1 SERVICING BRIEF Crichton Street Ottawa, Ontario Report No SB July 28, 2010 Revised November 3, 2010 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains 1052 Karsh Drive, Tel: (613) Ottawa, Ontario. Fax: (613) K1G 4N1 dbgray@rogers.com 1

2 SERVICING BRIEF Crichton Street Ottawa, Ontario The following Servicing Brief is a description of the services of a proposed 32 unit three storey stacked townhouse building development with underground parking located on 1686 sq.m. of land Crichton Street in Ottawa. Refer to drawing SG-1 & SG-2 (Revision 1: Jul 28-10), prepared by D. B. Gray Engineering Inc. Water Supply for Fire Fighting: There are two existing fire hydrants near the subject property on the municipal right-of-way for Crichton Street on the opposite side of the street. One is located approximately 39m from the south-east corner of the proposed building (and proposed fire department connection). The other is located approximately 47m from the south-west corner of the proposed building. A fire demand of 9,000 L/min is required as per "Required Minimum Water Supply Flow Rate" as calculated using the Ontario Building Code - Appendix A - Article A "Water Supply For Fire Fighting". Field measurements by the City of Ottawa has recorded the actual flow from one of these hydrants at 5,014 L/min (1,103 ipgm) at a dynamic water pressure of 496 kpa (72 psi). The calculated the flow at 138 kpa (20 psi) is 14,884 L/min (3,274 ipgm). As such, there is an adequate water supply for fire fighting. Water Service: The proposed water service will connect to an existing 300mm municipal watermain in Crichton Street. Field measurements by the City of Ottawa have recorded the static water pressure in the municipal watermain to be 80 psi (552 kpa). The AWWA plumbing fixture value of the proposed development totals Based on the AWWA water flow demand curve, an estimated water pressure at the meter of 80 psi ( 552 kpa) and one external hose bib operating, the peak domestic demand is expected to be 292 l/min (70 USgpm). To meet fire fighting requirements a 150mm diameter water service connection is being proposed. A water service of this size will also meet the domestic demand. Based on 67 people at 75 litres per person per day, the daily average flow is expected to be 3.5 l/min (0.9 USgpm). Sanitary Service: The post development peak flows are calculated to be 1.41 l/s. The proposed sanitary sewer service 2% l/s capacity) will connect to an existing 300mm municipal sanitary 0.508% l/s capacity) in Crichton Street. The 1.41 l/s peak flow contributing to the existing 300mm sanitary sewer is expected to have a negligible impact on the existing municipal sewer. City staff at Infrastructure Approvals has advised that there may be sanitary sewer capacity issues in the area and has advised us to contact city staff at Infrastructure Services. Several attempts have been made to contact staff but contact has yet to be made. 2

3 Stormwater: The release rate for post-development storm events is designed to be equal to or less than the flow produced by a five year storm using a runoff coefficient of 0.50 and a 20 minute time of concentration. To restrict the flow to the maximum release rate each of four roof drains in the upper roof area will be flow control causing the storm water to pond on the upper roof. An inlet control device (ICD) located at the outlet pipe of a manhole will control the release of stormwater off the site. The ICD will restrict the flow and force the stormwater to back up into the upstream sewer pipes, catch basins and manholes. (Refer to Stormwater Management Report No SWM, July prepared by D. B. Gray Engineering Inc.) During the five year event stormwater released through the ICD will be restricted to a maximum flow of 7.54 l/s and will be conveyed off the site via the proposed 250mm storm sewer connection (@ 0.43% l/s capacity) to an 450mm municipal storm sewer (@ 0.728% l/s capacity) in Crichton Street. The restricted flow is expected to have a negligible impact on the existing municipal sewer. The unrestricted flow produced by a one in five year storm event at a 10 minute time of concentration will produce a peak flow of 30.0 l/s. A second storm sewer service connection will serve only trench drain at the ramp down to the underground garage. The flow will be unrestricted. The flow produced by a one in five year storm event at a 10 minute time of concentration will produce a peak flow of 2.1 l/s. The proposed storm sewer connection 0.43%) has a capacity of 40.7 l/s. 3

4 RE: 280 Crichton St - 'Yahoo! Mail' Page 1 of 2 29/07/2010 RE: 280 Crichton St Note: the computed flows are approximate and performed for hydrant colour coding purposes, thus these values are not intended for design purposes. ` Douglas Gray Company: D. B. G R A Y E N G I N E E R I N G I N C. Tel: (613) Fax: (613) Location: Electric Request_dt: :39:04 dbgray@rogers.com Inspection Flow Residual Pressure (psi) Flow (igpm) Date Hydrant Hydrant Static Dynamic Pitot 20 psi 2009/05/ Murray Crowder Technical Support Drinking Water Operations Branch Environmental Services Department City of Ottawa 951 Clyde Avenue, Ottawa, On K1Z 5A6 Mail Code Tel: (613) x Fax: (613) murray.crowder@ottawa.ca From: DOUGLAS GRAY [mailto:dbgray@rogers.com] Sent: June 22, :35 AM To: Crowder, Murray Subject: 280 Crichton St Hi Murray I am working on a project at 280 Crichton St (see attached map). Please send me water supply / pressure information in this area. Thanks, Doug D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains 1052 Karsh Drive, Tel: (613) Ottawa, Ontario. Fax: (613) K1G 4N1 dbgray@rogers.com This originates from the City of Ottawa system. Any distribution, use or copying of this or the information it contains by other than the intended recipient(s) is unauthorized. If you are not the intended recipient, please notify me at the 4

5 RE: 280 Crichton St - 'Yahoo! Mail' Page 2 of 2 29/07/2010 telephone number shown above or by return and delete this communication and any copy immediately. Thank you. Le présent courriel a été expédié par le système de courriels de la Ville d'ottawa. Toute distribution, utilisation ou reproduction du courriel ou des renseignements qui s'y trouvent par une personne autre que son destinataire prévu est interdite. Si vous avez reçu le message par erreur, veuillez m'en aviser par téléphone (au numéro précité) ou par courriel, puis supprimer sans délai la version originale de la communication ainsi que toutes ses copies. Je vous remercie de votre collaboration. 5

6 6

7 Crichton Street, Ottawa Ontario Water Supply for Fire-Fighting Calculations: A fire demand of 9,000 L/min is required as per "Required Minimum Water Supply Flow Rate" as calculated using the Ontario Building Code - Appendix A - Article A "Water Supply For Fire Fighting". Fire Protection Water Supply Q = KVS Tot S Tot = S Side1 + S Side2 + S Side3 + S Side1 + S Side4 Spatial Coefficient Exposure Distance m S Side (to center line of road) S Side (to west property line) S Side (to north property line) S Side (to east property line) S Tot 2.5 Building (except garage): K (Water Supply Coefficient) 18 As per A Table 1 (Group C Occupancy / Combustible construction with fire separations and fire resistance ratings as per OBC ) V (Building Volume) Average Area Height Volume sq.m. m cu.m. Basement ,626 Ground ,809 Second ,900 Third ,743 3,772 sq.m. 11,078 cu.m. Q = Q 1 = KVS Tot 498,532 L Garage: K (Water Supply Coefficient) 22 As per A Table 1 (Group F3 Occupancy / Combustible construction with fire separations and fire resistance ratings as per OBC ) V (Building Volume) Q = Q 2 = Average Area Height Volume sq.m. m cu.m. 1, ,222 KVS Tot 177,223 L Q Tot = Q 1 + Q 2 Q Tot = 675,755 L Required Minimum Water Supply Flow Rate 9,000 L/min (As per A Table 2) Available Water Supply: Flow Residual Pressure Flow Hydrant Hydrant Static Dynamic 20 psi psi psi igpm igpm , kpa kpa kpa L/min L/min ,014 14,884 7

8 28-Jun Crichton St 32 Units WATER FIXTURE VALUE No. F.V. Total Bathtub Tiolet - tank Tiolet - flush valve Lavs Urinal - pedestal flush valve Urinal - wall flush valve Shower K. Sink Dishwasher Clothes Washer Commercial Sink J. Sink Commercial Dishwasher 0 Commercial Washer 0 Hose 1/2 in Peak Demand (fig 4-2 or 4-3) 60 Usgpm Meter 552 kpa 80 psi Pressure Factor (table 4-1) 1.17 Peak Demand 70 Usgpm Irrigation - hose 1/2 in 1 7 Usgpm (includes pressure factor) (assume one hose bib operating) TOTAL PEAK DEMAND 292 l/min 77 Usgpm Nominal Size 5.9 in 150 mm 0.9 ft/s 0.3 m/s DAILY AVERAGE 32 Units 2.1 Persons / unit 67.2 persons 75 litres / person / day 3.5 l / min 0.9 Usgpm 8

9 D. B. G R A Y E N G I N E E R I N G I N C. SANITARY SEWER DESIGN FORM Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains Average Daily Flows: Peaking Factor: PROJECT: Crchton St Residential: 350 l / capita / day Residential (Harmon Equation): P.F. = Karsh Drive Tel: (613) Commercial: 50,000 l / ha / day P = Population / P 0.5 Designed By: DBG Ottawa, Ontario. Fax: (613) Instituational: 50,000 l / ha / day K1G 4N1 dbgray@rogers.com Light Industrial: 50,000 l / ha / day Infiltration Allowance: 0.28 l / s / ha 28-Jul-10 Heavy Industrial: 50,000 l / ha / day Page: 1 of 1 Section Cumulative Section Cumulative SEWER DATA LOCATION Single Semi / Duplex / Apartments Apartments Apartments Apartments Residential Non-Residential Residential Sewage Infiltratio Total Family Townhouse Triplex (average) (1 Bed.) (2 Bed.) (3 Bed.) Area n = Area Peaking Area Flow Peaking Flow n Flow Flow STREET FROM TO ppu = 3.4 ppu = 2.7 ppu = 2.3 ppu = 1.8 ppu = 1.4 ppu = 2.1 ppu = 3.1 Pop. Type of Dia. Actual Dia. Nom. Slope Length Capacity Velocity Ratio Factor Factor No. of Units No. of Units No. of Units No. of Units No. of Units No. of Units No. of Units ha ha l/ha/day ha l/s l/s l/s Pipe (mm) (mm) (%) (m) (l/s) (m/s) Q/Qfull COMMENTS BUILDING EXIST PVC SDR mm SAN EXISTING MUNICIPAL SANITARY SEWER IN CRICHTON ST

10 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains STORM SEWER COMPUTATION FORM PROJECT: Chrichton St, Ottawa 1052 Karsh Drive Tel: (613) RATIONAL METHOD Q = 2.78 A I R FIVE YEAR EVENT Designed By: DBG Ottawa, Ontario. Fax: (613) K1G 4N1 dbgray@rogers.com n = Date: 28-Jul-10 Page: 1 of 1 Time of Rainfall SEWER DATA LOCATION AREA (ha) Individual Accum. Peak Flow Conc. Intensity Type of Dia. Actual Dia. Nom. Slope Length Capacity Velocity Time of Ratio 2.78 A R 2.78 A R Q (l/s) STREET FROM TO R = 0.9 R = 0.70 R = 0.2 R = 0.9 (min) I (mm/hr) Pipe (mm) (mm) (%) (m) (l/s) (m/s) Flow (min) Q/Qfull COMMENTS CB-6 CB/MH PVC SDR CB/MH-4 CB/MH PVC SDR CB/MH-3 CB/MH PVC SDR ROOF CB/MH PVC SDR CB/MH-2 CB/MH PVC SDR CB/MH-1 exist 450 ST PVC SDR Trench Drain exist 450 ST PVC SDR EXISTING 450 MUNICIPAL STORM SEWER IN CRICHTON ST

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers

More information

Silver Seven Corporate Centre Phase 1

Silver Seven Corporate Centre Phase 1 SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

PROPOSED FOUR-STOREY APARTMENT BUILDING DEVELOPMENT SITE FOR SUPERIOR CONSTRUCTION INC. LOT 8 R-PLAN MERIVALE ROAD CITY OF OTTAWA

PROPOSED FOUR-STOREY APARTMENT BUILDING DEVELOPMENT SITE FOR SUPERIOR CONSTRUCTION INC. LOT 8 R-PLAN MERIVALE ROAD CITY OF OTTAWA PROPOSED FOUR-STOREY APARTMENT BUILDING DEVELOPMENT SITE FOR SUPERIOR CONSTRUCTION INC. LOT 8 R-PLAN 327929 999 MERIVALE ROAD CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R-813-12A T. L. MAK ENGINEERING

More information

ADEQUACY OF SERVICING REPORT St. Joseph Boulevard Orleans (Ottawa), Ontario. Report No June 8, 2016

ADEQUACY OF SERVICING REPORT St. Joseph Boulevard Orleans (Ottawa), Ontario. Report No June 8, 2016 ADEQUACY OF SERVICING REPORT 379-3809 St. Joseph Boulevard Orleans (Ottawa), Ontario Report No. 604 June 8, 06 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 62 667 BANK STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT R 816 41A (Rev. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD.

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A REV. 1 MAY 2018 T. L. MAK ENGINEERING

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOTS 187 AND 188 R PLAN 441 324 326 DONALD STREET CITY OF OTTAWA SERVICEABILITY REPORT REPORT No. R 817 79A T. L. MAK ENGINEERING CONSULTANTS LTD.

More information

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario

Site Servicing & Stormwater Management Report for Site Plan Control Application. Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Site Servicing & Stormwater Management Report for Site Plan Control Application Proposed New Multi-Unit Development 284 Presland Road Ottawa, Ontario Prepared for: Martin Clement Attention: Mr. Martin

More information

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON K2C 3G4 February 10, 2016 File: 160401220 Attention: John Wu Development Review Urban Services Branch 110 Laurier Avenue West Ottawa, ON. K1P 1J1

More information

LEVAC ROBICHAUD LECLERC Consulting Engineers/Ingénieurs conseils Rockland Hawkesbury Gatineau

LEVAC ROBICHAUD LECLERC Consulting Engineers/Ingénieurs conseils Rockland Hawkesbury Gatineau LEVAC ROBICHAUD LECLERC Consulting Engineers/Ingénieurs conseils Rockland Hawkesbury Gatineau Site Servicing Brief Proposed Oakwood Designers & Builders Inc. Headquarters 865 Taylor Creek Drive, Orleans,

More information

SITE SERVICING PRELIMINARY DESIGN BRIEF

SITE SERVICING PRELIMINARY DESIGN BRIEF 855 Carling Avenue Proposed Redevelopment SITE SERVICING PRELIMINARY DESIGN BRIEF March 2010 March 23, 2010 RVA 081785 Arnon Corporation 1801 Woodward Dr. Ottawa, ON K2C 0R3 Attention: Mike Casey Re: 855

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. STORMWATER MANAGEMENT REPORT 22 Perkins Street Ottawa, Ontario Report No. 13030-SWM February 6, 2015 D. B. G R A Y E N G I N E E R I N G I N. Stormwater Management - Grading & Drainage - Storm & Sanitary

More information

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON KC 3G4 February 3, 017 File: 1604010159 Attention: Kimberly Baldwin Development Review Urban Services Branch 110 Laurier Avenue West Ottawa, ON.

More information

255 NORTHFIELD DRIVE EAST

255 NORTHFIELD DRIVE EAST 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,

More information

ULTRAMAR LTD 3467 Hawthorne Road Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT REPORT. Submitted to:

ULTRAMAR LTD 3467 Hawthorne Road Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT REPORT. Submitted to: ULTRAMAR LTD 3467 Hawthorne Road Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT REPORT Submitted to: Manon Renaud Architect 443 Saint-Claude, Montréal (QC) H2Y 3B6 Submitted by: Delcan Corporation

More information

D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains

D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers - Watermains SERVICING BRIEF 1003 Prince of Wales Drive Ottawa, Ontario Report No. 12069-SB May 7, 2013 Revised March 3, 2014 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage -

More information

Site Servicing and Stormwater Management Report 192 Forward Avenue Ottawa, Ontario

Site Servicing and Stormwater Management Report 192 Forward Avenue Ottawa, Ontario Site Servicing and Stormwater Management Report 192 Forward Avenue Ottawa, Ontario Type of Document: Site Plan Submission Client: 190 Forward Inc. 204-2525 St. Laurent Boulevard Ottawa, ON K1H 8P5 Project

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)

215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 December 17, 2013 130208 2343065

More information

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario

New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario New Retirement Home 6758 & 6766 Rocque Street Orleans, Ontario Site Servicing and Stormwater Management Report By Mohamad Salame, P.Eng. Kamco Technique Ltee. 60 Grand Avenue North Cambridge, Ontario N1S

More information

Myers Bodyshop Proposed Bodyshop and Future Dealership

Myers Bodyshop Proposed Bodyshop and Future Dealership Myers Bodyshop Proposed Bodyshop and Future Dealership 550 Dealership Drive, City of Ottawa Site Servicing and Stormwater Management Report Prepared for: BBS Construction 1805 Woodward Drive Ottawa, ON

More information

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx

P: (905) F: (905) PROPOSED BANK. Prepared For: ENT INC. JUNE Rev 0.docx The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED THREE-STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 19 R-PLAN 149 1162 ROCKINGHAM AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT No. R-815-41 T. L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2015

More information

Dunpar Developments Inc.

Dunpar Developments Inc. Dunpar Developments Inc. Proposed Townhouse Development 2158, 2168, 2180 and 2192 Trafalgar Road Oakville, Ontario Functional Servicing and Stormwater Management Report (in Support of a Re-Zoning and Site

More information

SANITARY AND STORM TRUNK SEWER DESIGN BRIEF KANATA RESEARCH PARK LANDS

SANITARY AND STORM TRUNK SEWER DESIGN BRIEF KANATA RESEARCH PARK LANDS SANITARY AND STORM TRUNK SEWER DESIGN BRIEF KANATA RESEARCH PARK LANDS Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 August 8, 2014 Novatech File: 114060 Ref: R-2014-114

More information

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR:

STORM WATER REPORT. Proposed Row House Complex Clare and Hilson 566 Hilson Ave. & 148 Clare St. Ottawa, Ontario PREPARED FOR: Civil Geotechnical Structural Environmental 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 STORM WATER REPORT Proposed Row House Complex Clare and

More information

St. Boniface Industrial Park Phase 2 Municipal Servicing Report

St. Boniface Industrial Park Phase 2 Municipal Servicing Report St. Boniface Industrial Park Phase 2 Municipal Servicing Report Prepared for: City of Winnipeg Prepared by: Stantec Consulting Ltd. File: 116809351 November 5, 2015 ST. BONIFACE INDUSTRIAL PARK PHASE 2

More information

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario

Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Site Servicing and Stormwater Management Report for Site Plan Control Application C&C Transportation 8015 Russell Road Ottawa, Ontario Prepared for The C and C Group of Companies Attention: Mr. Bob Cousins

More information

FUNCTIONAL SERVICING & STORMWATER MANAGEMENT REPORT. Proposed light Industrial Development 1015 Dairy Drive Ottawa, Ontario

FUNCTIONAL SERVICING & STORMWATER MANAGEMENT REPORT. Proposed light Industrial Development 1015 Dairy Drive Ottawa, Ontario FUNCTIONAL SERVICING & STORMWATER MANAGEMENT REPORT Proposed light Industrial Development 1015 Dairy Drive Ottawa, Ontario Prepared for: Mar Gard Ltd. 92 Bentley Ave, 2 nd floor Nepean, Ontario K2E 6T9

More information

SITE SERVICING & STORMWATER MANAGEMENT STUDY

SITE SERVICING & STORMWATER MANAGEMENT STUDY SITE SERVICING & STORMWATER MANAGEMENT STUDY IN SUPPORT OF MAJOR ZONING BY-LAW AMENDMENT AND SITE PLAN CONTROL APPLICAITON Location: 190 Richmond Road, Ottawa, Ontario CPE Project #: 16032 City of Ottawa

More information

Capital Hall Champagne Avenue

Capital Hall Champagne Avenue Capital Hall - 105 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Capital Hall - 105 Champagne Avenue Project Number OTT-00229902-A0

More information

Orleans Family Health Hub

Orleans Family Health Hub Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp

More information

Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario

Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario Stormwater Management & Servicing Report KMA Mosque and Community Centre 351 Sandhill Road, Ottawa, Ontario Client: Kanata Muslim Association 351 Sandhill Road Ottawa, Ontario K2K 1X7 Project Number: OTT-00238564-A0

More information

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT

Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Riverside South Block 3/4, Richcraft Group of Companies Inc., City of Ottawa SERVICING REPORT Prepared by: Stantec Consulting Ltd. 1505 Laperriere Avenue Ottawa, ON K1Z 7T1 File: 160401004/83 January 17,

More information

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R

PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R PROPOSED THREE STOREY RESIDENTIAL APARTMENT BUILDING SITE LOT 47 R PLAN 348 351 CROYDEN AVENUE CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 817 21 T.L. MAK ENGINEERING CONSULTANTS LTD. JUNE 2017 REFERENCE

More information

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT

PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT PROPOSED FIVE STOREY MIXED USE BUILDING DEVELOPMENT SITE LOT 2 R PLAN M 2 7 BANK STREET CITY OF OTTAWA STORM DRAINAGE REPORT REPORT R 81 41 (REV. 2) MARCH 2017 T.L. MAK ENGINEERING CONSULTANTS LTD. JULY

More information

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Notice: This e-learning module is intended for general information purposes only. It only highlights certain provisions of the

More information

Orleans Family Health Hub

Orleans Family Health Hub Orleans Family Health Hub Stormwater Management & Servicing Report Type of Document: Site Plan Application Project Name: Orleans Family Health Hub (OFHH) Project Number OTT-00240132-A0 Prepared By: exp

More information

CAPITAL ENGINEERING GROUP LTD Municipal / Environmental / Land Development

CAPITAL ENGINEERING GROUP LTD Municipal / Environmental / Land Development Existing Conditions CAPITAL ENGINEERING GROUP LTD Municipal / Environmental / Land Development SITE SERVICING AND DRAINAGE BRIEF WSI BUILDING 501 LACOLLE WAY CITY OF OTTAWA August 8, 2013 This site is

More information

Envie Champagne Avenue

Envie Champagne Avenue Envie - 101 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Envie - 101 Champagne Avenue Project Number 00219439-A0 Prepared By: J. Fitzpatrick,

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

SERVICING AND STORM WATER MANAGEMENT REPORT

SERVICING AND STORM WATER MANAGEMENT REPORT The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED BANK PLACE D ORLEANS MALL OTTAWA, ONTARIO SERVICING

More information

FIRE FLOW REQUIREMENT CALCULATIONS

FIRE FLOW REQUIREMENT CALCULATIONS BUILDING A, 255 KANATA AVENUE, OTTAWA, ON - SITE SERVICING AND STORMWATER MANAGEMENT REPORT Appendix A Fire Flow Requirement Calculations January 19, 2017 FIRE FLOW REQUIREMENT CALCULATIONS A.1 Kanata

More information

10 LOUISA STREET - THORNBURY

10 LOUISA STREET - THORNBURY 10 LOUISA STREET - THORNBURY Town of The Blue Mountains Functional Servicing Report prepared by: C.C. Tatham & Associates Ltd. 115 Sandford Fleming Drive, Suite 200 Collingwood, ON L9Y 5A6 Tel: (705) 444-2565

More information

HOUSING PLUMBING & SEWER CONNECTIONS CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL

HOUSING PLUMBING & SEWER CONNECTIONS CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL HOUSING PLUMBING & SEWER CONNECTIONS CHRIS PRICE TECHNICAL SERVICES OFFICER BIMOSE TRIBAL COUNCIL COPPER PIPING ALLOWED BELOW GRADE COPPER PIPING ALLOWED BELOW GRADE SIZING OF SEWER PIPING MINIMUM SIZE

More information

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By:

OHM Groups. FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph August 5, Prepared By: Prepared By: OHM Groups FUNCTIONAL SERVICING REPORT 33 Arkell Road City of Guelph 114169 August 5, 2015 Guelph Owen Sound Listowel Kitchener Exeter Hamilton GTA 650 Woodlawn Rd. W., Block C, Unit 2, Guelph

More information

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES

SPRINGWOOD COMMUNITY & CULTURAL FACILITIES SPRINGWOOD COMMUNITY & CULTURAL FACILITIES REPORT ON PROPOSED HYDRAULIC AND FIRE SERVICES Issue Date Revision Author Status A September 2011 Preliminary G. Barnes Current Prepared by: Prepared for: WARREN

More information

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO

DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO CLARIDGE HOMES (PRESTON) INC. DESIGN BRIEF MIX-USE DEVELOPMENT ICON 505 PRESTON STREET OTTAWA, ONTARIO PROJECT: 31637-5.2.2 OCTOBER 2014 IBI GROUP PROJECT: 31637-5.2.2 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Sanitary Sewer Design. Sanitary Sewers, Page 1

Sanitary Sewer Design. Sanitary Sewers, Page 1 Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination

More information

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1

Functional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1 Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...

More information

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

CAPITAL ENGINEERING GROUP LTD Municipal I Environmental I Land Development

CAPITAL ENGINEERING GROUP LTD Municipal I Environmental I Land Development CAPITAL ENGINEERING GROUP LTD Municipal I Environmental I Land Development EXISTING CONDITIONS SERVICING AND STORMW ATER MANAGEMENT BRIEF URBAN QUARRY BUILDING 2717 STEVENAGE DRIVE CITY OF OTTAWA March

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario

STORMWATER DRAINAGE ASSESSMENT. 479 Line 1 Road, Niagara-on-the-Lake, Ontario STORMWATER DRAINAGE ASSESSMENT 479 Line 1 Road, Niagara-on-the-Lake, Ontario November, 2015 1. Site Description Size: Location: Existing Land Use: Proposed Land Use: Soils: Stormwater Outlet: 1.38 hectares

More information

Storm Sewers, Page 2

Storm Sewers, Page 2 Storm Sewers storm sewer systems are dendritic systems used to collect and direct stormwater runoff storm sewer systems are integral components of any urban infrastructure curbs, gutters and storm inlets

More information

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.

PRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc. PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION

More information

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS City of Azusa Building & Safety Department 213 E. Foothill Blvd. Azusa, CA 91702-1395 (626) 812-5234 Fax: (626) 334-5464 GRAYWATER SYSTEMS FOR RESIDENTIAL BUILDINGS A. GRAYWATER SYSTEMS Under State regulations,

More information

Servicing Report 122 Daly Avenue

Servicing Report 122 Daly Avenue Servicing Report 122 Daly Avenue Project # 160401204 Prepared for: TC United Group Prepared by: Stantec Consulting Ltd. July 15, 2016 Sign-off Sheet This document entitled Servicing Report 122 Daly Avenue

More information

Avalon Encore Stage 6 Block 236 Infrastructure Servicing Brief

Avalon Encore Stage 6 Block 236 Infrastructure Servicing Brief Avalon Encore Stage 6 Block 236 Infrastructure Servicing Brief Prepared For: Minto Communities Inc. Prepared By: Robinson Land Development Our Project No. 17099 March 19, 2018 MINTO COMMUNITIES INC. BLOCK

More information

Section K - Submission Requirements and Design Criteria Checklist

Section K - Submission Requirements and Design Criteria Checklist Section K - Submission Requirements and Checklist K1 PLANS OF SUBDIVISION AND SITE PLANS K1.1 Submissions to External Agencies The Regional Municipality of ork Toronto and Region Conservation Authority

More information

UBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6

UBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 338201s CCTV Pipeline Inspection (see http://energy.ubc.ca/communityservices/contractors-developers/).2 330130.41s Cleaning of Sewers (link as above)

More information

WASTEWATER & STORM WATER COLLECTION AND REMOVAL

WASTEWATER & STORM WATER COLLECTION AND REMOVAL CVE 471 WATER RESOURCES ENGINEERING WASTEWATER & STORM WATER COLLECTION AND REMOVAL Assist. Prof. Dr. Bertuğ Akıntuğ Civil Engineering Program Middle East Technical University Northern Cyprus Campus CVE

More information

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM

CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM 2018 TABLE OF CONTENTS Section Four Water Distribution System SECTION PAGE NUMBER 1. Objective...1 2. Submissions

More information

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON

Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Functional Servicing and Stormwater Management Report Appleby Mall Residential Burlington ON Prepared By: R.J. Burnside & Associates Limited 1465 Pickering Parkway, Suite 200 Pickering ON L1V 7G7 Prepared

More information

Basics of Wastewater Collection System

Basics of Wastewater Collection System Basics of Wastewater Collection System PDH: 3.0 Hours 1 OUTLINE Introduction Definition of Terms Types of Collections Systems Types of Sewers Shapes of Sewers Collection System Appurtenances Basic Considerations

More information

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT

WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT WESTMINISTER WOODS EAST PHASE 10 (CLAIR/VICTORIA), GUELPH FUNCTIONAL SERVICING REPORT Prepared for: West Minister Woods Ltd. R.R. #2 6783 Wellington Road #34 Cambridge ON N3C 2V4 Prepared by: Stantec Consulting

More information

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 641 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 2, 24 Michael Cowpland

More information

Section D Sanitary Drainage

Section D Sanitary Drainage D1 INTRODUCTION Sanitary drainage systems shall be designed on the basis of gravity flow under open channel conditions. Any variation from the Design Criteria, the use of pumping stations or siphons, and

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO

RETAIL UNITS GUELPH. November Prepared For: File No Engineering Report.docx F: (905) P: (905) BURLINGTON, ONTARIO The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED COMMERCIAL RETAIL UNITS GUELPH LINE AND UPPER MIDDLE

More information

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For:

PROPOSED FOOD STORE 150 TORONTO STREET SOUTH MARKDALE, ONTARIO. Job No ENGINEERING REPORT. Prepared For: PROPOSED FOOD STORE 150 TORONTO STREET SOUTH Job No. 16227 ENGINEERING REPORT Prepared For: MAVERICK DEVELOPMENT CORPORATION 150 Woodbine Avenue Suite 3005 Toronto, Ontario Prepared By: The Odan/Detech

More information

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief

Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Report File #: 34197-5.2.2 Orleans Gardens Starbucks Drive Through Servicing and Stormwater Management Design Brief Prepared for North American Development Group by IBI Group June 2015 IBI GROUP REPORT

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

Review the section Preparing for work, then complete the following.

Review the section Preparing for work, then complete the following. CHAPTER 4: PLANNING THE LAYOUT FOR A RESIDENTIAL EXTERNAL SANITARY DRAINAGE SYSTEM 105 WORKSHEET 1 Student name: Enrolment year: Class code: Competency name/number: To be completed by teachers Satisfactory

More information

SUPPLEMENTAL 2011 PLUMBING CORRECTION SHEET FOR HIGH-RISES

SUPPLEMENTAL 2011 PLUMBING CORRECTION SHEET FOR HIGH-RISES SUPPLEMENTAL 2011 PLUMBIN CORRECTION SHEET FOR HIH-RISES 2010 CPC ENERAL REQUIREMENTS A1. Plans shall bear the registration or license number and signature of an architect, contractor, or engineer, registered

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET

SITE SERVICING REPORT CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET 120 Iber Road, Suite 103 Ottawa, Ontario K2S 1E9 Tel. (613)836-0856 Fax (613) 836-7183 www.dsel.ca SITE SERVICING REPORT FOR CHOICE PROPERTIES 1251 STITTSVILLE MAIN STREET CITY OF OTTAWA PROJECT NO.: 17-959

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

Longfields Subdivision, Block 7, City of Ottawa

Longfields Subdivision, Block 7, City of Ottawa Longfields Subdivision, Block 7, City of Ottawa 160400850/160401231 Prepared for: Campanale Homes Prepared by: Stantec Consulting Ltd. Table of Contents 1.0 INTRODUCTION...1.1 2.0 BACKGROUND...2.2 3.0

More information

PROJECT N Scotiabank Rideau and William Street Branch Site Services Brief

PROJECT N Scotiabank Rideau and William Street Branch Site Services Brief PROJECT N 37543 PROJECT N 37543 October 19, 2016 7391-001-00 Prepared by: Zakaria Fettaka, EIT Verified by: Frédérick Dionne, P.Eng. Director Associate (PEO Member 100133615) Project N 37543 7391-001-00

More information

Marianneville Developments Ltd.

Marianneville Developments Ltd. Estates of Glenway Project No. L09-301 March 2012 Executive Summary Cole Engineering Group was retained by Marianneville Developments Limited to undertake a Functional Servicing Report in support of the

More information

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS

GRAY WATER SYSTEMS FOR RESIDENTIAL BUILDINGS INFORMATION BULLETIN / PUBLIC - PLUMBING CODE REFERENCE NO.: LAMC 94.1502.0 Effective: 01-01-2017 DOCUMENT NO.: P/PC 2017-012 Revised: Previously Issued As: P/PC 20014-012 GRAY WATER SYSTEMS FOR RESIDENTIAL

More information

WATER & SEWER SERVICES

WATER & SEWER SERVICES WATER/SEWER ENGINEERING SECTION PHONE (703) 228-3677 WATER & SEWER SERVICES INFORMATION & APPLICATION PACKAGE REVISED MAY 2018 1 MAY 2018 Dear Customer: Thank you for taking the time to read this information

More information

3. Sanitary Plumbing Single Stack System

3. Sanitary Plumbing Single Stack System 3. Sanitary Plumbing Single Stack System On completion of this section, students should be able to: Design, install and develop bills of quantities for the Single Stack Systems for domestic, commercial

More information

MINTO COMMUNITIES INC.

MINTO COMMUNITIES INC. MINTO COMMUNITIES INC. STORM WATER MANAGEMENT, STORM SEWER, SANITARY SEWER AND WATERMAIN DESIGN BRIEF EAST URBAN COMMUNITY (Neighbourhood 2) 352 AQUAVIEW DRIVE CITY OF OTTAWA AUGUST 212 (Revision ) STORM

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14 Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter

More information

Septic Permit Application

Septic Permit Application BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Tel.: 519 845-5420 Toll Free: 1-866-324-6912 Fax: 519 845-3817 www.lambtononline.ca Septic Permit Application a) This application

More information

MINTO COMMUNITIES INC. HARMONY STAGE 2 PART OF 4025 STRANDHERD DRIVE NOISE CONTROL FEASIBILITY STUDY

MINTO COMMUNITIES INC. HARMONY STAGE 2 PART OF 4025 STRANDHERD DRIVE NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. HARMONY STAGE 2 PART OF 4025 STRANDHERD DRIVE NOISE CONTROL FEASIBILITY STUDY July 2017 Prepared for: MINTO COMMUNITIES INC. 180 Kent Street, Suite 200 Ottawa, Ontario K1P 0B6 Prepared

More information

Rainwater Harvesting ICC RES/34/#1 & UPC/6/#2

Rainwater Harvesting ICC RES/34/#1 & UPC/6/#2 TOPIC: Rainwater Harvesting ICC RES/34/#1 & UPC/6/#2 CODE: One & Two Family Dwelling Specialty Code: 2000 Edition; Plumbing Specialty Code: 2000 Edition APPROVED: REFERENCE: SUBJECT: Section 3101.2 & Section

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario

Functional Servicing Report. Sorensen Court Townhouses. 25 Sorensen Court, Niagara-on-the-Lake, Ontario Functional Servicing Report Sorensen Court Townhouses 25 Sorensen Court, Niagara-on-the-Lake, Ontario Prepared by: Quartek Group Inc. Engineers, Architects & Planners 89-91 St. Paul Street, Suite 100 St.

More information

3.9 times the average 3.8 times the average 3.6 times the average

3.9 times the average 3.8 times the average 3.6 times the average ARTICLE VI DESIGN OF SANITARY SEWERS M'RSMIN. VOL.281 JA 2 4 2001 IMAGE; Section 601 Determination of the Amount of Sewage for Sanitary Sewers A. MSD Design Standards for estimating sanitary sewage flow

More information