1 Primary Faculty Advisor: Prof. Bahnfleth December 5, 2003 Mechanical Systems Proposal:

2 Executive Summary: My senior thesis redesign will focus on the mechanical aspects of1919 M St is an 8-story, 265,000 sq.ft. multi-use office space located in the heart of downtown Washington, DC. The mechanical redesign of 1919 M St.will incorporate a thermal storage system. The ice storage takes advantage of the lower electrical rates during the night hours to produce ice in large tanks. This ice will be used to cool the building during the day, therefore, lowering the total electrical costs. My goals for installing the ice storage system are mainly to decrease the total electrical load placed on the building by the existing cooling system. In addition to decreasing the operating costs, I will attempt to lower the first costs of the building by supplying lower temperature air to the spaces and decreasing the duct size. I anticipate these measures will be able to lower the costs even with the high costs of the tanks. In addition to the in-depth mechanical analysis, I will look into a redesign of the electrical and structural systems. By using a thermal storage system, the existing mechanical equipment, including the chillers and cooling towers, will need to be resized leading to a change in the electrical supply. When the ice tanks in a thermal storage system are full, they produce a very large load on whatever surface they are placed. If the tanks are then placed on the roof, I must look into redesigning the current system to ensure it can handle the load. 2 of 9

3 I. Background: 1919 M St is an 8-story, 265,000 sq.ft. multi-use office space located in downtown Washington, DC. Four 13,000 cfm units serve the south end of the building while four 15,000 cfm units serve the north end -- two on each floor. The AHUs will in turn serve a VAV system that distributes air throughout the spaces. The VAVs utilize electric resistance coils to heat the air entering the spaces. Two 320-ton chillers, located in the mechanical penthouse, serve the building s cooling needs. Also, located on the roof is a 2400 gpm cooling tower. When specific conditions are met, 1919 utilizes waterside free cooling in order to save energy costs. The exclusive power supply for 1919 is electricity provided by PEPCO. The indoor conditions are designed to maintain 74 o DBT and 50% RH. The outdoor design conditions, 95 o DBT and 76.5 o WBT during the summer and 34 o DBT during the winter, are taken from ASHRAE Handbook of Fundamentals 2002 (.4%). The construction of 1919 M St. provided a very unique feature to the design process. The original building on the site was completely demolished to the structural concrete system and was fully renovated. The small spaces and layouts inherent in the existing structure proved to be a challenge for the design engineers. A problem associated with the original system was the very small floor-to-floor heights. This floor-to-floor height is on average 10-1, making the design very difficult. In several locations, the ducts require the entire plenum depth, making the layout of other systems more complex. II. The Problem: After conducting several analyses on the performance of 1919 M St. during the previous 4 tech assignments, the analyses have demonstrated that 1919 M St. is a very efficient, well-designed building. Through previous tests, it has been shown that 1919 M St. is energy efficient and greener than average similar office buildings. Its superior energy efficiency has enabled 1919 to receive an Energy Star. In addition, both the building envelope and lighting density pass the ASHRAE Standard 90.1 requirements. Although 1919 is very energy efficient, it is located in Washington DC, a very high-priced area. As a result, any additional savings in energy would be a major advantage for the owner. Due to the site requirements imposed by the existing structural system, another problem the building faces is the very limited floor-to-floor space in which the engineers had to work. 3 of 9

4 III. Redesign Alternatives: When deciding on a mechanical alternative for 1919 M St., several options were studied. After some research, the possibilities were narrowed down to two different methods--underfloor Air Distribution and Thermal Storage. 1. Underfloor Air Distribution: In an average office building with high turnover rates, underfloor air distribution (UAD) is an excellent system. An underfloor system delivers approximately 65 o air into the space through the diffusers in the floor. As the air mixes with the room air, the temperature begins to increase and rise to the ceiling due to convection forces. Along with the warmer air, particulates and pollutants are also forced to the ceiling. They are then removed from the space via the return air ducts, leaving cleaner more comfortable air around the occupant s level. Research has shown that by using a UAD system, occupant comfort and indoor air quality are improved. (Courtesy of York Modular Integrated Terminals) One reason the life cycle costs are much lower compared to a typical overhead system is because the system can be maintained with minimal changes when tenants renovate their spaces. In addition to the lower life cycles costs, the first costs are also lower. Without the need for supply ducts in the ceiling, both material and labor costs are reduced. Now to the negatives. Due to the extremely small floor-to-floor heights of 1919, it might prove to be very difficult to incorporate a raised floor, a ducted return and a suspended lighting scheme without creating a claustrophobic effect. Research has shown that a minimum of 8 is required to properly run an underfloor system. Knowing this, a safe design would use a 12 plenum leaving only 9 from finished floor to ceiling. In this case, a suspended ceiling is out of the question; therefore a ducted return system would be used. In addition to the ducts, the space must also contain lighting fixtures. These fixtures would be suspended, indirect fluorescent lamps. After taking into account all of this information, it is unlikely that a UAD system with suspended fixtures and a ducted return would be feasible for 1919 M St. 4 of 9

5 IV. Mechanical Proposal: Ice Storage with Low Temperature Air I plan to redesign the 1919 M St. mechanical system to incorporate a thermal storage system. During the semester, I will perform calculations to determine whether 1919 is a candidate for partial or full storage and the costs associated with both types. Once a system type has been chosen, I will begin to perform load calculations for the existing system in addition to the proposed system using Carriers Hourly Analysis Program, HAP. After the loads have been established, I will proceed with the sizing of the tanks using Calmac equations and/or software. When the ice tanks are determined, the additional mechanical equipment can be resized accordingly. After selection of the new mechanical equipment, the electrical system must be reworked. At that time I will review the location of the tanks to conclude whether it would be more feasible to strengthen and reposition the tanks on the roof or place them in the basement to reduce structural costs. The two main problems associated with 1919 M St. are the lack of plenum space and energy consumption costs. A thermal storage system has the opportunity to correct both of these problems. In addition, a thermal storage system can lower operating costs, and more importantly, reduce energy consumption. Because 1919 M St. is an office building, the main periods of occupancy are between 7am and 7 pm, the peak rate hours of the day. Using a thermal storage system, ice can be produced at night at a lower energy cost, therefore, providing cooling during the occupied hours. (Courtesy of Calmac webpage) By using an ice system, the two 320 ton chillers and the 2400 GPM cooling tower can be reduced in size. By using a partial storage system, the existing chillers can be reduced up to 50%. Along with the chillers and cooling tower, the ducts can be resized to a smaller dimension due to the low temperature air that is being supplied. With these reductions in equipment costs plus the lower cost of duct work, a lower first cost is possible even with the cost of the tanks. 5 of 9

6 V. Additional Analyses: In addition to my in-depth analysis, I plan to review several additional improvements that can be incorporated with thermal storage to further enhance the building. With 1919 already meeting several of the LEED requirements, I plan to look at what it would take to receive a LEED accreditation. During Tech 2a, I reviewed the points system, and I feel with some additions, 1919 has the opportunity to receive an accreditation. Another possible improvement that I am considering is the use of photovoltaic panels. If the positioning of the building is conducive, solar panels could possibly provide additional electrical power to the building, resulting in a small decrease in the amount of power the building has to purchase. Much more research must go into this idea; however, I am interested in learning more about the topic. VI. Electrical Breadth: The mechanical system and the electrical rework are integrated aspects of this design. After the mechanical system is resized, I must review the electrical system to determine what feeders, breakers, conduit, etc., can be resized. I will perform hand calculations utilizing equations and methods described in the National Electrical Code. VII. Structural Breadth: The basis for the thermal storage system is the large tanks in which the ice is created and melted. The larger storage tanks, with a storage capacity of over 500 ton-hrs, are very large and heavy. Weighing a total of nearly 50,000 lb, the filled tanks will place a load of approximately 400 lb/ft 2 on the concrete deck. If it is determined that the most beneficial place for the tanks is on the roof, a new system will be required. The existing concrete has a capacity of only 30 psf, therefore, requiring extensive strengthening. I will either use a program such as RISA to calculate the size of the new members or use an analysis program such as STAAD to establish the loads and then use hand calculations to determine the member sizes. If it is not feasible to strengthen the concrete structure to support such a load, 1919 has a parking garage located in its basement and the tanks could be placed there. The location of the tanks will be coordinated with the mechanical systems to ensure efficient operation will continue if the tanks are placed in the garage. A study on the costs of the two locations will also be conducted to determine whether it is more appropriate to locate the tanks on the roof and deal with strengthening the roof or placing them in the garage resulting in the loss of several parking spaces. 6 of 9

7 VIII. Justification: During the previous technical assignments it was obvious that the energy costs, although lower than a similarly sized office building, are still a substantial amount of money. I felt that with a building in a high rent area like Washington DC, any attempt at saving energy costs would benefit the owner. Another justification I had for using thermal storage for 1919 was because it is an all electric building creating a potential for high energy bills. In addition to the energy issue, I have been interested in thermal storage systems for a while and have not had many opportunities to work with them. I felt that this project would give me such an opportunity. From presentations I have attended, articles I have read, and conversations I have had with engineers in the industry, I feel that LEED accreditation is a very important, and soon to be a very highly sought after, commodity for buildings. It is for this reason, in addition to my interest in sustainable design that led me to consider reviewing my building s LEED status and attempting to pursue an accreditation. 7 of 9

8 IX. Work Plan: The following is a preliminary schedule to complete my thesis in time for presentations in April. The semester will commence with extensive research, primarily in thermal storage. I will research a few alternatives and additional systems. After the research is complete, I will start the process of learning the Calmac design methods and beginning my design. Once the thermal storage portion of my project is finished, I will begin working on the LEED accreditation requirements and any additional projects I wish to tackle. After the design period is concluded, I will wrap up the work and prepare the presentation. Week Description of work to be completed Starting 1/12/2004 Begin detailed research on thermal storage systems 1/19/2004 Review HAP from Tech 2b and make necessary changes. Use CALMAC program to calculate hourly loads. 1/26/2004 Size storage tanks 2/2/2004 Determine new equipment sizes 2/9/2004 Check duct sizes and determine if they can be reduced 2/16/2004 Electrical Breadth- Resize electrical lines and determine new energy costs 2/23/2004 Structural Breadth- Determine new roof design to support tanks 3/1/2004 Conduct a cost analysis for both tank placement and overall system advantages 3/8/2004 Spring Break 3/15/2004 Conduct a LEED analysis and determine what additional factors need to be pursued 3/22/2004 Complete all design work and begin writing report 3/29/2004 Finalize Report 4/5/2004 Design Power Point presentation 4/12/2004 Presentations 4/19/2004 RELAX 8 of 9

9 X. Bibliography 1. Calmac Webpage 2. Clamac: A Technical Introduction to Thermal Energy Stroage Commercial Applications 3. York International Website 4. York Modular Integrated Terminals: Convection Enhanced Ventilation Technical Manual 5. MacCracken, Mark M. Thermal Energy Storage Myths ASHRAE Journal September ASHRAE Handbook of Fundamentals; The American Society of Heating Refridgeration and Air Conditioning Engineers, Inc Database for State Incentives for Renewable Energy Website 8. Million Solar Roof Webpage 9. Solar Electric Power Association 9 of 9

Proposal: Mechanical System Redesign

Proposal: Mechanical System Redesign Proposal: Mechanical System Redesign The 959 Eighth Avenue 10019 Faculty Advisor: Dr. James Freihaut December 12, 2005 Table of Contents 1.0 Executive Summary 2.0 3.0 Proposal Obectives 4.0 Preliminary

More information

Thesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin

Thesis Proposal. Clemson University Advanced Material Research Laboratory Anderson, SC. David Anderson Mechanical Option. Photo by Fred Martin Thesis Proposal Photo by Fred Martin Clemson University Advanced Material Research Laboratory Anderson, SC David Anderson Mechanical Option Friday, December 15, 2006 Table of Contents 1. Executive Summary

More information

Mechanical Systems Proposal

Mechanical Systems Proposal Mechanical Systems Proposal Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option December

More information

Mechanical Systems Project Proposal

Mechanical Systems Project Proposal Mechanical Systems Project Proposal December 15, 2006 Table of Contents 1.0 Executive Summary... 2 2.0 Building Background... 3 3.0 Proposal Objectives... 5 4.0 Initial Considerations... 6 5.0 Proposed

More information

Grunenwald Science and Technology Building

Grunenwald Science and Technology Building Grunenwald Science and Technology Building Clarion University- Clarion, PA AE 482 Mechanical Project Proposal: Proposal for Alternative Designs Shane Helm The Pennsylvania State University Architectural

More information

Broad Institute Expansion: Cambridge, Massachusetts. Mechanical Thesis Proposal

Broad Institute Expansion: Cambridge, Massachusetts. Mechanical Thesis Proposal Broad Institute Expansion: Cambridge, Massachusetts Mechanical Thesis Proposal Table of Contents Executive Summary... 2 Building Overview... 3 Mechanical System Overview... 4 Mechanical System Design Objectives...

More information

Broad Institute Expansion: Cambridge, Massachusetts. Mechanical Thesis Proposal : REVISION I

Broad Institute Expansion: Cambridge, Massachusetts. Mechanical Thesis Proposal : REVISION I Broad Institute Expansion: Cambridge, Massachusetts Mechanical Thesis Proposal : REVISION I Table of Contents Executive Summary... 2 Building Overview... 3 Mechanical System Overview... 4 Mechanical System

More information

Georgetown University New Science Center

Georgetown University New Science Center Georgetown University New Science Center Final Thesis Proposal PENN STATE UNIVERSITY Prepared For: Dr. William P. Bahnfleth Department of Architectural Engineering Prepared By: Kevin M Edstrom Mechanical

More information

Terminal. 3 Las Vegas, NV

Terminal. 3 Las Vegas, NV McCarran International Airport Terminal 3 Thesiss Proposal Mechanical Systems Project Proposal December 18, 2007 Prepared By: Jason A. Witterman Faculty Advisor: Dr. William Bahnfleth, Ph.D., P..E. Table

More information

Evaluation of Underfloor Air Distribution

Evaluation of Underfloor Air Distribution McCarran International Airport Terminal 3 L as Vegas, NV Evaluation of Underfloor Air Distribution and Displacement Ventilation Systems The Pennsylvania State University AESenior ThesisPresentation, Spring

More information

Thesis Proposal. Park. Findlay 12/10/2010. Connor Blood

Thesis Proposal. Park. Findlay 12/10/2010. Connor Blood 1 Park Place Corporate Center One Mechanical Senior Thesis Project Thesis Proposal Park Place Corporate Center One Findlay Township,, PA 12/10/2010 Proposal Connor Blood 2 Park Place Corporate Center One

More information

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel  Mechanical Option EADQUARTERS 707 N. Calvert St. Mechanical System Renovation Construction Management & Lighting/Electrical Breadths Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

Comparison of Air Distribution Systems

Comparison of Air Distribution Systems of Air Distribution s vs. s & s Presentation Outline & s Distribution Conclusion & s & s Project Team Owner - Capital One Financial Corporation Owner s Rep - Jones Lang LaSalle Architect - Ai Architecture

More information

Coppin State University Physical Education Complex - Technical Report 2

Coppin State University Physical Education Complex - Technical Report 2 Coppin State University Physical Education Complex - Technical Report 2 Building and Plant Energy Analysis Report Kaylee M Damico Advisor: Dr. Jelena Srebric Location: Baltimore, MD Table of Contents Contents

More information

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion Mechanical Systems Redesign Proposal Thesis Proposal Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth December 12, 2014 Revised: January 16, 2015 Revised:

More information

AE 481W Thesis Proposal

AE 481W Thesis Proposal AE 481W Thesis Proposal I I Advisor: Dr. Treado UNIVERSITY OF CALIFORNIA SAN DIEGO RADY SCHOOL OF MANAGEMENT LA JOLLA, CA TABLE OF CONTENTS Executive Summary.3 Mechanical System Overview..4 Design Objectives,

More information

The Ed Roberts Campus

The Ed Roberts Campus The Ed Roberts Campus Proposal Anderson Clemenceau Mechanical Option Advisor: Donghyun Rim December 12, 2014 2 Contents Executive Summary... 3 Building Overview... 4 Existing Mechanical System... 5 Airside

More information

THERMAL STORAGE FEASIBILITY STUDY

THERMAL STORAGE FEASIBILITY STUDY THERMAL STORAGE FEASIBILITY STUDY SPRING 2005 NEW HOUSE RESIDENCE HALL PRESENTATION OUTLINE GENERAL PROJECT DATA PROJECT TEAM MECHANICAL REDESIGN ELECTRICAL ANALYSIS ACOUSTICAL ANALYSIS CONCLUSIONS GENERAL

More information

Project Proposal Proposal for Investigation of Alternative Systems

Project Proposal Proposal for Investigation of Alternative Systems Project Proposal Proposal for Investigation of Alternative Systems 01.15.2010 Defense Media Activity Building Fort George G. Meade Penn State University Architectural Engineering Faculty Advisor: Dr. Treado

More information

MECHANICAL PROJECT PROPOSAL (Revised)

MECHANICAL PROJECT PROPOSAL (Revised) PSUAE MECHANICAL PROJECT PROPOSAL (Revised) REDESIGN PROJECT Nicholas B Scheib 2011 M e c h a n i c a l O p t i o n - IP Table of Contents The Sunshine Elementary School Executive Summary... 2 Project

More information

David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal

David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Proposal David H. Koch Institute for Integrative Cancer Research Massachusetts Institute of Technology Cambridge,

More information

The Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option

The Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option The Milton S. Hershey Medical Center Academic Support Building AE Senior Thesis Kari Anne Donovan Mechanical Option Presentation Outline Existing Conditions Distributed Chilled Water Feasibility Study

More information

SENIOR THESIS FINAL PROPOSAL

SENIOR THESIS FINAL PROPOSAL Submitted 12/10/2010 Construction Management Advisor: Dr. Robert Leicht [The following report presents a detailed overview of the research topics to be done on the Office Renovation Building. A series

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

North Pocono High School

North Pocono High School Building System Integration Energy and Cost Analysis Architectural Engineering Senior Thesis Presentation Pennsylvania State University Presentation Outline Project Outline Existing System Design Conditions

More information

Mechanical Project Proposal

Mechanical Project Proposal Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18

More information

SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4

SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4 Table of Contents 1 Executive Summary... 1 2 Building Summary 3 3 Existing Mechanical System. 4 4 Mechanical Design Objectives..... 4 5 Mechanical System Evaluation. 5 5.1 Air Distribution System Evaluation....

More information

McCarran International Airport Terminal 3

McCarran International Airport Terminal 3 McCarran International Airport Terminal 3 The Pennsylvania State University Architectural Engineering Senior Thesis Final Report Evaluation of Underfloor Air Distribution and Displacement Ventilation Systems

More information

Mechanical Project Proposal. Indoor Multi-Sport Facility. At Pennsylvania State University

Mechanical Project Proposal. Indoor Multi-Sport Facility. At Pennsylvania State University At Pennsylvania State University Christopher Van Campen December 05, 2002 Executive summary The proposed thesis is to alleviate the of its only major problem, not enough seating capacity for the spectators

More information

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load.

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load. Redesign Introduction This report is an in depth analysis of the mechanical systems of the Outreach Innovation Building located in University Park, PA and the impact these changes had on other systems

More information

EMD SERONO RESEARCH CENTER EXISTING

EMD SERONO RESEARCH CENTER EXISTING EMD SERONO RESEARCH CENTER EXISTING BILLERICA, MA SHIYUN (SHARON) CHEN MECHANICAL AE SENIOR THESIS Building System Dedicated Outdoor Air System/ Systems Breadth Building Design Team Building: EMD Serono

More information

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program COMMERCIAL LOAD ESTIMATING Load Estimating Level 3: Block and Zone Loads Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design,

More information

Water Bottling Facility

Water Bottling Facility TECHNICAL REPORT 2 Water Bottling Facility Mid-Atlantic, US Building and Plant Energy Analysis Report The Pennsylvania State University Author: Justyne Neborak Architectural Engineering Advisor: Dr. William

More information

COOLING LOAD ESTIMATION OF A ROOM

COOLING LOAD ESTIMATION OF A ROOM COOLING LOAD ESTIMATION OF A ROOM Prof. Deepak Kumar Yadav 1, Aviral Srivastava 2, Ayush Chauhan 3, Gaurang Tripathi 4, Ankur Kumar 5 1Assistant Professor, Mechanical Engineering, IMS Engineering College,

More information

UNDERFLOOR AIR DISTRIBUTION INTEGRATED WITH AN INDIRECT AND DIRECT EVAPORATIVE COOLING ASSISTED 100% OUTDOOR AIR SYSTEM

UNDERFLOOR AIR DISTRIBUTION INTEGRATED WITH AN INDIRECT AND DIRECT EVAPORATIVE COOLING ASSISTED 100% OUTDOOR AIR SYSTEM UNDERFLOOR AIR DISTRIBUTION INTEGRATED WITH AN INDIRECT AND DIRECT EVAPORATIVE COOLING ASSISTED 100% OUTDOOR AIR SYSTEM YJ Seok, HJ Cho, SK Han and JW Jeong Department of Architectural Engineering, Sejong

More information

ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT.

ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT. ESL-TR-86/09-03 ENERGY ANALYSIS AND ENERGY CONSERVATION OPTION FOR THE WAREHOUSE FACILITY AT THE HUMAN SERVICES CENTER COMPLEX DRAFT REPORT Submitted by Mohsen Farzad Dennis O'Neal Prepared For Energy

More information

Chilled Water Plant Redesign

Chilled Water Plant Redesign 17 Chilled Water Plant Redesign OVERVIEW The chilled water plant redesign includes the addition of a thermal energy storage system. This allows for economic and operational benefits for the facility by

More information

Building Load and Energy Estimates Analysis. Instructor: Dr. Mumma. October 28, Thesis Building Sponsor s: INOVA Fairfax Hospital

Building Load and Energy Estimates Analysis. Instructor: Dr. Mumma. October 28, Thesis Building Sponsor s: INOVA Fairfax Hospital David Peterson Penn State AE, Mechanical INOVA Fairfax Hospital The INOVA Heart Institute David J. Peterson Mechanical Option Mechanical Technical Report #2b The INOVA HEART INSTITUTE AT INOVA Fairfax

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report Two: Building and Central Plant Energy Analysis Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date: 10/28/09

More information

UNIVERSITY SCIENCES BUILDING

UNIVERSITY SCIENCES BUILDING UNIVERSITY SCIENCES BUILDING Northeast USA Senior Thesis 2011 Faculty Advisor: Andrés Lepage Kathryn Gromowski Structural Option BUILDING INTRODUCTION SITE MAP New Laboratory/Classroom building Located

More information

[THESIS PROPOSAL] North Hall American University Washington, D.C.

[THESIS PROPOSAL] North Hall American University Washington, D.C. 2013 Brandon Tezak, LEED Green Associate Construction Management Option Faculty Advisor: Dr. Anumba January 9, 2013 [THESIS PROPOSAL] North Hall American University Washington, D.C. Executive Summary After

More information

LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS

LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS R. Hutcheson, P.Eng. LEED AP, CxA, S. Jorens B.Eng., D. Knapp, PhD., P.Phys., LEED AP Arborus Consulting

More information

43% reduction in water use below code maximum 100% 100% 14% reduction in lighting power density. 56% of offices have thermal comfort controls 100%

43% reduction in water use below code maximum 100% 100% 14% reduction in lighting power density. 56% of offices have thermal comfort controls 100% Insert school or unit logo Nocera Lab LEED CI v3.0 12 Oxford Street, Cambridge, MA GOLD Project Profile Laboratories are typically regarded as an energy intensive building typology. Many of these buildings

More information

Reed Berinato Mechanical Option. Building and Plant Energy Analysis Report October 27, Contents

Reed Berinato Mechanical Option. Building and Plant Energy Analysis Report October 27, Contents Contents Executive Summary... 3 LEED Green Building Rating Discussion... 4 ASHRAE Standard 90.1-1999... 5 Introduction to ASHRAE Standard 90.1-1999... 5 Envelope Compliance... 5 Lighting Compliance...

More information

Oklahoma University Children s Medical Office Building

Oklahoma University Children s Medical Office Building Oklahoma University Children s Medical Office Building Oklahoma City, O.K., BAE Advisor: Laura Miller Presentation Outline VRF System Dedicated Outdoor Air System Evaluation VRF Indoor Units Design Criteria

More information

DISPLACEMENT VENTILATION

DISPLACEMENT VENTILATION DISPLACEMENT VENTILATION D3 OVERVIEW The fundamental approach to displacement ventilation utilizes the natural buoyancy forces created by the convective flows from heat sources in the space. As supply

More information

THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA

THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA Amy Graver, Structural Option - Dr. Hanagan, Advisor 12.16.2002 THESIS PROPOSAL Executive Summary Architecture The Plaza at PPL

More information

3 Mechanical System Redesign

3 Mechanical System Redesign 3 Mechanical System Redesign 3.1 Considered Alternatives The MAC building offered many opportunities to change the existing design and explore an alternative different than the solution the original design

More information

The building on 250 West Street is a 7-story multi-use that provides space for parking,

The building on 250 West Street is a 7-story multi-use that provides space for parking, December 5, 2002 Thesis Executive Summary The proposal for the investigation of the building on 250 West Street will include an in depth look at the floor and lateral systems. A continuation of the Pro-Con

More information

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation 2900 Fairview Park Drive, Prepared By: Charles Haack Mechancial Option November 21, 2008 Prepared For: Dr. William P.

More information

The Montgomery County Conference Center and Hotel. The Montgomery County. Conference Center and Hotel

The Montgomery County Conference Center and Hotel. The Montgomery County. Conference Center and Hotel The Montgomery County 5701 Marinelli Road, Rockville, MD Senior Thesis Presentations 2005 Presentation Outline Building Overview Mechanical System Existing Conditions Mechanical System Redesign Goals /

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

Mechanical Thesis Proposal

Mechanical Thesis Proposal Mechanical Thesis Proposal New Braunfels Regional Rehabilitation Hospital Adam Bernardo Mechanical Option Faculty Advisor: Dr. William Bahnfleth Revised: 2/13/12 New Braunfels, TX ADAM BERNARDO MECHANICAL

More information

Analysis and System Design of a Large Chiller Plant for Korea, with or without Thermal Storage

Analysis and System Design of a Large Chiller Plant for Korea, with or without Thermal Storage Analysis and System Design of a Large Chiller Plant for Korea, with or without Thermal Storage Christine Levin HVAC Designer Flack + Kurtz Consulting Engineers, LLP New York, New York Peter Simmonds Director

More information

Thesis Proposal December 5, 2003

Thesis Proposal December 5, 2003 Executive Summary Thesis Proposal December 5, 2003 Brennan Hall is a five-story office/classroom building. It is located on a slightly sloping site, surrounded by other structures and a small green space.

More information

AE 481-COMPREHENSIVE SENIOR PROJECT I Building Mechanical & Energy Systems Option

AE 481-COMPREHENSIVE SENIOR PROJECT I Building Mechanical & Energy Systems Option Senior Thesis Program The Department of Architectural Engineering The Pennsylvania State University University Park, PA 2016-2017 AE 481-COMPREHENSIVE SENIOR PROJECT I Building Mechanical & Energy Systems

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

LESSONS LEARNED IN MODELING UNDERFLOOR AIR DISTRIBUTION SYSTEM

LESSONS LEARNED IN MODELING UNDERFLOOR AIR DISTRIBUTION SYSTEM LESSONS LEARNED IN MODELING UNDERFLOOR AIR DISTRIBUTION SYSTEM Kwang Ho Lee 1, 2, Stefano Schiavon 1, Tom Webster 1, Fred Bauman 1, Jingjuan Feng 1, Tyler Hoyt 1 1 Center for the Built Environment, University

More information

CAE 331/513 Building Science Fall 2017

CAE 331/513 Building Science Fall 2017 CAE 331/513 Building Science Fall 2017 November 14, 2017 Heating load calculations Advancing energy, environmental, and sustainability research within the built environment www.built-envi.com Twitter:

More information

Italcementi Center for Research and Innovation

Italcementi Center for Research and Innovation Italcementi Center for Research and Innovation Bergamo, Italy LEED-NC v2.1 EAc1 A. Project Narrative (Viridian) analyzed the energy use of the proposed Italcementi Center for Research and Innovation located

More information

Green California Summit It s Happening Now April 9, 2014 Sacramento, California. Porus Sam Antia

Green California Summit It s Happening Now April 9, 2014 Sacramento, California. Porus Sam Antia ZERO NET ENERGY BUILDINGS: PRACTICE, POLICIES, AND PERFORMANCE Green California Summit It s Happening Now April 9, 2014 Sacramento, California Porus Sam Antia 1 STANTEC NET ZERO ENERGY BUILDINGS 2 BUILDING

More information

Level 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort

Level 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort TDP-101 HVAC Industry Overview This TDP provides a general overview of the commercial HVAC industry and provides an awareness of the design process and construction. The documents involved in construction,

More information

Thermal Energy Storage & Low Temperature Air Distribution Senior Thesis Final Report Spring 2006

Thermal Energy Storage & Low Temperature Air Distribution Senior Thesis Final Report Spring 2006 Thermal Energy Storage & Low Temperature Air Distribution Senior Thesis Final Report Spring 2006 Bronx School for Law Government & Justice Bronx, NY Yulien Wong Penn State University Architectural Engineering

More information

Sample Reports. for. HAP v4.90 Example Problem

Sample Reports. for. HAP v4.90 Example Problem Sample Reports for HAP v4.90 Example Problem December, 2014 Carrier Software Systems Copyright 2014 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using

More information

Technical Report Three Mechanical Systems Existing Conditions Evaluation

Technical Report Three Mechanical Systems Existing Conditions Evaluation 09 10 Technical Report Three Mechanical Systems Existing Conditions Evaluation WESTINGHOUSE ELECTRIC CO. NUCLEAR ENGINEERING HEADQUARTERS CAMPUS Pittsburgh, PA Daniel P. Aughenbaugh Mechanical Dr. Bahnfleth

More information

THE PLAZA AT PPL CENTER ALLENTOWN, PA

THE PLAZA AT PPL CENTER ALLENTOWN, PA Building Function and Primary Use The owner of the new Plaza at PPL Center is Liberty Property Trust, but the primary tenant is PPL, which will use the building as the headquarters for its new subsidiaries

More information

Auburn Facilities Energy Reduction Plan

Auburn Facilities Energy Reduction Plan Auburn Facilities Energy Reduction Plan Revision 2: May 2012 Overall Plan: Auburn University Facilities will work to reduce energy usage, utility consumption, energy costs, and the University s carbon

More information

Interdisciplinary Science and Engineering Building

Interdisciplinary Science and Engineering Building 1 1 Senior Thesis Capstone Project Treado Thesis Proposal Interdisciplinary Science and Engineering Building University of Delaware Newark, DE 19716 2 2 Table of Contents Executive Summary 3-4 Building

More information

Compliance Evaluation: ASHRAE Standard Ventilation for Acceptable Indoor Air Quality

Compliance Evaluation: ASHRAE Standard Ventilation for Acceptable Indoor Air Quality Compliance Evaluation: ASHRAE Standard 62.1-2001 Ventilation for Acceptable Indoor Air Quality Photo rendering courtesy of Hooper Shiles Architects Philadelphia School District Administration Headquarters

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report Three: Mechanical Systems Existing Conditions Evaluation Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date:

More information

Access Floor Systems Underfloor Air Distribution Modular Power Distribution

Access Floor Systems Underfloor Air Distribution Modular Power Distribution Access Floor Systems Underfloor Air Distribution Modular Power Distribution COMPLETE FLOOR SYSTEM SOLUTIONS Camino manufactures the broadest solutions in modular Access Floor Systems, that combine electrical

More information

Mechanical Redesign. 3.1 Re-examining the loads

Mechanical Redesign. 3.1 Re-examining the loads Mechanical Redesign 3.1 Re-examining the loads I have praised and I will continue to praise the mechanical system for the Eastern High School Renovation. The system meets the requirements and special conditions

More information

Chilled Beams. The new system of choice?

Chilled Beams. The new system of choice? Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams

More information

Sample Reports. for. HAP v4.80 Example Problem

Sample Reports. for. HAP v4.80 Example Problem Sample Reports for HAP v4.80 Example Problem October, 2013 Carrier Software Systems Copyright 2013 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using the

More information

TECHNICAL REPORT 4B. Project Proposal and Schematic Design Summary

TECHNICAL REPORT 4B. Project Proposal and Schematic Design Summary TECHNICAL REPORT 4B Project Proposal and Schematic Design Summary Proposal for the thesis work to be done in the spring semester, covering the schematic lighting design, and proposed lighting design depth,

More information

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends Dan LeBlanc Senior Sustainability Manager dleblanc@yrgxyz.com LEED CERTIFICATION TRENDS MARKET SECTOR ADAPTATIONS Data

More information

Teague Research Center

Teague Research Center Continuous Commissioning Report for the Teague Research Center Building #445 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

Gaige. Thesis Project Proposal. The. December 13 th, 2013 Matthew Neal, Mechanical Option Stephan Treado, Advisor. Proposed System Changes

Gaige. Thesis Project Proposal. The. December 13 th, 2013 Matthew Neal, Mechanical Option Stephan Treado, Advisor. Proposed System Changes The Gaige Technology and Business Innovation Building Penn State Berks, Reading PA Thesis Project Proposal Proposed System Changes Stephan Treado, Advisor Table of Contents Executive Summary... 2 Building

More information

Project Name: Example Building OFPC Project No.: 12345

Project Name: Example Building OFPC Project No.: 12345 Energy Impact Statement Project Name: Example Building OFPC Project : 12345 Building Description and Assumptions: The design professional shall provide a brief narrative describing various building related

More information

Demonstration of Load Shifting and Peak Load Reduction with Control of Building Thermal Mass

Demonstration of Load Shifting and Peak Load Reduction with Control of Building Thermal Mass Demonstration of Load Shifting and Peak Load Reduction with Control of Building Thermal Mass J. E. Braun and T. M. Lawrence, Ray W. Herrick Laboratories, Purdue University C. J. Klaassen and John M. House,

More information

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview Mike Meyers, Xcel Energy Commitment from Leadership Our energy conservation programs are especially valuable because they give

More information

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat VRF System) (* Source: http://kr.lgeaircon.com/) Commercial Air-Conditioning Engineering Study ES-MultiVWaterIV_EnergyAnalysis-08-14

More information

Mechanical Tech Report 2

Mechanical Tech Report 2 Mechanical Tech Report 2 Design Load Estimation and Energy Analysis M Resort Spa and Casino Tom M. Chirdon Faculty Advisor; William P. Bahnfleth October 24, 2008 Table of Contents 1.0 Executive summary

More information

EnergyPro Building Energy Analysis. Nine-story Office Building

EnergyPro Building Energy Analysis. Nine-story Office Building EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy

More information

Prepared. r William. 10 th, Mechanical. Option. Architectural Engineering. Bachelor of. The

Prepared. r William. 10 th, Mechanical. Option. Architectural Engineering. Bachelor of. The Architectural Engineering Mechanical Option 2011 Thesiss Proposal Prepared for: Professor r William Bahnfleth, PhD, PE Date: December 10 th, 20100 Mechanical Option Senior Thesis 2010-2011 The Pennsylvania

More information

We created a beautiful, high-performance building that s good for the environment. And it didn t cost us any more to do it.

We created a beautiful, high-performance building that s good for the environment. And it didn t cost us any more to do it. banner bank building b o i s e PROJECT OVERVIEW AND TEAM OWNER: The Christensen Corp. LOCATION: Boise, Idaho Building Type: Speculative Office Building SIZE: 180,000 square feet COMPLETION DATE: March

More information

Air-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels

Air-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels Air-Water Systems and Beams Early 1980 s 1980 1990 2005 Buildings well insulated for heating Advent of personal computers Need to remove heat from space Limited space available TROX USA 1 2 Principle of

More information

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options River Tower at Christina Landing Wilmington, DE Joseph Bednarz Structural Option Faculty Advisor: Dr. Boothby Executive Summary January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign

More information

Thesis Proposal. Mechanical Systems Redesign. Xanadu Meadowlands Sports Complex Building A East Rutherford, New Jersey

Thesis Proposal. Mechanical Systems Redesign. Xanadu Meadowlands Sports Complex Building A East Rutherford, New Jersey Thesis Proposal Prepared For: Dr. James D. Freihaut, PhD Department of Architectural Engineering The Pennsylvania State University Prepared By: Jason M. Sambolt Mechanical Option December 14, 2007 Table

More information

3 ASM introduces 1970s 1980s 1990s

3 ASM introduces 1970s 1980s 1990s 1970s 1980s 1990s 1970s 1980s The early years of data processing and ne ASM Management Team expands floor line requirements for raised flooring. ASM to include a full metal clad oodcore Management Team

More information

A Protocol to Determine the Performance of South Facing Double Glass Façade System

A Protocol to Determine the Performance of South Facing Double Glass Façade System A Protocol to Determine the Performance of South Facing Double Glass Façade System A Preliminary Study of Active/Passive Double Glass Façade Systems by Shang-Shiou Li Thesis Submitted to the Faculty of

More information

Analysis 2: Alternative Thermal Window Design

Analysis 2: Alternative Thermal Window Design Analysis 2: Alternative Thermal Window Design (8.1) Problem Statement: In the first analysis, the cost and environmental impacts of the addition of solar PV panels to the roof of GrandView was determined.

More information

EnergyPro Building Energy Analysis. Single-story School Building

EnergyPro Building Energy Analysis. Single-story School Building EnergyPro Building Energy Analysis Single-story School Building EnergyPro Building Energy Analysis for a single-story school bulding Project Scope The purpose of the EnergyPro energy model was to evaluate

More information

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1: Overview of Energy Efficient Construction 1 CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1 is a quick reference guide that discusses the key components and features of energy

More information

You Can t Afford Discomfort. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

You Can t Afford Discomfort. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas You Can t Afford Discomfort Dan Int-Hout Chief Engineer, Krueger Richardson, Texas Where We Are Today: So You Want To Save Money? Things to consider: 1. First Cost 2. Energy cost 3. Occupant Salary costs

More information

UCI Natural Sciences Unit 2 Irvine, CA

UCI Natural Sciences Unit 2 Irvine, CA PROPOSAL UCI Natural Sciences Unit 2 Irvine, CA Updated Thesis Proposal Apr 04, 2008 Grant W. Kightlinger Lighting / Electrical Option Advisors Dr. Kevin Houser Prof. Ted Dannerth Grant W. Kightlinger

More information

Terminal. 3 Las Vegas, NV. Technical

Terminal. 3 Las Vegas, NV. Technical McCarran International port Terminal 3 Technical Assignment 1 ASHRAE Standard 62.1 2007 Compliance Evaluation October 5, 2007 Prepared By: Jason A. Witterman Faculty Advisor: Dr. William Bahnfleth, Ph.D.,

More information

Kaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Revised Thesis Proposal

Kaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Revised Thesis Proposal University at Buffalo CTRC/Incubator Buffalo, New York Revised William McDevitt January 14, 2011 Table of Contents Executive Summary...2 Introduction...3 Structural System Overview...4 Foundation...4 Floor

More information

TECHNICAL REPORT 3 JESSUP, MARYLAND. Mechanical System Existing Conditions Evaluation BY CHRISTOPHER LORENZ MECHANICAL, FOR DR. BAHNFLETH SUBMITTED

TECHNICAL REPORT 3 JESSUP, MARYLAND. Mechanical System Existing Conditions Evaluation BY CHRISTOPHER LORENZ MECHANICAL, FOR DR. BAHNFLETH SUBMITTED ENVIROCENTER PHASE II JESSUP, MARYLAND TECHNICAL REPORT 3 Mechanical System Existing Conditions Evaluation BY CHRISTOPHER LORENZ MECHANICAL, FOR DR. BAHNFLETH SUBMITTED NOVEMBER 16 2011 TABLE OF CONTENTS

More information

HITT Contracting Headquarters

HITT Contracting Headquarters Existing Conditions Falls Church,, VA Existing Conditions Existing Conditions HITT Contracting Headquarters Site EEconomics i & Existing Conditions Existing Project Team Conditions Owner HITT General Contracting

More information