1 2017 AIRPORT PLANNING & NEPA WORKSHOP Overview of the Airport Development Process Moving from Bright Ideas to Records of Decision Elliott Black, FAA ARP Joan Zatopek, Port of Oakland Bill Willkie, RS&H, Inc.
2 Why Are We Here? This session will show you how this course can help you get from bright ideas to Records of Decision. ROD
3 Why Are We Here? This session will show you how this course can help you get from bright ideas to Records of Decision. ROD
4 Why Are We Here? But the journey has many switchbacks, and the ROD is not the end of the road. What you can learn in this course will help you to avoid wasted time and effort. ROD NEPA $ Value Engineering
5 How do the Planning and NEPA Processes Relate? Sponsor Concerns, Scope of Ideas, Work Planning & Concepts Process Inventory Forecasts & Requirements Alternatives Evaluation Preferred Alternative Projects on ALP Agency Mandates & Priorities Scoping/ Coordination Affected Environment Purpose & Need Alternatives Impacts Proposed Action Permits & Approvals? 5
6 We Are Not Alone! Airport development involves many interests including planners, environmental specialists, designers, and builders. All have important roles in getting projects done
7 We Are Not Alone! (Unfortunately) Airport development involves many interests including planners, environmental specialists, designers, and builders. All have important roles in getting projects done
8 Can We Talk? If we can do a better job of communicating and looking at the entire process, we can avoid wasted effort and lost time
9 The Life Cycle of an All Too Typical Project CY 1 CY 2 CY 3 CY 4 CY 5 CY 6 CY 7 Public announcement of major construction project Request for Federal financial assistance Realization that airport construction has to be approved by the FAA Realization that FAA approvals require planning process and NEPA Anger Denial Bargaining Depression Acceptance Begin planning process properly, with FAA support Two years lost 9
10 Levels of Planning/NEPA Involvement Master Plan Capital Development Program Project Definition/Criteria/Program Document Project Design Construction Short Term Long Term
11 So, What Else is New? Need for speed Reducing risk Multiple project proponents Alternative delivery methods
12 Planning Scenario: Comprehensive Plans Master Plans Airport Development Plans o Terminal Area Plans o Other Focused Plans ALP Updates
13 Planning Scenarios: Specific Projects Runway Safety Area Construction Runway extension/widening Taxiway/ramp New/relocated roadways Terminal expansion
14 Planning Scenario: Third Party Development Familiarity with development requirements May not be aware of environmental constraints May not have considered alternatives
15 When to Transition from Planning to NEPA While the plan is evolving to save time? After the plan is complete to avoid wasted effort? Hint: a survey of 20 FAA NEPA practitioners at all levels concluded that a poor or incomplete planning foundation was the single greatest source of problems in the NEPA process
16 How Can We Work Smarter? What can planners do to help the NEPA process? What can the NEPA practitioners do to coordinate with the planners and designers? What can the designers do to avoid the need for re-opening the NEPA process? Who Keeps track of all of this? ROD NEPA $ Value Engineering Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA
17 How Will This Course Help? Provides specific technical details of both the planning and environmental processes Understanding of FAA and other agency needs Case studies and lessons learned to address key decision points to better integrate the planning and NEPA processes
NEPA Session 2 When to Start NEPA
ATLANTA, GEORGIA 1 ATLANTA, GEORGIA NEPA Session 2 When to Start NEPA Emily Underhill, PE Division Director Development SW Florida International emunderhill@flylcpa.com Bill Willkie Principal Project Manager,
More informationa g e n d a ACI-NA/ACC Airport NEPA & Planning Workshop November 29-December 1, 2017 RITZ CARLTON Pentagon City Arlington, Virginia
a g e n d a ACI-NA/ACC Airport NEPA & Planning Workshop November 29-December 1, 2017 RITZ CARLTON Pentagon City Arlington, Virginia 12:00 PM 5:00 PM Registration (Salon 3 Foyer) WEDNESDAY, NOVEMBER 29
More informationRaleigh Executive Jetport Master Plan Update SEPT 27, 2017
Raleigh Executive Jetport Master Plan Update SEPT 27, 2017 Presentation Outline 1. Master Plan Purpose 2. Master Plan Process 3. Public Involvement Plan 4. Project Schedule Presentation Outline 1. Master
More informationPublic Workshop #9. October 11, 2016
Public Workshop #9 October 11, 2016 Agenda Master Plan Status Preferred Alternative Environmental Considerations Vision 2040 Next Steps Master Plan Status Alternatives exploration and evaluation Environmental
More informationEnvironmental Clearance and Next Year s Grant. Los Angeles Airport District Office. Presented by: Brenda Pérez George Buley David Cushing
Environmental Clearance and Next Year s Grant Presented by: Los Angeles Airport District Office Brenda Pérez George Buley David Cushing ACA Conference - September 2017 Presentation Agenda Consideration
More informationMaster Plan Study Public Workshop #3. June 1-2, 2016
Master Plan Study Public Workshop #3 June 1-2, 2016 Agenda Master Plan Status Alternatives Process Development Screening Vision2040 Next Steps Alternatives (Boards) Master Plan Study Progress COMPLETED
More informationDefining & Completing the Planning Process
Defining & Completing the Process How Sets the Stage for Project Development Presented to: By: Gina Mitchell, AICP Date: November 5, 2014 AirTAP: Airport Project Development Process - From Idea to Award
More informationARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, Federal Aviation Administration
ARP SOP No. 5.00 SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016 Important Points to Note: FAA recently established Standard Operating Procedures (SOP) for CatEx Determinations
More informationAviation Environmental Design Tool Technical Talk
2017 AIRPORT PLANNING & NEPA WORKSHOP Aviation Environmental Design Tool Technical Talk NEPA Session 3 November 30, 2017 Clint Morrow Session Moderator KB Environmental Sciences, Inc. Panel members from:
More informationORDINANCE NO INTRODUCED BY COUNCIL
Public Service Committee Andrew Roberts, Chair ORDINANCE NO. 18-1 29 INTRODUCED BY COUNCIL AN ORDINANCE AUTHORIZING THE PROPER CITY OFFICIAL TO ENTER INTO A CONTRACT WITH CRAWFORD, MURPHY, AND TILLY INC.,
More informationAirport Construction Project Risk Management. Presented by: Mindy Price- Direct Effect Solutions
Airport Construction Project Risk Management Presented by: Mindy Price- Direct Effect Solutions Topics ACRP 01-22 Research Background Research Findings and Conclusions Project Risk Management Recommendations
More informationOakland International Airport-Materials Management Program (MMP) Updated November 2007
Fact Sheet Oakland International Airport-Materials Management Program (MMP) Over the next several years, Oakland International Airport (OAK) has many facilities requiring infrastructure improvements including,
More informationEconomic and Social Council
United Nations Economic and Social Council ECE/ TRANS/SC.2/2014/4 Distr.: General 15 September 2014 Original: English Economic Commission for Europe Inland Transport Committee Working Party on Rail Transport
More informationASSET INVENTORY BEST PRACTICES:
ASSET INVENTORY BEST PRACTICES: Company-Wide Implementation to Reduce Costs and Ensure Compliance >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> White Paper Effective Asset Inventory Management In today s current
More informationAirports 101. (or, 10 Things You Need to Know about Airports) MARY ASHBURN PEARSON, AICP ROY G. LEWIS, AICP DELTA AIRPORT CONSULTANTS, INC.
Airports 101 (or, 10 Things You Need to Know about Airports) MARY ASHBURN PEARSON, AICP ROY G. LEWIS, AICP DELTA AIRPORT CONSULTANTS, INC. 4/10/2015 1 Delta Airport Consultants, Inc. oyes, it s ALL we
More informationTransportation and NEPA The Role of Private Equity and PPPs in Public Transit 1
Transportation and NEPA 1 Strategies to Accelerate Transit Project Delivery and Comply with NEPA If you ask anyone in the public sector about transportation infrastructure, you will hear some version of
More informationCLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview
CLT Charlotte Douglas International Airport Environmental Impact Statement Scoping Overview What is the National Environmental Policy Act (NEPA)? Patrick Schneider NEPA is a federal statute that requires
More informationSouthern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015
Southern Ute Indian Tribe Coordination Kick-Off Meeting November 4, 2015 Awareness of the Master Plan Recommendations (Proposed Action) Understanding of the Environmental Assessment (EA) purpose and content
More informationWELCOME TO THE FEDERAL AVIATION ADMINSTRATION SCOPING MEETING
TIER 2 EIS MEETING December 3, 2003 WELCOME TO THE FEDERAL AVIATION ADMINSTRATION MEETING Slide 1 The Federal Aviation Administration would like to welcome you here and thank you for participating in today
More informationIntegrating Health & Safety into Designs
Integrating Health & Safety into Designs Kevin Fairclough (Technical Officer) 28 th November 2012 Workshop objective To explain the CDM duties of a Designer Designers must: Be competent at design work
More informationSUSTAINABLE AIRPORT MASTER PLAN (SAMP) UPDATE
SUSTAINABLE AIRPORT MASTER PLAN (SAMP) UPDATE February 13, 2018 Item No. 9B Meeting Date: February 13, 2018 1 Briefing Overview Background Existing conditions Long-term vision Planning update Phased approach
More informationCLT. Charlotte Douglas International Airport. Environmental Impact Statement Scoping Overview
CLT Charlotte Douglas International Airport Environmental Impact Statement Scoping Overview What is the National Environmental Policy Act (NEPA)? Patrick Schneider NEPA is a federal statute that requires
More informationOakland International Airport Airport Perimeter Dike Improvement
Oakland International Airport Airport Perimeter Dike Improvement Environmental Assessment and Initial Study Public Scoping Workshop January 13, 2011 5:30 to 6:30 PM Oakland International Airport, Terminal
More informationagenda ACI-NA/ACC Airport Planning & NEPA Workshop December 9-11, 2013 Washington Marriott Washington, D.C. Thank you to our conference sponsor:
agenda ACI-NA/ACC Airport Planning & NEPA Workshop December 9-11, 2013 Washington Marriott Washington, D.C. Thank you to our conference sponsor: 12:00 PM 5:00 PM Registration Open MONDAY, DECEMBER 9 1:15
More informationChincoteague National Wildlife Refuge and Wallops Island National Wildlife
This document is scheduled to be published in the Federal Register on 01/08/2016 and available online at http://federalregister.gov/a/2016-00176, and on FDsys.gov Billing Code 4333 15 DEPARTMENT OF THE
More informationFederal Aviation Administration
U.S. Department of Transportation Federal Aviation Administration DRAFT Environmental Impact Statement for Proposed Redevelopment and Extension of Runway 9R/27L March 30, 2007 Fort Lauderdale-Hollywood
More informationAirport Master Plan Update (AMPU) Phase 2. Scope of Work
BST AMPU Phase 2 Scope of Work Page 1 of 19 Belfast Municipal Airport Belfast, Maine Airport Master Plan Update (AMPU) Phase 2 Scope of Work The intent of this project is to update the 1999 Belfast Municipal
More informationOakland Energy and Climate Action Plan Second Public Workshop. January 28, 2009
Oakland Energy and Climate Action Plan Second Public Workshop January 28, 2009 Workshop Goals Provide background on purpose of the Energy and Climate Action Plan Develop shared understanding of Plan development
More informationAgency Scoping. May 31, :00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport
Agency Scoping Meeting 10:00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport Presented to: CMH EIS Agencies By: FAA Consultant, Landrum & Brown Date: Agenda I. History,
More informationIPMA-Canada Certification Program
Program IPMA-CP (In Training) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE International Personnel Management Association Canada 3333 333 Program IPMA-Canada is a national human resource management association whose
More informationIPMA-CANADA INTERNATIONAL CERTIFICATION PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE
IPMA- Canada INTERNATIONAL PROGRAM IPMA-CP (IN TRAINING) IPMA-CP IPMA-ACP IPMA-EX IPMA-CE INTERNATIONAL PROGRAM is a national human resource management association whose mission is to promote excellence
More informationBurbank-Glendale-Pasadena Airport Authority
Burbank-Glendale-Pasadena Airport Authority Status Update Replacement Passenger Terminal Presentation to the Burbank City Council May 23, 2017 I. Airport Layout Plan (ALP) Revision I. Airport Layout Drawing
More informationNASDA and the Multi-State Partnership for Security in Agriculture Food, Animal and Plant Emergency Response Plan Templates AFDO Food Defense Workshop
NASDA and the Multi-State Partnership for Security in Agriculture Food, Animal and Plant Emergency Response Plan Templates AFDO Food Defense Workshop June 17, 2006 History September 2004 National Association
More informationPangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Kickoff Meeting #1 DATE: August 22, 2016 On behalf of the Pangborn Memorial Airport, I would like to invite you to serve
More informationActivities of the OECD/NEA/CSNI Working Group on Fuel Cycle Safety in Spent Fuel and High-Level Waste Management
Activities of the OECD/NEA/CSNI Working Group on Fuel Cycle Safety in Spent Fuel and High-Level Waste Management Marissa Bailey, Director Division of Fuel Cycle Safety, Safeguards and Environmental Review
More informationExpediting the Implementation of ATM System Improvements
Expediting the Implementation of ATM System Improvements Sponsored by Transportation Research Board National Research Council National Academy of Sciences Washington, D.C. 6 April 2000 Welcome and Introduction
More informationHow to Prepare Your Categorical Exclusion (CATEX) Information and Prepare a Brief Environmental Assessment
How to Prepare Your Categorical Exclusion (CATEX) Information and Prepare a Brief Environmental Assessment Presented to: By: Peter F. Ciesla, Environmental Protection Specialist Date: CATEX Presentation
More informationWhat s a NEPA? Modern Environmental Planning in the United States. Vanasse Hangen Brustlin, Inc.
What s a NEPA? Modern Environmental Planning in the United States November 5, 2009 MIT Airport Planning Class Marla Engel, AICP Principal, Airports Planning Vanasse Hangen Brustlin, Inc. Modern Environmental
More informationTraining Calendar 2013
Step Guide to Professionalism Training Calendar 2013 P.O. Box: 336,, KSA Tel: +966 3 83 1 5454 Fax: +966 3 831 5656 E-mail: info@ meli.edu.sa Visit us: www.meli.edu.sa PARTNERS The International Road Transport
More informationSR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES
Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road
More informationEnhanced Pavement Management Program. Pavement Management Program
Enhanced Pavement Management Program Presented to the Transportation and Environment Committee Feb. 12, 2007 VISION STATEMENT Creating the Most Cost Effective, Pavement Management Program in the Nation
More informationDepartment of Transportation Federal Aviation Administration
Department of Transportation Federal Aviation Administration Draft for New Runways, Terminal Facilities and Related Facilities at Washington Dulles International Airport Washington Dulles International
More informationAviation Electrical Infrastructure
Aviation Electrical Infrastructure Improved Management Processes for the Design, Construction and Maintenance of Airfield Electrical Systems Presented to: IESALC 2013 Annual Conference Tucson, Az. Today's
More informationInternational Project Management. prof.dr MILOŠ D. MILOVANČEVIĆ
International Project Management prof.dr MILOŠ D. MILOVANČEVIĆ Project Communications Management Contents Importance of Good Communications Project Communications Management Processes Communications planning
More informationDeveloping Operations Strategies: What, Why, And How?
Developing Operations Strategies: What, Why, And How? Gene Tyndall Tompkins International Valerie Bonebrake Tompkins International Tompkins Supply Chain Leadership Copyright Forum 2015 August 31 September
More informationFacing an Uncertain Future: Increasing Resilience at Marinas and Harbors
Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Amy Samples November 17, 2015 National Working Waterfronts and Waterways Symposium Michigan Sea Grant Operators Face Change and
More informationPavement Update Track: Engineering
Pavement Update Track: Engineering 2017 ACC Airports Technical Workshop June 21-22, 2017 Arlington, VA Gregory D. Cline, P.E. FAA Airport Engineering AAS-100 gregory.cline@faa.gov (202) 267-8814 Pavement
More informationLindbergh Field Alternatives Considered
Presented To: San Diego County Regional Airport Authority Strategic Planning Committee Lindbergh Field Alternatives Considered May 22, 2006 1 Alternatives Considered - Outline Lindbergh Field Site Constraints
More informationGreenhouse Gas. Guidance for FAA NEPA Documents. Thomas Cuddy. Office of Environment and Energy (AEE-400)
Greenhouse Gas Federal Aviation Guidance for FAA NEPA Documents Thomas Cuddy Office of Environment and Energy (AEE-400) 202-493-4018 thomas.cuddy@faa.gov Prepared for:, Overview Aviation GHG emissions
More informationAir Quality, General Conformity & Class Exercise
Air Quality, General Conformity & Class Exercise Thurs., Dec. 10 th, 2009 (8:00 12:00) Ed Melisky Environmental Specialist, Federal Aviation Administration, Airports Planning and Environmental Division,
More informationGet the high hanging fruit. Case Study: Engaging people is key to mastering business change at Cargill India
Case Study: Engaging people is key to mastering business change at Cargill India Engaging and involving people are key to mastering business change at Cargill India We are what we repeatedly do, Aristotle
More information7 Financial Analysis 49
7 Financial Analysis 49 50 M A S T E R P L A N Harrisburg International Airport As part of the Master Plan, a financial feasibility analysis was conducted. The objectives of this element of the Master
More informationCDM Road Show. Friends & Partners in Aviation Weather Vision Forum NBAA/NCAR. CDM Overview - Friends & Partners in Aviation Weather / Washington, D.C.
CDM Road Show Friends & Partners in Aviation Weather Vision Forum NBAA/NCAR 1 CDM Road Show Friends & Partners in Aviation Weather / Washington, D.C. Welcome: NBAA/NCAR 2 CDM Road Show Friends & Partners
More informationStakeholder Engagement Approach (SEA)
Stakeholder Engagement Approach (SEA) EFSA 28 th Focal Point Meeting Parma, 15 September 2016 Goran Kumric, EXREL NEW ENGAGEMENT APPROACH STRATEGIC CONCEPT Innovation The 1st objective of the EFSA Strategy
More informationCOMBINED PUBLIC WORKSHOP/ PUBLIC HEARING
COMBINED PUBLIC WORKSHOP/ PUBLIC HEARING Draft Environmental Assessment Five-Year Capital Improvement Program Punta Gorda Airport, Charlotte County, Florida March 2019 Project Overview The Charlotte County
More informationI N S I G H T S I N T O I N D I G O S J O U R N E Y & K E Y S A P F & R C A PA B I L I T I E S J U LY 6,
I N S I G H T S I N T O I N D I G O S J O U R N E Y & K E Y S A P F & R C A PA B I L I T I E S J U LY 6, 2 0 1 6 Indigo 1 Indigo $850+ M Revenue Last Fiscal Year Print General Merchandise Toys Trade Books
More informationEnergy Efficiency Obligations in the UK. John Mason Senior Manager of Customers Policy and Regulation
Energy Efficiency Obligations in the UK John Mason Senior Manager of Customers Policy and Regulation 1 Title of Presentation 1 January 2014 EDF Energy plc. All rights Reserved EDF ENERGY EDF Energy is
More informationThe Inventory Optimization Maturity Curve
An Executive White Paper The Inventory Optimization Maturity Curve Mapping an IO Journey for Today s Supply Chain Teams Table of Contents People, Process and Technology...3 The IO Maturity Curve...4 Stage
More informationAppendix G-5 FINAL GENERAL CONFORMITY DETERMINATION
Appendix G-5 FINAL GENERAL CONFORMITY DETERMINATION Department of Transportation Federal Aviation Administration Final for New Runways, Terminal Facilities and Related Facilities at Washington Dulles International
More informationUpcoming ACRP Webinars
Information on ACRP www.trb.org/acrp Regular news and updates on: o Upcoming and ongoing research projects o New publications o Success stories o Announcements o Webinars Find ACRP on Facebook and LinkedIn
More informationAdvancing Clean Energy in New Hampshire: The Northern Pass. Southern New Hampshire Planning Commission February 22, 2011
Advancing Clean Energy in New Hampshire: The Northern Pass Southern New Hampshire Planning Commission February 22, 2011 Today s Agenda Purpose and Overview of Proposed Project Project Benefits Proposed
More informationEXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No
EXHIBIT A TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No. 429768-4-12-01 This Exhibit forms an integral part of the Agreement between the DEPARTMENT and, the CONSULTANT,
More informationMinnesota Comprehensive Statewide Freight and Passenger Rail Plan
Minnesota Comprehensive Statewide Freight and Passenger Rail Plan Open House Round 2 October 2009 presented by Cambridge Systematics,, Inc. Kimley-Horn and Associates, Inc. TKDA, Inc. Agenda Outreach Erika
More informationRequirements Analysis and Design Definition. Chapter Study Group Learning Materials
Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this
More informationPRINCE2 - Project Brief
Created/updated 05/11/17 PRINCE2 - Project Brief Downloaded from stakeholdermap.com. Visit Prince2 Templates for more Prince2 downloads. Get a Mind Map Project Brief template Project
More informationEngagement with Stakeholders
UNITED UTILITIES WATER LIMITED 19/20 Charges Engagement with Stakeholders A summary of engagement with CCWater on charging in relation to all of our Charges Schemes, and the response taken by UUW is contained
More informationAIRPORT PAVEMENT ODOT/FAA WORKSHOP. Federal Aviation Administration. Presented to: By: Date: Ohio Sponsors & Consultants
AIRPORT PAVEMENT ODOT/FAA WORKSHOP Presented to: Ohio Sponsors & Consultants By: Date: Alex Erskine, Ernest Gubry, Marlon Peña, Brian Tenkhoff March 2016 To Better Understand: TODAY S OBJECTIVES Pavement
More informationTIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING
TIER 2 EIS SCOPING MEETING WELCOME TO THE FEDERAL AVIATION ADMINISTRATION SCOPING MEETING TIER 2 EIS OVERVIEW SOUTH SUBURBAN INAUGURAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT The proposed, (SSA) will require
More informationSustainable Manufacturing
Sustainable Manufacturing Using Green Stream Mapping techniques to optimize Sustainable Manufacturing A Fabrinet Case Study Dr. Harpal Gill Mark Lopus Page 1 Abstract Today, businesses worldwide are placing
More informationHOW TO MITIGATE DROP IN COLLECTIONS AFTER CIS GO-LIVE. TECO Energy: An Emera Company
HOW TO MITIGATE DROP IN COLLECTIONS AFTER CIS GO-LIVE TECO Energy: An Emera Company Introduction Today s speakers Clayton Dean TECO Energy Manager, Call Center, Customer Service Tampa, FL cbdean@tecoenergy.com
More informationThe Collaborative Decision Making Framework
The Collaborative Decision Making Framework The transportation decision making process is made of many individual steps. Most of these steps are work activities that take place in the technical decision
More informationSCOPING FOR COMPLICATED PROJECTS. TxDOT scoping process for EAs and EISs
SCOPING FOR COMPLICATED PROJECTS TxDOT scoping process for EAs and EISs September 10, 2015 Scoping for Complicated Projects Mike Chavez, Project Delivery Manager, TxDOT ENV This session will look at the
More informationBuilding an Enterprise GIS for SFO Then and Now
Building an Enterprise GIS for SFO Then and Now Introduction Overhead View Humble Beginnings Organization Overhaul Technical Transformation Stakeholder Engagement Enterprise Implementation Next Destination
More informationHow do we do more with less? Kaizen, MPI and patient collections
How do we do more with less? Kaizen, MPI and patient collections Legacy Carilion Labs Company History 1995 Consolidated lab formed within Carilion Clinic 2006 For-profit subsidiary of Carilion Clinic formed
More informationREQUEST FOR PROPOSALS
I. INTRODUCTION The Port of Oakland Aviation Division requests proposals from qualified consultants to perform technical evaluations for existing Terminal 1 buildings at Oakland International Airport (OAK).
More informationFirst Steps in Procurement. Finance Training
First Steps in Procurement Finance Training First Steps in Procurement A course developed by Finance Training and Procurement specifically for the University. It is not accredited but is an excellent starting
More informationCOURSE LISTING. Courses Listed. 4 February 2018 (12:50 GMT) SAPSCM - SAP SCM. SCM200 - Business Processes in Planning (SCM)
with, SAP SCM Courses Listed SAPSCM - SAP SCM SCM200 - Business Processes in Planning (SCM) SCM210 - SCM Core Interface APO SCM220 - Demand Planning (APO DP) SCM212 - Core Interface and Supply Chain Integration
More informationMIA Cargo Facilities and Needs Workshop June 29 th, 2011
MIA Cargo Facilities and Needs Workshop June 29 th, 2011 SMP Overview 1. Prior Studies 2. Current MIA Capital Improvement Program (CIP) 3. SMP Goals and Objectives 4. SMP Study Approach 2 SMP Background
More informationLessons Learned from Implemen/ng a Total Rewards Philosophy and Strategy at the Port of Sea:le
Lessons Learned from Implemen/ng a Total Rewards Philosophy and Strategy at the Port of Sea:le Ann McClellan, Port of Sea1le Ma1 Johnson, Johnson HR Consul8ng, Inc. Introduction! Ann McClellan! Compensation
More informationLeadership & Strategic Wellness
Leadership & Strategic Wellness ISODC Conference, Vermont May 17 th 20 th, 2017 - Brent Green, Ph.D., MPH, Presenter Principal, IntelliVen-San Francisco Copyright 2017 IntelliVen, LLC and Peter F. DiGiammarino
More informationTimothy Stokes. PE, MBA Delcan Corp, Senior Principal Denver, CO
Improving Project Management to Realize Successful Outcomes by Focusing on Requirements Management Timothy Stokes. PE, MBA Delcan Corp, Senior Principal Denver, CO Introduction Begin at the beginning,
More informationDelri Muller, Karen B. Marais, Payuna Uday (Purdue) R. John Hansman, Tom G. Reynolds, Jonathan Lovegren (MIT)
An FAA/NASA/TC-sponsored Center of Excellence Delri Muller, Karen B. Marais, Payuna Uday (Purdue) R. John Hansman, Tom G. Reynolds, Jonathan Lovegren (MIT) AAE Systems Day August 28, 2010 Motivation Demand
More informationCOUNTRY REPORT ON INFRASTRUCTURE AND FINANCE GEORGIA TABLE OF CONTENT
COUNTRY REPORT ON INFRASTRUCTURE AND FINANCE TABLE OF CONTENT I. COUNTRY INFRASTRUCTURE AND POLICY DIRECTIONS... 2 II. 1.1 IMPLEMENTATION PROCESS... 2 1.2 LEGAL AND REGULATORY FRAMEWORK FOR INFRASTRUCTURE...
More informationNote by the Consultative Group of Experts on National Communications from Parties not included in Annex I to the Convention
United Nations FCCC/SBI/2012/INF.15 Distr.: General 19 October 2012 English only Subsidiary Body for Implementation Thirty-seventh session Doha, 26 November to 1 December 2012 Item 4(a) of the provisional
More informationDraft Land Use, Scenario Planning, & Sustainability Technical Report. Summary
` Draft Land Use, Scenario Planning, & Sustainability Technical Report Summary Introduction In 2006, the Genesee County Metropolitan Planning Commission (GCMPC) performed an analysis of the past and current
More informationGlobal Supply Chain Planning under Demand and Freight Rate Uncertainty
Global Supply Chain Planning under Demand and Freight Rate Uncertainty Fengqi You Ignacio E. Grossmann Nov. 13, 2007 Sponsored by The Dow Chemical Company (John Wassick) Page 1 Introduction Motivation
More informationSeminars for Workplace Leaders 2018 Mike Deblieux All Rights Reserved
A Mike Deblieux Program Summary Seminars for Workplace Leaders 2018 Mike Deblieux All Rights Reserved Program Summaries Table of Contents Effective Training 1 Workshops and Seminars 2 The Workplace Leader
More informationSiebel CRM On Demand Administrator Rollout Guide
Siebel CRM On Demand Administrator Rollout Guide This Administrator Rollout Guide consolidates tips and lessons learned from implementing Siebel CRM On Demand, discusses your role as an administrator,
More informationJob Description. Salary Range: Market Range 13
Job Title: Application Analyst Salary Range: Market Range 13 Supervisor Title: Application Development Manager Position Summary: Partner with the Business Analyst in the design, development, installation,
More informationThe Challenges of Container Terminal Development. Ashebir Jacob, PE September 10, 2013
The Challenges of Container Terminal Development Ashebir Jacob, PE September 10, 2013 State of Containerization Since its inception, the container shipping industry has done their best to increase the
More informationCPM Solutions Ltd. Newsletter
CPM Solutions Ltd. Newsletter November, 2007 Volume 1, Number 2 In This Issue CPM Solutions in the Plant Maintenance and Turnaround Environments NEW course #CPM300 Primavera P6 Training for Plant Shutdowns
More informationRegional Transportation Studies Regional Council
Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement
More informationThe Seven Deadly Wastes
The Seven Deadly Wastes Facilitator s Guide Seven Deadly Wastes Overview Learn what the seven wastes are and why they are so deadly to your organization. A step by step guide to presenting Gemba Academy
More informationMINUTES Meeting 12. Aviation Stakeholder Advisory Committee Oakland International Airport Thursday, May 4, 2006
MINUTES Meeting 12 Aviation Stakeholder Advisory Committee Oakland International Airport Thursday, May 4, 2006 This meeting of the Aviation Stakeholder Advisory Committee (the Committee) was the twelfth
More informationDraft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements
JUNE 2016 RONALD REAGAN WASHINGTON NATIONAL AIRPORT Draft Environmental Assessment Terminal B/C Redevelopment, Secure National Hall, and Related Improvements PREPARED BY: Ricondo & Associates, Inc. IN
More informationReliability and Economics: Separate Realities?
Reliability and Economics: Separate Realities? James F. Wilson Principal, Wilson Energy Economics Harvard Electricity Policy Group Sixty-Fifth Plenary Session Dallas, Texas December 1-2, 2011 1 Reliability
More informationLand Use, Scenario Planning, & Sustainability Technical Report. Summary
` Land Use, Scenario Planning, & Sustainability Technical Report Summary Introduction In 2006, the Genesee County Metropolitan Planning Commission (GCMPC) performed an analysis of the past and current
More informationWebinar Series for Comprehensive Plan Updates. Transportation Overview
Webinar Series for Comprehensive Plan Updates Transportation Overview Presented by Michael Larson and Mark Filipi August 18, 2016 2040 Transportation Policy Plan Adopted January 14 th, 2015 Multimodal
More informationCERA s Programme Management Office
CERA s Programme Management Office Published 18 April 2016 Canterbury Earthquake Recovery Authority The Government established the Canterbury Earthquake Recovery Authority (CERA) in March 2011 to lead
More informationFocus on Technology: Preparing your practice for ICD-10
Focus on Technology: Preparing your practice for ICD-10 The role technology plays in transitioning your practice to ICD-10 can t be overstated. Testing that technology and training your staff are also
More information