1 Highway 417 Bridge Replacement West of Maitland Avenue to East of Island Park Drive Hampton Iona Community Group June 6, :00 p.m. to 9:00 p.m.

2 Overview of Project Area MAITLAND CLYDE CARLING WBL ISLAND PARK CARLING EBL KIRKWOOD MERIVALE Limits of Contract 2 Limits of Contract 1

3 Description of the Work Contract No. 1 Island Park Merivale

4 Description of the Work Contract No. 1 Rehabilitation of Island Park Drive Bridge Deck replacement; Abutment refacing; Removal of existing sound barrier and installation of new sound barrier; Replacement of sidewalks and curbs; Removal of old connection to Merivale Road from Island Park Drive; Deck construction / demolition within construction staging area; and Reinstatement of construction staging area.

5 Description of the Work Contract No. 1 Rehabilitation of Island Park Drive Bridge Existing bridge Images Underside of Island Park Bridge Images

6 Island Park Drive Bridge South Side

7 Island Park Drive Bridge North Side

8 Description of the Work Contract No. 1 Rehabilitation of Island Park Drive Bridge Existing bridge Images Underside of Island Park Bridge Images

9 Island Park Drive Bridge

10 Island Park Drive Bridge

11 Construction Staging Area Island Park Proposed Construction Staging Area Merivale

12 Construction Staging Area

13 Construction Staging Area

14 Construction Staging Area

15 Construction Staging Area

16 Construction Staging Area

17 Construction Staging Area

18 Heavy Lift Technologies Animation of a heavy lift move (Mammoet) Video of a heavy lift move (Rayne, Louisiana) Video

19 Construction Stages 1. Establish fenced construction staging area; 2. Construct new deck in staging area; 3. Abutment refacing and widening; 4. Removal / reinstatement of deck by rapid replacement; and 5. Demolition of existing bridge in staging area.

20 Roadway Closures for Contract No. 1 Kirkwood Island Park Island Park off-ramp and adjacent local roads to nearest intersection closed Parkdale Westbound on-ramp closed at Parkdale Bayswater Preston All ramps closed at Rochester Booth Bronson Carling at Kirkwood eastbound on-ramps closed Merivale Carling Potential Road Closures Potential Detours

21 Possible Hoarding Design

22 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #1: The construction site required for the bridge rehabilitation will be designed so that no trees will be included within the construction site. Mitigation #1: We agree that no trees will be included within the temporary construction site. In addition, those trees in close proximity to the site will be provided with protection. A bid item, barrier for tree protection, will be included in the contract and the trees requiring this protection will be identified on the drawings.

23 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #2: The size of the construction site will be approximately 75 m x 150 m as indicated in your public notification of June 4, 2005 and in the location noted in the same public notification. Mitigation #2: We agree to the size constraint in your , however I should clarify that in the PIC Meeting I further constrained the area to that bounded by Island Park Drive to the east, the Queensway to the south, the recreational path to the north and a dimension of approximately 80 m from the existing edge of pavement. This area is significantly less than the 75 m x 150 m indicated in the notice. We continue to refine the needs of the project and we will continue to review this area and ensure that the footprint is as small as possible within the limits identified.

24 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #3: Any area of the park that is used (and we define the entire area of Hampton Park including the field adjacent to the Queensway as park) will be returned to its current condition. Should any trees be killed during construction, they will be replaced by trees of a comparable age. The Ministry of Transportation will commit to take care of any replacement trees until they are fully established and should any replacement trees die, they in turn will be replaced. Mitigation #3: We agree that any area disturbed by construction activity will be returned to its preconstruction condition. Furthermore we will complete a precondition survey of the site with the property owner (NCC) and document the preconstruction condition. A similar post-construction survey will be conducted after the contractor has completed reinstatement to ensure that the preconstruction conditions have been achieved. The Ministry will ensure that any trees planted, as mitigation in this project, will be warranted until they are established.

25 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #4: An 8 to 10 foot fence will be erected around the entire work site. Mitigation #4: A solid wood fence, 8 to 10 feet tall, will be erected around the temporary construction site. The Ministry will further require that this fence be painted. Both the final height of the fence (minimum 8 feet) and the colour of paint will be proposed during detail design for public comment.

26 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #5: The work will be completed within one construction season. Mitigation #5: The temporary construction site will only be used for one construction season.

27 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #6: The above five conditions will form part of i) the tender specifications that are issued and ii) the signed contract. The tender documents and the relevant sections of the commercial contract will be provided to Hampton Iona for our inspection. Mitigation #6: The above five (5) conditions will be included in the contract documents (operational constraints, specifications, tender, and drawings, as appropriate). The parts of the contract that reference these conditions shall be made available to HICG executive for review prior to tendering. A copy of the contract will be provided to HICG after award of the contract. These conditions will also be made available at the PIC during detail design for the Island Park bridge replacement.

28 Environmental Conditions Agreed to by the Hampton Iona Community Group and the Ministry of Transportation, Ontario Condition #7: The Ministry of the Environment will be advised that these are the conditions that have been agreed upon in order for us to withdraw our bump-up request. Mitigation #7: All conditions and commitments agreed to herein will be further documented in the Design and Construction report required for the project as part of the environmental approval process.

29 Description of the Work Contract No. 2 MAITLAND CLYDE CARLING WBL ISLAND PARK CARLING EBL KIRKWOOD MERIVALE Heavy Lift Replacement Rehabilitation Constructing Staging Area Retaining Walls

30 Description of the Work Contract No. 2 Widening 417 for construction Retaining walls; Three (3) lanes in each direction; Additional lane width constructed for staging; Ramp modifications; Median barrier replacement;

31 Description of the Work Contract No. 2 Widening 417 for construction continued Storm sewer replacement (median if required); New storm sewer for outside widening (new construction); Overhead signs; and Upgraded illumination.

32 Description of the Work Contract No. 2 Bridge replacement using heavy lift for: Carling Avenue westbound; Kirkwood Avenue; Carling Avenue eastbound; and Clyde Avenue. Bridge rehabilitation: Merivale Road.

33 Local Roadways Construction Contract No. 2 Lowering of profiles to maintain bridge clearances staged construction; Rehabilitation of underground plant (as required): Storm and sanitary sewers; Watermains; Illumination / traffic signals; and Bell, hydro, gas, etc. Reinstatement of roadway elements.

34 Carling Avenue Westbound Contract No. 2 CARLING WBL Bridge Over Carling WBL CARLING EBL KIRKWOOD Proposed Construction Staging Area

35 Carling Avenue Westbound Contract No. 2 Rehabilitation of Carling Westbound Bridge Existing bridge Images Construction staging area Local road work Images Images

36 Carling Avenue Westbound West Portal

37 Carling Avenue Westbound East Portal

38 Carling Avenue Westbound Contract No. 2 Rehabilitation of Carling Westbound Bridge Existing bridge Images Construction staging area Local road work Images Images

39 Construction Staging Area - Carling WBL

40 Construction Staging Area - Carling WBL

41 Carling Avenue Westbound Contract No. 2 Rehabilitation of Carling Westbound Bridge Existing bridge Images Construction staging area Local road work Images Images

42 Carling WB Profile

43 Sherbourne Traffic Management for Carling Westbound Carling Westbound traffic rejoins Hwy 417 at Carling/Kirkwood westbound on-ramp Kirkwood Westbound traffic must exit at Carling/ Kirkwood off-ramp Holland Parkdale Carling Bayswater Preston Booth Bronson Maitland Eastbound traffic must exit at Carling / Kirkwood off-ramp. Westbound Carling through traffic directed along detour. Eastbound traffic re-joins Hwy 417 at Bronson Merivale Fisher Baseline Potential Road Closures Potential Detours

44 Kirkwood Avenue Contract No. 2 CARLING WBL Bridge Over Kirkwood CARLING EBL KIRKWOOD Proposed Construction Staging Area (same as for Carling WBL)

45 Kirkwood Avenue Contract No. 2 Rehabilitation of Kirkwood Avenue Bridge Existing bridge Images Construction staging area Local road work Images Images

46 Kirkwood Avenue North Portal

47 Kirkwood Avenue South Portal

48 Kirkwood Avenue Contract No. 2 Rehabilitation of Kirkwood Avenue Bridge Existing bridge Images Construction staging area Local road work Images Images

49 Construction Staging Area - Kirkwood

50 Construction Staging Area - Kirkwood

51 Kirkwood Avenue Contract No. 2 Rehabilitation of Kirkwood Avenue Bridge Existing bridge Images Construction staging area Local road work Images Images

52 Kirkwood Avenue Profile

53 Traffic Management for Kirkwood Sherbourne Westbound traffic rejoins Hwy 417 at Carling/Kirkwood westbound on-ramp Kirkwood Holland Carling Maitland Westbound traffic on Hwy 417 must exit at Carling/ Kirkwood offramp Eastbound traffic on Hwy 417 must exit at Maitland off-ramp. All eastbound ramps closed at Maitland. Merivale Fisher Baseline Potential Road Closures Potential Detours

54 Carling Avenue Eastbound Contract No. 2 CARLING WBL Proposed Construction Staging Area Saigon Court will be closed. CARLING EBL Bridge Over Carling EBL KIRKWOOD

55 Carling Avenue Eastbound Contract No. 2 Rehabilitation of Carling Avenue EBL Bridge Existing bridge Images Construction staging area Local road work Images Images

56 Carling Avenue Eastbound East Portal

57 Carling Avenue Eastbound West Portal

58 Carling Avenue Eastbound Contract No. 2 Rehabilitation of Carling Avenue EBL Bridge Existing bridge Images Construction staging area Local road work Images Images

59 Construction Staging Area Carling EBL

60 Construction Staging Area Carling EBL

61 Carling Avenue Eastbound Contract No. 2 Rehabilitation of Carling Avenue EBL Bridge Existing bridge Images Construction staging area Local road work Images Images

62 Carling Avenue EB Profile

63 Traffic Management for Carling Eastbound Eastbound Carling detoured at Maitland Sherbourne Carling / Kirkwood westbound on-ramp closed Kirkwood Westbound traffic must exit at Carling/ Kirkwood off-ramp Carling Maitland Merivale Eastbound traffic must exit at Carling / Kirkwood off-ramp. Fisher Baseline Potential Road Closures Potential Detours

64 Clyde Avenue Contract No. 2 CLYDE Bridge Over Clyde WOODWARD LAPERRIERE Proposed Construction Staging Area

65 Clyde Avenue Contract No. 2 Rehabilitation of Clyde Avenue Bridge Existing bridge Images Construction staging area Local road work Images Images

66 Clyde Avenue - North Portal

67 Clyde Avenue - South Portal

68 Clyde Avenue Contract No. 2 Rehabilitation of Clyde Avenue Bridge Existing bridge Images Construction staging area Local road work Images Images

69 Construction Staging Area Clyde

70 Construction Staging Area Clyde

71 Clyde Avenue Contract No. 2 Rehabilitation of Clyde Avenue Bridge Existing bridge Images Construction staging area Local road work Images Images

72 Clyde Avenue Profile

73 Traffic Management for Clyde Westbound traffic must exit at Carling/ Kirkwood off-ramp Sherbourne Westbound on-ramps closed at Carling / Kirkwood Kirkwood Holland Carling Clyde Maitland Merivale Eastbound traffic must exit at Maitland off-ramp. All eastbound ramps closed at Maitland Local roads closed adjacent to Clyde construction site Fisher Potential Road Closures Potential Detours

74 Merivale Road (Rehabilitation) Contract No. 2 Bridge Over Merivale ISLAND PARK MERIVALE

75 Merivale Road Contract No. 2 Rehabilitation of Merivale Road Bridge Existing bridge Images No construction staging area needed as these decks will not be replaced Local road work Images

76 Merivale Road - South Portal

77 Merivale Road North Portal

78 Merivale Road Contract No. 2 Rehabilitation of Merivale Road Bridge Existing bridge Images No construction staging area needed as these decks will not be replaced Local road work Images

79 Merivale Road Profile

Eastern Region, Ministry of Transportation, Ontario. Island Park Drive Rapid Bridge Replacement

Eastern Region, Ministry of Transportation, Ontario. Island Park Drive Rapid Bridge Replacement Eastern Region, Ministry of Transportation, Ontario Island Park Drive Rapid Bridge Replacement Dina Miron and Frank Vanderlaan, Ministry of Transportation, Ontario, Eastern Region Paper prepared in support

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

Re: PW Appendix 3 - Part 8

Re: PW Appendix 3 - Part 8 Demolish S/W DVP ramp, FGE WBL (including Logan Ramp), Don River bridge WB, and existing LSB WBL Construct new S/W DVP ramp, FGE WBL ramp, Don River bridge WB, and remaining portion of LSB WB roadwork.

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON. REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018

JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

Attachment No. 1 Council Report Attachment

Attachment No. 1 Council Report Attachment Attachment No. 1 Council Report Attachment 19T-03E01 Part Lots 16 to 19, Concession 2, Town of East Gwillimbury Re: Draft Plan of Subdivision prepared by KLM Planning Partners Inc. Project No. P-466, dated

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2 Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:

More information

ARCHITECTUS FEBRUARY 2010

ARCHITECTUS FEBRUARY 2010 ARCHITECTUS PEDESTRIAN AND TRAFFIC MANAGEMENT PLAN FOR DEMOLITION, EXCAVATION AND CONSTRUCTION OF COLLEGE OF FINE ARTS CAMPUS, PADDINGTON FEBRUARY 2010 COLSTON BUDD HUNT & KAFES PTY LTD ACN 002 334 296

More information

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313

B HOT MIX, HOT LAID ASPHALTIC CONCRETE OPSS 313 B 313-1 OPSS 313 313-1.1 GENERAL HL,, Mixture, and/or Mix, is hot mixed, hot laid asphaltic concrete, used for pavement construction and other uses. 1. HL 1 This dense graded surface course mix is used

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY TO: FROM: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING FEBRUARY 21 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR OF ENVIRONMENTAL AND ENGINEERING SERVICES & CITY ENGINEER SUBJECT: CONTRACT AWARD:

More information

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables Highway 400 Improvements from 1 km South of Highway 89 to the Junction of Highway 11 Appendix C - Highway 400 Widening and Interchange Tables Prepared for: Ontario Ministry of Transportation Four General

More information

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING APRIL 3, 2017 AT THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS 01238 7:00 PM FOR THE PROPOSED SUPERSTRUCTURE REPLACEMENT PROJECT CHAPEL STREET OVER GREENWATER BROOK Project No.

More information

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) The Medina County Highway Engineer is soliciting statement of qualifications

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 WESTMINSTER DRIVE UNDERPASS ACCELERATED BRIDGE CONSTRUCTION USING GIGO (GET IN-GET OUT) BRIDGE CONCEPT Mark D Andrea, M.Sc., P.Eng. Stantec Consulting Ltd., Canada

More information

PERMITTING AND CONSTRUCTION MANUAL

PERMITTING AND CONSTRUCTION MANUAL PUBLIC RIGHT-OF-WAY CONTENTS PERMITTING AND CONSTRUCTION MANUAL 1. INTRODUCTION 2. PUBLIC SERVICE PROVIDER REGISTRATION 3. CONSTRUCTION PERMITTING PROCEDURE 3.1 Permitting Process 3.2 Permit Application

More information

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways.

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways. APPENDIX A FILE NO: 04-T-2008-01 The City of Cornwall s conditions and amendments to final plan approval for registration of subdivision File No. 04-T-2008-01 are as follows: NO. CONDITIONS 1. That this

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

To The Property Owners, Tenants Re: Invitation to Attend a Public Information Centre Spruce Street and Briercrest Avenue Reconstruction

To The Property Owners, Tenants Re: Invitation to Attend a Public Information Centre Spruce Street and Briercrest Avenue Reconstruction March 7, 2016 To The Property Owners, Tenants Re: Invitation to Attend a Public Information Centre Spruce Street and Briercrest Avenue Reconstruction The City of Cambridge is proposing to reconstruct Spruce

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008 2008 Street and Utility Improvement Project West Golden Lake Road C P Public Informational Meeting January 3, 2008 Presentation Summary Project Location Existing Conditions Proposed Improvements Project

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

Rosslyn Circle Improvements, WB Lee Hwy. - US 29. April 6, :30 a.m North Fort Myer Drive, LL-10, Arlington, VA

Rosslyn Circle Improvements, WB Lee Hwy. - US 29. April 6, :30 a.m North Fort Myer Drive, LL-10, Arlington, VA REQUIRED PROJECT SHOWING MINUTES Project No. 0029-000-859, C501, B605 UPC No. 109813 PROJECT SHOWING MINUTES, WB Lee Hwy. - US 29 Project No. 0029-000-859, C501, B605 UPC No. 109813 April 6, 2017 10:30

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS Financial Management Institute of Canada November 19, 2008 Ministry s Assets Mature network - large inventory Over 16,500 km Over 2,800 bridges 8

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT August 22, 2017 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 316-00-17-47-2 Project Name: Lake Village Drainage

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Traffic Control permits, notifications, mobilization, temporary signs, barriers, lights, flagging personnel, striping, markings, and demobilization and removal. 1.2 RELATED

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

Carpinteria Avenue Bridge Replacement Project Description Introduction

Carpinteria Avenue Bridge Replacement Project Description Introduction Carpinteria Avenue Bridge Replacement Project Description Introduction The City of Carpinteria is proposing to replace the existing Carpinteria Avenue Bridge over Carpinteria Creek (Br. No. 51C 0172) with

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG Meeting September 5 th, 2006 1 Agenda 1. Study Update 2. Construction Staging for Tunneling 3. Other Business 2 Deep Borehole Program 3 Status Update - Engineering

More information

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

CHAPTER 18 TEMPORARY ROADS AND BRIDGES Change #1 - Revised 12/12 CHAPTER 18 TEMPORARY ROADS AND BRIDGES 18.0 INTRODUCTION These guidelines are to be used to design temporary roads and bridges where traffic will be maintained at the construction

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH) City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002

More information

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing

Interstate 66 Tier 1 Environmental Impact Statement Public Hearing Interstate 66 Tier 1 Environmental Impact Statement Public Hearing 1 Project Corridor Study Process / Tiering Approach Tier 1 EIS focuses on broad issues - Purpose and need - Mode / Technology choice -

More information

Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House

Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House May 22, 2018 1 Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House Rendering of Trail and Community Improvements at Project Completion 2

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

B760 - NOISE BARRIER SYSTEMS OPSS 760

B760 - NOISE BARRIER SYSTEMS OPSS 760 B760 - OPSS 760 760.1 GENERAL Proprietary noise barrier systems are designed and manufactured by the noise barrier companies in accordance with the Canadian Highway Bridge Design Code (CHBDC) and the Ministry's

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

CITY HALL: March 15, AN ORDINANCE to amend and reordain Section of the Code of the City of

CITY HALL: March 15, AN ORDINANCE to amend and reordain Section of the Code of the City of ORDINANCE CITY OF NEW ORLEANS CITY HALL: March 15, 2012 CALENDER NO. 28,965 NO. MAYOR COUNCIL SERIES BY: COUNCILMEMBER HEAD AN ORDINANCE to amend and reordain Section 146-193 of the Code of the City of

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2

More information

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award S.R. 0070, Section T20 Engineering District 12-0 ASHE National Project of the Year Award AMERICAN SOCIETY OF HIGHWAY ENGINEERS National Project of the Year Award OFFICIAL ENTRY FORM AWARD CATEGORY (Check

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION MAINTENANCE OF EXISTING CONDITIONS SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged

More information

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets.

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets. 630-5 Maintenance of Traffic Alternative Analysis As noted in Section 630-1, Section 1400 of the L&D Manual indicates that a Maintenance of Traffic Alternative Analysis will be performed. This analysis

More information

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Whittier Bridge/I-95 Improvement Project. Public Information Meeting Whittier Bridge/I-95 Improvement Project Public Information Meeting October 23, 2013 Agenda: WHITTIER BRIDGE / I-95 IMPROVEMENT PROJECT Introduce the Design-Build Team Current Project Schedule Design Project

More information

1A-300 SCREENING AND BUFFERING REQUIREMENTS

1A-300 SCREENING AND BUFFERING REQUIREMENTS 1A-301 GENERAL SCREENING AND BUFFERING REQUIREMENTS Ord. 3129/12-16-96; Ord. 4341/10-20-2014 A. APPLICABILITY Screening to provide partial visual protection and to serve as a barrier between uses shall

More information

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS

VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS VILLAGE OF MORTON GROVE DEPARTMENT OF PUBLIC WORKS RIGHT-OF-WAY (ROW) PERMIT APPLICATION REQUIREMENTS For general information concerning submittal requirements, please refer to Village Code 7-9-4 (c.).

More information

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL

CPC GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL CPC-2014-3808-GPA-ZC-HD-CU-CUB-ZAI-SPR T-1 CONDITIONS FOR EFFECTUATING TENTATIVE (T) CLASSIFICATION REMOVAL Pursuant to Los Angeles Municipal Code Section 12.32 G, the T Tentative Classification shall

More information

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX Rev. 2016 STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX ARTICLE PAGE 1. Pavement Removal and Restoration... P-1 2. Street

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

The Commissioner of Engineering and Public Works recommends: There are no immediate budgetary impacts resulting from the adoption of this report.

The Commissioner of Engineering and Public Works recommends: There are no immediate budgetary impacts resulting from the adoption of this report. COMMITTEE OF THE WHOLE JUNE 19, 2006 FENCING LANGSTAFF ROAD Recommendation The Commissioner of Engineering and Public Works recommends: That this report BE RECEIVED for information purposes. Economic Impact

More information

STP number: (internally assigned) Is Contractor s current insurance policy on file?

STP number: (internally assigned) Is Contractor s current insurance policy on file? BE ADVISED THAT FAXED APPLICATIONS AND/OR DOCUMENTS ARE NOT ACCEPTED. APPLICATION IS TO BE COMPLETED ONLINE, PRINTED THEN SENT VIA EMAIL TO DALPermits@city.cleveland.oh.us SECTION A: APPLICANT INFORMATION

More information

on the eastbound side of Route 29). identified in the table.

on the eastbound side of Route 29). identified in the table. To: Jeannie Swim, Memo From: Ken Demmons, P.E. Project: Route 29 Bridge Replacement over Little Rocky Run Per plans received on January 23, 2012 CC: File Date: February 21, 2012 Job No: P2464 RE: Review

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

MEMORANDUM - CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS

MEMORANDUM - CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS . ATTACFTMENT D I MEMORANDUM CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS DATE: TO: FROM: RE: Denver Miller, Zoning Administrator Planning and Development Department City Engineer Department of Public Works

More information

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10 EXECUTIVE SUMMARY Background The proposal for Rail Deck Park (RDP) comprises the construction of a decking structure over the rail corridor in downtown Toronto between Blue Jays Way and Bathurst Street

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL

CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 928 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR STRUCTURE REHABILITATION - CONCRETE REMOVAL TABLE OF CONTENTS 928.01 SCOPE 928.02 REFERENCES 928.03

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

QUEEN ALEXANDRA COMMUNITY CENTRE

QUEEN ALEXANDRA COMMUNITY CENTRE BRICK REPOINTING AND NEW BARRIER FREE RAMP 180 BARNARDO AVENUE PETERBOROUGH, ON. ARCHITECTURAL A1 A1 A2 SITE PLAN AND DEMOLITION NOTATION NEW CONSTRUCTION DETAIL PLANS AND SECTIONS NEW CONSTRUCTION SECTION

More information

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Minimum Standards for Construction of Aircraft Hangars ARTICLE 1. MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Section 1. - Purpose Section 2. - Goals Section 3. General Provisions Section 4.

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313 313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

313-1 HOT MIX ASPHALT - OPSS.PROV 313

313-1 HOT MIX ASPHALT - OPSS.PROV 313 313-1 - OPSS.PROV 313 313-1.1 GENERAL Hot mix asphalt consists of several mix types, which are grouped into two categories: Stone Mastic Asphalt and Superpave as detailed below. The type of hot mix asphalt

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Hamilton Rapid Transit Preliminary Design and Feasibility Study Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT DESIGN BRIEF Version:1.0 Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT

More information

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections. Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE

More information

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253) Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains

More information

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis MEMORANDUM To: CAJA Environmental Services, LLC Date: From: Subject: Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis LLG

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment DR-15-11/LLA-15-01 Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment Existing Zoning and Land Uses Enter footer information 2 Office Business Center (OBC)

More information

SPECIAL SPECIFICATION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL SPECIFICATION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0050-06-081 SPECIAL SPECIFICATION 000--2733 Description of Project, Scope of Contract, and Sequence of Work 1. Description of Project. General. This project involves widening of

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201 Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October

More information

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Ohio Department of Transportation - Prebid Questions Project No. 110510 Sale Date - 9/29/2011 CUY-22212 - SR-17-8.38 (BROOKPARK ROAD) 9/22/2011 10:38:17 AM Quanity of materials for asbestos abatement?

More information