Amount of Request: $98,191 Other Funding Sources and Amount of Total Match: Extension agents time and sampling equipment: $64,870 (66% match)

Size: px
Start display at page:

Download "Amount of Request: $98,191 Other Funding Sources and Amount of Total Match: Extension agents time and sampling equipment: $64,870 (66% match)"

Transcription

1 Executive Summary Project Title: Septic to Cistern Conversion: Repurposing Septic Tanks to Reduce Potable Water Use, Runoff Volumes and Nutrient Loadings, and Increase Freshwater Recharge Project Applicant and Partners: Dr. Eban Bean (PI), Assistant Professor and Extension Specialist, Agricultural and Biological Engineering, University of Florida Institute of Food and Agriculture Sciences (UF/IFAS) Dr. Lisa Krimsky (Co-PI), Water Resources Regional Specialized Agent, UF/IFAS Ms. Linda Seals (Co-PI), County Extension Director & Horticulture Extension Agent, Brevard Co., UF/IFAS Ms. Kate Rotindo (Co-PI), Urban Horticulture Extension Agent, St. Lucie County, UF/IFAS Amount of Request: $98,191 Other Funding Sources and Amount of Total Match: Extension agents time and sampling equipment: $64,870 (66% match) Project Description: Description Narrative: Septic tanks will be converted to cisterns for stormwater runoff volume and load reductions. Sites will be monitored to measure runoff volume and load reductions. An assessment tool and educational program will be developed for citizens and public officials. Location: Latitude: N Longitude: W Figure 1. IRL Location and Project Boundary Map Outputs: at least eight septic tanks converted to cisterns, septic-cistern conversion assessment tool, fact sheets, educational program for IRL, final report detailing reductions in N and P loadings, runoff volumes, and potable water consumption. Outcomes: Short-term: loading reductions to IRL, water conservation, runoff reduction, increased recharge, increase knowledge across IRL counties about impacts of septic systems and stormwater runoff. Mid-term: additional conversions increase water quantity and quality benefits, increased decommissioning of septic tanks and use as cisterns. Long-term: Restore ecological integrity in IRL. CCMP Action Plans addressed by project: FSD-4, FSD-10, FSD-11, FSD-13, AD-1, TMDL-3, PIE-1, PIE-4 and PIE-5

2 Section 1: Title Page 1. Project Title: Septic to Cistern Conversion: Repurposing septic tanks to reduce potable water use, runoff volumes and nutrient loadings, and increase freshwater recharge 2. CCMP Action Plans implemented by project: Fresh and Storm Water Discharges Action Plan FSD-4 Develop and implement best management practices (BMPs) for the management of stormwater, agricultural and fresh water discharges. FSD-10 Encourage the proper use of fertilizers, herbicides, pesticides and reuse water. FSD-11 Educate residents and property owners about the impacts of freshwater and stormwater discharges on the Indian River Lagoon and what they can do to reduce these impacts. FSD-13 Upgrade existing urban and agricultural stormwater systems to reduce pollutant loadings to the Indian River Lagoon. Atmospheric Deposition Action Plan AD-1 Determine the impacts of atmospheric deposition of pollutants on the water quality and resources of the Indian River Lagoon. Total Maximum Daily Loads (TMDLs) Action Plan TMDL-3 Support implementation of Basin Management Action Plans (BMAPs) for all basins requiring TMDLs. Public Involvement and Education Action Plan PIE-1 Implement and expand public involvement and education projects or programs. PIE-4 Increase public and governmental involvement in activities designed to protect and restore the resources of the Indian River Lagoon. PIE-5 Strategically prioritize and implement public education programs based on pollution potential, perceived likelihood for behavior change, resource availability, and opportunities that arise. 3. Applicant Information: University of Florida, Gainesville, Florida Principle Investigator: Eban Bean, Assistant Professor and Extension Specialist, Department of Agricultural and Biological Engineering, University of Florida Institute for Food and Agricultural Sciences, 2295 Mowry Rd., PO Box , Gainesville, FL , , Section 2: Project Specifics A. Project Goals and Objectives The goal of this project is to facilitate restoration of ecological integrity in the Indian River Lagoon (IRL) through restoring water quality by reducing stormwater runoff discharges and pollutant loadings from residential developments. Several septic decommissioning projects are on-going or scheduled throughout the IRL to reduce nutrient loadings over the next five years. When homes are hooked up to sewer systems, septic tanks are typically abandoned in place by puncturing the bottom and filling with sand or stone. These tanks are often 1,000+ gallons (equivalent to 20+ rain barrels) and, as an alternative, can be repurposed for rainwater harvesting to capture and eliminate stormwater runoff from roofs, provide an alternate water supply for irrigation, and/or facilitate groundwater recharge (F.A.C 64E-6.011(4)). This project seeks to promote conversion of septic tanks to cisterns by monitoring multiple conversion sites, using these data to develop an assessment tool, and creating a public outreach extension program focused on the effects of septic tanks and stormwater runoff on water quality in the IRL. Our objectives, outputs, and outcomes for this proposal are listed below.

3 Objectives 1) Coordinate with local government partners to identify and convert at least eight septic tanks planned for decommissioning to cisterns for capturing roof runoff that recover storage volume via infiltration or irrigation. 2) Evaluate water quantity and quality benefits of cistern conversions by regular monitoring and sampling at sites. 3) Develop and deliver an extension outreach program to educate citizens within the IRLNEP about septic systems, water reuse, and stormwater runoff. 4) Develop a publicly available tool for citizens and local governments to estimate runoff volume reductions, nutrient load reductions, and associated costs of converting septic tanks to cisterns. Outputs Photo documentation and total costs of converting septic tanks to cisterns from at least eight sites. Reductions in runoff volumes (eight sites: 183,000 gallons), pollutant loadings (eight sites: 3.1 lbs N/yr; 0.46 lbs P/yr), and potable water usage (four sites: 91,500 gallons), and increase in groundwater recharge (four sites: 91,500 gallons) based on monitoring data at eight sites. Fact sheets explaining benefits of septic decommissioning, reducing stormwater runoff, and reuse. A guide for homeowners with detailed instructions for converting septic tanks to cisterns. At least two peer-reviewed publications, including a UF/IFAS Electronic Database Information Sources (EDIS) publication. A Microsoft Excel tool that will calculate estimated: a) nutrient load reductions; b) runoff volume reductions; c) groundwater recharge; d) water conservation; and e) costs associated with septic conversion projects. Outcomes Short-term Outcomes: 1) At least eight homes identified for septic-to-sewer conversion will retrofit their decommissioned septic tank to a cistern for a) stormwater capture for infiltration, or b) rainwater harvesting for irrigation. Expected completion September ) At least 250 residents, county and municipality employees will increase their knowledge about a) how OSDS may be a pollutant source and/or b) beneficial reuse options, by 75% as determined by post-survey evaluations. Of those, twenty-five homes that have been previously identified for septic-to-sewer conversion will receive one-on-one site visits. Presentations and site visits will begin in 2017 and will be ongoing. 3) Determine the nitrogen and phosphorus load reductions and water conservation savings associated with beneficial conversions of decommissioned OSDS. Expected completion late 2018/early ) A Microsoft Excel tool will be developed to evaluate the expected volume reductions, loading reductions, water conservation, recharge, and costs based on site characteristics such as contributing roof area, tank volume, irrigable area, irrigation frequency, soil types, and depth to water table. Expected completion March Mid-term Outcome: 1) 1-5% of all homes identified for septic-to-sewer conversion within the SOIRLPP will retrofit their decommissioned OSDS for a) stormwater capture for infiltration, or b) rainwater harvesting for irrigation as determined by DOH abandonment permits. Expected completion December Long-term Outcomes: 1) Restore water quality and ecological integrity to the IRL by reducing stormwater runoff. Broadly promote and demonstrate benefits of stormwater harvesting and reuse as alternative water supply

4 2) Increase resilience to sea level rise and salt-water intrusion by increasing freshwater recharge and reducing potable consumption for irrigation. B. Technical Merit/Justification Elevated concentrations of nutrients have been problematic in the ground and surface waters along the Indian River Lagoon and have resulted in environmental health issues including algal blooms, eutrophic conditions, and the largest fish kill in recorded history. The majority of the Indian River Lagoon as well as the St. Lucie Estuary are under Basin Management Action Plans for impairment due to excess nutrients. Stormwater runoff is a major source of nutrients to the IRL and St. Lucie Estuary and Onsite Septic Disposal Systems (OSDS) have been shown to contribute N and P to groundwater and surface waters along the Indian River Lagoon. Thousands of homes will have their septic systems decommissioned and connected to sewers in the IRLNEP at an estimated cost of $43 million over the next five years. Another $11 million will be spent to reduce stormwater pollutant loadings. Within the area BMAPs, counties and municipalities are seeking additional technologies that can help them achieve the required TP and TN total maximum daily loads (personal communication). The proposed project will enhance current and planned septic decommissioning programs specifically in Brevard Co. (Breeze Swept, Rockledge; Merritt Island; Phase B, Palm Bay) and Martin Co. (North River Shores, Stuart; homes entering Grinder program). Converting septic tanks at the time of sewer connection is optimal to limit landscape disturbance, limit costs, and avoid tank abandonment and filling with stone or sand. In addition, offering home owners an opportunity to reduce their water usage and associated water and wastewater costs could incentivize them to proceed with sewer hookup. This project would also provide additional nutrient load reduction of 3.0 lb N/yr and 0.46 lb P/yr, and runoff volume reductions of 183,000 gallons/yr, which will be validated via monitoring. This project will be completed by March However, these program tools and materials, once developed can be used and adopted ad infinitum. C. Benefit(s) to the IRL Each site is unique (roof area, tank volume, and lawn area). However, a 1000 gallon tank can capture 1.25 in. of runoff from a 2,000 ft 2 roof area. Assuming 55 inches of rainfall per year and a capture efficiency of 50% results in a volume of 22,000 gal/year for each installation. Assuming runoff has concentrations of 2.0 mg N/L and 0.30 mg P/L, the runoff load reduction from this project is estimated to be 3.0 lb. N/yr and 0.46 lb. P/yr for eight homes. These estimates will be validated by monitoring at the eight conversion sites. Water levels will be continuously monitored within each cistern to quantify volume reductions. At least six samples will be collected from each cistern and analyzed for nutrient concentrations. At least one site will be paired with a control site (remaining on septic) and each will be instrumented to monitor runoff and groundwater (water level logger in multiple wells) flow rates. At least six runoff and groundwater samples will also be collected for nutrient analysis. Water quality analyses will include NH 4-N, NO 2+3-N, TKN, and TP. Brevard Co. will be conducting similar monitoring within the Breeze Swept neighborhood in Rockledge. Public knowledge increase will be quantified by post-survey evaluations. Other resource benefits of this project will include increased groundwater recharge, water conservation, and flood protection. D. Local commitment This project is not part of the Save Our Indian River Lagoon Project Plan (SOIRLPP), but it has been developed with input from Brevard County Department of Natural Resources (Virginia Barker, personal communication) and Martin County Utilities Department (Liz Wood, personal communication) so that it can be conducted in concert with the septic to sewer conversion projects, including those identified in the 2017 Supplement to the SOIRLPP.

5 E. Project Readiness Each conversion site will require a septic permit for decommissioning the septic system (F.A.C. 64E ). These will be filed once sites are identified and homeowners commit to participation. The design for the study is complete but the locations have yet to be determined. Well permits will be required for installation and will be filed once monitoring locations are identified. The project is ready to for awarding, as Brevard Co. is currently connecting homes to sewer within the Breeze Swept neighborhood of Rockledge. Below is a project schedule with time tables for specific tasks. O 17 N D J 18 F M A M J J A S O N D J 19 F M 2019 ongoing Site selection X X X Monitoring and Sampling X X X X X X X X X X X X X X X X Conversions X X X X X X Data Analysis X X X X X X X X X X X X X X Develop Education Program X X X X X X Fact sheets/ publications X X X X X Deliver Education Program X X X X X X X X X X X X X Develop Assessment Tool X X X X X X X X Final Report X X F. Project Monitoring/Evaluation and Maintenance Plans Runoff Reduction: Runoff reductions will determined by monitoring water levels in each cistern. Water levels and tank geometries will be used to calculate a volume time series, which will then be analyzed with rainfall data and contributing roof area to calculate overall runoff reduction. In addition, we will monitor runoff from a converted lot and a control lot, prior to and after conversion. If multiple lots are adjacent to each other, every effort will be made to increase the number of converted lots draining to a runoff monitoring location, to more holistically evaluate runoff changes. Water Quality: Runoff will be sampled from converted and control monitoring locations. Three groundwater monitoring wells will be installed at a converted location and a control lot. Samples will be collected from wells on four occasions prior to conversion and six occasions after conversion. Water levels will also be continuously monitored in groundwater monitoring wells to estimate flow direction and rates based on soils information. Samples from cisterns will be collected on six occasions after conversion. Runoff, groundwater, and cistern samples will be analyzed for TKN, NH 4+ -N, NO 3- -N and TP. Flowrates and volumes will be used with water quality results to estimate nutrient loadings. Public Education: Attendees at public education events will complete post-surveys to evaluate knowledge gained. This project will be sustained by UF/IFAS extension offices in the IRL area continuing to deliver educational materials. The assessment tool will be made publicly available via the internet and through personal communications with county and municipal officials.

6 G. Citizen/Volunteer Engagement and Outreach Components Outreach programs will initially target homes in neighborhoods undergoing septic-sewer connection in Brevard and Martin Co., but will then expand to all five counties within the IRL. Outreach efforts will include one-on-one site visits to these communities as well community educational efforts through the St. Lucie County Florida Yards & Neighborhoods Homeowner Program. These programs are expected to reach 250 residents as measured by site visit and workshop evaluations. Upon completion of the Microsoft Excel tool, demonstrations will be made to county and municipal officials. H. Experience and Past Performance Dr. Eban Bean (PI) is an assistant professor and extension specialist in urban water resources engineering and specializes in stormwater management, water quantity and quality issues, low impact development (LID), and sustainable urban development to reduce nonpoint source pollution. Dr. Bean received a PhD in agricultural and biological engineering from the University of Florida and is a licensed professional engineer. References: Humphrey et al. 2016a, Humphrey et al. 2016b, Humphrey et al. 2015, Bean, E. and M. Dukes. 2015, Bean E. and M. Dukes Dr. Lisa Krimsky (Co-PI) is the UF/IFAS Water Resources Extension Agent for the South District, which includes the program location. Dr. Krimsky s focus is on protecting and enhancing water quality in coastal and estuarine systems where she has 8 years of experience in developing and implementing outreach and extension programs addressing coastal and water quality impacts in south Florida. Dr. Krimsky received a PhD in marine biosciences from the University of Delaware. Ms. Linda Seals (Co-PI) is the UF/IFAS County Extension Director for Brevard County. Ms. Seals will be acting supervisor to the new Brevard County Associate Environmental Specialist (expected hiring date Summer, 2017) whose job will be to provide technical and information support for residents whose properties have been identified for septic-to-sewer conversion though the SOIRLPP. Ms. Kate Rotindo (Co-PI) is the UF/IFAS Urban Horticulture Extension Agent for St. Lucie County. In addition to Master Gardener training and Urban Agriculture programs, Ms. Rotindo will include water conservation in the landscape and reducing residential environmental impacts on the IRL. We will be submitting a proposal to the St. Lucie River Issues Team Surface Water Restoration Grant. I. Special Requirements (5). The Northern Indian River Lagoon (Project #s ROCK-26) and St. Lucie River (Project #s MC-16, PSL-9, S-14) BMAPs receive a TMDL credit for septic planned and/or ongoing phase out projects. This project will be a collaboration with these and other planned septic phase out projects. Once quantified, counties and municipalities may be able to receive extra credits through management actions associated with any additional nutrient reductions associated with conversion projects. This project promotes climate change adaptation by increasing stormwater capture capacity and conservation by providing alternate water supply for irrigation. Promoting infiltration of fresh water would protect against salt-water intrusion resulting from sea level rise. Palm Bay is one of the targeted conversion areas for this project and is classified as economically distressed due to low income and high unemployment. Section 3: Project Funding A. Partnership and Cost Sharing Brevard County Natural Resources Management Department (Virginia Barker): facilitating and coordinating site identification in areas undergoing septic decommissioning, including Breeze Swept in City of Rockledge (Alix Bernard) and Palm Bay Phase B in City of Palm Bay (Eddy Fountain). Martin County Utilities and Solid Waste Department (John Polley and Elizabeth Woods): facilitating and coordinating site identification in areas undergoing septic decommissioning, including North River

7 Shores Phase I & II in City of Stuart, and individual homeowners connecting to sewer system via grinder pump system. UF IFAS Extension: Brevard County (Linda Seals, County Director; OSTDS Extension Agent), St. Lucie County IFAS Extension Office (Kate Rotindo, Urban Horticultural Agent): agents will focus on developing and delivering educational program materials. Agents will also assist will monitoring and sampling efforts. Match funds will come from two UF/IFAS extension agents time contributed to project tasks ($25,737). Each agent will record the number of hours worked on the project and report to the PI regularly. Four autosamplers will be provided for stormwater runoff sample collection by University of Florida ($16,800). Requested Grant Funds: $98,191 Match Funds: $64,870; Value of In-kind Match: $64,870; Match as percentage of Total Project Costs = 42%; Match as percentage of Request: 66%. B. Project Budget Budget Line Item Task Description Budget Description IRL Funding Amount 1 Identify Project Sites Grad student salary and tuition, travel 2 Pre-conversion monitoring Grad student salary and (data and sample collection; tuition, travel, materials install monitoring equipment) 3 Convert septic tanks to Material and supply cisterns costs 4 Post-conversion monitoring Grad student salary and (data and sample collection) tuition, travel, materials 5 Analyze water quantity and Grad student salary and quality data tuition 6 Develop Assessment Tool Grad student salary and tuition 7 Program Material Extension Agents Time, Development Materials 8 Program Delivery Extension Agents Time, Cost Share Funding Amount $11,071 $0 Cost Share Funding Source $20,533 $8,007 In-Kind $9,144 $0 $15,918 $11,367 In-Kind $8,076 $0 $8,076 $0 $1,450 $11,582 In-Kind $2,285 $11,582 In-Kind Travel 9 Final Report $2, F&A 25%/52.5% $19,638 $22,332 Summary Cost $98,191 $64,870 (66%) Project Total Cost $163,061

8 Statement of Work Septic to Cistern Conversion: Repurposing septic tanks to reduce potable water use, runoff volumes and nutrient loadings, and increase freshwater recharge I. Introduction/Background The Indian River Lagoon (IRL) is a highly impaired water body as a result of excess nutrient inputs. In many areas these nutrients originate from urban areas being contributed at the surface through stormwater runoff and subsurface via Onsite Septic Disposal Systems (OSDS). Homes are being disconnected from septic systems and hooked up to centralized sewer collection systems to reduce this nutrient source. Typically, the septic tanks are abandoned by puncturing the bottom and filling them with sand or aggregate and left on site. This project proposes to repurpose septic tanks, which commonly have a volume of at least 1000 gallons, as cisterns that would either infiltrate into the subsurface or provide a supply for landscape irrigation, which has already successfully been done in the Florida Keys. This provides an additional benefit of the existing infrastructure to further reduce stormwater runoff volumes and loadings, increase groundwater recharge, and increase conservation. As sewer connections typically cost approximately $20,000, along with typically having a wastewater fee, many home owners are resistant to do so on their own. Utilizing an onsite cistern could reduce water and wastewater costs for homeowners, incentivizing them to proceed with sewer connection. II. Objectives 1) Coordinate with local government partners to identify and convert at least eight septic tanks planned for decommissioning to cisterns for capturing roof runoff that recover storage volume via infiltration or irrigation. 2) Evaluate water quantity and quality benefits of cistern conversions by regular monitoring and sampling at sites. 3) Develop and deliver an extension outreach program to educate citizens within the IRLNEP about septic systems, water reuse, and stormwater runoff. 4) Develop a publicly available tool for citizens and local governments to estimate runoff volume reductions, nutrient load reductions, and associated costs of converting septic tanks to cisterns. III. Location of Project In collaboration with Brevard County Department of Natural Resources and Martin County Utilities and Solid Waste Department, this project will target homes scheduled for septic to sewer conversion in Rockledge, Merritt Island, Palm Bay (Brevard County), and North River Shores (Martin County) communities. Extension education will occur throughout Brevard, Indian River, St. Lucie, and Martin counties. IV. Scope of Work Septic Tank Conversion to Cistern and Monitoring

9 In collaborate with Brevard County and Martin County agencies, this project will convert up to eight septic tanks to cisterns for rainwater harvesting. These will be residential properties undergoing sewer connection or otherwise decommissioning their septic tanks. Pre-conversion and post-conversion monitoring will be conducted at a minimum of one conversion home and one control site. Concentrations and flow data will be used to assess post-conversion nutrient loadings and load reductions compared to pre-conversion. Cistern water level records will be used to quantify volumetric runoff reductions and compare with runoff measurements from the site scale at cistern and control homes. For irrigating systems, irrigation volumes will be quantified to estimate potable water savings. Cistern Assessment Tool An excel spreadsheet tool will be developed to estimate the costs and benefits of converting septic tanks to cisterns. The tool will use contributing roof area, irrigable area, soil conditions, cistern volume, and utility rate structures to estimate long-term runoff volume reductions, nutrient loading reductions, water conservation, and costs. The tool will be based on long-term weather records to estimate rainfall and landscape irrigation needs and soil infiltration rates. While this tool will account for septic to cistern conversion, it will also assess implementation of new cistern and rainwater harvesting systems. This tool will provide home owners and local decision makers with valuable information to evaluate the benefits of septic tank conversion to cisterns. Extension Education Program Outreach programs will initially target homes in Brevard, and St. Lucie Counties septic-to-sewer conversion projects. At least 250 residents, county and municipality employees will increase their knowledge about 1) how OSDS may be a pollutant source and/or 2) beneficial reuse options by 75% as determined by post-survey evaluations. Of those, homes that have been previously identified for septicto-sewer conversion will receive one-on-one site visits. Outreach efforts will also include community educational efforts through the St. Lucie County Florida Yards & Neighborhoods Homeowner Program. These programs are expected to reach 250 residents as measured by site visit and workshop evaluations. These impacts are not inclusive of social media outreach including Facebook, IFAS blogs, and Twitter. Additionally, the project team will coordinate with Brevard County Department of Natural Resources, Martin County, and St. Lucie County Stormwater/Water Quality Division and relevant municipalities to introduce the cistern assessment tool and encourage participation within the reuse conversion program as part of current and future septic to sewer conversion and phase out projects. V. Task Identification Recipient shall complete the following tasks: 1. Quarterly Progress Reports. The recipient shall submit quarterly progress reports starting after the first quarter following contract execution and continuing to project completion. 2. Identify project sites for septic tank conversion to cistern. 3. Pre-conversion monitoring data collection and sampling 4. Convert eight septic tanks to cisterns 5. Post-conversion monitoring data collection and analysis 6. Analyze water quantity and quality data 7. Development assessment tool

10 8. Development of extension educational program 9. Deliver extension educational program 10. Project Administration and Final Report. The recipient shall complete 100 percent of the project and submit a project final report VI. Deliverables and Time Frames Task 1. Quarterly Progress Reports: Quarterly progress reports starting after the first quarter following contract execution and continuing to project completion. Deliverables due in Council office quarterly after contract execution. Deliverables: Quarterly reports Task 2. Identify project sites and recruit homeowners to participate in program. Deliverable due in Council office as part of the first quarterly progress report. Deliverable: Map of project sampling locations. Task 3. Pre-conversion monitoring. Install groundwater wells and runoff flow measurement devices at conversion and control sites. Deliverable due in Council office by April 30, 2018 Deliverable: Photos of installations, copies of any well permits obtained, and map of locations. Task 4. Convert septic tanks to cisterns. Obtain permits and decommission septic tanks. Install water level monitoring equipment. Deliverable due in Council office by April 30, Deliverable: Photos of installation and conversion process, copies of septic permits. Task 5. Post-conversion monitoring of conversion sites and water quality sample collection. Deliverable due in Council office by February 28, Deliverable: Summaries of water quality results and plots of water level data in Microsoft Excel file format. Task 6. Analyze monitoring and water quality data to estimate loading reductions for monitored sites. Deliverable due in Council office as part of the final report. Deliverable: Estimates of runoff reduction, groundwater recharge, loading reductions, and potable water conservation. Task 7. Develop assessment tool to evaluate water quantity and quality benefits and costs of converting septic tanks to cisterns. Deliverable due in Council office by March 31, 2019 Deliverable: Assessment tool. Task 8. Develop extension program materials. Create fact sheets, EDIS documents, and presentations. Deliverable due in Council office by April 30, 2018 Deliverable: Extension program materials

11 Task 9. Deliver extension educational program. Identify project sites and recruit homeowners to participate in program. Deliverable due in Council office by February 28, Deliverable: Results of post-surveys. Task 10. Project Final Report Deliverable due in Council office by March 31, Deliverable: Project final report. VII. Budget Budget Line Item Task Description Budget Description IRL Funding Amount 1 Identify Project Sites Grad student salary and tuition, travel 2 Pre-conversion monitoring Grad student salary and (data and sample collection; tuition, travel, materials install monitoring equipment) 3 Convert septic tanks to Material and supply cisterns costs 4 Post-conversion monitoring Grad student salary and (data and sample collection) tuition, travel, materials 5 Analyze water quantity and Grad student salary and quality data tuition 6 Develop Assessment Tool Grad student salary and tuition 7 Program Material Extension Agents Time, Development Materials 8 Program Delivery Extension Agents Time, Cost Share Funding Amount $11,071 $0 Cost Share Funding Source $20,533 $8,007 In-Kind $9,144 $0 $15,918 $11,367 In-Kind $8,076 $0 $8,076 $0 $1,450 $11,582 In-Kind $2,285 $11,582 In-Kind Travel 9 Final Report $2, F&A 25%/52.5% $19,638 $22,332 Summary Cost $98,191 $64,870 (66%) Project Total Cost $163,061

12 Division of Sponsored Research 219 Grinter Hall PO Box Gainesville, FL Phone Fax May 18, 2017 Mr. Frank Sakuma IRL Council COO 1235 Main Street Sebastian, FL Dear Mr. Sakuma, The following proposal has been reviewed and institutionally approved by the University of Florida: UF Principal Investigation: Dr. Eban Bean/UF Department: Proposal Title: Approved Amount Requested $98,192 Approved Cost Share Amount: $64,870 Ag & Bio Engineering/UF IFAS Septic to Cistern Conversion: Repurposing septic tanks to redu potable water use, runoff volumes and nutrient loadings, and increase freshwater recharge. If there are any questions please do not hesitate to contact our office. Best Regards, Adrienne J. Aviles Sponsored Programs Manager Division of Sponsored Programs The Foundation for The Gator Nation An Equal Opportunity Institution

Sustainable Water Resource Practices

Sustainable Water Resource Practices Sustainable Water Resource Practices This section is related to and shoudl be read in conjunction with the Land Use Element, and Conservation Element. Implementing sustainable water resource practices

More information

A Brief Summary of the Water Bill, SB 552 1

A Brief Summary of the Water Bill, SB 552 1 FA205 1 Lisa Krimsky, Andrea Albertin, Charles Barrett, James Fletcher, and Mary Lusk 2 Florida Senate Bill 552 was passed in 2016 to protect Florida s water and natural resources. The policies aim to

More information

Virginia Barker Tony Janicki Steve Peene Harvey Harper Claudia Listopad Gordon England

Virginia Barker Tony Janicki Steve Peene Harvey Harper Claudia Listopad Gordon England Refining TMDLs for the Indian River Lagoon Virginia Barker Tony Janicki Steve Peene Harvey Harper Claudia Listopad Gordon England IRL Economic Fast Facts 2007 $1.2 B in economic benefits to Brevard 3,100

More information

Prepared by the East Central Florida Regional Planning Council and the Treasure Coast Regional Planning Council for the Florida Department of

Prepared by the East Central Florida Regional Planning Council and the Treasure Coast Regional Planning Council for the Florida Department of Prepared by the East Central Florida Regional Planning Council and the Treasure Coast Regional Planning Council for the Graphics Courtesy of Sea Turtle Conservancy; Coastal Tech Corp, UFL IFAS, Brevard

More information

Indian River Lagoon (IRL) Basin Management Action Plans (BMAPs) Fact Sheet

Indian River Lagoon (IRL) Basin Management Action Plans (BMAPs) Fact Sheet Indian River Lagoon (IRL) Basin Management Action Plans (BMAPs) Fact Sheet Improving Water Quality and Seagrass Bed Coverage in the Lagoon Overview of Total Maximum Daily Loads A Total Maximum Daily Load

More information

Environmental Protection Division. Wekiwa Spring and Rock Springs Basin Management Action Plan (BMAP) Status Update

Environmental Protection Division. Wekiwa Spring and Rock Springs Basin Management Action Plan (BMAP) Status Update Environmental Protection Division Wekiwa Spring and Rock Springs Basin Management Action Plan (BMAP) Status Update June 19, 2018 Presentation Outline Work Session #1 Overview Community Meeting Outcome

More information

Fertilizer. It s Use within the. Indian River Lagoon. Watershed

Fertilizer. It s Use within the. Indian River Lagoon. Watershed Fertilizer & It s Use within the Indian River Lagoon Watershed Legislative & Permit Requirements Florida Statue 403.9337(2) Impaired Waters must adopt the State Model as a Minimum IRLBMAP (Indian River

More information

Background (cont.) Measuring Pollutant Loads. Nonpoint source Nitrogen is discrete and generated by a vast array of sources, including:

Background (cont.) Measuring Pollutant Loads. Nonpoint source Nitrogen is discrete and generated by a vast array of sources, including: Suffolk County North Shore Embayments Watershed Management Plan EEA PUBLIC SUMMARY DOCUMENT Inc. December 2007 Purpose Background The Suffolk County North Shore Embayments Watershed Management Plan (herein

More information

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it? Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it? Britt McMillan, Malcolm Pirnie, Inc. Mercury Venus Mars

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

Reducing Pollution at Its Source. Laurie Albrecht UF/IFAS Environmental Horticulture Extension Agent Palm Beach County

Reducing Pollution at Its Source. Laurie Albrecht UF/IFAS Environmental Horticulture Extension Agent Palm Beach County Reducing Pollution at Its Source Laurie Albrecht UF/IFAS Environmental Horticulture Extension Agent Palm Beach County University of Florida Initiative #2: Enhancing and protecting water quality, quantity

More information

ENHANCING AND PROTECTING WATER QUALITY, QUANTITY, AND SUPPLY

ENHANCING AND PROTECTING WATER QUALITY, QUANTITY, AND SUPPLY FLORIDA EXTENSION INITIATIVE #2: ENHANCING AND PROTECTING WATER QUALITY, QUANTITY, AND SUPPLY STATEWIDE EDUCATIONAL PROGRAMS IN URBAN WATER QUALITY SITUATION Florida is uniquely characterized by its numerous

More information

SURFACE WATER MANAGEMENT ELEMENT

SURFACE WATER MANAGEMENT ELEMENT SURFACE WATER MANAGEMENT ELEMENT of the PINELLAS COUNTY COMPREHENSIVE PLAN Prepared By: The Pinellas County Planning Department as staff to the LOCAL PLANNING AGENCY for THE BOARD OF COUNTY COMMISSIONERS

More information

Practical Applications of Stormwater BMPs for addressing Nutrient & Water Quality Challenges in Watersheds

Practical Applications of Stormwater BMPs for addressing Nutrient & Water Quality Challenges in Watersheds Practical Applications of Stormwater BMPs for addressing Nutrient & Water Quality Challenges in Watersheds Florida Water Quality Challenges in 2016 St. Lucie River Lake Okeechobee July 2, 2016 Port Mayaca

More information

Septic System Impacts on Stormwater and Impaired Waterbodies. December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech

Septic System Impacts on Stormwater and Impaired Waterbodies. December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech Septic System Impacts on Stormwater and Impaired Waterbodies December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech Presentation Overview Charlotte County: Many areas adjacent to impaired

More information

BMPs for Florida Landscapes. Laurie E. Trenholm Urban Turfgrass BMP Specialist University of Florida

BMPs for Florida Landscapes. Laurie E. Trenholm Urban Turfgrass BMP Specialist University of Florida BMPs for Florida Landscapes Laurie E. Trenholm Urban Turfgrass BMP Specialist University of Florida BMPs in Florida The first urban BMP in Florida began in 2000 in Broward County because a specific canal

More information

Sanibel Golf Course Fertilizer and Lake Management Recommendations Annual Report Card. July This report was specifically prepared for:

Sanibel Golf Course Fertilizer and Lake Management Recommendations Annual Report Card. July This report was specifically prepared for: Sanibel Golf Course Fertilizer and Lake Management Recommendations Annual Report Card July 2012 This report was specifically prepared for: The Dunes Golf and Tennis Club Introduction Stormwater runoff

More information

Draft March 31, Estimate of Nitrogen Loading from Septic Systems in Martin County. Gary Goforth, P.E., Ph.D. 1

Draft March 31, Estimate of Nitrogen Loading from Septic Systems in Martin County. Gary Goforth, P.E., Ph.D. 1 EXECUTIVE SUMMARY Gary Goforth, P.E., Ph.D. 1 In a recent report to the Martin County Board of County Commissioners and the Martin County Utilities Department, Harbor Branch Oceanographic Institute (HBOI)

More information

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N

O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N O R A N G E C I T Y S INTEGRAT E D W AT E R R E S O U R C E S M A N A G E M E N T & R E S I L I E N C Y P L A N Cooperation is Key Cooperation among Volusia County and Cities is critical to solve our water

More information

Prepared by The Florida Senate Committee on Environmental Preservation and Conservation

Prepared by The Florida Senate Committee on Environmental Preservation and Conservation Prepared by The Florida Senate Committee on Environmental Preservation and Conservation What causes algae blooms cyanobacteria or blue-green algae is naturally occurring freshwater algae that can grow

More information

Anne Arundel County Programmatic Two-Year Milestones January 2018 December 2019

Anne Arundel County Programmatic Two-Year Milestones January 2018 December 2019 Anne Arundel County 2018 2019 Programmatic Two-Year Milestones January 2018 December 2019 (Note: New Milestones are highlighted in green) Target Urban Stormwater 12/2016 Implement the County s Watershed

More information

Bear Creek/Bear Lake Upper Watershed Information and Education Plan

Bear Creek/Bear Lake Upper Watershed Information and Education Plan Bear Creek/Bear Lake Upper Watershed Information and Education Plan Addressing Stormwater Pollution Prevention and the Muskegon Lake Area of Concern Eutrophication Beneficial Use Impairment (BUI) 2010

More information

Northern Region. Final Project Evaluations and Rankings

Northern Region. Final Project Evaluations and Rankings SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT Northern Region Cooperative Initiative Final Project s and Rankings 2379 Broad Street, Brooksville, Florida 34604-6899 (352) 796-7211 or 1-800-423-1476 (FL

More information

From My Backyard to Our Bay It s the 911 for the Chesapeake Bay

From My Backyard to Our Bay It s the 911 for the Chesapeake Bay From My Backyard to Our Bay Reporting Problems on Our Bay, Rivers, and Streams We can all be the eyes and ears of our local waterways. Maryland has established the Chesapeake Bay Safety and Environmental

More information

Springs Coast Basin Management Action Plans (BMAPs)

Springs Coast Basin Management Action Plans (BMAPs) Springs Coast Basin Management Action Plans (BMAPs) January 2018 Terry Hansen P.G., Basin Coordinator 850-245-8561 terry.hansen@dep.state.fl.us Springs Coast BMAP Study Areas and Priority Focus Areas (PFAs)

More information

What happens if a water body doesn t meet its water quality standard (the numeric nutrient criteria)?

What happens if a water body doesn t meet its water quality standard (the numeric nutrient criteria)? Page 1 of 15 Why Does the City of Fort Myers Need a Nutrient Credit Bank? The estuarine portion of the Caloosahatchee River, the part that runs through Fort Myers, is not in compliance with the State s

More information

Anne Arundel County Programmatic Two-Year Milestones January 2016 December 2017

Anne Arundel County Programmatic Two-Year Milestones January 2016 December 2017 Anne Arundel County 2016 2017 Programmatic Two-Year Milestones January 2016 December 2017 (Note: New Milestones are highlighted in green) Target Urban Stormwater Implement the County s Watershed Protection

More information

Stormwater Management - Basic Overview for Municipal Employees

Stormwater Management - Basic Overview for Municipal Employees Stormwater Management - Basic Overview for Municipal Employees October 13 th, 2011 Scott D. Cook Environmental Program Specialist 2 NYSDEC - Region 7 Syracuse Division of Water 315-426-7502 sdcook@gw.dec.state.ny.us

More information

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers The Next Generation of Stormwater Management and Site Design Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers History of WMD Stormwater Rule Florida passed the first rule requiring

More information

INDIAN RIVER LAGOON NATIONAL ESTUARY PROGRAM REQUEST FOR PROPOSAL APPLICATION. Executive Summary

INDIAN RIVER LAGOON NATIONAL ESTUARY PROGRAM REQUEST FOR PROPOSAL APPLICATION. Executive Summary INDIAN RIVER LAGOON NATIONAL ESTUARY PROGRAM REQUEST FOR PROPOSAL APPLICATION Executive Summary Project Title: Monitoring Pollutants of Concern for Human Health in the Indian River Lagoon Project Applicant:

More information

Part 2.0 Non-Numeric Effluent Limitations

Part 2.0 Non-Numeric Effluent Limitations 2017 NH Small MS4 General Permit Page 50 of 67 report on its findings and progress towards making the practices allowable. (Information available at: http://www.epa.gov/region1/npdes/stormwater/assets/pdfs/addressingbarrier2lid.pdf

More information

For the Basin Management Action Plan Adopted by the Florida Department of Environmental Protection. for the. [Name] Basin Addressing [Impairment(s)]

For the Basin Management Action Plan Adopted by the Florida Department of Environmental Protection. for the. [Name] Basin Addressing [Impairment(s)] [YEAR] ANNUAL UPDATE For the Basin Management Action Plan Adopted by the Florida Department of Environmental Protection for the [Name] Basin Addressing [Impairment(s)] BMAP Report Year [Year] Developed

More information

Amount of Request: $100,000: Other Funding Sources: FDEP Grant Agreement No. S0714 Brevard County Muck Dredging.

Amount of Request: $100,000: Other Funding Sources: FDEP Grant Agreement No. S0714 Brevard County Muck Dredging. Executive Summary Project Title: Adaptive Framework for Predicting the Impacts of Climate Change and Urbanization on Water Quality in the Indian River Lagoon Project Applicant: Florida Institute of technology,

More information

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN CONTENTS Introduction 1 The Challenge 5 The Solution 7 Tracking Progress 11 What can you do? 15 INTRODUCTION The DC Stormwater

More information

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal

More information

Sustainable Florida Priority Statement: Talking Points: Water Quality, Water Supply, & Infrastructure Needs Contact:

Sustainable Florida Priority Statement: Talking Points: Water Quality, Water Supply, & Infrastructure Needs Contact: Sustainable Florida Priority Statement: The Florida League of Cities SUPPORTS measures that promote a sustainable Florida, including legislation that: Incentivizes the development and expansion of reclaimed

More information

Town of Sewall s Point Septic Tank to Sanitary Sewer. History

Town of Sewall s Point Septic Tank to Sanitary Sewer. History November 15, 2016 History In 2015, Martin County Utilities completed a Septic to Sewer conversion study which illustrated the need to remove septic tanks from the Indian River Lagoon and St. Lucie Estuary.

More information

Effectiveness of Non-Structural Measures in Watershed Restoration

Effectiveness of Non-Structural Measures in Watershed Restoration Effectiveness of Non-Structural Measures in Watershed Restoration Bill Frost, PE, D.WRE Sr. Water Resources Engineer KCI Technologies, Inc. Sparks, MD 2011 Low Impact Development Symposium Philadelphia,

More information

ALMY POND TMDL MANAGEMENT PLAN

ALMY POND TMDL MANAGEMENT PLAN ALMY POND TMDL MANAGEMENT PLAN PUBLIC WORKSHOP Presented by: City of Newport Department of Utilities And Pare Corporation May 7, 2014 Presentation Overview Introduction to Almy Pond Project Introduction

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

The Corsica River Project ~A Five Year Update~ Monitoring from the Field to the Estuary LID/NPS Conference Philadelphia

The Corsica River Project ~A Five Year Update~ Monitoring from the Field to the Estuary LID/NPS Conference Philadelphia The Corsica River Project ~A Five Year Update~ Monitoring from the Field to the Estuary 2011 LID/NPS Conference Philadelphia The Corsica River Watershed t Nutrient Loads by Land Use (MDE 2000) 809 Septic

More information

Old Winter Beach Road Improvement Plans

Old Winter Beach Road Improvement Plans 0 10 20 40 Graphic Scale 60 80 Scott B. McGuire, P.E. Fl. Reg No. 39573 David S. Knight, P.E. Fl. Reg No. 41060 5 INDIAN RIVER LAGOON NATIONAL ESTUARY PROGRAM FY 2017-2018 Work Plan, 2017-003 PROPOSAL

More information

Some Context behind the Implementation of Numeric Nutrient Criteria or Why do we have these Water Quality Regulations?

Some Context behind the Implementation of Numeric Nutrient Criteria or Why do we have these Water Quality Regulations? Some Context behind the Implementation of Numeric Nutrient Criteria or Why do we have these Water Quality Regulations? Mark W. Clark and Thomas Obreza Soil and Water Science Department University of Florida,

More information

Reservoir age, increasing human population,

Reservoir age, increasing human population, B-6249 02/12 Eagle Mountain Watershed Management Brent Clayton, Justin Mechell, David Waidler and Clint Wolfe* Reservoir age, increasing human population, and changing land uses have prompted the development

More information

STORMWATER MANAGEMENT AND IMPAIRED WATERS. Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL

STORMWATER MANAGEMENT AND IMPAIRED WATERS. Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL STORMWATER MANAGEMENT AND IMPAIRED WATERS Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL Impaired Waters Not meet their WQS Loss of designated uses TOTAL MAXIMUM DAILY LOADS Section

More information

St. Johns River Water Quality Projects. St. Johns River Water Quality Projects Fiscal Year

St. Johns River Water Quality Projects. St. Johns River Water Quality Projects Fiscal Year St. Johns River Water Quality Projects Fiscal Year 2011 2012 The St. Johns River is an invaluable part of Florida and is central to our quality of life. However, for decades, the river has suffered from

More information

MS4 Assessment Program to Satisfy Part V. Monitoring Requirements

MS4 Assessment Program to Satisfy Part V. Monitoring Requirements MS4 Assessment Program to Satisfy Part V. Monitoring Requirements Submitted by City of Boynton Beach MS4 Permit No. FLS000018-004 The purpose of this document is to outline the City of Boynton Beach Stormwater

More information

Norwalk Harbor Report Card

Norwalk Harbor Report Card Norwalk Harbor Report Card C+ Following the water s trail from your house, into the river, and to the Harbor The way land is used in a watershed has a significant effect on water quality. In areas where

More information

Local Solutions to Our Water Quality Crisis

Local Solutions to Our Water Quality Crisis Local Solutions to Our Water Quality Crisis Florida SouthWestern State College Lifelong Learning Institute January 2019 Dr. Coty Keller Why the estuary is so important to our economy and lifestyles What

More information

Sustaining Our Water Resources Public Health. April 27, 2011

Sustaining Our Water Resources Public Health. April 27, 2011 Sustaining the the Bay Bay Environmental Environmental Health Health Sustaining Our Water Resources Public Health Sustaining i i Our Our County Economic i Health Health lh IMPLEMENTATION: 2011 and Beyond

More information

Alternate Water Systems

Alternate Water Systems Alternate Water Systems Los Angeles County Department of Public Health ACONA Meeting, March 04, 2014 Carlos Borja, R.E.H.S, M.P.H. Chief Environmental Specialist L.A. County Department of Public Health

More information

HIDDEN SOURCES: MEASURING GROUNDWATER LOADS TO THE INDIAN RIVER LAGOON. Carolina Alvarez Claudia Listopad, Ph.D. Leesa Souto, Ph.D.

HIDDEN SOURCES: MEASURING GROUNDWATER LOADS TO THE INDIAN RIVER LAGOON. Carolina Alvarez Claudia Listopad, Ph.D. Leesa Souto, Ph.D. HIDDEN SOURCES: MEASURING GROUNDWATER LOADS TO THE INDIAN RIVER LAGOON Carolina Alvarez Claudia Listopad, Ph.D. Leesa Souto, Ph.D. Indian River Lagoon 1/3 of Florida s east coast Estuary of National Significance

More information

POTABLE WATER ELEMENT

POTABLE WATER ELEMENT Goal 4.0. Provide current and future residents of the County's utility service areas, and large users of the regional raw water system a cost-effective and equitable potable or raw water supply system

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

Continuous Monitoring and Adaptive Control Retrofits for Water Quality

Continuous Monitoring and Adaptive Control Retrofits for Water Quality Continuous Monitoring and Adaptive Control Retrofits for Water Quality Addressing Indian River CCMP Action Plans Fresh and Storm Water Discharges Total Maximum Daily Loads (TMDLs) Climate Change Public

More information

Restoration Plan for the Rainbow Springs and River DRAFT. 11 Appendices

Restoration Plan for the Rainbow Springs and River DRAFT. 11 Appendices 11 Appendices Appendix A. Location of Onsite Sewage Treatment Systems in Marion County Source: Marion County Utilities (Darker green areas indicate the locations of septic tanks) Normandeau Associates,

More information

Jacksonville City Council Candidate Survey 2019

Jacksonville City Council Candidate Survey 2019 Jacksonville City Council Candidate Survey 2019 Threats to the St. Johns River s Health The State of the River Report for the Lower St. Johns River Basin has scientifically tracked and assessed key health

More information

SANITARY SEWER ELEMENT

SANITARY SEWER ELEMENT Goal 5.0. The Environmental Protection and Growth Management Department (EPGMD) and Water and Wastewater Services (WWS) shall identify the needs of and provide the unincorporated areas, large users, and

More information

Hydrologic Restoration via LID Retrofit Tracy Fanara, Ph.D. UCOWR Annual Conference, Henderson NV June 18, 2015

Hydrologic Restoration via LID Retrofit Tracy Fanara, Ph.D. UCOWR Annual Conference, Henderson NV June 18, 2015 Hydrologic Restoration via LID Retrofit Tracy Fanara, Ph.D. UCOWR Annual Conference, Henderson NV June 18, 2015 Integration Taking Research In Water Treatment Groundwater Hydrology Surface Water Hydrology

More information

What Does It All Mean? CWA? Sara Esposito, P.E. DNREC Division of Watershed Stewardship

What Does It All Mean? CWA? Sara Esposito, P.E. DNREC Division of Watershed Stewardship What Does It All Mean? CWA? Sara Esposito, P.E. DNREC Division of Watershed Stewardship sara.esposito@state.de.us Why are we here? Just like pavement has helped move cars faster; it has also helped water

More information

Proposed EPA NNC January 14, TN (mg/l) TP (ppb) Chla (ug/l) Canals Peninsula South.

Proposed EPA NNC January 14, TN (mg/l) TP (ppb) Chla (ug/l) Canals Peninsula South. Proposed EPA NNC January 14, 2009 Palm Beach County Canals Peninsula South TN (mg/l) 1.205 1.6 TP (ppb) 107 42 Chla (ug/l) - 4.0 Values exceeding proposed EPA water quality standards TN 1.6 mg/l, TP 42

More information

City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS

City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS City of Delray Beach MS4 Assessment Program: Part V. Monitoring Requirements MS4 Permit No. FLS 000018 004 The purpose of this document is to outline the assessment program for the City of Delray Beach

More information

Florida s Water Quality Trading. Carla Seiwert EPA R

Florida s Water Quality Trading. Carla Seiwert EPA R Florida s Water Quality Trading Carla Seiwert EPA R4 Seiwert.Carla@epa.gov 404-562-9299 Agenda Florida s motivation for Water Quality Trading Background of Florida s Trading Legislation Basin Management

More information

HOME PRACTICES TO PROMOTE WATER QUALITY

HOME PRACTICES TO PROMOTE WATER QUALITY November 2004 HOME PRACTICES TO PROMOTE WATER QUALITY There are four major watersheds in the Mid- Atlantic: the Ohio River basin draining to the Gulf of Mexico, the Delaware Bay, the Roanoke and Chowan

More information

Stormwater Programs. BIA Meeting June 5, Jason Uhley

Stormwater Programs. BIA Meeting June 5, Jason Uhley Stormwater Programs BIA Meeting June 5, 2014 Jason Uhley Chief of Watershed Protection Riverside County Flood Control and Water Conservation District Presentation Outline Clean Water Act Stormwater Program

More information

Water Supply and Delivery

Water Supply and Delivery Utilities Water Supply and Delivery Goal U-1 Availability of an adequate, safe, and sustainable water supply and maintenance of an efficient water system for residents and visitors. (Modified Goal 4.B)

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information

Rainwater Harvesting:

Rainwater Harvesting: Rainwater Harvesting: Using and Reducing the Water that Goes to Waste. By Steve Williams 2012 An Answer to Urban Water Quantity and Quality Problems Urban Ecosystem Analysis The City of Atlanta Tree loss

More information

Richard V. Busche, P.E., CFM

Richard V. Busche, P.E., CFM Florida Stormwater Association EXCELLENCE AWARDS STORMWATER PROGRAMS & PROJECTS 2015 NOMINATION FORM I. Nomination Information Nomination Category (please check only one box): Program (Department/Division)

More information

City of Tallahassee, Florida

City of Tallahassee, Florida Upper Wakulla River Regulations, Restoration,.Rethink for Future City of Tallahassee, Florida American Planning Association Webinar - The Issue of Water: Quality and Quantity and Implications for Florida

More information

New Rule Development for Unified Stormwater Quality Rules ERP Phase Two

New Rule Development for Unified Stormwater Quality Rules ERP Phase Two New Rule Development for Unified Stormwater Quality Rules ERP Phase Two Caloosahatchee River Watershed Protection Plan Working Team Meeting Wednesday, May 21, 2008 Damon Meiers and Susan Roeder Martin

More information

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

CHAPTER 6 SANITARY SEWER SUB-ELEMENT CHAPTER 6 SANITARY SEWER SUB-ELEMENT Page 1 of 10 CHAPTER 6 SANITARY SEWER SUB-ELEMENT A. OVERVIEW The following Future Land Use categories are considered to be urban and require the provision of sanitary

More information

DRAFT ANNOTATED OUTLINE 12/4/2006

DRAFT ANNOTATED OUTLINE 12/4/2006 DRAFT ANNOTATED OUTLINE 12/4/2006 INTEGRATED WATER MANAGEMENT PLAN SAN DIEGO REGION A. INTRODUCTION AND REGIONAL WATER MANAGEMENT GROUP Summary This Integrated Regional Water Management Plan (IRWM Plan)

More information

Chesapeake Bay TMDL and Maryland s Watershed Implementation Plan. Robert M. Summers, Ph.D. Acting Secretary Maryland Department of the Environment

Chesapeake Bay TMDL and Maryland s Watershed Implementation Plan. Robert M. Summers, Ph.D. Acting Secretary Maryland Department of the Environment Chesapeake Bay TMDL and Maryland s Watershed Implementation Plan Robert M. Summers, Ph.D. Acting Secretary Maryland Department of the Environment TMDL Background TMDL = Total Maximum Daily Load. The maximum

More information

Texas Nonpoint Source Pollution Program Grant Cycle

Texas Nonpoint Source Pollution Program Grant Cycle Texas Nonpoint Source Pollution Program and the 2010 Grant Cycle Texas Commission on Environmental Quality Anju Chalise Clean Water Act 319(h) Grants Federal funds provided by EPA Funds administered by

More information

SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH

SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH SOUTHEAST FLORIDA S RESILIENT WATER RESOURCES INCLUDING A CASE STUDY FOR THE CITY OF POMPANO BEACH SOUTHEAST FLORIDA S WATER INFRASTRUCTURE IS VULNERABLE TO CLIMATE CHANGE THE WATER INFRASTRUCTURE IN FLORIDA

More information

Capturing Storm Water in Semi-arid Climate

Capturing Storm Water in Semi-arid Climate Capturing Storm Water in Semi-arid Climate REBEKA SULTANA, PHD CALIFORNIA STATE UNIVERSITY, LONG BEACH NATHANIEL SUMMERVILLE, PE CALIFORNIA STATE UNIVERSITY LONG BEACH (STUDENT PROJECT MANAGER) AND CH2M

More information

MARION COUNTY COMPREHENSIVE PLAN 2035

MARION COUNTY COMPREHENSIVE PLAN 2035 0 0 0 GOAL : the County shall ensure safe, effective, and efficient wastewater treatment systems that protect the quality of surface water, groundwater, and springsheds are established and maintained,

More information

Section Wastewater Treatment Element

Section Wastewater Treatment Element 3.3.4. Wastewater 4-3-12 Section 3.3.4. Wastewater Treatment Element Pursuant to Section 163.3177(3), Florida Statutes and Chapter 9J-5.011(2) of the Florida Administrative Code. Background Discussion

More information

June 27, 2012 Holly Galavotti U.S. EPA

June 27, 2012 Holly Galavotti U.S. EPA June 27, 2012 Holly Galavotti U.S. EPA Urban stormwater is a leading source of water quality impairment Urban stormwater identified as source of impairment (2004 WQ Report) 22,559 miles of impaired rivers

More information

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders 14 th Annual EPA Region 6 Stormwater Conference 26 June 2012 TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders Michael F. Bloom, PE, CFM, BCEE

More information

Stakeholder Meeting #1

Stakeholder Meeting #1 Santa Clara Basin Stormwater Resource Plan Stakeholder Meeting #1 October 4, 2017 Jill Bicknell, P.E. SCVURPPP Presentation Overview Background SCVURPPP Green Infrastructure Stormwater Resource Plan (SWRP)

More information

Recommended Best Management Practices Nutrients (Includes Phosphorus, Nitrogen, & Ammonia)

Recommended Best Management Practices Nutrients (Includes Phosphorus, Nitrogen, & Ammonia) Recommended Best Management Practices for Nutrients (Includes Phosphorus, Nitrogen, & Ammonia) Total Maximum Daily Load Fact Sheet About Nutrients Nutrients like phosphorus, nitrogen, and ammonia are needed

More information

Wastewater Treatment & Reclamation

Wastewater Treatment & Reclamation Wastewater Treatment & Reclamation BACKGROUND Of the pollution sources to Sarasota Bay (wastewater, stormwater, and atmospheric), wastewater contains the highest concentrations of nitrogen. In the Bay

More information

Urban Geology Spring 2011

Urban Geology Spring 2011 Urban Geology Spring 2011 Gowanus Canal Historical use New York City Water pollution Sewage treatment plants Eutrophication Combined sewage outflows (CSO) Remediation Sustainability Gowanus Canal today

More information

5. RESOURCE MANAGEMENT STRATEGIES

5. RESOURCE MANAGEMENT STRATEGIES Central Orange County Integrated Regional Water Management Plan 5. RESOURCE MANAGEMENT STRATEGIES 5.1 STRATEGIES INAPPLICABLE TO REGION Nearly all types of resource management strategies are applicable

More information

Why Camden s environment is important to everyone in the Delaware Watershed...

Why Camden s environment is important to everyone in the Delaware Watershed... Delaware Estuary Science & Environmental Summit 2015 Wednesday January 28, 2015 Camden s Waterfront Brownfields & Landfills: Opportunities For Creation of Environmental Assets That Benefit the Entire Delaware

More information

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.

Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No. Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...

More information

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING

More information

BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY

BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY BEE BRANCH WATERSHED GREEN INFRASTRUCTURE SUMMARY purpose & background PURPOSE & BACKGROUND Through the Bee Branch Watershed Green Infrastructure Project, the City proposes to install permeable interlocking

More information

CHAPTER 10 NATURAL GROUNDWATER AND AQUIFER RECHARGE ELEMENT

CHAPTER 10 NATURAL GROUNDWATER AND AQUIFER RECHARGE ELEMENT CHAPTER 10 NATURAL GROUNDWATER AND AQUIFER RECHARGE ELEMENT Page 1 of 7 G:\Comp\Adopted Comprehensive Plans\15. Cylce 16-2 and 16-3\Elements not changed\ Groundwater & Aquifer A. OVERVIEW CHAPTER 10 NATURAL

More information

A Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June

A Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June A Primer on Stormwater Management, your Facility and the Chesapeake Bay Tom Schueler Chesapeake Stormwater Network June 5. 2017 Key Themes Why do we need to be concerned about Stormwater? What are all

More information

Everglades Restoration Definitions

Everglades Restoration Definitions Everglades Restoration Definitions - CERP - CEPP - C-44, C-43 - EAA - IRL South - Plan 6 - SLE - STA - Water Farming - WCA - WRDA Pre-drainage Flow Present Flow Restored Flow Source: The National Academies

More information

Impacts From Development

Impacts From Development Why Rainwater? Impacts From Development Point Source Pollution Benefits Storm Water Management Reduce CSO s s & SSO s Promote Water Quality Water Conservation Reduction Potable Water Use A leading-edge

More information

Building a Stormwater BMP Maintenance Program from the ground up.

Building a Stormwater BMP Maintenance Program from the ground up. DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Building a Stormwater BMP Maintenance Program from the ground up. May 4-6, 2016 APWA Mid-Atlantic Presentation Agenda Post-Construction Stormwater

More information

Stormwater. General Awareness Training

Stormwater. General Awareness Training Stormwater General Awareness Training Water Regulatory History 1972 Congress enacts Clean Water Act Regulates wastewater pollution 1987 Congress amends Clean Water Act Stormwater pollution regulation added

More information

Sanibel Golf Course Fertilizer and Lake Management Recommendations Annual Report Card. September This report was specifically prepared for:

Sanibel Golf Course Fertilizer and Lake Management Recommendations Annual Report Card. September This report was specifically prepared for: Sanibel Golf Course Fertilizer and Lake Management Recommendations Annual Report Card September 2015 This report was specifically prepared for: Sanibel Island Golf Club Introduction Stormwater runoff from

More information

Florida TMDLs and Biosolids. A Topic for Concern Related to Florida Surface Waters By: Gary N. Roderick

Florida TMDLs and Biosolids. A Topic for Concern Related to Florida Surface Waters By: Gary N. Roderick Florida TMDLs and Biosolids A Topic for Concern Related to Florida Surface Waters By: Gary N. Roderick - 2018 Research in Florida has shown that bahiagrass may produce satisfactorily without phosphorus

More information

Connection btwn Smart Growth and. Watershed. Approach

Connection btwn Smart Growth and. Watershed. Approach Connection btwn Smart Growth and Integrating Watershed Planning Watershed and Approach Transportation Planning Robert Goo Office of Wetlands, Oceans and Watersheds U.S. EPA What is the Connection Between

More information

Factsheet: Town of Deep River Water Quality and Stormwater Summary

Factsheet: Town of Deep River Water Quality and Stormwater Summary 79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Factsheet: Town of Deep River Water Quality and Stormwater Summary This document was created for each

More information