1 FORM 1, FORM 1A AND CONCEPTUAL PLAN FOR ENVIRONMENTAL CLEARANCE OF PROPOSED IT BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, Project Proponent: M/S LOGIX INFOMEDIA EIA Consultant: Ind Tech House Consult (An ISO 9001:2008 Certified Organization) G-8/6, Ground Floor, Sector 11, Rohini Delhi Tel: , Fax: August, 2017 ITHC/PRJ/17-18/EIA/89 IND TECH HOUSE CONSULT

2 PROPOSED IT Project Proponent: M/S LOGIX INFOMEDIA For and on behalf of: Ind Tech House Consult Approved by: Mr. Arvind Narayan Devikar Signed: Position: EIA Coordinator Date: August, 2017 This report has been prepared by Ind Tech House Consult with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our general terms and conditions of business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. The document has been prepared for the titled project or named part thereof and should not be relied upon or used for any other project without an independent check being carried out as to its suitability and prior written authority of Ind Tech House Consult being obtained. Ind Tech House Consult accepts no responsibility or liability for the consequences of this document being used for a purpose other than the purpose for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Ind Tech House Consult for all loss or damage resulting there from. Ind Tech House Consult accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned. ITHC/PRJ/17-18/EIA/89 IND TECH HOUSE CONSULT

3 DECLARATION BY EXPERTS Declaration by Experts Contributing to the Report of Proposed It Building 142 One At Plot. 03, Sector 142 ida, I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above Report. EIA coordinator: Mr. Arvind Narayan Devikar Signature and Date Associate Coordinator: Mr. Soumya Dwivedi Functional Area Experts: S. NO. Functional areas Name of the expert/s 1 WP Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member) Signature and date 2 MSW Mrs. Supriti Guha (FAE) Mr. Soumya Dwivedi (Team Member) 3 LU Mr. Rajveer Singh (FAE) Mr. Manish Shukla (Team Member) 4 AP Mr. Suman Banerjee (FAE) Mr. Soumya Dwivedi (Team Member) 5 NV Dr. Manoj Kr. Mishra (FAE) Mr. Suman Banerjee (Team Member) 6 EB Dr. Sameer DeshPande(FAE) Dr. Bideh Shukla (Team Member) 7 SE Dr. Debashish Bhttacharya (FAE) 8 SC Mr. Shrikant Mishra (FAE) Dr. Bideh Shukla (Team Member)

4 Associate Staff 1. Mr. Anand Kumar Dubey 2. Mr. Indra Sharma 3. Ms Monika Singh 4. Saurabh Bharadwaj Monitoring Laboratory Involved Ind Research and Development House ( NABL Approved Lab) Signature For Ind Tech House Consult

5 S.. Contents I Form 1 II Form 1 A III Conceptual Plan IV Annexure A DESCRIPTIVE Site Location Map Annexure-A1 500 mts Radius Map Annexure-A2 10 km Radius Map Annexure-A3 Water balance Diagram Annexure-A4 Rainwater Harvesting Calculation Annexure-A5 C CONSULTANT DISCLOUSURE Consultant Disclosure Annexure-C1 NABET Accreditation letter Annexure-C2 D DRAWINGS Site Plan Annexure-D1 Landscape Plan Annexure-D2 Stilt & open Parking Plan Annexure-D3 Basement Parking Plan Annexure-D4

6 FORM-1 Application for Prior Environmental Clearance (EC) FORM 1 (See Paragraph 6 tification dt.14 th September 2006) As amended to EIA tification, 2006 issued vide S.O. 3067(E) on Dt Basic Information S.. Item Details 1. Name of the project/s Environment Clearance for proposed IT building 142 One at plot no. 03, sector 142 ida. 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled Plot Area: 8100 sq. m. Built Up area: sq. m. Number of Building Blocks: 1 Max. Building height: m. Max. of Floors: B+ST+SER+9 4. New/Expansion/Modernization New 5. Existing capacity/area etc. Nil 6. Category of the project i.e. A or B 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. B 9. Location ida Plot/Survey/Khasra. Plot. 3, Sector 142 Tehsil - District ida State 10. Nearest railway station/airport Dadri railway station: km E along with distance in kms. 11. Nearest town, city, District Headquarters along with distance in Kms. Indira Gandhi International Airport: km NW Greater ida: 9.17 km SE 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given) ida ITHC/PRJ/17-18/EIA/89 1 IND TECH HOUSE CONSULT

7 FORM Name of the applicant Logix Infomedia Pvt. Ltd. 14. Registered Address B-231, Greater Kailash I, Delhi Address for correspondence: Stellar Corporate Office, C-56/9, Sector-62, ida Name Mr. Himanshu Mathur Designation (Owner / Partner / CEO CEO) Address C-56/9, SECTOR-62, NOIDA Pin Code hmathur@infostellar.com Telephone Fax Details of Alternative Sites alternative site is examined examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects t Applicable 18. Whether separate application of interlinked project has been submitted? t Applicable 19. If yes, date of submission t Applicable 20. If no, reason. t Applicable 21. Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. (a) The forest (Conservation) Act, 1980? (b) The wildlife (Protection) Act, 1972? (c) The C.R.Z. tification, 1991? 22. Whether there is any Government Order/Policy relevant/ relating to the site? The project land is for the development of IT building as per the Master Plan and does not belong to any forest land and protected area hence mentioned approval is not required. 23. Forest land involved (hectares). 24. Whether there is any litigation pending against the project and/or land in which the project is proposed to be set up? (a) Name of the Court (b) Case. (c) Orders/directions of the Court, if any and its relevance with the proposed ITHC/PRJ/17-18/EIA/89 2 IND TECH HOUSE CONSULT

8 project. FORM-1 (I) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sl.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data There is no change in the existing land use and the proposed development is as per the ida Master Plan. Since the project site is vacant, no clearance of existing land and vegetation & buildings is required as the land is free from any vegetation & structure. 1.3 Creation of new land uses? There will be no creation of new land use. The landuse for proposed project is in conformity with ida Master Plan 1.4 Pre-construction investigations e.g. bore houses, soil testing? Yes Geotechnical Soil investigation has been carried out. 1.5 Construction works? Yes The major construction works are given below: Site Development Road Development Internal roads Utilities/Services Water Supply Sewerage Drainage Rain Water Harvesting Structures and Pits Power supply and back up facility, Buildings IT office Parking Provisions 1.6 Demolition works? Demolition work is not involved in the project, as the site has no existing building or constructed area. 1.7 Temporary sites used for Yes Mostly, local labors will be employed. ITHC/PRJ/17-18/EIA/89 3 IND TECH HOUSE CONSULT

9 FORM-1 Sl.. Information/Checklist confirmation construction works or housing of construction workers? Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data However temporary labour camps will be established for labourers and a dormitory for the site supervisors during the construction stage at project site only. All the construction activities including storage of raw materials will be confined to the storage spaces earmarked on project site only. 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations Yes Above ground building structures will include building of 01 block. The earthwork is involved for foundation and laying of underground services etc. Excavated soil will be used for site leveling, back filling/filling and road construction. Top 200 mm layer of soil will be separately stored and used for landscaping/horticulture development work. 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? t involved Dredging? t involved Offshore structures? t involved. Yes Underground works includes excavation of earth for construction of foundation, basement, water storage tank and STP Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid or liquid effluents? Yes Yes This is a construction of IT Building Hence no production or manufacturing activities will take place. Temporary storage facilities will be created during construction phase for storage of construction materials. Solid Waste Construction Stage : Solid waste, generated during the construction phase, will comprise mainly of construction waste. The construction waste will be reused within the site for various constructions filling work. In addition to that there will be generation of small quantity of municipal waste from 19.5 kg/day ITHC/PRJ/17-18/EIA/89 4 IND TECH HOUSE CONSULT

10 FORM-1 Sl.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data (Camp-15, Floating-4.5) construction labors. It will be ensured that the generated waste will be sent to nearest designated waste storage bins. Operation Stage: Solid waste generation from the facility will be approximately 0.57 TPD including 0.34 TPD biodegradable. Solid waste generated from the block will be collected by the dedicated and trained housekeeping staff. Twin bin systems will also be provided for segregation at sources. Recyclable wastes will be sold to vendors and non-recyclable wastes will be disposed through authorized agency to municipal waste disposal site. Biodegradable waste will be treated in organic waste converter and used as manure for horticulture development. MSW including horticulture waste will be handled as per the Municipal Solid Waste Management & Handling Rules, Sewage sludge 27 kg/day of sewage sludge will be generated which will be used as manure for plants. Waste water will also be generated from construction activities, cleaning, curing washing etc. which contain suspended materials. Hazardous waste: 4.04 liters/ day of waste oil will be generated and sold to authorized recyclers. ITHC/PRJ/17-18/EIA/89 5 IND TECH HOUSE CONSULT

11 FORM-1 Sl.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data Liquid Effluent Construction Stage: During the construction stage domestic liquid effluent generation will be limited to small quantity from labor camp proposed at site. Wastewater generated from construction site contains suspended materials, and washings from various areas. Construction wastewater shall be collected in a separate basin and shall be reused after primary treatment for sprinkling on roads. Mobile toilets and potable water facilities will be provided at site during construction phase for labour and staff. Operation Stage: Approximately 74 KLD of waste water will be generated from the proposed facility. This effluent will be treated in Sewage Treatment Plant of 90 KLD. The total treated water from STP will be reused for flushing, horticulture, D.G. Cooling and HVAC 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? t applicable t applicable t applicable t applicable t applicable ITHC/PRJ/17-18/EIA/89 6 IND TECH HOUSE CONSULT

12 FORM-1 Sl.. Information/Checklist confirmation 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data t applicable 1.22 Stream crossings? t applicable 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or runoff? 1.25 Transport of personnel or materials for construction, operation or decommissioning? Yes There will be no ground water extraction for the project during construction phase. During operation phase, water will be supplied by New Okhla Industrial Development Authority. Surface drainage may affect due to construction of the project. By considering run-off prior to development & run off after development there is some increment in storm water run-off. However, runoff generated from the project site during monsoon season will be used to recharge ground aquifer. Network of drainage system developed in the site will be used to collect roof as well as surface runoff. Potential Quantity of runoff will be CUM on annual basis which will be recharged to ground. During construction phase transport of personnel as well as construction materials would be required. The personnel would preferably be engaged from nearby areas. Precaution is being taken to reduce the impact of vehicular movement by trying to avoid the vehicular trips during peak hours Long-term dismantling or decommissioning or restoration works? During operation phase, parking will be provided in Surface, stilt & basement. t applicable ITHC/PRJ/17-18/EIA/89 7 IND TECH HOUSE CONSULT

13 FORM-1 Sl.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? t applicable Yes Construction phase Temporary influx of about 80 people is expected from the nearby areas. Operation phase IT offices: Visitors: 213, Total: Introduction of alien species? t applicable 1.30 Loss of native species or genetic diversity? t applicable 1.31 Any other actions? ne 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.. Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data The proposed project is for development of IT building and the proposed development is as per the ida Master Plan. Yes Water requirement during construction phase will be met through tanker water supply. 2.3 Minerals (MT) t applicable During operation phase, fresh water demand will be met from water supply department of New Okhla Industrial Development Authority. Treated water demand for flushing, gardening DG Set cooling and HVAC shall be met from treated water from STP installed at site. 60 KLD from treated water will be used within site premises from STP installed at site. 2.4 Construction material stone, aggregates, sand / soil (expected source MT) Construction materials such as Cement, Steel, Bricks, Stone aggregates, and Sand are required for construction of the project. These ITHC/PRJ/17-18/EIA/89 8 IND TECH HOUSE CONSULT

14 FORM-1 S.. Information/checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data materials are being procured from local reputed licensed vendors. 2.5 Forests and timber (source MT) Limited use of timber will be done and it will be restricted to selected locations. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Yes Power for the proposed project will be supplied by Uttar Pradesh Power Corporation Ltd. Maximum power Demand for the proposed project is 2400 KW. DG sets of 3510 (1x1500+1x1010+1x1000) KVA will be used as power backup during power failure. HSD (ultra low sulphur variety as per availability) fuel will be used for DG sets. 2.7 Any other natural resources (use appropriate standard units) Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.. Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data t applicable. t applicable. t Applicable. t applicable. 3.5 Any other causes t applicable ITHC/PRJ/17-18/EIA/89 9 IND TECH HOUSE CONSULT

15 FORM-1 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Top soil generated during earth excavation will be stacked, covered, and preserved for reuse as top layer for horticulture development. Remaining soil will be used for site leveling, back filling/filling in raft and road construction. 4.2 Municipal wastes (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Yes Yes Construction Phase: Municipal solid waste 19.5 kg/day Operation Phase: Municipal solid wastes 0.57 TPD. Wastes includes paper, plastic cans etc. and wastes from street sweeping. Organic waste generated shall be treated into onsite OWC and recyclable waste shall be disposed off through authorized recyclers. Waste oil 4.04 Lts on daily basis from DG sets will be the only hazardous waste generated from the project. This waste oil will be carefully stored in HDPE drums in isolated covered space and sold to recyclers authorized by CPCB / SPCB. Suitable care will be taken so as to prevent spills/ leaks of used oil from storage. 4.4 Other industrial process wastes t applicable 4.5 Surplus product t applicable 4.6 Sewage sludge or other sludge from effluent treatment Yes Sewage sludge shall be used as manure. 4.7 Construction or demolition wastes Yes Demolition work is not involved. Construction Work: Excavated soil will be used for landscaping and back filling. Other construction waste like bricks, concrete etc will be used in road works / manholes etc. Gunny bags, cardboards will be sent to ITHC/PRJ/17-18/EIA/89 10 IND TECH HOUSE CONSULT

16 FORM-1 S.. Information/Checklist confirmation Yes/ 4.8 Redundant machinery or equipment t applicable Details thereof (with approximate quantities/rates, wherever possible) with source of information data authorize recycler. The inert waste will be sent to nearby land fill site. 4.9 Contaminated soils or other materials t applicable 4.10 Agricultural wastes t applicable 4.11 Other solid wastes t applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist confirmation 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources 5.2 Emissions from production processes Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Emission will be from: Stationary Sources: DG sets 3510 KVA Mobile Sources: Vehicular emissions CPCB approved DG sets with acoustic canopy will be used only during power failure. t applicable 5.3 Emissions from materials handling including storage or transport Fugitive dust emission due to handling and loading - unloading activities is envisaged during construction. Frequent water sprinkling is being done to minimize the fugitive emissions. 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes Margi nal Yes During the construction phase, major emission will be in the form of fugitive dust, use of DG sets and transportation of construction material. The project may cause rise in dust levels during construction phase. Precautions are being taken to reduce dust generation during construction phase:- RMC use will reduce the handling ITHC/PRJ/17-18/EIA/89 11 IND TECH HOUSE CONSULT

17 FORM-1 S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data of cement, sand and concrete thus dust emission will be minimized. Tarpaulins will be used to cover trucks carrying debris. Water sprinkling is being practiced at regular intervals to reduce dust emissions. Dust is likely to be generated during operation phase due to movement of vehicles and blowing of air. But the impact is negligible. Sewage generated from proposed project will be treated in onsite STP. 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) t applicable Burning of any substances including biomass, slash materials and/ or construction debris will be prohibited 5.8 Emissions from any other sources Nil 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data ise is expected to be generated during construction phase mainly from operation of heavy machinery, DG sets, and traffic. The indicated noise levels from certain construction plants/equipment are indicated below: Concrete Mixer - 85 dba Generator - 95 dba Pumps dba Trucks dba For control of noise following measures shall be adopted: Properly maintained equipment with mufflers will be used. High noise generating construction activities would be ITHC/PRJ/17-18/EIA/89 12 IND TECH HOUSE CONSULT

18 FORM-1 S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data carried out only during day time. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. During operation noise from operation of DG sets is envisaged. However, the generator sets installed will operate at noise level less than 75 db (A) as the generators will be placed either in acoustic chambers or a canopy. 6.2 From industrial or similar processes t applicable 6.3 From construction or demolition Yes ise Pollution Control: ise pollution will be due to operation of machinery as well as transportation vehicles. As there is no habitation in nearby area hence there will be negligible impact. However following precautions shall be taken to control noise pollution: High noise generating construction activities would be carried out only during day time. Installation, use and maintenance of mufflers on equipment. Workers working near high noise construction machinery would be supplied with ear muffs/ear plugs. 6.4 From blasting or piling Blasting & piling work is not involved in the project. 6.5 From construction or operational traffic Yes Construction Phase: Welding is light and heat generating activity during construction. Appropriate safety measures will be taken as per I.S. code and CPWD work manual. Materials for construction work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. Operation Phase: Car parking is provided on surface, ITHC/PRJ/17-18/EIA/89 13 IND TECH HOUSE CONSULT

19 FORM-1 S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data stilt and in basement. Vehicular movement is restricted to roads and parking areas. Provision of soft green peripheral road side plantation will help in reduction of noise level. 6.6 From lighting or cooling systems Nil 6.7 From any other sources Nil 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data The waste oil, generated during operation phase from the DG sets, will be collected and separately stored in HDPE drums, over concrete floor within the premises, before final disposal. All precautionary steps will be taken to avoid spillage. It will be directly transferred to authorized recyclers. 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Sewage, generated from the complex, will be treated in proposed on-site STP of 90 KLD and recycled within the project facility for gardening, DG cooling, flushing and HVAC etc. Dust generation during construction phase from earthworks and movement of vehicles is a temporary phenomenon and will have short term impact during construction phase. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. ITHC/PRJ/17-18/EIA/89 14 IND TECH HOUSE CONSULT

20 FORM-1 S.. Information/Checklist confirmation Yes/ 7.4 From any other sources t applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources?. Details thereof (with approximate quantities/rates, wherever possible) with source of information data DG exhaust will be discharged at height stipulated by CPCB. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Yes/ Details thereof (with approximate quantities/rates, wherever possible) with source of information data This is a construction for IT Building and does not involve major hazardous construction activity. Hence chances of explosions, spillages, fires are minimal. 8.2 From any other causes Nil 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Yes The project area is located at seismic zone IV, according to Indian Standard Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. There are no chances of flood and landslide in the area. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project, which could have impact on the environment e.g.: Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data The project will be equipped with dedicated internal road, parking, internal water distribution system, and fire fighting system, internal sewage collection network, lighting facilities, solar lighting and power backup facility. ITHC/PRJ/17-18/EIA/89 15 IND TECH HOUSE CONSULT

21 FORM-1 S.. Information/Checklist confirmation Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Yes/ Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Appropriate infrastructure like, roads, power supply and waste management will be developed within the site so that chances of occurrence of any adverse impacts are minimized. extractive industries t applicable supply industries t applicable other t applicable 9.2 Lead to after-use of the site, which could have an impact on the environment Set a precedent for later developments Yes This is a construction of IT building and there will be generation of employment during construction & operation phase. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects - (III) Environmental Sensitivity S.. Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground waters Name/ Identity Yes Yes Aerial distance (within 15 km.) Proposed project location boundary t within 15 km from the project site. Okhla Bird Sanctuary, Km., NW Hindon River: 1.79 km, E Yamuna River: 3.21km, SW Okhla Bird Sanctuary, Km., NW t located within 15 km of the proposed project location. ITHC/PRJ/17-18/EIA/89 16 IND TECH HOUSE CONSULT

22 FORM-1 S.. Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary 5 State, National boundaries Yes Haryana Border, 3.18 Km., SW Delhi Border: 6.66 Km, NW 6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas The site does no fall under any route to any pilgrim, tourist areas. 7 Defence installations t located within 15 km of the proposed project location. 8 Densely populated or built-up area Density of surrounding development is as per master plan. 9 Areas occupied by sensitive manmade land uses (hospitals, schools, places of worship, community facilities) Yes Manmade community facilities such as hospitals, schools, places of worship and community facilities will not be affected due to construction of the project, since; they are not located in the vicinity of project. 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Yes Area does not fall in the ground water scarce category thing specific The project is located at seismic zone IV, according to Indian Standard Seismic Zoning Map. Structural design will be done for this seismic zone as per code. There are no possibilities of the proposed project site getting flooded as per available records. Landslides not applicable as the project site & surrounding land is flat. ITHC/PRJ/17-18/EIA/89 17 IND TECH HOUSE CONSULT

23 it' BUILDING "142 ONE'AT PLOT NO,03, SECTOR 142 NOIDA, tr "l hereby given undertaking that the data and information given in the application and enclosures are true to the best ol my knowledge and belief and I am aware that if any part of the data and inlormation submitted is found to be lalse.or misleading at any stage, the project will be rejecled and clearance give, il any to the project will be revoked at our risk and cost." Date: Place: \* Signatudol the Proponent with 'Name and Full Address tlirncruhu tvlirhw c-sal2 kelnr-6> N 6ID,4 tthc/prj/i7.1 8/EF,/89 18 IND TECH HOUSE CONSULT

24 FORM-1A 1.0 LAND ENVIRONMENT FORM-1 A (CHECKLIST OF ENVIRONMENTAL IMPACTS) 1.1. Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan / Development Plan of the area. Change of land use, if any and the statutory approval from the competent authority be submitted). Attach Maps of (i) site location, (ii) surrounding features of the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans. The construction of IT building is proposed at plot no 03, Sector 142, ida, Uttar Pradesh. Project activity will not change the existing land use, since, the site is proposed for the development of IT building as per NOIDA Master Plan. The following maps are attached. (i) Site location, (ii) Layout ( Conceptual ) plan, (iii) Surrounding features of the proposed site (within 500 meters and 10 Km, Ref. Annexure 1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc. The proposed project is construction of IT building. Salient feature of the proposed project is given below in Table -1: Table-1: Salient Feature of the Project S.. Description Quantitty Unit GENERAL 1 Plot Area SQM 2 Proposed Built Up Area SQM 3 Number of Building Blocks 1 NOS 4 Max Height of Building (Upto Terrace) M 5 Max of Floors B+ST+SER+9 NOS 6 Cost of Project 100 CR 7 Expected Population (All Floating) 2414 PERSONS AREAS 8 Permissible Ground Coverage Area (30%) 2430 SQM 9 Proposed Ground Coverage Area ( 29.7%) 2408 SQM 10 Permissible FAR Area (Incl 5% for Green Rating) SQM 11 Proposed FAR Area SQM 12 Basement Area (Excluding Service Area) SQM 13 Stilt & other n FAR areas SQM 14 Proposed Built Up Area SQM WATER 15 Total Water Requirement KLD 16 Fresh water requirement KLD ITHC/PRJ/17-18/EIA/89 19 IND TECH HOUSE CONSULT

25 FORM-1A 17 Waste water Generation KLD 18 Proposed STP Capacity 90 KLD 19 Treated Water Available for Reuse 59.9 KLD 20 Recycled Water 59.9 KLD 21 Discharge to Municipal Sewer 0 KLD RAIN WATER HARVESTING 22 Rain Water Harvesting Potential CUM 23 of RWH of Pits Proposed 2 NOS PARKING 24 Total Parking Required as / Building Bye Laws 425 ECS 25 Proposed Total Parking 446 ECS 26 Proposed Parking on Surface 96 ECS 27 Proposed Parking in Stilt 75 ECS 28 Basement Parking (Mech Stack Parking) 275 ECS GREEN AREAS 29 Proposed Green Area (18.01% of Plot Area) SQM WASTE GENERATION 30 Municipal Solid Waste Generation 0.57 TPD 31 Quantity of Hazardous waste Generation 4.04 LTS/DAY 32 Quantity of Sludge Generated from STP 27.5 KG/DAY POWER 33 Total Power Requirement 2400 KW 34 DG set backup 3510 KVA 1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing land use, disturbance to the local ecology). The project is being developed in accordance with NOIDA building bye laws, approved building plans and NBC norms. The development will not cause any disturbance to local ecology and surrounding establishments. Peripheral green belt will be developed. Proposed project will provide all the basic utilities such as proper drainage, sewerage treatment & water supply system. The proposed development will have a positive impact as the project site is vacant and will be developed for IT building. The project will provide organized open spaces and green areas adding to aesthetics and improvement of surrounding environment. 1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). The main reasons for erosion are over exploitation of groundwater, unstable slopes, landslides etc. The proposed site area is primarily a flat land and is not prone to erosion. The proposed construction will involve excavation for foundation. Excavated soil will be used for backfilling, play fields and parking area. The project would involve construction of paved areas which would reduce the chances of erosion subsidence. Subsidence was not anticipated, as ground water will not be used. ITHC/PRJ/17-18/EIA/89 20 IND TECH HOUSE CONSULT

26 FORM-1A Structural design of building will be vetted by the Govt agency & structural stability certificate will be submitted to local body as per rules. Seismo-Tectonic Appraisal of the Area: Bureau of Indian Standards (BIS) has prepared a seismic zoning map of India based on tectonic features and records of past earthquakes. The project site falls under Zone-IV as per the Seismic Zoning map of India (IS 1893, Part I, 2002.) Necessary seismic factors as per codes shall be incorporated suitably while designing the structures to safeguard against earthquake risks. 1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site) The proposed project activities will not cause any alteration of natural drainage system. changes are expected outside from project premises. The project will implement planned drainage system within the site and there will be a positive change in the drainage pattern. 1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.) During construction phase, excavation is envisaged in order to provide foundations. 20 cm top soil will be stripped from the project site prior to start of construction/excavation. Total plot area is 8100 sqm. Quantity of top soil obtaining after stripping 20 cm: 1620 cum. This excavated soil will be properly stacked within the site under tarpaulin cover; and will be reused for backfilling purpose, road construction etc. The top-soil will be preserved separately and will be used for landscaping purpose only. Hence, no immediate adverse impacts on the land environment are envisaged. The valuable top soil will not be dumped or wasted under any circumstance. 1.7 Give details regarding water supply, waste handling etc. during the construction period. Water Supply: During construction stage, Treated waste water from the tanker water will be taken for construction works. This water is tested for fitness for construction purpose. Waste Generation and Handling: Excavated soil will be stored and covered at site and it will be reused for site leveling, back filling and road construction. The fertile top soil will be reused for landscaping purpose. Spillage of oil from the machinery is being properly collected in drums and disposed off. For construction laborers, proper sanitary facilities & wash areas is provided and good hygienic conditions is maintained. Handling of waste generated is being done by a good agency approved by SPCB/CPCB. 1.8 Will the low lying areas and wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity). There is no low lying area observed within and around the vicinity of the project site. ITHC/PRJ/17-18/EIA/89 21 IND TECH HOUSE CONSULT

27 FORM-1A 1.9 Whether construction debris and waste during construction cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labor and the means of disposal) The waste generated during construction phase can broadly be classified as construction waste and domestic waste. About 1354 MT of construction waste (Calculated using TIFAC (Technology Information, Forecasting, and Assessment Council 40 Kg / sq m) and negligible quantity of domestic waste would be generated from labours employed at site. Most of the construction waste generated will be used on the site as filler material for leveling and development of site and internal road. Construction waste if any remaining will be sent to an approved dumping site/landfill site through authorized agency. 80 labors per day will be employed during the construction stage of the project. Required sanitary, drinking water and other requisite facilities will be provided at site. Wash areas will be constructed and good hygienic conditions would be maintained in labour camp. 2.0 WATER ENVIRONMENT 2.1 Give the total quantity of water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement. Total water requirement for this project is 177 KLD, out of which, 60 KLD of treated water from STP will be reused. The fresh water demand of 117 KLD will be met from water supply department of NOIDA. Breakup of water requirements for various uses is given below. Efficient dual flushing fixtures will be provided to achieve conservation of fresh water. Detail of water requirement has been given in table 3 below: S.. Table 3: Water Requirement Details of the Project Particulars Water requirement (KLD) 1. Total water requirement Total treated water requirement 60 Treated waste water recycled for flushing 27 HVAC 70 (58 fresh+12 treated) Treated waste water recycled for landscaping within project area 2 D G Cooling Net fresh water requirement 117 ITHC/PRJ/17-18/EIA/89 22 IND TECH HOUSE CONSULT

28 FORM-1A Water Balance Diagram 2.2 What is the capacity (dependable flow or yield) of the proposed source of water? During operation stage fresh water will be supplied by water supply department of NOIDA. Any shortfall in supply will be met from tanker supplies/extraction of potable water from tube well with prior permission of CGWA. 2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 60 KLD of treated water will be met through on-site STP. The quality of water would conform to the desirable drinking water standards as per IS: How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage) Approximately 60 KLD of treated water from proposed on-site STP and will be used for flushing, D. G. Cooling, gardening and HVAC. 2.5 Will there be diversion of water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption). Fresh water conforming to the drinking water standard will be supplied by water supply department of NOIDA. Therefore, no diversion of water from other user is expected and no impact on the existing users is anticipated. 2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity). Waste water expected to be generated from the project is 74 KLD which will be treated in on-site STP. Approx. 60 KLD treated water will be used in horticulture, flushing, DG cooling and HVAC. ITHC/PRJ/17-18/EIA/89 23 IND TECH HOUSE CONSULT

29 FORM-1A 2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created. As estimated, 74 KLD of waste water will be generated from the project which will be treated through proposed on-site STP. The characteristics of the wastewater and of the effluent after treatment are as follows: Conc. Value Expected in Parameters Wastewater Reclaimed Water Quality mg/l mg/l ph to 8.5 Biochemical Oxygen Demand (BOD5) < 5 Chemical Oxygen Demand (COD) < 30 Suspended Solids <5 Oil & Grease <50 <5 2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in any way? Due to construction of the project on vacant land there would be change in the runoff characteristics quantitative and qualitative as well The quantitative change: Runoff coefficient from the project site prior to development of project = 0.2 Runoff coefficient from the project site after development of project = 0.75 (Considering different coefficients for paved area, soft area, terrace etc) Hence incremental runoff = = 0.52 Qualitative change: Runoff from parking areas Storm water drainage & Rain water harvesting system as described in item no: 2.7 above meet quantitative, qualitative & prevention of over flooding/water logging requirements. 2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any). There will be no tapping of ground water and will be strictly prohibited during construction and operation phase of the project What precautions/measures are taken to prevent the run-off from construction activities polluting land and aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts). During the construction operation, Runoff from the construction site shall not be allowed to stand or enter into the roadside or nearby drain. Adequate measures shall be taken to collect such run off and either shall be reused (if possible) or disposed at the designated construction waste disposal location. Suitable garlanding drain as per the existing contours of the plot will be developed. ITHC/PRJ/17-18/EIA/89 24 IND TECH HOUSE CONSULT

30 FORM-1A 2.11 How is the storm water from within the site managed? (State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels). There will be a provision of storm water drain along the site. Storm water from run offs will be collected and channelized to common storm water collection system. Storm water from roof top of the IT building will be collected and channelized to rain water harvesting pits. Water so collected will pass through de-silting-cum-filter chamber, oil and grease separators Will the deployment of construction laborers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation) Labour camp for 50 labours will be constructed at project site. Temporary rest rooms, office and first aid/ safety office will also be provided on site. Proper sanitation facility shall also be made available on site What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology and facilities for recycling and disposal) During operational phase estimated quantity of sewage to be generated on project site is 74 KLD, which will be treated in proposed on-site STP. Approx 60 KLD treated water will be used in horticulture, HVAC, D. G. Cooling and flushing Give details of dual plumbing system if treated waste water is used for flushing of toilets or any other use. Treated waste water will be used for flushing of toilets. Treated waste water will be collected and stored in underground tank. This tank will provide water for horticulture and flushing. Water for flushing will be pumped from this tank to terrace tank of each tower and will be connected to each toilets through separate pipes. 3.0 VEGETATION 3.1 Is there any threat of the project to the biodiversity? (Give a description of the local ecosystem with its unique features, if any) There is no endangered plant or animal species in the region. Moreover, the area does not fall under the path of any migratory species. There is no reserve forest, wild life sanctuary or protected forest around the project site. Hence no threat to biodiversity is envisaged. 3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project) The proposed project site is vacant and clear from vegetation. The construction of proposed project does not involve extensive clearing or modification of vegetation. 3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale) ITHC/PRJ/17-18/EIA/89 25 IND TECH HOUSE CONSULT

31 FORM-1A Landscape development plan prepared for the project includes peripheral & avenue plantation with local species, ornamental as well as thick foliage plants especially on the periphery. Trees and plant species for plantation in the project will be selected from the list given below. Table-3: List of Evergreen, Shady, Ornamental and Flowering Trees for Green Belt Development 4.0 FAUNA SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus 4.1 Is there likely to be any displacement of fauna-both terrestrial and aquatic or creation of barriers for their movement? Provide the details. fauna has been recorded from the project influenced area. This site is not a natural host to any sensitive creature. Therefore, no animal habitat is likely to be effected due to construction of the proposed building. 4.2 Any direct or indirect impacts on the avifauna of the area? Provide details. direct or indirect impact on the avifauna of the area is envisaged. 4.3 Prescribe measures such as corridors, fish ladders etc. to mitigate adverse impacts on fauna. Measures such as corridors, fish ladders are not applicable for this project. 5.0 AIR ENVIRONMENT 5.1 Will the project increase atmospheric concentration of gases and result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions) ITHC/PRJ/17-18/EIA/89 26 IND TECH HOUSE CONSULT

32 FORM-1A Heat island effect will effect will be negligible due to reduction in hard area more plantation of hard area along roads and parking lots. Construction Phase The important activities during the construction phase that produce particulate matter and affect the air quality are excavation of earth for foundation structure, material storage, transportation and handling of excavated earth and construction materials like cement, sand and aggregates. Gaseous pollutants like SO 2, NO x, CO emitted from the various machineries and vehicles used in construction activities. Appropriate mitigation measure will be employed during this stage of the project to reduce the pollution level to the acceptable limit. Operational Phase During this stage, there will be no major impact on air environment. Ultra Low sulphur diesel for DG Set will be used as a fuel which will causes air pollution. But APMC will minimize the pollution load into environment. 5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give details in relation to all the meteorological parameters. During construction phase, generation of dust, Particulate Matter is the main pollutant. Other emission sources are intermittent and include emissions of SO 2 NO x and CO from materials transport of heavy vehicles on site & periodic operation of DG sets etc. Proper upkeep and maintenance of vehicles, DG sets, sprinkling of water on roads and construction site are some of the measures that would reduce the impact during construction phase. Sources of Air pollution during operational phase The gaseous emission from vehicles. Emissions from DG set while in operation only during power failure. Mitigation measures: The traffic congestion will be avoided by proper parking arrangement and maintaining smooth traffic flow. Regular PUC check up for vehicles. CPCB approved DG sets only will be used. Regular maintenance of DG sets shall be done & ultra low sulphur diesel shall be used. 5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site., proposal does not create shortage of parking space; for vehicles parking provisions exceed bye law requirements, well organized parking arrangement has been designed for the project. 5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category. Movement pattern is given in parking and circulation plan. ITHC/PRJ/17-18/EIA/89 27 IND TECH HOUSE CONSULT

33 FORM-1A 5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above. The source of noise is mainly vehicular noise. Well organized parking arrangement is designed to maintain smooth traffic flow which would help in reducing traffic congestion and noise levels. Trees planned along road & periphery and soft areas would act as noise barrier and will reduce the noise level. 5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details. D.G. Sets will be operated only in case of power failures during construction and operational phase in case of IT building. The pollutants like Particulate Matter, SO 2 that may arise from emissions from D.G. sets will be discharged through vent of proper height. D.G. sets will be installed with inbuilt acoustic enclosures to reduce the noise of D.G. sets while in construction or operation. Plantation of trees would act as noise barrier and will reduce noise level. DG sets of 3510 KVA capacity have been proposed for operation phase as power backup during failure of power supply. 6.0 AESTHETICS 6.1 Will the proposed constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents? As the proposed site is in conformity with the local land use and represent IT Building. There is no scenic amenity or landscaping in its surroundings so there is no possibility of obstruction of abovementioned conditions. 6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the considerations taken into account? Since the developmental plan is as per the master plan by New Okhla Industrial development Authority, hence, the construction of the proposed project will not have any adverse impact on the existing structures. 6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out. There are no local consideration of urban forms and urban design influencing the project area. The project will be constructed within the site and as per the local building by laws, defined by the New Okhla Industrial development Authority. 6.4 Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered., anthropological or archeological sites of significance do not exist in the vicinity of the project site. However all possible measures will be taken to reduce the impact on air and noise pollution during construction and operation phase. ITHC/PRJ/17-18/EIA/89 28 IND TECH HOUSE CONSULT

34 FORM-1A 7.0 SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in any changes to the demographic structure of local population? Provide the details. change in demographic structure is expected. 7.2 Give details of the existing social infrastructure around the proposed project. The area is for construction IT Building. The proposed project site is located at plot no: 03, Sector 142, ida Uttar Pradesh. Bus stand for public transport, hospitals/ clinics, market, educational institutions are located in a convenient distance. 7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed? The proposed construction will not have any adverse effects on local communities. 8.0 BUILDING MATERIALS 8.1 May involve the use of building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency) ISI marked building materials of reputed brands to be procured from 400 km range as far as possible. Preference will be given to locally available building materials for construction. Use of alternative technologies for each component of the buildings of envelope, superstructure, finishes and the road and surrounding areas will be as per guidelines provided in NBC Some of them are given below: Ready mix concrete with 15-20% fly ash. Fly ash/aac bricks will be used for walls. Some of the alternate materials proposed for construction will be used to the extent possible Use of steel of smaller diameter from recycled content, Saw dust/particles board for door panels, Alternatives for floor finishes include Ceramic tiles The use of the above alternatives for building materials will help reduce the use of nonrenewable resources and impact on natural resources. 8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts? Mitigation Measures for Air Pollution during Construction Stage The impact on ambient air quality during construction stage around the project site will be assessed. Various construction activities especially related to handling of loose material likely to cause generation of fugitive dust will affect the air quality of the surrounding area of the project site. To minimize such impact following measures shall be taken: ITHC/PRJ/17-18/EIA/89 29 IND TECH HOUSE CONSULT

35 FORM-1A The construction material will be carried in properly covered vehicles. Construction material will be stored at identified site/temporary go downs at site. All the loose material either stacked earth or transported shall be provided with suitable covering such as tarpaulin, etc. Internal roads will be maintained in good conditions with regular sprinkling of water to curb the dust nuisance to the surrounding. Water sprinkling shall be done at the location where dust generation is anticipated. Tin sheets will barricade the periphery of the plot. Mitigation Measures for ise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of db (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact. 8.3 Are recycled materials used in roads and structures? State the extent of savings achieved? Locally available recyclable & recycle content materials would be given preference However, bricks made from the fly-ash/aac will be used for construction of side walls, boundaries for parks etc. Readymix concrete (RMC) will be used in construction. This will result in significant saving in the total cost of project. 8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project. As estimated, generation of solid waste is 0.57 TPD from block will be generated. Waste Management during operation phase: Municipal Solid Waste Sweepers will be engaged for collection and handling municipal waste. Location for bin/container at common places would be identified for collection of waste. Adequate number of collection bins separately for biodegradable and non-biodegradable waste shall be provided as per the Municipal Solid Waste (Management and Handling) Rule, Wastes from such bins shall be collected on daily basis handed over to authorized agency for disposal Appropriate site for storage and segregation will be identified in the project. All waste collection bins shall be properly maintained on regular basis. Arrangement will be made with local civic authority, for providing garbage station or transfer point (preferably near the entry/ exit point of the site), for collection and ITHC/PRJ/17-18/EIA/89 30 IND TECH HOUSE CONSULT

36 FORM-1A disposal of inert waste. It will be assured that there is no spillage of waste along the internal roads during collection of wastes. The garbage storage/transfer point will be covered and cleaned every day to as to avoid any nuisance, vectors and unhygienic conditions. Biodegradable waste shall be treated into onsite organic waste converter. Landscape waste comprises of fallen leaves and other vegetative material which shall be collected and treated along with other biodegradable waste. 9.0 ENERGY CONSERVATION 9.1 Give details of the power requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption? Power will be sourced from Uttar Pradesh Power Corporation Ltd. The maximum power demand for the project is estimated to be as around 2400 KW. The power shall be supplied by Uttar Pradesh Power Corporation Ltd. DG set of 3510 KVA Capacity: is proposed to meet requirement of power back up during grid failure. Energy Conservation Measures & Management Plan: During operation phase, appropriate energy conservation measures & management plan will be adopted in order to minimize the consumptions of conventional energy. The following energy saving measures are suggested to be adopted. o Incorporate solar passive techniques in a building design to minimize load on conventional systems. o Programmable switching arrangement for common areas/ street lighting. o Energy efficient lighting fixture & LED lamps to reduce energy consumption. o Use of local building material (400 Km range) to reduce pollution & transportation energy. o The DG sets shall be automatically controlled to optimize the usage based on the actual load requirement at any given time. These measures will effectively cut down fuel & energy consumption. o Variable frequency drive with Motors, Pumps and Lifts. o Power factor shall be maintained 0.96 or higher o Transformer shall have minimum no load losses as compared to conventional transformers. o Cables shall be derated to avoid heating and reduce losses 9.2. What type of, and capacity of, power back-up to you plan to provide? I) Type: D.G. Set II) 3510 KVA will be provided for power back-up 9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave radiation? Glass panes will have high light transmission, but low solar heat inflow. This will reduce the quantity of heat flowing into the buildings, lessens cooling load on air-conditioners and induces energy saving. ITHC/PRJ/17-18/EIA/89 31 IND TECH HOUSE CONSULT

37 FORM-1A 9.4 What passive solar architectural features are being used in the building? Illustrate the applications made in the proposed project. Passive solar technique:- Building design and envelope has been optimized through selection of appropriate wall and roof construction and through adoption of solar passive measures after analysis of sun path movement. Predominantly N/S orientation Day light integrated to reduce artificial lighting demand. 9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details. Yes, the layout of streets & buildings has been designed to maximize the potential for solar energy devices. Further, solar energy will also be used for common area lighting to the extent possible. 9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected? Provision of peripheral plantation for shading & reduction of cooling load. Roof shall have insulation to reduce solar gains. 9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications. Yes, energy efficient air conditioning system shall be free of CFC and HCFC. 9.8 What are the likely effects of the building activity in altering the micro-climates? Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects? Proposed green area and treatment of hard area will reduce heat island effect. 9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components. Glass: Energy efficient low U Value glass shall be selected for external glazing. Roof: shall have insulation. Walls: Energy efficient material with low U values shall be selected for paneling screen for external wall. Building envelope shall comply ECBC norms What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans. In design component of the project, adequate measure has being taken as per the provisions of the National Building Code 2016 to provide for fire protection services. ITHC/PRJ/17-18/EIA/89 32 IND TECH HOUSE CONSULT

38 FORM-1A Sufficient quantity of water will be stored within the premise to subdue fire if at all required. Water will be supplied from the underground water storage reservoir. Apart from providing sufficient water for firefighting, other measures that have been considered include: The 6 m internal road will have sufficient load bearing capacity to withstand fire engines The building materials shall be of appropriate fire resistance standard. Further, design shall include provision for the following: o The electrical systems shall be provided with automatic circuit breakers activated by the rise of current as well as activated by over current. o Fire Alarm systems at appropriate places o Means of escape, o Access for fireman o Adequate fire fighting requirement shall be taken into account while designing the electrical distribution system 9.11 If you are using glass as wall material provides details and specifications including emissive and thermal characteristics. Glass on external walls shall be as per ECBC recommendation for WWR to reduce solar gain What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration. Air conditioned areas are made air tight with the provision of weather strips, sealants. Infiltration rate will be controlled within the limits specified in ECBC To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used. Solar energy will be used for common area lighting to the extent possible Environment Management Plan The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire. Table 5: Environment Management Plan Sl. Potential. Impact Action Parameters for Monitoring Timing I. Construction Phase All equipments are Construction Random checks of Operated within specified activities Equipment logs/ manuals design parameters. 1. Air Emission Vehicle trips to be minimized to Site Clearance and Vehicle logs the extent Construction Possible activities Any dry, dusty materials stored Absence of stockpiles or Construction ITHC/PRJ/17-18/EIA/89 33 IND TECH HOUSE CONSULT

39 FORM-1A Sl.. Potential Impact Action Parameters for Monitoring Timing in sealed containers or prevented from blowing. open containers of dusty materials. activities 2. ise 3. Wastewater Discharge 4. Soil Erosion Drainage and effluent Management Waste Management Compaction of soil during various construction activities Ambient air quality within the premises of the proposed unit to be monitored. List of all noise generating machinery onsite along with age to be prepared. Equipment to be maintained in good working order. Construction logs The ambient air quality will conform to the standards for PM10, PM2.5, SO2, NOx, CO Equipment logs, noise reading Construction activities As per PCB requirement. During construction phase. Night working to be minimized. Working hour records Construction activities Maintenance records of During construction Generation of vehicular noise vehicles phase. Implement good working practices (equipment selection and siting) to minimize noise and also reduce its impacts on human health (ear muffs, safe distances, enclosures). Acoustic mufflers / enclosures to be provided in large engines ise to be monitored in ambient within the plant premises. The ise level will not exceed the permissible limit both during day and night times. All equipment operated within specified design parameters. Vehicle trips to be minimized to the extent Possible untreated discharge to be made to surface water, groundwater or soil. The discharge point should be selected properly and sampling and analysis should be undertaken prior to discharge Take care in disposal of wastewater generated such that soil and groundwater resources are protected. Minimize area extent of site clearance, by staying within the defined boundaries Protect topsoil stockpile where possible at edge of site. Ensure drainage system and specific design measures are working effectively. The design to incorporate existing drainage pattern and avoid disturbing the same. Implement waste management plan that identifies and characterizes every waste arising associated with Site working practices records, noise reading Mufflers / enclosures in place. ise reading Random checks of Equipment logs/ manuals Vehicle logs discharge hoses in vicinity of watercourses. Discharge norms for effluents as given in consent to operate by PCB. Discharge norms for effluents as given in consent to operate by PCB. Site boundaries not extended / breached as per plan document. Effective cover in place. Visual inspection of drainage and records thereof Comprehensive Waste Management Plan in place and available for inspection on-site. Compliance with During construction phase. Prior to use of equipment. As per PCB requirement or quarterly whichever is lesser. During phase. During phase. During phase. During phase. During phase. During phase. During phase Prior to site Clearance. construction construction construction construction construction construction construction ITHC/PRJ/17-18/EIA/89 34 IND TECH HOUSE CONSULT

40 FORM-1A Sl Potential Impact n-routine events and accidental releases Environmental Management Cell/Unit II. Operational Phase 9. Air Emission 10. ise Wastewater Discharge Drainage and Effluent Management 13. Energy Usage Emergency preparedness, such as fire fighting Environment Management Cell/Unit Action Parameters for Monitoring Timing proposed activities and which identifies the procedures for collection, handling & disposal of each waste arising. Plan to be drawn up, considering likely emergencies and steps required to prevent/limit consequences. The Environmental Management Cell/Unit is to be set up to ensure implementation and monitoring of environmental safeguards. Stack emissions from DG set to be optimized monitored Ambient air quality within the premises of the proposed unit to be monitored. Exhaust from vehicles to be minimized by use of fuel efficient vehicles and well maintained vehicles having PUC certificate. Vehicle trips to be minimized to the extent possible ise generated from operation of DG set to be optimized and monitored DG sets to generate less than 75 db(a) Leq at 0.5 m from the source DG sets are to be provided with acoustic enclosures with height of chimney as specified by PCB Generation of vehicular noise untreated discharge to be made to surface water, groundwater or soil. Take care in disposal of wastewater generated such that soil and groundwater resources are protected Ensure drainage system and specific design measures are working effectively. Design to incorporate existing drainage pattern and avoid disturbing the same. Replacement of conventional luminaries to energy efficient luminary fittings Fire protection and safety measures to take care of fire and explosion hazards, to be assessed and steps taken for their prevention. The Environment Management Cell/Unit to be set up to ensure implementation and monitoring of environmental safeguards. MSW Rules, 1998 and Hazardous Wastes (Management and Handling Rules), 2003 Mock drills and records of the same A formal letter from the management indicating formation of Environment Management Cell The ambient air quality will conform to the standards for SPM, SO2 and NOx as given by SPCB. The ambient air quality will conform to the standards for PM10, PM2.5, SO2 and NOx as given by SPCB Vehicle logs to be maintained Vehicle logs Maintain records of vehicles Maintain records of vehicles discharge hoses in vicinity of watercourses. Discharge norms for effluents Visual inspection of drainage and records thereof Luminary parameters Mock drill records, on site emergency plan, evacuation plan A formal letter from the management indicating formation of Environment Management Cell During phase During phase During operation phase During operation phase During operation phase construction construction During operation phase During operation phase. During phase During phase During phase During phase operation operation operation operation ITHC/PRJ/17-18/EIA/89 35 IND TECH HOUSE CONSULT

41 1.0 Introduction BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN M/S Logix Infomedia Pvt Ltd. has proposed a IT Building 142 ONE at plot no. 03, Sector 142, ida, Uttar Pradesh. Project Site 2.0 Project Details Figure-1: NOIDA Master Plan The proposed project is planned on a plot area of 8100 sq. m. The total built up area will be sq m. The Design approach shall be sensitive to environmental issues. The main thrust shall be laid on energy conservation, safety and ease of maintenance and current technological development. The Design Philosophy is to ensure fulfillment of all functional requirements in accordance with Design Guidelines, Relevant Standards and Codes as well as local Bye Laws. The following design standards/guidelines with latest amendments shall be followed during detailed design of services. In case of any discrepancy, the stringent shall be followed: National Building Code of India National Building Code of India 2016 (Fire & Life Safety) Relevant Codes of Bureau of Indian Standards ITHC/PRJ/17-18/EIA/89 36 IND TECH HOUSE CONSULT

42 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN Energy Conservation Building Codes 2009 Indian Electricity Rules 1956 Environmental Guidelines. New Okhla Industrial Development Area Building Regulation, 2010 IEC 60726/ IS: 2026 (Part 1, II and IV)/ IS 11171(Part III): Transformers (Cast Resin) IEC 60831/ IS & IS 13341: Capacitors IEC 60947/ IS 13947: Specification for low voltage switch gear & control gear BS 6651/ IS 2309: Lightning protection system BS 7430, IS 3043: Earthing & bonding BS 7671 requirements for electrical installation NEC NFPA 70, National Electric Code. The project area statement and its components are as per the table 1 details given below: Table1- Area Statement for Proposed Project S.. Description Quantity Unit GENERAL 1 Plot Area SQM 2 Proposed Built Up Area SQM 3 Number of Building Blocks 1 NOS 4 Max Height of Building (Upto Terrace) M 5 Max of Floors B+ST+SER+9 NOS 6 Cost of Project 100 CR 7 Expected Population (All Floating) 2414 PERSONS AREAS 8 Permissible Ground Coverage Area (30%) 2430 SQM 9 Proposed Ground Coverage Area ( 29.7%) 2408 SQM 10 Permissible FAR Area (Incl 5% for Green Rating) SQM 11 Proposed FAR Area SQM 12 Basement Area (Excluding Service Area) SQM 13 Stilt & other n FAR areas SQM 14 Proposed Built Up Area SQM WATER 15 Total Water Requirement KLD 16 Fresh water requirement KLD 17 Waste water Generation KLD 18 Proposed STP Capacity 90 KLD 19 Treated Water Available for Reuse 59.9 KLD 20 Recycled Water 59.9 KLD 21 Discharge to Municipal Sewer 0 KLD RAIN WATER HARVESTING 22 Rain Water Harvesting Potential CUM 23 of RWH of Pits Proposed 2 NOS PARKING 24 Total Parking Required as / Building Bye Laws 425 ECS 25 Proposed Total Parking 446 ECS ITHC/PRJ/17-18/EIA/89 37 IND TECH HOUSE CONSULT

43 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN 26 Proposed Parking on Surface 96 ECS 27 Proposed Parking in Stilt 75 ECS 28 Basement Parking (Mech Stack Parking) 275 ECS GREEN AREAS 29 Proposed Green Area (18.01% of Plot Area) SQM WASTE GENERATION 30 Municipal Solid Waste Generation 0.57 TPD 31 Quantity of Hazardous waste Generation 4.04 LTS/DAY 32 Quantity of Sludge Generated from STP 27.5 KG/DAY POWER 33 Total Power Requirement 2400 KVA 34 DG set backup 3510 KVA 3.0 Connectivity The project site is well connected to the major roads through network of road and is situated at 0.48 KM W from ida Gr. ida Expressway and 3.47 KM NE from Dadri Main Road. Figure-2: Project site Location ITHC/PRJ/17-18/EIA/89 38 IND TECH HOUSE CONSULT

44 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN Figure-3: 500 m Radius Map Figure-4: 10 km radius map ITHC/PRJ/17-18/EIA/89 39 IND TECH HOUSE CONSULT

45 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN 4.0 Project Surroundings The proposed commercial project site is located at plot no 03, Sector 142 ida, Project site is at N to E. The details of site surroundings are given below in Table- 2. Table-2: Site and Surrounding of the project Site S.. Particulars Details 1. Nearest National Highway ida Gr. ida Expy: 0.48 KM/W Dadri Main Road: 3.47 KM /NE 2. Nearest Railway Station Dadri railway station: km E 3. Nearest Airport Indira Gandhi International Airport: km NW 4. Nearest Town/ City Gr. ida 5. River Body Hindon River: 1.79 km, E Yamuna River: 3.21km, SW 6. Hills/ Valleys t within 10 km from the project site 7. Site Topography Plain 8. Archaeologically Important Site Nil 9. National Parks/ Wildlife Sanctuaries Okhla Bird Sanctuary km,nw 10 State Boundary Haryana Border, 3.18 Km., SW Delhi Border: 6.66 Km, NW 11. Reserved/ Protected Forests Okhla Bird Sanctuary km,nw 12. Seismicity The study area falls under Seismic Zone-IV 500 m and 10 km radius surroundings of the project site are given above in Fig 3 and Fig 4 respectively: 5.0 Occupancy Details During operation phase employees and staff will be 2201 and visitors will be 213. The total floating population will be 2414 persons. POPULATION I T OFFICES (Employees/Staff etc ) CANTEEN/RECRN/GYM FACILITY MANAGEMENT STAFF/DRIVERS LS 35 TOTAL 2201 VISITORS I.T. OFFICES 213 TOTAL VISITORS 213 TOTAL POPULATION 2414 ITHC/PRJ/17-18/EIA/89 40 IND TECH HOUSE CONSULT

46 6.0 Water Demand BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN 6.1 Water supply & source The water supply for the project during operation phase will be sourced from New Okhla Industrial Development Authority. The total water requirement based on the population will be 177 KLD. The daily water requirement calculation for the project and waste water generation and reuse details are provided in Table 4 and the water balance Diagram is given below in Figure-5. Table 4: Calculations for Daily Water Demand for Proposed Project WATER REQUIREMENT POPULATION/ AREA/UNIT RATE IN LTS TOTAL QTY IN KL NON RESIDENTIAL (Working) DOMESTIC (Fresh) FLUSHING (Treated) VISITORS DOMESTIC (Fresh) FLUSHING (Treated) TOTAL POPULATION 2414 SEATS CAFETERIA (Fresh) SQM GARDENING (Treated) KVA D G COOLING (Treated) TR HVAC (Fresh + Treated) TOTAL WATER REQUIREMENT TOTAL TREATED WATER REQUIREMENT TOTAL FRESH WATER CAPACITY OF STP WATER FLOW TO STP (DOMESTIC) 80% WATER FLOW TO STP (FLUSHING) 100% TOTAL WASTE WATER GENERATION REQUIRED CAPACITY OF STP - 120% 90 SAY 90 AVAILABLE TREATED WATER (80%) REUSE OF TREATED WATER DISCHARGE TO MUNICIPAL SEWER 0 ITHC/PRJ/17-18/EIA/89 41 IND TECH HOUSE CONSULT

47 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN Fig 5: Water Balance Diagram for Proposed IT Building 7.0 Solid Waste Generation, Collection, Transport and Disposal Solid waste would be generated both during the construction as well as during the operation phase. The solid waste expected to be generated during the construction phase will comprise of excavated materials, used bags, bricks, concrete, MS rods, tiles, wood etc. The following steps are to be followed for the management solid waste: Construction yards are used for storage of construction materials. The excavated material such as topsoil and stones will be stacked for reuse during later stages of construction. Excavated top soil will be stored in temporary constructed soil bank and will be reused for landscaping of the Project. Remaining soil shall be utilized for refilling / road work / rising of site level at locations/ selling to outside agency for construction of roads etc. Figure 6: Solid Waste Management Scheme (Construction Phase) ITHC/PRJ/17-18/EIA/89 42 IND TECH HOUSE CONSULT

48 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN Table 5: Quantity of Waste Generation from Commercial / Multiplex WASTE GENERATION Total Waste Generation 0.57 TPD Organic Waste Generation 0.34 TPD Sludge Generation 27 KG/Day Hazardous Waste Generation (DG Waste Oil) 4.04 Lts/ Day N B: The solid waste generation has been 0.5 kg. per capita per day basis. Following arrangements will be made at the site in accordance to Municipal Solid Wastes (Management and Handling) Rules, 2000 and amended Rules, Collection and Segregation of waste 1. For adequate number of colored bins (Green and Blue & dark grey bins separate for Bio-degradable and n Bio-degradable) are to be provided at the strategic locations of the commercial area. 8.0 Power Requirement Details The power supply shall be supplied by Uttar Pradesh Power Corporation Ltd. The connected load for the project will be approx KW. Table: 6 Power Demand ELECTRICAL LOAD & DG BACK UP` ELECTRICAL - DEMAND LOAD 2400 KW POWER BACK UP - DG SETS 3510 KVA NO OF DG SETS (1X1500+1X1010+1X1000) DG STACK HEIGHT (6M above Building Block) M 8.1 Backup Power Details There is provision of DG set of 3510 (1X1500+1X1010+1X1000)) KVA for power back up in proposed IT Building project. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion. Energy Conservation Measures: The energy conservation measures shall be adopted to minimize the demand on non- renewable resources and maximize the utilization efficiency of these resources. The benefits of Energy Conservation measures are as follows: Reduced Energy Consumption without sacrificing comfort levels. Reduced destruction of natural resources. Reduced air pollution. Reduced Pollution Loads. Increased user productivity. ITHC/PRJ/17-18/EIA/89 43 IND TECH HOUSE CONSULT

49 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN Following Energy Conservation Measures will be adopted: a) Energy efficient LED Lamps b) All cables shall be derated to avoid heating during use. This also indirectly reduces losses and improves reliability. c) Power factor shall be maintained 0.95 or higher. This will reduce electrical power distribution losses in the installation. 9.0 Construction of Storm Water Drains A network of storm water drainage shall be planned to collect rain water for recharge& excess rain water shall be discharged in municipal drain Rain Water Harvesting System The storm water disposal system for the premises shall be self-sufficient to avoid any collection/stagnation and flooding of water. The amount of storm water run-off depends upon many factors such as intensity and duration of precipitation, characteristics of the tributary area. Rain water will be harvested and the potential for rain water harvesting projected is given as per the Table 7. Two rain water harvesting pits at selected locations, which will harvest the maximum run-off from the area. Design specifications of the rain water harvesting plan are as follows: Catchments/roofs would be accessible for regular cleaning. The roof will have smooth, hard and dense surface which is less likely to be damaged allowing release of material into the water. Roof painting has been avoided since most paints contain toxic substances and may peel off. sewage or wastewater would be admitted into the system. PARTICULARS Table 7: Calculations for storm water Harvesting Potential OTHER OPEN AREAS RAIN WATER HARVESTING ROAD/PAVEMENT/PARKING AREAS GREEN AREA ROOF TOP AREA Area (Sq.m.) Runoff coefficient Rainfall (m) Harvesting potential (cu.m.) Net water availability and potential for recharge (cu.m.) per year (considering 20% losses) ITHC/PRJ/17-18/EIA/89 44 IND TECH HOUSE CONSULT

50 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN Rain Water Harvesting Pit Design Particulars Values Unit Peak hourly rate 45 mm/hr for one hour duration CUM Peak hourly rate 45 mm/hr for 15 min duration CUM Volume of recharge pit 31 CUM. of recharge pit required Proposed 2. Total of 02 Rain Water Harvesting pits are to be proposed for artificial rain water recharge within the project premises. Figure-8: A typical recharge pit 11.0 Landscape & Shelterbelt development Total green area measures (18.01%.of the plot area) will be under tree plantation within the plots, commercial area and along the roads. There are several trees which will be planted along the sides of the Project boundary. Trees that are to be planted in the project premises are given below in below: ITHC/PRJ/17-18/EIA/89 45 IND TECH HOUSE CONSULT

51 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN List of Evergreen Trees, Dense Foliage, Shady, Ornamental and Flowering Trees for Green Belt Development SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal 9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus 12.0 Parking Facilities Adequate provision will be made for parking at proposed IT Building. There shall also be adequate parking provisions for visitors so as not to disturb the traffic and allow smooth movement at the site Parking Details Table 8: Parking Facilities Total Parking Required as / Building Bye Laws 425 ECS Proposed Total Parking 446 ECS Proposed Parking on Surface 96 ECS Proposed Parking in Stilt 75 ECS Basement Parking (Mech Stack Parking) 275 ECS 13.0 Seismicity Based on the tectonic features and records of earthquake, a Seismic Zoning map has been developed for the country by Bureau of Indian Standard (BIS). The area under study falls in Seismic Zone-IV. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. Earthquake resistant construction material will be used Emergency Lighting The emergency lights operated on battery power should be provided at appropriate locations such as corridors, common area, staircase, exit and entrance doors, ITHC/PRJ/17-18/EIA/89 46 IND TECH HOUSE CONSULT

52 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN parking, etc. The transformers will be kept energized and should feed independently alternate rows of lights so that in case of failure of one transformer, there will not be complete darkness Fire Safety Fire Fighting Designed: As per National Building Code 2016 Fire Tender route with access to each block Fire escape staircases as per NBC requirements. Fire Alarm system Sand buckets will be placed on each floor of convenient shopping Environmental Pollution Mitigation Measures 16.1 Air Pollution Increased traffic generation due to project (no. of parking space proposed for the project is not going to cause significant increase in atmospheric concentration of gases and will not result in heat island formation as adequate landscaping has been provided. Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed: All the loose material either stacked or transported will be provided with suitable covering such as tarpaulin, etc. Water sprinkling shall be done at the locations where dust generation is anticipated. To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity. Mitigation Measures for Air Pollution during Operational Stage Operation of DG Sets is the only source of air pollution during operational phase. Sufficient stack height will be provided for proper dispersion of pollutants. Also, it is proposed to minimize air pollution by providing plantation as buffer on the periphery of the project site and on the open spaces. An area of (18.01%.of the plot area) has been kept for plantation purposes Water Pollution ITHC/PRJ/17-18/EIA/89 47 IND TECH HOUSE CONSULT

53 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN The source of water pollution during construction and operation phase is due to waste water generated from toilets and washing. Mitigation Measures for Water Pollution during Operational Stage: Waste water generation and treatment and reuse are dealt in ise Environment It is envisaged that there shall be maximum movement of light motor vehicles within the project site, which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the sides of internal roads, on the open spaces inside and around the periphery of whole complex. Proper maintenance of the internal roads will also be carried out and Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits. Mitigation Measures for ise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of db (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact. Mitigation Measures for ise Pollution during Operation Stage It is envisaged that there shall be maximum movement of light motor vehicles, which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the open spaces and around the periphery of whole complex. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits. ITHC/PRJ/17-18/EIA/89 48 IND TECH HOUSE CONSULT

54 BUILDING 142 ONE AT PLOT NO. 03, SECTOR 142 NOIDA, CONCEPTUAL PLAN 17.0 Construction Materials The following construction materials are required for IT building construction; 1. Coarse sand 2. Fine sand 3. Stone aggregate 4. Cement 5. Fly Ash 6. Reinforcement steel 7. Plywood & steel shuttering 8. Pipe scaffolding (cup lock system) 9. Bricks 10. Granite stones & Marble 11. Vitrified &ceramic tiles 12. P.V.C. conduit 13. MCBs/DBs 14. PVC overhead water tanks 15. Pavors 16. CPVC pipe 17. waste water lines 18. S.W. sewer line upto main sewer 19. UPVC pipes 20. Glass 21. Joinery hardware Apart from this, in order reduce the overall energy requirement of the building; materials with low U value will be used List of Machinery Used During Construction (i) Dumper (ii) Concrete mixer with hopper (iii) Excavator (iv) DG Sets (v) Scaffoldings (vi) Cranes (vii) Road roller (viii) Tower Cranes (ix) Hoist (x) Concrete pressure pumps (xi) Mobile transit mixer 19.0 Cost of the Project The cost of the proposed IT building project is approximately 100 Cr. ITHC/PRJ/17-18/EIA/89 49 IND TECH HOUSE CONSULT

55 SITE LOCATION MAP ON GOOGLE EARTH

56 500 MT RADIUS MAP ON GOOGLE EARTH

57 GOOGLE MAP 10 KM MT RADIUS S.NO. FEATURES LEGENDS 1 PROJECT SITE 2 ROADS 3 RIVER BODY 4 STATE BOUNDARY S.N Feature Distance 1 HINDON RIVER 1.79 KM/E 2 YAMUNA RIVER 3.21 KM/SW 3 NOIDA 0.48 KM/W GREATER NOIDA EXPY. 4 DADRI MAIN 3.47 KM/NE RD. 5 UP HARYANA 3.18 KM/SW BORDER 6 UP-DELHI BORDER 6.66 KM/NW

58 n Residential Fresh : 40 KLD Waste Water : 32 KLD Total Water Demand of project : 177 KLD n Residential Flushing: 26 KLD Visitors Fresh: 2 KLD Visitors Flushing: 1 KLD Waste Water : 26 KLD Waste Water : 1 KLD Waste Water : 1 KLD Total Waste water : 74 KLD Total Fresh Water Demand: 117 KLD Treated water reuse: 60 KLD Cafeteria: 17 KLD Gardening: 2 KLD DG Cooling: 19 KLD Waste Water : 14 KLD Proposed STP : 90 KLD Treated Water : 60 KLD HVAC: 70 KLD (58 KLD Fresh+ 12 KLD Treated) Recycled Treated Waste water : 60 KLD Zero Discharge

59 PARTICULARS OTHER OPEN AREAS RAIN WATER HARVESTING ROAD/PAVEMENT/PARKING AREAS GREEN AREA ROOF TOP AREA Area (Sq.m.) Runoff coefficient Rainfall (m) Harvesting potential (cu.m.) Net water availability and potential for recharge (cu.m.) per year (considering 20% losses) Rain Water Harvesting Pit Design Particulars Values Unit Peak hourly rate 45 mm/hr for one hour duration CUM Peak hourly rate 45 mm/hr for 15 min duration CUM Volume of recharge pit 31 CUM. of recharge pit required Proposed 2.

60

61

62

63

64

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage

More information

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral

More information

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT Application for Extension of Environmental Clearance (EC) UPDATED (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to

More information

EXPANSION OF SPORTS INJURY CENTRE AT SAFDARJUNG ENCLAVE, NEW DELHI

EXPANSION OF SPORTS INJURY CENTRE AT SAFDARJUNG ENCLAVE, NEW DELHI Application for Prior Environmental Clearance (EC) FORM 1 (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information

More information

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P.

Proposed Office Building at Plot no: 11 & 12 Sector 127, Noida, U.P. FORM 1, FORM 1A AND CONCEPTUAL PLAN FOR ENVIRONMENTAL CLEARANCE OF Proposed Office Building at Plot no: 11 & 12 Sector 127, ida, U.P. Project Proponent: M/S SQUARE EIA Consultant: Ind Tech House Consult

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

Application for Prior Environmental Clearance (EC) FORM 1

Application for Prior Environmental Clearance (EC) FORM 1 Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information

More information

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

FORM 1 BASIC INFORMATION S.NO.

FORM 1 BASIC INFORMATION S.NO. FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/

More information

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command

More information

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE

More information

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga

More information

PROPOSED COMMERCIAL COMPLEX AT PLOT NO: C4A, SECTOR 16B, GREATER NOIDA (WEST), UTTAR PRADESH

PROPOSED COMMERCIAL COMPLEX AT PLOT NO: C4A, SECTOR 16B, GREATER NOIDA (WEST), UTTAR PRADESH FORM 1, FORM 1A AND CONCEPTUAL PLAN FOR ENVIRONMENTAL CLEARANCE OF PROPOSED COMMERCIAL COMPLEX AT PLOT NO: C4A, SECTOR 16B, GREATER NOIDA (WEST), UTTAR PRADESH Project Proponent: M/S MAHESHWARI. EIA Consultant:

More information

APPENDIX I. (See paragraph 6) FORM 1

APPENDIX I. (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information

More information

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command

More information

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.

More information

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds- Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya

More information

FORM-I for seeking clearance for project attracting CRZ notification

FORM-I for seeking clearance for project attracting CRZ notification AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location

More information

APPENDIX - I (See paragraph 6) FORM 1

APPENDIX - I (See paragraph 6) FORM 1 APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the

More information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar

More information

APPENDIX- I FORM- 1. (I) Basic Information:

APPENDIX- I FORM- 1. (I) Basic Information: (I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION

More information

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a) FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)

More information

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion

More information

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2 (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease

More information

ENVIRONMENTAL CLEARANCE FOR GROUP HOUSING AT PLOT 02/ E, SECTOR 150, NOIDA UTTAR PRADESH

ENVIRONMENTAL CLEARANCE FOR GROUP HOUSING AT PLOT 02/ E, SECTOR 150, NOIDA UTTAR PRADESH ENVIRONMENTAL CLEARANCE FOR PROPOSED GROUP HOUSING AT PLOT NO SC- 02/ E, SECTOR 150, NOIDA UTTAR PRADESH FORM 1, FORM 1A & CONCEPTUAL PLAN Project Proponent: M/S SAMRIDDHI BUILDMART PVT. LTD EIA Consultant:

More information

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s. FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,

More information

PROPOSED RECREATIONAL ENTERTAINMENT PARK AT PLOT NO. REP 1, SECTOR- 27,GREATER NOIDA, (U.P) Application for Prior Environmental Clearance (EC) FORM 1

PROPOSED RECREATIONAL ENTERTAINMENT PARK AT PLOT NO. REP 1, SECTOR- 27,GREATER NOIDA, (U.P) Application for Prior Environmental Clearance (EC) FORM 1 Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information

More information

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA

More information

ENVIRONMENTAL CLEARANCE OF PROPOSED GROUP PROJECT

ENVIRONMENTAL CLEARANCE OF PROPOSED GROUP PROJECT ENVIRONMENTAL CLEARANCE OF PROPOSED GROUP HOUSING PROJECT AT KHASRA NO. 7, 9, 10, 11, 12 AT VILLAGE CHHAJARSI AND PLOT NO FORM 1, FORM 1A & CONCEPTUAL PLAN Project Proponent: M/S A.S. PROPTECH PVT. LTD.

More information

Sri.T.N.Balasubramanya

Sri.T.N.Balasubramanya Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As

More information

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD. Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment

More information

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining

More information

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd & Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental

More information

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh. Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra

More information

Proposed Multiplex & Commercial Complex FORM I

Proposed Multiplex & Commercial Complex FORM I I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Multiplex cum Commercial Complex 2 no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 13,218.80

More information

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number

More information

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..

More information

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - Construction of Beach Resort

More information

FORM-I. Sector-16-B, GH Greater Noida, U.P.

FORM-I. Sector-16-B, GH Greater Noida, U.P. ida, U.P. APPENDIX I (See paragraph-6) FORM 1 S.. Item Details 1. Name of the project/s Residential Complex entitled Ajnara Homes by M/s APV Reality Ltd. 2. S.. in the schedule 8 (b): Township and Area

More information

Centrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I

Centrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I At Plot. 1, Sector 140, NOIDA ida, U.P FORM- I (I) Basic Information S.. Item Details 1. Name of the project/s Centrade 2. S.. in the schedule 8 (a) 3. Proposed capacity/ area/ length/ tonnage to be handled/

More information

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I. FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule

More information

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,

More information

Expansion of MDI Complex, Plot No 25, Sector 16A, Noida, Uttar Pradesh

Expansion of MDI Complex, Plot No 25, Sector 16A, Noida, Uttar Pradesh Plot 25, Sector 16A, ida, Uttar Pradesh (I) Basic Information FORM- I S.. Item Details 1. Name of the project/s Expansion of MDI Complex 2. S.. in the schedule 8 (a) 3. Proposed capacity/ area/ length/

More information

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a) APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,

More information

Application for Prior Environmental Clearance (EC) FORM 1

Application for Prior Environmental Clearance (EC) FORM 1 Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information

More information

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.

9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1. FORM I I. BASIC INFORMATION Item Details 1 Name of the project Proposed construction of residential building by M/s. CASA GRANDE AXIOM PRIVATE LIMITED. 2 no. in the schedule 8 (a) 3 Proposed area Area

More information

FORM 1, FORM 1A AND CONCEPTUAL PLAN

FORM 1, FORM 1A AND CONCEPTUAL PLAN EXPANSION OF GROUP HOUSING PROJECT "SIGNATURE HEIGHTS" AT KHASRA NO: 977,976,981, VILLAGE NOOR NAGAR, PARGANA - LONI, TAH & DIST GHAZIABAD, UTTAR PRADESH FORM 1, FORM 1A AND CONCEPTUAL PLAN Project Proponent:

More information

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat

More information

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

FORM 1 (Application for Environment Clearance)

FORM 1 (Application for Environment Clearance) (I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh

More information

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

A 'N 'E B 'N 'E C 'N 'E D 'N 'E Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled

More information

(I) Basic Information:

(I) Basic Information: (I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased

More information

APPENDIX I (See paragraph 6) FORM 1

APPENDIX I (See paragraph 6) FORM 1 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item

More information

ENVIRONMENT CLEARANCE FOR PROPOSED EXPANSION OF SARVODAYA HOSPITAL & RESEARCH CENTRE (A UNIT HOSPITALS LTD) AT SITE NO.

ENVIRONMENT CLEARANCE FOR PROPOSED EXPANSION OF SARVODAYA HOSPITAL & RESEARCH CENTRE (A UNIT HOSPITALS LTD) AT SITE NO. FORM-1, 1A & CONCEPTUAL PLAN FOR ENVIRONMENT CLEARANCE FOR PROPOSED EXPANSION OF SARVODAYA HOSPITAL & RESEARCH CENTRE (A UNIT OF ANSHU HOSPITALS LTD) AT SITE NO.1, SECTOR-088 AT FARIDABAD, HARYANA Project

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

RATNAAKAR SHELTER LLP

RATNAAKAR SHELTER LLP FORM 1 Slum Rehabilitation Scheme Aventus Heights At C.T.S 1A (pt) of village Deonar, Taluka Kurla, at Plot 49, Survey no.93 (pt.), Road 5/6 Shivaji Nagar, Govandi East, Mumbai- 400 043. By M/s. RATNAAKAR

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:

More information

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project

FORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project FORM 1 Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project At C.S. 990 situated at 243-G Patthe Bapurao Marg (Falkland Road), at Girgaon, Division D ward, Mumbai 400 004.

More information

FORM I GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES AND INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT

FORM I GROUP HOUSING PROJECT GH-03C, SECTOR-144 NOIDA, UP. For. M/s GULSHAN HOMES AND INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT GROUP HOUSING PROJECT AT GH-03C, SECTOR-144 NOIDA, UP For M/s GULSHAN HOMES AND INFRASTRUCTURE PVT.LTD ENVIRONMENT CONSULTANT en-vision Enviro Technologies Pvt. Ltd. (NABET/EIA/364/IA-018(Rev. 1) dated

More information

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD. FORM 1 (Submitted to Ministry of Environment, Forests & Climate Change) BY SRI LAKSHMI GAYATRI HOSPITAL (P) LTD. Proposed at: SY. NO. 306, BACHUPALLY VILLAGE, QUTHABULLAPUR MANDAL, RANGAREDDY DISTRICT,

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

APPENDIX I. (See Paragraph 6) FORM 1

APPENDIX I. (See Paragraph 6) FORM 1 APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As

More information

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,

556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2, I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Residential Development Royal Nesto by K. K. Chandrasekar, Krishna Kishor, B. Paranthaman Sethupathi, Paulvannan,

More information

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease

More information

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar

More information

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed

More information

ENVIRONMENT IMPACT ASSESSMENT FOR EXPANSION OF GROUP HOUSING PROJECT AT PLOT NO GH-04, SECTOR- TECHZONE-IV, GREATER NOIDA, UTTAR PRADESH

ENVIRONMENT IMPACT ASSESSMENT FOR EXPANSION OF GROUP HOUSING PROJECT AT PLOT NO GH-04, SECTOR- TECHZONE-IV, GREATER NOIDA, UTTAR PRADESH ENVIRONMENT IMPACT ASSESSMENT FOR EXPANSION OF GROUP HOUSING PROJECT AT PLOT NO GH-04, SECTOR- TECHZONE-IV, GREATER NOIDA, UTTAR PRADESH Project Proponent: M/S NIRALA INFRATECH PVT EIA Consultant: Ind

More information

Haridarshan Residency ( Row Type House & School Building )

Haridarshan Residency ( Row Type House & School Building ) Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:

More information

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification

Annexure-IV. Form-I for seeking clearance for project attracting CRZ notification Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - CRZ Clearance for Resort project

More information

Revised FORM - I & PRE-FEASIBILITY REPORT

Revised FORM - I & PRE-FEASIBILITY REPORT Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,

More information

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project

Renewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project 1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification

More information

M/S Overseas Min Tech Consultants, Jaipur 1

M/S Overseas Min Tech Consultants, Jaipur 1 (I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:

More information

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1 Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

Application for Prior Environmental Clearance (EC)

Application for Prior Environmental Clearance (EC) Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s .APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage

More information

APPENDIX I (See paragraph - 6) FORM 1

APPENDIX I (See paragraph - 6) FORM 1 APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,

More information

Form - 1 Appendix- I (See Paragraph-6)

Form - 1 Appendix- I (See Paragraph-6) (I) Basic Information Form - 1 Appendix- I (See Paragraph-6) Item Details 1 Name of the Project/s Construction of Proposed Residential, Commercial & Multiplex Buildings By M/s. Sahiti Infratec Ventures

More information

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli

More information

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH

More information

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1 (I) Basic Information APPENDIX I (See paragraph-6) FORM 1. Item Details 1 Name of the Project/s M/s Cane Agro Energy India Limited 2 S.. in the Schedule 5(g) 3 Proposed capacity/area/length/tonnge to be

More information

FORM 1 Riverbed Sand Mining Project

FORM 1 Riverbed Sand Mining Project FORM 1 Riverbed Sand Mining Project At Gata. 117ध, 1306म ( Kuda River) Village: Gujarauliya, Beltikar, Tehsil: Naugarh, District: Siddharthnagar, Submitted by M/s Baburam Construction Address-1769 B-5

More information