IRP Advisory Group 2017 IRP Kick Off
|
|
- Barbra Gallagher
- 6 years ago
- Views:
Transcription
1 IRP Advisory Group 2017 IRP Kick Off
2 2017 IRP Kick Off 12:30 12:50 Introductions and Check In 12:50 1:10 IRP Process Overview 12:50 1:20 Stakeholder Process Updates 1:20 1:45 Ground Rules 1:45 3:15 Review WUTC Letter 3:15 3:30 Next Steps 2
3 IRP Rule WAC Integrated resource planning. (1) Purpose. Each electric utility regulated by the commission has the responsibility to meet its system demand with a least cost mix of energy supply resources and conservation. In furtherance of that responsibility, each electric utility must develop an "integrated resource plan." (2) (a) "Integrated resource plan" or "plan" means a plan describing the mix of energy supply resources and conservation that will meet current and future needs at the lowest reasonable cost to the utility and its ratepayers. (2) (b) "Lowest reasonable cost" means the lowest cost mix of resources determined through a detailed and consistent analysis of a wide range of commercially available sources. At a minimum, this analysis must consider resource cost, market-volatility risks, demand-side resource uncertainties, resource dispatchability, resource effect on system operation, the risks imposed on ratepayers, public policies regarding resource preference adopted by Washington state or the federal government and the cost of risks associated with environmental effects including emissions of carbon dioxide. 3
4 Regulatory Compliance Establish Resource Needs Stakeholders Commit to Action Make Decisions Planning Assumptions & Resource Alternatives Analyze Alternatives and Portfolios Market Outlook Analyze Results 4 Customer Needs
5 Stakeholder Process Updates Build Off Existing Approach + Ideas from Council s Approach Improve Transparency Improve Efficiency with More Structure Update Informed by Dialogue with Several Stakeholders Thank you! 5
6 Stakeholder Process Structure Retain IRP Advisory Group Open to all interested in participating Generally broader policy issues Overview of details Needs to stay focused on agenda Technical Advisory Committees Detailed technical information PSE Staff needs from industry experts Participants: Open and focused on agenda Balancing TAC and IRPAG Meetings More structure to allow more efficient use of everybody s time Hopefully not more meetings-more splitting up agenda for better time planning Other Meetings PSE may meet with any party/groups as needed to complete IRP 6
7 Technical Advisory Committees Focus Technical details PSE staff needs to perform IRP analysis Not cross-examination & discovery of assumption development Demand-Side Resource Advisory Committee (DSR-AC) Electric and gas demand-side resource potentials and costs Electric Resource Advisory Committee (Thermal RAC & Renewable RAC) Resource alternatives, costs, and operational performance Thermals and renewables/storage separate for timing Gas Resource Advisory Committee (GRAC) Resource alternatives, costs, and timing related issues Will invite other gas utilities and pipeline representatives Electric Flexibility Technical Advisory Committee (FTAC) Discussion of frameworks, analytical approaches, and assumptions Will invite other utilities, NPCC, and others we know in region with experience 7
8 Ground Rules-2017 IRP Advisory Group See Document 8
9 Review of 2015 IRP Acceptance Letter
10 Main Topics Addressed in Letter Electric Resource Adequacy Generation Resources Reserve Requirements Thermal Plant Capital Investments Distribution and Transmission System Evaluation Energy Storage and Flexibility Process and Public Participation Natural Gas Resources 10
11 Electric Resource Adequacy Planning Standard Rejected update, suggests reverting back to 5% LOLP Market risk approach is reasonable approach and should continue Response: PSE plans to update planning standard: 5% LOLP w/market risk Response: Will review all assumption deviations from NPCC model Resource Capacity Values: ICE vs ELCC Consider alternative methods for approximating ELCC Do not use ICE to acquire resources Response: Detailed and complicated many use language loosely Difference: resource adjustments vs load adjustments Will calculate ELCC for new intermittent resources Will discuss details of analyzing existing resources ICE vs ELCC doesn t affect resource need, only peak capacity value of new resources 11
12 Generation Resources (1) Peakers with Oil Back-up Assume peakers can have full oil back-up unless document infeasibility Response: Will extend reliability of oil back-up analysis to include new plants, not just existing fleet Major Maintenance and Similar Assumptions Affecting Dispatch Revisit how major maintenance is reflected in assumptions and discuss with technical advisory group Provide narrative of any such changes in the future Response: Will have those discussions Location of Peakers Quantify benefits/costs of peakers in east/west WA. Include dynamic scheduling Include potential risks with BPA transmission policies Response: Will do that again, but east/west is not necessarily WA 12
13 Generation Resources (2) Montana Wind Revisit assumptions regarding eastern Montana wind Consider use of Colstrip transmission if portion retired Consider a sensitivity where MT wind qualifies for WA RPS Response: Will update assumptions and transmission availabilities Response: Will consider sensitivity where MT wind could qualify. Caution--PSE does not want to be seen as undermining the intent of RCW (RPS). 13
14 Generation Resources (3) Renewable Resources Compare the marginal cost of generating a REC from company-built resources versus cost of purchasing unbundled RECs Response: Seems like an acquisition, not IRP question Response: An RFP is appropriate process to determine availability and price of long-term RECs Response: Will reflect results of RFP if feasible or tipping point analysis Renewable Resource and Storage Costs Solicit feedback from advisory group on timing and cost performance of renewables and storage Clearly identify any learning curves used to discount future costs or improved performance Response: Will do this with renewables, storage, and thermal resources 14
15 Reserve Requirements Work with regional stakeholders, including the Northwest Power and Conservation Council staff to publish information about PSE s reserve requirements. Response: Complicated, but PSE will work with the Council staff on information they would find helpful and provide it if possible. 15
16 Thermal Plant Capital Investments PSE must develop a model that economically optimizes the timing of thermal plant retirements, capital investments, and replacement power for use in all future IRPs. Response: Will examine different analytical frameworks Need to develop assumptions for all the gas plants on a long-term basis. Probably need to consider Colstrip with scenarios. Also, consistency with PSE s upcoming 2017 general rate case. 16
17 Distribution and Transmission System Evaluation (1) Statement of Concern: the planning process for addressing local distribution and transmission needs is appropriately separate from the IRP s high-level generic resource and system-wide view point. Commission is concerned above statement contradicts WAC Response: Will consider returning System Planning Chapter in 2017 IRP like in prior IRPs Continue including value of avoided T&D costs in demand-side resource potentials Transmission was central issue in IRP Reliability of transmission to market Transmission import limits from CA in adequacy analysis Transmission for MT wind scenarios East-vs-West of Cascades gas plants Appendix I, Regional Transmission Resources 17
18 Distribution and Transmission System Evaluation (2) Impact of Local Transmission System Constraints 2013 IRP recommended PSE model the transmission system constraints in its system and explicitly describe the impact those constraints have on resource selection Response: Appendix I illustrated those transmission system constraints in Appendix I, p. I-5. The constraints may influence where generation would be located, but are not sufficient to impact resource alternatives. Exact location of new generation is a level of detail that is examined in the Acquisition process, because the cost of specific generators and related implications on the transmission system are resource specific. Distributed Solar and Impact on Distribution System Applauded effort and encouraged continued evaluation of distributed generation on generation, transmission, and distribution. Response: Will discuss ideas at next IRP meeting. 18
19 Energy Storage and Flexibility Value ancillary services and model sub-hourly dispatch to the fullest extent possible. Response: Acquired Plexos and will engage with Flexibility TAC Specify the operating and performance characteristics PSE prioritizes for energy storage prior to issuing its next RFP Response: Depends on timing of next RFP. If in 2016, it will not be feasible, as we are currently developing the analytical framework. 19
20 Process and Public Involvement Encouraged continued use of outside facilitator to manage advisory group meetings. Response: Lyn Wiltse will be helping again. Commission continues to expect PSE to provide written responses to all Advisory Group questions submitted in writing. Also provide minutes for each Advisory Group meeting. Response: Responding in writing is in our ground rules. IRPAG minutes provided on PSE website 20
21 Natural Gas Resources PSE s IRP does not contain sufficient information to allow the Commission to evaluate the availability of pipeline capacity on Westcoast. Revisit in next IRP. Response: This will be addressed in the GRAC process. 21
22 DRAFT: Proposed 2017 IRP Meeting Schedule-- Work Plan Filed July 15 Thurs, Sept 16 6 GRAC IRPAG Tues, Nov 15 8 IRPAG Thurs, Apr IRPAG IRP Filed July 14 Fri, June 17 1 IRPAG Mon, Aug 22 5 Renewable RAC Mon, Oct 17 7 Flex Tac DSR-AC Thurs, Jan 12 9 IRPAG Fri, March IRPAG Mon, May IRPAG June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June July July 25 3 Thremal RAC Draft IRP April 28 July 2016 July 13 or 14 2 Flex TAC July 28 4 DSR-AC IRPAG Refer to handout for description of each meeting 22
23 Next Steps Finalize Meeting Dates Work Plan filed at WUTC: July 15, 2016 (Friday) Draft 2017 IRP: May 15, 2017 (Monday) 2017 IRP Filed: July 14, 2017 (Friday) 23
24 THANK YOU June 6,
2017 IRP Advisory Group. July 21, 2017 IRPAG
2017 IRP Advisory Group Today s Agenda 2 General Rate Case Caution Need to avoid the possibility of unintentionally violating ex-parte communication rules Please refrain from bringing up any rate case
More information2017 IRP Advisory Group. June 22, 2017 IRPAG
2017 IRP Advisory Group Today s Agenda 2 Purpose of IRP WAC 480-100-238 Integrated resource planning. 1) Purpose. Each electric utility regulated by the commission has the responsibility to meet its system
More informationExecutive Summary PSE Integrated Resource Plan. Contents. Chapter 1: Executive Summary
1 2017 PSE Integrated Resource Plan Executive Summary The IRP is best understood as a forecast of resource additions that appear to be cost effective given what we know today about the future. We know
More informationPortland General Electric 2016 Integrated Resource Plan. OPUC Public Meeting December 20, 2016
Portland General Electric 2016 Integrated Resource Plan OPUC Public Meeting December 20, 2016 Agenda Process and Compliance Approach and Summary Analysis Action Plan Next steps 2 2013 IRP Order Resource
More informationAPRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin
APRIL 23, 2014 Capacity Value of Wind Assumptions and Planning Reserve Margin Executive Summary Effective Load Carrying Capacity (ELCC), or capacity value, of variable generation and required planning
More informationPGE s 2013 Integrated Resource Plan
PGE s 2013 Integrated Resource Plan OPUC Public Meeting 2014 Portland General Electric. All rights reserved. Today s topics IRP public process Load-resource balance Assumptions and inputs E3 low-carbon
More informationWind Workshop. Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am
Wind Workshop Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am Objective of this session: Understand BC Hydro s definitions and calculation methodology of dependable capacity
More informationPreliminary Assumptions for On-Shore Wind Technologies. Gillian Charles GRAC October 2, 2014
Preliminary Assumptions for On-Shore Wind Technologies Gillian Charles GRAC October 2, 2014 At the last meeting Discussed current status of wind development in PNW Reviewed recent trends in development
More informationAugust 22, 2014 FIRE ISLAND WIND
August 22, 2014 FIRE ISLAND WIND Phase 1 Summary: Performance Project Performance: Benefits realized: 93,500 MWh LTD >875,000 MCF of NG burn avoided ~$6.5 MM in NG purchases avoided 55,000 tons of CO2
More informationDeveloping an Incremental Cost Methodology: Washington s Experience
Developing an Incremental Cost Methodology: Washington s Experience Jeremy Twitchell, Regulatory Analyst National Summit on RPS September 23, 2014 Background: Washington s RPS Created in 2006 by voter
More informationMEMORANDUM. January 6, Power Committee. Maury Galbraith. Draft Sixth Plan Electricity Price Forecasts
W. Bill Booth Chair Idaho James A. Yost Idaho Tom Karier Washington Dick Wallace Washington Bruce A. Measure Vice-Chair Montana Rhonda Whiting Montana Melinda S. Eden Oregon Joan M. Dukes Oregon January
More informationFinal 2014 Flexible Capacity Needs Assessment
Final 2014 Flexible Capacity Needs Assessment May 1, 2014 Table of Contents 1. Introduction... 2 2. Summary... 2 3. Defining the ISO System-Wide Flexible Capacity Need... 3 4. Forecasting Minute-by-Minute
More informationJanuary 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND:
Henry Lorenzen Chair Oregon Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Jennifer Anders Montana Tim Baker Montana January 3, 2018 MEMORANDUM
More informationIRP 101. Intro to Integrated Resource Planning. Scott Benson Manager, Resource & Transmission Planning. March 23, 2017
IRP 101 Intro to Integrated Resource Planning Scott Benson Manager, Resource & Transmission Planning March 23, 2017 1 What is an IRP? Definition Integrated resource planning is a process by which a power
More informationPumped hydro Storage Plants
Pumped hydro Storage Plants Olivier Teller, Product Director PSP 15 Nov 2012 PSP >130 GW (99% world electricity storage) Market: 6 GW/year Europe: ~1.5GW/year 100 years / illimited cycle numbers ~1000
More informationEugene Water & Electric Board. The Future of Utilities in the Pacific Northwest
Eugene Water & Electric Board The Future of Utilities in the Pacific Northwest 1 Eugene Water & Electric Board The Future of Utilities in the Pacific Northwest Erin Erben Manager, Power & Strategic Planning
More informationElectricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)
For the first quarter of 2015, Ontario experienced overall demand that was typical for the province in winter, and strong generator output. Demand for Ontario electricity increased as a result of cold
More informationElectric Price Outlook April 13, 2017
Electric Price Outlook April 13, 2017 Scott Drzycimski, Director Customer, Community and Economic Development Jason Nielsen, Manager Regulatory Affairs Keeping you informed Ongoing pricing outlook webinars
More informationFor Bandon Utilities Commission
For Bandon Utilities Commission July 12, 2017 Profile BPA, a component of the U.S. Department of Energy, is a non-profit and self-funded power marketing administration in the Pacific Northwest. Congress
More informationCalifornia ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring
California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive
More informationREGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017
REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017 Agenda 1. Welcome & Introductions Project Team Technical Advisory Committee (TAC) 2. Study Overview 3. TAC Charter 4.
More informationFinal Flexible Capacity Needs Assessment for 2018
Final Flexible Capacity Needs Assessment for 2018 April 28, 2017 1 Table of Contents 1. Introduction... 3 2. Summary... 3 3. Defining the ISO System-Wide Flexible Capacity Need... 5 4. Forecasting Minute-by-Minute
More informationMid-C Seminar July 16 th, 2014
NWPP Members Market Assessment and Coordination Initiative Mid-C Seminar July 16 th, 2014 Dan Williams, LC Chair, Portland General Electric Slides not reviewed or approved by MC Members 1 Agenda History
More informationMTEP18 Futures. Planning Advisory Committee June 14, 2017
MTEP18 Futures Planning Advisory Committee June 14, 2017 Overview Objective: Present final MTEP18 Futures and an overview of stakeholder feedback Key Takeaways: Four Futures to be used in MTEP18 to consider
More informationZero Net Carbon Portfolio Analysis
Zero Net Carbon Portfolio Analysis Prepared for: Platte River Power Authority December 12, 2017 www.paceglobal.com Agenda Background Methodology Assumptions Cases Findings and Recommendations Page 2 Background
More informationRenewable energy - the future is now
University of Nevada, Las Vegas Digital Scholarship@UNLV UNLV Renewable Energy Symposium 2007 UNLV Energy Symposium Aug 15th, 9:00 AM - Jul 15th, 10:00 AM Renewable energy - the future is now Thomas Fair
More informationBad News and Good News
Regional Regulatory Policy The View From Washington Buying & Selling Electric Power in the West January 14 & 15, 2008 Mark Sidran, Chairman Washington Utilities & Transportation Commission 1 Bad News and
More informationMay 9, This presentation will summarize some key takeaways from the most recent Pacificorp Integrated Resource Plan (IRP) filed in April 2017
Henry Lorenzen Chair Oregon Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Jennifer Anders Montana Tim Baker Montana May 9, 2017 MEMORANDUM
More informationPJM EIS Generation Attribute Tracking System (GATS)
PJM EIS Generation Attribute Tracking System (GATS) Presented to NASEO 2015 Mid-Atlantic Regional Meeting June 22, 2015 Who is PJM EIS? PJM Environmental Information Services, Inc. Formed in February 2005
More informationExploring the Impacts of California s Renewable Portfolio Standard
Exploring the Impacts of California s Renewable Portfolio Standard System Planning Committee April 2010 Table of Contents Purpose... 1 Vocabulary... 1 System Planning Committee s Initial Assessment...
More informationBad News and Good News
Mark H. Sidran of Washington Utilities and Transportation Commission Speaker 4: 1 Regional Regulatory Policy The View From Washington Buying & Selling Electric Power in the West January 14 & 15, 2008 Mark
More information2017 Integrated Resource Plan. Public Input Meeting 8 March 2-3, 2017
2017 Integrated Resource Plan Public Input Meeting 8 March 2-3, 2017 Agenda March 2 - Day One Introductions Draft Preferred Portfolio Overview Market Price Scenarios (Refresher) Lunch Break (1 hour) 11:30
More informationManagement Systems. Linkage. 26 March Text #ICANN49
Management Systems Linkage 26 March 2014 Agenda Introduction /Overview Strategy Strategic & Financial Planning Implementation Operating Plan Budget / Cost Mgmt. Project Portfolio Mgmt. People Performance
More informationPUBLIC UTILITY DISTRICT NO.1 OF FRANKLIN COUNTY INTEGRATED RESOURCE PLAN PREPARED IN COLLABORATION WITH
PUBLIC UTILITY DISTRICT NO.1 OF FRANKLIN COUNTY INTEGRATED RESOURCE PLAN 2014 PREPARED IN COLLABORATION WITH Contributors Name Company Title Linda Esparza Franklin PUD Director of Power Management Richard
More informationBest Practices in Risk-Based Resource Planning A Case Study of NorthWestern s Acquisition of Hydros
Best Practices in Risk-Based Resource Planning A Case Study of NorthWestern s Acquisition of Hydros Presenters: Gary Dorris, PhD August 4, 2015 Overview of Ascend Short, Intermediate, & Long-Tem: operating
More informationIntegrated Resource Planning. Roundtable 17-2 May 10, 2017
Integrated Resource Planning Roundtable 17-2 May 10, 2017 1 Meeting Logistics Local Participants: World Trade Center facility Wireless internet access Network: 2WTC_Event Password: 2WTC_Event$ Sign-in
More informationManitoba Hydro - Power Plants and SWOT Analysis, 2011 Update
Manitoba Hydro - Power Plants and SWOT Analysis, 2011 Update #43357 $1000 53 pages In Stock Report Description The report contains the profile of the company that is involved in the field of power generation
More information18-Month Outlook. An Assessment of the Reliability and Operability of the Ontario Electricity System FROM OCTOBER 2017 TO MARCH 2019
18-Month Outlook An Assessment of the Reliability and Operability of the Ontario Electricity System FROM OCTOBER 2017 TO MARCH 2019 Executive Summary The outlook for the reliability of Ontario s electricity
More informationPuget Sound Energy, Inc., Docket No. ER Filing of Revisions to OATT Schedules 4 and 9
A LIMITED LIABILITY PARTNERSHIP 1050 Thomas Jefferson Street, NW Seventh Floor Washington, DC 20007 (202) 298-1800 Phone (202) 338-2416 Fax GARY D. BACHMAN (202) 298-1880 gdb@vnf.com VIA E-TARIFF FILING
More informationTransmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008
Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage
More informationFundamentals of Transmission Operations
Fundamentals of Transmission Operations Equipment Outages PJM State & Member Training Dept. Objectives At the end of this presentation the Learner will be able to: Identify how weather may influence outage
More informationColorado PUC E-Filings System
Page of BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF COLORADO FOR APPROVAL OF ITS 0 ELECTRIC RESOURCE PLAN ) ) )
More informationMarc de Croisset FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue
Marc de Croisset. 646.885.5423. mdecroisset@fbr.com FBR CAPITAL MARKETS & CO. Coal-to-Gas Switching: Distilling the Issue September 20, 2012 Disclosures Important disclosures can be found at the end of
More informationIncluding Advanced Energy Storage in Integrated Resource Planning: Cost Inputs and Modeling Approaches
Including Advanced Energy Storage in Integrated Resource Planning: Cost Inputs and Modeling Approaches November 2016 v1.1 Advanced energy storage costs are declining rapidly and large-scale storage deployments
More informationDATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans
ENTERGY GULF STATES LOUISIANA, L.L.C. & ENTERGY LOUISIANA, LLC LPSC DOCKET NO. I-33014 DATA ASSUMPTIONS AND DESCRIPTION OF STUDIES TO BE PERFORMED 2014 EGSL & ELL Integrated Resource Plans This version
More information1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh.
1. Is there a preference between MW and MWh? RPS need for San Diego Gas & Electric is based upon a percentage of retail sales, which is in MWh. There is no target for MW of renewable capacity (except in
More informationTerms of Reference AG 2017/01
Long-term Analysis of the Chilean National Electricity System Considering Variable and Intermittent Energy Resources Terms of Reference AG 2017/01 February 2017 Index 1. Introduction... 2 2. Objectives
More information20 MW Flywheel Energy Storage Plant
1 20 MW Flywheel Energy Storage Plant Case Study for the: Advanced Energy 2010 Conference Chet Lyons, Director, Marketing and Sales November 8-9, 2010 3 Safe Harbor Statement This presentation contains
More informationJanuary 26, We have attached a summary of the Boardman plan from the PGE website for additional background.
Bruce A. Measure Chair Montana Rhonda Whiting Montana W. Bill Booth Idaho James A. Yost Idaho Dick Wallace Vice-Chair Washington Tom Karier Washington Bill Bradbury Oregon Joan M. Dukes Oregon January
More informationUpdate on the Market Renewal Program
Update on the Market Renewal Program Update to Technical Panel September 26, 2017 Overview Introduction Defining Market Renewal Update on Engagement and MRWG Priorities Looking Ahead Appendix: Why We Need
More informationTucson Electric Power 2017 Integrated Resource Plan. Southern Arizona Regional Solar Partnership Jeff Yockey, PE
Tucson Electric Power 2017 Integrated Resource Plan Southern Arizona Regional Solar Partnership Jeff Yockey, PE May 2017 Integrated Resource Plan (IRP) Overview Just a Plan Additional steps for specific
More informationSurvey of Modeling Capabilities and Needs for the Stationary Energy Storage Industry
Survey of Modeling Capabilities and Needs for the Stationary Energy Storage Industry Prepared for: Energy Storage Association 1155 15th Street, NW Suite 500 Washington, DC 20005 202.293.0537 energystorage.org
More informationPomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 2017
Pomme de Terre One Watershed, One Plan Request for Proposal Responses DUE: May 19 th, 20 The Pomme de Terre watershed planning area has begun planning in the One Watershed, One Plan (1W1P) program. With
More informationSolar Power Realities
Solar Power Realities Supply-Demand Characteristics, Storage and Capital Costs by Peter Lang Abstract This paper provides a simple analysis of the capital cost of solar power and energy storage sufficient
More informationAppendix C. Regulatory Compliance Matrix DRAFT 2018 OR IRP
Matrix DRAFT 2018 OR IRP Matrix Page 2 Order No. 07-047 Guideline (1)(a) Guideline (1)(b) All resources must be evaluated on a consistent and comparable basis All known resources for meeting the utility
More informationPumped Storage - The Proven Grid Scale Storage Solution. Presented to: NWPCC GRAC Committee
Pumped Storage - The Proven Grid Scale Storage Solution Presented to: NWPCC GRAC Committee January 27, 2015 Presentation Agenda Part 1 Variable Energy Resources Integration Challenges The Need for Grid
More informationTransmission and Interconnectors
Transmission and Interconnectors Peter Børre Eriksen Head of Systems Analysis Energinet.dk 1 ENTSO-E: 41 TSOs from 34 countries Founded on 19 Dec 2008 and fully operational since July 2009 A trans-european
More informationAPPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST
APPENDIX B: WHOLESALE AND RETAIL PRICE FORECAST Contents Introduction... 3 Key Findings... 3 Background... 5 Methodology... 7 Inputs and Assumptions... 8 Load... 8 Fuel Prices... 9 Resources... 9 Pacific
More informationPaper 8: IATI Governing Board paper on Long-term Institutional Arrangements
Members Assembly Meeting 03-05 October 2017 IFAD HQ, Via Paolo di Dono, 44, 00142 Roma RM, Italy Paper 8: IATI Governing Board paper on Long-term Institutional Arrangements 1. INTRODUCTION The current
More informationNorthwest Power and Conservation Council NW Power Markets Symposium Products & Transactions
Northwest Power and Conservation Council NW Power Markets Symposium Products & Transactions Presented by: John Wilkinson John.Wilkinson@MorganStanley.com 604-658-8132 July 2013 Disclaimer: The information
More information! "#$$%& MY BLOG 2014
!"#%& 2014 =/*55&- 789:/4; RESOLUNTIONS!"# 20(5< SMART GOAL: GOAL: GOAL: GOAL: Often people set resolutions and don t look at them again after the month of January. One way to make sure that you are actively
More informationPlatte River Power Authority Overview
Estes Park Longmont Fort Collins Loveland Platte River Power Authority Overview City of Fort Collins Climate Action Plan Citizen Advisory Committee June 12, 2014 Platte River Power Authority History We
More informationDescription of EDC Data and Documents in the Additional Data Portion of the BGS Auction Data Room
of Data and Documents in the Additional Data Portion of the BGS Auction Data Room Revised 9-15-2017 This document provides descriptions of data posted to the additional data page of the BGS Auction Data
More informationAnalysis of Solar Capacity Equivalent Values for the South Carolina Electric and Gas System
Analysis of Solar Capacity Equivalent Values for the South Carolina Electric and Gas System John D. Wilson, Southern Alliance for Clean Energy March 21, 2017 The assessment of solar energy s contribution
More informationENTERED 08/10/06 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1182 ) )
ORDER NO. 06-446 ENTERED 08/10/06 BEFORE THE PUBLIC UTILITY COMMISSION OF OREGON UM 1182 In the Matter of an Investigation Regarding Competitive Bidding. ) ) ORDER DISPOSITION: GUIDELINES ADOPTED On December
More informationPORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS
PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS Edwin Castro CNEE Guatemala Viena, september 2009 What is the reason to develop this model? In our own electricity market
More informationFred Stoffel. Tri-State Generation and Transmission Association, Inc. May 19, Utility Resource Planning Fundamentals
Fred Stoffel Tri-State Generation and Transmission Association, Inc. May 9, 202 Tri-State Overview Tri-State is a not-for-profit, wholesale power supplier owned by 44 electric cooperatives and public power
More informationCHP Economic Factors: Electric and Natural Gas Market Trends PREPARED BY: PREPARED FOR: DATE:
CHP Economic Factors: Electric and Natural Gas Market Trends PREPARED BY: PREPARED FOR: DATE: Daniel Peaco, Principal Consultant Efficiency Maine Combined Heat & Power Conference SEPTEMBER 29, 2016 Discussion
More informationFlexible power generation and interconnection capacity needs of the Italian power system using PLEXOS LT plan.
Flexible power generation and interconnection capacity needs of the Italian power system using PLEXOS LT plan. Executive Summary One of the main developments of the last few years on the Italian power
More informationOverview of Avista s DSM Programs and Basis for Collaborations
Overview of Avista s DSM Programs and Basis for Collaborations Bruce Folsom Director, Energy Efficiency Policy August 2, 2012 NASEO Regional Meeting Background: About Avista 123 year old investor owned
More informationRegulatory Assistance Project. Emissions Performance Standards in Selected States
ResearchBrief Regulatory Assistance Project November 2009 Emissions Performance Standards in Selected States The Regulatory Assistance Project Research Staff prepared this summary of Emissions Performance
More informationANNUAL REPORT ON MARKET ISSUES & PERFORMANCE
ANNUAL REPORT ON MARKET ISSUES & PERFORMANCE Department of Market Monitoring ACKNOWLEDGEMENT The following members of the Department of Market Monitoring contributed to this report Eric Hildebrandt Keith
More informationPotential Impacts of a Renewable and Energy Efficiency Portfolio Standard in Kentucky
Potential Impacts of a Renewable and Energy Efficiency Portfolio Standard in Kentucky Prepared for the Mountain Association for Community Economic Development & the Kentucky Sustainable Energy Alliance
More informationDSR follow on final presentation
DSR follow on final presentation A presentation to DECC Andrew Nind, Oliver Pearce, Kostas Theodoropoulos 4 April 2011 Agenda 1. Objectives 2. Scenario assumptions 3. Scenario results 4. Next steps 2 Objectives
More informationDay Ahead Market Enhancements: Issue Paper/Straw Proposal
Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic
More informationBest Practices in Conducting Grid Integration Studies
GREENING THE GRID Best Practices in Conducting Grid Integration Studies ENHANCING CAPACITY FOR LOW EMISSION DEVELOPMENT STRATEGIES (EC-LEDS) Agenda and Learning Objectives Part 1: Why conduct a grid integration
More informationManaging Flexibility in MISO Markets
Managing Flexibility in MISO Markets Clean Energy Regulatory Forum November 9, 2012 Outline Impacts of Variable Generation on Ancillary Services Dispatchable Intermittent Resources Introduction to Proposed
More informationGeneration Technology Assessment & Production Cost Analysis
SPO Planning Analysis Generation Technology Assessment & Production Cost Analysis EAI Stakeholder Meeting July 31, 212 Technology Life Cycle Technology Deployment Over Time Conceptual Research & Development
More informationOutlook for Natural Gas Demand for Winter
Outlook for Natural Gas Demand for 2010-2011 Winter Energy Ventures Analysis, Inc. (EVA) Overview Natural gas demand this winter is projected to be about 295 BCF, or 2.5 percent, above demand levels recorded
More informationPACIFICORP DEMAND-SIDE RESOURCE POTENTIAL ASSESSMENT FOR
PACIFICORP DEMAND-SIDE RESOURCE POTENTIAL ASSESSMENT FOR 2017-2036 VOLUME 1: EXECUTIVE SUMMARY Prepared for: PacifiCorp February 14, 2017 Applied Energy Group, Inc. 500 Ygnacio Valley Road, Suite 250 Walnut
More informationGas-Electric Coordination: Pipeline Infrastructure
Platts Northeast Energy Markets Conference Gas-Electric Coordination: Pipeline Infrastructure New England States Committee on Electricity April 23, 2013 NESCOE New England s Regional State Committee Governed
More informationFurther Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market
Further Analyses of the Exercise and Cost Impacts of Market Power In California s Wholesale Energy Market March 2001 Prepared by Eric Hildebrandt, Ph.D. Department of Market Analysis California Independent
More informationNet Demand Variability (NDV) Summary
Net Demand Variability (NDV) Summary Executive Summary: This document provides a summary of the Net Demand Variability (NDV) work presented to the Energy and Ancillary Service (EAS) workgroup in WG meetings
More informationRENEWABLE ENERGY INTEGRATION IN TAMILNADU
RENEWABLE ENERGY INTEGRATION IN TAMILNADU Generator Installed Capacity in MW CGS Nuclear 6% PURCHASE (LTOA, MTOA) 18% TN Hydro 2308 TN Thermal 4320 TN Gas 516 TN IPP 746 CGS Thermal 15% CPP 3% TN IPP 3%
More informationIntegrated Resource Plan
2011 Integrated Resource Plan Addendum Let s turn the answers on. June 27, 2011 For more information, contact: PacifiCorp IRP Resource Planning 825 N.E. Multnomah, Suite 600 Portland, Oregon 97232 (503)
More informationOrganics Collection Program and Yard Material Pile Collection Update
STAFF REPORT DATE: August 29, 2017 TO: FROM: SUBJECT: City Council Robert A. Clarke, Public Works Director Stan Gryczko, Assistant Public Works Director Richard Tsai, Environmental Resources Manager Organics
More informationLehman Brothers T Conference San Francisco. Craig DeYoung, Vice President Investor Relations December 9, 2004
Lehman Brothers T4 2004 Conference San Francisco Craig DeYoung, Vice President Investor Relations December 9, 2004 Safe Harbor Safe Harbor Statement under the U.S. Private Securities Litigation Reform
More informationAnchor Data Set (ADS) Definition, Benefits, Implementation and Management Ver. 6-Aug 15 th DRAFT Proposal only
Anchor Data Set (ADS) Definition, Benefits, Implementation and Management Ver. 6-Aug 15 th 2016 DRAFT Proposal only Formal stakeholder review will begin August 24 th and remain open through September 12
More informationMISO SPP Interregional Stakeholder Advisory Committee. April 8 th, 2014 Carmel, IN
MISO SPP Interregional Stakeholder Advisory Committee April 8 th, 2014 Carmel, IN 1 Agenda Introductions Discussion on Draft Coordinated System Plan (CSP) Study Scope Lunch Continue Discussion on Draft
More informationHedging Coal Price Risk in a Deregulated Power Market
Hedging Coal Price Risk in a Deregulated Power Market Ginny Farrow Manager Rail Car Fleet NCCI Spring Conference Greensboro, NC April 12, 2007 Safe Harbor Statement This Presentation contains forward-looking
More informationCapacity Performance Training. March 16, 2015
Capacity Performance Training March 16, 2015 Training Objectives Provide Capacity Market Sellers with information necessary to participate in the Reliability Pricing Model (RPM) under a Capacity Performance
More information2012 Integrated Resource Plan
2012 Integrated Resource Plan Entergy System This document describes the Entergy System s Integrated Resource Plan for the period 2012 2031. The Integrated Resource Planning Process results in a Preferred
More informationField Pea and Lentil Marketing Strategies
EC-1295 Field Pea and Lentil Marketing Strategies George Flaskerud Professor and Extension Crops Economist Department of Agribusiness and Applied Economics The United States is a small but growing producer
More informationLa regulación del incierto futuro de los sistemas eléctricos
La regulación del incierto futuro de los sistemas eléctricos Foro XM-2017 El futuro de la energía eléctrica en Colombia 25 de mayo, Cartagena, Colombia Carlos Batlle https://energy.mit.edu/profile/carlos-batlle
More informationUnderstanding the NAAQS and the Designation Process
Understanding the NAAQS and the Designation Process Shawn Seals Senior Environmental Manager Office of Air Quality Indiana Department of Environmental Management (IDEM) September 21, 2016 1 Presentation
More informationNew England Electricity Outlook
O C T O B E R 2 1, 2 0 1 6 S O U T H P O R T L A N D, M E New England Electricity Outlook Environmental and Energy Technology Council of Maine (E2Tech) Eric Johnson D I R E C T O R, E X T E R N A L A F
More informationRegional Coordination in the West: Benefits of PacifiCorp and California ISO Integration
Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration Technical Appendix October 2015 Regional Coordination in the West: Benefits of PacifiCorp and California ISO Integration
More informationLoad Serving Entity Definition Refinement Draft Final Proposal
Updated: September 21, 2016 Table of Contents 1. Executive Summary... 4 2. Scope of Initiative... 6 3. Changes to this proposal... 6 4. Stakeholder Engagement... 7 5. Background... 8 Allocation of Congestion
More informationGas-Electric Infrastructure Challenges. WPUI Gas Program September 17, September 13, 2012 Madison, WI
Gas-Electric Infrastructure Challenges WPUI Gas Program September 17, 2012 MISO EPA/Gas related efforts - Timeline EPA Rules & Regulations MISO EPA Impact Study, Oct 2011 Gas Consultant Phase 1 Study,
More informationWATER AND WIND QUÉBEC S CLEAN, RENEWABLE ENERGY RESOURCES
WATER AND WIND QUÉBEC S CLEAN, RENEWABLE ENERGY RESOURCES QUÉBEC HAS THE CLEAN ENERGY MASSACHUSETTS NEEDS Hydro-Québec is proposing a new source of clean energy to Massachusetts, in the form of firm deliveries