The MDC s South Hartford Conveyance and Storage Tunnel

Size: px
Start display at page:

Download "The MDC s South Hartford Conveyance and Storage Tunnel"

Transcription

1 The MDC s South Hartford Conveyance and Storage Tunnel Presentation to CONN-OSHA Roundtable Andrew Perham, CHMM - MDC Brian J. McCarthy, PE, CCM, PMP September 19, 2017

2 Safety Moment Storm Watch: Be Prepared Anticipate high winds when storing materials Stay away from booms, towers, fences and trees during thunder and lightning storms; seek shelter Is your site subject to flash floods or poor drainage? Be a weather watcher 2

3 Presentation Topics Background Project Team Tunnel Alignment Drop Shafts Geotechnical Investigation Risk Management Contract Packaging Right of Way Acquisition Permitting Public Communication Construction Procurement Progress to-date Safety 3

4 About the MDC Metropolitan District Commission Non-profit municipal corporation providing water and sewer services to the greater Hartford area Member Towns: Bloomfield, East Hartford, Hartford, Newington, Rocky Hill, West Hartford, Wethersfield, Windsor Serves a population of 440,000 1,300 miles of sewers; 105 MGD treatment capacity 1,600 miles water main; Average 40 MGD consumption 4

5 Background The Clean Water Project Consent Order and Consent Decree program to control Combined Sewer Overflows (CSO) and Sanitary Sewer Overflows (SSO) 1 billion gal / yr (about 50 events/yr) Expand HWPCF capacity to 200 MGD 670 acres of sewer separation Tunnel storage and conveyance Reduce stormwater inflow/ groundwater infiltration (I/I) 5

6 Combined Sewer Overflows Dry day No problems Household sewage only (toilet, shower) Wet day During rain events the combined sewer cannot convey all the flow & results in overflows (CSOs) into streams/rivers Regulator River Interceptor Regulator River Interceptor Sanitary Wastewater Wastewater Sanitary Wastewater Catch Basin Interceptor Sewer to Treatment Plant Wastewater/Stormwater Interceptor Sewer to Treatment Plant Roadway Combined Sewer Pipe Stormwater Runoff Combined Sewer Pipe 6

7 7 Sanitary Sewer Overflows

8 Storage Tunnels Common Approach to Combined Sewer Overflow (CSO) Management Providence is closest recent example, operational in 2008 Others include Chicago (1980 s) Milwaukee (1990 s) Boston (2000 s) Atlanta (2000 s) Portland (2000 s) Cleveland (2010 s) Indianapolis (2010 s) Washington (2010 s) 8

9 Project Team Public DEEP Towns Other Projects Program Manager Construction Manager Design Engineer Utilities USACE 9

10 10 Tunnel Alignment Connect the dots

11 Final Alignment 4 miles long, 18 ft ID, 6 intermediate drop shafts 7,300 feet of consolidation conduits Deep circular shaft pump station 11

12 12 Tunnel Route Flyover

13 Hard Rock Tunnel Boring Machine (TBM)

14 14 Building the Tunnel

15 15 Drilling the rock

16 16 Building the tunnel lining

17 Drop Shaft Schematic

18 18 Hydraulic Drop Shafts in Operation

19 Final Site Plan and Landscaping Property Line- Back of Sidewalk Gate Chamber Drop Shaft Decorative Fence Air Treatment Driveway 19

20 Air Treatment System Activated Carbon Ventilation Fan 20

21 21 Geotechnical Investigation

22 22 Geologic Profile

23 Geotechnical Investigation Support Design of Tunnel Adits Shafts Conduits Pump Station By Investigating Rock and soil physical properties Geologic structure Faults Water Environmental Phased Investigation 2009 Preliminary Design 2012 Basis of Design / Alignment Final Design 23

24 Investigation 67 Deep Borings in Tunnel Corridor 30 Shallow Borings - Shafts & PS Cone Penetrometer Tests Wells and Piezometers Packer Tests, Slug Tests Borehole geophysics Surface geophysics Soil & Rock Testing 24

25 Critical Areas of Inquiry Faults Water 25

26 Risk Management Structured Risk Management Process Started Early Planning Identification Analysis Mitigation & Response Monitoring & Control Risk Workshops Risk Register 26

27 Qualitative Risk Analysis Likelihood and Impact 27

28 Example Register Advancing Professional Construction and Program Management

29 Contract Packaging Project designed as an integrated system Contract packaging based on Technical specialization Geography / Geology Mitigating interface risks Availability of funding Five Contracts 1. Utility Relocation 2. Main Tunnel and Shafts 3. Pump Station 4. East Conduits 5. West Conduits 29

30 30 Contract Packaging

31 31 Contract Packaging

32 Rights of Way Property Launch Shaft / Pump Station Drop Shafts Retrieval Shaft Subterranean Easements No Surface rights Defines tunnel construction envelope Precedent with Park River Auxiliary Conduit 32

33 Outreach and Communication Council briefings NRZ meetings Mailings / Flyers Business groups TBM Naming Contest 33

34 Tunnel Contract Procurement Prequalification Process Evaluation Criteria Technical Capability & Experience Commercial Key Personnel Safety JV Role DEEP review and approval of RFQ & process 14 Submittals 6 qualified 2 JVs, 4 independent Other Contract Provisions Dispute Resolution Board Escrowed Bid Documents 34

35 Tunnel Contract Procurement Advertised October 2015 Bid February bids received all joint ventures Low Kenny / Obayashi - $279.4MM Others Salini - Impregilio / SA Healy Traylor / Kiewit Shea / Skanska Contract executed June 2016, NTP August 1,

36 Launch Shaft Site Pump Station Shaft Launch Shaft 36

37 37 Drop Shaft Site

38 38 Shaft Drilling Rig

39 39 Advancing the shaft

40 Safety MDC is a Proactive Owner Prequalification process Active oversight Near misses / lessons learned Drills Contractor SSO key person Hazards Normal construction housekeeping, slips, trips, falls, heavy equipment Air Quality (gassy/non-gassy) Hoisting, conveyors Electrical Blasting Dust Confined Space Public Safety / Traffic / Critical Facilities (flood control, etc) Geotechnical monitoring Security / Access / visitor & worker orientation 40

41 Housekeeping A clean job is a safe job. Lots of heavy equipment traffic Kenny/Obayashi spends a great deal of time & effort keeping an clean & organized site. Space is tight 41

42 42 Access / Egress

43 Working at the Shaft Hazards pinch points uneven and slippery walking and working surfaces poor air quality struck by hazards water loose rock overhead objects 43

44 Communications Every shift starts with a take 5 Natural voice insufficient mine phone Job Hazard Analyses Signage 44

45 Blasting Specialty subcontractor Coordinated with fire departments No explosives stored on site Shafts, starter tunnel well into next year Adit tunnels after TBM mining 45

46 46 Fall Protection

47 OSHA Standard for Underground Construction 29 CFR Training Access Control Ventilation Air Monitoring Illumination Fire Prevention & Control Drilling & Blasting Cranes & Hoists Emergency Procedures, Rescue Teams Recordkeeping 47

48 Progress to Date Launch shaft cleared soil removal New wetlands constructed New access road to dike and highway tunnel Launch shaft excavated to tunnel crown Pump station shaft excavated to top of rock Retrieval shaft secant pile installation underway Drop shaft overburden drilling completed, rock drilling underway TBM manufactured, arriving this month 48

49 Schedule Sept/Oct 2015 Construction Begins Spring 2018 Tunnel boring begins Summer / Fall 2019 Tunnel drive completed 2023 Construction complete/facility in operation 49

50 Questions?

Foster Park Retrieval Shaft

Foster Park Retrieval Shaft Fort Wayne Tunnel Works Foster Park Retrieval Shaft October 25, 2017 Agenda Brief review of the Tunnel & Shafts project Why we have to be in Foster Park Retrieval Shaft Drop Shaft What the project is going

More information

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017

The Metropolitan District. Stormwater & I/I Reduction Presentation March 16, 2017 The Metropolitan District Stormwater & I/I Reduction Presentation March 16, 2017 AGENDA Introductions/MDC Background CWP Background Consent Decree/SSO Program Discussion Private Inflow Discussion Program

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by Milwaukee Metropolitan Sewerage District Conveyance and Treatment System MACRO made available by Eric Loucks,, CDM MMSD Collection System Operations MMSD operates an extensive system of sanitary sewers

More information

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present

The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present The Indianapolis Deep Tunnel Surge Analysis: Debugging Future Operational Issues in the Present Karen Ridgway, P.E., Applied Science Inc. Chris Ranck, P.E., BCEE, D.WRE, RW Armstrong Dave Klunzinger, P.E.,

More information

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E.

Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control. Glenn Weist, P.E. Deep Tunnel, Shallow Pipe - How the City of Hamilton, OH plans to save millions on SSO control Glenn Weist, P.E. Columbus, Ohio May 10, 2012 Agenda Background Project Description Regulatory Synopsis Stakeholder

More information

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Farmer, P.E. Hazen and Sawyer, P.C. Project Background City

More information

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Synergy: Addressing Combined Sewer Overflows and Nitrogen District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing

More information

Customer Conference Speedway, IN 46224

Customer Conference Speedway, IN 46224 Customer Conference Speedway, IN 46224 DigIndy and Citizens Capital Investment Plan Updates Mark C. Jacob Vice President Capital Programs & Engineering September 18, 2014 A Matter of Trust Challenges Annually

More information

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley SELECTION OF TUNNEL METHODS By: Dr. Gary S. Brierley Successful Tunnel Design 2 Produce a satisfactory finished facility for no more money and in no more time than is required for the existing ground conditions.

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

Metro Purple Line Extension

Metro Purple Line Extension metro.net/works Metro Purple Line Extension Construction Fact Sheet summer 2013 building the stations Construction at each station is estimated to take five to seven years. The station is a large box,

More information

Chapter 8 Addressing I/I Issues and High Flows

Chapter 8 Addressing I/I Issues and High Flows Chapter Outline Chapter 8 Addressing I/I Issues and High Flows This chapter is organized into the following sections: Introduction Background Estimation of Infiltration Volume Conveyance Costs Effect of

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned

Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned Ashok Kothari, P.E. WSP USA, Sr. Vice President Los Angeles, California Michael McKenna, P.E. LACMTA Executive Officer,

More information

SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM TUNNELING & UNDERGROUND CONSTRUCTION

SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM TUNNELING & UNDERGROUND CONSTRUCTION TUNNELING & UNDERGROUND CONSTRUCTION THE OFFICIAL PUBLICATION OF UCA OF SME WWW.TUCMAGAZINE.COM VOLUME 1 NO 2 JUNE 2007 SEATTLE S BRIGHTWATER UNDERGROUND CONVEYANCE SYSTEM Tunnel Demand Forecast Ground

More information

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities

MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MSD Integrated Watershed Management Planning Approach to Achieve Sustainable Communities MaryLynn Lodor MSD of Greater Cincinnati Sharon Jean-Baptiste CH2M HILL April 4, 2013 Overview MSD s Environmental

More information

Metropolitan District Commission

Metropolitan District Commission Metropolitan District Commission Hartford Procurement Department How to Business with the MDC June 4, 2014 Metropolitan District Commission The Metropolitan District (MDC) is a non-profit municipal corporation

More information

Liquid Waste Coordination Committee

Liquid Waste Coordination Committee Annacis Island Wastewater Treatment Plant Outfall Project Liquid Waste Coordination Committee FOR LWCC BY KEN MASSÉ. 19 JANUARY 2017 Ken Massé, P.Eng. METRO VANCOUVER April 3, 2017 CONTRACTOR INFORMATION

More information

Alternative Construction Methods and Pipe Material provide Solutions for Cleveland WWTP Project

Alternative Construction Methods and Pipe Material provide Solutions for Cleveland WWTP Project Alternative Construction Methods and Pipe Material provide Solutions for Cleveland WWTP Project Bernie Ashyk 1, Christopher Lucie, P.E. 2, Jeffrey LeBlanc, P.E. 3 1 Shook Walbridge JV, Project Manager;

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016

Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control. OWEA Conference June 29, 2016 Integrated Long Term Control Plan Targeted Inflow Reduction for CSO Control OWEA Conference June 29, 2016 WWTP Average Daily Flow 6 MGD Peak Flow (Primary Only) 12 MGD Collection System 123 Miles (8 to

More information

Take Me to the Other Side:

Take Me to the Other Side: Take Me to the Other Side: The Importance of Trenchless Crossings in Routing Water Supply Transmission Brooke Barry, E.I.T., Mark Havekost, P.E. 2014 HDR, all rights reserved. PURPOSE: Develop an additional

More information

EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary

EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary EMERGENCY STORAGE PROJECT San Vicente Pipeline and San Vicente Dam Raise Update Presentation Summary DATE: Nov. 2, 2005 EVENT: MEETING LOCATION: PRESENTER(S): STAFF RESOURCES: TIME: 7:30 p.m. Lakeside

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Newtown Creek Superfund Citizens Advisory Group Newtown Creek Combined Sewer Overflow Long Term Control Plan

Newtown Creek Superfund Citizens Advisory Group Newtown Creek Combined Sewer Overflow Long Term Control Plan Newtown Creek Superfund Citizens Advisory Group Newtown Creek Combined Sewer Overflow Long Term Control Plan Location: McCarren Park Community Center Date: July 25, 2017 Agenda 1 Topic Welcome; Recap of

More information

Management of Aging Wastewater Infrastructure -- Challenges and Strategies --

Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Management of Aging Wastewater Infrastructure -- Challenges and Strategies -- Jerry N. Johnson, General Manager District of Columbia Water and Sewer Authority Washington, D.C. Overview of the Aging Situation

More information

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION

WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: WATER SUPPLY AND DISTRIBUTION INTRODUCTION WATER RESOURCES CHAPTER 7 INTRODUCTION KEY PRINCIPLES TO IMPLEMENTING THE WATER RESOURCES PLAN INCLUDE: Greenway Connections Protect and enhance drainage corridors Compact Development Continue efficient,

More information

Progress update (November to March) 03/23/2009 2

Progress update (November to March) 03/23/2009 2 Second Avenue Subway Construction Progress Update (November to March) Presented by S3 Tunnel Constructors AND MTA CAPITAL CONSTRUCTION March 23, 2009 1 Topics Covered Progress update (November to March)

More information

COMMUNITY BOARD EIGHT

COMMUNITY BOARD EIGHT SECOND AVENUE SUBWAY PROJECT COMMUNITY BOARD EIGHT PROJECT UPDATE SEPTEMBER 26, 2011 Scope: SECOND AVENUE SUBWAY - PHASE 1 Tunnels from 92 nd St to 63 rd St Stations at 96 th St, 86 th St, 72 nd St and

More information

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel

Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel 5 Surge Analysis for the Proposed OSIS Augmentation Relief Sewer Tunnel M. P. Cherian, Ari Pandian, Karen Ridgway and Gregory Barden The City of Columbus, Ohio, submitted a wet weather management plan

More information

Interim Interconnector Sewer Operational Plan

Interim Interconnector Sewer Operational Plan Interim Interconnector Sewer Operational Plan Gary Hickman Plant Manager Jackson Pike Wastewater Treatment Plant Jeff Hall Assistant Plant Manager Southerly Wastewater Treatment Plant Columbus Area Collection

More information

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014

SR 710 North Study. Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014 SR 710 North Study Technical Advisory Committee Meeting No. 16 August 13, 2014 Stakeholder Outreach Advisory Committee Meeting No. 12 August 14, 2014 1 1 1 Agenda Public Outreach Activities Project Report

More information

MICRO-TUNNELING LARGE DIAMETER SEWER MAY BE THE BEST OPTION FOR YOU

MICRO-TUNNELING LARGE DIAMETER SEWER MAY BE THE BEST OPTION FOR YOU ABSTRACT MICRO-TUNNELING LARGE DIAMETER SEWER MAY BE THE BEST OPTION FOR YOU Christopher L. Windley, PE (McKim & Creed, Inc.)* Joshua P. Farmer, PE and Stephen D. Leitch, PE (Hazen & Sawyer, PC) *McKim

More information

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City of Los Angeles Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City Council Meeting November 14, 2006 The Challenges New

More information

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Springfield Water and Sewer Commission Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Joshua Schimmel Executive Director Introduction Overview of System Presentation Summary Commission

More information

WESTERN ENGINEERING CONSULTANTS, Inc LLC

WESTERN ENGINEERING CONSULTANTS, Inc LLC WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017

More information

Texas-Sized Challenges

Texas-Sized Challenges Aerial view of the City of Austin s Water Treatment Plant No. 4 in northwest Austin near the intersection of RM 620 and Bullick Hollow Road. cover story Delivering Water Provides Texas-Sized Challenges

More information

EGLINTON CROSSTOWN Fairbank Oakwood CLC April 19, 2018

EGLINTON CROSSTOWN Fairbank Oakwood CLC April 19, 2018 EGLINTON CROSSTOWN Fairbank Oakwood CLC April 19, 2018 INFORMATION IS CURRENT AS OF APRIL 19, 2018 AND SUBJECT TO CHANGE 2 Agenda Caledonia Station Update Fairbank Station Update Oakwood Station Update

More information

London Tideway Tunnels Modernising London s Sewerage System Rob Furniss

London Tideway Tunnels Modernising London s Sewerage System Rob Furniss London Tideway Tunnels Modernising London s Sewerage System Rob Furniss AECOM Water Global Director of Community Infrastructure The Background to London s Sewers 1848 Cholera deaths peak In London 1858

More information

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto

Reducing Flood Risk in Toronto. David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Reducing Flood Risk in Toronto David Kellershohn, M.Eng., P. Eng. Toronto Water, City of Toronto Institute for Catastrophic Loss Reduction February 19, 2016 1 Agenda Reducing Flood Risk in Toronto 1) Overview

More information

Community Involvement Within Your Organization

Community Involvement Within Your Organization Community Involvement Within Your Organization Purdue Road School March 8, 2016 Chris Gale, PE HNTB Corporation Vice President Indiana Office Leader Mark C. Jacob citizens energy group Vice President Capital

More information

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel

Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mill Creek/Peaks Branch/State- Thomas Drainage Relief Tunnel Mobility Solutions, Infrastructure & Sustainability Committee January 22, 2018 Sarah Standifer, Director Trinity Watershed Management Overview

More information

JCK UNDERGROUND INCORPORATED STATEMENT OF QUALIFICATIONS

JCK UNDERGROUND INCORPORATED STATEMENT OF QUALIFICATIONS JCK UNDERGROUND INCORPORATED STATEMENT OF QUALIFICATIONS OCTOBER 2017 JCK Underground is an employee-owned firm specializing in program management, engineering, and construction management of underground

More information

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation. FACT SHEET GENERAL INFORMATION The project extends the existing No.7 Line subway service via a 1.5 mile extension from Times Square to the new 34 Street Hudson Yards station located at West 34th Street

More information

Ground Freezing for Tunnel, Shafts, and Adits

Ground Freezing for Tunnel, Shafts, and Adits Ground Freezing for Tunnel, Shafts, and Adits Joseph A. Sopko, Adam Curry Moretrench American Corporation Bianca Messina Skanska USA Civil Stephen Njoloma McMillen Jacobs Associates ABSTRACT Construction

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

Reason for Acceptance or Rejection

Reason for Acceptance or Rejection Value Engineering Approval Form Project: 25th Avenue & Union Pacific Grade Separation #6 VE Study Date: January 28 through February 1, 2013 Form updated: 5/7/2013 (Final) FHWA Functional ENV 1 ROW 1 The

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System

NIAGARA REGION. Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System Welcome to the NIAGARA REGION Pollution Prevention Control Plan for the Town of Niagara-On-The-Lake Wastewater Collection System MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT Public Information Centre Please

More information

CHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD

CHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD North American Society for Trenchless Technology (NASTT) No-Dig Show 2012 Nashville, TN Paper A-2-04 CHALLENGES AND SUCCESSES OF OPEN SHIELD PIPE JACKING CONSTRUCTION IN A CONGESTED NEIGHBORHOOD Christopher

More information

Bioswales, Wetlands, and Trees: How going green can be a part of a Wet Weather Management Plan. Presented by Brian Tornes, PE

Bioswales, Wetlands, and Trees: How going green can be a part of a Wet Weather Management Plan. Presented by Brian Tornes, PE Bioswales, Wetlands, and Trees: How going green can be a part of a Wet Weather Management Plan Presented by Brian Tornes, PE Water Management It all Contributes to the Streams Sanitary Sewers Storm Sewers

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

Unique Riverbank Filtration System Provides 80 MGD

Unique Riverbank Filtration System Provides 80 MGD Unique Riverbank Filtration System Provides 80 MGD HENRY HUNT September 28, 2017 Outline Summary Basics of Riverbank Filtration Louisville Water Company Background LWC Decision Process System Construction

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

Rocky Hill. Challenges

Rocky Hill. Challenges Rocky Hill Rocky Hill is located in the southern portion of the Capitol Region. Its land area covers 13.9 square miles with an estimated 2010 Census population of 19,703. Elevation in Rocky Hill ranges

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto.

The Don River and Central Waterfront are among the most degraded waterways in the City of Toronto. This document was put together following the fourth round of public consultation for the Class Environmental Assessment study for this Project. In June 2011, the Project Team consulted with stakeholders

More information

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background

Background Where did CSO systems begin? Combined Sewer Overflow (CSO) Control. Background. Background. Background Background Where did CSO systems begin? Combined Overflow (CSO) Control Eric Bergstrom HDR Engineering Background System Development Before About 196 House Background System Development After 196 Building

More information

2.0 PROJ ECT D ESCRI PTION

2.0 PROJ ECT D ESCRI PTION 2.0 PROJ ECT D ESCRI PTION 2.1 PROJECT LOCATION The proposed project is in the City of Los Angeles (Figure 2.1-1, Regional Project Location Map) in the communities of Venice and Playa Del Rey (see Figure

More information

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo Moncton Watermain Relocation Moncton, New Brunswick TRS 2010 Dr Mark Knight University of Waterloo Presentation Outline Overview of the project Design and construction Issues Trenchless construction Lessons

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY

IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY IV. ENVIRONMENTAL IMPACT ANALYSIS G. HYDROLOGY/WATER QUALITY ENVIRONMENTAL SETTING The project site is located in the Wilshire community of the City of Los Angeles and is bound by S. Wetherly Drive to

More information

Water, Wastewater & Stormwater Systems

Water, Wastewater & Stormwater Systems Water, Wastewater & Stormwater Systems Water Systems POTENTIAL GOAL Reduce use of potable water TECHNIQUE Collect rainwater for re-use CASE STUDY Phillip Merrill Environmental Center; Annapolis, MD Cisterns

More information

FY 2018 Proposed Capital Improvement Program

FY 2018 Proposed Capital Improvement Program FY 2018 Proposed Capital Improvement Program Metropolitan St. Louis Sewer District FY 2018 Capital Improvement Program Proposed Engineering Services Rich Unverferth, P.E. Director of Engineering January

More information

CHICAGO TUNNELING OVERVIEW & RESERVOIRS CONNECTING TUNNELS

CHICAGO TUNNELING OVERVIEW & RESERVOIRS CONNECTING TUNNELS McCook Main Tunnel System connection to TARP Mainstream Tunnel on right CHICAGO TUNNELING OVERVIEW & RESERVOIRS CONNECTING TUNNELS Faruk Oksuz, P.E. & Cary Hirner, P.E. Welcome to Chicago Windy City Lake

More information

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement

Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement Pushing the Limits of Constructability Pushes the Limits of Stakeholder Involvement Case Study: Myrtle-Morehead SDIP City of Charlotte, North Carolina Presented By: Chip Smith, PE Woolpert Kate Labadorf,

More information

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall

Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall Cleaning Up Our Waterways: Update The Don River and Central Waterfront Project and The Ashbridges Bay Treatment Plant outfall Focus of projects : Lower Don River and Toronto s Inner Harbour & Ashbridges

More information

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS

ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS ATTACHMENT N ASSESSMENT OF PROGRAM EFFECTIVENESS [This page has been left blank intentionally] Assessment of Program Effectiveness 1. Assessment of your agency's compliance with permit requirements, based

More information

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois Updating the MWRD s Excessive Infiltration and Inflow Control Program February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois MWRD SEPARATE SEWER AND COMBINED SEWER AREAS LEGEND: Separate/Unsewered

More information

Appendix C. BMPS, Measurable Goals, and Implementation Schedule

Appendix C. BMPS, Measurable Goals, and Implementation Schedule Appendix C BMPS, Measurable Goals, and Implementation MCM 1 Public Education, Outreach and Involvement Public Education and Outreach Residents BMP 1.1 Utility Bill Insert Continue implementation of existing

More information

London s sewerage system was designed by Sir Joseph Bazalgette in the 1850s, for a population of four million

London s sewerage system was designed by Sir Joseph Bazalgette in the 1850s, for a population of four million Thames Tideway Tunnel technical challenges of the Tideway East section Chambers Wharf to Abbey Mills Pumping Station London s sewerage system was designed by Sir Joseph Bazalgette in the 1850s, for a population

More information

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

THUNDER BAY AREA DRAINAGE MASTER PLAN

THUNDER BAY AREA DRAINAGE MASTER PLAN THUNDER BAY AREA DRAINAGE MASTER PLAN Overall problem Vs. local solutions There are several areas with local flooding problems A review of the situation showed that the problem is not local, but that the

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas TRANSPORTATION RESEARCH FORUM March 2006 A State-of-the-Art of Underground Construction In Urban Areas Nasri Munfah PE Vice President Tunneling Practice Leader Parsons Brinckerhoff Underground Construction

More information

DEPARTMENT OF ENVIRONMENTAL RESOURCES REVIEW NOTICE

DEPARTMENT OF ENVIRONMENTAL RESOURCES REVIEW NOTICE DEPARTMENT OF ENVIRONMENTAL RESOURCES REVIEW NOTICE This report, prepared by outside consultants, has been reviewed by the Department of Environmental Resources and approved for publication. The contents

More information

ALTERNATIVE PROJECT DELIVERY DIVISION

ALTERNATIVE PROJECT DELIVERY DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION ALTERNATIVE PROJECT DELIVERY DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Design-Build Requirements for Advertisement SPECIFIC SUBJECT: APPROVED:

More information

The Corporation of The City of London

The Corporation of The City of London The Corporation of The City of London Legislative Health and Safety Requirements The following is a health and safety guide for those providing a tender to assist in determining legislative health and

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0

Appendix J. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION. Version 3.0 Appendix J Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN PERMIT INFORMATION Version 3.0 April 2015 Table of Contents Section 1 General Information... 1 Section 2 State of Tennessee

More information

RISK MANAGEMENT. Harald Wagner PhD, PE

RISK MANAGEMENT. Harald Wagner PhD, PE WATER RESOURCES & HYDROPOWER DEVELOPMENT IN ASIA TRAINING COURSE ON CONTRACT MANAGEMENT VIENTIANE, LAO PDR February 28-29, 2016 GUEST LECTURE RISK MANAGEMENT Principles in Hydropower Tunnelling Harald

More information

Stage 4 Geotechnical Investigations Information Sheet

Stage 4 Geotechnical Investigations Information Sheet Stage 4 Geotechnical Investigations Information Sheet Geotechnical specialists will use a range of equipment to examine ground conditions by either excavating small shallow test pits of soil, using a mechanical

More information

City of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing

City of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing City of Grosse Pointe Park Sanitary Sewer System Inflow and Infiltration Investigation Smoke Testing August 2017 Definitions Sanitary Sewer System Sanitary sewer pipes and pump stations that collect wastewater

More information

Infiltration Guidelines

Infiltration Guidelines Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage

More information

National Utility Contractors Association, Hawaii Chapter. Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014

National Utility Contractors Association, Hawaii Chapter. Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014 National Utility Contractors Association, Hawaii Chapter Kaneohe-Kailua Wastewater Conveyance and Treatment Facilities January 29, 2014 Project Background KAHUKU PAALAA KAI LAIE WAIANAE WAHIAWA HONOULIULI

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information