ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
|
|
- Cornelia Foster
- 6 years ago
- Views:
Transcription
1 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
2 Active Construction Projects SR Bill Williams River NWR Rd CAP Intersection US 95, Castle Dome-La Paz CL (MP 54-63) I-8, State Line-Fortuna Rd (MP ) I-8, Ligurta-Dateland (MP 19-66) Sign Rehab I-8, Foothills Blvd-Wellton Crack Seal I-10, Bouse Wash Rest Area Gas Line Rd (MP 52-63) I-10, Dike Repairs (MP 47-48) SR Gila Bend Ph I Oxbow Bridge
3 SR Gila Bend Ph I Contractor- Haydon Building Corp. Contract Amount- $13,473,722 Project Status- 48% Complete Project consists the realignment of Pima St. and Maricopa Rd, demolition of SR 85/B8 interchange and the construction of Pima/B8 intersection. Work consists of removal of 2 bridges, AC pavement, and existing box culvert; constructing new AC pavement, curb & gutter, drainage improvements, construction of new bridges, lighting, landscape and other related items.
4 Oxbow Bridge Contractor- Lawrence Construction Company Contract Amount- $979,712 Project Status- 70% Complete Project consists of removing bridge deck and replacing with new wooden bridge deck.
5 SR 95, Colorado River Bridge Replacement Prime Contractor- MCM Construction, Inc. Project Cost- $23,465, Project Start Date- 4/15/11 Project Description- Project consists of removing existing bridge and constructing a new bridge.
6 Ave 3E, Gila Ridge Road- 24 th Street Existing Bridge Project Estimate- $8.2 Million Joint project between ADOT & City of Yuma Project consists of widening the bridge over the railroad to accommodate 3 lanes in each direction with concrete median. Project received $7 Million of Coordinated Border Infrastructure Funding
7 I-8, Fortuna Road & South Frontage Road Improvements o Project is scheduled for construction in FY 12 o Project consists of widening the existing south frontage road, placing new chain link fence along the r/w line, and widening the return radius from Fortuna Road to the south frontage road o Joint project with Yuma County & ADOT
8 US 95, MP 82 & 89 Intersection Improvements Project cost estimated at $1.6 Million Construction scheduled for FY 12 Work consists of adding a right and left turn lane at each intersection. At MP 89.2 the turnout will be realigned to remove the existing skew. MP 89.2
9 US 95, International Border-Juan Sanchez Blvd. Construction Estimate- $5 Million Design FY 12 thru 13 Construction FY 13 Project improvements will include: improvement traffic circulation to and from the port of entry. One-way streets at Archibald & 1 st Ave. New pavement, new curb & gutter, pedestrian lights, luminares, signage, & storm drain system
10 US 95, International Border-Juan Sanchez Blvd. Other Work Elements- Enhancement project on US 95 (Main St) from D Street to Border 1. Install raised curb median between B St & Juan Sanchez Blvd. and curb bump outs for on street parking between A St. and D St. 2. New sidewalk, street furniture, bike racks 3. New signage & pedestrian lighting Installing storm drain system for Yuma County Flood Control District Enhancement Project Storm Drain System
11 I-10, Ehrenberg Roundabout & Pavement Preservation Project construction scheduled for FY 12 Estimated Construction Cost- $4.67 Million Project consists of constructing a roundabout at The crossroad and south frontage road, milling and replacing pavement, and reconstructing portion of the roadway near the roundabout
12 US 95, Ave 9E to Aberdeen Corridor Gila River Bridge The Project consists of widening the existing roadway from a two-lane roadway to a five-lane section with 10 shoulders from Ave 9E to the Gila River Bridge and from the Gila River Bridge to Aberdeen Road the roadway will be widened to a four-lane divided highway section. 30% General Plan Complete Corridor will be split into 4 to 5 separate smaller projects. Corridor Cost Estimate- $118 Million Castle Dome Road & US 95 Intersection
13 US 95, Ave 9E to Aberdeen Ph I Phase I- Ave 9E to Fortuna Wash Bridge (MP ) Project consists of widening the roadway to a five lane section with 10 shoulders, constructing a new bridge over the Fortuna Wash, constructing a roundabout at the intersection of US 95 & Fortuna Road, widening an existing canal bridge. Roundabout Existing US 95
14 I-8, Araby TI Improvements
15 I-10, West Quartzsite TI Improvements Construct roundabouts at ramp intersections to alleviate traffic congestion without widening the crossroad The construction of roundabouts at the ramp intersections could handle increasing traffic volumes for a number of years before any other improvements will need to be made.
16 I-10, West Quartzsite TI Improvements
17 Highway Safety Improvement Program Projects Ave 8E & US 95 Intersection Improvements (Roundabout) SR 95 & Cienega Springs Road (MP 149.2) Intersection Improvement (left turn lane) SR 95 & Mohave Road (MP 142.9) Intersection Improvements (Roundabout)
18 Questions?
TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA
HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction
More informationOhio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director
Ohio Contractor Association Annual Work Forecast Program John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director John R. Kasich, Ohio Governor Jerry Wray, ODOT Director ODOT S
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)
More informationIMPROVING I 81 IN MARYLAND
IMPROVING I 81 IN MARYLAND April 25, 2017 Stephen A. Bucy, P.E. Improving I 81 in Maryland Overview: Facts SHA s Comprehensive I 81 Strategy Current Phase 1 Widening Project Update Closing Improving I
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could
More informationI-17 and Happy Valley Road Diverging Diamond Interchange (DDI)
I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) Bharat Kandel (ADOT) and Jeremy Neuman (HDR) February 28, 2018 Project Purpose and Overview New interchange will accommodate current and future
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four
DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127
More informationAPPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
Route 3, Route 46, Valley Road and Notch/Rifle Camp Road Interchange, Contract B DBNUM: 059B / UPC: 123020 From Notch/Rifle Camp Road to just east of the Valley Road Intersection, Route 46 will be widened
More informationHighway Construction Program
Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,
More informationADA Training Design Case Studies MnDOT
ADA Training Design Case Studies 2018 MnDOT 2 ADA Design Case Studies Overview TH 61 (Mounds Blvd) Mill & Overlay Lesson: Steep Slopes and Construction Limits Snelling Avenue Mill & Overlay Lesson: Strategies
More informationHighway Construction Program
Highway Construction Program Monthly Delivery Progress Report Watch List October 2018 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,
More informationSTAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program
STAFF REPORT DATE: November 14, 2017 TO: Bryan Montgomery, City Manager Approved and Forwarded to the City Council FROM: SUBJECT: Kevin Rohani, P.E. Public Works Director/City Engineer FY 2017/18 First
More informationCapital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds
Capital District Transportation Committee November 6, 2018 Unit Costs for Non-State Highway Reconstructions with Federal Funds CDTC s unit costs for non-state reconstruction projects were last updated
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 57, Bridge over Branch Lopatcong Creek DBNUM: 16345 / UPC: 163450 Problem Statement submitted by BMS for Tier 1 Screening. It is recommended for
More information5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA
PUBLIC OFFICIALS MEETING MAY 11, 2016 AGENDA I. INTRODUCTIONS V. CURRENT PROJECT STATUS VI. PROJECT SCHEDULE VII. UPCOMING ACTIVITIES VOPEN DISCUSSION & QUESTIONS IX. ACTION ITEMS 1 A. Bridge Lighting
More informationFor Public Input Period
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,
More informationBerkshire Region TIP Project Data Form
BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing
More informationBRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report
BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1
More informationPRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1
PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:
More information5.0 PRELIMINARY ENVIRONMENTAL REVIEW
5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 1 DBNUM: 15417 / UPC: 154170 This contract will bring projects into compliance with current ADA design requirements that could
More informationConstruction Cost Estimation Preparation Manual for Preliminary Design (English Units)
10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents
More information2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions
2016/2017 Organizational Chart Effective 7/1/2016 ed 29 FTE Positions ed 1 Part-Time Position ed 4 Intern Positions Ricardo Sandoval Administrative Secretary (1) Transportation/Land Development Project
More informationYear Pre Total County Debt (Bonds & BANS) Mitigation Fees
CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge
More informationConstruction Cost Estimation Preparation Manual (Metric Units)
07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction
More informationAdministrative Modification 22 FY FY 2021 Transportation Improvement Program October 25, Page 1
County KIPDA ID State ID Name Description KENTUCKY PROJECTS Jeffersontown Jefferson 2230 Miscellaneous Sidewalks and ADA Ramps Construct and replace various sidewalks and ADA ramps throughout the city.
More informationSR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to
More informationCITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107
CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 Web: www.a2gov.org Printed on recycled paper May 17, 2016 Subject:
More informationCITY OF ROCKLIN STANDARD DRAWINGS
CITY OF ROCKLIN STANDARD DRAWINGS November 2016 Table of Contents Page # Section 1 Section 2 Section 3 General Notes and Review Boxes 01-01 Signature Blocks... 1 01-02 General Notes (Sheet 1 of 8)... 2
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM Route 9/35, Main Street Interchange DBNUM: 079A / UPC: 088032 Rt. 9/35 over Main Street Interchange is a breakout from the Rt 9/35 over Main St. Bridge.
More information} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.
} SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT
More informationCity of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)
City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk
More informationPinellas County Capital Improvement Program, FY FY2016 Project Summary Report
Function : Transportation Activity : Road & Street Facilities Category : Arterial Roads Pinellas County Capital Improvement Program, FY2011 - FY2016 Project No: 1618 Title: 118th Avenue Expressway Cost
More informationCHAPTER 3 SCOPE SUMMARY
CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the
More informationPreventive Maintenance Project & Treatment Selection
Preventive Maintenance Project & Treatment Selection 19 th Annual TERRA Pavement Conference February 12, 2015, St. Paul, MN Mark Watson, MnDOT Maintenance Outline Introduction Network Level Project Level
More informationROADWAY DESIGN AND CONSTRUCTION STANDARDS
ROADWAY DESIGN AND CONSTRUCTION STANDARDS Adopted: 1990 Amended: 1994 2003 2011 2013 ROADWAY DESIGN AND CONSTRUCTION STANDARDS ORIGINALLY ADOPTED IN 1990 Resolution No. R-990-046 OFFICIALLY AMENDED IN
More informationProject Initiation Form
Meeting Date: The Project Initiation Form should be completed in conjunction with the Level 2 Screening Form. Process Leads and/or Planners should complete the Project Initiation Form to document coordination
More informationFuture Programmatic Date 09/04/2018 Sorted By District (Subject to Departmental Changes) Run Date 6/22/2018
Future Programmatic 09/04/2018 Sorted By rict (Subject to Departmental Changes) Run 6/22/2018 Prgmtc 1 09/04/2018 102864 D01/D02 ENV FY19 Task Order Environmental task order agreement for rict 1 and rict
More informationAREAWIDE BRIDGE REPLACEMENT AND REHABILITATION
CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally
More informationWelcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.
Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?
More informationFuller /Fuller Heights Road Improvements
Transportation Fuller /Fuller Heights Road Improvements Total Cost - $4.4M Description This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of
More informationconnections 2040 the waco metropolitan transportation plan amendment 1
connections 2040 the waco metropolitan transportation plan amendment 1 developed by the waco metropolitan planning organization in cooperation with the following agencies: Adopted June 23, 2016 amendment
More informationPage 1D-1 Revised language to link from Project Management Manual to Project Management Online Guide.
IMPERIAL ROAD DESIGN MANUAL REVISIONS July 2008 CHAPTER 1D Page 1D-1 Revised language to link from Project Management Manual to Project Management Online Guide. CHAPTER 2A Page 2A-3 Revised language to
More informationRAIL-HWY PROJECT DEVELOPMENT GUIDE AND
RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT
More informationNW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL
VALUE ENGINEERING STUDY OF NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL FM Number: 430637-1-22-01 STUDY NUMBER: 1400601 MIAMI, FLORIDA October 21-25, 2013 FINAL REPORT In Association With: THE FLORIDA
More informationBROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure
BROWARD COUNTY Solicitation Bid #V2114585P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure YOUR CEI SOLUTION YOUR PARTNERS Cory Nichols, P.E Quality Assurance Quality Control
More informationPAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA
PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationPAVEMENT DESIGN MEMORANDUM
PAVEMENT DESIGN MEMORANDUM FOR SR 70 (15TH STREET EAST) ROUNDABOUT MANATEE COUNTY FINAL SUBMITTAL FPID 435090-1-52-01 PREPARED FOR: FLORIDA DEPT. OF TRANSPORTATION DISTRICT 1 FEBRUARY 16, 2018 PREPARED
More informationPublic Works Capital Projects Management. Presented by: Joseph Cordts P. E., Portfolio Manager Capital Projects Management
Public Works Capital Projects Management Presented by: Joseph Cordts P. E., Portfolio Manager Capital Projects Management Overview Capital Projects Management (CPM) is responsible for management of the
More informationFY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Baltic Avenue, Maine to Mississippi Avenues Project ID Numbers: S1702 / 173620 This project will mill and repave the roadway, upgrade ADA ramps, and improve drainage, thermoplastic stripping, manholes,
More informationThe Main Street Bridge - Supporting Transportation Systems
The Main Street Bridge - Supporting Transportation Systems October 28, 2015 So what is the Transportation System Project Background BACKGROUND N DOWNTOWN 70 70 SOUTH INNERBELT STUDY Existing Condition
More informationRequest for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2
Addendum Number 1 Request for Proposals No. 17-001 Various On-call Professional Design and Engineering Services To all prospective firms under specifications for Request for Proposals (RFP) No. 17-001,
More informationPublic Works Department Five Year Capital Improvement Plan FY PROPOSED
Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted
More informationI-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017
I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),
More informationSUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.
SUBDIVISION CHECKLIST Subdivision Name Account Number Review Engineer Prior To Review Preliminary plan approved by Planning Commission / Council as required. Review fee paid. Statement of Responsibility
More informationSECTION 6. ROAD CONSTRUCTION STANDARDS
SECTION 6. ROAD CONSTRUCTION STANDARDS Construction of new roads or reconstruction of existing roads proposed for dedication to the County shall conform to the standards set forth in this section. Roads
More informationDRAFT Geotechnical Technical Memorandum
DRAFT Geotechnical Technical Memorandum US 19 (SR 55) Reevaluation from 66 th Avenue North to SR 690/118 th Avenue North Work Program Item Segment No. 435914-1 Project Development and Environment Study
More informationFuture Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)
Sorted By rict (Subject to Departmental Changes) Future Prog Beyond Prompt By Run : 1/25/2019 1 09/08/20 101082 D01 UBI FY21 Use a consultant to perform underwater bridge inspections. Consultant to perform
More informationADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP
TAC Agenda Item 6B Mailout - 03/09/16 ADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP Background The Transportation Policy Council (TPC) has authorized the Metropolitan Planning Organization (MPO) Director
More informationEngineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017
Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue
More informationSustainable Pavement Practices Help Local Agencies in California Improve Their Road Infrastructure
Sustainable Pavement Practices Help Local Agencies in California Improve Their Road Infrastructure LA County s Path to Success Kevin Donnelly Western Emulsions Presentation Objectives What are applicable
More informationUS-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015
US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015 1 DELIVERY RECOMMENDATION GOALS Project Readiness: Enhance Funding pursuits Corridor Related Projects Coordination Develop Information to: Resolve Questions
More informationUS-101 CORRIDOR ADVISOR S UPDATE
US-101 CORRIDOR ADVISOR S UPDATE MONTECITO ASSOCIATION BOARD OF DIRECTORS 12 MAY 2015 1 SCOPE OF SERVICES Identify & evaluate innovative project delivery strategies: Avoid & minimize delays / expedite
More informationMoving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements
Moving Ruston Forward City of Ruston Infrastructure Maintenance and Improvements MLK Extension Project will be done in conjunction with proposed water and sewer improvements Connect Martin Luther King
More informationCHAPTER 8 TRANSPORTATION ELEMENT
CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized
More informationSTRUCTURE AND BRIDGE DIVISION
Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work
More informationFinal Air Quality Report
Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026
More informationCLA /10.54, PID Project Description:
Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway
More informationConstruction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL
Construction Engineering and Inspection Services to Silver Shores Boulevard Broward County, FL R L I N O. R 2 11 4 0 8 0 P 1 I. Experience and Qualifications with Roadway Construction a. Eisman & Russo
More informationCOST ESTIMATE STREET IMPROVEMENTS (Off Site)
STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter
More informationAgenda TxDOT PAVED Transportation Summit Tyler March 20,
March 20, 2018 Agenda 2 Industry Partners Thank you to the following industry partners: Alliance Geotechnical Group Austin Bridge & Road Equify Ferrovial Agroman US Corp Fluor Corporation Granite Construction
More informationStandard Performance Attributes for Transportation Projects
Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on
More informationTABLE OF DRAWINGS. Pierce County Public Works & Utilities
Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement
More informationTarbutton Road Interchange and I-20 Frontage Roads. Estimating and Planning Group
Tarbutton Road Interchange and I-20 Frontage Roads Dr. N. Wasiuddin Braden Smith Jared Taylor John Harrison Sarah Wells Samantha Tatro Ryan Ross Instructor Project Manager Transportation Group Geotechnical
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
ADA South, Contract 1 w/o ROW DBNUM: 15420 / UPC: 154200 This contract will bring projects into compliance with current ADA design requirements that could not be completed within original design or construction
More information2017 Highway Safety Improvement Program Call
2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public
More informationTABLE OF DRAWINGS. Pierce County Public Works & Utilities
Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement
More information2016 Arizona Pavement/Materials Conference. Dennis Smith MAG Executive Director (602)
2016 Arizona Pavement/Materials Conference Dennis Smith MAG Executive Director (602) 254-6300 www.azmag.gov MAG Committee Structure MAG Membership Regional Planning Districts Councils of Governments (COGs)
More informationMinnesota Statewide Freight Bottlenecks
Minnesota Statewide Freight Bottlenecks Transportation Performance Measures Reporting for MAP21 Compliance Oct. 1, 2018 2018 Minnesota Statewide Freight Bottlenecks Report Report Prepared by: Minnesota
More informationFROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND
More informationWELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016
WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives
More informationTangerine Road Dove Mountain Boulevard to La Cañada Drive
Tangerine Road Dove Mountain Boulevard to La Cañada Drive PUBLIC MEETING The Highlands at Dove Mountain November 19, 2015 PRESENTATION OUTLINE 1. Tangerine Road Corridor in Review Project Need Project
More informationSTIP Project Description Guidance Revised December 14, 2015
General Guidance The guidance below applies to all local and MnDOT projects shown in the STIP. STIP Project Description Guidance The project description must clearly identify the specific route, point
More informationI-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation
I-11 Project 2017 Nevada Transportation Conference Ryan Wheeler, P.E. NDOT, Senior Project Manager Nevada Department of Transportation nevadadot.com About NDOT NDOT Core Values: Respect treating others
More informationSUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)
Updated July 21, 2017 ALLEGHENY COUNTY SR 0000 #109397 PROPOSAL:$28.56 The description and location of the project is as follows: This work is the 3-year term maintenance if intelligent transportation
More informationAnnual CSAH Needs Update for 2017
Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.
More informationTacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)
Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains
More informationDesign-Build and Design-Bid-Build
Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build
More informationOverview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer
Overview of Maintenance and Construction Programs Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer March 3, 2015 Overview Maintenance and Construction State v.
More informationRehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016
Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations
More informationI-90 Pavement Rehab VE Study
I-90 Pavement Rehab VE Study Using Value Analysis to Select Project Delivery Method Ken L. Smith, PE, CVS 360-570-4415 The week may have started with a bang But it ended with a success Do not drink and
More informationRt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016
Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb
More informationATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page AGENCY (Requestor or Agency who'll open bids): Contact: Phone:
ATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page 1 1. AGENCY (Requestor or Agency who'll open bids): Contact: Phone: 2. AGENCY PRIORITY (Numerical): 3. PROJECT #: 4. ROUTE SYSTEM (e.g. TWP 108 or
More informationDepartment of Street Services
Department of Street Services FY 07-08 Proposed Budget Briefing to the City Council September 5, 2007 Purpose An overview of the Department of Street Services Scope of operation and maintenance activities
More informationInformation for File # RJH
Information for File #2011-01629-RJH Applicant: Matthew Ternes Corps Contact: Ryan Huber, U. S. Army Corps of Engineers, 211 North Broadway, Suite 221, Green Bay, Wisconsin 54303; ryan.j.huber@usace.army.mil;
More informationTacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)
Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:
More informationAnnual CSAH Needs Update for 2018
Annual CSAH Needs Update for 2018 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segment and project data using the SANeeds system.
More informationTRANSPORTATION. Governmental Projects
TRANSPORTATION Governmental Projects Function: Activity: Category: Transportation Road & Street Facilities Arterial Roads Project No: 1618 Title: 118th Avenue Expressway Cost Center: 841418 Department:
More information