1 REQUEST FOR PROPOSALS PHASE 2 INFORMATION TECHNOLOGY INSTALLATION PLAN TO IMPROVE THE COLLEGE NETWORK COMPUTING ENVIRONMENT AT LOS ANGELES PIERCE COLLEGE RFP Number: Addendum Number: 2 Date: September 7, 2016 LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts Office 770 Wilshire Boulevard, 6 th Floor Los Angeles, California NOTICE TO PROPOSERS: THIS ADDENDUM SHALL BECOME PART OF THE RFP, AND PROPOSERS SHALL ACKNOWLEDGE, IN WRITING, RECEIPT AND INCORPORATION OF ALL ADDENDA AND CLARIFICATIONS IN THEIR RESPONSE. FAILURE OF THE PROPOSER TO RECEIVE ADDENDA SHALL NOT RELIEVE THE PROPOSER FROM ANY OBLIGATION UNDER ITS BID AS SUBMITTED. THE BIDDER SHALL IDENTIFY AND LIST IN ITS PROPOSAL ALL ADDENDA RECEIVED AND INCLUDED IN ITS PROPOSAL; FAILURE TO DO SO MAY BE ASSERTED BY THE DISTRICT AS A BASIS FOR DETERMINING THE PROPOSAL NON-RESPONSIVE. CLARIFICATIONS REQUESTED BY POTENTIAL PROPOSERS Number Vendors' Questions LACCD Response 1 Will the district accept bids that only include certain pieces of the project? For example, will the district accept a bid that only includes project 1, or do all projects need to be included in our bid? 2 Page 1 of the RFP states "Prospective proposers may elect to submit proposals on any one of the five projects or submit proposals for all five projects collectively in their entirety as long as each project is individually delineated." And, page 6 of the RFP states "Los Angeles Pierce College desires a qualified Information Technology company (or companies) to submit proposals on five independent projects." Bids are welcome on individual projects or all five of the projects. Each one of the listed projects however must be carefully delineated to reflect only the price for that specific project. While we would prefer to have a qualified Information Technology Company to be involved with the setup, observation, and analysis aspects of the focus group, we would consider a Non-information Technology company to perform the focus group as long they subcontracted with a qualified Information Technology company to provide the critical interface.
2 Will LACCD consider a proposal from a non- Information Technology company (such as a company experienced in conducting focus groups) to conduct the focus group component of Project 2? 3 Are Projects #1, 3 & 5 all expected to be completed by 5/31/17? 4 For Project #5, are you requesting additional pricing or should we use pricing from Project #1? 5 General: Will the Burwood Group or Lassen & Associates have a role in Vendor selection for projects detailed in this RFP? 6 General: What the current firewall technology installed at the Pierce College location? Our target date for completion of this phase is 5/31/17. Based on the specific needs for the DR data center you can refer to the BOM for project 1. Neither the Burwood Group nor Lassen & Associates will have a role in vendor selection. Currently there are dual Palo Alto Network firewalls deployed at Pierce College. 7 General: Will the District be responsible for any recommended firewall changes or will the vendor be? 8 General: What is the profile of the current server environment? (# of physical servers, # of virtual servers, hypervisor(s) deployed) 9 General: Are there any plans for a Pre-Bid vendor walkthrough or conference? 10 Projects 1 & 5: How will the installation of the new hyper-converged system correlate to the timing of the installation of the new datacenter switches? (before? during? after?) Please clarify. 11 Projects 1 & 5: Will the selected vendor for Projects 1 & 5 be responsible for contracting/installing any new recommended fiber The District will be responsible for any firewall changes. Total 82 servers. P = 23; V= 69; Hypervisors = 8 Not at this time, no Pre-Bid vendor walk is scheduled. The vendor will be responsible to manage the project and map out the critical scheduling aspects to ensure success At this time the college is not aware of any new requirements for fiber backbone cabling. This is considered as outside of the scope of this SOW.
3 backbone cabling? 12 Projects 1 & 5: Will the selected vendor for Projects 1 & 5 be responsible for contracting/installing any required additional power resources? 13 Projects 1 & 5: Given the broad scope of work detailed in the RFP, for Projects 1 & 5, is the District expecting vendors to provide a firm total dollar bid for Network Engineering and Project Management labor services in this bid response? Or is the Rate Fee Chart (Appendix A Point 11) delineating hourly rates sufficient at this point? Both projects 1 and 5 may require the vendor to subcontract with a qualified licensed electrician. The vendor must provide a firm total dollar bid for all services including VCE engineering, project management, and labor resources related to each of the projects. You can base your total bid for each project on the number of hours allocated times your hourly rate. As indicated in the RFP you need to break out the cost of materials (not including the cost of products) and other consumable supplies the only cost which will be evaluated are the labor and materials / consumable costs for Projects 1,2,4,5. 14 Projects 1 & 5: For the Datacenter Core Switches (HP12904) the BOM for each chassis specifies 48 Ports of 40G QSFP+ and (36+12) 48 Ports of 1/10GBase-T ports. Are these the actual number of ports required? If not what are the actual number of ports required? 15 Projects 1 & 5: For the Core Switches (HP7904) the BOM for each switch specifies 24 Ports of 40G QSFP+ (12+12) 24 Ports of 1/10G SFP+. Are these the actual number of ports required? If not, what are the actual number of ports required? 16 Projects 1 & 5: The Datacenter Core Switch BOM specifies (8) 40G QFP+ DAC cables and the Core Switch BOM specifies (8) 40G QFP+ DAC cables. Please describe the planned 40G connectivity involving the 4 Chassis. These are the actual numbers of ports. These are the actual numbers of ports. The overriding goal is to create greater network resiliency.
4 17 Projects 1 & 5: As it relates to SECTION F Statement of Work, please clarify what switches Phase 4 relates to. 1. The Vendor will follow a phased approach as dictated below: a. Phase 1: Planning and functional specification guide b. Phase 2: Core, Distribution, Access c. Phase 3: Data Center/Perimeter network Demilitarized Zone (DMZ) d. Phase 4: Switches 18 Projects 1 & 5: For patch cords, will the selected vendor be able to assess quantities, lengths and colors before committing to price quotes? 19 Project 3: How many access points are currently installed on the Pierce Campus? 20 Project 3: What are vendor makes and models installed? 21 Project 3: Specific mention is made to installation of Wireless Controllers. Would the District consider a WiFi solution with controller functionality embedded into the APs, or are separate wireless controllers a requirement? The various network switches are covered in phase 2 and phase 3. Phase 4 should be removed. The vendor should include a provision delineating the anticipated costs for cables and other supplies required to complete the project. The amount must reflect a not-to-exceed contingency. Choice of colors, quantities and lengths will be dependent on the application and must be broken out in the submittal so that it will not be used as the bases of evaluation. Greater than 150 access points HP ProCurve Series (8200, 5400, 3600, 2800 series). The necessity for a management console to the APs is practical and paramount. Our current configuration is a separate wireless controller. We would defer to the best practice industry standard for an HP/Aruba deployment. 22 Project 3:The project calls for potential network cabling installations. Will the selected vendor be able to assess, quantities, lengths, and facilities considerations before committing to price quotes As part of managing the projects, the vendor will have to conduct an assessment as it pertains to both the network cabling requirements within the data center and to support network cabling needs for the WiFi environment.
5 for these requirements? 23 Project 3: What is a reasonable estimate for maximum number of WiFi devices to be supported on the Campus? 24 Project 3: Will there be requirements for outdoor WiFi coverage? 25 Project 3: Is there a requirement that proposed Access Points (APs) be able to support ac Wave 2 specification? 26 We would like to request an extension to the proposal deadline for RFP No Phase 2 Information Technology Installation Plan to Improve the College Network Computing Environment at Los Angeles Pierce College to September 19, The two week extension would allow us to provide you with the most comprehensive and competitive proposal possible. 27 Can you clarify that pricing for services and materials (Not Product) is all that is required. The way we read this is that only a BOM for product is required and that hardware/product will be procured outside of the RFP. A reasonable estimate is greater than 300 mobile devices. WiFi coverage will be required for both internal and external environments. This is the district standard for wireless g AP 802.1x AP n AP AC AP POE AP 802.1q Controller Guest VLAN (Delegation Attributes) AP, Controller Centralized Control (Wireless Service Modules/Appliance) Controller Authenticated (Must provide Credentials) Controller Rate Limiting Controller WPA2 Enterprise i Controller Extension has been granted. Evaluation and award within each project will be based only on the vendor submitted total costs for labor and materials (not including product) costs. The cost to procure the product will be the responsibility of the College.
6 FROM RFP: The Vendor shall provide a Bill of Materials (BOM) for procurement following the suggested BOM which is provided in Exhibit G. The fee chart shall be broken into two parts, cost of materials and cost of labor resources. Cost of materials may include a provision delineating the cost to obtain cables and other supplies required to complete the project. This must reflect a not-toexceed provision. Rate Fee Chart Provide a fee chart for each project broken down into the logical critical phases as revealed in the Statement of Work. This fee chart shall break out the cost of materials, cost of labor, and consumable supplies for all projects except for Project 3 in which the costs will be expressed as an estimate. 28 Should contractors be listed in the RFP if any are to be used? Yes, Please indicate the names of the proposed subcontractors whom you will be using as part of the submittals. From RFP: Proposers may only use Subcontractors for specific assignments if relevant. Otherwise, use of Subcontractors will not be permitted without prior written approval from the College. 29 Can you clarify what is meant by consumer requirements for a wireless access network 30 Office 365 Migration: #1 Please Clarify what function specification guide means. Does that mean as built drawings, admin settings, etc.? Consumer requirements refer to the information assembled from the focus group discussions within project 3. Function Specification Guide means, the migrator would provide a project plan regarding data migration, configuration settings, diagrams of data flow, moves, adds, and changes. 31 Office 365 Migration: What is your current Exchange 2010
7 Exchange Version? 32 Office 365 Migration: #2, what are the other systems needed for connectivity to? a. Domain federations/trusts setup with the other colleges? b. Is there a current list/inventory of what Multifunction devices and applications that might be attached to services? Will updating those services be in scope, or will Pierce staff assist? A. Here are domain federations/trusts setup with the following domains. 1. Laccd.edu 2. Wlac.edu 3. Elac.edu 4. Lasc.edu 5. Lamission.edu 6. Lahc.edu 7. Lacitycollege.edu 8. Lattc.edu 9. Lavc.edu B. There are no MFDs attached to services at this time. Updating those services are not in scope at this time. Pierce staff will have to assist. 33 Office 365 Migration: Should they plan for some level of discovery needed prior to starting the migration? 34 Page 5 Section C: Is the HP solution referenced in Exhibit G being referenced as the Hyperconverged system? 35 Can we be provided a copy of the IT Quality Focus Essay referenced in page 6 paragraph 2? 36 Will the college provide a reference architecture for the Utelogy solution for DR systems configuration? 37 Page 8 Section F Paragraph 2: Are we to provide a BOM with pricing that align functionally with Exhibit G? The vendor must plan to include a large level of discovery. Pierce College is part of a larger ecosystem that connects and shares the GALs with 9 other LACCD locations. The HP solution as referenced in Exhibit G pertains to a hyperconverged system. The IT Quality Focus Essay is available at EvaluationReport.pdf page The college can provide a reference architecture for a DR solution. It should not be limited to Utelogy solutions. Exhibit G is provided only as a suggested BOM. You should use it as a guide to better understand the scope of these projects. 38 Page 8 Section F Paragraph 2: Are we to provide Exhibit G is provided only as a suggested BOM. Product pricing is
8 pricing for the BOM in Exhibit G? 39 Page 8 Section F Paragraph 12: Is training to be delivered On-site, Off-site, or both? 40 Page 11 Project 5 Paragraph 7: Are premanufactured patch cables required, or can they be manufactured on-site? not required as it will not be used to evaluate the submittals. Depending on the nature of the training and the ideal training environment it can be provided either on site or off site. Pre manufactured cables can be used.
REQUEST FOR PROPOSAL
COLORADO HOUSING AND FINANCE AUTHORITY REQUEST FOR PROPOSAL (RFP) COLORADO HOUSING AND FINANCE AUTHORITY 1981 BLAKE STREET DENVER, CO 80202 REQUEST FOR PROPOSAL Hyperconverged Infrastructure Solution POSTED:
More informationALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project.
LOS ANGELES COMMUNITY COLLEGES 770 Wilshire Boulevard, Los Angeles, CA 90017 Telephone: 213/891-2000 CITY EAST HARBOR MISSION PIERCE SOUTHWEST TRADE TECHNICAL VALLEY WEST ADMINISTRATIVE OFFICES Date: October
More information1. Revision to Profession Services Contract in Exhibit F
REQUEST FOR PROPOSALS ADMINISTRATION OF FLEXIBLE SPENDING ACCOUNT (FSA) AND HEALTH REIMBURSEMENT ARRANGEMENT (HRA) SERVICES FOR THE LOS ANGELES COMMUNITY COLLEGE DISTRICT RFP Number: 18-02 Addendum Number:
More informationRequest for Proposal. For. Consulting Services for. Accela Software Upgrade
Request for Proposal For Consulting Services for Accela Software Upgrade September 30, 2013 1 1.0 General Invitation 1.1 Purpose of the Request for Proposal Guilford County is soliciting the submission
More informationSAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL
DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of
More information1.1 Language: For the duration of this document the language shall be as addressed below:
Central Pierce Fire & Rescue Request for Proposal Wireless Mobile Gateways 1. Introduction Central Pierce Fire and Rescue is seeking proposals from qualified firms to provide technology that would enable
More informationService Provider Criteria and Contract Requirements
Request for Proposal Wireless LAN Controller and Network Access Point Equipment Moorhead Area Public School District ( the District ) wishes to take advantage of E Rate funding discounts to provide 802.11ac
More informationREQUEST FOR PROPOSALS. LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts Office 770 Wilshire Boulevard, 6th Floor Los Angeles, California 90017
REQUEST FOR PROPOSALS LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts Office 770 Wilshire Boulevard, 6th Floor Los Angeles, California 90017 RFP Number: 17-08: INFORMATION TECHNOLOGY ORGANIZATION, STAFF
More informationThis document becomes a fully incorporated part of the specifications, and this letter constitutes legal notice of this requirement.
Board of County Commissioners Pete Gerken President Tina Skeldon Wozniak Ben Konop Office of Support Services John C. Zeitler Director Lynn DiPierro Manager Addendum #1 Issued on May 8, 2009 Regarding
More informationProcurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202
Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 October 26, 2017 ADDENDUM NUMBER: ONE (1) TITLE: Arc-Resistant Metal-Clad Switchgear
More informationSr. Buyer, Goods and Non-Technology Services
DATE: June 17, 2015 TO: FROM: RE: All Prospective Proposers Beth Kirk Sr. Buyer, Goods and Non-Technology Services 301-985-7618 RFP 91286 On-Line and On-Site Sales Management for Branded and Promotional
More informationEric Pfister Assistant Director, Technology Procurement
DATE: January 26, 2018 TO: FROM: All Prospective Proposers Lauren Jaber Senior Buyer, Technology Procurement 301-985-7415 And Eric Pfister Assistant Director, Technology Procurement 301-985-7095 RE: RFP
More informationForm 470 Application #
Form 470 Application #2027700028234 Infrastructure Upgrade Request for Proposals Be it known that the Manteno Community School District No 5 (herein called District ) with the main office located at 84
More informationSOLICITATION SCHEDULE RFP #91286
DATE: June 3, 2015 TO: All Prospective Proposers FROM: Beth Kirk Sr. Buyer, Goods and Non-Technology Services 301-985-7618 RE: RFP 91286 On-Line and On-Site Sales Management for Branded and Promotional
More informationREQUEST FOR PROPOSALS: Pelham City Schools Charlie Maison
REQUEST FOR PROPOSALS: Requestor: RFP Contact: Pelham City Schools Charlie Maison BEN: 127527 IT Director 203 Mathewson Ave. Tel: 229.294.8715 Pelham, GA 31779 cmaison@pelham-city.k12.ga.us For: Pelham
More informationCity of Tacoma Department of Public Utilities - Tacoma Power
City of Tacoma Department of Public Utilities - Tacoma Power Service Oriented Architecture (SOA) Integration Infrastructure Implementation RFP Specification No. PS15-0233F QUESTIONS and ANSWERS All interested
More informationErie County Medical Center Corporation. Addendum Number 1 to RFP # 21728
Erie County Medical Center Corporation RFP # 21728 Addendum Number 1 Erie County Medical Center Corporation Addendum Number 1 to RFP # 21728 ARCHITECTURAL / ENGINEERING SERVICES FOR: MEP SYSTEMS / ELEVATOR
More informationRFP ADDENDUM #1 Date of Addendum: 03/15/2018
Page 1 of 9 Date of Addendum: 03/15/2018 NOTICE TO ALL POTENTIAL RESPONDENTS The Request for Proposals (RFP) is modified as set forth in this Addendum. The original RFP Documents and any previously issued
More informationBUTLER COUNTY EDUCATIONAL SERVICE CENTER GOVERNING BOARD NOTICE TO BIDDERS
BUTLER COUNTY EDUCATIONAL SERVICE CENTER GOVERNING BOARD NOTICE TO BIDDERS The Governing Board is requesting bids for Service Providers for the Audiology & Hearing Impaired Services Portal Application
More informationORANGE COUNTY WATER DISTRICT Ward Street Fountain Valley, California ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR
ORANGE COUNTY WATER DISTRICT 18700 Ward Street Fountain Valley, California 92708-6930 ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR OCWD Physical Access Control System Replacement and Video Monitoring Upgrades
More informationADDENDUM #1 TO REQUEST FOR PROPOSALS FOR SCADA SYSTEM DESIGN/INSTALL
ADDENDUM #1 TO REQUEST FOR PROPOSALS FOR SCADA SYSTEM DESIGN/INSTALL This addendum contains: A clarification to the RFP requirements Responses to Questions Received 02-18-10 through 03-11-10 The System
More informationX 1/22/2018 NO 2/23/2018
REQUEST FOR PROPOSAL (RFP) - SUMMARY PAGE ENTITY # 200244 SCHOOL NAME SOUTHWEST TECHNOLOGY CENTER ADDRESS 711 WEST TAMARACK CITY, STATE, ZIP ALTUS, OK 73521 Please submit bids/proposals to the school by
More informationEnd of Sale Announcement for ProCurve Access Control Server 745wl & Switch xl Access Controller Module Announcement Date: April 1, 2008
End of Sale Announcement for ProCurve Access Control Server 745wl & Switch xl Access Controller Module Announcement Date: April 1, 2008 End of Sale Date: September 1, 2008 or While Supplies Last Module
More informationREQUEST FOR PROPOSAL PROFESSIONAL SERVICES AUTOMATION SOLUTION. Submittal Date: April 22, 11:00 AM (PST)
REQUEST FOR PROPOSAL PROFESSIONAL SERVICES AUTOMATION SOLUTION Submittal Date: April 22, 2016 @ 11:00 AM (PST) Issued by: Southern California Coastal Water Research Project 3535 Harbor Blvd., Suite 110
More informationCity of Bartlett. Request for Proposal. Nortel Phone System
City of Bartlett Request for Proposal Nortel Phone System November 6, 2009 Dear Vendor: November 6, 2009 The City of Bartlett is actively pursuing installation of a Nortel Phone System to be located at
More informationOAKLAND UNIFIED SCHOOL DISTRICT REQUEST FOR QUOTES (RFQ)
OAKLAND UNIFIED SCHOOL DISTRICT REQUEST FOR QUOTES (RFQ) I. BACKGROUND Chromebooks, carts, access points, and services The Oakland Unified School District (the District) wishes to receive quotes for Chromebooks,
More informationADDENDUM #1. for the. Physical Security (Phase II), #31336 Bid #G San Jose City College
ADDENDUM #1 for the Physical Security (Phase II), #31336 Bid #G2010.0179 at San Jose City College San Jose Evergreen Community College District San Jose, California September 8, 2017 SAN JOSE EVERGREEN
More informationADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.
ADDENDUM NO. 1 Date: January 11, 2017 for RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College BID No. 332 South Orange County Community College District General-All
More informationADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS
ADDENDUM 2 TO REQUEST FOR PROPOSAL NO. 663-BC WORKDAY HUMAN CAPITAL MANAGEMENT AND WORKDAY FINANCIAL CAPITAL MANAGEMENT IMPLEMENTATION CONSULTANTS University of Nevada, Las Vegas Purchasing Department
More informationDOCUMENT POST BID INTERVIEW
DOCUMENT 00 45 90 POST BID INTERVIEW PART 1 GENERAL 1.01 SUMMARY By request of the District, this Section requires the apparent low bidder to attend and participate in a Post Bid Interview with the Construction
More informationRental Property Registration and Crime Free Housing Software. Request for Proposal
Rental Property Registration and Crime Free Housing Software RFP NO.: 13-11 Request for Proposal 19 December 2013 Page 1 TABLE OF CONTENTS Section 1 Introduction...3 General Information...4 RFP Submittal
More informationDOCUMENT BID PROPOSAL
DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of
More informationThe Center for Health Care Services
The Center for Health Care Services SUBJECT: FROM: Request for Proposal (RFP) for Electronic Health Record Consultant Services, RFP 2018-015, Scheduled to Open: July 16, 2018; Date of Issue: June 14, 2018
More informationCONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553
ADDENDUM #4 CONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553 CLASSROOM NOTIFICATION DEVICE INSTALLATION - DISTRICTWIDE Contra Costa College / Diablo College / Los Medanos College Date: May
More informationInformation for Contractors Regarding Public Works Projects
Information for Contractors Regarding Public Works Projects Page 1 Table of Contents 1. INTRODUCTION...3 WHAT IS CUPCCAA?...3 BENEFITS OF CUPCCAA...3 2. TRADITIONAL BIDDING VS. MCC IMPLEMENTED CUPCCAA...4
More informationREQUEST FOR PROPOSAL FOR INFORMATION TECHNOLOGY SERVICES
REQUEST FOR PROPOSAL FOR INFORMATION TECHNOLOGY SERVICES 2018-003 Pines Behavioral Health 200 Vista Drive Coldwater MI Phone 517-278-2129 1 NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses
More informationAnswers to Questions
ADDENDUM #1 The following constitutes Addendum #1 to the above referenced solicitation. This addendum is provides questions posed during the electronic Question and Answer period and the Board of Public
More informationADDENDUM 5. RFP # Remote Monitoring and Management System for the County of El Paso
County of El Paso Purchasing Department 800 E. Overland Room 300 El Paso, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 www.epcounty.com ADDENDUM 5 To: From: All Interested Vendors Elvia Jauregui, Formal
More informationInformation for Contractors Regarding Public Works Projects
Information for Contractors Regarding Public Works Projects Table of Contents INTRODUCTION...2 WHAT IS CUPCCAA?...2 BENEFITS OF CUPCCAA...2 TRADITIONAL BIDDING VS. MCC IMPLEMENTED CUPCCAA...3 ADOPTION
More informationADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS)
ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) PROJECT NOTICE DPR Construction, hereinafter called DPR, intends to award
More informationRFP SA 1804-Recruitment Services. Addendum #2
Procurement Department 4 County Complex Court, Woodbridge, Virginia 22195-2266 Fax (703) 335-7954 January 8, 2018 -Recruitment Services Addendum #2 THIS SOLICITATION IS HEREBY AMENDED AS FOLLOWS: Questions
More informationMarch 6, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Addendum No. 1/RFP Y15-1023-CH DISASTER DEBRIS MONITORING SERVICES Proposal Opening Date: March 17, 2015 This addendum is hereby incorporated
More informationDISTRICT-WIDE PROP 39 INTERIOR LED LIGHTING UPGRADES BID NO
CHABOT-LAS POSITAS COMMUNITY COLLEGE DISTRICT DISTRICT-WIDE PROP 39 INTERIOR LED LIGHTING UPGRADES BID NO. 18-05 ADDENDUM NO. THREE DATE: November 20, 2017 CLIENT / PROJECT: Chabot-Las Positas Community
More informationALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project.
LOS ANGELES COMMUNITY COLLEGES 770 Wilshire Boulevard, Los Angeles, CA 90017 Telephone: 213/891-2000 CITY EAST HARBOR MISSION PIERCE SOUTHWEST TRADE TECHNICAL VALLEY WEST ADMINISTRATIVE OFFICES Date: October
More informationADDENDUM No. 1 for. Leadership & Management Development Program RFP
OFFICE OF PROCUREMENT SERVICES 2039 KENNEDY BOULEVARD, ROOM# H-111 JERSEY CITY, NEW JERSEY TELEPHONE NO. (201) 200-3159 FAX NO. (201) 200-3238 ADDENDUM No. 1 for Leadership & Management Development Program
More informationREQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA
REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for engineering design services
More informationCITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES
CITY OF KOTZEBUE REQUEST FOR PROPOSAL 18-01 ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Vendors are required to provide as much detail as possible in
More informationINSTRUCTIONS TO BIDDERS Sealed proposals shall be addressed to: For legal address, contact contracting office.
INSTRUCTIONS TO BIDDERS PART ONE: GENERAL 1.1 Bid Proposals/Invitation to Tender 1.1.1 Sealed proposals shall be addressed to: For legal address, contact contracting office. and delivered enclosed in a
More informationCentral Mississippi Regional Library System Notice to Bidders Cabling Switches E Rate Registration with USAC
Notice to Bidders Bids must be received by April 5th, 2017 at the Central Mississippi Regional Library System (CMRLS) Administrative Office. Physical address - 100 Tamberline Street, Brandon, MS 39042
More informationRequest for Proposal: Community Planning & Development System City of University Place, Washington
Request for Proposal: Community Planning & Development System City of University Place, Washington CONTENTS 1. Invitation and Introduction 2. System Expectations and Scope 3. System Demonstration and Product
More informationRequest For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)
Request For Information (RFI) For a Spectrum Management & Monitoring System (SMMS) Table of Contents 1 Introduction... 3 1.1 About Iraq CMC... 3 1.2 The Iraq CMC Objectives... 3 1.3 RFI Process... 4 2
More informationBidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue
Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued
More informationMOBILE WEBSITE AND APPLICATIONS CONTRACT RFP # BC P ADDENDUM # 1 Page 1 of 7
DATE: April 4, 2012 TO: FROM: RE: All Prospective Proposers Delores R. Pertee MOBILE WEBSITE AND APPLICATIONS CONTRACT RFP # BC-20798-P ADDENDUM # 1 Page 1 of 7 The following amends the above referenced
More informationVirtual Desktop Computing Solution Request for Proposal (RFP), Addendum 1 October 22 nd, 2012
Question 1: Are the 3 identified hardware suggestions (HP/IBM/Cisco) the only hardware platforms requested at this time? Or can another product be represented? Answer 1: Respondents must comply with the
More informationPurchasing Department Finance Group INVITATION TO BID
Purchasing Department Finance Group July 24, 202 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for a Computer Network Enterprise System Management Software
More informationREQUEST FOR PROPOSALS DISTRICTWIDE EXCLUSIVE DIGITAL IMAGING DEVICES MASTER PURCHASING AGREEMENT
REQUEST FOR PROPOSALS DISTRICTWIDE EXCLUSIVE DIGITAL IMAGING DEVICES MASTER PURCHASING AGREEMENT RFP Number: 15-09 Addendum Number: 6 Date: March 9, 2016 LOS ANGELES COMMUNITY COLLEGE DISTRICT Contracts
More informationClinton Area Transit System
Clinton Area Transit System Request for Proposal for Domain Server Project RFP #2018-01 Issuing Office: Clinton Area Transit System 215 North Scott Road St. Johns, MI 48879 Procurement Schedule: RFP #2018-01
More informationBidding Conditions Attachment C
Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS
More informationBid No A - Contract for the Procurement and Installation of an Enterprise Resource Planning System for the City of East Point
Department of Finance Lolita Grant, Director 2777 East Point Street East Point, Georgia 30344 MAYOR Jannquell Peters COUNCIL MEMBERS Ward A Alexander Gothard Sharon D. Shropshire DATE: June 2, 2017 TO:
More informationAddendum No. 1 Page 1 of 1
Addendum No. 1 Page 1 of 1 DATE: February 26, 2018 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Steam Pipe System Replacement w/
More informationMICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK
MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK Michigan Commission on Law Enforcement Standards The FileNet Enterprise
More informationREQUEST FOR PROPOSALS
` REQUEST FOR PROPOSALS Delivery of Information Technology Services Scott Simon Executive Director Greg Beck Assistant Executive Director/Point of Contact Response Deadline March 29, 2019 4:00 PM Page
More informationSELECTION CRITERIA AND PROCESS
Page 12 of 49 / ATTACHEMENT 1 - ADDENDUM 3: replace pages 12-16 with the following: Super User Training Admin Training Representatives from the IT, Legal, Finance, Neighborhood Services, and Police Departments
More informationRequest for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.
Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions
More informationState of North Carolina Department of Health and Human Services
State of North Carolina Department of Health and Human Services REQUEST FOR PROPOSAL (RFP) Addendum #6 Date: September 5, 2018 RFP Number: 30-180397 RFP Description: Independent Verification and Validation
More informationAttachment D: Cost Proposal, RFP Section 3.4
ATTACHMENT D: COST PROPOSAL, RFP SECTION 3.4 Instructions: Use this template to comply with Section 3.4, Cost Proposal. Because the requirements of this RFP are part of a portfolio of projects designed
More informationRequest for Proposal (RFP) Newark Unified School District Measure G Bond Program Technology Infrastructure Upgrades
Request for Proposal (RFP) Newark Unified School District Measure G Bond Program Technology Infrastructure Upgrades August 21, 2013 The District invites responses from qualified firms, partnerships, corporations,
More informationRFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors.
RFP 19-006 SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES Questions/Answers in BOLD Addendum #1 Date 1/30/2019 1. Is this a new solicitation? If not, please share the name of incumbent vendors. This
More informationCITY OF LAGUNA NIGUEL
CITY OF LAGUNA NIGUEL REQUEST FOR PROPOSALS INTEGRATED MUNICIPAL ENTERPRISE RESOURCE PLANNING (ERP) SOFTWARE SOLUTION AND SERVICES Issued January 30, 2017 CITY OF LAGUNA NIGUEL REQUEST FOR PROPOSALS FOR
More informationWorth County School District
Worth County School District Request for Proposal (RFP) 3-YEAR COPIER LEASE Inquiries and requests regarding this RFP should be directed to: Jim McMickin, Director of Technology Worth County Schools 103
More informationADDENDUM NO. 2 REQUEST FOR PROPOSALS (RFP) YP SELECTED THIRD PARTY ADMINISTRATION OF EMPLOYEE BENEFITS
ADDENDUM NO. 2 REQUEST FOR PROPOSALS (RFP) 15-066-YP SELECTED THIRD PARTY ADMINISTRATION OF EMPLOYEE BENEFITS PURPOSE OF ADDENDUM This addendum has been prepared to revise and provide additional proposal
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 2 DATE: December 28, 2011 RE: RFP NUMBER: RFP TITLE: ITS Equipment Replacement in Broward County OPENING OF TECHNICAL PROPOSAL DATE: January 5, 2012 Notice
More informationADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108
ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 REQUEST FOR PROPOSAL (RFP) 18-4016-28A TEMPORARY STAFFING AGENCY SERVICES Issue Date: December
More informationOUTAGAMIE COUNTY REQUEST FOR BID FOR CISCO & AXIOM HARDWARE FOR IT DEPARTMENT
OUTAGAMIE COUNTY REQUEST FOR BID FOR CISCO & AXIOM HARDWARE FOR IT DEPARTMENT DUE BY: JUNE 26, 2017 1.0 Specifications Requesting bids for Cisco and Axiom equipment. The bidding vendor must be able to
More informationX 11/9/2017 YES 1/17/2018
REQUEST FOR PROPOSAL (RFP) - SUMMARY PAGE ENTITY # 139904 SCHOOL NAME HOLLIS PUBLIC SCHOOLS ADDRESS PO BOX 193 / 415 N MAIN STREET CITY, STATE, ZIP HOLLIS, OK 73550 Please submit bids/proposals to the
More informationRequest for Proposal # Athletic Trainer for CCSU Club Sports Addendum 1 dated February 7, 2019
Request for Proposal # 2019-30 Athletic Trainer for CCSU Club Sports Addendum 1 dated February 7, 2019 Addendum 1 has been issued to answer questions submitted related to the subject RFP Group 1 1. What
More informationRFP IP-Based Surveillance Camera System
RFP IP-Based Surveillance Camera System The Clinton Community School District (referenced as the DISTRICT throughout this proposal) desire to implement a district wide,tcp/ip based surveillance camera
More informationADDENDUM No. 2 Request for Proposals (RFP) 19RFP033 Structured Network Cabling
December 19, 2018 ADDENDUM No. 2 Request for Proposals (RFP) 19RFP033 Structured Network Cabling Item 1: General Clarifications Item 2: Questions and Answers Item 1: General Clarifications for 19RFP033
More informationA D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary
A D D E N D U M 1 TO All Plan Holders ISSUE DATE 20 January 2017 PROJECT # 15-028 REGARDING Switchgear Replacement NARRATIVE PAGES 1 15-02812 KVa Switchgear Replacement Project SPECIFICATION PAGES 10 DRAWING
More informationREQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS
REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms
More informationBeaverton School District Capital Program Purchasing SW Merlo Road, Beaverton, OR Phone:
Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97003 Phone: 503-591-4155 SOLICITATION ADDENDUM NO. 2 INFORMAL RFP 14-0040 Full Commissioning Services for New High
More informationInvitation for Bid - Standard Office Furniture / Task Chair
Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described
More informationADDENDUM 03 RFP Maintenance Management Software (MMS) Information Technology
ADDENDUM 03 RFP 14-032 Maintenance Management Software (MMS) Information Technology Carolyn Estes, C.P.M., Purchasing Specialist Boise City Purchasing Phone (208) 384-3778 Fax (208) 384-3995 cestes@cityofboise.org
More informationADA BARRIER REMOVAL PHASE
ADDENDUM #3 For ADA BARRIER REMOVAL PHASE 2 Bid #5-1213 at WEST VALLEY COLLEGE Owner West Valley-Mission Community College District Saratoga, California November 9, 2012 WEST VALLEY MISSION COMMUNITY COLLEGE
More informationCRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST
Request for Quote CRISP Azure Migration Consulting Services Friday, July 7th, 2017 All responses due no later than Friday, July 21 st, at 5pm EST 1 Request for Quote RFQ TO ALL RESPONDERS CRISP Azure Migration
More informationADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4
ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:
More informationElmhurst Community Unit School District 205 Invitation to Bid
Elmhurst Community Unit School District 205 Invitation to Bid Bidders are invited to submit bids in conformance with the requirements established by the specifications herewith: Bid Number: 15-02 Item
More informationREQUEST FOR PROPOSAL Mitel VoIP Phone System Implementation. Owosso Public Schools Technology Department
1 REQUEST FOR PROPOSAL Mitel VoIP Phone System Implementation Owosso Public Schools Technology Department 2 Contents Executive Summary... 4 1. Bid Response Information... 5 2. Current Communications Technology
More informationREQUEST FOR PROPOSALS. Request for Proposals for Classification Pay and Benefits Study (A )
CITY OF TUSCALOOSA ) STATE OF ALABAMA ) REQUEST FOR PROPOSALS TO: FROM: RE: Qualified Firms The City of Tuscaloosa, Alabama Request for Proposals for Classification Pay and Benefits Study (A17-0172) DATE
More informationPORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4
RE: ITB: PORTLAND COMMUNITY COLLEGE 12000 SW 49 th Avenue Portland, Oregon 97219 Sylvania Campus Bookstore Remodel Dated: February 22, 2017 April 11, 2017 ADDENDUM NO. 4 This addendum, together with the
More informationKansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, MO 64108
Issue Date: 3/11/15 ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, MO 64108 RFP No. 15-7015-25B Lawson Accounts Receivable and Billing Implementation This Addendum
More informationChristy Wegener, Director of Planning and Operations
SUBJECT: FROM: Transit Signal Priority Upgrade Project Scope of Work for Design and Project Management Christy Wegener, Director of Planning and Operations DATE: October 2, 2017 Action Requested Authorize
More informationSECTION I: Corrections, Deletions, Revisions to RFP
For which Proposals are scheduled to be received no later than 10 a.m., Central Standard Time on Wednesday, June 21, 2017 (pursuant to the Request of Proposal (RFP): Temporary Staffing Services for 2018
More informationQuestions and Answers Set #2, Master Service Agreement (MSA) Invitation For Bid (IFB) Office Moving Services
July 9, 2013 To: Subject: All Bidders Questions and Answers Set #2, Master Service Agreement (MSA) Invitation For Bid (IFB) 5139901 Office Moving Services Q.1. A.1. Q.2. A.2. Q.3. A.3. Q.4. A.4. Q.5. A.5.
More informationStrategic Planning Consultant Proposal No. P13/9824 Date: July 17, 2013
Answers to Vendor Questions - Questions are in black, answers are in red. 1. In reference to Section 7 Agreement Page 15 are we to include a copy of this within our returned proposal or will this be executed
More informationThe Bid Date has changed to 03/16/2010 at 2:30 PM.
, Chinatown / North Beach Campus Main Building & Annex Building Curbs Gutters and Sidewalk CCSF Project No. 107 A 1. Summary DOCUMENT 00900 Bid Package 7.20 Curbs Gutters and Sidewalk ADDENDUM NO. 4 (02/22/2009)
More informationSAM Server Optimization
SAM SOFTWARE ASSET MANAGEMENT SAM Server Optimization Engagement kit 1 SAM Server Optimization engagement kit Table of Contents How to use this document 3 Introduction 4 Step 1: Planning 7 Step 2: Data
More information2. Provide a revised Section 17 and 27 to our Instructions to Bidders (attached)
Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 November 19, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-152.0
More informationSan Bernardino Community College District Administrative Procedure Chapter 6 Business and Fiscal Affairs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 AP 6330 AP 6330 San Bernardino Community College District Administrative Procedure
More informationWASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY. Attachment# 1
Attachment# 1 CQ18223- Questions and Answers for the Productivity Transformation 1. Is Appendix C Small Business Local Preference Program (SBLPP) applicable on this RFP? Answer: Appendix C Small Business
More information