: Dr. Kenneth E. Kolm, Hydrologic
More informationENVIRONMENTAL ASSESSMENT FORM (E.A. Form)
3930-PM-WM0017A Rev. 11/2001 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION and U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL ASSESSMENT FORM (E.A. Form) PART 1 - RESOURCE IDENTIFICATION
More information15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.
15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines. Estuarine shorelines AEC are those non-ocean shorelines
More informationWhitcomb Heights Subdivision Wetland Delineation Project No.: 90570
Whitcomb Heights Subdivision Wetland Delineation Project No.: 90570 WETLAND DELINEATION REPORT Prepared for City and Borough of Sitka 100 Lincoln Street Sitka, Alaska 99835 July 2008 Prepared by USKH Inc.
More informationENVIRONMENTAL RESOURCE PERMIT APPLICATION
ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION
More informationClick here to enter a date.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationSurvey of Bottom Substrate Composition and Fish Habitat Value at Nett Lake
Survey of Bottom Substrate Composition and Fish Habitat Value at Nett Lake Prepared by: Frank G. Stone, U.S. Fish & Wildlife Service Ashland FRO May 2006 The objective of this project was to characterize
More informationErosion and Sediment Control Plan for a Timber Harvesting Operation
3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationPORT OF VANCOUVER, USA PARCEL 1A NE LAYDOWN WETLAND DELINEATION
PORT OF VANCOUVER, USA PARCEL 1A NE LAYDOWN WETLAND DELINEATION February 2012 Prepared by: Port of Vancouver, USA 3103 NW Lower River Road Vancouver, Washington 98660 360.693.3611 TABLE OF CONTENTS INTRODUCTION...
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM US Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook SECTION I:
More informationTES Industrial Development SW ¼ SEC Lacombe County Outline Plan
TES Industrial Development Lacombe County Outline Plan 112849297 June 2012 am v:\1128\active\112849297\07_reports_studies\rpt_tes_20120508.doc i Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE... 1
More informationRiverbank Stabilization Techniques Workshop Merrimack River, Haverhill, MA
Riverbank Stabilization Techniques Workshop Merrimack River, Haverhill, MA Dwight R. Dunk, PWS Association of Massachusetts Wetland Scientists September 30, 2011 Introduction Project History Design Development
More informationHYDRIC SOILS. By Neal Svendsen Resource Soil Scientist Natural Resources Conservation Service Sept 2006
HYDRIC SOILS By Neal Svendsen Resource Soil Scientist Natural Resources Conservation Service Sept 2006 Wetlands and Hydric Soils The term hydric soils proposed by Cowardin in 1979 Classification of Wetlands
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationDesign Features of Constructed Wetlands for Nonpoint Source Treatment. September 1995
Design Features of Constructed Wetlands for Nonpoint Source Treatment September 1995 Brochure written by William W. Jones, School of Public and Environmental Affairs, Indiana University, Bloomington, Indiana.
More informationChapter 22A. Forest Conservation - Trees.
Chapter 22A. Forest Conservation - Trees. Sec. 22A-1. Short title. Article I. General. This Chapter may be referred to as the Montgomery County Forest Conservation Law. (1992 L.M.C., ch. 4, 1) Sec. 22A-2.
More informationFOREST CONSERVATION REGULATIONS
CECIL COUNTY MARYLAND FOREST CONSERVATION REGULATIONS Adopted: December 2, 1992 Effective: January 1, 1993 Amended: July 16, 2002 October 20, 2009 June 17, 2014 Articles II, III, VI, VIII, IX, X-1, X-2,
More informationCenter for Urban Rural Interface Studies. Pearl River County, Mississippi Land Cover Analysis
Center for Urban Rural Interface Studies Pearl River County, Mississippi Land Cover Analysis Introduction The Center for Urban Rural Interface Studies (CURIS) created land cover maps for its focus area
More informationAugust, 2010 A-1, FSD 1 Page 1 STANDARD FSD NOTES. General Notes to include on all FSDs with all blanks filled in:
STANDARD FSD NOTES General Notes to include on all FSDs with all blanks filled in: 1. This site is zoned (insert zone) and is located in the (Rural/ Developing/ Developed) Tier as defined in the Approved
More informationSaturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS
Saturated Buffer To intercept tile drainage prior to discharging to surface waters and redistribute the water laterally in the soil profile of the streamside buffer. Subsurface drainage, also known as
More informationSurface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.
Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter 62-340 F.A.C. What are Waters? 373.019 F.S. Definitions (20) Water or waters in the state means any and all
More informationPRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN
1 PRESENTERS David Bourff, Director of Environmental Planning Simon Davies, LEED AP, Environmental Scientist Summer O Brien, PWS, Senior Environmental Scientist Contact Information: RW Armstrong Union
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More information1. Executive Summary. Valley Branch and Trout Brook Watershed Grishma Shrestha
1. Executive Summary Introduction This report intends to explore various environmental characteristics in the Valley Branch and Trout Brook watersheds, Washington County. The report primarily emphasizes
More informationSediment Basin. Fe= (Depends on soil type)
3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment
More informationNRI/FSD and FOREST CONSERVATION EXEMPTION SUBMISSION REQUIREMENTS
Detailed description of the submission requirements for the NRI/FSD and forest conservation exemption requests may be found in the MNCPPC Trees Technical Manual. The applicant, applicant s agent, or qualified
More informationPart B Guidelines for the Preparation of a Natural Resource Inventory
Part B Guidelines for the Preparation of a Natural Resource Inventory 1.0 INTRODUCTION A Natural Resources Inventory (NRI), as defined in Subtitles 24 and 27 is: A plan map and supporting documentation
More informationAssessment of Depressional Wetland Characteristics Influencing On-site and LiDAR Delineation Methods
UNIVERSITY OF FLORIDA Assessment of Depressional Wetland Characteristics Influencing On-site and LiDAR Delineation Methods Sean R. Rochette Spring 2013 Introduction Wetland protection started within the
More informationDepartment of the Army Permit Application
Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers
More informationPerformance Standards for Target Hydrology
Performance Standards for Target Hydrology Steve Eggers Senior Ecologist Regulatory Branch St. Paul District December 10, 2015 US Army Corps of Engineers Introduction Target Hydrology: the hydrology necessary
More informationM E M O R A N D U M Clallam County Public Works Department
M E M O R A N D U M Clallam County Public Works Department TO: TO: Craig Jacobs, Public Works Director Joel Winborn, Division Manager FROM: Dave Lasorsa, Environmental Coordinator SUBJ: Wetland Assessment
More informationMechanical Site Preparation
Mechanical Site Preparation 1 Mechanical Site Preparation Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...5 Design Outcomes To Maintain Soil Productivity...6 Planning...7 Planning
More informationSITE ANALYSIS DATA SHEET SITE #18
SITE ANALYSIS DATA SHEET SITE #18 REVISED - SITE ANALYSIS DATA SHEET GENERAL SITE INFORMATION Site #: 18 Site name: Georgia-Pacific Woodwaste Landfill APN: 019-03-027 Driving Distance from Gateway: 3.3
More informationNOTE(S): 1. Tongass National Forest LUD mapping from El Capitan GIS Scoping (R. Carstensen 2013).
1/31/14 BCB Figure 1 ADJACENT LAND USE DESIGNATION MAP LEGEND: Mitigation Bank Site 1. Tongass National Forest LUD mapping from El Capitan GIS Scoping (R. Carstensen 2013). 2/3/2014 10:06 AM S:\Prince
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring
DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:
More informationEFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA
EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA Technical Memorandum Farming in the Floodplain Project Prepared for May 2017 PCC Farmland Trust Photo credit: Google Earth TABLE OF CONTENTS Page
More informationCass County Soil Erosion & Sedimentation Control Program
Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose
STANDARD FOR GRASSED WATERWAYS Definition A natural or constructed watercourse shaped or graded in earth materials and stabilized with suitable vegetation for the safe conveyance of runoff water. Purpose
More informationRecommended Resources: The following resources may be useful in teaching this lesson:
Unit E: Basic Principles of Soil Science Lesson 7: Understanding Soil Erosion and Management Practices Student Learning Objectives: Instruction in this lesson should result in students achieving the following
More informationIngham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)
Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION
More informationAPPENDIX E. LESA Models
APPENDIX E LESA Models LESA ASSESSMENT CALEXICO SOLAR FARM I PHASE A PROJECT AREA CALEXICO SOLAR FARM I PHASE A PROJECT (SW/4 Section 13, S/2 Section 14, S/2 NE/4 Section 15, NW/4 Section 15, T17S, R13E,
More informationConservation Assessment & Prioritization System (CAPS)
Conservation Assessment & Prioritization System (CAPS) Assessing ecological integrity and supporting decision-making for land conservation, habitat management, project review & permitting to protect biodiversity
More informationARTICLE XIVA. - CHESAPEAKE BAY PROTECTION
Sec. 90-661. - Findings of fact. (a) The Chesapeake Bay and its tributaries are one of the most important and productive estuarine systems in the world, providing economic and social benefits to the citizens
More informationChapter 4. Drainage Report and Construction Drawing Submittal Requirements
4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for
More information5. Name of waterbody(ies) (if applicable & if known) in which work will occur? Harney Flats Canal
SECTION C: SUPPLEMENTAL INFORMATION FOR WORKS OR OTHER ACTIVITIES IN, ON, OR OVER WETLANDS AND/OR OTHER SURFACE WATERS (Note: This section is not required if all the proposed activities are covered in
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationClimate: describes the average condition, including temperature and precipitation, over long periods in a given area
Ch. 6 - Biomes Section 6.1: Defining Biomes Biome: a group of ecosystems that share similar biotic and abiotic conditions, large region characterized by a specific type of climate, plants, and animals
More informationNatural Resources KEY ISSUES SCENIC AREA ACT PROVISIONS CHAPTER 3. not adversely affect natural resources [Section 6(d)(3)].
CHAPTER 3 Natural Resources Climate, geology, soils, and other environmental factors combine to make the Gorge rich in natural resources. For this chapter, natural resources mean wetlands, streams, ponds
More informationPERFORMANCE STANDARDS AND MONITORING PROTOCOL FOR TIDAL WETLAND MITIGATION BANKS. October 28, 2016
PERFORMANCE STANDARDS AND MONITORING PROTOCOL FOR TIDAL WETLAND MITIGATION BANKS October 28, 2016 A. Tidal wetland mitigation banks shall conform to the following performance standards by the end of the
More informationBuilding Resilient Communities - Low Impact Development and Green Infrastructure Strategies
Building Resilient Communities - Low Impact Development and Green Infrastructure Strategies October 24, 2013 Bridgewater State University E. Heidi Ricci Senior Policy Analyst Mass Audubon Shaping the Future
More informationINSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION
Permits will be processed only when ALL required information is provided Application MUST be accompanied by the following: Property address or road location with distance from nearest intersection. IT
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationDAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN
DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN 2011-2015 4100 220 th Street West, Suite 102 Farmington, MN 55024 651-480-7777 www.dakotacountyswcd.org I. INTRODUCTION A. Purpose
More informationCharacteristics of Land Resources
Chapter Chapter 1 Characteristics of Land Resources The geology, soils and topography of Woodford County T he geology, soils and topography of an area are important to the community planning process for
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More informationPLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013
PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside
More informationSalt Marsh Restoration. Mary Ann Metcalf
Salt Marsh Restoration Brent Manning Mary Ann Metcalf What is a salt marsh? Shallow areas flooded by ocean tides on a regular basis Found on margins of sounds and estuaries Plant communities adapted to
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL
More informationHydrology Handbook For Conservation Commissioners
Hydrology Handbook For Conservation Commissioners A Guide to Understanding Hydrologic And Hydraulic Data and Calculations Under the Massachusetts Wetlands Protection Act Massachusetts Department of Environmental
More informationConstruction Site Erosion Control and Phase II of the Stormwater Permit Program
Construction Site Erosion Control and Phase II of the Stormwater Permit Program Robert Pitt Department of Civil, Construction, and Environmental Engineering University of Alabama Tuscaloosa, AL In Georgia,
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More informationNJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007
NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007 Peter L. Kallin, Ph.D., P.W.S. Phone: 732-499-3600 Ext. 237 E-mail: pkallin@aesop.rutgers.edu www.water.rutgers.edu
More informationChapter 13: Wildlife and Vegetation
Chapter 13: Wildlife and Vegetation Introduction and Setting Nevada County contains an extremely wide range of plants, animals and habitat types. With topographic elevations ranging from 300 feet in the
More information