FINAL DRAINAGE REPORT CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO

Size: px
Start display at page:

Download "FINAL DRAINAGE REPORT CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO"

Transcription

1 FINAL DRAINAGE REPORT CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone LLC 558 Castle Pines Parkway Suite B4-321 Castle Pines, CO Ph: Attn: Joseph H. Quinn PREPARED BY: Contact: David R. Addor, P.E. ORIGINAL DATE PREPARED: April 26, 2016 REVISED:

2 TABLE OF CONTENTS Page No. 1. General Location and Description Drainage Basins & Sub-Basins Drainage Design Criteria Drainage Facility Design Conclusions List of References... 6 Appendix: 7 Basin and Runoff Calculations Storm Sewer Calculations Backup Information (Firmette, Soils Information) 9 (19 sheets) 29 (13 sheets) 43 (6 sheets)

3 Thornton Cornerstone LLC herby certifies that the drainage facilities for Cornerstone River Valley Village Filing No. 1 will be constructed according to the design presented in this report. I understand that the City of Thornton does not and shall not assume liability for the drainage facilities designed and/or certified by my engineer. I understand that the City of Thornton reviews drainage plans but cannot, on behalf of Thornton Cornerstone LLC, guarantee that final drainage design review will absolve Thornton Cornerstone LLC and/or their successors and/or assigns of future liability for improper design. I further understand that approval of the Plat and/o Development Permit does not imply approval of my engineer s drainage design. Attest: Name of Responsible Party Notary Public Authorized Signature I hereby certify that this report (plan) for the final drainage design of Cornerstone River Valley Village Filing No. 1 was prepared by me (or under my direct supervision) in accordance with the provisions of the City of Thornton Standards and Specifications for the Design and Construction of Public and Private Improvements for the Responsible Parties thereof. I understand that the City of Thornton does not and shall not assume liability for drainage facilities designed by others. Registered Professional Engineer State of Colorado No. Cornerstone River Valley Village Engineering Service Company

4 1. General Location and Description a. Location This property is located in the SW ¼ of Section 18, T. 2 S., R. 67 W. of the 6 th P.M. It is located on the northeast corner of Colorado Boulevard and Thornton Parkway to the west of Clermont Street. The Colorado Agricultural Ditch runs along the western edge of the property. This site is bounded on the west by The Reserve at Thornton on the west side of Colorado Boulevard and Cherrylane Subdivision to the south on the south side of Thornton Parkway. To the north and east are undeveloped portions of River Valley Village Subdivision. b. Description of Property This first filing for Cornerstone River Valley Village will subdivide the south acres of the western portion of the River Valley Village Subdivision. Tract D containing acres will be subject to future platting for additional residential development. The property is sparsely covered with native grasses. Grades are generally to the south and east at slopes between 1 and 3 percent. Thornton Parkway is elevated from 2 to 10 feet above this site along the south boundary. Soils are generally Ulm Loams which is a hydrologic group C soil. Other soils within this western portion of River Valley Village Subdivision are Samsil Shingle Complex located generally on the northwest quadrant of acres. This is a hydrologic group D soil. The proposal for this first phase is to subdivide this portion of the property into 79 single family residential lots. 2. Drainage Basins and Sub-basins a. Major Basin Description This site lies outside of the100-year floodplain. It appears on two FIRMs as provided by FEMA, Map Number 08001C0602H and 08001C0606H, both dated March 5, Cornerstone River Valley Village Engineering Service Company

5 This site falls within the Basin 4100 and Direct Flow Area 0056 Outfall System Planning Study prepared for the City of Thornton and Adams County by Kiowa Engineering, March Reach lies along the alignment for Thornton Parkway. It is not the existing flow path for any existing runoff. Local storm sewer is identified to control drainage. b. Sub-Basin Description This site is part of the River Valley Village Subdivision Amendment No. 1. That plat was the subject of a Final Drainage Report prepared by Manhard Consulting as approved by the City of Thornton on May 23, It has since been the subject of a Preliminary Drainage Report prepared by VLC, LLC that revised the original Manhard report to change the uses on the acres that lie within Cornerstone River Valley Village Filing No. 1. This report rationalizes the basins in the southern acres to align with the proposal street and storm sewer layout. 3. Drainage Design Criteria a. Regulations The key variation from the City of Thornton Standards is the use of the Rational Method for runoff calculations. This was done due to the relatively small sizes of the various subbasins created by the storm sewer system. b. Development Criteria Reference and Constraints As stated above, this property was the subject of a previous final drainage report by Manhard Consulting. That report set in place the existing detention facility for the overall River Valley Village complex. The discharge from this site will be to the existing storm sewer system that directs the flows to this pond. c. Hydrological Criteria The design rainfall is taken from the City of Thornton Standards and Specifications. The five year one-hour rainfall is 1.38 inches and the 100-year one-hour rainfall is 2.69 inches. Cornerstone River Valley Village Engineering Service Company

6 Runoff calculations were done using the Rational Method. The rainfall intensities were generated using the UDFCD formula applying the one-hour rainfall for the 5-year and 100- year storms. d. Hydraulic Criteria Water surface profiles were calculated for the storm sewer system using the UDFCD NeoUDSewer program. Streets and inlets will be evaluated using UDFCD UD-Inlet. 4. Drainage Facility Design a. General Concept The drainage pattern for this site will be the simple collection of runoff in the proposed street system and directed to the storm sewer system for delivery to the existing detention pond. There is little offsite drainage that impacts this first filing. Minor flows may collect along the northern boundary and will be directed to the existing storm system in Clermont Street. The project site has been divided into thirteen (13) sub-basins with one off-site basin. See the Drainage Plan. All of the basins are similar and were developed to show discharge to the proposed storm sewer system. The outfall will be into the existing 36 RCP storm sewer at the intersection of Thornton Parkway and Clermont Street. b. Specific Details There were no specific drainage problems encountered. The off-site basin is the existing Basin identified as CPA:1 on the VLC plan or 14C on the Manhard Plan. This basin consists of the right-of-way for Colorado Boulevard and Thornton Parkway adjacent to this site. No new calculations are included for this basin as it does not impact the proposed subdivision. Detention will be provided in the existing pond located at the northwest corner of Thornton Parkway and Riverdale Road. Cornerstone River Valley Village Engineering Service Company

7 Inlet calculations are included for key locations. Design Point 1 has the maximum flow and the calculations show that it requires a 10 foot Type R inlet. Design Point 6 has the high median flow and was calculated as the maximum for a 5 foot Type R inlet. All inlets that receive more flow are sized as 10 foot. 5. Conclusions a. Compliance with Standards The drainage for this site complies with all City of Thornton Standards and Specifications and with the Urban Drainage Flood Control District Criteria Manual. b. Drainage Concept The drainage design will control the runoff as anticipated in the previous reports and direct it to the existing detention facility. F. LIST OF REFERENCES #1) Standards and Specifications for the Design and Construction of Public and Private Improvements, City of Thornton, Colorado. October #2) Urban Storm Drainage Criteria Manual - Volumes 1,2, and 3, Urban Drainage and Flood Control District, Denver, Colorado. Published June 2001, latest edition. #3) Phase III Drainage Study for River Valley Village Subdivision, prepared by Manhard Consulting, Ltd., May, #4) Phase I Drainage Report for Cornerstone River Valley Ranch, prepared by Vision Land Connection, LLC, August, #5) Soil Map Arapahoe County, Colorado, United States Department of Agriculture, Natural Resources Conservation Service, Web Soil Survey 2.2. Cornerstone River Valley Village Engineering Service Company

8 APPENDIX Cornerstone River Valley Village Engineering Service Company

9

10 BASIN & RUNOFF CALCULATIONS Cornerstone River Valley Village Engineering Service Company

11 Site Data: Cornerstone River Valley Village Total Basin: 662,027 Sq. Ft Acres #REF! Composite Coefficient of Runoff: (Developed Area) Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 51, % Asphalt Pavement 141, % Roof 190, % Landscaping 279, % Figures are from Table 1, City of Aurora Storm Drainage Design & Technical Criteria Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC Results: C 2 : C 5 : C 10 : C 100 : Developed Basin Imperviousness: I= 55.0% Cornerstone RVV 4/28/2016

12 Sub-Basin Calculations: Basin Designation: C2 Design Point: 1 Basin Area: 127,392 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 11, % Asphalt Pavement 17, % Roof 41, % Landscaping 57, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.43 C 5 : 0.47 C 10 : 0.49 C 100 : 0.61 Developed Basin Imperviousness: I= Basin Designation: C3 Design Point: 2 Basin Area: 31,249 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 2, % Asphalt Pavement 9, % Roof 7, % Landscaping 12, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.50 C 5 : 0.53 C 10 : 0.53 C 100 : 0.64 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

13 Sub-Basin Calculations: Basin Designation: C4 Design Point: 2 Basin Area: 66,904 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 6, % Asphalt Pavement 8, % Roof 22, % Landscaping 29, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.43 C 5 : 0.47 C 10 : 0.49 C 100 : 0.62 Developed Basin Imperviousness: I= Basin Designation: C5 Design Point: 3 Basin Area: 35,897 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 1, % Asphalt Pavement 14, % Roof 7, % Landscaping 12, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.54 C 5 : 0.57 C 10 : 0.55 C 100 : 0.66 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

14 Sub-Basin Calculations: Basin Designation: C6 Design Point: 4 Basin Area: 41,959 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 3, % Asphalt Pavement 6, % Roof 13, % Landscaping 18, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.45 C 5 : 0.48 C 10 : 0.50 C 100 : 0.62 Developed Basin Imperviousness: I= Basin Designation: C7 Design Point: 5 Basin Area: 7,779 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks % Asphalt Pavement 4, % Roof % Landscaping 2, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.55 C 5 : 0.58 C 10 : 0.53 C 100 : 0.64 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

15 Sub-Basin Calculations: Basin Designation: C8 Design Point: 6 Basin Area: 57,208 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 5, % Asphalt Pavement 8, % Roof 18, % Landscaping 25, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.44 C 5 : 0.48 C 10 : 0.50 C 100 : 0.62 Developed Basin Imperviousness: I= Basin Designation: C9 Design Point: 7 Basin Area: 24,917 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 1, % Asphalt Pavement 8, % Roof 5, % Landscaping 9, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.52 C 5 : 0.55 C 10 : 0.54 C 100 : 0.65 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

16 Sub-Basin Calculations: Basin Designation: C10 Design Point: 9 Basin Area: 70,351 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 5, % Asphalt Pavement 18, % Roof 18, % Landscaping 27, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.49 C 5 : 0.52 C 10 : 0.52 C 100 : 0.64 Developed Basin Imperviousness: I= Basin Designation: C11 Design Point: 10 Basin Area: 54,256 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 4, % Asphalt Pavement 10, % Roof 16, % Landscaping 22, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.46 C 5 : 0.50 C 10 : 0.51 C 100 : 0.63 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

17 Sub-Basin Calculations: Basin Designation: C12 Design Point: 10 Basin Area: 54,309 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 4, % Asphalt Pavement 13, % Roof 14, % Landscaping 21, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.48 C 5 : 0.52 C 10 : 0.52 C 100 : 0.64 Developed Basin Imperviousness: I= Basin Designation: C13 Design Point: 11 Basin Area: 40,671 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 2, % Asphalt Pavement 10, % Roof 10, % Landscaping 16, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.48 C 5 : 0.51 C 10 : 0.52 C 100 : 0.63 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

18 Sub-Basin Calculations: Basin Designation: C14 Design Point: Basin Area: 49,135 Sq. Ft Acres Composite Coefficient of Runoff: Surface Area % of Site C 2 value C 5 value C 10 value C 100 value Imp. Drives & Walks 2, % Asphalt Pavement 12, % Roof 12, % Landscaping 21, % Figures are from Table RO-3 and Figures RO-3 thru RO-5, Urban Drainage and Flood Control District Criteria Manual Formula: (% of Site)(C Value)+(% of SIte)(C Value)+(% of Site)(C Value) = CC C 2 : 0.46 C 5 : 0.49 C 10 : 0.50 C 100 : 0.62 Developed Basin Imperviousness: I= Cornerstone RVV 4/28/2016

19 STANDARD FORM SF - 1 TIME OF CONCENTRATION Project: Cornerstone River Valley Village CALCULATED BY: DRA DATE: 04/06/16 tc = ti + tt SUB - BASIN INITIAL / OVERLAND TRAVEL TIME t c CHECK FINAL REMARKS DATA TIME (t i ) (t t ) (URBANIZED BASINS) t c DESIGN AREA C5 LENGTH SLOPE ti LENGTH SLOPE VEL. tt COMP. TOTAL LEGNTH tc=(l/180)+10 POINT Ac Ft % Min Ft % FPS Min tc (Ft) Min Min (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) C C C C C C C C C C C C STORM DRAINAGE DESIGN AND TECHNICAL MANUAL

20 CALCULATED BY: DRA STANDARD FORM SF - 2 JOB NO: DATE: 4/6/2016 STORM DRAINAGE SYSTEM DESIGN PROJECT: Cornerstone River Valley Village CHECKED BY: DRA (RATIONAL METHOD PROCEDURE) DESIGN STORM: 5 YR STREET DESIGN POINT AREA DESIGN AREA (AC) 1 Hour Rainfall: 1.38 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME RUNOFF COEFF tc (MIN) C. A (AC) I IN / HR Q (CFS) tc (MIN) SUM C. A (AC) I IN / HR (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) 1 1 C C C C3 + C4 4 3 C C2 TO C5 5 4 C C C6 + C7 7 6 C C C 6 TO C9 Q (CFS) SLOPE (%) STREET FLOW(CFS) DESIGN FLOW(CFS) SLOPE (%) PIPE SIZE LENGTH (FT) VELOCITY (FPS) t t (MIN) REMARKS STORM DRAINAGE DESIGN AND TECHNICAL MANUAL C2 TO C9

21 CALCULATED BY: DRA STANDARD FORM SF - 2 JOB NO: DATE: 4/6/2016 STORM DRAINAGE SYSTEM DESIGN PROJECT: Cornerstone River Valley Village CHECKED BY: DRA (RATIONAL METHOD PROCEDURE) DESIGN STORM: 5 YR STREET DESIGN POINT AREA DESIGN AREA (AC) 1 Hour Rainfall: 1.38 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME RUNOFF COEFF tc (MIN) C. A (AC) I IN / HR Q (CFS) tc (MIN) SUM C. A (AC) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) 1 8 C C2 TO C C C2 TO C C I IN / HR Q (CFS) SLOPE (%) STREET FLOW(CFS) DESIGN FLOW(CFS) SLOPE (%) PIPE SIZE LENGTH (FT) VELOCITY (FPS) tt (MIN) REMARKS 4 10 C C12 TO C C C13 TO C STORM DRAINAGE DESIGN AND TECHNICAL MANUAL

22 CALCULATED BY: DRA STANDARD FORM SF - 2 JOB NO: DATE: 4/6/2016 STORM DRAINAGE SYSTEM DESIGN PROJECT: Cornerstone River Valley Village CHECKED BY: DRA (RATIONAL METHOD PROCEDURE) DESIGN STORM: 100 YR STREET DESIGN POINT AREA DESIGN AREA (AC) 1 Hour Rainfall: 2.69 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME RUNOFF COEFF tc (MIN) C. A (AC) I IN / HR Q (CFS) tc (MIN) SUM C. A (AC) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) 1 1 C C C C3 + C4 4 3 C C2 TO C5 5 4 C C C6 + C7 7 6 C C C 6 TO C9 I IN / HR Q (CFS) SLOPE (%) STREET FLOW(CFS) DESIGN FLOW(CFS) SLOPE (%) PIPE SIZE LENGTH (FT) VELOCITY (FPS) tt (MIN) REMARKS STORM DRAINAGE DESIGN AND TECHNICAL MANUAL C2 TO C9

23 CALCULATED BY: DRA STANDARD FORM SF - 2 JOB NO: DATE: 4/6/2016 STORM DRAINAGE SYSTEM DESIGN PROJECT: Cornerstone River Valley Village CHECKED BY: DRA (RATIONAL METHOD PROCEDURE) DESIGN STORM: 100 YR STREET DESIGN POINT AREA DESIGN AREA (AC) 1 Hour Rainfall: 2.69 DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME RUNOFF COEFF tc (MIN) C. A (AC) I IN / HR Q (CFS) tc (MIN) SUM C. A (AC) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) 1 8 C C2 TO C C C2 TO C C I IN / HR Q (CFS) SLOPE (%) STREET FLOW(CFS) DESIGN FLOW(CFS) SLOPE (%) PIPE SIZE LENGTH (FT) VELOCITY (FPS) tt (MIN) REMARKS 4 10 C C12 TO C C C13 TO C STORM DRAINAGE DESIGN AND TECHNICAL MANUAL

24 DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Worksheet Protected Project: Inlet ID: Cornerstone RVV DP 1 Show Details Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *Q Known = cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Site Type: Site is Urban Site is Non-Urban Flows Developed For: Street Inlets Area Inlets in a Median Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Overland Flow = Channel Flow = Slope (ft/ft) Length (ft) <--- FILL IN THIS SECTION OR FILL IN THE SECTIONS BELOW. <--- Rainfall Information: Intensity I (inch/hr) = C 1 * P 1 / ( C 2 + T c ) ^ C 3 Minor Storm Major Storm Design Storm Return Period, T r = Return Period One-Hour Precipitation, P 1 = C 1 = C 2 = C 3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C 5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Q b = cfs years inches Total Design Peak Flow, Q = cfs Cornerstone DP 1 UD-Inlet_v3.14.xlsm, Q-Peak 4/28/2016, 9:48 AM

25 Project: Inlet ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Cornerstone RVV DP 1 Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 12.4 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = ft/ft Manning's Roughness Behind Curb (typically between and 0.020) n BACK = Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 17.0 ft Gutter Width W = 2.00 ft Street Transverse Slope S X = ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or ft/ft) S W = ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = ft/ft Manning's Roughness for Street Section (typically between and 0.020) n STREET = Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Q allow = SUMP SUMP cfs Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Cornerstone DP 1 UD-Inlet_v3.14.xlsm, Q-Allow 4/28/2016, 9:48 AM

26 INLET IN A SUMP OR SAG LOCATION Project = Inlet ID = Cornerstone RVV DP 1 H-Curb W W P H-Vert Lo (C) Wo Lo (G) Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = CDOT Type R Curb Opening Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') a local = inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = inches Grate Information MINOR MAJOR Override Depths Length of a Unit Grate L o (G) = N/A N/A feet Width of a Unit Grate W o = N/A N/A feet Area Opening Ratio for a Grate (typical values ) A ratio = N/A N/A Clogging Factor for a Single Grate (typical value ) C f (G) = N/A N/A Grate Weir Coefficient (typical value ) C w (G) = N/A N/A Grate Orifice Coefficient (typical value ) C o (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening L o (C) = feet Height of Vertical Curb Opening in Inches H vert = inches Height of Curb Orifice Throat in Inches H throat = inches Angle of Throat (see USDCM Figure ST-5) Theta = degrees Side Width for Depression Pan (typically the gutter width of 2 feet) W p = feet Clogging Factor for a Single Curb Opening (typical value 0.10) C f (C) = Curb Opening Weir Coefficient (typical value ) C w (C) = Curb Opening Orifice Coefficient (typical value ) C o (C) = MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = cfs Cornerstone DP 1 UD-Inlet_v3.14.xlsm, Inlet In Sump 4/28/2016, 9:48 AM

27 DESIGN PEAK FLOW FOR ONE-HALF OF STREET OR GRASS-LINED CHANNEL BY THE RATIONAL METHOD Worksheet Protected Project: Inlet ID: Cornerstone RVV DP 6 Show Details Design Flow: ONLY if already determined through other methods: Minor Storm Major Storm (local peak flow for 1/2 of street OR grass-lined channel): *Q Known = cfs * If you enter values in Row 14, skip the rest of this sheet and proceed to sheet Q-Allow or Area Inlet. Geographic Information: (Enter data in the blue cells): Site Type: Site is Urban Site is Non-Urban Flows Developed For: Street Inlets Area Inlets in a Median Subcatchment Area = Acres Percent Imperviousness = % NRCS Soil Type = A, B, C, or D Overland Flow = Channel Flow = Slope (ft/ft) Length (ft) <--- FILL IN THIS SECTION OR FILL IN THE SECTIONS BELOW. <--- Rainfall Information: Intensity I (inch/hr) = C 1 * P 1 / ( C 2 + T c ) ^ C 3 Minor Storm Major Storm Design Storm Return Period, T r = Return Period One-Hour Precipitation, P 1 = C 1 = C 2 = C 3 = User-Defined Storm Runoff Coefficient (leave this blank to accept a calculated value), C = User-Defined 5-yr. Runoff Coefficient (leave this blank to accept a calculated value), C 5 = Bypass (Carry-Over) Flow from upstream Subcatchments, Q b = cfs years inches Total Design Peak Flow, Q = cfs Cornerstone DP 6 UD-Inlet_v3.14.xlsm, Q-Peak 4/28/2016, 9:46 AM

28 Project: Inlet ID: ALLOWABLE CAPACITY FOR ONE-HALF OF STREET (Minor & Major Storm) (Based on Regulated Criteria for Maximum Allowable Flow Depth and Spread) Cornerstone RVV DP 6 Gutter Geometry (Enter data in the blue cells) Maximum Allowable Width for Spread Behind Curb T BACK = 12.4 ft Side Slope Behind Curb (leave blank for no conveyance credit behind curb) S BACK = ft/ft Manning's Roughness Behind Curb (typically between and 0.020) n BACK = Height of Curb at Gutter Flow Line H CURB = 6.00 inches Distance from Curb Face to Street Crown T CROWN = 17.0 ft Gutter Width W = 2.00 ft Street Transverse Slope S X = ft/ft Gutter Cross Slope (typically 2 inches over 24 inches or ft/ft) S W = ft/ft Street Longitudinal Slope - Enter 0 for sump condition S O = ft/ft Manning's Roughness for Street Section (typically between and 0.020) n STREET = Minor Storm Major Storm Max. Allowable Spread for Minor & Major Storm T MAX = ft Max. Allowable Depth at Gutter Flowline for Minor & Major Storm d MAX = inches Allow Flow Depth at Street Crown (leave blank for no) check = yes MINOR STORM Allowable Capacity is based on Depth Criterion Minor Storm Major Storm MAJOR STORM Allowable Capacity is based on Depth Criterion Q allow = SUMP SUMP cfs Minor storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Major storm max. allowable capacity GOOD - greater than flow given on sheet 'Q-Peak' Cornerstone DP 6 UD-Inlet_v3.14.xlsm, Q-Allow 4/28/2016, 9:46 AM

29 INLET IN A SUMP OR SAG LOCATION Project = Inlet ID = Cornerstone RVV DP 6 H-Curb W W P H-Vert Lo (C) Wo Lo (G) Design Information (Input) MINOR MAJOR Type of Inlet Inlet Type = CDOT Type R Curb Opening Local Depression (additional to continuous gutter depression 'a' from 'Q-Allow') a local = inches Number of Unit Inlets (Grate or Curb Opening) No = 1 1 Water Depth at Flowline (outside of local depression) Ponding Depth = inches Grate Information MINOR MAJOR Override Depths Length of a Unit Grate L o (G) = N/A N/A feet Width of a Unit Grate W o = N/A N/A feet Area Opening Ratio for a Grate (typical values ) A ratio = N/A N/A Clogging Factor for a Single Grate (typical value ) C f (G) = N/A N/A Grate Weir Coefficient (typical value ) C w (G) = N/A N/A Grate Orifice Coefficient (typical value ) C o (G) = N/A N/A Curb Opening Information MINOR MAJOR Length of a Unit Curb Opening L o (C) = feet Height of Vertical Curb Opening in Inches H vert = inches Height of Curb Orifice Throat in Inches H throat = inches Angle of Throat (see USDCM Figure ST-5) Theta = degrees Side Width for Depression Pan (typically the gutter width of 2 feet) W p = feet Clogging Factor for a Single Curb Opening (typical value 0.10) C f (C) = Curb Opening Weir Coefficient (typical value ) C w (C) = Curb Opening Orifice Coefficient (typical value ) C o (C) = MINOR MAJOR Total Inlet Interception Capacity (assumes clogged condition) Q a = cfs Inlet Capacity IS GOOD for Minor and Major Storms (>Q PEAK) Q PEAK REQUIRED = cfs Cornerstone DP 6 UD-Inlet_v3.14.xlsm, Inlet In Sump 4/28/2016, 9:46 AM

30 STORM SEWER HYDRAULIC CALCULATIONS Cornerstone River Valley Village Engineering Service Company

31

32

33

34

35

36

37

38

39

40

41

42

43

44 BACKUP INFORMATION FIRMETTE SOILS MAP Cornerstone River Valley Village Engineering Service Company

45

46

47 104 56' 28'' W Hydrologic Soil Group Adams County Area, Parts of Adams and Denver Counties, Colorado (River Valley Village (Thornton, CO)) ' 48'' W ' 30'' N 39 52' 30'' N 39 52' 10'' N ' 10'' N ' 28'' W N Map Scale: 1:4,290 if printed on A landscape (11" x 8.5") sheet. Meters Feet Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS ' 48'' W Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2016 Page 1 of 4

48 Hydrologic Soil Group Adams County Area, Parts of Adams and Denver Counties, Colorado (River Valley Village (Thornton, CO)) MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:20,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Adams County Area, Parts of Adams and Denver Counties, Colorado Survey Area Data: Version 12, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: 18, 2014 Aug 30, 2014 Sep The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2016 Page 2 of 4

49 Hydrologic Soil Group Adams County Area, Parts of Adams and Denver Counties, Colorado River Valley Village (Thornton, CO) Hydrologic Soil Group Hydrologic Soil Group Summary by Map Unit Adams County Area, Parts of Adams and Denver Counties, Colorado (CO001) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI NuA Nunn clay loam, 0 to 1 percent slopes NuB Nunn clay loam, 1 to 3 percent slopes C % C % ShF UlC UlD Samsil-Shingle complex, 3 to 35 percent slopes Ulm loam, 3 to 5 percent slopes Ulm loam, 5 to 9 percent slopes D % C % C % Totals for Area of Interest % Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2016 Page 3 of 4

50 Hydrologic Soil Group Adams County Area, Parts of Adams and Denver Counties, Colorado River Valley Village (Thornton, CO) Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 4/19/2016 Page 4 of 4

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303)

January 20, Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO (303) January 20, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter

More information

Astra Engineering LLC

Astra Engineering LLC Astra Engineering LLC!"#$#% &'( ) *) ) *)* +## ) ',#$$+-."$% "#"-",-/$+ 0 ) )1'(0 23** ) 243 5*6 78947)3 9**!:;24?)3* 973''!"$#%=4? *9> %-2/- 2+ @:* 3*$/A 2 32 @3*49 13* 32 3-3*-* 2!!2 3*!*!2

More information

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES Revised August 18, 2016, August 10, 2016, September 19,2016 Prepared By: Isch and Associates, Inc. 14848 Bristol Park

More information

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

November 21, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report November 21, 2016 City of Thornton 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7295 RE: Maverik Thornton, CO - Drainage Report As per your request, we are submitting to you the drainage report

More information

The site slopes generally from the southwest to northeast at approximately 3.7 percent.

The site slopes generally from the southwest to northeast at approximately 3.7 percent. March 3, 2017 Nate Hatleback Project Manager, City of Thornton Development Engineering 9500 Civic Center Drive Thornton, CO 80229 (303) 538-7694 RE: Riverdale Five Retail Drainage Conformance Letter Dear

More information

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229

December 6, Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 December 6, 2016 Nate Hatleback Project Manager City of Thornton 9500 Civic Center Drive Thornton, CO 80229 RE: Drainage Conformance Letter Hilton Garden Inn @ The Grove The Grove Filing No 1, lot 5E Thornton,

More information

Drainage Letter for Falcon High School Building Expansion

Drainage Letter for Falcon High School Building Expansion August 11, 2017 El Paso County Planning and Community Development Department 2880 International Circle, Suite 110 Colorado Springs, CO 80910 ATTN: RE: Mr. Jeff Rice Drainage Letter for Falcon High School

More information

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP

REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP REFERENCE MAPS FEMA FIRM MAP NRCS SOILS MAP Hydrologic Soil Group-Hillsborough County, Florida (Independence Parkway) 27' 58' 56" 27" 58' 57" 2r 58' 32" 27" 58' 33" Map Scale: 1:5,290 if printed on A size

More information

FINAL DRAINAGE REPORT FALLBROOK FILING NO. 3 Thornton, CO

FINAL DRAINAGE REPORT FALLBROOK FILING NO. 3 Thornton, CO FINAL DRAINAGE REPORT FALLBROOK FILING NO. 3 Thornton, CO May 6, 2016 JN: 14053 Prepared for: Carlson Associates CalAtlantic Homes PO Box 247 6161 S. Syracuse Way, Suite 200 Eastlake, CO 80614 Greenwood

More information

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report

City of Fort Collins. Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report City of Fort Collins Spring Creek Place (2105 South College Avenue) Preliminary Drainage Report OCTOBER 2016 VERSION 3 Prepared By: 4582 South Ulster Street, Suite 1500 Denver, CO 80237 Daniel L. Skeehan,

More information

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION

STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION STORMWATER MANAGEMENT REPORT FOR THE BORGATA OUTDOOR EVENT AREA POOL ADDITION City of Atlantic City, Atlantic County, New Jersey Prepared For: Marina District Development Company, LLC One Borgata Way Atlantic

More information

Stormwater Analysis Report

Stormwater Analysis Report Stormwater Analysis Report Solar Panel Array Temple Street (Rt. 14) West Boylston, MA February 24, 216 SITE Prepared for: West Boylston Municipal Lighting Plant 4 Crescent Street West Boylston, MA 1583

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

If you have any further questions, feel free to contact me at or by at

If you have any further questions, feel free to contact me at or by  at July 20, 2017 City of Thornton Colorado City Development Engineering 9500 Civic Circle Drive Thornton, CO 80229 Subject: Panda Express, Thornton, CO 144 th and Washington Summit, Lot 1 and Lot 2a Stormwater

More information

If you have any further questions, feel free to contact me at or by at

If you have any further questions, feel free to contact me at or by  at July 20, 2017 City of Thornton Colorado City Development Engineering 9500 Civic Circle Drive Thornton, CO 80229 Subject: Panda Express, Thornton, CO 144 th and Washington Summit, Lot 1 and Lot 2a Stormwater

More information

Site Description. CCR Rule Initial Inflow Design Flood Control System Plan (cont.) 2

Site Description. CCR Rule Initial Inflow Design Flood Control System Plan (cont.) 2 Site Description Kentucky Utilities Company (KU) owns and operates Ghent Gypsum Stack, a CCR surface impoundment, at the Ghent Generating Station in Carroll County, Kentucky. The impoundment is permitted

More information

Final Drainage Report. High School No. 3 Offsite Improvements

Final Drainage Report. High School No. 3 Offsite Improvements Final Drainage Report High School No. 3 Offsite Improvements For School District 27J April 8, 2016 Revised May 18, 2016 May 18, 2016 Mr. Jason O Shea City of Thornton Public Works 9500 Civic Center Drive

More information

FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5. Prepared for:

FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5. Prepared for: 215063FD1 2014-3046 01J FINAL DRAINAGE REPORT FOR: LOT 1 BLOCK 1 ROLLINS SUBDIVISION FILING #5 Prepared for: Mr. Hari Sach RV America 3640 N. Chambers Road Aurora, Co. 80011 Phone: 303-360-0252 Email:

More information

Final Drainage Report. High School No. 3 Offsite Improvements

Final Drainage Report. High School No. 3 Offsite Improvements Final Drainage Report High School No. 3 Offsite Improvements For School District 27J April 8, 2016 Revised May 18, 2016 Revised June 8, 2016 Revised June 21, 2016 June 21, 2016 Mr. Jason O Shea City of

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW7 September 2017 SW7.01 Purpose The purpose of this Chapter is to establish a basis for inlet design utilizing City of Fort Wayne standard inlets and

More information

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2)

Arvada Plaza Redevelopment. Walmart Store # (Lot 1) Industrial Realty Group, LLC (Lot 2) Drainage Analysis Arvada, CO Arvada Plaza Redevelopment Including: Walmart Store #4734-00 (Lot 1) & Industrial Realty Group, LLC (Lot 2) (W 58 th Ave & Independence Street) Arvada, Colorado Preliminary

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 99 52' 37'' W Yields of Irrigated Crops (Component): Cotton lint (Lbs) Haskell County, Texas 99 51' 40'' W 33 21' 4'' N 418500 418600 418700 418800 418900 419000 419100 419200 419300 419400 419500 419600

More information

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone

More information

SAMPLE DRAINAGE STATEMENT

SAMPLE DRAINAGE STATEMENT Firm Name & Logo Hidalgo County Drainage District No. 1 Drainage Statement Subdivision Name Hidalgo County, Texas Prepared By: Firm's Name Address City, State, Zip Telephone Fax Email Date SAMPLE DRAINAGE

More information

Final Drainage Report

Final Drainage Report Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite

More information

Alapaha Tract. Alapaha Tract. Berrien County GA Acres Par LL 320 LD 5. Date: 6/6/2017. TractName

Alapaha Tract. Alapaha Tract. Berrien County GA Acres Par LL 320 LD 5. Date: 6/6/2017. TractName The 996 Planted Slash was st thinned in 0 TractName Alapaha inch equals 74 miles in = 44,786 ft 0 0 60 Miles :,77,40 The 996 Planted Slash was st thinned in 0 TractName Alapaha inch equals miles in = 6,7

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Pre-construction and post-construction drainage maps, UD-inlet design spreadsheets, and storm sewer conveyance calculations are attached.

Pre-construction and post-construction drainage maps, UD-inlet design spreadsheets, and storm sewer conveyance calculations are attached. May 8, 2017 City of Thornton Colorado City Development Engineering 9500 Civic Circle Drive Thornton, CO 80229 Subject: Panda Express, Thornton, CO 144 th and ashington Summit, Lot 1 and Lot 2a Stormwater

More information

Pre-construction and post-construction drainage maps, UD-inlet design spreadsheets, and storm sewer conveyance calculations are attached.

Pre-construction and post-construction drainage maps, UD-inlet design spreadsheets, and storm sewer conveyance calculations are attached. May 8, 2017 City of Thornton Colorado City Development Engineering 9500 Civic Circle Drive Thornton, CO 80229 Subject: Panda Express, Thornton, CO 144 th and ashington Summit, Lot 1 and Lot 2a Stormwater

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

Soil Map Lewis County, Kentucky (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) Web Soil Survey National Cooperative Soil Survey

Soil Map Lewis County, Kentucky (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) Web Soil Survey National Cooperative Soil Survey 83 37' 43'' W (Denham Farm, Sand Hill/Trinity, Lewis Co., KY) 83 36' 18'' W 38 40' 37'' N 271500 271700 271900 272100 272300 272500 272700 272900 273100 273300 38 40' 37'' N 38 39' 54'' N 4282900 4283100

More information

City Plaza Residential (TPM ) Preliminary Hydrology Report

City Plaza Residential (TPM ) Preliminary Hydrology Report Hydrology Study City Plaza Residential (TPM 2016-127) Preliminary Hydrology Report Orange, Orange County, California Prepared For: Greenlaw Partners 18301 Von Karman Avenue, Suite 250 Irvine, CA 92612

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

Introduction to Storm Sewer Design

Introduction to Storm Sewer Design A SunCam online continuing education course Introduction to Storm Sewer Design by David F. Carter Introduction Storm sewer systems are vital in collection and conveyance of stormwater from the upstream

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual

More information

Appendix H Amanda Estates Drainage Study

Appendix H Amanda Estates Drainage Study Appendix H Amanda Estates Drainage Study Hunsaker & Associates 2015 Contents 1 Scope... 1 2 Existing Conditions... 1 3 Project Description... 3 4 Methodology... 5 4.1 Hydrology... 5 4.2 Hydraulics...

More information

Drainage Report. PDC Energy Metcalf Soil Treatment Facility. OA Project No

Drainage Report. PDC Energy Metcalf Soil Treatment Facility. OA Project No Drainage Report PDC Energy Metcalf Soil Treatment Facility OA Project No. 013-0036 760 Horizon Drive, Suite 102 Grand Junction, CO 81506 TEL 970.263.7800 FAX 970.263.7456 DRAINAGE REPORT PDC METCALF CENTRALIZED

More information

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview

FORT COLLINS STORMWATER CRITERIA MANUAL Hydrology Standards (Ch. 5) 1.0 Overview Chapter 5: Hydrology Standards Contents 1.0 Overview... 1 1.1 Storm Runoff Determination... 1 1.2 Design Storm Frequencies... 1 1.3 Water Quality Storm Provisions... 2 1.4 Design Storm Return Periods...

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

Watershed Delineation Techniques

Watershed Delineation Techniques Watershed Delineation Techniques Stacy D. Dehne DATCP Engineer February 2008 1 What Is a Watershed? An Area of Land that Drains to a given location February 2008 2 Contour Map Features Contour Maps: Represent

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

Red Barn R.V. and Boat Storage Weld County, Colorado. Final Drainage Report

Red Barn R.V. and Boat Storage Weld County, Colorado. Final Drainage Report Red Barn R.V. and Boat Storage Weld County, Colorado Final Drainage Report Prepared for Kevin Moore Project No. 1318-001 February 27, 2017 Prepared By: KETTERLING, BUTHERUS AND NORTON ENGINEERS, LLC. 820

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

APPENDIX F RATIONAL METHOD

APPENDIX F RATIONAL METHOD 7-F-1 APPENDIX F RATIONAL METHOD 1.0 Introduction One of the most commonly used procedures for calculating peak flows from small drainages less than 200 acres is the Rational Method. This method is most

More information

Alternative Analysis Cherry Creek Reservoir West Boat Ramp Parking Lot Water Quality Improvements

Alternative Analysis Cherry Creek Reservoir West Boat Ramp Parking Lot Water Quality Improvements January 2012 Submitted to: Cherry Creek Basin Water Quality Authority 8390 E Crescent Parkway, Suite 500 Greenwood Village, CO 80111 Submitted by: AMEC Earth & Environmental, Inc. 2000 S. Colorado Blvd.,

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

LAKE COUNTY HYDROLOGY DESIGN STANDARDS

LAKE COUNTY HYDROLOGY DESIGN STANDARDS LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Paradox Seed Mother Orchard Red Bluff, CA

AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA Fax Paradox Seed Mother Orchard Red Bluff, CA AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Paradox Seed Mother Orchard Red Bluff, CA AG-LAND INVESTMENT BROKERS 275 Sale Lane / P. O. Box 896 Red Bluff,

More information

Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA. Presented By:

Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA. Presented By: Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA Presented By: Pinheiro Ranch 55+/- Acres Orchard Development Ground Orland, CA Location: This property is located on the SE corner of Road

More information

DRAINAGE PLAN AND REPORT OLD DENVER ROAD

DRAINAGE PLAN AND REPORT OLD DENVER ROAD DRAINAGE PLAN AND REPORT 16140 OLD DENVER ROAD PART OF THE NW1/4 SEC. 28, T.11S., R.67W., 6 th P.M. EL PASO COUNTY February 3, 2017 Revised January 5, 2018 Prepared for All About Outdoor Storage Oliver

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs.

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs. 19 May 2017 City of Thornton Attn: Nate Hatleback 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 05/16/17 Letter Dear Mr. Hatleback: This letter is in response to technical comments

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements

Chapter 4. Drainage Report and Construction Drawing Submittal Requirements 4.0 Introduction The requirements presented in this section shall be used to aid the design engineer or applicant in the preparation of drainage reports, drainage studies, and construction drawings for

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

Appendix G Preliminary Hydrology Study

Appendix G Preliminary Hydrology Study Appendix G Preliminary Hydrology Study Preliminary Hydrology Study VESTING TTM 72608 Long Beach, CA Prepared for: The Long Beach Project, LLC 888 San Clemente, Suite 100 New Port Beach, CA May 28, 2014

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY

PRELIMINARY DRAINAGE REPORT NEWCASTLE FIRE STATION OLD STATE HIGHWAY PRELIMINARY DRAINAGE REPORT FOR THE NEWCASTLE FIRE STATION OLD STATE HIGHWAY PREPARED FOR THE NEWCASTLE FIRE PROTECTION DISTRICT JULY 2014 BY ROSEVILLE DESIGN GROUP, INC. ROSEVILLE DESIGN GROUP, Inc Established

More information

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Contents SITE LOCATION / DESCRIPTION... 3 WESTPOINTE STORMWATER MANAGEMENT PLAN... 3 THE ENCLAVE AT WESTPOINTE DETENTION POND... 3 Table

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Foothills Solar & Substation

Foothills Solar & Substation Final Drainage Study Foothills Solar & Substation Loveland, CO Prepared for: City of Loveland 410 E. Fifth Street Loveland, CO 80537 December 12, 2015 1501 Academy Ct. Ste. 203 Fort Collins, Colorado 80524

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

STORM DRAINS AND IRRIGATION

STORM DRAINS AND IRRIGATION TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 STORM DRAINS AND IRRIGATION 105.1. STORM DRAINS... 105.1 105.2. METHODS OF ANALYSIS... 105.1 105.2.1. Rational Method... 105.1 105.2.2.

More information

Web Soil Survey National Cooperative Soil Survey

Web Soil Survey National Cooperative Soil Survey 289300 289700 290100 290500 83 12' 5'' W 83 13' 37'' W Farmland Classification Ben Hill and Irwin Counties, Georgia 290900 291300 31 46' 8'' N 3514000 3514000 3514400 3514400 3514800 3514800 3515200 3515200

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS

Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS v. 11.0 WMS 11.0 Tutorial Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox and WMS Objectives Learn how to use several Hydraulic Toolbox calculators

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Introduction. Figure 1 ZONING MAP

Introduction. Figure 1 ZONING MAP Introduction Weatherly McNally & Dixon, PLC is evaluating the property located at 7620 Sawyer Brown Road in Nashville, Tennessee, for its highest and best use of development. The property is currently

More information

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO

DR DRAINAGEWAY THORNTON VALLEY SUBDIVISION OVERALL DEVELOPMENT PLAN & CONCEPTUAL SITE PLAN SWC OF COLO BLVD & THORNTON PKWY THORNTON, CO /CONCEPTUAL SITE PLAN TRACT A, THORNTON VALLEY FILING NO. 1 LOCATED IN THE NE 1/4 OF SEC. 24, T. 2 S., R. 68 W., OF THE 6TH P.M., CITY OF UNTY OF ADAMS, STATE OF COLORADO Planning. Architecture. Engineering.

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Rational Method Hydrological Calculations with Excel COURSE CONTENT

Rational Method Hydrological Calculations with Excel COURSE CONTENT Rational Method Hydrological Calculations with Excel Harlan H. Bengtson, PhD, P.E. COURSE CONTENT 1. Introduction Calculation of peak storm water runoff rate from a drainage area is often done with the

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information

FINAL DRAINAGE REPORT FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO MCLAUGHLIN ROAD COLORADO SPRINGS, COLORADO

FINAL DRAINAGE REPORT FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO MCLAUGHLIN ROAD COLORADO SPRINGS, COLORADO FINAL DRAINAGE REPORT FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO. 3 7368 MCLAUGHLIN ROAD COLORADO SPRINGS, COLORADO October 4, 2017 Revised November 2018 Prepared For: TBONE CONSTRUCTION 1310 FORD STREET

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Chapter 3 Dispersion BMPs

Chapter 3 Dispersion BMPs Chapter 3 Dispersion BMPs 3.1 BMP L611 Concentrated Flow Dispersion 3.1.1 Purpose and Definition Dispersion of concentrated flows from driveways or other pavement through a vegetated pervious area attenuates

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Mapping and Understanding YOUR LAKE S WATERSHED By: Tony Groves, Pam Tyning, and Tory Meyers Water Resources Group, Progressive AE

Mapping and Understanding YOUR LAKE S WATERSHED By: Tony Groves, Pam Tyning, and Tory Meyers Water Resources Group, Progressive AE By: Tony roves, Pam Tyning, and Tory Meyers Water Resources roup, Progressive A What is a Watershed? A watershed is the land area surrounding a lake from which water drains to the lake. The imaginary line

More information

Extended Detention Basin Design

Extended Detention Basin Design Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention

More information

SIZING WATER SERVICE LINES AND METERS

SIZING WATER SERVICE LINES AND METERS SIZING WATER SERVICE LINES AND METERS COUNTY OF CURRITUCK Water Customer Data Sheet Customer: Address: Building Address: 2 Lark Drive Zip Code: Subdivision: Lot #: Block #: Type of Occupancy: FIXTURE FIXTURE

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008

CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008 CONSISTENCY BETWEEN CUHP AND RATIONAL METHODS James C.Y. Guo, PhD, P.E., and Ben Urbonas, P.E., D.WRD 08/04/2008 When estimating runoff for a storm event it is assumed that the storm runoff occurs from

More information

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN

PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN PRELIMINARY DRAINAGE REPORT FOR THE EDI MASTER PLAN April 5, 2015 Wayne W. Chang, MS, PE 46548 Chang Civil Engineering Hydrology Hydraulics Sedimentation P.O. Box 9496 Rancho Santa Fe, CA 92067 (858) 692-0760

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

Design of Stormwater Wetlands

Design of Stormwater Wetlands Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak

More information

Mule Ranch - Dorris, CA 1,234 +/- acres, Siskiyou County

Mule Ranch - Dorris, CA 1,234 +/- acres, Siskiyou County AG-LAND Investment Brokers 275 Sale Lane Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Mule Ranch - Dorris, CA 1,234 +/- acres, Siskiyou County AG-LAND INVESTMENT BROKERS 275 Sale Lane / P. O. Box

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Stormwater Management Manual Revision History

Stormwater Management Manual Revision History Stormwater Management Manual Revision History Manual Creation Date: January 30, 2007 12/12/2006 Water Quality for Post-Construction Standards and Criteria are established as part of the National Pollution

More information

FINAL DRAINAGE REPORT FOR HOMESTEAD AT STERLING RANCH FILING NO. 1 EL PASO COUNTY, COLORADO

FINAL DRAINAGE REPORT FOR HOMESTEAD AT STERLING RANCH FILING NO. 1 EL PASO COUNTY, COLORADO FINAL DRAINAGE REPORT FOR HOMESTEAD AT STERLING RANCH FILING NO. 1 EL PASO COUNTY, COLORADO July 2018 Prepared for: SR Land, LLC 20 Boulder Crescent, Suite 210 Colorado Springs, CO 80903 Prepared by: 20

More information

Appendix L. Drainage Report

Appendix L. Drainage Report Appendix L Drainage Report 2nd Street and Pacific Coast Highway Retail Project City of Long Beach County of Los Angeles, CA DRAINAGE REPORT April 5, 2017 DRAINAGE REPORT For: 2nd Street and Pacific Coast

More information

PHYSICAL SOIL PROPERTIES

PHYSICAL SOIL PROPERTIES PHYSICAL SOIL PROPERTIES Physical Soil Properties Santa Cruz County, California Scotts Valley Target Physical Soil Properties This table shows estimates of some physical characteristics and features that

More information

HY-12 User Manual. Aquaveo. Contents

HY-12 User Manual. Aquaveo. Contents Y-12 User Manual Aquaveo Contents Overview...2 Watershed Parameters...3 Channel Parameters...3 Storm Drain Parameters...3 Design of new systems...4 Analysis of existing systems...4 Steady flow...4 ydrographic

More information

Soil Map Lowndes County, Alabama (McEvoy_Gordonsville)

Soil Map Lowndes County, Alabama (McEvoy_Gordonsville) 524700 525000 525300 525600 525900 526200 3568000 3568000 3567700 3567700 3567400 3567400 3567100 3567100 3566800 3566800 3566500 3566500 3566200 3566200 3565900 3565900 524700 525000 525300 525600 Map

More information