1 Integrated Project Delivery: A Case Study on Process Improvement and Embracing a True Collaborative Team Approach October 14,
2 Brenda Bullied Project Manager, Lawrence + Memorial Hospital Josh DiGloria Construction Manager, Suffolk Construction Scott Mueller Architect, TRO Jung Brannen 2
3 Learning Objectives Explain process of implementing an IPD contract Identify benefits and challenges of IPD Outline importance of stakeholder buy-in Describe tactical collaboration tools used at L+M
4 Building Statistics
5 IPD Contractual Structure Tradi&onal Construc&on Approach Integrated Project Delivery (IPD) O O A C A C
6 IPD Participant Structure One Contract O A C Lump-Sum Consultants ICL* Consultants ICL* Subcontractors Lump-Sum Subcontractors Cost -Plus Consultants Risk Sharing Bubble *ICL = Incentive Compensation Layer Cost-Plus Subcontractors
7 Co-location
8 Production Preparation Process Production Preparation Process 3-day collaborative event to design facility 3-day collaborative event to design facility Pre-planning Building parameters Process flows Patient experience = focal point
9 3P Event
10 3P Event
11 3P Event
12 3P Event 3P Final Floor Plan
13 Team Structure PIT Groups IPD Core Team Structure SMT Senior Management Team L&M Crista Durand A/E Team Bob Peterson Contractor Peter Campot L&M Brenda Bullied Shraddha Patel PMT Project Management Team A/E Team Pamela Mace Contractor Josh DiGloria Ed Tobin Structural PIT Project ImplementaFon Teams M.E.P. Engineering I.T. & Low Voltage PaFent Experience Exterior Envelope Medical Equipment Site Design Interior Finishes
14 Commitment-Based Tracking Exterior Interior to date % % # of % # % Day acfvifes # complete complete # of acfvifes complete complete 5-Nov % % 6-Nov % % 7-Nov % % 8-Nov % % 9-Nov % % 10-Nov 11-Nov 12-Nov % % 13-Nov % % 14-Nov % % 15-Nov % % 16-Nov % % 17-Nov 18-Nov 19-Nov % % 20-Nov % % 21-Nov % % 22-Nov 23-Nov 2 0 0% 1 0 0% 24-Nov 25-Nov 26-Nov % % 27-Nov % % 28-Nov % % 29-Nov % % 30-Nov % %
15 Lean: Target Value Design
16 Results: Cost $45.0 $40.0 $35.0 $30.0 $25.0 $38.5M $36.2M $34.5M $33.1M $34.5M $31.8M Owner ConFngency IncenFve CompensaFon Layer $20.0 ConstrucFon Costs $15.0 Consultant Fees $10.0 $5.0 Owner Costs $- IniFal EsFmate Contract Values Final Values
17 Results: Schedule Design 12 months Permit 7 months Design 6 months Permit 5 months Construction 12 months Construction 18 months Reductions: Construction 33% Design 50% Permit 28% Project Total 37%* 13 months
18 Challenges Allocation of Resources Owner Change Request Process Timely & Durable Decisions 18
19 Benefits Schedule: Reduced Design Minimum User-driven Changes Value Add: HVAC controls Value Add: Geothermal Value Add: Higher FF&E Package Schedule: Reduced Construction Costs: on budget, and savings Value Add: Waterproofing belts & suspenders Value Add: Upgraded Millwork Value Add: Improved Staff satisfaction and efficiencies Value Add: Access Control Points
20 Collaborative Results The level of client ownership of the project design was unprecedented for the L+M Cancer Center Architect Scott Mueller Being a part of the team from day 1 of design and being a part of the 3P event was a huge opportunity we wish we could have this involvement on every project. Construction Manager Joshua DiGloria The amount of value that the hospital received and the amount of input we had was extraordinary. Owner Brenda Bullied
21 Discussion 21
L+M Cancer Center IPD: Embracing a True Collaborative Team Approach
L+M Cancer Center IPD: Embracing a True Collaborative Team Approach WHO WE ARE Who We Are Brenda Bullied Owner, Lawrence + Memorial Hospital Josh DiGloria Construction Manager, Suffolk Construction Pam
More informationTexas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds
Seminar Objectives 1) IPD and its impact on team behavior 2) Lean and its role in a collaborative process. 3) Pre-Fabrication 4) How Lean, BIM and collaborative processes impact project value. The Project
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationIPD. Who Are We? 25/04/2017. The Red Deer Catholic Story. Red Deer is located between Edmonton & Calgary Population - 100,000
IPD The Red Deer Catholic Story PNW A4LE, Banff, Alberta May 18, 2017 Ken Jaeger, Red Deer Catholic Regional Schools Who Are We? Red Deer is located between Edmonton & Calgary Population - 100,000 Red
More informationS CONSTRUCTION. Building INNOVATIONS
I & S CONSTRUCTION I & S CONSTRUCTION is doing business since 2011 & are known for providing the very best quality, performance, value and service. We pride ourselves not just for designing and building,
More informationTaking Design to Operation
Taking Design to Operation Presenters: Jacob D Albora Associate VP, Director of BIM-FM Services McVeigh & Mangum Engineering, Inc. Bernie Sublette, CHC Project Executive, Project Development Healthcare
More informationHamad Alrahmani. Construction Management Option
Hamad Alrahmani Construction Management Option Murur Mixed Use Complex Ajman, United Arab Emirates Proposal Table of contents A. Executive Summary.... 3 B. Project overview... 4 C. Analysis 1 (Photovoltaic
More informationReport For Class D Construction Cost Estimate
Report For Class D Construction Cost Estimate Douglas McNeill Director Jon Gilford Senior Cost Manager Turner & Townsend 170 Laurier Avenue West Suite 604 Ottawa Ontario K1P 5V5 t: +1 (613) 221 9560 e:
More informationPROPOSAL FOR ARCHITECTURAL SERVICES. June 22, 2015
PROPOSAL FOR ARCHITECTURAL SERVICES June 22, 2015 FIRM BACKGROUND Dimension IV Madison Design Group is built on a vision of architecture and professional services that puts the client and users, the building
More informationTime to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO
Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from
More informationTHE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010
THE DESIGN PROCESS AUGUST 2010 HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN TAQ ASSOCIATES. ARCHITECTURE & INTERIOR DESIGN KARACHI PAKISTAN 1 SO A BLANK PIECE OF PAPER. HOW DO WE GET FROM
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Provider Name: Lean Construction
More informationWEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES
1. Introduction WEST YELLOWSTONE SIEGEL LEARNING CENTER REQUEST FOR QUALIFICATIONS / PROPOSALS FOR CONSTRUCTION MANAGER AT RISK (CM-AR) SERVICES The Town of West Yellowstone (Town) is seeking a qualified
More informationTarget Value Design and BIM: Delivering the targets of construction 2025
Target Value Design and BIM: Delivering the targets of construction 2025 Prof Lauri Koskela, University of Huddersfield Dr Paul Coates, University of Salford Amit Kaushik, MSc, University of Salford Presentation
More informationMitigating Risk: Exploratory, Enabling and Preconstruction, Planning for Higher Educational Projects
Mitigating Risk: Exploratory, Enabling and Preconstruction, Planning for Higher Educational Projects Kevin Sullivan Vice President, Shawmut Design and Construction Randy Catlin, LEED AP, CHC Project Executive,
More informationSTATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist
STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the
More informationWhy Projects Excel? The Business Case for Lean Construction
California Communities of Practice June 14-152017 Why Projects Excel? The Business Case for Lean Construction John Pemberton Lean Construction Institute Bevan Mace, Ph.D. National VP, Operations & Lean
More informationComparison of Air Distribution Systems
of Air Distribution s vs. s & s Presentation Outline & s Distribution Conclusion & s & s Project Team Owner - Capital One Financial Corporation Owner s Rep - Jones Lang LaSalle Architect - Ai Architecture
More informationREQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.
REQUEST FOR PROPOSAL Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend For St. Charles Health System Issued: May 9, 2016 Proposal Due: June 9,
More informationCommittee Meeting. Procurement Processes for Professional Services and Contractors
Citizen s i Oversight Committee Meeting Procurement Processes for Professional Services and Contractors March 2, 2011 1 Procurement Process for Professional Services 2 Procurement Process for Professional
More informationStakeholders and project delivery methods
Stakeholders and project delivery methods CIV-E.1040 Construction Management Lecture II 8 th November 2016 Antti Peltokorpi Assistant Professor Department of Civil Engineering, Aalto University antti.peltokorpi@aalto.fi
More informationMethodist Hospital for Surgery Addison, Texas. CLIENTS Methodist Health System Private Physician Consortium SRP Medical Medica Development
Team First: A Case Study Discussing the Benefits of Team Collaboration and Building Information Modeling on the Design and Construction of a Physician-Owned Surgery Hospital Impacted by Federal Health
More informationWATERTOWN ELEMENTARY SCHOOLS SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018
SCHOOL BUILDING COMMITTEE MEETING: OCTOBER 3, 2018 Types of Public Construction Delivery Methods Available: Design-Bid-Build (DBB) under M.G.L Ch. 149 Overview Pros Cons Construction Management at Risk
More informationALTERNATIVE CONTRACTING METHODS
ALTERNATIVE CONTRACTING METHODS Conventional Design-Bid-Build Design/Build Negotiated General Contractor By Jeff Warner, AIA, LEED AP Principal, ALSC Architects CONVENTIONAL DESIGN-BID-BUILD The most traditional
More informationPrefabrication and Modular Construction: Providing Value from a Builders Perspective Shannon Lightfoot McCarthy Building Companies, Inc.
Shannon Lightfoot McCarthy Building Companies, Inc. CR3099-P A prefabrication strategy allows for the practice of lean concepts, while delivering a successful project. Prefabrication of MEP systems has
More informationMEMORIAL HERMANN REQUEST FOR PROPOSAL PROJECT:
MEMORIAL HERMANN REQUEST FOR PROPOSAL FOR GENERAL CONTRACTOR PROJECT: MEMORIAL HERMANN HOSPITAL SYSTEM MEMORIAL HERMANN MEMORIAL CITY CLINICAL LAB RENOVATION 921 GESSNER RD. HOUSTON, TEXAS 77024 MHMC Clinical
More informationECI: Two-Stage Contracts
ECI: Two-Stage Contracts Client and Contractor Considerations Michael Creedon Special Counsel ECI in Infrastructure and Major Projects Summit 2010 Sydney, 17 June 2010 Sessions Outline Introduction /
More informationHEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN
HEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN PROJECT INTRODUCTION PROGRAM + DESIGN RESPONSE Built-to-Suit prototype Medical Clinic was designed in response to tenant s extensive development
More informationIs Your District Ready For the New Law?
Is Your District Ready For the New Law? Ben Pintabona Operations Manager Scaparotti Construction Group Craig Weise Construction Reform Program Director Ohio School Facilities Commission Sylvia Gillis,
More informationPROJECT DELIVERY METHODS
Understanding the Construction Contract Project Delivery Methods ISBA April 7,2017 Copyright 2017 by K&L Gates LLP. All rights reserved. Design Bid Build Design Negotiate Build Construction Manager Advisor
More information2.3.6 Design Development
2.3 Management of the Project 2.3.6 Design Development Canadian Handbook of Practice for Architects 2.3.6 Introduction Design Development Tasks Engineering Services for Design Development Structural Mechanical
More informationAttachment 8 Statement of Work (SOW)
Attachment 8 Statement of Work (SOW) The following requirements are necessary for successful implementation of the contract for the proposer to provide design A/E services to assist the County in the Development
More informationBOND CONSTRUCTION UPDATE
BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND
More informationJOB ORDER CONTRACTING. United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference
JOB ORDER CONTRACTING United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference March, 2015 AGENDA Who is the Gordian Group Introduction to Job Order Contracting Explanation
More informationDESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors
DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors YOUR SUPERHERO TRAINERS TODAY ADAM NELSON Senior Architectural
More informationReport No. 419-F Meeting Date: November 22, 2011 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA
Report No. 419-F Meeting Date: November 22, 2011 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA Topic: AMENDMENT NO. 1 TO INCREASE CONTRACT WITH WLC ARCHITECTS FOR RE-DESIGN OF
More informationA/E-LED INTEGRATED PROJECT DELIVERY
A/E-LED INTEGRATED PROJECT DELIVERY PRESENTED BY: Mark C. Friedlander Schiff Hardin LLP 233 South Wacker Drive Suite 6600 Chicago, Illinois 60606 (312) 258-5500/Fax: (312) 258-5600 mfriedla@schiffhardin.com
More informationCarolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery
Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas
More informationConsensusDOCS are the only standard contract documents endorsed by 23 leading construction associations Construction Contracts Built by Consensus
ConsensusDOCS Contracts Catalog ConsensusDOCS are the only standard contract documents endorsed by 23 leading construction associations Construction Contracts Built by Consensus 1 The release of ConsensusDOCS
More informationM $336M .73 S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS A BETTER WAY TO BUILD. YEARS OF CONSTRUCTION SERVICES DESIGN-BUILD PROJECTS
A BETTER WAY TO BUILD. S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS Our team of construction professionals has more than 30 years of building experience in New England. We pride ourselves on the personal
More informationKAISER PERMANENTE MEDICAL OFFICE BUILDING at Tysons Corner
KAISER PERMANENTE MEDICAL OFFICE BUILDING at Tysons Corner McLean, Virginia Brooke Helgesen Advisor: Dr. Chimay Anumba Construction Management PRESENTATION OUTLINE Cost/ Schedule Impact KAISER PERMANENTE
More informationProject Delivery Methods
7 Project Delivery Methods Design-Bid-Build CM-at-Risk Design-Build Bridging Bridging / CM-at-Risk CM Agency Integrated Project Delivery September 2010 SELECTING THE APPROPRIATE CONSTRUCTION PROJECT DELIVERY
More informationINTEGRATED PROJECT DELIVERY
INTEGRATED PROJECT DELIVERY IPD For Facility Professionals THE PANEL Doug Kitlar GEF Seniors Housing Pete Wardell Chandos Construction Jonathan Rockliff Rockliff Pierzchajlo Kroman Architects Ltd. Bert
More informationLean Practices from Competition through Construction
Lean Practices from Competition through Construction UCSF MISSION HALL PROJECT RUDOLPH & SLETTEN, INC WRNS STUDIO Introductions RUDOLPH & SLETTEN, INC Gary Taylor Senior Project Executive Kelli Quinn Senior
More informationWE MAKE YOUR HEALTHCARE REAL ESTATE WORK FOR YOU PROJECT DELIVERY METHODS FOR HEALTHCARE CONSTRUCTION
WE MAKE YOUR HEALTHCARE REAL ESTATE WORK FOR YOU PROJECT DELIVERY METHODS FOR HEALTHCARE CONSTRUCTION PROJECT DELIVERY METHODS FOR HEALTHCARE CONSTRUCTION Table of Contents 1. Introduction 2. Design-Bid-Build
More informationYardmen Arena Expansion & Renovation Project Update
For Immediate Release 25, September,2017 Yardmen Arena Expansion & Renovation Project Update BELLEVILLE ON With 33 days until puck drop of the home opening game of the American Hockey League s Belleville
More informationPREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS
Workshop W4 Wednesday, November 14 9:00 10:15 a.m. and 10:45 a.m. noon PREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS Presented by Panelists: Workshop W4 Robert G. Compton Director of Product
More informationAddendum #02 New County Office Building Responses to RFP Questions
Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All
More informationFairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017
Fairview Park City Schools Facilities Advisory Committee Meeting: 4/12/2017 Facilities Advisory Committee (FAC) AGENDA FAC focus and framework FPCS Preliminary Design and Construction Schedule Meet our
More informationLEVEL I PREQUALIFICATION DOCUMENTS
Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,
More informationConsensusDocs. Catalog. Updated Docs Inside
ConsensusDocs ConsensusDocs Contracts Catalog Updated Docs Inside ConsensusDocs Keeping You Ahead of the Cur ve ConsensusDocs... Building A Better Way! Whether working at the office, from the road or even
More informationREQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS
REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS 1. REQUEST FOR PROPOSALS. Clearwater Public Schools, Ewing Public Schools,
More informationConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K
CONTRACTS CATALOG Updated Docs Inside ou Ah ead o f the Cur v e gy epin e K ... BUILDING A BETTER WAY! Whether working at the office, from the road or even at home, the platform provides instant access
More informationMeasuring the Impact of BIM in Design-Bid-Build
Measuring the Impact of BIM in Design-Bid-Build A Case Study Dace A. Campbell, AIA, LEED AP // BNBuilders // 2 November 2011 The Associated General Contractors of America (AGC) is a Registered Provider
More informationMARK TURTON MCIOB, MAPM
MARK TURTON MCIOB, MAPM Southside (6 th Floor) 105 Victoria Street Westminster London SW1E 6QT 0870 9917749 info@somersetconsult.com BRIEF SUMMARY Mark is a Construction Industry /Contract Manager with
More informationCommissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015
1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program
More informationRFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018
Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as
More information1/4/2014. Alternative Project Delivery Methods 1. Agenda
Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia
More informationNHS ProCure21. Presented by Peter Woolliscroft
NHS ProCure21 Presented by Peter Woolliscroft Programme for the day Set out how partnering was promoted in England How NHS ProCure21 was developed The successes and next Steps In the beginning!! Government
More informationRequest for Proposal (RFP) Building Repair and Renovation Project. Instruction to Bidders (Project Management Consultants) & Eligibility Criteria
Section -I Request for Proposal (RFP) Building Repair and Renovation Project Instruction to Bidders (Project Management Consultants) & Eligibility Criteria 1. Project Management Consultants should submit
More informationBuilding Enclosure Commissioning of a Student Athletic Facility
Building Enclosure Commissioning of a Student Athletic Facility Presented by: Paul Totten, PE, Senior Project Manager BEST3 Conference Atlanta, Georgia 3 April 2012 www.sgh.com Presentation Outline Section
More informationPROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA
PROGRESSIVE DESIGN-BUILD Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA ADVANTAGES/DISADVANTAGES DESIGN BID BUILD (HARD BID) The traditional project delivery method, which customarily
More information5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods
PROCUREMENT 5/21/13 Agenda Common Tendering Systems Procurement Methods 1 Agenda Common Tendering Systems Procurement Methods Common Tendering Systems Competitive / Open-bid: (Qualified) contractors are
More informationADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)
ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) Subject to conditions prescribed by the University of California, San Francisco (the University or UCSF ), bids for a Construction Manager at Risk Agreement
More informationEnhancing the Environment in Which People Live, Learn, Heal, Work and Play. HEALTHCARE INTERIOR SOLUTIONS
TM Enhancing the Environment in Which People Live, Learn, Heal, Work and Play. HEALTHCARE INTERIOR SOLUTIONS DESIGNED FOR HEALTHCARE PSI s Healthcare products include custom casework, millwork, wall panel
More informationOffice of Planning, Design and Construction. Capital Program Update April 10, 2017
Office of Planning, Design and Construction Capital Program Update April 10, 2017 Projects Under Construction Translational Research Center Translational Research Center Phase I Site work Completed - June
More informationThree Opportunities Created by Lean Construction
Three Opportunities Created by Lean Construction Gregory Howell, P.E. Lean Project Consulting How do we manage projects now? Determine client requirements including quality, time and budget limits and
More informationRecent developments in contract procurement models
Recent developments in contract procurement models 5 th Annual Contract Management Masterclass Michael Creedon Partner 7 September 2010 ME_80102001 Overview 1. Introduction The current environment Alliancing
More informationThe benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM
Page 1 of 5 The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM By Rick Oehmcke, S.E. Not that many years ago, few structural engineers
More informationFebruary Significant reduction in delays, unexpected costs and disputes between the parties arising during construction.
February 2014 The major benefits to the Owner in a design and construction program carried out by employing the Bridging method are listed and discussed below along with the benefits to the Owner s Design
More informationFacility Basics for Bond Project Communications
Facility Basics for Bond Project Communications TSPRA Annual Conference February 19, 2013 Presented by: Cathy Brandewie O Connell Robertson Architectural Teams can help with Evaluating / Assessing Facilities
More informationDesign-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION
Design-Build Trifecta A joint presentation of DBIA WESTERN PACIFIC REGION and AIA LOS ANGELES September 16, 2014 Design-Build Trifecta MODERATOR: SPEAKERS: Robert J, Hartung, Hon AIA, DBIA President, Alternative
More informationMace - Hertford Office. Programme Management
Mace - Hertford Office Programme Management 2004 1 BACKGROUND - INTRODUCTION Hertfordshire County Council Contract to deliver Capital Works Programme (for projects over 100,000) based on anticipated HCC
More informationIntegrated Design & Delivery Tool
Integrated Design & Delivery Tool Chris Pechacek, McCarthy Building Companies, Inc. 18 October 2017 C A P T U R E A N D L E V E R A G E T H E L E A N A D V A N T A G E Introduction/Agenda Current Conditions
More informationMeeting the Challenge of a Difficult Job GC The Beck Group Colorado Mills Mall Restoration 1
2018 AGC ACE Awards Entry Category 3 Meeting the Challenge of a Difficult Job GC Contractor The Beck Group Project Name Colorado Mills Mall Restoration When the costliest storm in state s history unleashed
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationNEC3 Contracts explained
ICE London Graduates & Students NEC3 Contracts explained Monday 21 April 2008 Peter Higgins, pd Consult former Chairman of NEC Panel Purpose and development of NEC3 Contracts State of the Construction
More informationPROJECT OUTCOMES PARTIES OUTCOMES
TODAY PROJET OUTOMES PARTIES OUTOMES Project Outcomes are not tied to Project Requirements or Project Objectives Separate ontracts do Little to Improve Project Outcomes ontracting Models LINEAR ONTRATING
More informationDell Seton Medical Center at the University of Texas at Austin
Dell Seton Medical Center at the University of Texas at Austin Capital Equipment Track Medical Equipment Planning, Procurement, and Logistics A Case Study: Dell Seton Medical Center at the University of
More informationDocument Synopses by Series
Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)
More informationBE THE BEST 2909 OFFICE SILVER TOWER BUSINESS BAY DUBAI BURJ KHALIFA DISTRICT DUBAI UNITED ARAB EMIRATES
+971 55 206 8104 ferrutti@ferrutti.com BUILD THE BEST BE THE BEST 2909 OFFICE SILVER TOWER BUSINESS BAY DUBAI BURJ KHALIFA DISTRICT DUBAI UNITED ARAB EMIRATES BUILD THE BEST BE THE BEST TABLE OF CONTENT
More informationDESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS
SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS GENERAL The University of South Alabama is officially and formally committed to the concept of Commissioning all new buildings and major renovations.
More informationThis addendum form a part of the Contract Documents and Modifies the Bidding Documents dated March 27, 2015 with amendments and additions noted below.
DOCUMENT 00910 ADDENDUM NUMBER 1 DATE: April 7, 2015 PROJECT: Celina First Church of God 850 Fairground Rd. Celina, OH 45822 PROJECT NUMBER: 14119.0 OWNER: Celina First Church of God Contact: Pastor Bruce
More informationPrefabricating a New Clinical Building at Boston Children s Hospital
SESSION TWO: PANELIZE+ PERFORM Prefabricating a New Clinical Building at Boston Children s Hospital JIM CHAMBERS Shepley Bulfinch JASON LANSBERRY Suffolk Construction JOSHUA KIVELA Simpson Gumpertz & Heger
More informationFacilities Planning Summit
Facilities Planning Summit Premier Healthcare Alliance Capital Solutions Partner Presenters: Jim Venker, AIA, Senior Director, Facilities, Construction & Environmental Services; Premier Healthcare Alliance
More informationProSales Buying and Selling Research Report
ProSales Buying and Selling Research Report - July 2015 Table of Contents PROJECT TEAM: Grant Farnsworth Account Manager Grant Gries Project Director Page PROJECT OBJECTIVES AND METHODOLOGY 3-4 DETAILED
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationProgressive Design Build
Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-3 Issue date: August 2012 1. General MATERIAL AND COLOR SELECTIONS This Directive is applicable to all projects where materials and finishes in public areas are involved, from stand-alone
More informationLEAN design for life cycle information. Steen Sunesen Senior Project Manager / Digitalisation Lead LINK arkitektur
LEAN design for life cycle information Steen Sunesen Senior Project Manager / Digitalisation Lead LINK arkitektur sts@linkarkitektur.no LEAN in design LEAN design for life-cycle information Steen Sunesen
More informationTech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey
Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule
More informationCONSULTATION ON THE SCOPE OF WORKS AND CONTRACTING STRATEGY FOR THE RENOVATION OF THE PALAIS DES NATIONS
CONSULTATION ON THE SCOPE OF WORKS AND CONTRACTING STRATEGY FOR THE RENOVATION OF THE PALAIS DES NATIONS Presented by: UNOG/PTS and UNOG/SHP Date: June 2017 INTRODUCTION David Mc Cuaig Project Director,
More informationProject Information. Nominations of Artists. University of Houston
UNIVERSITY OF HOUSTON SYSTEM SYSTEM WIDE ART ACQUISTION COMMITTEE AGENDA ITEM ITEM: UH University Center Transformation Project Artwork-Artists Nominations DATE PREVIOUSLY SUBMITTED: NA SUMMARY: Nominations
More informationRequest for Proposal. February 6, 2017
Request for Proposal Holy Redeemer Medical Office Building 1648-1650 Huntingdon Pike Huntingdon Valley, PA 19046 MANDATORY CONTRACTOR WALK-THRU: Wednesday, February 8, 2017 at 8:30 AM BIDS DUE: Monday,
More informationExisting Construction Conditions
Tracy Lo Terrell Place 575 7 th Street NW Washington DC September 23, 2002 Construction Management Existing Construction Conditions Executive Summary For this assignment, I have sent out an email to gather
More informationREQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit.
REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit. 1. INVITATION The Anchorage Museum is soliciting bids from qualified general contractors
More informationChildren s Hospital of Pittsburgh s Clinical Services Building Pittsburgh, PA
PLEASE SILENCE ALL CELL PHONES! Children s Hospital of Pittsburgh s Clinical Services Building Pittsburgh, PA PLEASE SILENCE ALL CELL PHONES! THANK YOU! THANK YOU! Final Thesis Presentation Gloria Brashear
More informationSEPARATED PROJECT DELIVERY SYSTEMS
SEPARATED PROJECT DELIVERY SYSTEMS Separated (aka Traditional) The traditional delivery method typically involves three sequential project phases: The design phase, which requires the services of a designer
More informationADVERTISEMENT FOR BIDS
1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,
More informationWelcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way
Welcome! Achieving Collaborative IPD-ish Delivery with basic D-B, P3 or CM contracts: Yes, there is a way Wed, June 10, 2015 1:00 PM - 2:00 PM EDT Earn 1.0 AIA HSW LUs Moderator Jane Cameron, AIA, LEED
More information