Study Area Roadways for Road Diet / Lane Narrowing / Reconfiguration 11/11/2016

Size: px
Start display at page:

Download "Study Area Roadways for Road Diet / Lane Narrowing / Reconfiguration 11/11/2016"

Transcription

1 Study Area Roadways for Road Diet / Lane Narrowing / Reconfiguration 1

2 Road Road Diet Road Typical Section Cross Section ~100 Curb to Curb ~78 Road Diet Moving the Curbline Road Typical Section Cross Section ~90 Curb to Curb ~60 Road Diet Maintaining the Curbline Road Typical Section Cross Section ~100 Curb to Curb ~78 2

3 Road Road Diet with 30% Growth Road at (Germantown Road) Road at Crystal Rock Drive Road at (Great Seneca Highway) Crystal Rock Drive CLV V/C Road Diet CLV V/C LOS C C Road Diet Future (30% Growth) CLV V/C CLV V/C Road Diet CLV V/C Road Diet Future (30% Growth) CLV V/C CLV V/C LOS B A Road Diet CLV V/C LOS C A Road Diet Future (30% Growth) CLV V/C LOS E F* LOS C C *Lane configuration adjustments and/or altering road diet limit may improve LOS LOS E C 3

4 Road Road Diet with 20% Growth Road at (Germantown Road) Road at Crystal Rock Drive Road at (Great Seneca Highway) Crystal Rock Drive CLV V/C Road Diet CLV V/C LOS C C Road Diet Future (20% Growth) CLV V/C CLV V/C Road Diet CLV V/C Road Diet Future (20% Growth) CLV V/C CLV V/C LOS B A Road Diet CLV V/C LOS C A Road Diet Future (20% Growth) CLV V/C LOS D E LOS B C *Lane configuration adjustments and/or altering road diet limit may improve LOS LOS D C 4

5 Drive One through lane with a center two way left turn lane (30% Growth) Drive at (Germantown Road) Drive at Crystal Rock Drive Drive at (Great Seneca Highway) Crystal CLV V/C Future 4 lanes (30% Growth) CLV V/C LOS A C Future 3 lanes center turn lane CLV V/C LOS C F CLV V/C Future 4 lanes (30% Growth) CLV V/C Future 3 lanes center turn lane CLV V/C CLV V/C Future 4lanes (30% Growth) CLV V/C Future 3 lanes center turn lane CLV V/C LOS B C 5

6 Drive One through lane with a center two way left turn lane (20% Growth) Drive at (Germantown Road) Drive at Crystal Rock Drive Drive at (Great Seneca Highway) Crystal CLV CLV CLV V/C V/C V/C Future 4 lanes (20% Growth) Future 4 lanes (20% Growth) Future 4 lanes (20% Growth) CLV CLV CLV V/C V/C V/C LOS A C Future 3 lanes Center Turn Lane Future 3 lanes center turn lane Future 3 lanes center turn lane CLV CLV CLV V/C LOS B E V/C V/C LOS B B 6

7 Drive One through lane with a center two way left turn lane Drive Typical Section Curb to Curb ~55 Road Diet Drive Proposed Typical Section Curb to Curb ~55 7

8 Great Seneca Highway Four lanes (30% Growth) (Great Seneca Highway) At Road (Great Seneca Highway) At (Four lanes) CLV V/C LOS B A Future (Four lanes; 30% Growth) CLV V/C LOS D B (Four lanes) CLV V/C Future (Four lanes; 30% Growth) CLV V/C Note: The northbound approach () is a critical movement. 8

9 Great Seneca Highway Four lanes (20% Growth) (Great Seneca Highway) At Road (Great Seneca Highway) At (Four lanes) CLV V/C LOS B A Future (Four lanes; 20% Growth) CLV V/C LOS C B (Four lanes) CLV V/C Future (Four lanes; 20% Growth) CLV V/C Note: The northbound approach () is a critical movement. 9

10 Germantown Road Shared Use Path Typical Section Median Drive lane RIGHT OF WAY (ASSUMED FROM BACK OF SIDEWALK TO BACK OF SIDEWALK) ~115 ROAD BED ~35 ROAD BED ~35 Typical Section Shared Use Path OPTION 1 Widen Sidewalk by Reducing Buffer Share Use Path Median BUFFER REDUCED FROM 4 TO 1 Typical Section Shared Use Path OPTION 2 Widen Sidewalk to the Outside (may require additional right of way) Share Use Path Median Drive lane REBUILD SIDEWALK EXTENDING BY 4 View Point - North RIGHT OF WAY ~119 10

DRAFT MEMORANDUM DATE: 10/06/2017

DRAFT MEMORANDUM DATE: 10/06/2017 DATE: 10/06/2017 FROM: TO: SUBJECT: DRAFT MEMORANDUM Paul Silberman, P.E., PTOE, Sabra, Wang & Associates, Inc. Elisa Mitchell, P.E., Sabra, Wang & Associates, Inc. Laura Hodgson, LEED AP, Montgomery County

More information

Williston Road Network Transportation Plan South Burlington Planning Commission Meeting

Williston Road Network Transportation Plan South Burlington Planning Commission Meeting Williston Road Network Transportation Plan South Burlington Planning Commission Meeting August 8, 2017 Exploring ways to build a complete corridor for South Burlington s future A Long-Term Vision for Williston

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement

More information

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

TABLE OF DRAWINGS. Pierce County Public Works & Utilities Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

B723 ENERGY ATTENUATORS - OPSS 723

B723 ENERGY ATTENUATORS - OPSS 723 B723 - OPSS 723 723.1 GENERAL Various proprietary permanent and temporary energy attenuators are used to reduce the hazard associated with the ends of permanent and temporary concrete barriers. Tables

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

Chapter 4: Transportation and Circulation

Chapter 4: Transportation and Circulation Chapter 4: Transportation and Circulation 4.1 Introduction Circulation improvements constructed for the West Valley Logistics Center will improve the functional efficiency of the circulation system in

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

White Oak Science Gateway (WOSG) Master Plan Preliminary Transportation Analysis. Presentation to the White Oak Science Gateway CAC May 22, 2012

White Oak Science Gateway (WOSG) Master Plan Preliminary Transportation Analysis. Presentation to the White Oak Science Gateway CAC May 22, 2012 White Oak Science Gateway (WOSG) Master Plan Preliminary Transportation Analysis Presentation to the White Oak Science Gateway CAC May 22, 2012 Transportation Modeling Process Overview 2 Regional Model

More information

Environmental Hearing Officer Hearing/ Scoping Meeting

Environmental Hearing Officer Hearing/ Scoping Meeting Environmental Hearing Officer Hearing/ Scoping Meeting Draft Environmental Impact Report South Storke Road Widening Project May 3, 2017 Agenda Introductions & Hearing/Meeting Objectives Description of

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2

More information

GDOT s Design-Build Program Past, Present and Future

GDOT s Design-Build Program Past, Present and Future GDOT s Design-Build Program Past, Present and Future John D. Hancock, P.E. Assistant State Innovative Program Delivery Engineer September 16, 2013 Agenda Program Overview GA Code 32-2-81 (SB 70) Look Ahead

More information

Appendix O Level of Service Standard and Measurements

Appendix O Level of Service Standard and Measurements July 8, 2016 Appendix O. Appendix O Standard and Measurements Definition Level of service (LOS) is a mechanism used to determine how well a transportation facility is operating from a traveler s perspective.

More information

TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL TRANSPORTATION INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL CADBURY-SCHWEPPES SITE FINAL CONCEPT-LEVEL STRATEGY REPORT I. Introduction The purpose of this report is to recommend infrastructure

More information

MONTGOMERY COUNTY CIRCUIT COURT (Subdivision Plats, MO) Plat 13750, MSA_S1249_ Date available 1982/01/05. Printed 08/05/2016.

MONTGOMERY COUNTY CIRCUIT COURT (Subdivision Plats, MO) Plat 13750, MSA_S1249_ Date available 1982/01/05. Printed 08/05/2016. Attachment B Attachment C MONTGOMERY COUNTY CIRCUIT COURT (Subdivision Plats, MO) Plat 13750, MSA_S1249_19955. Date available 1982/01/05. Printed 08/05/2016. RESULTS OF INTERSECTION

More information

B723 ENERGY ATTENUATORS - OPSS 723

B723 ENERGY ATTENUATORS - OPSS 723 B723 - OPSS 723 723.1 GENERAL Various proprietary permanent and temporary energy attenuators are used to reduce the hazard associated with the ends of permanent and temporary concrete barriers. Tables

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VIII. ENGINEERING AND ENVIRONMENTAL EVALUATION INTERSECTION IMPROVEMENTS SOUTHERN For the southern end of the corridor, traffic volumes are expected to increase over existing levels. The Phase A Report

More information

B351 - CONCRETE SIDEWALK - OPSS 351

B351 - CONCRETE SIDEWALK - OPSS 351 B351 - - OPSS 351 351.1 GENERAL The design and construction of concrete sidewalks, when justified and approved in accordance with Provincial Engineering Memorandum, Director s Office #2011-01 (February

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

North Woodbridge Urban Mixed Use Master Zoning Plan

North Woodbridge Urban Mixed Use Master Zoning Plan North Woodbridge Urban Mixed Use Master Zoning Plan 18 October 2005 Project Team: Potomac Communities A premier residential, business and visitor location on the Potomac River 2004-2008 Strategic Plan

More information

Evaluation of Drainage on Nicholasville Bypass

Evaluation of Drainage on Nicholasville Bypass Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1987 Evaluation of Drainage on Nicholasville Bypass David L. Allen University of Kentucky, dallen@engr.uky.edu

More information

40TH AVENUE NE BRIDGE REPLACEMENT

40TH AVENUE NE BRIDGE REPLACEMENT Is this Project funded? The City plans to use approximately $22 million of Penny for Pinellas funds to rebuild this and other bridges in the near future. The Federal Department of Transportation (FDOT)

More information

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination

Interstate 73 FEIS: I-95 to the Myrtle Beach Region Chapter 4. Public Involvement and Agency Coordination 4-65 Interstate 73 FEIS: I-95 to the Myrtle Beach Region 4-66 Comment noted. The use of existing roadways was considered during alternative development (refer to Chapter 2, Section 2.1, page 2-1 and the

More information

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996. DATE ADDRESS OF INSTALLATION OWNER ADDRESS CITY STATE ZIP CODE NATURE OF WORK: (check

More information

Construct each curb ramp using Type A1 Use curb ramps with flared sides at locations with wide sidewalks. NOTES Construct each curb ramp using Type A2 Construct each curb ramp using Type A1 PERPENDICULAR

More information

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES

CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES CITY OF DRAPER TRAFFIC IMPACT STUDY DESIGN GUIDELINES June 1, 2012 Draper City Traffic Impact Study Guidelines Table of Contents Introduction... 1 Traffic Impact Classification Levels... 1 Analysis Approach

More information

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Routes Name: CR 571 Mileposts: 4.85 DBNUM: N1127 County Route 571/County Route 527, Reconstruction, Toms River Township This project is for intersection improvements at CR 571 and CR 527 in Tom s River

More information

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES

SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES SECTION VII TRAFFIC IMPACT ANALYSIS GUIDELINES A. GENERAL Traffic Impact Analyses (TIAs) are tools that have historically been utilized to evaluate the interaction between existing transportation infrastructures

More information

Corridor Planning Standards + Potential Performance Measures

Corridor Planning Standards + Potential Performance Measures Corridor Planning Standards + Potential Performance Measures January 17, 2007 1. Transportation improvements should connect people with potential places of employment and regional activity centers, particularly

More information

The location is viewable on Google Maps in this link:

The location is viewable on Google Maps in this link: Transportation Event Description The City of Irvine has plans to develop single family homes on a vacant property in Planning Area 1 (PA1). The location of PA1 in the City of Irvine is identified at the

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic

More information

Woodburn Interchange Project Transportation Technical Report

Woodburn Interchange Project Transportation Technical Report Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...

More information

Traffic Analysis. Appendix I

Traffic Analysis. Appendix I FHWA #T-A000(18) / NHDOT #13742 Bow Concord Improvements Appendix I Traffic Analysis The traffic analysis for the project was conducted using the Bow-Concord Traffic Microsimulation Model prepared specifically

More information

STAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program

STAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program STAFF REPORT DATE: November 14, 2017 TO: Bryan Montgomery, City Manager Approved and Forwarded to the City Council FROM: SUBJECT: Kevin Rohani, P.E. Public Works Director/City Engineer FY 2017/18 First

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

The Lewistown Narrows. State Routes 22/322

The Lewistown Narrows. State Routes 22/322 The Lewistown Narrows State Routes 22/322 "The Narrows...a History of Transportation" The history of transportation in the Narrows is a compelling story that begins with early man and the Juniata River.

More information

10.0 Congestion Management Process

10.0 Congestion Management Process Livability 2040 Regional Transportation Plan 10-1 10.0 Congestion Management Process 10.1 CMP Summary The identification and evaluation of projects for the Livability 2040 Regional Transportation Plan

More information

Designing Pedestrian Facilities for Accessibility

Designing Pedestrian Facilities for Accessibility Keith P. Skilton Local Programs Engineer FHWA NJ Division 840 Bear Tavern Road, Suite 310 West Trenton, NJ 08628 Phone: 609-637-4203 Fax: 609-538-4919 keith.skilton@dot.gov Note: Pictures may depict non-compliant

More information

SITE AREA AERIAL PHOTO

SITE AREA AERIAL PHOTO ward consulting group EXHIBIT 1.2 SITE AREA AERIAL PHOTO 168 STREET 164 STREET 32 AVENUE 28 AVENUE 24 AVENUE 160 STREET HIGHWAY 99 156 STREET HIGHWAY 99A PHOTO DATE: YEAR 2004 152 STREET 1480 ward consulting

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Markings 01/04/1994 04/01/1994 TOS/TO For use with Marking items. DIVISION 200 GRADING

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

on the eastbound side of Route 29). identified in the table.

on the eastbound side of Route 29). identified in the table. To: Jeannie Swim, Memo From: Ken Demmons, P.E. Project: Route 29 Bridge Replacement over Little Rocky Run Per plans received on January 23, 2012 CC: File Date: February 21, 2012 Job No: P2464 RE: Review

More information

The following slides will discuss the Technically Infeasible Form.

The following slides will discuss the Technically Infeasible Form. The following slides will discuss the Technically Infeasible Form. What is the technically infeasible form? Simply put It is a record of the design process and decisions for any construction not fully

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: -- ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS

More information

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S

More information

IMPROVING I 81 IN MARYLAND

IMPROVING I 81 IN MARYLAND IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I

More information

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention

More information

Highway 417 Bridge Replacement

Highway 417 Bridge Replacement Highway 417 Bridge Replacement West of Maitland Avenue to East of Island Park Drive Hampton Iona Community Group June 6, 2006 7:00 p.m. to 9:00 p.m. Overview of Project Area MAITLAND CLYDE CARLING WBL

More information

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

South Boston. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

AIRPORT CURBSIDE AND TERMINAL-AREA ROADWAY OPERATIONS (ACRP Project 7-02)

AIRPORT CURBSIDE AND TERMINAL-AREA ROADWAY OPERATIONS (ACRP Project 7-02) Overview of AIRPORT CURBSIDE AND TERMINAL-AREA ROADWAY OPERATIONS (ACRP Project 7-02) 2009 ACI NA Operations and Technical Affairs Conference Peter Mandle Jacobs Consultancy March 17, 2009 Agenda Research

More information

INNOVATIVE INTERSECTIONS. Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division

INNOVATIVE INTERSECTIONS. Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division INNOVATIVE INTERSECTIONS Terrell Hughes, PE Conceptual Planning Manager VDOT Transportation and Mobility Planning Division Current Tools Common Project Solutions Traffic Signalization Widening Projects

More information

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721 B721-2 - - OPSS.PROV 721 721-2.1 GENERAL Steel beam guide rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

TRANSPORTATION MOBILITY PLAN GUIDELINES

TRANSPORTATION MOBILITY PLAN GUIDELINES TRANSPORTATION MOBILITY PLAN GUIDELINES for Development Applications November 2016 Executive Summary The Regional Municipality of York (the Region) is located in the heart of the Greater Toronto Area (GTA)

More information

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center, Washington February 2015 FINAL DRAFT - NW La Center Road/I-5 Interchange Improvement Project (MP 16.80) La Center,

More information

Categorical Exclusion (CE)

Categorical Exclusion (CE) Categorical Exclusion (CE) Project Information Project Name: ROUTE 17 I95 BRIDGE TO HOSPITAL BLVD Federal Project#: NHPP-5111(298) Project Number: 0017-088-R72, B616, C501, P101, R201 Project Type: Construction

More information

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS DIVERGING DIAMOND INTERCHANGE State Route 120/Union Road Diverging Diamond Retrofit Presented by: Mark Houghton Sam Sherman Matt Brogan Aaron Silva City of Manteca Caltrans, District 10 Mark Thomas Mark

More information

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives

CHAPTER 5. City of Greensburg Comprehensive Plan. Introduction. Transportation Goals & Objectives CHAPTER 5 TRANSPORTATION Introduction The transportation system forms the backbone of the community. I-74 provides the community with connections to larger metropolitan areas such as Indianapolis and Cincinnati.

More information

Every Day Counts Market Ready Options

Every Day Counts Market Ready Options Every Day Counts Market Ready Options Every Day Counts (EDC ) is a state-based model to identify and rapidly deploy proven, but underutilized innovations to shorten the project delivery process, enhance

More information

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost

More information

Table of Contents LIST OF TABLES LIST OF FIGURES LIST OF MAPS CHAPTER 1: REGIONAL GOODS MOVEMENT: LINKS TO OUR PAST AND TO OUR FUTURE

Table of Contents LIST OF TABLES LIST OF FIGURES LIST OF MAPS CHAPTER 1: REGIONAL GOODS MOVEMENT: LINKS TO OUR PAST AND TO OUR FUTURE Table of Contents LIST OF TABLES LIST OF FIGURES LIST OF MAPS iv v vi CHAPTER 1: REGIONAL GOODS MOVEMENT: LINKS TO OUR PAST AND TO OUR FUTURE Strategic Freight Plan Intent 1-2 Study Area 1-4 CHAPTER 2:

More information

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation OVERVIEW History of Events 2018 Bridge Redesign Construction Schedule 2 ACRONYMS AND TERMINOLOGY FHWA =

More information

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850)

CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) CITY OF MARIANNA MUNICIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL 32447 (850) 482-2786 TRANSPORTATION CONCURRENCY ANALYSIS CITY OF MARIANNA CONCURRENCY MANAGEMENT SYSTEM (CMS) This form

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT 6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT Project Location The 6 th Street Viaduct (Bridge No. 53C-1880) and Sixth Street Overcrossing (Bridge No. 53-0595) comprise a single structure, which spans

More information

902 - EXCAVATION AND BACKFILL FOR STRUCTURES - OPSS Bridges - Working slabs/pads - footings for piers and abutments - wingwalls

902 - EXCAVATION AND BACKFILL FOR STRUCTURES - OPSS Bridges - Working slabs/pads - footings for piers and abutments - wingwalls 902 - - OPSS 902 902.1 GENERAL 902.1.1 Excavation for Structures Excavation for structures deals with excavation in earth or rock for the placement of the following structures: - Bridges - Working slabs/pads

More information

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010

I-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010 I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD

More information

Coulter Transportation Consulting, LLC 1524 Paula Avenue Wheaton, IL Ph:

Coulter Transportation Consulting, LLC 1524 Paula Avenue Wheaton, IL Ph: MEMO To: Tri-Cities Impact Fee Review Group From: Brent Coulter, PE, PTOE Date: November 8, 2006 Subject: General Review of the Preliminary Kane County CRIP Kane County requested in recent (late October

More information

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS HPTER 5 PRLLEL PRKWY ORRIDOR IMPROVEMENTS nother key area within the Village West study area is the Parallel Parkway corridor. This chapter focuses on the segment of Parallel Parkway between 106 th Street

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

I-90 ALLSTON INTERCHANGE

I-90 ALLSTON INTERCHANGE I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT TASK FORCE MEETING March 10, 2016 FIORENTINO COMMUNITY CENTER 1 Meeting Agenda Welcome & Introductions Urban Interchange Concept 3K-4c with

More information

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313 B 313-1 OPSS 313 313-1.1 GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for

More information

District 2 System Preservation Projects for FY 17 and FY 18

District 2 System Preservation Projects for FY 17 and FY 18 District 2 System Preservation Projects for FY 17 and FY 18 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer Project Development Bret Hadzimichalis Assistant District

More information

COMMUNITY MEETING #4. Final Summary Presentation September 5, 2018

COMMUNITY MEETING #4. Final Summary Presentation September 5, 2018 COMMUNITY MEETING #4 Final Summary Presentation September 5, 2018 AGENDA 1. Project Review 2. From Framework to Projects 3. Story Map Report 4. Next Steps 2 PROJECT PARTNERS CuyahogaGreenways@clevelandmetroparks.com

More information

VIII. LAND USE ISSUES

VIII. LAND USE ISSUES VIII. LAND USE ISSUES The & Route 57 Land Use and Circulation Study (Land Use Study, Figure 6) was completed for the Town of Clay in November 1999 (Clough, Harbour & Associates). This study investigated

More information

New Prague Area Schools

New Prague Area Schools New Prague Area Schools Athletic Track & Field Improvements January 28, 2013 Agenda Introduction Existing Conditions Variations Considered Track Configurations Reuse Existing Top Soil Sand / Peat Prescribed

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

Authority: N.J.S.A. 27:1A-5, 27:1A-6 and 27:7-44.1, and 27:7-89 et seq., specifically 27:7-91. Expires on February 27, 2021.

Authority: N.J.S.A. 27:1A-5, 27:1A-6 and 27:7-44.1, and 27:7-89 et seq., specifically 27:7-91. Expires on February 27, 2021. TITLE 16. TRANSPORTATION CHAPTER 47. STATE HIGHWAY ACCESS MANAGEMENT CODE Authority: N.J.S.A. 27:1A-5, 27:1A-6 and 27:7-44.1, and 27:7-89 et seq., specifically 27:7-91. Expires on February 27, 2021. SUBCHAPTER

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2

More information

CE 452 Traffic Impact Assessment

CE 452 Traffic Impact Assessment CE 452 Traffic Impact Assessment 1 Why Required? New developments Produce/ attract new traffic Production: Residences Attraction: Shops, Offices, Schools, Hospitals etc. etc. Changes in traffic pattern

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

OR99E: Clackamas River Bridge Dunes Drive. Oregon City, OR

OR99E: Clackamas River Bridge Dunes Drive. Oregon City, OR Oregon City, OR Technical Information Project Completion Date: March 5, 2015 Project Location: Oregon City, OR Size of Project: 7,015 linear feet of curb; 35,083 square feet of sidewalk and driveways;

More information

General Legend Details...100

General Legend Details...100 SECTION 1 - ROADWAYS TABLE OF CONTENTS General Legend Details......100 Details Roadway Section......... 110 Residential Street Intersection.........115 Waterway and Waterway Transition Detail........116

More information

Appendix A Transportation Technical Analysis Methodology

Appendix A Transportation Technical Analysis Methodology Appendix A Transportation Technical Analysis Methodology Appendix A Transportation Technical Analysis Methodology and Assumptions and Updates 1.0 Introduction The Transportation Technical Analysis Methodology

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

Administrative Modification 22 FY FY 2021 Transportation Improvement Program October 25, Page 1

Administrative Modification 22 FY FY 2021 Transportation Improvement Program October 25, Page 1 County KIPDA ID State ID Name Description KENTUCKY PROJECTS Jeffersontown Jefferson 2230 Miscellaneous Sidewalks and ADA Ramps Construct and replace various sidewalks and ADA ramps throughout the city.

More information

City of San Juan Capistrano PROJECT UPDATE ORTEGA HIGHWAY (SR-74) CITY- SEGMENT WIDENING PROJECT (CIP 14107) December 15, 2015 FOR THE

City of San Juan Capistrano PROJECT UPDATE ORTEGA HIGHWAY (SR-74) CITY- SEGMENT WIDENING PROJECT (CIP 14107) December 15, 2015 FOR THE City of San Juan Capistrano PROJECT UPDATE FOR THE ORTEGA HIGHWAY (SR-74) CITY- SEGMENT WIDENING PROJECT (CIP 14107) CITY COUNCIL MEETING 1 TONIGHT S RECOMMENDATIONS Receive and file a project update presentation.

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 11. TRANSPORTATION AND CIRCULATION 1. TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 11. TRANSPORTATION AND CIRCULATION 1. TRAFFIC 4. EVIROMETAL IMPACT AALYSIS 11. TRASPORTATIO AD CIRCULATIO 1. TRAFFIC 1. ITRODUCTIO The following section summarizes the information provided in the Traffic Impact Study, SMC Malibu Satellite Campus Project,

More information

EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.

EXHIBIT A County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640. EXHIBIT "A" County Road 54 (Wesley Chapel Boulevard) (from North of Magnolia Boulevard to Oakley Boulevard) Work Order No. C-1640.00 SECTION I PURPOSE This document describes the scope of work and the

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items.

More information