1 Mnthly Status Reprt February 2017 Santa Susana Field Labratry Mnthly Status Reprt February 2017 This mnthly update is t infrm the cmmunity abut Santa Susana Field Labratry (SSFL) investigatin and cleanup activities that ccurred in February 2017 as well as thse that are planned fr March 2017 under the Califrnia Department f Txic Substances Cntrl s (DTSC) versight. A prject verview fr The Being Cmpany (Being), United States Department f Energy (DOE) and Natinal Aernautics and Space Administratin (NASA) SSFL areas is included at the end f this reprt. 1 SSFL ACTIVITIES COMPLETED DURING FEBRUARY 2017 DTSC CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) DTSC s CEQA cntractr, Envirnmental Science Assciates (ESA), is gathering infrmatin t develp a Prgrammatic Envirnmental Impact Reprt (PEIR) fr the SSFL prject. DTSC anticipates DTSC s draft PEIR will be available fr public review in mid SITE WIDE AIR MONITORING PLAN Being, DOE and NASA submitted a jint Baseline Air Mnitring Wrk Plan in April 2016 t evaluate baseline cncentratins f dust, vlatile rganic cmpunds, and radinuclides in the vicinity f SSFL befre cleanup activities begin. This data will be used t evaluate what, if any, impacts t air quality are caused by cleanup activities. DTSC released cmments n the Baseline Air Mnitring Wrk Plan t Being, DOE, and NASA n December 9, NASA SOILS: NASA submitted a revised Sil Data Summary Reprt t DTSC n February 22, This dcument is a revisin t an earlier draft dcument (dated May 2015) reviewed and cmmented n by DTSC in bth March and July, The reprt summarizes the results f sil samples cllected t define the extent f chemical cntaminatin at NASA-administered sites at SSFL. DTSC will review the revised NASA reprt prir t a decisin n apprval. Grundwater: NASA is preparing reprts fr the fur majr grundwater areas which were investigated between 2013 and 2016, (the Frmer Liquid Oxygen (LOX) Plant Area, the Expended Launch Vehicle (ELV)-Building 204 Area, and the frmer Alfa-Brav and Cca-Delta Test Stand Areas). The results f these investigatins will be reprted in mid-2017, and will cntribute t the site-wide SSFL Grundwater Remedial Investigatin effrt. Page 1 f 14

2 Mnthly Status Reprt February 2017 DEMOLITION: Seasnal cnditins prevented demlitin wrk at NASA SSFL Area II fr much f February. Remval f inactive infrastructure and supprt equipment utside the engine test stands cntinued under their Phase 2 demlitin prgram. NASA anticipates that their Phase 3 prgram, under which ancillary structures and supprt buildings at the Alfa, Brav, and Cca areas will be remved, will cmmence in March Strm water Pllutin Preventin Plan (SWPPP) measures are being maintained and mnitred at the active NASA demlitin sites ver the rainy seasn. NASA demlitin activities at SSFL are cnducted under Ventura Cunty authrity. PERMITTING: In June 2016, NASA submitted a draft pst-clsure permit renewal applicatin fr the Area II Surface Impundments. DTSC is currently reviewing the Area II Surface Impundment pst-clsure permit applicatin fr technical cmpleteness. The effect f recent legislative changes t pst-clsure permit requirements under Califrnia Cde f Regulatins Title 22, Article 6 are als being evaluated as part f the review. The pst-clsure requirements fr the Area II Surface Impundments are regulated by DTSC under RCRA laws and regulatins because the impundments are frmer hazardus waste facilities. The required cleanup levels fr the impacted sil and grundwater will cntinue t be dictated by the 2010 Administrative Order n Cnsent fr Remedial Actin (AOC). DOE SOILS: In 2012, US Envirnmental Prtectin Agency (US EPA), in crdinatin with DTSC and DOE, cmpleted sampling effrts t define the nature and extent f Area IV radilgic cntaminatin. In crdinatin with DTSC, DOE cmpleted the Phase 3 Sil Chemical Data Gap Investigatin sampling in subareas lcated thrughut Area IV and the Nrthern Buffer Zne (NBZ). On December 29, 2016, DOE submitted a Draft Chemical Data Summary Reprt. The AOC required submittal f this dcument t summarize the entirety f the chemical data cllectin effrts and define the vertical and hrizntal extent f cntaminatin abve backgrund fr Area IV. On January 6, 2017, DOE issued a Draft Envirnmental Impact Statement (Draft EIS) that analyzes the ptential envirnmental impacts f alternatives fr cnducting cleanup activities in Area IV f the Santa Susana Field Labratry and the adjining Nrthern Buffer Zne. Remediatin is needed t clean up residual chemicals and radinuclides frm histrical peratins in Area IV, in cmpliance with regulatins, rders, and agreements. The alternatives analyzed in the Draft EIS invlve the remediatin f sil and grundwater, the dispsitin f remaining DOE facilities and supprt buildings, and the dispsal f all resulting waste at existing licensed r permitted facilities in rder t prtect public health and safety and the envirnment. The Draft EIS is available at REMEDIATION PLANNING: The AOC requires the DOE t cnduct sil treatability testing t develp data fr assessing treatment f sils in place r n-site that culd achieve the AOC cleanup gals. Data cllected during the sil treatability studies culd be used t evaluate nsite sil treatment technlgies that culd ptentially reduce the vlume f cntaminated sil t be excavated and transprted frm Area IV. The treatability Page 2 f 14

3 Mnthly Status Reprt February 2017 studies addressed sil partitining, mercury valence state in sil, biremediatin, phytremediatin, and natural attenuatin, as well as residual fuel hydrcarbn characterizatin methds. The Sils Treatability Investigatin Grup (STIG) meeting dcuments and the sil treatability studies study plans, evaluatin reprts and Summary Reprt have been upladed t the DTSC-SSFL DOE Sil Treatability Studies web page. The Sil Treatability Studies Summary Reprt (CDM Smith, September 2015), which is als psted n the DTSC-SSFL web site, prvides a summary fr each f the studies and their findings. The findings frm the sil treatability studies are being used fr remediatin planning. Attachment B (Agreement in Principle) and Attachment C (Cnfirmatin Prtcl) f the 2010 AOC state if an nsite r ffsite surce f backfill sils that achieves all lk-up table values cannt be reasnably fund, then DTSC, DOE and USEPA shall enter a cnsultatin prcess and DTSC shall determine the best available surce f backfill. In a letter dated December 21, 2016 t DTSC, DOE nted that, based n an evaluatin f sil frm three ptential brrw sites and fill sil frm tw lcal hme imprvement stres, nne f the sils tested frm these sites achieved lk-up table values, thus the sils d nt qualify as backfill usable by DOE in Area IV f SSFL. Based n these findings, DOE requested initiatin f the cnsultatin prcess between the three agencies t determine the best available surce f backfill. GROUNDWATER: The DTSC-apprved Final RCRA Facility Investigatin (RFI) Grundwater Wrk Plan, Prtin f Area IV under DOE Respnsibility (CDM Smith, Nvember 9, 2015) presents the results and recmmendatins f DOE s grundwater data gap evaluatin with respect t DOE s 2007 Cnsent Order respnsibilities. The Wrk Plan presents the ratinale and apprach fr data cllectin t fill identified data gaps fr DOE sites in Area IV. The Wrk Plan als addresses the activities DOE is implementing t answer questins raised by DTSC during review f the site-wide 2009 Grundwater Remedial Investigatin Reprt (MWH, 2009) in terms f seeps, springs, faults, and flw and transprt mdeling specific t Area IV. The findings frm the RFI grundwater investigatin will be presented in a future SSFL Grundwater RFI Reprt. In late Nvember 2015, DOE submitted an Implementatin Plan that addresses Grundwater Interim Measures fr the impacted grundwater lcatin within the Area IV Frmer Sdium Dispsal Facility (FSDF). The FSDF has been identified as a surce area fr trichlrethylene (TCE) cntaminatin in grundwater. The scpe f wrk fr the Implementatin Plan includes aquifer prperty testing, extended aquifer pumping, treatment f extracted grundwater, and discharge f treated water at the FSDF site. Additinally, the plan prpses treating and discharging the extracted grundwater in Area IV instead f cnnecting t the Grundwater Interim Measure cnveyance and treatment system. DTSC apprved the aquifer test prtin f the plan (Appendix A), t allw cllectin f data regarding aquifer prperties t further refine the scpe f wrk. DTSC prvided field versight f wrk assciated with the FSDF GWIM. Infrmatin btained during the field effrts was reviewed and discussed in meetings between DOE and DTSC. Data shw site cnditins have changed in the vicinity f FSDF, as water levels have drpped and the shallw well within the perched zne (RS-54) that histrically shwed elevated cncentratins f trichlrethene (TCE) in grundwater was dry. The histrical presence f elevated cncentratins f TCE in well RS-54 Page 3 f 14

4 Mnthly Status Reprt February 2017 was the basis fr including the lcatin in the grundwater interim measures. On June 9, 2016, DOE submitted a letter summarizing their findings f this change in cnditins at FSDF, and indicated their intent t suspend plans fr implementing the interim measure until the perched grundwater is resaturated and grundwater cncentratins rise t levels that warrant interim measure. Because grundwater beneath the FSDF was deeper, and ther nearby mnitring wells did nt exhibit elevated cncentratins f TCE, DTSC and DOE evaluated a revised apprach t GWIM implementatin in Area IV. Given the recent rains, DTSC will be evaluating grundwater levels and cnditins at and near FSDF, as data becmes available. DTSC has reviewed and cmmented n DOE s submittal Draft White Paper n Thermal Remediatin Technlgies fr Treatment f Chlrinated Slvents. This dcument was submitted because in-situ thermal remediatin has been identified as a ptentially applicable remedy t address mass remval f chlrinated slvents and ther cntaminants f cncern in grundwater. BUILDING DEMOLITION: The DOE Standard Operating Prcedure fr Demlitin f Facilities in Area IV describes DOE s prtcls and prcedures fr demlitin decisins f DOE buildings in Area IV. DOE s Area IV demlitin activities are cnducted under DOE and Ventura Cunty authrity. PERMITTING: DOE is currently addressing DTSC s cmments regarding Hazardus Waste Management Facility (HWMF) and Radiactive Materials Handling Facility (RMHF) clsure plans. Once cmments are adequately addressed, DTSC will issue a frmal public ntice and invite public review and cmments as well as hld a public meeting t further describe the clsure prcess. The clsure plans will nt receive final apprval until bth DTSC s PEIR and DOE s Envirnmental Impact Statement (EIS) are cmpleted and certified. Clsure f the RMHF and HWMF buildings themselves is regulated by DTSC under RCRA laws and regulatins, as bth are regulated under the hazardus waste facilities prgram. The sils beneath the RMHF and HWMF will be investigated and remediated in accrdance with the AOC. BOEING Being is finishing sils investigatin wrk in Area I, Area III, and the suthern buffer zne. Being s surficial media characterizatin wrk is divided int units identified as Being RFI Subareas: 1A Nrth, 1A Central, 1A Suth 1B Nrth, 1B Suthwest, 1B Sutheast 5/9 Nrth, 5/9 Suth, and Grup 10 SURFICIAL MEDIA INVESTIGATION: Being is using the Data Quality Objectives (DQOs) prcess and standard perating prcedures fr planning and cnducting sampling wrk t cmplete the characterizatin f surficial media. The purpse f the current phase f surficial media investigatin wrk is t cllect sufficient data t fill data gaps that were identified in the 2007 and 2008 Grup RFI Reprts. All f the first rund wrk plans were presented t the public, with the first public meeting held n March 13, 2013 and the last held n December 12, The secnd rund surficial media data gap sampling wrk plans have all been apprved by DTSC. Page 4 f 14

5 Mnthly Status Reprt February 2017 Sampling is nw substantially cmplete. All Being sites are in the data evaluatin and reprting wrk phases. Subarea 5/9 Suth - Systems Testing Lab (STL-IV), Cmpund A, Sewage Treatment Plant (STP)-3, and Envirnmental Effects Labratry (EEL), and areas nt assciated with RFI sites in Subarea 5/9 Suth DTSC frwarded cmments n the draft RFI Data Summary and Findings Reprts t Being n August 23, Being submitted respnses t DTSC cmments n December 16, DTSC is currently reviewing the respnses. Subarea 1A Central - Building 359, Advanced Prpulsin Test Facility (APTF), and Happy Valley Nrth and areas nt assciated with RFI sites in Subarea 1A Central DTSC frwarded cmments n the draft RFI Data Summary and Findings Reprts t Being n September 12, Subarea 5/9 Nrth - Silvernale, Engineering Chemistry Labratry (ECL), and areas nt assciated with RFI sites in Subarea 5/9 Nrth Data gap sampling is cmplete. Preparatin f the summary reprts is nging. Subarea 10 (Suthern Buffer Zne) Data gap sampling is cmplete. Preparatin f the summary reprt is nging. Subarea 1B Sutheast Chemical Test Lab (CTL)-III, Perimeter Pnd, and areas nt assciated with RFI sites in Subarea 1B Sutheast. Data gap sampling is cmplete. Preparatin f the summary reprts is nging. Subarea 1B Nrth - Bwl, R-1 Pnd, and areas nt assciated with RFI sites in Subarea 1B Nrth Data gap sampling is cmplete. Preparatin f the summary reprts is nging. Subarea 1B Suthwest - Area I Burn Pit, CTL-V, and areas nt assciated with RFI sites in Subarea 1B Suthwest Data gap sampling is cmplete. Preparatin f the summary reprts is nging. Subarea 1A Nrth - B-1, Instrument & Equipment Labratry (IEL), Area 1 Landfill, and areas nt assciated with RFI sites in Subarea 1A Nrth Data gap sampling is cmplete. Preparatin f the summary reprts is nging. Frmer Shting Range The Frmer Shting Range is nt part f Subarea 1A Nrth but the site infrmatin is included here as the Frmer Shting Range is lcated n the Muntains Recreatin Cnservancy Authrity, Sage Ranch prperty which is adjacent t Subarea 1A Nrth and sme sil data verlap between the Frmer Shting Range area and Subarea 1A Nrth. The wrk is being cnducted under an apprved wrk plan and addendum. Page 5 f 14

6 Mnthly Status Reprt February 2017 Field wrk t investigate sils t define the extent f lead sht and clay pigens as well as characterize the sil fr lead, arsenic, antimny, and plynuclear armatic hydrcarbn cncentratins began in late September and was cmpleted n January 18, Labratry analysis f sil samples is n-ging. Once the labratry results are received additinal sampling will be cnducted if necessary. If n additinal sil sampling is necessary the prject will mve nt the reprting phase. Lead sht and clay pigens bserved during the sampling activities are being remved by hand. Subarea 1A Suth - Canyn, Happy Valley Suth, Laser Engineering Testing Facility (LETF)/CTL-I, and areas nt assciated with RFI sites in Subarea 1A Suth Data gap sampling is cmplete. Preparatin f the summary reprts is nging. Risk Assessment Risk Assessments were included in the tw draft RFI Data Summary and Findings Reprts submitted t date (Subareas 5/9 Suth and 1A Central). Based n DTSC review cmments and changes in risk assessment input parameters by the USEPA, the risk assessment prcess will need t underg sme changes. The changes t the prcess are t be submitted fr DTSC review and apprval thugh an addendum t the Standardized Risk Assessment Methdlgy (SRAM-2). It is anticipated this prcess will take sme time t wrk thrugh. T ensure cntinued prgress is ccurring with the RFI Reprts, DTSC requested Being remve the risk assessments frm the RFI Reprts and submit them under separate cver. GROUNDWATER: Faults DTSC is currently reviewing a draft technical memrandum evaluating faults. Additinal Studies On Nvember 30 and December 1, 2016, DTSC met with Being t discuss the results f grundwater cntaminatin surce zne evaluatin wrk in Areas I and Area III. Being grundwater characterizatin wrk in Area IV Seven well were installed by Being in Area IV; evaluatin f the hydrlgic data is nging. BUILDING DEMOLITION: The Superir Curt f Califrnia, Cunty f Sacrament, cntinues t evaluate the nging litigatin ver the demlitin f Being buildings in SSFL Area IV. Per the December 11, 2013, temprary injunctin, DTSC will nt issue crrespndence regarding the matter until the curt issues a decisin. A curt hearing n the matter is tentatively scheduled fr late PERMITTING: In Octber 2015, Being submitted a draft pst-clsure permit renewal applicatin fr the Areas I and III Surface Impundments and a separate Clsure Plan fr the Thermal Treatment Facility. DTSC is currently reviewing the Areas I and III Surface Impundment pst-clsure permit applicatin fr Page 6 f 14

7 Mnthly Status Reprt February 2017 technical adequacy. DTSC has temprarily suspended review f the Clsure Plan fr the Thermal Treatment Facility pending nging discussin f risk assessment requirements. The pst-clsure requirements fr the Area I and III Surface Impundments and clsure requirements fr the Thermal Treatment Facility are regulated by DTSC under RCRA laws and regulatins because bth are frmer hazardus waste facilities. The required cleanup levels fr the impacted sil and grundwater will cntinue t be dictated by the 2007 Cnsent Order. On May 24, 2016, DTSC cnducted a Site Cmpliance Inspectin at the Area I and III Surface Impundments. A reprt summarizing the findings f this inspectin dated July 21, 2016 was issued in Octber SITEWIDE GROUNDWATER CHARACTERIZATION AND CLEANUP The SSFL grundwater characterizatin and cleanup prgram is being cnducted by the three respnsible parties; Being, DOE and NASA. The grundwater characterizatin and cleanup prgram cnsists f: Investigatin and characterizatin f grundwater cntaminatin; Grundwater mnitring; Grundwater interim measures; and Treatment f cntaminated grundwater with permitted discharge frm the Grundwater Extractin and Treatment System. GROUNDWATER REMEDIAL INVESTIGATION (GWRI) Data gaps were identified in the 2009 GWRI Reprt by the RPs. DTSC als identified additinal data gaps that were presented in the GWRI cmments. The data gap wrk has been divided int six categries: Data gaps identified in the Remedial Investigatin (RI) Reprt; Surce Zne Characterizatin; Characterizatin f seeps and springs; Characterizatin f faults; Grundwater flw mdel; and Cntaminant transprt mdeling. STATUS OF GWRI DATA GAP WORK Wrk t fill the surce zne data gaps is being addressed in the data gap wrk plans. Data gaps identified in the 2009 Grundwater RI Reprt by the RPs Field wrk and sampling t fill data gaps identified in sectin f the draft RI Reprt is cmplete. Surce Zne Characterizatin Surce zne characterizatin wrk is being cnducted by Being, DOE and NASA under their respective surficial media characterizatin prgrams. Drilling and investigatin field wrk is substantially cmplete, data evaluatin is nging. Seeps and Springs Installatin f the seventeen well clusters fr seep characterizatin is cmplete. A selectin f wells has been added t the grundwater mnitring prgram. The University f Guelph submitted a reprt summarizing the seeps investigatin t DTSC. Page 7 f 14

8 Mnthly Status Reprt February 2017 Faults Characterizatin and study f faults are being cnducted by Being, DOE and NASA under their respective grundwater characterizatin prgrams. A technical memrandum and the sitewide RFI reprt fr grundwater will present an integrated cncept f faults at the site. Grundwater flw mdel The cnditinally apprved, grundwater flw mdel wrk plan presents an apprach fr a muntain scale grundwater flw mdel. Wrk frm the fault studies and data frm mnitring wells installed since 2009 will be used t supplement the grundwater flw mdel. DTSC, Being, DOE and NASA are cnsidering applying the revised mdel at the remedy design stage f the prject. Cntaminant transprt mdeling Being, DOE and NASA are develping an apprach fr cntaminant transprt mdeling. SITEWIDE GROUNDWATER TREATABILITY STUDIES Treatability studies are being cnducted n several technlgies t be evaluated in the feasibility study. The treatability studies address bth sil/bedrck and grundwater cntaminatin. Treatability studies can be either field studies r labratry studies. Fur grundwater labratry studies are being cnducted: Chemical xidatin using ptassium permanganate; Thermal heating f rck cre; DOE develped a white paper study f thermal heating f fractured bedrck and submitted it t DTSC in April DTSC has reviewed and cmmented n this paper. Micrbial characterizatin and Bi-Stimulatin f rck cre, pre water; Testing at university research labratries is cmplete. A summary reprt will be submitted in the first quarter f Tw field studies are being cnducted: In-situ chemical xidatin (ISCO) using ptassium permanganate Being develped a summary reprt fr ISCO and submitted it t DTSC n June 14, DTSC is reviewing the reprt. Bedrck vapr extractin (BVE) Cnducted at NASA s frmer Brav test area in late 2014 DTSC has reviewed and cmmented n the Technical Memrandum: Results frm Brav Bedrck Vapr Extractin Treatability Study dated Nvember Page 8 f 14

9 Mnthly Status Reprt February 2017 GROUNDWATER MONITORING Grundwater mnitring reprts are submitted quarterly, with the furth submittal being an annual reprt. DTSC reviews the quarterly reprts fr cmpleteness and cmpliance but may nt issue written cmments n the specific quarterly reprt if significant issues are nt present. If cmpliance issues arise during review f the quarterly grundwater mnitring reprts, DTSC directs the Respnsible Parties t take actin t cmply, and fllws up t ensure cmpliance is achieved and maintained. The annual reprts present the results f the previus year s mnitring and underg a mre thrugh review. DTSC cmpleted review f the 2015 Annual Reprts fr DOE, NASA and Being grundwater mnitring activities, and submitted a cmment letter n September 16. Being submitted respnses t DTSC cmments n December 16, DTSC is reviewing the respnses. DTSC is reviewing the 1 st, 2 nd and 3 rd Quarter 2016 Grundwater Mnitring Reprts fr NASA and Being and DOE. Being submitted a technical memrandum titled Being 2017 Sitewide Prgram Grundwater Sampling and Gauging Plan n December 14, DTSC GSU prvided cmments t the plan n January 9, A meeting was held n January 12, 2017 t discuss the GSU cmments and Being is revising their prpsed sampling plan. GROUNDWATER INTERIM MEASURES (GWIM) The GWIM prject includes the peratin f furteen grundwater extractin wells. The water will be pumped t the existing Grundwater Extractin Treatment System (GETS) fr treatment. The GETS effluent will be discharge under an NPDES discharge permit frm the Ls Angeles Reginal Water Quality Cntrl Bard. GWIM and GETS infrastructure is cmplete and start-up will cmmence when a permit that allws fr cntinuus discharge is secured. Being is finalizing discharge requirements with the LARWQCB that will regulate injectin f GETS effluent t WS-5. The cnditins f the current NPDES permit d nt allw fr cntinuus discharge f treated water created by GWIM peratins. As mentined abve, DTSC and DOE are evaluating a revised apprach t GWIM implementatin at RS-54A in Area IV. OPERATION OF WS-9A WS-9A did nt pump in Nvember, WS-9A, lcated in the suthwest crner f Area II, nrth f the suthern buffer zne, is n a pumping prgram t lwer the grundwater elevatin near seep SP-890 with a gal f reducing the amunt f Trichlrethene (TCE) cntaminatin in grundwater in the immediate area. When perating, grundwater extracted frm WS-9A is pumped t the GETS. Except fr intermittent testing in December 2012 and January 2013, WS-9A has nt been pumping since Nvember The water levels in the seep areas dwnstream f WS-9A are being mnitred. If seepage ccurs, it is mechanically cllected. Pumping at WS-9A will resume when the GWIM is restarted. The extractin f water at the well will be ptimized t perfrm the intended functin at as lw a rate as practical. GROUNDWATER RFI REPORT Wrking t a reprt frmat apprved by DTSC n January 13, 2017, Being, DOE, and NASA are preparing individual reprt sectins fr their specific grundwater characterizatin activities. The individual sectins will be part f single sitewide reprt deliverable. DTSC anticipates reprt sectin reviews t begin in mid Page 9 f 14

10 Mnthly Status Reprt February 2017 FEASIBILITY STUDY / CORRECTIVE MEASURES STUDY DTSC has cnditinally apprved the Feasibility Study wrk plan. Cleanup f sitewide grundwater and surficial media in Being areas will be regulated under Chapter 6.5 f Divisin 20 f the Health and Safety Cde (Califrnia Hazardus Waste Cntrl Law and the Resurce Cnservatin and Recvery Act authrizatins). Sils in DOE and NASA areas will be cleaned up under the respective AOCs, and Sils Remedial Actin Implementatin Plans (SRAIPs) will be prepared t describe their respective cleanup activities. PUBLIC OUTREACH Public Participatin activities in February 2017 included: On February 15, 2017, DTSC upladed and distributed the agenda fr the SSFL Cmmunity Advisry Grup meeting n February 15, Tpics included DOE EIS cntent analysis and respnses. Three dcuments were upladed t the website. 2 SSFL ACTIVITIES ANTICIPATED DURING MARCH 2017 DTSC NASA DOE DTSC s cntractr will cntinue wrk t develp the draft PEIR. DTSC wrked with sister agencies t review the Baseline Air Mnitring Wrk Plan, submitted jintly by all three respnsibly parties. DTSC submitted a cmpilatin f these cmments t the respnsible parties in a letter dated December 9, 2016, and anticipates meeting with the parties in March 2017 t discuss the cmments prir t submittal f the revised wrk plan. DTSC will review NASA s February 2017 revisin f the Sil Data Summary Reprt. It is anticipated that ur review will cnclude in March NASA will cntinue maintenance f strm water cntrls at active demlitin sites. Demlitin under their Phase 2 prgram shuld cnclude, and the Phase 3 remval f ancillary structures and buildings at Alfa, Brav, and Cca areas shuld cmmence. NASA demlitin activities are cnducted under Ventura Cunty authrity. NASA and DTSC will cntinue t evaluate data frm the Area f Impacted Grundwater (AIG) prgram and prepare the results f the investigatin fr release later in DTSC will review and cmment n NASA s September 2016 Sil Treatability Study Summary reprt. DOE and DTSC will cntinue t evaluate data generated frm recent investigatin activities. DTSC will cntinue t review the recently submitted draft Chemical Data Summary Reprt. DTSC will participate in the cnsultatin prcess between USEPA, DTSC, and DOE t determine the best available surce f backfill fr DOE s use at Area IV f SSFL. DTSC will review and cmment n DOE s Draft EIS. Page 10 f 14

11 Mnthly Status Reprt February 2017 BOEING SURFICIAL MEDIA INVESTIGATION Preparatin f the RFI summary reprts and Risk Assessment is nging fr all Being sites and subareas. RFI summary reprts and risk assessments will nw be submitted separately. Labratry analysis f sils frm within the Frmer Shting Range is n-ging. Once the data are received they will be evaluated t determine if additinal data cllectin is necessary r if the prject can mve n t the reprting phase. GROUNDWATER Faults DTSC is reviewing Being s revised, draft fault technical memrandum that includes the wrk cnducted since the submittal f the 2009 RI Grundwater reprt. Being grundwater characterizatin wrk in Area IV Evaluatin f the hydrlgic data fr surce znes is nging. STORMWATER MONITORING AND SAMPLING T cmply with Ls Angeles Reginal Water Quality Cntrl Bard requirements, Being will mnitr flw and cllect samples as needed during rain events. ISCO FIELD STUDY DTSC is reviewing the summary reprt. FEASIBILITY STUDY / CORRECTIVE MEASURES STUDY (CMS) Prgress n the Crrective Measures Study will prceed when further develpment f characterizatin data and screening f remedial technlgies are applied t site areas. SITEWIDE GROUNDWATER Each f the respnsible parties will cntinue their nging data evaluatin and develpment f reprt sectins fr the Sitewide Grundwater RFI Reprt. PUBLIC OUTREACH Anticipated Public Participatin activities in the next 30 days include: DTSC will pst this DTSC SSFL Mnthly Update Reprt fr March nline and add it t the What s New page. DTSC will invite cmmunity members t the next public meeting. Page 11 f 14

12 Mnthly Status Reprt February PROJECT OVERVIEW The SSFL is lcated 30 miles nrthwest f dwntwn Ls Angeles in sutheastern Ventura Cunty, near the crest f the Simi Hills at the western brder f the San Fernand Valley. A frmer rcket engine test and nuclear research facility, the 2,849-acre field labratry is currently the fcus f a cmprehensive envirnmental investigatin and cleanup prgram, cnducted by Being, DOE and NASA, and verseen by DTSC. Being wns and perates Area I, with the exceptin f the apprximately 41 acre frmer Liquid Oxygen (LOX) Plant area, and all f Areas III and IV. Areas I and III are perated by Being. Being als wns the apprximately 1,143 acre suthern buffer zne and 182 acre NBZ. NASA is respnsible fr cleanup and administratin f Area II and the frmer LOX Plant, but it is wned by the federal gvernment. Being wns and perates Area IV but DOE is respnsible fr cleanup f sils in Area IV and the NBZ. Figure 1 SSFL and Surrunding Area DOE DTSC and DOE participated in chemical sil sampling effrts in Area IV f the SSFL prperty where frmer DOE activities ccurred n the Site. Area IV is a 290-acre area lcated in the nrthwestern sectin f the site. DOE wns facilities n a 90-acre site within Area IV. Area IV includes the Energy Technlgy Engineering Center (ETEC) facility where nuclear research, develpment, and testing began in the 1950 s. Page 12 f 14

13 Mnthly Status Reprt February 2017 The Area IV radilgical sil sampling effrt, cnducted by the US EPA, was cmpleted in The US EPA apprached the investigatin by splitting the Area IV and NBZ investigatin int histrical site assessment (HSA) subareas. The chemical sil sampling effrts fllwed the same HSA subarea designatins. DOE and DTSC participated in Area IV and NBZ c-lcated sil sampling fr chemical cntaminants. DOE cmpleted the chemical sil characterizatin sampling in The sampling included three phases, as specified in the December 2010 AOC, signed by DTSC and DOE: Phase 1 - c-lcated sampling fr chemical analysis at US EPA s first phase f radilgical sampling lcatins in Area IV and the NBZ. Phase 2 - sampling at randmly selected sampling lcatins, and Phase 3 - identify the lcatins at the Site where insufficient chemical data exists (chemical data gaps) and sample as apprpriate. In 2012, the US EPA, in crdinatin with DTSC and DOE, cmpleted its secnd rund f sampling effrts t define the nature and extent f radilgic cntaminatin in Area IV. US EPA s rund tw sampling lcatins were based upn the validated sampling results they received frm their Phase 1 sampling. Nt all f US EPA s Rund 2 sample lcatins were sampled fr chemical cntaminants in 2012 and chemical data gap investigatin lcatins may have been required where n radilgical sampling was needed. In , the ratinale and selectin f chemical data gap investigatin sampling lcatins fr Area IV were prvided, discussed with the cmmunity, and implemented. The Area IV chemical data gap sampling is nw cmplete. The radinuclide and chemical results frm these investigatins are being used fr remediatin planning. A Draft Chemical Data Summary Reprt was submitted t DTSC n December 29, DOE Draft Envirnmental Impact Statement was issued t the public n January 6, DOE has cmpleted investigatins f grundwater surce areas at DOE sites in Area IV, with the gal f characterizing the nature and extent f cntaminant releases at these areas fr grundwater remedial planning. DOE s findings will be presented in a site-wide RCRA Facility Investigatin Reprt, which is anticipated t be submitted in NASA NASA has cncluded chemical data gap investigatins f sil and surficial media characterizatin at the 41.7-acre NASA administered prtin f Area I (the frmer LOX Plant), and 404-acre Area II. NASA Area II was used primarily fr rcket engine testing and includes the Alfa, Brav, Cca, frmer Delta Test Stands and supprt structures. Under the terms f the December 2010 AOC, NASA implemented six Field Sampling Plans (FSPs) t cmplete the AOC sil investigatins. Page 13 f 14

14 Mnthly Status Reprt February 2017 The five NASA surficial media FSPs include: FSP-1 - Alfa-Brav Fuel Farm, Cca-Delta Fuel Farm, Prpellant Lad Facility FSP-2 - Incineratr/Ash Pile/STP, Building 204, Strable Prpellant Area (SPA), and Skyline Rad FSP-3 - Alfa Test Stand, Brav Test Stand FSP-4 - LOX Plant, Area II Landfill, ELV FSP-5 - Cca Test Stand, frmer Delta Stand, R2 Pnds The sampling prpsed in the FSPs is cmplete, and DTSC is reviewing NASA s draft Data Summary Reprt fr sils characterizatin wrk in the NASA areas f the site. NASA is cnducting extensive investigatins f five majr grundwater surce areas at Area I LOX Plant and Area II, with the gal f characterizing the nature and extent f cntaminant releases at these areas fr grundwater remedial planning. BOEING Being wns mst f Area I and all f Areas III and IV. Areas I and Ill ttal 792 acres and are perated by Being. Being als wns the 1,143 acre suthern buffer zne and 182 acre NBZ. Sils in Area IV and the NBZ are being characterized in the DOE prtin f the prject. Being cntinues t investigate and characterize sils in Area I, Area III, and the suthern buffer zne. Since 2013, Being has been implementing wrk plans and wrk plan addenda prepared t address data gaps identified in the RFI Reprts submitted t date. DTSC anticipates these activities will cmplete the sil characterizatin f the Being sites in Being sites are lcated in Reprting Grups 1A, 1B, 5, 9 and 10. Being has rerganized the sites in subgrups identified as Being RFI Grups: 1A Nrth, 1A Central, 1A Suth 1B Nrth, 1B Suthwest, 1B Sutheast 5/9 Nrth, 5/9 Suth, and Grup 10 The prpsed sampling is substantially cmplete, and Being has begun submitting data summary reprts fr DTSC review. Being is cnducting investigatins f grundwater surce areas at Being sites in Area I and Area III, with the gal f characterizing the nature and extent f cntaminant releases at these areas fr grundwater remedial planning. Additinal Infrmatin can be fund n DTSC's website at: Page 14 f 14

Santa Susana Field Laboratory Monthly Status Report September 2016

Santa Susana Field Laboratory Monthly Status Report September 2016 Santa Susana Field Labratry Mnthly Status Reprt September 2016 This mnthly update is t infrm the cmmunity abut Santa Susana Field Labratry (SSFL) investigatin and cleanup activities that ccurred in September

More information

Santa Susana Field Laboratory Monthly Status Report April 2017

Santa Susana Field Laboratory Monthly Status Report April 2017 Mnthly Status Reprt April 2017 Santa Susana Field Labratry Mnthly Status Reprt April 2017 This mnthly update is t infrm the cmmunity abut Santa Susana Field Labratry (SSFL) investigatin and cleanup activities

More information

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS The Cre Team Prcess: Making Risk-Infrmed Decisins fr On-site Mnitring at the SRS Mary A. Flra Directr, Envirnmental Cmpliance & Area Cmpletin Prjects Savannah River Nuclear Slutins, LLC January 10, 2014

More information

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin

More information

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley)

Summary AB 1739 (Dickinson), SB 1168 (Pavley) and SB 1319 (Pavley) Summary AB 1739 (Dickinsn), SB 1168 (Pavley) and SB 1319 (Pavley) The Sustainable Grundwater Management Act empwers lcal agencies t manage grundwater basins in a sustainable manner ver a lng-term hrizn.

More information

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report Lndn BRT Transit Prject Assessment Prcess Draft Envirnmental Prject Reprt Table f Cntents 6 Permits and Apprvals... 6-1 Federal... 6-2 Prvincial... 6-2 Municipal... 6-3 Utilities... 6-3 Institutins...

More information

Instructions for Conducting Sampling During Underground Storage Tank Closure

Instructions for Conducting Sampling During Underground Storage Tank Closure Instructins fr Cnducting Sampling During Undergrund Strage Tank Clsure Permitting and Cmpliance Assistance Prgram Divisin f Waste Management Flrida Department f Envirnmental Prtectin April 2016 [Incrprated

More information

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2 Flaw indicatins in the reactr pressure vessels f Del 3 and Tihange 2 1. Cntext Technical infrmatin nte 2013.02.01 Del 3 and Tihange 2 are tw f the seven Belgian nuclear reactrs perated by Electrabel, a

More information

Kootenai River Restoration Master Plan: Master Plan Overview

Kootenai River Restoration Master Plan: Master Plan Overview Ktenai River Restratin Master Plan: Master Plan Overview Ktenai River Restratin Prject #200200200 Restre Natural Recruitment Ktenai River White Sturgen Prject Overview In late 2006, the KTOI received prject

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

STUDENT INFORMATION GUIDE BSB51315 Diploma of Work Health and Safety

STUDENT INFORMATION GUIDE BSB51315 Diploma of Work Health and Safety STUDENT INFORMATION GUIDE Abut Future Skills Future Skills is an industry wned and perated registered training rganisatin, specialising in pst trade electrical and wrk health and safety training in Queensland

More information

Section 8 Implementation and Monitoring Plans

Section 8 Implementation and Monitoring Plans Sectin 8 Implementatin and Mnitring Plans This sectin describes the prpsed implementatin plan, the mnitring required under the cntinuatin f the existing SJBGFMP, and the implementatin f the recmmended

More information

MEETING SUMMARY. Remand Stakeholder Engagement (RSE) Process Kickoff Meeting for Invited Stakeholders

MEETING SUMMARY. Remand Stakeholder Engagement (RSE) Process Kickoff Meeting for Invited Stakeholders MEETING SUMMARY Remand Stakehlder Engagement (RSE) Prcess Kickff Meeting fr Invited Stakehlders September 7, 2012, 1:00 3:00 p.m. Sheratn Grand Htel 1230 J Street, Sacrament, CA Gardenia Rm Attendees:

More information

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA What we are trying t achieve BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA This strategy sets ut hw Birmingham City Cuncil will prvide regular cmprehensive releases f public pen data and hw it will use

More information

February 14, Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324

February 14, Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 February 14, 2012 Burt Fleischer, R.E.A., R.E.P. Directr, Envirnmental Affairs Hilmar Cheese Cmpany 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Lwer Aquifer Data Gap Prgress Reprt #1 Hilmar Cheese

More information

O c t o b e r 1 0 th,

O c t o b e r 1 0 th, Oil and Gas Study Octber 10 th, 2011 Agenda 1. Intrductins 2. Shale gas extractin and resurces in NC 3. Prcess f the DENR il and gas study 4. Public input pprtunities 5. Prpsed utline fr the il and gas

More information

Gainesville Regional Transit System Rapid Transit Study. Public Involvement Plan

Gainesville Regional Transit System Rapid Transit Study. Public Involvement Plan Gainesville Reginal Transit System Rapid Transit Study Public Invlvement Plan Prepared fr: Gainesville Reginal Transit System P.O. Bx 490, Statin 4 Gainesville, FL 32602 ph (352) 334-2609, fax (352) 334-2607

More information

Three priority issues have been identified. They are supported by joint projects presented in more detail online at

Three priority issues have been identified. They are supported by joint projects presented in more detail online at JOINT PROJECTS FOCUSED ON THREE ISSUES Under the St. Lawrence Actin Plan 2011 2026, the gvernments f Canada and Quebec cntinue t wrk tgether by pling their expertise and their resurces t prtect and enhance

More information

o Mitigation measures are required to be identified. Soil

o Mitigation measures are required to be identified. Soil Mitigatin measures are required t be identified. Sil Pllutin f sil due t handling, use and strage f hazardus substances during cnstructin and peratin. The lss f available tp sil. Mitigatin measures are

More information

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION INTRODUCTION As stipulated in Sectin 21002.1(a) f the CEQA Statutes (Public Resurces Cde): The purpse f an envirnmental impact reprt is t identify the

More information

Purpose. Contaminated Materials. Contaminated Materials Management Team (CMMT) Contacts

Purpose. Contaminated Materials. Contaminated Materials Management Team (CMMT) Contacts Cntaminated Materials Cntaminated Materials Management Team (CMMT) Cntacts Michelle Waters Districts 2, 4, Metr West (651) 366-3627 michelle.waters@state.mn.us Carlyn Bben - Districts 1, 3, Metr Nrth &

More information

MARINE CONSENTS GUIDANCE

MARINE CONSENTS GUIDANCE MARINE CONSENTS GUIDANCE FEBRUARY 2008 CONTROLLED DOCUMENT STATUS PROJECT TITLE DOCUMENT TITLE DOCUMENT REF BR Marine Cnsents Guide.dc REVISION RECORD STATUS DATE SUMMARY OF CHANGES CHECKED APPROVED 0

More information

PS ACID SULPHATE MATERIALS

PS ACID SULPHATE MATERIALS PS ACID SULPHATE MATERIALS PURPOSE AND SCOPE The purpse f this primary standard is t eliminate r minimise risk f envirnmental harm caused by acid sulphate materials including acid sulphate sils and acid

More information

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure Ls Angeles Unified Schl District Office f Envirnmental Health & Safety Tree Trimming and Remval Prcedure I. Purpse This Tree Trimming and Remval Prcedure (Prcedure) was develped t ensure the District is

More information

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria. Memrandum T: Bassett Creek Watershed Management Cmmissin Frm: Barr Engineering C. Subject: Item 6Dii Cnsider Apprval f Prpsal t Prepare Feasibility Study fr Westwd Lake Water Quality Imprvement Prject

More information

STAFF REPORT. Peter Zielsdorf

STAFF REPORT. Peter Zielsdorf STAFF REPORT Applicatin: Cnstruct a new septic drainfield t replace the existing drainfield apprximately 64 feet frm Mink Lake (min. 75 ft required). Applicant: Agenda Item: 4(a) Peter Zielsdrf Backgrund

More information

VEHICLE MILES TRAVELED (VMT)

VEHICLE MILES TRAVELED (VMT) DATE: April 13, 2017 TO: FROM: RE: San Francisc Planning Department Transprtatin Cnsultants Wade Wietgrefe, Senir Planner In September 2016, a memrandum was sent t the transprtatin cnsultant pl regarding

More information

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report March 6, 2018 Ministry f the Envirnment 70 Fster Drive, Suite 110 Sault Ste. Marie, ON P6A 6V4 ATTENTION: Safe Drinking Water Branch RE: ELLIOT LAKE Wastewater Treatment Plant Annual Perfrmance Reprt -

More information

Copies: Lisa Kellogg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh

Copies: Lisa Kellogg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh MEMO T: Yvnne Meeks/PG&E Cpies: Lisa Kellgg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh ARCADIS U.S., Inc. 100 Mntgmery Street Suite 300 San Francisc Califrnia 94104 Tel 415 374

More information

ENVIRONMENTAL POLICY

ENVIRONMENTAL POLICY ENVIRONMENTAL POLICY Pride Pint, Ashcrft Rad, Knwsley Industrial Park Nrth, Liverpl, L33 7TW Tel: 0151 546 9995 Fax: 0151 546 9996 Email: freddy.peacck@acnw.uk.cm REVIEWED BY THE MANAGING DIRECTOR 1 Envirnmental

More information

Renewable Energy & Eastern Oregon Landscape Conservation Partnership (aka Sagebrush Conservation Partnership ) Declaration of Cooperation

Renewable Energy & Eastern Oregon Landscape Conservation Partnership (aka Sagebrush Conservation Partnership ) Declaration of Cooperation Renewable Energy & Eastern Oregn Landscape Cnservatin Partnership (aka Sagebrush Cnservatin Partnership ) Declaratin f Cperatin Preamble The State f Oregn has adpted laws fr cnservatin, renewable energy

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

Pollution Prevention in Enforcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Information for companies-

Pollution Prevention in Enforcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Information for companies- January 1998 Number 61 Pllutin Preventin in Enfrcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Infrmatin fr cmpanies- Many cmpanies are realizing substantial envirnmental and

More information

DRAFT. Southern Rail Corridor

DRAFT. Southern Rail Corridor DRAFT PURPOSE AND NEED STATEMENT Suthern Rail Crridr Feasibility and Alternatives Analysis Study Prepared fr: Prepared by: June 2012 Kimley-Hrn and Assciates, Inc. 160519013 Suthern Rail Crridr Draft Purpse

More information

Purpose The purpose of this Standard Operating Procedure (SOP) is to define the scope of the Human Research Protection Program (HRPP).

Purpose The purpose of this Standard Operating Procedure (SOP) is to define the scope of the Human Research Protection Program (HRPP). MISSISSIPPI STATE UNIVERSITY HUMAN RESEARCH PROTECTION PROGRAM Scpe f the Human Research Prtectin Prgram (01-28) Apprved 11.24.2015 Purpse The purpse f this Standard Operating Prcedure (SOP) is t define

More information

PFAS PRELIMINARY INVESTIGATION

PFAS PRELIMINARY INVESTIGATION PRELIMINARY INVESTIGATION July 2018 PRELIMINARY INVESTIGATION What is? Per-and Ply-fluralkyl Substances () are a grup f man-made chemicals that have been widely used since the 1950s in husehld and industrial

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report UNC Request Wrkgrup Reprt At what stage is this dcument in the prcess? UNC 0594R: Meter Reading Submissin fr Advanced & Smart Metering The rllut f Advanced and Smart Metering delivers the pprtunity t utilise

More information

Project: Sydney Metro - Utility in stigations, Application Title:

Project: Sydney Metro - Utility in stigations, Application Title: Sydney Metr Integrated Management System (IMS) (Uncntrlled when printed) Iv' sydney METRO Pre-Cnstructin Minr Wrks Apprval Frm Minr Wrks are defined as any lw impact activities that are undertaken prir

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

City of Vancouver Planning By-law Administration Bulletins

City of Vancouver Planning By-law Administration Bulletins City f Vancuver Planning By-law Administratin Bulletins Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax: 604.873.7100

More information

BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending

BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending Hlanga Sand Mining (Pty) Ltd SAND MINING APPLICATION Tugela River (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT DMR REFERENCE: Pending BACKGROUND INFORMATION An applicatin has been submitted t the Department

More information

Water Regulation through to 2021 and beyond

Water Regulation through to 2021 and beyond Water Regulatin thrugh t 2021 and beynd Sheenagh Rney Directr f Water Regulatin Cmmissin fr Regulatin f Utilities (CRU) WWT Water Ireland Cnference 25 April 2018 Presentatin Overview The CRU Irish Water

More information

M&E & Special Studies Quarterly Progress Report: July 2013 to September Summary Information. Executing Agency(ies)

M&E & Special Studies Quarterly Progress Report: July 2013 to September Summary Information. Executing Agency(ies) M&E & Special Studies Quarterly Prgress Reprt: July 2013 t September 2013 Summary Infrmatin Status Activity Number Task Team Leader(s) Executing Agency(ies) Start date t Clsing Date Gegraphic Cverage Active

More information

Meeting Agenda Project Management and Oversight Subcommittee (PMOS)

Meeting Agenda Project Management and Oversight Subcommittee (PMOS) Meeting Agenda Prject Management and Oversight Subcmmittee (PMOS) March 6, 2013 1:00 p.m. 5:00 p.m. Muntain Hyatt Regency Albuquerque Fiesta 3-4 Rm 330 Tijeras Avenue NW Albuquerque, NM 87102 Intrductins

More information

Bruce A and B 2018 Licence Renewal

Bruce A and B 2018 Licence Renewal Bruce A and B 2018 Licence Renewal Cmmissin Hearing (Part 2) May 28-31, 2018 CNSC Staff Presentatin e-dc 5485824 (PPT) e-dc 5539758 (PDF) nuclearsafety.gc.ca Presentatin Outline Backgrund Purpse f Hearing

More information

Southwestern Region 3 Carson National Forest Jicarilla Ranger District

Southwestern Region 3 Carson National Forest Jicarilla Ranger District United States Department f Agriculture Frest Service Suthwestern Regin 3 Carsn Natinal Frest Jicarilla Ranger District 664 East Bradway Blmfield, New Mexic 87413 (505) 632-2956 FAX (505) 632-3173 File

More information

Malibu Schools Alignment Project & CEQA Review. Community Meeting October 9, 2018

Malibu Schools Alignment Project & CEQA Review. Community Meeting October 9, 2018 Malibu Schls Alignment Prject & CEQA Review Cmmunity Meeting Octber 9, 2018 Agenda 1. Intrductin 2. CEQA Purpses & Prcess 3. Prject Descriptin 4. Schedule 5. CEQA Findings 6. Public Participatin 7. Q &

More information

A method of securing cellular services information is being implemented under the

A method of securing cellular services information is being implemented under the Cellular Telephne Service Descriptin The Cellular Telephne service plan prvides cellular telephne service and equipment frm a number f cellular telephne service prviders. The plan is intended t cver the

More information

Centennial Management System

Centennial Management System Identificatin number: 0206500_CP_11_02_en_2.0 Centennial Management System Shrt descriptin The Centennial HSEQ Management and Respnsibility sectin gverns the requirements fr rganizatinal supprt and implementatin

More information

Cadiz Valley Water Conservation, Recovery and Storage Project. OVERVIEW & UPDATE August 2011

Cadiz Valley Water Conservation, Recovery and Storage Project. OVERVIEW & UPDATE August 2011 Cadiz Valley Water Cnservatin, Recvery and Strage Prject OVERVIEW & UPDATE August 2011 The Cadiz Valley Water Resurce 1,300 sq. mile watershed Apprximately 20 millin acre-feet (AF) f water undergrund.

More information

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

TG 19 SOUTH AUSTRALIAN WATER CORPORATION TG 19 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Water Netwrk Requirements fr Land Develpment Applicatins Issued by: Principal Engineer Water & Wastewater Netwrks Issue Date: SA

More information

PREMIER GOLD MINES HARDROCK INC. HARDROCK PROJECT TERMS OF REFERENCE. Appendix D: Consultation Plan for the Environmental Assessment

PREMIER GOLD MINES HARDROCK INC. HARDROCK PROJECT TERMS OF REFERENCE. Appendix D: Consultation Plan for the Environmental Assessment Appendix D: Cnsultatin Plan fr the Envirnmental Assessment Appendix D Cnsultatin Plan fr the Envirnmental Assessment D.1 INTRODUCTION Premier recgnizes the imprtance f cnsultatin with stakehlders (cmmunity

More information

Operator Certification Program Proposed Draft ORO/OIC Guideline. Wastewater Practitioners Group Meeting November 29, 2017

Operator Certification Program Proposed Draft ORO/OIC Guideline. Wastewater Practitioners Group Meeting November 29, 2017 Operatr Certificatin Prgram Prpsed Draft ORO/OIC Guideline Wastewater Practitiners Grup Meeting Nvember 29, 2017 Tday s Tpic Overall Respnsible Operatr (ORO) and Operatr-in-Charge (OIC) Updating the Guideline

More information

Public record pursuant to s39(l) of the Environmental Protection Act 1986

Public record pursuant to s39(l) of the Environmental Protection Act 1986 Envirnmental Prtectin Authrity GOVERNMENT OF WESTERN AUSTRALIA Public recrd pursuant t s39(l) f the Envirnmental Prtectin Act 1986 Prpsal Title: Prpsal Lcatin: Case Number: CMS 15314 Lt 383, Cttesle Date

More information

Federal Wetland Jurisdiction

Federal Wetland Jurisdiction Federal Wetland Jurisdictin Tri White Deputy Chief, Regulatry Divisin USACE, Jacksnville District July 24, 2014 US US Army Army Crps Crps f f Engineers Engineers BUILDING BUILDING STRONG STRONG Bttm Line

More information

Table of Contents. Section 1 - I am a Manager in an ETB, how will the ESBS affect me & what do I need to know?

Table of Contents. Section 1 - I am a Manager in an ETB, how will the ESBS affect me & what do I need to know? ESBS ETB Payrll Shared Services FREQUENTLY ASKED QUESTIONS Nvember 2018 Table f Cntents Sectin 1 - I am a Manager in an ETB, hw will the ESBS affect me & what d I need t knw? 1.1. What are the risks assciated

More information

PEPA CHECKLIST FOR WASTE MANAGEMENT INFRASTRUCTURE TO ASSESS THE STATUS OF PLANNING/PROGRAMMING OF THE PROJECT PIPELINE

PEPA CHECKLIST FOR WASTE MANAGEMENT INFRASTRUCTURE TO ASSESS THE STATUS OF PLANNING/PROGRAMMING OF THE PROJECT PIPELINE _ PEPA CHECKLIST FOR WASTE MAAGEMET IFRASTRUCTURE TO ASSESS THE STATUS OF PLAIG/PROGRAMMIG OF THE PROJECT PIPELIE te: The starting pint fr an accessin-driven envirnmental investment prgramme is a systematic

More information

Research Officer / Data Analyst

Research Officer / Data Analyst Psitin Descriptin Research Officer / Data Analyst Psitin details POSITION TITLE TEAM / UNIT BASE LOCATION EMPLOYMENT TYPE HOURS SALARY RANGE REPORTS TO Research Officer / Data Analyst Lirata Cnsulting

More information

New Product Approval Process

New Product Approval Process New Prduct Apprval Prcess 1. Scpe T prvide an assessment f the suitability f a new prduct fr prcurement and use by Manitba Infrastructure (MI). Manitba Infrastructure may require updates, resubmissin f

More information

Centennial Management System

Centennial Management System Shrt descriptin The Centennial HSEQ Management and Respnsibility sectin gverns the requirements fr rganizatinal supprt and implementatin f the HSEQ management system and describes the prcess fr auditing

More information

The proposed AlloyStream Manganese Project at Metalloys, Samancor Meyerton Works. Reference Number: GAUT 002/07-08/N0553

The proposed AlloyStream Manganese Project at Metalloys, Samancor Meyerton Works. Reference Number: GAUT 002/07-08/N0553 Aim f the Prject The prpsed AllyStream Manganese Prject at Metallys, Samancr Meyertn Wrks. Reference Number: GAUT 002/07-08/N0553 The prpnent applying fr the Envirnmental Impact Assessment (EIA) authrisatin

More information

ESH Standard Corporate. VA Lockout/Tagout

ESH Standard Corporate. VA Lockout/Tagout Page 1/5 Lckut/Tagut 1 Objective 2 Scpe 3 Validity 4 Definitin f terms Lckut/tagut (LOTO) is an essential safety-regulatin fr the wrk n r arund equipment with the gal f reducing any hazards t emplyees

More information

Marketing Research: Process and Systems for Decision Making

Marketing Research: Process and Systems for Decision Making Chapter 2 Marketing Research: Prcess and Systems fr Decisin Making High-Level Chapter Outline I. The Rle f Marketing Research II. The Marketing Research Prcess A. Purpse f the Research B. Plan f the Research

More information

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number:

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number: www.dt.state.pa.us Request fr Qutes PennDOT Leadership Academy fr Managers (PLAM) Slicitatin Number: 6100041372 Curse Title: Curse Date(s) & Lcatins: PennDOT Leadership Academy fr Managers (PLAM) This

More information

POWERBUTTE WORKSHOP BOARD OF SUPERVISORS AUGUST 25, 2015 SOLAR OVERLAY ZONE

POWERBUTTE WORKSHOP BOARD OF SUPERVISORS AUGUST 25, 2015 SOLAR OVERLAY ZONE POWERBUTTE WORKSHOP BOARD OF SUPERVISORS AUGUST 25, 2015 SOLAR OVERLAY ZONE PwerButte: Slar Overlay hamim Mhamed A Place Fr Clean Energy Presentatin Overview Intrductin Cntext Slar Overlay Gals and Prcess

More information

Interstate 91 Viaduct Study MassDOT Contract No Public Involvement Plan

Interstate 91 Viaduct Study MassDOT Contract No Public Involvement Plan Interstate 91 Viaduct Study MassDOT Cntract N. 82617 Public Invlvement Plan Prject Overview and Gals The prtin f Interstate 91 (I-91) between State Street and the interchange with I-291 parallels the Cnnecticut

More information

Project 12: Environmentally Sound Management of Selected End-of-Life Vehicle Batteries, Including Spent Lead-Acid Batteries (SLABs), in North America

Project 12: Environmentally Sound Management of Selected End-of-Life Vehicle Batteries, Including Spent Lead-Acid Batteries (SLABs), in North America Prject 12: Envirnmentally Sund Management f Selected End-f-Life Vehicle Batteries, Including Spent Lead-Acid Batteries (SLABs), in Nrth America Operating Year(s): 2013 2014 Planned Budget fr tw years:

More information

Malibu Schools Alignment Project & CEQA Review. Board Meeting November 1, 2018

Malibu Schools Alignment Project & CEQA Review. Board Meeting November 1, 2018 Malibu Schls Alignment Prject & CEQA Review Bard Meeting Nvember 1, 2018 Agenda 1. Intrductin 2. CEQA Purpses & Prcess 3. Prject Descriptin 4. Schedule 5. CEQA Findings 6. Public Participatin 7. Requested

More information

STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS

STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS RE: GREEN MOUNTAIN CENTER ) DISTRICT ENVIRONMENTAL RANDOLPH, VT ) COMMISSION # 3 ) ) APPLICATION #3R1089 ) ) September 11, 2015 COMMENTS This revised

More information

TOPIC: Outcome of Grain and Plant Products Export Industry Consultative Committee Meeting 21 February 2018

TOPIC: Outcome of Grain and Plant Products Export Industry Consultative Committee Meeting 21 February 2018 Ntice 06 f 2018 13th March 2018 TOPIC: Outcme f Grain and Plant Prducts Exprt Industry Cnsultative Cmmittee Meeting 21 February 2018 DISTRIBUTION: GTA Members primary cntact list. Please circulate t all

More information

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other Purchasing Plicy N. 3 Exhibit 1, Page 1 f 2 X CONTRACT OPPORTUNITY ANNOUNCEMENT Prfessinal Service Cntract Cnstructin Cntract Service Cntract Material Requirement Other Cntract Opprtunity Title: Overall

More information

The purpose of IPRO 304 is to create a software package to assist A. Finkl & Sons in tracking of parts in heat treatment furnaces.

The purpose of IPRO 304 is to create a software package to assist A. Finkl & Sons in tracking of parts in heat treatment furnaces. Prject Plan Reprt: Heat Treat Subgrup 1.0 Objective The purpse f IPRO 304 is t create a sftware package t assist A. Finkl & Sns in tracking f parts in heat treatment furnaces. Objective fr Spring 2008:

More information

Fort McMurray Burned and Unburned Soil Samples

Fort McMurray Burned and Unburned Soil Samples Frt McMurray Burned and Unburned Sil Samples The analysis in this dcument was cnducted using publically available test results frm sil samples cllected in the weeks fllwing the Frt McMurray wildfire. These

More information

FINAL SITE MITIGATION PLAN BAYVIEW GATEWAY PARK PROJECT SAN FRANCISCO, CALIFORNIA

FINAL SITE MITIGATION PLAN BAYVIEW GATEWAY PARK PROJECT SAN FRANCISCO, CALIFORNIA FINAL SITE MITIGATION PLAN BAYVIEW GATEWAY PARK PROJECT SAN FRANCISCO, CALIFORNIA PREPARED FOR PORT OF SAN FRANCISCO OCTOBER 2013 SUBMITTED BY AEW ENGINEERING, INC. 55 NEW MONTGOMERY STREET, SUITE 722

More information

Emerald Ash Borer in St. Louis A Strategy for Treatment, Removals, and Replanting

Emerald Ash Borer in St. Louis A Strategy for Treatment, Removals, and Replanting Emerald Ash Brer in St. Luis A Strategy fr Treatment, Remvals, and Replanting Frestry Divisin - City f St. Luis June 12, 2016 Infrmatin available at: www.stluis-m.gv/ash-brer/ Intrductin: St. Luis has

More information

Malibu Civic Center Stakeholders Meeting. January 29, 2015 Malibu City Hall 8:30 a.m.

Malibu Civic Center Stakeholders Meeting. January 29, 2015 Malibu City Hall 8:30 a.m. Malibu Civic Center Stakehlders Meeting January 29, 2015 Malibu City Hall 8:30 a.m. Meeting Agenda Reginal Water Quality Cntrl Bard Cmmunity Facilities District (CFD) Outreach Meetings/Presentatins Assessment

More information

July 2013 and Paralympic games 2012 Policy 0.2 Title change and tracked changes removed

July 2013 and Paralympic games 2012 Policy 0.2 Title change and tracked changes removed EAST f ENGLAND AMBULANCE SERVICE NHS TRUST Dcument title First Draft Authrs: Additinal authrs/cntributrs: Jint Cllective Agreement: HR Respnse t Majr Organisatinal Change Tracey Leghrn, Barry Jarvis Ann

More information

Panel Project Solicitation

Panel Project Solicitation Panel Prject Slicitatin April 4, 2016 BUSINESS PROCESSES ELECTRICAL TECHNOLOGIES ENVIRONMENTAL INFORMATION TECHNOLOGIES PLANNING, PRODUCTION PROCESSES & FACILITIES RISK MANAGEMENT SHIP DESIGN & MATERIAL

More information

Principle and Procedure of Analytical Test Method Validation for GMP Regulated Industry

Principle and Procedure of Analytical Test Method Validation for GMP Regulated Industry Principle and Prcedure f Analytical Test Methd Validatin fr GMP Regulated Industry Regulatry Basis: FDA Quality Systems Regulatins Reference: FDA CFR - Cde f Federal Regulatins Title 21 Purpse The purpse

More information

Facilities Study Report

Facilities Study Report Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager

More information

EICC s New Strategy IMPLEMENTATION PROPOSAL

EICC s New Strategy IMPLEMENTATION PROPOSAL EICC s New Strategy IMPLEMENTATION PROPOSAL 1 Backgrund 2012: EICC apprved new gvernance and accuntability mdel 2013: Implemented gvernance & accuntability mdel. Began strategic planning Hired FSG t develp

More information

Solid Non-Hazardous Waste Disposal Site Inspection Report

Solid Non-Hazardous Waste Disposal Site Inspection Report Slid Nn-Hazardus Waste Dispsal Site Inspectin Rep Ministry f the Envirnment and Climate Change Ministère de l Envirnnement et de l Actin en matière de changement climatique Slid Nn-Hazardus Waste Dispsal

More information

Communications White Paper

Communications White Paper Intrductin The quality and effectiveness f the cmmunicatin between the prject and the stakehlder grups is a significant cntributing factr t prject success r failure. Cmmunicatin is abut sending and receiving

More information

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors Career Entry and Develpment Prfile Cmpanin Guide A Guide fr ITT Tutrs and Inductin Tutrs Intrductin Wh is the cmpanin guide fr? This guide is fr initial teacher training (ITT) tutrs wrking with trainees/teachers,

More information

Frequently asked questions:

Frequently asked questions: Frequently asked questins: Standardized pre/pst surveys fr grw grant results Versin 2.0 May 10, 2017 Cntents HelpDesk Cntact Infrmatin... 2 General Questins... 2 Why is OTF using these surveys?... 2 Wh

More information

WORK PLAN FOR PILOT PROJECT

WORK PLAN FOR PILOT PROJECT WORK PLAN FOR PILOT PROJECT Ensuring Minimum Wages in Field Prductin PO3 Purpse: Objective: Outcme: Output: T ensure minimum wage payments t seed prductin wrkers n the Syngenta supplying farms as a step

More information

Lacombe County. Communications Plan

Lacombe County. Communications Plan Lacmbe Cunty Cmmunicatins Plan 2016-2018 Cntents... 1 EXECUTIVE SUMMARY... 3 THE COMMUNICATIONS PROCESS... 3 BACKGROUND... 3 CURRENT STATUS... 4 Crprate Identity... 4 Cunty News... 4 Graphic Design...

More information

COMPREHENSIVE PACKAGE AGREEMENT 30 AUGUST 2017

COMPREHENSIVE PACKAGE AGREEMENT 30 AUGUST 2017 Annex 21: Cmprehensive Package Agreement f 30 August 2017 COMPREHENSIVE PACKAGE AGREEMENT 30 AUGUST 2017 Western Bundary: The western bundary (Segment A1) is a bundary fr the cntinental shelf regime nly.

More information

Opportunities for Potable Reuse in the Livermore-Amador Valley

Opportunities for Potable Reuse in the Livermore-Amador Valley Image Surce: Australian Academy f Technlgical Sciences and Engineering (ATSE) Opprtunities fr Ptable Reuse in the Livermre-Amadr Valley Brad Ledesma Assciate Engineer Integrated Planning What is Zne 7?

More information

Project Tracker Implementation Plan

Project Tracker Implementation Plan Prject Tracker Implementatin Plan Transprtatin Planning and Prgramming Divisin March 1, 2018 INTRODUCTION The (TxDOT) is cmmitted t cntinuusly imprve custmer service, transparency and accuntability. One

More information

Malibu Civic Center Stakeholders Meeting. March 26, 2015 Malibu City Hall 8:30 a.m.

Malibu Civic Center Stakeholders Meeting. March 26, 2015 Malibu City Hall 8:30 a.m. Malibu Civic Center Stakehlders Meeting March 26, 2015 Malibu City Hall 8:30 a.m. Meeting Agenda Reginal Water Quality Cntrl Bard Cmmunity Facilities District (CFD) Outreach Meetings/Presentatins Assessment

More information

Initial Draft: National Water Resources Policy for the Fiji Islands

Initial Draft: National Water Resources Policy for the Fiji Islands Appendix 2: Water plicy draft Initial Draft: Natinal Water Resurces Plicy fr the Fiji Islands Backgrund and scpe f plicy This plicy has been develped in recgnitin f the increasing threats and cmpeting

More information

Working Families Success Network in Community Colleges Definitions and Expected Design Elements

Working Families Success Network in Community Colleges Definitions and Expected Design Elements Wrking Families Success Netwrk in Cmmunity Clleges Definitins and Expected Design Elements Cre Prgram and Service Delivery Elements Clleges shuld prvide services in each f the three WFSNCC cre pillars:

More information

Manufacturing Sustainably Isn t Just a Goal. At Aurora, It s an Ongoing, Daily Focus.

Manufacturing Sustainably Isn t Just a Goal. At Aurora, It s an Ongoing, Daily Focus. Manufacturing Sustainably Isn t Just a Gal. At Aurra, It s an Onging, Daily Fcus. Here at Aurra, we care abut the envirnment and believe that wise, thughtful use f resurces isn t just imprtant, but is

More information

Request for Qualifications

Request for Qualifications Request fr Qualificatins Writer and Cpy Editr Cnsultant RELEASE DATE» December 2018 1 Table f Cntents Intrductin... 2 Abut PetrLMI... 2 Prject Backgrund, Objectives and Scpe... 3 Cnsultant Selectin Prcess...

More information