Sustainable Sites (SS)

Size: px
Start display at page:

Download "Sustainable Sites (SS)"

Transcription

1 Sustainable Sites (SS) Category SS C1 Leed Certified Design & Construction Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations To reward environmentally sensitive design and construction Option 1: The building was previously cetified under LEED for New Construction and Major Renovations. Option 2: The building was previously certified under LEED for Schools. Option 3: The building was previously certified under LEED for Core and Shell Development, and at least 75% of the floor area was certified under LEED for Commercial Interiors. 4 US Green Building Council, leadership in Energy and Environmental Design Previously certfied buildings will be able to earn credits under LEED EB:O & M. 1. Document official scorecards from previous certifications. 2. List the floor areas of spaces that earned LEED for Commercial Interiors. SS SS C2 Building Exterior and Hardscape Management Plan To encourage environmentally sensitive exterior and hardscape management practices Plan must address all of the following: 1. Maintenance equipment 2. Snow and ice removal 3. Cleaning of Building Exterior 4. Paints and sealants used on building exterior 5. Cleaning of sidewalks, pavements, and other hardscape 1 IEQ C3.4- Green Cleaning- Sustainable Cleaning Equipment IEQ C3.5- Green Cleaning- Indoor Chemical Pollutant Source IEQ C3.6- Indoor Integrated Pest Management 1. Maintain plan and record the dates during which it was implemented. 2. Describe the best management practices employed, and how you have reduced environmental impacts. Buildinge exterior and hardscape and management plan will vary with regional climate. MR C3- Sustainable Purchasing- Facility Alterations & Addition SS C3 Integrated Pest Management, Erosion Control, and Landscape Management Plan Preserve ecological integrity, natural diversity, and protect wildlife. 1. Generate environmentally sensitive management plan for the site's natural components 2. Reduce harmful chemical use, waste of energy, water wastage, air pollution, solid waste, chemical run off, etc. 3. IPM- Integrated Pest Management Manage outdoor pests through use of least toxic chemical pesticides, use only in targeted locations, and only on targeted species. IPM requires regular inspection, and monitoring. IPM should comply with IEQ C3.6 Green Cleaning. 4. Erosion and sedimentation control for ongoing landscape operations, and construction activity. Include measures that prevent sedimentation and erosion, air pollution. 5. Divert landscape waste from main stream via mulching, composting or any other low-impact means. 6. Minimise use of artifical chemicals by the use of native plants, low impacting fertilizers. 1 IEQ C3.6: Green Cleaning- Indoor Integrated Pest Management WE C3: Water Efficient Landscaping SS C5: Site Development- Protect or Restore Open Habitat 1. Maintain plan and record the dates during which it was implemented.keep logs of pesticide applications, etc. 2. Describe the best management practices employed, and how you have reduced environmental impacts. IPM, erosion control, landscape management, etc will vary with location of the project. SS C4 Alternative Commuting Transportation Reduce pollution and land development impacts from automobile use of commuting. 1. Encourage telecommuting, compressed workweeks; mass transit, walking, bicycles or other human powered conveyance; carpools; low emitting, fuel efficient or alternative fuel vehicles. 2. Show perfromance calculations relative to baseline case. 3. Points are earned according to the following table: % Reduction---- Points 10% ** For every 3.75% increment add 1 point upto max. of 75% which gets you 15 points. 3 to California Air Resource Board, Definition of Zero-Emission Vehicle 2. American Council for an Energy Efficient Economy, The ACEEE Green Book: The Environmental Guide to Cars and Trucks SS C5: Site Development- Protect or Restore Open Habitat SS C6: Stormwater Management SS C7.1: Heat Island Reduction- Non Roof 1. Retain documents verifying compliance with formal commuter reduction program. 2. Prepare summary of the employee commuting data collected via survey methodology outlined by SCAQMD Rule 2202 Program (Feb 2004) Project may earn Innovation in Operations Credit for 95% reduction in conventional commuting. 1. Identify alternative transportation strategies based on local infrastructure. 2. Promote bicycle use may gain relevance in areas with potential for cycling. 3. South Coast Air Quality Management District, Rule Low emitting vehicles will gain importance where transit systems are not available. SS C5 Site Development- Protect or Restore Open Habitat 1. Conserve existing natural site areas 2. Restore damaged site areas to provide and encourage biodiversity 1. Cover 25% of total site area with native vegetation (not including the building foot print) OR 5% of total site area (including the building footprint) 2. Improve/ maintain off -site area with native vegetation. Document the contract with the owner of off-site area. Every 2sft off site is equivalent to 1sft on site. 3. Features like water bodies, exposed rock, unvegetated ground, or any other feature part of the historic natural landscape can contribute towards this credit. 1 SS C6: Stormwater Management SS C7.1: Heat Island Reduction- Non Roof SS C7.2: Heat Island Reduction- Roof SS C3: Integrated Pest Management, Erosion Control, and Landscape Management Plan 1. List the area (including the native plant species, and description of other ecological features) used to achieve the credit 2. If an off-site natural area is being protected, document contract details and the level of support being provided by the off-site owner. 1. Protect 50% of the site area (not including the building foot print) or 10% of total site area (including the building footoprint) to qualify for Innovation in Operations creditwhichever is greater. For off-site contract, docuble the required areas. 2. Project that has earned SS C5.1: Site Development- Protect or Restore Natural Habitat, is also eligible. Will vary considerably by region and climate. WE C3: Water Efficient Landscaping SS C6 Stormwater Quantity Control 1. Reduce impervious cover 2. Increase on site infiltration 3.Reduce/ Eliminate pollution from stormwater runoff 4. Eliminate contaminants 1. Implement a stormwater management plan that infiltrates, collects, and reuses run off water or evapotranspirates runoff from atleast 15% of the precipitation falling on the entire project site- for an average weather year and for 2 year, 24 hr design storm. 2. Implement an annual inspection program for all stormwater management facilities to confirm continued performance. Maintain documentation of inspection, areas of erosion, maintenance needs and repairs. All necessary maintenance/ repairs must be carried out within 60 days of inspection. 1 SS C5: Site Development- Protect or Restore Open Habitat SS C7.1: Heat Island Reduction- Non Roof SS C7.2: Heat Island Reduction- Roof WE C2: Additional Indoor Plumbing Fixture and Fitting Efficiency 1. Assess the stormwater mitigated by site features by evaluating the project's site surface areas or assembling stormwater assessment reports prepared by qualified industrial professionals. 2. Document the stormwater management strategies. 3. Record copies of stormwater inspection logs that show that any necessary manintenance was carried within 60 days of inspection. Reduce stormwater runoff by 30% or more to qualify for Innovation in Operations credit. The appraoch to achieve this credit will vary across regions and climate zones. WE C3: Water Efficient Landscaping Copyright 2012 Green Exam Guide. All Rights Reserved

2 Sustainable Sites (SS) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations SS C7.1 Heat Island Reduction- Nonroof Reduce heat islands to minimize impacts on microclimates and human/wildlife habitats. Option1: Use one or more of the following strategies for 50% of the site (including roads, sidelwalks, courtyards, and parking lots): * Provide shade from existing tree canopy or within 5 years of lanscape installation. However, trees must be in place at the time of application. * Provide shade from structures covered by solar panels. * Provide shade from architectural devices or buildings that have SRI of atleast 29. These surfaces should be cleaned at least once every 2 years under the maintenance program. * Use hardscape materials with an SRI of at least 29. These should be cleaned once every two years under the maintenance program. * Use open grid pavement system to achieve at least 50% perviousness. Option 2: 50% of parking space under cover. Roof of parking - should have SRI of atleast 29, OR - be a vegetated roof, OR - be covered with solar panels that produce energy to offset some nonrenewable resouce use. 1 SS C5: Reduced Site Disturbance- Protect or Restore Open Habitat 1. For projects shading 50% of site hardscapes, generate a site plan that shows all nonroof hardscape areas counting towards credit achievement. Also document SRI values, dimensions of solar panels, etc 3. Document maintenance procedures for maintaining surfaces. Your project may qualify for Innovations in Operations credit if: SS C6: Stormwater Quantity Control 1. At least 95% of nonroof impervious surfaces have been constructed with WE C3: Water-Efficient Landscaping 2. For projects plaving parking spaces under cover- claculate SRI compliant materials and/or opengrid paving or will be shaded within 5 total number of parking spaces, and the number under cover. If applicable list SRI values of roofs thatd irectly shade the years. parking area. 2. At least 95% of the on-site parking spaces are under cover. Will vary with weather, climate, proximity to water bodies, etc. Implement a maintenance plan to ensure that all SRI surfaces are cleaned at least once every 2 years. SS C7.2 Heat Island Reduction- Roof Reduce heat islands to minimize impacts on microclimates and human/wildlife habitats. Option 1: For 75% of the roof surface use roofing material with SRI of 78 if it is low sloped roof ( 2:12) or SRI of 29 is it is steep sloped roof (>2:12) Option 2: Cover 50% of the roof area with a vegetated roof. Option 3: Use combination of high-albedo and vegetated roof which meets the following creiteria: 1 SS C5: Site Development- Protect or Restore Open Habitat SS C6: Stormwater Quality Control EA C1:Optimize Energy Efficiency 1. For reflective roofing materials, assemble information about the area covered by each material, slope, SRI values. Document the maintenance, cleaning procedures and schedules. 2. For vegetated roof systems, assemble plans and/or photographs to show the vegetated roof features. Achieve Innovations in Operations Will vary with weather, climate, credit by planning vegetated roof on proximity to water bodies, etc. 95% of the project's roof area (not including any mechanical equipment, solar panels, and skylights) Area of roof with min. SRI/ Area of Vegetated Roof/0.5 Total Roof Area SS C8 Light Pollution Reduction 1. Minimize light trespass from buildings. 2. Reduce sky glow. 3. Glare reduction 4. Protect nocturnal environements Comply with interior lighting requirements, and achieve 1 of the following 3 options for exterior lighting. Interior Lighting: 1. During all after-hours periods turn off all nonemergency built-in luminaires with a direct line of sight to any openings in the building envelope. * The total duration of all programmed after-hours periods annually must be 2190 hours per year (50% of annual nighttime hours) ** Manual override capability may be provided for occasional after hours use. *** Implement a program to ensure that teh lighting control system is being properly used to adjust lighting levels during all after-hours periods. 1 EA Prerequisite 2: Minimum Energy 1. For automatic controls, assess the lighting schedule for each zone to detrmine after-hours periods. 2. Demonstrate through fixture specifications, manufacturer's data, or photographs that all exterior fixtures over 50 watts have been partially or fully sheilded. 3. Show the project boundary and location of measurement points on the drawings for exterior lighting. Exterior Lighting: Option 1: If the project was previously certified show that this credit was achieved. Option 2: Shield fully or partially all over 50 watts exterior fixtures. Option 3: Measure night illumination levels at regular intervals on the perimeter of the property, with the building's exterior and site lights both on and off. The building's interior lights must be in the same state during both measurements. Take 8 measurements are required at a maximum spacing of 100 feet. Illumination levels measured with lights on should not be greater than 20% above the levels with lights shut. Copyright 2012 Green Exam Guide. All Rights Reserved

3 Water Efficiency (WE) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations WE P1 Minimum Indoor Plumbing Fixture and Fitting Efficiency Reduce indoor fixture and fitting water use within the building to reduce burden on potable water supply or waste water systems. 1. Reduce potable water use of indoor plumbing to a level equal to or less than LEED 2009 for Existing Buildings: Operations and Maintenance baseline, assuming all the fixtures meet the requirements of 2006 UPC or IPC. These fixtures are: water closets, urinals, shower heads, faucets, faucet replacement aerators, and metering faucets. 2. The baseline is calculated as follows: ** For plumbing completed before 1993, the baseline is 160% of water use, assuming that all the fixtures meet the above stated codes. ** For plumbing completed after 1993, the baseline is 120% of water use, assuming that all the fixtures meet the above stated codes. Required International Association of Plumbing and Mechanical Officials, Publication IAPMO/ANSI UPC , Uniform Plumbing Code2006, Section 402.0, Water Conserving Fixtures and Fittings International Code Council, International Plumbing Code 2006, Section 604, Design of Building Water Distribution System WE C2: Additional Indoor Plumbing Fixture and Fitting Efficiency SS C6: Stormwater Quantity Control WE C3: Water-Efficiency Landscaping WE C4.2: Cooling Tower Water Management- Non potable Water Use 1. Record number of occupants. 2. Record flush rate for each fixture. 3. Record date of substantial completion for the plumbing installations. 4. Compile manufacturer's data. 5. Show economic assessment of converting to high efficiency fixtures. Local building and health codes vary with region. WE WE C1: Water Measurement EA C2: Existing Building EA C3: Measurement WE C1 Water Measurement Measure building and subsystem water performance, and identify opportunities for additional water savings. Option 1: Whole Building Metering (1 point) - Permanent metering to measure total potable water use on a regular basis, and compiled into monthly/ annual summaries. - If possible, measure gray water too. Option 2: Submetering (2 points) Fulfill the requirements for option 1, and also include permanently installed metering for one of the following- - Irrigation- for at least 80% of the irrigated landscape area - Indoor Plumbing- for at least 80% of indoor plumbing fixtures and fittings - Cooling Towers- for all cooling towers serving the facility - Domestic hot water- for at least 80% of installed domestic hot water heating capacity - Other process water- for at least 80% of expected daily water consumption Gray water may also be measured to achieve this credit. 1 to 2 WE P1: Minimum Indoor Plumbing Fixture and Fitting Efficiency WE C2: Additional Indoor Plumbing Fixture and Fitting Efficiency WE C3: Water Efficient Landscaping WE C4.1: Cooling Tower Water Management- Chemical Management WE C4.2: Cooling Tower Water Management- Nonpotable Water Source Use 1. Compile monthly and annual water consumption summaries. 2. Record process of recording for each meter, intervals, and schedules. 3. For meters not owned by third party- record manufacturer's specifications, intervals for calibrations. 4. Show with calculations the percentage of the water subsystem covered by metering. Earn innovation credit by meeting requirements of Option 1, and Option 2 for at least two water subsystems. WE C2 Maximize indoor plumbing fixture and Reduce indoor potable water use from baseline (in WE P1). For Additional Indoor Plumbing Fixture fitting efficiency. 10% Reduction- earn 1 point and Fitting Efficiency 15% Reduction- earn 2 points 20% Reduction- earn 3 points 25% Reduction- earn 4 points 30% Reduction- earn 5 points 1 to 5 International Association of Plumbing and Mechanical Officials, Publication IAPMO/ANSI UPC , Uniform Plumbing Code2006, Section 402.0, Water Conserving Fixtures and Fittings Same as for WE P1: Minimum Indoor Plumbing Fixture and Fitting Efficiency Same as for WE P1: Minimum Indoor Plumbing Fixture and Fitting Efficiency Earn innovations credit by demonstrating water saveings of at least 35% Local building and health codes vary with region. International Code Council, International Plumbing Code 2006, Section 604, Design of Building Water Distribution System WE C3 Water Efficiency Landscaping Reduce use of potable water for landscape irrigation. Reduce use of potable water for irrigation. Either have a separate meter for irrigation, or show water use reduction through calculations. For 50% Reduction- earn 1 point 62.5% Reduction- earn 2 points 75% Reduction- earn 3 points 87.5% Reduction- earn 4 points 100% Reduction- earn 5 points Note- The project is not elligibel for this credit, if planters/ garden space cover less than 5% of the site area. 1 to 5 SS C3: Integrated Pest Management, Erosion Control, and Landscape Management Plan SS C5: Site Development- Protect or Restore Open Habitat SS C6: Stormwater Quantity Control 1. Record information of the irrigation systems being used on site. 2. Show the percentage reduction achieved with respect to baseline case. Also record the portion of water that comes from nonpotable sources. Consider site's climate, microclimate, soil type, drainage, topography, etc while designing landscape for the site. Option 1 : Calculate mid-summer baseline irrigation water use, and compare it with actual use on site through metering. Use these values to calculate reduction achieved. Option 2: Calculate mid-summer irrigation water use from landscape area and the major vegetation types. Also calculate baseline case irrigation water use. Use the estimated and baseline case to calculate reduction achieved. Option 3: Use independent irrigation performance and ranking tools available from local, regional, state or national sources, to calculate reduction achieved.

4 Water Efficiency (WE) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations WE C Reduce use of potable water for Cooling Tower Water Management cooling towers. WE C4.1 (1 Point): Chemical Management- Address chemical treatment, bleed off, biological control, and staff training in the water management plan for the cooling tower. And/Or WE C4.2 (1 Point): Non-potable Water Source use- Use makeup water consitsing of at least 50% non-potable water. Meters must be calibrated per manufacturer's guidelines. Thirdparty meters are exempt. 1 to 2 SS C6: Stormwater Quantity Control WE C3: Water-Efficient Landscaping WE C1: Water Measurement EA P1: Energy Efficiency Best Management Practices 1. Record water management plan implemented. 2. Verify installation and maintenance of the conductivity meters. 3. Compile plans, engineering drawings, photos, or any other information on meters and automatic controls. 4. Calculate the portion of cooling tower makeup water from non-potable sources. Earn innovation credit for Option 2, by showing that 95% of makeup water came from non-potable sources. Amount of water that will be used in the cooling tower is a function of local climate. EA C2: Existing Building

5 Energy and Atmosphere (EA) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations EA P1 Energy Efficiency Best Management Practices: Planning, Documentation, and Opportunity Assessment To ensure that energy-efficiency operating strategies are continued and become the basis for system analysis and training. 1. Document the existing sequence of operations for the building. 2. Develop a operations plan that lays out how the building is to be operated and maintained in different seasons, days of the week, and times of the day. This must include: - Occupancy Schedule - Equipment run schedule - Design set points for HVAC - Design lighting levels 3. Briefly narrate the mechanical and electrical systems in the building. 4. Briefly describe the preventive maintenance plan and schedule for all the equipment included in the systems narrative. 5. Conduct an energy audit to meet the requirements of ASHRAE Level 1 walk through assessment. Required ASHRAE Level 1, Walk-through Analysis EA C2.1: Existing Building - Investigation and Analysis EA C2.2: Existing Building - Implementation 1. Maintain all documentation on existing systems, manuals, operating plans, and utility bills. 2. Review building design setpoints with respect to building operations plan, systems narrative, and sequence of operations. 3. Conduct assessment of operations of preliminary energyuse analysis and an energy audit meeting the requirements of ASHRAE Energy Level 1, Walk-through Analysis. 4. Implement a preventive maintenance plan for all systems in the building. Mechanical systems in the building and energy efficiency strategies will vary with climate and avilable energy sources. EA EA C2.3: Existing Building : Ongoing WE P1: Minimum Indoor Plumbing Fitting and Fixture Efficiency IEQ P1: Minimum Indoor Air Quality IEQ C1: Indoor Air Quality Best Management Practices EA P2 Minimum Energy Efficiency Establish minimum level of operating energy performance in relation to buildings of similar type. Case 1: Projects Eligible for ENERGY STAR Rating - Achieve energy performance rating of at least Install energy meters to measure all energy use throughout the performance period. 12 months of energy use data is required. If the meter is owned by owner or tenant directly, calibrate the meters per manufacturer's recommended interval. Third party meters are exempt. Case 2: Projects not Eligible for Energy Star Rating Option 1: Demonstrate energy efficiency of at least 19% better than the national average for buildings of similar type. Follow the detailed instructions in the LEED Referenced Guide for Green Building Operations and Maintenance, 2009 Edition. Option 2: Use the alternative method as described in the LEED Referenced Guide for Green Building Operations and Maintenance, 2009 Edition. AND Install energy meters to measure all energy use throughout the performance period. 12 months of energy use data is required. If the meter is owned by owner or tenant directly, calibrate the meters per manufacturer's recommended interval. Third party meters are exempt. IEQ C2: Occupant Comfort Required EA P1: Energy Efficiency Best Management Practices- Planning, Documentation, and Opportunity Assessment EA C2.1: Existing Building - Investigation and Analysis EA C2.2: Existing Building - Implementation EA C2.3: Existing Building : Ongoing EA C3.1: Measurement- Building Automation System EA C3.2: Measurement- System Level Metering 1. Record building's total energy meter output on a regular basis, for 1 year. 2. File all utilty bills for all electricity and fuel used in the building. 3. Calculate the project's site energy use intensity and weathernormalized using Portfolio Manager. If you are using Case 2, enter weather-normalized figures into the offline EA Credit 1 calculator. Monthly or bimonthly tracking of building's energy performance is required. To make it nationally comparable ENERGY STAR uses climate data to compare similar buildings in similar climate zones, thereby removing potential regional variations. However, city or state policies, and availability of local resources may make it easier to achieve this credit. IEQ P1: Outdoor Air Introduction and Exhaust Systems IEQ C1.3: IAQ Best Management Practices- Increased Ventilation IEQ C2.1: Occupant Comfort- Occupant Survey EA P3 Fundamental Refrigerant Management Reduce stratospheric ozone depletion. 1. Zero use of CFC based refrigerants in heating, ventilating, air conditioning and refrigeration (HVAC&R) base building systems. Not required only - if a third party audit (as defined in LEED Reference Guide for Green Building operations & Maintenance, 2009 Edition) shows that simple payback of the replacement is more than 10 years. OR - show that a phase out plan is in place. Required US EPA Clean Air Act, Title VI, Section 608 IEQ C2.4: Occupant Comfort- EA C5: Enhanced Refrigerant Management 1. Track with manufacturer's documentation the type of refrigerant. 2. If applicable, lay out the phase out plan. 2. Small HVAC&R units standard refrigerators, small water coolers or any other colling equipment, which contain less than 0.5 pounds of refrigerant, is exempt.

6 Energy and Atmosphere (EA) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations EA C1 Optimize Energy Efficiency EA C2.1 Existing Building - Investigation and Analysis To increase levels of operating energy performance as compared to buildings of similar type. Optimize energy performance of the building's major energy-using systems. Case 1: Projects Eligible for ENERGY STAR Rating - Achieve energy performance rating of at least 71. EPA ENERGY STAR Energy Rating...Points upto a max. of 18 points for 95 EPA rating. - Install energy meters to measure all energy use throughout the performance period. 12 months of energy use data is required. If the meter is owned by owner or tenant directly, calibrate the meters per manufacturer's recommended interval. Third party meters are exempt. Case 2: Projects not eligible for Energy Star Rating Option 1: Show energy efiiciency of at least 21% better than national average of buildings of similar type, from data provided in the Portfolio Manager. Option 2: For buildings not suited for Case 2, Option 1, use the alternative method as described in LEED Reference Guide for Green Building Operations and Maintenance, 2009 Edition. AND - Achieve energy efficiency performance better than the minimum requirements listed above. - Install energy meters to measure all energy use throughout the performance period. 12 months of energy use data is required. If the meter is owned by owner or tenant directly, calibra - Use Portfolio Manager tool avilable on the ENERGY STAR website as benchmark, even if yo % Level above national median...points 21% % % upto max. of 18 points for 45% Option 1: Process - Develop ongoing commissioning plan for the major energy using systems of the building. - Conduct the investigation and analysis phase. - Document the breakdown of all energy use in the building. - List down operating problems that affect occupant comfort and energy use. Develop solutions for these problems. - List down improvements that will generate cost saving energy savings. Document cost benefit analysis associated with each. OR Option 2: ASHRAE Level II Energy Audit - Conduct energy audit to meet the requirements of American Society of Heating, Refrigerating & Air Conditioning Engineers (ASHRAE), LEVEL II Energy Survey and Analysis. - Note down breakdown of all energy use in the building. - Do a financial analysis (cost and savings) of all the energy saving practical measures, keeping in mind the owner's constraints and economic criteria. - List the capital improvements that are cost effective and will save energy. 18 ENERGY STAR Portfolio Manager EA P1: Energy Efficiency Best Management Practices- Planning, Documentation, and Opportunity Assessment 2 ASHRAE Level II, Energy Audit, Energy Survey and Analysis EA C2.1: Existing Building - Investigation and Analysis EA C2.2: Existing Building - Implementation EA C2.3: Existing Building : Ongoing EA C3.1: Measurement- Building Automation System EA C3.2: Measurement- System Level Metering IEQ P1: Outdoor Air Introduction and Exhaust Systems IEQ C1.3: IAQ Best Management Practices- Increased Ventilation IEQ C2.1: Occupant Comfort- Occupant Survey IEQ C2.4: Occupant Comfort- EA P1: Energy Efficiency Best Management Practices- Planning, Documentation, and Opportunity Assessment EA C2.2: Existing Building - Implementation EA C2.3: Existing Building - Ongoing performance 1. Record building's total energy meter output on a regular basis, for 1 year. 2. File all utilty bills for all electricity and fuel used in the building. Achieve exemplary performance credit when you accomplish: - ENERGY STAR rating of 97 or higher for Case 1. To make it nationally comparable ENERGY STAR uses climate data to compare similar buildings in similar climate zones, thereby removing 3. Calculate the project's site energy use intensity and weather-- 47% above national median for your potential regional variations. normalized using Portfolio Manager. If you are using Case 2, enter weather-normalized figures into the offline EA Credit 1 calculator. Monthly or bimonthly tracking of building's energy performance is required. 1. Investigate and analyse building systems through either commissioning or implementation of ASHRAE Level II Audit. 2. List down and Analyse all building systems that use energy. 3. List energy saving measures and cost benefits associated with each. project buildings for Case 2, Option 2. However, city or state policies, and availability of local resources may make it easier to achieve this credit. Local climate and avilable energy sources will determine mechanical systemsand energy saving strategies. EA C2.2 Existing Building - Implementation EA C2.3 Existing Building - Ongoing EA C3.1 Measurement- Building Automation System To optimize energy performance by - implementing minor improvements - Identify planned capital projects to repair/ operate/ maintain major energy-using systems. To optimise energy performance by - commissioning the changes in facility occupancy, use, maintenance or repair. To provide information to support ongoing accountability and optimisation of building energy performance. 1. Implement no or low cost operational improvements. 2. For major retrofits or upgrades, generate a capital plan. 3. Build energy efficiency awareness and skills by training the facilities management staff. 4. Document the benefits of the measures that have been implemented, and anticipated financial costs. 5. Update the building's operations plan to reflect the changes. 1. Implement ongoing commissioning to include planning, system testing, performance verification, corrective action response, measurement and documentation. 2. Summarize the overall commissioning cycle by grouping the equipment or the building systems. The commissioning cycle cannot exceed 24 months. 3. 1st half of the scope of work should be completed in 1st commissioning cycle, before the date of application for certification. Only the work that was completed within 2 years prior to the date of application can be included. 4. Update the building's operations plan to reflect the changes. 1. Computer based BAS (Building Automation System) to monitor and control major building systems. To include at least heating, cooling, ventilation, and lighting. 2. Preventive Maintenance Program to ensure that BAS is tested, repaired, or replaced according to the manufacturer recommended intervals. 3. Show that BAS is being used to formulate changes to building systems. 2 EA C2.1: Existing Building - Investigation and Analysis 2 EA C2.1: Existing Building - Investigation and Analysis 1 EA C2.3: Existing Building - Ongoing 1. Document financial analysis in terms of cost savings of all the imporvements that have been implemented. 2. Monitor all no- or low- cost improvements or repairs during the performance period. Document cost savings for each improvement. 3. Update building operations plan to reflect changes. 4. Briefly describe the training that the management staff has been given, and who gave the training. 1. Document ongoing commissioning cycle. 2. Update building operations plan to reflect changes. 3. Document data and costs for completed phases of commissioning. Only the tasks completed in previous 2 years can be included. 1. Maintain documentation on BAS operation and function. 2. Retain periodic BAS reports to indicate that the system is functioning as programmed. 3. Record preventive maintenance practices. 4. Record all the decisions that are informed by BAS. Local climate and available energy sources will determine mechanical systemsand energy saving strategies. Local climate and available energy sources will determine mechanical systemsand energy saving strategies. EA C3.2: Measurement- System Level Metering IEQ C2.2: Controllability of Systems- Lighting

7 Energy and Atmosphere (EA) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations EA C3.2 Measurement- System Level Metering To provide accurate energy-use information to aid energy management. 1. Record breakdown of energy use in the building, either through EA C2.1 and EA C2.2, or from utility bills, or metering. This analysis should be done within 2 years of date of application for certification. 2. Employ permanent system level metering and recording covering 40% or 80% of the total expected annual energy consumption of the building. Submetering is permitted. 2 EA P1: Energy Efficiency Best Management Practices- Planning, Documentation, and Opportunity Assessment. 1. List type and location of system level meters. 2. Track energy use on each system level. 3. Document system level metering operations and function for manufacturer recommended intervals. 4. Record preventive maintenance practices. 4. Generate energy use reports. EA C2.3: Existing Building - Ongoing EA C3.1: Measurement- Building Automation System EA C4 On- Site and Off-Site Renewable Energy To encourage use of on/off-site reneweable energy to minimize use of fossil fuel energy. 1. Meet building's entire energy use with on-site or off-site reneweable energy systems. 2. Points are earned as shown in table below: On-Site Off-Site Points Renewable Energy Renewable Energy 3% 25% 1 4.5% 37.5% 2 6% 50% 3 7.5% 62.5% 4 9% 75% 5 12% 100% 6 6 Center for Resource Solutions Greene Energy certification Programs EA P1: Energy Efficiency Best Management Practices- Planning, Documentation, and Opportunity Assessment EA C2: Existing Building 1. Document on-site renewable energy systems. 2. Sign 2 year contract showing purchase of off-site RECs 3. Track annual energy use, indicating portion supplied by alternative sources. 4. Document the alternative energy sources used for your project. Show 13.5% on-site renewable Regional and local climate, and energy, or equivalent combination of available incentives will determine on-site and off-site renewable energy. the viability and cost effectiveness of on-site renewable energy systems. EA C5 1. Reduce ozone depletion Enhanced Refrigerant Management 2. Support Montreal Protocol 3. Off site reneweable energy sources includes Green Power from Green-e-Energy-certified power marketer, Green-e-Energy accredited utility program, or Green-e-Energy certified tradable renweable certificates or their equivalents. Option 1: Do not use refrigerants in HVAC& R systems Option 2: Select refrigerants and HAVC&R equipment to minimize or eliminate ozone depletion and climate change. Use this formula to set maximum threshold for combined effect of each. 1 EA P3: Fundamental Refrigerant Management 1. List the building systems that contain refrigerants, and associated type of refrigerant. Include ODP and GWP. 2. Record manufacturer's documentation on type and quantity of refrigerant. 3. Track leakage rates. LCGWP + LCODP X 10⁵ 100 where LCGWP = Lifecycle Direct Global Warming Potential LCODP = Lifecycle Ozone Depletion Potential EA C6 Emission Reduction Reporting To record benefits of emission reduction 1. Track emission reductions achieved by all building efficiency measures that have been employed. 2. Report emission reductions through third party voluntary tool or certification program from EPA, ENERGY STAR, etc Annual utility and energy consumption data from on-site operations that generate emissions. 2. Compare emission reductions each year. 3. Report emission reductions through third party voluntary tool or certification programs. EPA identifies 'Egrid SUBREGIONS' and allots specific emission rates to buildings in each. EA C3: Measurement EA C2: Existing Building EA C4: On-site and Off-site Renewable Energy

8 Materials and Resources (MR) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations MR MR P1 Sustainable Purchasing Policy Reduce environmental impact of the materials that are purchased for operations and maintenance of the buildings. 1. Draft EPP (Environmentally Preferable Purchasing) policy addressing the requirements of MR C1: Sustainable Purchasing-. 2. Extend the EPP to address requirements for at least oen of these credits: - MR C2.1: Sustainable Purchasing- Electric Powered Equipment. - MR C2.2: Sustainable Purchasing- Furniture - MR C3: Sustainable Purchasing- - MR C4: Sustainable Purchasing- Reduced Mercutry in Lamps Required MR C1: Sustainable Purchasing- MR C2.1: Sustainable Purchasing- Electric Powered Equipment MR C2.2: Sustainable Purchasing- Furniture MR C3: Sustainable Purchasing- 1. List materials to be included in EPP policy. 2. Record implementation dates. 3. Make sure all changes made to EPP policy from time to time are clearly documented. 4. Give reasons for excluding any part of the building from EPP policy. 1. If project is within or in vicinity industrial area, there maybe an opportunity to use materials that have been extracted and manufactured locally. 2. Options to recycle may also exist. MR C4: Sustainable Purchasing- Reduced Mercury in Lamps MR P2 Solid Waste Management Policy Reduce waste generated by occupants that ends up in landfills. Draft solid waste management policy for project addressing the requirements of the following credits: MR C5: Sustainable Purchasing- Food Required MR P1: Sustaianble Purchasing Policy MR C6: Solid Waste Management- Waste Stream Audit 1. Confirm that project will be able to comply with MR C Record implementation dates. 3. Give reasons for excluding any part of the building from solid waste management policy. Availability of waste management services vary by region. MR C1 Sustainable Purchasing- Ongoing Consumables MR C2.1-C2.2 Sustainable Purchasing- Durable Goods Reduce environmental impact of the materials that are purchased for operations and maintenance of the buildings. Reduce environmental impact of the materials that are purchased for operations and maintenance of the buildings. Achieve sustainable purchasing for 60% of total purchasing (by cost), including materials with a low cost per unit that are used and replaced at regular intervals- paper, binders, desk accessories, toner cartridges, and batteries. Maintain consistency with credit MR C7. Meet at least one of the following creiteria: - Purchase 10% post consumer, and/or 20% post industrial material. - Purchase at least 50% rapidly renweable materials. - Purchase at least 50% materials harvested and processed within 500 miles of the project. - Purchases consist of at least 50% FSC certified paper products. - Purchase rechargeable batteries. MR C2.1: Electric Powered Equipment- 1 point - Achieve sustainable purchasing for at least 40% of total purchases of electric powered equipment (by cost). - It is a sustainable purchase if it meets one of these criteria: * Equipment is ENERGY STAR qualified. OR * Equipment relaces conventional gas-powered equipment AND/OR MR C2.2: Furniture- 1 point - Achieve sustainable purchasing for at least 40% of total purchases of furniture (by cost). - It is a sustainable purchase if it meets at least one of these criteria: * contains at least 10% post-consumer and/or 20% post-industrial materials. * contains at least 70% material salvaged from off-site. * contains at least 70% material salvaged on-site. * contains at least 50% rapidly renweable material. * contains at least 50% FSC certfied wood. * contains at least 50% materials harvested and processed within 500 miles of the project. 1 Forest Stewardship Council (FSC) Certified Paper Products MR P2: Solid Waste Management Policy MR C6: Solid Waste Management- Waste Stream Audit 1 or 2 ENERGY STAR Qualified Products MR P2: Solid Waste Management Policy Forest Stewardship Council, certified Wood MR C6: Solid Waste Management- Waste Stream Audit Electronic product Environmental Assessment Tools (EPEAT) 1. Track costs of sustainable as well as non-sustaianble Accomplish credit for exemplary materials purchased for the project building. performance by achieving 2. Track costs, date of purchase, and quantities of all materials sustainable purchases of at least that meet at least one of the criterias given in the 95% (by cost) requirements. 3. Record manufacturer's documents to verify compliance. 1. Track costs of all electric-powered equipment and furniture. 2. Track date of purchase, purchasing entity, and quantity for the electric-powered equipment and furniture that meets at least one of the criteria given in the requirements. 3. Record manufacturer's documents to verify compliance. 4. Record information on floor area, management, and occupancy of all spaces that are exempt. Accomplish credit for exemplary performance by achieving sustainable purchases of electrical equipment of 80% (by cost) of total electronic purchases. OR Purchase EPEAT-rated desktops, laptops, and monitores for 40% of their durable goods. OR Accomplish credit for exemplary performance by increasing sustainable purchases of furniture to 80% (by cost) of total furniture purchases. 1. If project is within or in vicinity industrial area, there maybe an opportunity to use materials that have been extracted and manufactured locally. 2. Options to recycle may also exist. 1. If project is within or in vicinity industrial area, there maybe an opportunity to use materials that have been extracted and manufactured locally. 2. Options to recycle may also exist.

9 Materials and Resources (MR) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations MR C3 Sustainable purchasing- Facility Alterations and Additions Reduce environmental impact of the materials that are purchased for operations and maintenance of the buildings. Achieve sustainable purchasing of 50% of total purchasing (by cost) of materials used for facility renovations, demolitions, and new construction additions. - Applicable only to base building elements. - MEP components and speciality items like elevators are excluded. Sustainable purchases should meet at least one of these criteria: * contains at least 10% post-consumer and /or 20% post-industrial materials. * contains at least 70% material salvaged from off-site. * contains at least 50% rapidly renweable material. * contains at least 50% FSC certified wood. * contains at least 50% materials harvested and processed within 500 miles of the project. * VOC content in adhesives and sealants is less than current VOC content limits of SCAQMD Rule # OR Sealants used as filters should meet requirements of BAAQMD Regulation 8, Rule 51 * VOC emissions in paints and coatings should not limits set by Green Seal Standard GS-11. * Noncarpet flooring is FloorScore-certified, and is minimum of 25% of finished floor area. * Carpet meets requirements laid down by CRI Green Label Plus Carpet Testing Program. * Carpet cushion meets the requirements of the CRI Green Label Testing program. * Composite panels and agrifiber products contains no added urea-formaldehyde resins. 1 Forest Stewardship Council (FSC) Certified Paper Products FloorScore Green Label Testing Program (1992) and Green Label Plus Testing program (2004) Green Seal GS-11 Environmental Requirements for Paints, effective May 1993 Bay Area Air Quality Management District (BAAQMD), Regulation 8, Organic Compounds, Rule 51, Adhesive and Sealant Products, effective July 2002 South Coast Air Quality Management District (SCAQMD) Rule 1168, Adhesive and Sealant Applications, effective October 2003 MR P2: Solid Waste Management Policy MR C6: Solid Waste Management- Waste Stream Audit 1. Track costs of all materials purchased for facility alterations and additions. 2. Track date of purchase, purchasing entity, and quantity for the materials that meet at least one of the criteria given in the requirements. 3. Record manufacturer's documents to verify compliance. 4. Record information on floor area, management, and occupancy of all spaces that are exempt. Accomplish credit for exemplary performance if the materials purchased for alterations and facility additions acocunt for 95% of total. 1. If project is within or in vicinity industrial area, there maybe an opportunity to use materials that have been extracted and manufactured locally. 2. Options to recycle may also exist. MR C4 Sustainable purchasing- Reduced Mercury in Lamps Reduce amount of mercury brought to the site due to purchase of lamps. 1. Develop a purchasing plan such that 90% of lamps purchased during the performance period have mercury content of 90 picograms per lumen- hour or less, in both outdoor and indoor lamps. 2. CFLs may be excluded from the calculations if these comply with the guidelines published by NEMA. 1 NEMA Voluntary Commitment on mercury in Compact Fluorescent Lights MR P2: Solid Waste Management Policy MR C6: Solid Waste Management- Waste Stream Audit 1. Record technical specifications of all lamps. Earn additional point if 90% of lamps 2. Record manufacturer's documents to show compliance with have average mercury content of 70 NEMA. picograms per lumen-hour or less. 3. Record manufacturer's documents to verify mercury content. MR C5 Sustainable Purchasing- Food Reduce environmental impact associated with food production and distribution. 1. Make sustainable purchases for at least 25% of total combined food and beverages. 2. It is a sustainable purchase if it meets at least one of the following: - Food ir prepared within 100 miles of the site. - Food is labeled USDA Organic/ Food Alliance Certified/ Rainforest Alliance Certified/ Protected Harvest Certified/ Fair Trade/ Marine Stewardship Council's Blue Eco-Label 1 Fairtrade Labeling organizations International Certification Food Alliance Certification Marine Stewardship Council Blue Eco-Label Protected Harvest certification Rainforest Alliance certification MR P2: Solid Waste Management Policy MR C6: Solid Waste Management- Waste Stream Audit 1. Track the costs, date of purchase, purchasing authority, Earn additional point if 50% of food item, sustainable criteria met, and distance between project and beverage purchases are site and site of production for materials purchased for food and sustainable. beverages. 2. Record documentation that states that product is organic or local. 3. Record information on floor area, management, and occupancy of all spaces that are exempt. Projects in agricultural regions may offer more locally grown and processed food. US Department of Agriculture organic Certification MR C6 Solid Waste Management- Waste Stream Audit Reduce waste generated by occupants that ends up in landfills. 1. Audit ongoing consumables waste stream in the project building (not counting durable goods, or construction waste from alterations or new construction) 2. Identify opportunities to recycling and waste diversion. 3. Establish a baseline from weight or volume of each type of waste. 1 MR C1: Sustainable Purchasing- MR C2.1: Sustainable Purchasing- Electric Powered Equipment MR C2.2: Sustainable Purchasing- Furniture 1. Show how you will conduct the waste stream audit at regular intervals. 2. Rercord audit reports. 3. List identified opportunities for recycling and waste diversion. 4. If you used 10% exemption of building's gross floor area, record details on management, occupancy, floor area of exempt spaces, etc. Availability of local waste auditors may vary by region. MR C3: Sustainable Purchasing- MR C4: Sustainable Purchasing- Reduced Mercury in Lamps MR C5: Sustainable Purchasing- Food

10 Materials and Resources (MR) Category Credit Intent Requirements Max. points Referenced Standard Related Credits Documentation Exemplary Regional Variations MR C7 Solid Waste Management- Reduce waste generated from ongoing consumables by occupants that ends up in landfills. 1. Develop a waste reduction and recycling program accounting for materials with a low cost per unit. These should include (at minimum)- paper, plastics, glass, cardboard, corrugated cardboard, food waste, toner cartirdges, and metals. 2. Develop a battery recycling program, and must divert at least 80% of the discarded batteries. Actual diversion must be verified annually. 1 MR C1: Sustainable Purchasing- MR C2.1: Sustainable Purchasing- Electric Powered Equipment MR C2.2: Sustainable Purchasing- Furniture 1. Educate facility staff/ third party contractors on materials that are being recycled for this credit. 2. Track diverted ongoing consumables. 3. Detail out the battery recycling program. 4. Record information on floor area, management, and occupancy of all spaces that are exempt. Earn additional point by documenting 95% diversion. May be difficult to achieve if local haulers or recycling efforts are limited. MR C3: Sustainable Purchasing- MR C4: Sustainable Purchasing- Reduced Mercury in Lamps MR C5: Sustainable Purchasing- Food MR C6: Solid Waste Management- Waste Stream Audit MR C8: Solid Waste Managementdurable Goods MR C8 Reduce waste generated from Solid Waste Management- Durable durable goods by occupants that Goods ends up in landfills. 1. Develop a waste reduction and recycling program to reuse or recycle 75% of durable goods (by weight, volume or replacement value). These include (at minimum): - office equipment like computers, monitors, copiers, etc - appliances- refrigerators, water coolers, etc - audiovisual equipment - external power adapters 1 MR C1: Sustainable Purchasing- MR C2.1: Sustainable Purchasing- Electric Powered Equipment MR C2.2: Sustainable Purchasing- Furniture 1. Educate facility staff/ third party contractors on materials that are being recycled for this credit. 2. Track diverted durable goods. 3. Record information on floor area, management, and occupancy of all spaces that are exempt. Earn additional point by documenting 95% diversion. May be difficult to achieve if local haulers or recycling efforts are limited. MR C3: Sustainable Purchasing- MR C4: Sustainable Purchasing- Reduced Mercury in Lamps MR C5: Sustainable Purchasing- Food MR C6: Solid Waste Management- Waste Stream Audit MR C9 Solid Waste Management- Facility Alterations and Additions Reduce waste generated from 1 Divert 70% of waste (by volume) generated from facility alterations and additions. construction and demolition that ends Applicable only to base building elements, which include (at minimum): up in landfills. - building components and structures like wall studs, insulation, doors, and windows) - panels - attached finishes -carpets and other flooring materials - adhesives and sealants - paints and coatings EXCLUDED: - Furniture, fixtures, and equipment cannot be included. - MEP, and specialty items like elevators, etc 1 MR C1: Sustainable Purchasing- MR C2.1: Sustainable Purchasing- Electric Powered Equipment MR C2.2: Sustainable Purchasing- Furniture MR C3: Sustainable Purchasing- 1. Track waste stream from facility alterations and additions. 2. Track volumes and mode of diversion of the materials that were diverted. 3. Record information on floor area, management, and occupancy of all spaces that are exempt. Earn additional point by diverting at least 95% of waste generated. Recycling programs vary by regionurban centers have more developed resources. MR C4: Sustainable Purchasing- Reduced Mercury in Lamps MR C5: Sustainable Purchasing- Food

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

LEED Application Guide for Multiple Buildings and On-Campus Building Projects LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

LEED Application Guide for Multiple Buildings and On Campus Building Projects

LEED Application Guide for Multiple Buildings and On Campus Building Projects LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods

More information

2016 LEED Equivalency Analysis for Stanford Campus

2016 LEED Equivalency Analysis for Stanford Campus 6 LEED Equivalency Analysis for Stanford Campus Analysis performed by: Moira Hafer, LEED AP O+M Office of Sustainability Department of Sustainability & Energy Management Stanford University Category Type

More information

500 WEST PUTNAM AVENUE GREENWICH, CT

500 WEST PUTNAM AVENUE GREENWICH, CT LEED-CI ANALYSIS June 2015 500 WEST PUTNAM AVENUE GREENWICH, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability

More information

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability 01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions

Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions Leased Space Environmental and Energy Efficiency Attributes Tenant Instructions This document is to evaluate the Environmental and Energy Efficiency attributes of a leased facility/space. The tenant s

More information

LEED -Existing Buildings. Crescent Ridge Corporate Center I

LEED -Existing Buildings. Crescent Ridge Corporate Center I LEED -Existing Buildings Crescent Ridge Corporate Center I LEED Leadership in Energy and Environmental Design The U.S. Green Building Council is a coalition of leaders in the building industry promoting

More information

Sustainable Design A DIVISION OF SHIVE-HATTERY

Sustainable Design A DIVISION OF SHIVE-HATTERY Sustainable Design A DIVISION OF SHIVE-HATTERY our transition to sustainability must be a deliberate choice to leave the linear surge of an extractive economy and enter a circulating, renewable one. Janine

More information

LEED Project Delivery Process Manual Appendices

LEED Project Delivery Process Manual Appendices LEED Project Delivery Process Manual Appendices November 2016 Second Edition Appendices Page Appendix 1: Other Alberta Requirements and Green Building Standards 3 Appendix 2: Integrated Design Process

More information

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process Instructional Facility VeterinaryVeterinary MedicineMedicine Instructional Facility GOING FOR GOLD Valley Hall has achieved LEED Platinum certification. The Leadership in Energy and Environmental Design

More information

LEED for Existing Buildings:

LEED for Existing Buildings: LEED for Existing Buildings: Operations and Maintenance 101 0 Agenda 1. Overview of changes to LEED-EBOM 2009 3. Assessing Building Opportunities Building Exterior and Site Water Efficiency Energy & Atmosphere

More information

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP LEED 2009 for Commercial Interiors Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP Homes Commercial Interiors Core & Shell New Construction Schools Healthcare Existing Building Operations

More information

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION Genentech Building 20 Office LEED-CI Gold Above and Beyond A LEED Gold 50,00 s.f. tenant improvement, the space was originally designed with a goal to achieve LEED silver certification. Innovative approaches

More information

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA Analysis 1 LEED Analysis of Laboratory Buildings Background The LEED program (Leadership in Energy and Environmental Design) established by the U.S. Green Building Council is becoming the standard by which

More information

CALGREEN NON-RESIDENTIAL BUILDING Checklist

CALGREEN NON-RESIDENTIAL BUILDING Checklist CALGREEN NON-RESIDENTIAL BUILDING Checklist REVISED 11/18/14 New non-residential buildings shall be designed to include the green building mandatory measures specified in this checklist. This checklist

More information

The Leadership in Energy and Environmental Design-Existing Buildings Certification of the Art and Architecture Building

The Leadership in Energy and Environmental Design-Existing Buildings Certification of the Art and Architecture Building The Leadership in Energy and Environmental Design-Existing Buildings Certification of the Art and Architecture Building Nicholas Alanen Lauren Berent Jason rinsky Emily Thomas Environ 302 April 20, 2009

More information

LEED 2009 for New Construction and Major Renovations

LEED 2009 for New Construction and Major Renovations LEED 2009 for New Construction and Major Renovations Bayshore District Operations Building Project Checklist 4.28.6 20 4 0 Sustainable Sites Possible Points: 26 Y? N d/c Notes: Y C Prereq Construction

More information

BUILDING FOR OUR FUTURE

BUILDING FOR OUR FUTURE BUILDING FOR OUR FUTURE The John T. Chambers Technology Center is a LEED Certified Building The Leadership in Energy and Environmental Design (LEED) Green Building Rating System is a voluntary national

More information

SACRAMENTO County New Animal Care Facility LEED Elements

SACRAMENTO County New Animal Care Facility LEED Elements Construction Activity Pollution Prevention We reduced pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust generation by creating an Erosion and

More information

LEED Leadership in Energy and Environmental Design

LEED Leadership in Energy and Environmental Design LEED Leadership in Energy and Environmental Design United States Green Building Council (USGBC) Founded in 1993, the United States Green Building Council (USGBC) was the first Green Building Council formed

More information

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium

37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium Taubman Building, 15 Eliot St., Cambridge, MA, 02138 LEED CI V2009 GOLD The is a 2,943 square foot space located in the Taubman Building of the Harvard Kennedy School of Government. The project scope includes

More information

Projected actual points. Responsible for UNC -- Project name. Remarks

Projected actual points. Responsible for UNC -- Project name. Remarks UNC LEED Checklist Total points available Projected Responsible for UNC -- Project name Cost documentation Sustainable Sites Prerequisite- Erosion and Sediment control Prerequisite REQ Y All campus projects

More information

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007

McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 Project Highlights McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 > 42.7% reduction in potable water usage achieved with high-efficiency low-flow fixtures > 94.6% of the construction

More information

LEED version 4 Leadership in Energy and Environmental Design

LEED version 4 Leadership in Energy and Environmental Design LEED version 4 Leadership in Energy and Environmental Design United States Green Building Council Founded in 1993, the United States Green Building Council (USGBC) was the first Green Building Council

More information

WMU Facility Life Cycle Design Guidelines Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16)

WMU Facility Life Cycle Design Guidelines Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16) Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16) Developed by Sustainable Design Committee: Christopher Caprara, Devon Miller, Carolyn Noack, Eleonora Philopoulos, Kelsey Pitschel,

More information

GREEN BUILDING GUIDELINES

GREEN BUILDING GUIDELINES 018110 GREEN BUILDING GUIDELINES PART 1: GENERAL 1.01 INTENT AND BACKGROUND A. Cornell is signatory to the American College and University Presidents Climate Commitment (PCC). By signing this document,

More information

LEED And Your Indoor Environment

LEED And Your Indoor Environment LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings

More information

The Fort Collins Discovery Museum LEED stands for Leadership in Energy and Environmental Design.

The Fort Collins Discovery Museum LEED stands for Leadership in Energy and Environmental Design. The Fort Collins Discovery Museum is has achieved LEED Platinum Certification, the highest level of achievement in the rating system. LEED stands for Leadership in Energy and Environmental Design. LEED

More information

Green Building Rating System For Commercial Interiors. Version 2

Green Building Rating System For Commercial Interiors. Version 2 Green Building Rating System For Commercial Interiors Version 2 November 2004 Leadership in Energy and Environmental Design (LEED ) Buildings fundamentally impact people s lives and the health of the planet.

More information

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best CASE STUDY #3 A SUSTAINABLE SITE & BUILDING Macy Brannan, Kiana Fannin, & Chase Muchow MCALLEN MAIN LIBRARY Located in McAllen, TX Architects: MSR Design 120,000 sq. ft. Completed in 2011 Largest single

More information

LEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S.

LEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S. LEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S. October 2011 This is a draft document and can be used only in the interim until LEED

More information

Schematic Design Stage Report for Stanford Knight Management Center

Schematic Design Stage Report for Stanford Knight Management Center 1 of 12 6/5/2007 11:26 PM Schematic Design Stage Report for Stanford Knight Management Center INTRODUCTION Stanford Knight Management Center, Stanford, California is a 4 story, 357,684 ft² building. There

More information

1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2)

1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2) 1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2) A. 52.2-2007 B. 55-2010 C. 62.1-2010 D. 90.1-2010 E. 189.1 Answer A and C. 52.2-2007 - ASHRAE Standard

More information

Research Analysis: Building Envelope and LEED Credits Introduction

Research Analysis: Building Envelope and LEED Credits Introduction : Building Envelope and LEED Credits Introduction Green buildings are no longer a new idea and are quickly becoming the trend in the slowly changing industry of building construction. Even though the essence

More information

Green Building Rating System For Commercial Interiors

Green Building Rating System For Commercial Interiors Green Building Rating System For Commercial Interiors Version 2.0 *Updated December 2005 November 2004 *With revised EA section for projects registered after June 26, 2007. LEED for Commercial Interiors

More information

LEED for Operations and Maintenance

LEED for Operations and Maintenance LEED for Operations and Maintenance Bill Green PE, LEED AP Jessie Jones, EIT, LEED AP O+M The RMH Group September 16, 2010 Topics of Discussion Overview of USGBC s LEED Rating System(s) Benefits of LEED

More information

LEED for Homes Project Checklist

LEED for Homes Project Checklist LEED for Homes Project Checklist Builder Name: Project Team Leader: Home Address (Street/City/State): Project Description Adjusted Certification Thresholds Building Type: Project type: Certified: 45.0

More information

CALGREEN NON-RESIDENTIAL BUILDING Plan Submittal Checklist

CALGREEN NON-RESIDENTIAL BUILDING Plan Submittal Checklist CALGREEN NON-RESIDENTIAL BUILDING Plan Submittal Checklist VERSION 1.0 REVISED 12/19/16 New non-residential buildings shall be designed to include the green building mandatory measures specified in this

More information

LEED for Commercial Interiors

LEED for Commercial Interiors LEED-CI LEED for Commercial Interiors Kim Lam Renee Webley What is the LEED-CI Rating System? The benchmark for tenant improvements of new or existing office space. An integrated design tool that sets

More information

NCMA TEK CONCRETE MASONRY & HARDSCAPE PRODUCTS IN LEED 2009 TEK 6-9C

NCMA TEK CONCRETE MASONRY & HARDSCAPE PRODUCTS IN LEED 2009 TEK 6-9C Provided by: Concrete Block Insulating Systems, Inc. (CBIS) National Concrete Masonry Association an information series from the national authority on concrete masonry technology NCMA TEK CONCRETE MASONRY

More information

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB

More information

Case Study: Element PROJECT DESCRIPTION

Case Study: Element PROJECT DESCRIPTION Case Study: Element PROJECT DESCRIPTION Project type: Project gross SF: Number of keys: Location: Hotel (Hospitality), extended-stay prototype Varies, prototypical SF: 79,035 SF gross Varies, prototypical:

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information

The 2010 California Green Building Code; "CalGreen" effective January 1st, 2011

The 2010 California Green Building Code; CalGreen effective January 1st, 2011 1 The 2010 California Green Building Code; "CalGreen" effective January 1st, 2011 Existing Culver City Building Safety Division Green Programs: The Culver City Mandatory Photovoltaic Requirement, effective

More information

LEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS

LEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS LEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS Designers and builders have long recognized steel for its strength, durability and functionality. An important aspect of steel s

More information

TORONTO GREEN STANDARD VERSION 2.0

TORONTO GREEN STANDARD VERSION 2.0 For New Mid to High Rise Residential and all New Non-Residential The Toronto Green Standard (TGS) is a two-tier set of performance measures, with supporting guidelines for new development. Its purpose

More information

TORONTO GREEN STANDARD v3

TORONTO GREEN STANDARD v3 TORONTO GREEN STANDARD v3 AIR QUALITY ENERGY/ GHG & RESILIENCE WATER BALANCE, QUALITY AND EFFICIENCY SOLID WASTE ECOLOGY SUSTAINABILITY REQUIREMENTS FOR NEW DEVELOPMENT IN TORONTO For Residential Apartment

More information

Toronto GREEN Development Standard Checklist [for Low-Rise Residences]

Toronto GREEN Development Standard Checklist [for Low-Rise Residences] the Toronto GREEN Development Standard Checklist [for Low-Rise Residences] Purpose The Checklist is a tool to aid developers in tracking their intended implementation of the Standard for any given project,

More information

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program

Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC

More information

Construction Specifications Canada Conference May 23, BOMA BESt

Construction Specifications Canada Conference May 23, BOMA BESt Construction Specifications Canada Conference May 23, 2013 BOMA BESt Creating a sustainable environment one building at a time. BOMA Calgary BOMA Canada BOMA Calgary BOMA BESt local administrator BOMA

More information

Sustainable Facilities Policy

Sustainable Facilities Policy Sustainable Facilities Policy In response to the Governor s request, as the Chair of the State of Wisconsin Building Commission, to recognize and address the sustainable design and construction of state

More information

LEED-2009 Green Building Rating System. New Construction & Major Renovations

LEED-2009 Green Building Rating System. New Construction & Major Renovations LEED-2009 Green Building Rating System New Construction & Major Renovations 1 The following pages are designed to assist Engineers acquire LEED Credits in the design of Green Sustainable building utilizing

More information

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone: 2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen

More information

A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning

A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning A Building Commissioning Overview Presented by: Goetting & Associates Commissioning www.goettingcx.com What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of

More information

ULMA S COMPROMISE & CONTRIBUTION TO LEED CERTIFICATION

ULMA S COMPROMISE & CONTRIBUTION TO LEED CERTIFICATION ULMA S COMPROMISE & CONTRIBUTION TO LEED CERTIFICATION UNDERSTANDING LEED Leadership in Energy and Environmental Design- LEED is an internationally recognized green building certification system, providing

More information

CALGreen 2013 Tier Comparison to LEED v4

CALGreen 2013 Tier Comparison to LEED v4 CG-2016 5.106.1 SSp1 All projects must have a SWPP plan that meets State national Pollution CALGreen and LEED v4 are equivalent. Storm Water Soil Loss Discharge Elimination (NPEDS) Prevention Plan The

More information

MATERIALS AND RESOURCES

MATERIALS AND RESOURCES MATERIALS AND RESOURCES MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide

More information

TORONTO GREEN STANDARD v3

TORONTO GREEN STANDARD v3 Attachment 2 TORONTO GREEN STANDARD v3 AIR QUALITY ENERGY/ GHG & RESILIENCE WATER BALANCE, QUALITY AND EFFICIENCY SOLID WASTE ECOLOGY SUSTAINABILITY REQUIREMENTS FOR NEW DEVELOPMENT IN TORONTO Mid to High-Rise

More information

P-7A PROGRAM GSF FAR / NSF FAR COMMENT Basement - BOH Program 3,975 0 Below grade NIC below grade Ground Level - Lobby Program 3,935 includes elevator floors 9'-0" Level 2 - Lounge/F+B Program 5,765 5,367

More information

Sustainable Sites. SS Prerequisite 1: Construction Activity Pollution Prevention Required

Sustainable Sites. SS Prerequisite 1: Construction Activity Pollution Prevention Required Sustainable Sites SS Prerequisite 1: Construction Activity Pollution Prevention Required Reduce pollution from construction activities by controlling soil erosion, waterway sedimentation and airborne dust

More information

Green Building Ordinance Overview

Green Building Ordinance Overview Green Building Ordinance Overview September, 2013 City of Dallas Sustainable Development and Construction Dallas Green Ordinance 2008 Task Force Recommendations Two-phase implementation strategy Solution

More information

Balco, Inc. Stair Nosings

Balco, Inc. Stair Nosings Balco, Inc. Stair Nosings Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. Stair Nosings Contributes to LEED Credits Zero maintenance, reducing

More information

Green Guide for Health Care Version 2.2 Operations Section, 2008 Revision Comparison with GGHC Version 2.2, January 2007

Green Guide for Health Care Version 2.2 Operations Section, 2008 Revision Comparison with GGHC Version 2.2, January 2007 Green Guide for Health Care Version 2.2 Operations Section, 2008 Revision Comparison with GGHC Version 2.2, January 2007 2.2 Mod New 0 79 42 Green Guide for Health Care Version 2.2 Operations Section,

More information

LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise

LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise About LEED Certification The U.S. Green Building Council s LEED green building program

More information

LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN

LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN LEADERSHIP IN ENERGY AND Leadership in Energy and Environmental Design (LEED) Green Building Rating System is a third-party certification for the design, construction and operation of environmentally friendly

More information

Balco, Inc. PC Series Partition Closure Systems

Balco, Inc. PC Series Partition Closure Systems Balco, Inc. PC Series Partition Closure Systems Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. PC Series Partition Closure Systems Contributes

More information

GSA Public Buildings Service. GSA LEED Applications Guide

GSA Public Buildings Service. GSA LEED Applications Guide GSA Public Buildings Service GSA LEED Applications Guide February 2005 Acknowledgements The authors of the GSA LEED Applications Guide would like to thank Mr. David B. Eakin, Chief Engineer in the Office

More information

LEED CERTIFICATION PROJECT REVIEW REPORT

LEED CERTIFICATION PROJECT REVIEW REPORT LEED CERTIFICATION PROJECT REVIEW REPORT How to Interpret this Report Purpose Leadership in Energy and Environmental Design (LEED) was designed by the US Green Building Council to encourage and facilitate

More information

University of California, Santa Cruz. Campus Green Building Baseline Narrative

University of California, Santa Cruz. Campus Green Building Baseline Narrative University of California, Santa Cruz Campus Green Building Baseline Narrative Submitted To: University of California Office of the President Facilities Administration Planning, Design and Construction

More information

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition

PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition Chapter 1 GENERAL SECTION 101 GENERAL 101.1 Title. These regulations shall be known as the California San Francisco Green Building Standards

More information

2013 City of Oakland CALGreen Checklist for NEW NON-RESIDENTIAL BUILDINGS

2013 City of Oakland CALGreen Checklist for NEW NON-RESIDENTIAL BUILDINGS 2013 City of Oakland CALGreen Checklist for NEW NON-RESIDENTIAL BUILDINGS Scope: The provisions of this checklist apply only to newly constructed non-residential buildings. Repairs (not additions or alterations)

More information

CAMP BLANDING JOINT TRAINING CENTER CONSTRUCTION AND FACILITY MANAGEMENT OFFICE ARCHITECT S PROJECT # CFMO PROJECT #

CAMP BLANDING JOINT TRAINING CENTER CONSTRUCTION AND FACILITY MANAGEMENT OFFICE ARCHITECT S PROJECT # CFMO PROJECT # SECTION 018113.13 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes general requirements and procedures for compliance with certain USGBC LEED prerequisites and credits needed for Project to obtain LEED

More information

Session 2: Sustainable Sites & Water Efficiency

Session 2: Sustainable Sites & Water Efficiency Session 2: Sustainable Sites & Water Efficiency Topics Covered: Sustainable Sites: Location and linkage Site design & management Alternative Transportation Stormwater management Water Efficiency: Indoor

More information

Chapter 6:Energy & Atmosphere

Chapter 6:Energy & Atmosphere Chapter 6:Energy & Atmosphere Category with highest number of points 1 Learning Objectives Fundamental & Enhanced commissioning and verification Minimum & Optimize energy performance Building-level & Advanced

More information

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills.

88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills. WEITZ LABORATORY GORDON MCKAY LABS BUILDING, 9 OXFORD STREET, CAMBRIDGE, MA 02138 LEED-CIV3.0 GOLD The Gordon McKay Laboratory of Applied Science (McKay) building, occupied and operated by the School of

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction

CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction In order to facilitate sustainable construction practices, all new projects* must comply with the State

More information

Rating System & Addendum. for New Construction & Major Renovations LEED Canada-NC Version 1.0

Rating System & Addendum. for New Construction & Major Renovations LEED Canada-NC Version 1.0 Rating System & Addendum for New Construction & Major Renovations LEED Canada-NC Version 1.0 December 2004 Introduction The Canada Green Building Council (CaGBC) has been officially established as a national

More information

75% 40% reduction in water consumption. 43% 68% 90%

75% 40% reduction in water consumption. 43% 68% 90% HOLOKE EIGHTH FLOOR CAMPUS SERVICE CENTER 75 Mount Auburn Street, Cambridge, MA 02138 LEED-CI V3 GOLD The Harvard Campus Service Center LEED CI project is an interior renovation of existing office space

More information

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM APRIL 2012 ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM Abu Dhabi Education Council Infrastructure and Facilities Division Jyoti Sharma, Senior Architect, Design Section WHY SUSTAINABILITY IS IMPORTANT UAE

More information

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled: Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic

More information

LEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted.

LEED-EB Checklist. Sustainable Sites - 14 points 3/9/ Documentation Required. Not Pursued Key Party. Purchase Record. Targeted. Sustainable Sites - 4 points Map(s) ord Prereq Erosion & Sedimentation Control Required TC/JR/ BM X X X Prereq 2 Age of Building Required JJ X Credit. Green Site & Building Exterior Management, 4 actions

More information

LEED-EB Project Case Study: JohnsonDiversey Headquarters

LEED-EB Project Case Study: JohnsonDiversey Headquarters LEED-EB Project Case Study: JohnsonDiversey Headquarters CONTENTS HOW TO USE THIS CASE STUDY... II INTRODUCTION TO JOHNSONDIVERSEY...4 CULTIVATING AN ORGANIZATIONAL COMMITMENT TO LEED-EB...5 ACHIEVING

More information

Devon Tower: From Brown to Gold Larry Nichols May 23, Site Selection

Devon Tower: From Brown to Gold Larry Nichols May 23, Site Selection Devon Tower: From Brown to Gold Larry Nichols May 23, 2012 Site Selection 1 Previous site uses Several automobile fueling and service operations were established and operated for numerous years Operations

More information

Decoustics and LEED Leadership in Energy and Environmental Design

Decoustics and LEED Leadership in Energy and Environmental Design Decoustics and LEED Leadership in Energy and Environmental Design Buildings fundamentally impact people s lives and the health of the planet. In the United States, buildings use one-third of the total

More information

LEED FACT SHEET AND BACKGROUND

LEED FACT SHEET AND BACKGROUND Updated 2012 LEED FACT SHEET AND BACKGROUND Tupper Lake, NY - The Wild Center in Tupper Lake, New York, received a Leadership in Energy and Environmental Design (LEED) Silver certification. The LEED certification,

More information

LEED for New Construction & Major Renovations

LEED for New Construction & Major Renovations LEED for New Construction & Major Renovations Version 2.2 For Public Use and Display October 2005 Buildings fundamentally impact people s lives and the health of the planet. In the United States, buildings

More information

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building

More information

Produkt Declaration - LEED 2009 New Construction And Major Renovations NC & CS

Produkt Declaration - LEED 2009 New Construction And Major Renovations NC & CS OL REFLECT 2K- Product Rating The product fulfills the requirements for adhesives and sealants and contribute to achieve one LEED credit within IEQ Credit 4.1. The product fulfills the requirements for

More information

SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR

SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR 1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR 1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR There are many reasons

More information

Continued reiteration of best practices delivered in 2010 training sessions. Signage posted in driver areas and on school property

Continued reiteration of best practices delivered in 2010 training sessions. Signage posted in driver areas and on school property Actions Towards Carbon Neutrality The actions listed below contribute to a reduction in greenhouse gas emissions from sources for which public sector organizations are responsible under the carbon neutral

More information

Alpen Windows - LEED Impact Analysis

Alpen Windows - LEED Impact Analysis ALPEN WINDOWS MATERIALS: Energy Efficient Windows Alpen Windows - LEED Impact Analysis SECTION I. PRODUCT IDENTIFICATION Product Name: Alpen Windows Manufacturer: Alpen High Performance Products 6268 Monarch

More information

toxicity/ieq: While many media can be very toxic during production, most are considered inert when cured/compete.

toxicity/ieq: While many media can be very toxic during production, most are considered inert when cured/compete. This is a guidance document with sample specification language intended to be inserted into project specifications on this subject as appropriate to the agency's environmental goals. Certain provisions,

More information

Construction cost effectiveness of sustainable buildings in warm and humid climate zone of India

Construction cost effectiveness of sustainable buildings in warm and humid climate zone of India Construction cost effectiveness of sustainable buildings in warm and humid climate zone of India Abhay S. Avhad and Gayatri S. Vyas The importance of an integrated approach to sustainable building design

More information

PROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD

PROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 General Requirements A. These guidelines are intended to provide a framework to evaluate building projects for the University of Texas at Austin to: 1. Verify the feasibility of options

More information

NONRESIDENTIAL ADDITIONS & ALTERATIONS 2016 CALGreen Checklist

NONRESIDENTIAL ADDITIONS & ALTERATIONS 2016 CALGreen Checklist NONRESIDENTIAL ADDITIONS & ALTERATIONS 2016 Applies to Nonresidential Addition and Alteration projects without sleeping accommodations and meeting the following criteria: The permit application is submitted

More information

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2016-29 Issuing Office: CECW-CE Issued: 13 Dec 16 Expires: 13 Dec 18 SUBJECT: Lessons Learned from LEED v4 Pilot Projects CATEGORY: For Information 1. References:

More information

LEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources

LEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources LEED of the Knight Management Center Energy & Atmosphere Materials & Resources Energy & Atmosphere: 17 possible points LEED-NC Scorecard LEED for New Construction v2.2 Registered Project Checklist Project

More information

35% reduction in water use below code maximum 83% 88% 49% reduction in lighting power density 12%

35% reduction in water use below code maximum 83% 88% 49% reduction in lighting power density 12% Science Center Cabot Library Project LEED CI v4.0 1 Oxford Street, Cambridge, ma LEED Certified Project Profile December 2017 The Science Center Cabot Library project was comprised of renovating the entry,

More information