2 Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - CRZ Clearance for Resort project by M/s Vaamika Island Resorts Pvt. Ltd. Sy.. 236/2B, 121/16/1, 177/2/2 & others, Panavally Village, Panavally Panchayat, Cherthala Taluk, Alappuzha District, Kerala. Size of the project ( in terms of total area ): ha. ( Plot Area ) 1, sq.m. ( Total Built-up Area ) (Existing built-up area 1, sq.m. + Proposed built-up area sq.m. ) Resort Villas = 9 Villas CRZ classification of the area :- Expected cost of the project: - Contact Information:- CRZ IV Small Islands as per approved CZMP, 1996 of Kerala (page no. 56 of CZMP) Rs. 40 Crores Mr. VIJAY B. RAHEJA, Director M/s VAAMIKA ISLAND RESORTS PVT. LTD. Raheja Chambers, Linking Road & Main Avenue, Santacruz (West), Mumbai Ph / 11 Fax Mobile vijay@vraheja.com ( II ) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality ( topography, land use, changes in water bodies, and the like ) S.. Information / Checklist confirmation / 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use ( with respect to local land use plan ) 1.2 Details of CRZ classification as per the approved Coastal Zone Management Plan? Details thereof (with approximate quantities / rates, wherever possible) with source of information data Due to the resort buildings project, there is permanent change in land use, land cover or topography including increase in intensity of land use of the project area. The project is located within the Panchayat limits of Panavally Grama Panchayat, Alappuzha District, Kerala., the project is located within the Panchayat limits of Panavally Grama Panchayat and the site is in CRZ-IV ( Small Islands as per approved CZMP, 1996 of Kerala (page no. 56 of CZMP)). 1
3 1.3 Whether located in CRZ-I area? The project is located within the Panchayat limits of Panavally Grama Panchayat and the site is in CRZ-IV ( Small Islands as per approved CZMP, 1996 of Kerala (page no. 56 of CZMP)). 1.4 The distance from the CRZ-I area. The project is located within the Panchayat limits of Panavally Grama Panchayat and the site is in CRZ-IV ( Small Islands as per approved CZMP, 1996 of Kerala (page no. 56 of CZMP)). 1.5 Whether located within the hazard zone as mapped by Ministry of Environment and Forests / The site is not within the hazard zone as per mapped by MoEF/NDMA. National Disaster Management Authority? 1.6 Whether the area is prone to cyclone, tsunami, tidal surge, subduction, earthquake etc.? 1.7 Whether the area is prone for saltwater ingress? 1.8 Clearance of existing land, vegetation and buildings? The building construction and clearance of existing plant species were already done. 1.9 Creation of new land uses? The new land use is resort building project with related infrastructure facilities Pre-construction investigations e.g. bore hole, soil testing? Pre construction soil investigation was carried out and the ground water table is found at higher level Construction Works? Some of the constructions of building structures are already done and additional construction will be carried out. Also, some of the existing buildings which need to be modified Demolition Works? Some of the existing buildings which need to be modified Temporary sites used for construction works, or housing of construction workers? All the construction activities in stalking building materials within the project site only Above ground buildings, structures or earthworks The building construction project involves including linear structures, cut and fill or resort villas with related facilities within the excavations site. Excavation for pile foundation of structures was carried out. The excavated top soil used for landscaping, internal road construction and for backfilling purposes Underground works including mining or underground work including mining or tunneling? tunneling. 2
4 1.16 Reclamation works? There was no reclamation work 1.17 Dredging / reclamation / land filling / disposal of dredging, reclamation, land filling dredged material etc.? required Offshore structures? offshore structure required Production and manufacturing processes? production / manufacturing process involved Facilities for storage of goods or materials? Facilities for storage of goods or material will be provided during construction period within the site Facilities for treatment or disposal of solid waste The expected municipal solid waste or liquid effluents? generated about 19 kg/day. The Solid Waste Management Rules, 2016 will be followed in the solid waste disposal. Collection & segregation within the site (bio-degradable waste (green bins), nonbiodegradable waste (blue bins) and domestic hazardous waste (yellow bins). The recyclable waste like packaging material, paper etc. would be sold through vendors and the area earmarked for the storage of the same. The Bio-degradable waste would be disposed through the microbial composting (bio-bin system) to be installed within the site. The manure generated will be utilized for green area development within the premises. The domestic hazardous waste which includes discarded painted drums, pesticide cans, CFL bulbs, tube lights, expired medicines, broken mercury thermometers, used batteries, used needles and syringes and contaminated gauge etc. generated at the household level will be collected in yellow bins and to be handed over to authorized waste pickers or waste collectors. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Effluent :- The domestic sewage about 5 KL/day will be generated which will be 3
5 treated through Sewage Treatment Plant within the project premises and no waste water is disposed off in the water bodies Facilities for long term housing of operational workers? Operational Workers are hired locally and hence no housing facilities for workers are developed New road, rail or sea traffic during construction or t Applicable operation? 1.24 New road, rail, air waterborne or other transport t Applicable infrastructure including new or altered routes and stations, port airport etc.? 1.25 Closure or diversion of existing transport routes or t Applicable infrastructure leading to changes in traffic movements? 1.26 New or diverted transmission lines or pipelines? t applicable 1.27 Impoundment, damming, culverting, realignment impoundment, damming, culverting, or other changes to the hydrology of watercourses realignment or other changes to the or aquifers? hydrology of water courses or aquifer Stream and river crossings? t Applicable 1.29 Abstraction or transfers of water from ground or Ground water will be using for the project. surface waters? 1.30 Changes in water bodies or the land surface affecting drainage or run-off? Surface drainage will not be affected Transport of personnel or materials for Transportation of personnel / material during construction, operation or decommissioning? the construction and operation phases are envisaged through water ways Long-term dismantling or decommissioning or t Applicable restoration works? 1.33 Ongoing activity during decommissioning which t Applicable could have an impact on the environment? 1.34 Influx of people to an area in either temporarily or permanently? The project is a resort project and the project is providing (about 25 persons) job facilities to the locals Introduction of alien species? t Applicable 1.36 Loss of native species or genetic diversity? t Applicable 1.37 Any other actions? ne 2. Use of Natural resources for construction or operation of the Project ( such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.. Information / checklist confirmation / Details thereof ( with approximate quantities / rates, wherever possible ) with source of information data 4
6 2.1 Land especially undeveloped or agricultural land ( ha ) The resort building construction project is spread over an area of 2.23 ha. and located in Panavally Grama Panchayat area. The site surrounding area is backwater island. 2.2 Water (expected source & competing users ) unit: KLD The total water requirement for the project is about 6 KLD and fresh water req. of the project is about 7 KLD. The sources of water during operation phase for the proposed project are: - 1. Stored Rain water (n-flushing req.) (Rainy days-concurrent use) 2. Ground water (n flushing req.) (non-rainy days) 3. Treated waste water from STP (Flushing Req.) (Entire Year) The details regarding the water consumption related items are provided at daily water balance chart and daily water consumption chart attached. 2.3 Minerals ( MT ) t applicable 2.4 Construction material stone, aggregates, sand / soil ( expected source MT ) Construction material purchased from local market. 2.5 Forests and timber ( source MT ) Wood was used for frame, however recyclable wood used for doors. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) Power Requirement = about 50 kwh Power Source : Kerala State Electricity Board & D.G. Sets = 100 kva x 2 s. (Standby arrangement ) Fuel Low Sulphur HSD 2.7 Any other natural resources ( use appropriate standard units ) t Applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information / Checklist confirmation /. 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) Details thereof (with approximate quantities / rates, wherever possible) with source of information data This is a building construction of resort project and no storage of hazardous chemicals (as per MSIHC Rules) is done, apart from used oil from D.G. Sets and suitable arrangements are adopted for the 5
7 3.2 Changes in occurrence of disease or affect disease vectors ( e.g. insect or water borne diseases ) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes, that would affect local communities, fisherfolk, their livelihood, dwelling units of traditional local communities etc ne same. This is stored in HDPE drums and kept in covered rooms under lock and key and sold to CPCB approved vendors only. Suitable drainage and waste management measures are adopted to restrict stagnation of water or accumulation of water. This effectively restricts the reproduction and growth of disease vectors. use, storage, treatment, handling or production is envisaged from the resort project. t applicable. t applicable 4. Production of solid wastes during construction or operation or decommissioning ( MT / Months ) S.. Information / Checklist confirmation / Details thereof (with approximate quantities / rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes such spoil over burden or mine waste is generated. 4.2 Municipal waste (domestic and or commercial Solid waste generation about 19 kg/day will be wastes ) generated and adequate numbers of collection bins separately for Bio-degradable and n-biodegradable waste are provided as per the MSW Rules, The nonbiodegradable and recyclable waste is sold to the recyclers. The biodegradable waste is sent to bio-bin system. 4.3 Hazardous wastes (as per Hazardous Waste Management Rules ) Used Oil from the D.G. Sets are sold to the CPCB approved recyclers. Used oil is stored in HDPE drums in isolated covered facility. 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment Sludge from S.T.P. will be generated which will be used as manure for gardening. 4.7 Construction or demolition wastes During the construction / modification of the existing buildings, some of the 6
8 construction/demolition wastes will be generated. 4.8 Redundant machinery or equipment t applicable 4.9 Contaminated soils or other materials Necessary measures will take care to prevent contamination of soil or other materials Agricultural wastes Some agricultural waste & garden waste is generated and which will be disposed accordingly Other solid wastes t applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air ( Kg / hr. ) S.. Information / Checklist confirmation / Details thereof ( with approximate quantities / rates, wherever possible ) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources The operation of the project does not envisage any major air pollutant generating sources except D.G. sets. During operation phase for power back up for hotel, emergency services and for common area services, project proponent is provided by D.G. sets. 5.2 Emissions from production processes t applicable 5.3 Emissions from materials handling including t applicable storage or transport 5.4 Emissions from construction activities including plant and equipment The source of emission is from D.G sets in the project site. 5.5 Dust or odours from handling of materials During construction phase, dust generated including construction materials, sewage and during the handling of construction waste materials. 5.6 Emissions from incineration of waste t applicable, no incinerator is proposed. 5.7 Emissions from burning of waste in open air ( e.g. t applicable slash materials, construction debris ) 5.8 Emissions from any other sources t applicable 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information / Checklist confirmation / 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Details thereof (with approximate quantities / rates, wherever possible) with source of information data During construction, the machinery used for construction was of highest standard of reputed make and adhere to 7
9 international standards. These standards itself take care of noise pollution control. 6.2 From industrial or similar processes t applicable 6.3 From Construction or demolition Due to the various construction activities there is short term noise generation, further there is no human habitation in the immediate vicinity of the project site. 6.4 From blasting or piling blasting or mechanized piling used in the construction phase. 6.5 From construction or operational traffic t applicable 6.6 From lighting or cooling systems Provision of cooling system. Appropriate noise & vibration measures will take care. 6.7 From any other sources t applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, ground water, coastal waters or the sea: S.. Information / Checklist confirmation / 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water Details thereof ( with approximate quantities / rates, wherever possible ) with source of information data Used Oil from the D.G. Sets are stored in a separate place and sold to CPCB approved recyclers. Sewage is disposed off through Sewage Treatment Plant developed within the premises and no sewage discharge to the water bodies. There is no emission except of D.G. sets. Bye use of low sulphur disel, the emission from the D.G. sets will be within the norms. 7.4 From any other sources t applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? t applicable 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information / Checklist confirmation / 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances Details thereof ( with approximate quantities / rates, wherever possible ) with source of information data The project is resort villa project. The chances of explosions, spillages, fire are minimal. 8
10 major hazardous waste is being stored within the project site. Industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire fighting measures are provided. 8.2 From any other causes t applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g., floods, earthquakes, landslides, cloudburst etc)? As per seismic classification, the project site falls in Zone-III. reported cloudburst in the area. Structural design aspects as per the seismic codes IS 1893 (2002), IS (1993) and IS 456 (2000) as applicable incorporated in the project. The project site is on a small island which is surrounded by backwater and the building design consider as per HFL of the water body. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information / Checklist confirmation / 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Details thereof (with approximate quantities / rates, wherever possible) with source of information data Appropriate infrastructure like roads, power supply, waste management and waste water treatment are developed within the site so that chances of occurrence of any adverse impacts are minimized. Supporting infrastructure (roads, power Appropriate infrastructure like power supply, waste or waste water treatment, supply, waste treatment, water supply, etc.) recreation area are developed. housing development Construction project of resort villa building Project extractive industries The surrounding to the project site at main land will have lot of ancillary developmental activities in order to cater the requirement of the guests/visitors of 9
11 the hotel. The project is required large quantities of supply industries house hold goods and thereby the supply industries or bulk suppliers of materials are developed in the project vicinity at main land. other The project have resort project and this development attracts other ancillary activities like essential services like milk supply & other items of human consumption and there are bulk suppliers in the project vicinity at main land. 9.2 Lead to after-use of the site, which could have an t applicable impact on the environment 9.3 Set a precedent for later developments Project proponent intends to develop an environmental friendly resort project and to set a precedent for future development. 9.4 Have cumulative effects due to proximity to other t applicable existing or planned projects with similar effects (III) Environmental Sensitivity S. Name/ Aerial distance (within 15 km.) Proposed project. Areas Identity location boundary 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration n within the study area The project site is located within the small island i.e. Vettilathuruth which is surrounded by back water and Lakshadweep sea is about 6 km. towards west direction. ne within the area 10
12 4 Inland, coastal, marine or The project site is located within the small island i.e. underground waters Vettilathuruth which is surrounded by back water and Lakshadweep sea is about 6 km. towards west direction. 5 State, National boundaries ne within the area 6 Routes or facilities used by the public ne within the area for access to recreation or other tourist, pilgrim areas 7 Defense installations ne within the area 8 Densely populated or built-up area The project site is located within the small island i.e. Vettilathuruth and site is falling within Panavally Grama Panchayat which is densely populated. 9 Areas occupied by sensitive manmade land uses (hospitals, schools, Hospitals, schools, places of worship, community facilities are located within 15 km. around the site. places of worship, community facilities) 10 Areas containing important, high t applicable quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution t applicable or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard The project area and it s surroundings falls under which could cause the project to Zone-III, according to the Indian Standards Seismic present environmental problems Zoning Map. reported earth quake, subsidence, (earthquakes, subsidence, landslides, erosion, cloudburst in the area or in its erosion, flooding or extreme or surroundings. Also, there is no report of landslides adverse climatic conditions) in and around the project site. (IV). Proposed Terms of Reference for EIA studies Ans. The project is having built-up area 1, sq.m. and the project has applied under MoEF tification 06/03/2018 for CRZ Clearance and Terms of Reference (ToR) for EIA study is not required for the project. 11
13 12
14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Sr.. Item Details 1. Name of the project/s CRZ Clearance for Resort project by M/s Vaamika Island Resorts Pvt. Ltd. 2. S.. in the schedule Building Construction project with built-up area of 1, sq.m. and project is falling in CRZ-IV and hence required CRZ Clearance from MoEF&CC under CRZ tification, Proposed capacity / area / Total Plot Area = 2.23 ha length / tonnage to be Total Built-up Area = 1, sq.m. handled/command area/lease (Existing built-up area 1, sq.m. + area/ number of wells to be drilled Proposed built-up area sq.m.) Resort Villas = 9 Villas, Reception, Restaurant with supporting infrastructure facilities. 4. New/Expansion/Modernization New 5. Existing capacity/area etc., 6. Category of Project i.e. A or Category B as per EIA tification, 2006 B The project application is prepared for obtaining CRZ clearance under tification dt. 06/03/ Does it attract the general NO condition? If yes, please specify 8. Does it attract the specific NO condition? If yes, please specify 9. Location Sy.. 236/2B, 121/16/1, 177/2/2 & others, Panavally Village, Panavally Panchayat, Cherthala Taluk, Alappuzha District, Kerala Plot/Survey/Khasra. Sy.. 236/2B, 121/16/1, 177/2/2 & others Village Panavally
15 Tehsil Cherthala District Alappuzha State Kerala 10. Nearest railway station/airport along with distance in Kms The nearest railway station (Ernakulam) is about 3 km. (W) and Cochin Int. Airport, Nedumbassery is about 37 km. (N) away from the project site. (Source :- Google Earth map aerial distance) 11. Nearest Town, city, District Town Panavally- about 1 km. (E) Headquarters along with Kochi city about 13 km. (NW) distance in Kms District Headquarter - Civil Station, Palace Rd, Civil Station Ward, Alappuzha about 37 km. (S) (Source :- Google Earth map Aerial distance) 12 Village Panchayats, Zilla Village Office address :- Parishad, Municipal Panavally Village Office, Corporation, Local body Panavally P.O., Cherthala, (complete postal addresses with telephone nos. to be Alappuzha District, Kerala Mobile given) Panchayat Office address :- Panchayat Secretary, Panavally Grama Panchayat Office, Panavally P.O., Cherthala, Alappuzha District,Kerala Ph Name of the applicant M/s Vaamika Island Resorts Pvt. Ltd. 14 Registered Address M/s VAAMIKA ISLAND RESORTS PVT. LTD. Raheja Chambers, Linking Road & Main Avenue, Santacruz (West), Mumbai Address for correspondence : M/s VAAMIKA ISLAND RESORTS PVT. LTD. Raheja Chambers, Linking Road & Main Avenue, Santacruz (West), Mumbai Name Mr. Vijay B. Raheja Designation (Owner/Partner/CEO) Director
16 Address M/s VAAMIKA ISLAND RESORTS PVT. LTD. Raheja Chambers, Linking Road & Main Avenue, Santacruz (West), Mumbai Pin Code Mumbai Telephone / 11 Mobile Fax. Fax Details of Alternative Sites t Applicable examined, if any. Location of these sites should be shown on a topo sheet Village-District-State Interlinked Projects t applicable 18 Whether separate application of NO interlinked projects has been submitted? 19 If yes, date of submission N.A. 20 If no, reason N.A. 21 Whether the proposal involves approval/clearance under: If yes, details of the same and their status to be given. (a) The Forest (Conservation) NO Act, 1980? (b) The W ildlife (Protection) NO Act, 1972? (c) The C.R.Z tification,, the project site is located at a small 2011? island (Vettilathuruth) which is surrounded by backwater and is tidal influenced and hence site is attract the CRZ tification, 1991/2011 and site is categorized as CRZ-IV as per CZMP, 1996 (page no. 56). Small Island as per approved CZMP, 1996 of Kerala (page no. 56 of CZMP). 22 Whether there is any NO Government Order/Policy
17 relevant/relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case. There was a Court case before Supreme Court vide SLPs (C) s of (c) Orders/directions of the The Judgment is enclosed. Court, if any and its relevance with the proposed project. Sr.. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? / Details thereof (with approximate quantities /rates, wherever possible) with source of information data Due to the resort buildings project, there is permanent change in land use, land cover or topography including increase in intensity of land use of the project area. The project is located within the Panchayat limits of Panavally Grama Panchayat, Alappuzha District, Kerala. The building construction and clearance of existing species were already done. 1.3 Creation of new land uses? The new land use is resort building 1.4 Pre-construction investigations e.g. bore houses, soil testing? project with related infrastructure facilities. Pre construction soil investigation was carried out and the ground water table is found at higher level. 1.5 Construction works? Some of the constructions of building structures are already done and
18 additional construction will be carried out. Also, some of the existing buildings which need to be modified. 1.6 Demolition works? Some of the existing buildings which need to be modified. 1.7 Temporary sites used for All the construction activities in construction works or housing of construction workers? stalking building materials within the project site only. 1.8 Above ground buildings, The building construction project structures or earthworks involves resort villas with related including linear structures, cut facilities within the site. and fill or excavations Excavation for pile foundation of structures was carried out. The excavated top soil used for landscaping, internal road construction and for backfilling purposes. 1.9 Underground works including underground work including mining mining or tunneling? or tunneling Reclamation works? There was no reclamation work 1.11 Dredging? dredging work was required in the project development Offshore structures? offshore structure was required in the project development Production and manufacturing processes? production / manufacturing process involved in the project development Facilities for storage of goods Facilities for storage of goods or or materials? material will be provided during construction period within the site Facilities for treatment or The expected municipal solid waste disposal of solid waste or liquid effluents? generated about 19 kg/day. The Solid Waste Management Rules, 2016 will be followed in the solid waste disposal. Collection & segregation within the site (bio-degradable waste (green bins), non-biodegradable waste (blue bins) and domestic hazardous waste (yellow bins).
19 The recyclable waste like packaging material, paper etc. would be sold through vendors and the area earmarked for the storage of the same. The Bio-degradable waste would be disposed through the microbial composting (bio-bin system) to be installed within the site. The manure generated will be utilized for green area development within the premises. The domestic hazardous waste which includes discarded painted drums, pesticide cans, CFL bulbs, tube lights, expired medicines, broken mercury thermometers, used batteries, used needles and syringes and contaminated gauge etc. generated at the household level will be collected in yellow bins and to be handed over to authorized waste pickers or waste collectors. Further, the spent oil from the D.G. sets (defined as hazardous waste) will be sold to C.P.C.B. approved recyclers. Effluent :- The domestic sewage about 5 KL/day will be generated which will be treated through Sewage Treatment Plant within the project premises and no waste water is disposed off in the water bodies Facilities for long term housing of operational workers? Operational Workers are hired locally and hence no housing facilities for workers are developed New road, rail or sea traffic t applicable during construction or operation? 1.18 New road, rail, air, waterborne t applicable
20 or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing t applicable transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? t applicable 1.21 Impoundment, damming, impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the changes to the hydrology of hydrology of surface water courses is watercourses or aquifers? provided Stream crossings? t applicable 1.23 Abstraction or transfers of Ground water will be using for the water form ground or surface project. waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? Surface drainage is not affected Transport of personnel or Transportation of personnel / material materials for construction, during the construction and operation operation or decommissioning? phases are envisaged through water ways Long-term dismantling or There is no long term dismantling or decommissioning or restoration decommissioning or restoration works. works? 1.27 Ongoing activity during t applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in The project is a resort project and the either temporarily or project is providing (about 25 persons) permanently? job facilities to the locals Introduction of alien species? t applicable 1.30 Loss of native species or t applicable
21 genetic diversity? 1.31 Any other actions? ne S.. 2. Use of Natural resources for construction or operation of the Project (such as land, w ater, materials or energy, esp ecially a ny resources w hich are n onrenewable or in short supply): Information/checklist confirmation 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD / Details thereof (with approximate quantities /rates, wherever possible) with source of information data The resort building construction project is spread over an area of 2.23 ha. and located in Panavally Grama Panchayat area. The site surrounding area is backwater island. The total water requirement for the project is about 6 KLD and fresh water req. of the project is about 7 KLD. The sources of water during operation phase for the proposed project are: - 1. Stored Rain water (n-flushing req.) (Rainy days-concurrent use) 2. Ground water (n flushing req.) (non-rainy days) 2.3 Minerals (MT) t Applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) 3. Treated waste water from STP (Flushing Req.) (Entire Year) The details regarding the water consumption related items are provided at daily water balance chart and daily water consumption chart attached. Construction material purchased from local market. 2.5 Forests and timber (source MT) 2.6 Energy including electricity and fuels (source, competing users) Wood was used for frame, however recyclable wood used for doors. Power Requirement = about 50 kwh Power Source : Kerala State Electricity
22 Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Board & D.G. Sets = 100 kva x 2 s. (Standby arrangement ) Fuel Low Sulphur HSD t applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr.. Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., / Details thereof (with approximate quantities/rates, wherever possible) with source of information data This is a building construction of resort project and no storage of hazardous chemicals (as per MSIHC Rules) is done, apart from used oil from D.G. Sets and suitable arrangements are adopted for the same. This is stored in HDPE drums and kept in covered rooms under lock and key and sold to CPCB approved vendors only. Suitable drainage and waste management measures are adopted to restrict stagnation of water or accumulation of water. This effectively restricts the reproduction and growth of disease vectors. use, storage, treatment, handling or production is envisaged from the resort project. t applicable. 3.5 Any other causes ne t applicable
23 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S. Information/Checklist / Details thereof (with approximate. confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine such spoil over burden or mine waste wastes 4.2 Municipal waste (domestic and or commercial wastes) 4.3 Hazardous wastes (as per Hazardous Management Rules) Waste 4.4 Other industrial process wastes is generated. Solid waste generation about 19 kg/day will be generated and adequate numbers of collection bins sep arately for Biodegradable and n-biodegradable waste are provided as per the MSW Rules, The non-biodegradable and recyclable waste is sold to the recyclers. The biodegradable waste is sent to bio-bin system. Used Oil from the D.G. Sets are sold to the CPCB approved recyclers. Used oil is stored in HDPE drums in isolated covered facility. t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment 4.7 Construction or demolition wastes 4.8 Redundant machinery or equipment 4.9 Contaminated soils or other materials Sludge from S.T.P. will be generated which will be used as manure for gardening. During the construction / modification of the existing buildings, some of the construction/demolition wastes will be generated. t applicable Necessary measures will take care to prevent contamination of soil or other materials Agricultural wastes Some agricultural waste & garden waste is generated and which will be disposed accordingly Other solid wastes t applicable
24 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate S. Information/Checklist / quantities / rates, wherever possible). confirmation with source of information data 5.1 Emissions from combustion of The operation of the project does not fossil fuels from stationary or envisage any major air pollutant mobile sources generating sources except D.G. sets. During operation phase for power back up for hotel, emergency services and for common area services, project proponent is provided by D.G. sets. 5.2 Emissions from production t applicable processes 5.3 Emissions from materials t applicable handling including storage or transport 5.4 Emissions from construction The source of emission is from D.G activities including plant and sets in the project site. equipment 5.5 Dust or odours from handling of During construction phase, dust materials including construction generated during the handling of materials, sewage and waste construction materials. 5.6 Emissions from incineration of t applicable, no incinerator is waste proposed. 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) t applicable 5.8 Emissions from any other t applicable sources 6.0 Generation of ise and Vibration, and Emissions of Light and Heat: S. / Details thereof (with approximate. Information / Checklist quantities/rates, wherever possible) confirmation with source of information data 6.1 From operation of equipment e.g. During construction, the machinery engines, ventilation plant, used for construction of highest crushers standard of reputed make and adhere
25 to international standards. These standards itself take care of noise pollution control. 6.2 From industrial or similar t applicable processes 6.3 From construction or demolition Due to the various construction activities there is short term noise generation, further there is no human habitation in the immediate vicinity of the project site. 6.4 From blasting or piling blasting or mechanized piling was used in the construction phase. 6.5 From construction or operational t applicable traffic 6.6 From lighting or cooling systems Provision of cooling system. Appropriate noise & vibration measures will take care. 6.7 From any other sources t applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants emitted to air into the land or into water / Details thereof (with approximate quantities/rates, wherever possible) with source of information data Used Oil from the D.G. Sets are stored in a separate place and sold to CPCB approved recyclers. Sewage disposed off through Sewage Treatment Plant developed within the premises and no sewage discharge to the water bodies. There is no emission except of D.G. sets. Bye use of low sulphur disel, the emission from the D.G. sets will be within the norms. 7.4 From any other sources t applicable 7.5 Is there a risk of long term build t applicable
26 up of pollutants in the environment from these sources? S.. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Information/Checklist confirmation 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances / Details thereof (with approximate quantities/rates, wherever possible) with source of information data The project is resort project. The chances of explosions, spillages, fire are minimal. major hazardous waste is being stored within the project site. Industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire fighting measures are provided. 8.2 From any other causes t applicable 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? As per seismic classification, the project site falls in Zone-III. reported cloudburst in the area. Structural design aspects as per the seismic codes IS 1893 (2002), IS (1993) and IS 456 (2000) as applicable incorporated in the project. The project site is near to the backwater and the building design consider as per HFL of the water body. 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation / Details thereof (with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of Appropriate infrastructure like roads,
27 supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: power supply, waste management and waste water treatment are developed within the site so that chances of occurrence of any adverse impacts are minimized. Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) Appropriate infrastructure like power supply, waste treatment, water supply, recreation area are developed. housing development Construction project of resort villa building Project extractive industries The surrounding to the project site will have lot of ancillary developmental activities in order to cater the requirement of the guests/visitors of the resort. supply industries The project is required large quantities of house hold goods and thereby the supply industries or bulk suppliers of materials are developed in the project vicinity. other 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments The project have resort project and this development attracts other ancillary activities like essential services like milk supply & other items of human consumption and there are bulk suppliers in the project vicinity. t applicable Project proponent intends to develop an environmental friendly resort complex and to set a precedent for future development.
28 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects t applicable (III) Environmental Sensitivity S. Name/ Aerial distance (within 15 km.). Areas Identity Proposed project location boundary 1 Areas protected under n within the study area international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or The project site is located within the small island i.e. Vettilathuruth which is surrounded by back water and other water bodies, coastal Lakshadweep sea is about 6 km. zone, biospheres, mountains, towards west direction. forests 3 Areas used by protected, ne within the area important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or The project site is located within the underground waters small island i.e. Vettilathuruth which is surrounded by back water and Lakshadweep sea is about 6 km. towards west direction. 5 State, National boundaries ne within the area 6 Routes or facilities used by the ne within the area public for access to recreation or other tourist, pilgrim areas 7 Defense installations ne within the area 8 Densely populated or built-up area The project site is located within the small island i.e. Vettilathuruth and
29 9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) site is falling within Panavally Grama Panchayat which is densely populated. Hospitals, schools, places of worship, community facilities are located within 15 km. around the site. t applicable t applicable The project area and it s surroundings falls under Zone-III, according to the Indian Standards Seismic Zoning Map. reported earth quake, subsidence, erosion, cloudburst in the area or in its surroundings. Also, there is no report of landslides in and around the project site. (IV). Proposed Terms of Reference for EIA studies Ans. The project is having built-up area 1, sq.m. and the project has applied under MoEF tification 06/03/2018 for CRZ Clearance and Terms of Reference (ToR) for EIA study is not required for the project.
30
31
32
33
34
35
36
37
38
39
40 SATELLITE MAP OF THE SITE & SURROUNDINGS
41 VICINITY MAP OF THE SITE & SURROUNDINGS Project Site.
42 DAILY WATER CONSUMPTION BALANCE CHART Fresh Water Req. (Stored rain water / Tube Well) (7 KL) 4 KL Domestic Water Requirement ( n-flushing ), 4 KL Wastewater generation from Domestic water of 6 KL i.e. 5 KL STP with Tertiary Treatment (6 KL capacity) Domestic Water Requirement ( Flushing ), 2 KL 2 KL Treated Wastewater 90 %of total Horticulture Water Requirement 1 KL 1 KL wastewater generated, i.e., 5 KL 3 KL Make-up water req. for cooling towers attached to HVAC system (3 KL + 2 KL) 5 KL 2 KL 1
43 ACTIVITY WISE POPULATION & WATER CONSUMPTION DETAILS ACTIVITY VILLAS POPULATION NON-FLUSHING REQ. ( in KLD ) FLUSHING REQ. ( in KLD) TOTAL ( in KLD ) Resort Villa 9 nos. 18 Persons ( 9 villas x 2 Persons) 18 x 90 Ltr. = x 45 Ltr. = Restaurant 30 Seats 30 Persons ( 1 person / seat ) 30 x 45 Ltr. = x 25 Ltr. = Staff Persons 25 x 15 Ltr. = x 30 Ltr. = TOTAL Say 4 KL 2.31 Say 2 KL KL
44
APPENDIX I. (See paragraph-6) FORM 1
(I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone Mining (ML. 15/95) 2. S.. in the schedule B1- Mining of Mineral 3. Proposed capacity/area/length/tonnage
More informationFORM-I for seeking clearance for project attracting CRZ notification
AnnexureIV FORM-I for seeking clearance for project attracting CRZ notification Basic information: SEA CLIFF RESORTS TOURISM PROJECT (.1682/A3/15/KCZMA/S&TD) Name of the Project: THE SEACLIFF Location
More informationAPPENDIX I. (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information Name of the Project Size of the project (in terms of total area) CRZ classification of the area Expected cost of the project Contact Information
More informationFORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra
FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL
More informationAPPENDIX I. (See paragraph-6) FORM 1
(I) Serial Number Basic Information Item APPENDIX I (See paragraph-6) FORM 1 Details 1. Name of the project/s Soapstone, Red Ocher and China Clay (ML. 81/82) 2. S.. in the schedule 1 (a) - Mining of Mineral
More informationMolvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No
Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information: S.. Item Details 1 Name of the project/s: M/s. Sri Lakshmi Enterprises 2 S.. in the schedule 1 (a) 3. Proposed capacity/area/length/tonnage to
More informationFORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai
FORM 1 (I) Basic Information Sr. Item Details. 1 Name of the Project WHITE CITY METAL 2 S.. in the Schedule 8 (b) 3 Proposed capacity/area /length/tonnage to Plot area: 45,800.00 sq.mt. be handled/command
More informationFORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik
FORM-I (I) Basic Information Item Details. 1. Name of the Project Proposal for Sand Quarry in Kas Village, Taluka Trimbakeshwar, District Nasik, State Maharashtra over an area of 1.5400 Ha at Damanganga
More informationM/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I
FORM - I (I) Basic Information S.. Item Details 1 Name of the project/s M/s.Karthika Mines & Minerals Pvt.Ltd. Colour Granite Quarry, 10.00 Ha. 2 S.. in the schedule 1 (B) 3 Proposed capacity Area-10.00
More informationFORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006
FORM 1 APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006 (I) Basic Information: S. Item Details 1. Name of the Project/s : Expansion
More informationAnnexure-IV. Form-I for seeking clearance for project attracting CRZ notification. At Thengamputhur Village, Tamil Nadu by
Annexure-IV Form-I for seeking clearance for project attracting CRZ notification Basic Information: Name of the Project :- Location or site alternative under consideration: - Construction of Beach Resort
More informationFORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram
FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY Asst.Director of Mines and Geology, Rajamahendravaram Ordinary Sand Land Details : Govt Land Extent : 3.9634 Ha. VILLAGE
More informationForm -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-
Project Name : Design and Construction of Precast Arch Bridges(3s.) on Holding Pond. 3A, 3 & 4 for Form -1 [Vide tification dated 1 st December 2009] FOR PROPOSED COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI
More informationFORM 1 BASIC INFORMATION S.NO.
FORM 1 BASIC INFORMATION S.NO. Item Details 1 Name of the Project M/s AVA Stones (P) Ltd, Director: Sri.Bimal Kumar Agarwal Colour Granite Mine. 2 S.. in the schedule 1(a) 3 Proposed capacity/ area/ length/
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. No Item Details 1 Name of the Project/s Sri A. Narasimulu 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to be handled/command
More informationAPPENDIX - I (See paragraph 6) FORM 1
APPENDIX - I (See paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the project/s M/S Jashnani Constructions Pvt. Ltd. Proposed residential building project at Shahapur, Thane 2 S.. in the
More informationAPPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: KRUTI ONELLA Sahyog Rekha Infraproject LLP Location / site alternatives Survey no.
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment tification dtd 14-09-2006 & 01-12-09 To be submitted By SHRI SANJAY SINGH S/O SHRI MAHENDRA SINGH RATHORE To Madhya
More informationAPPENDIX I (See paragraph 6) Form 1 (I) Basic Information
APPENDIX I (See paragraph 6) Form 1 (I) Basic Information Sr.. Item Details 1 Name of the Project/s Proposed expansion in Environment Clearance for Residential and Commercial project by Manikchand Kumar
More informationProposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)
FORM I (I) Basic Information S.. Item Details 1. Name of the project Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S.. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage
More information(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project 2 S. number in schedule 8(a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease area/number
More informationFORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju
FORM I TERMS OF REFERENCE For QUARRY OF ROAD METAL (6.265 Ha) Of Sri K Kasi Raju PROP: K.Kasi Raju Extent: 6.265 Ha of Budawada (V), Chimskurthy (M), Prakasam (Dt), Andhra Pradesh (I) BASIC INFORMATION
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Sarpanch, Gram Panchayat chando chando Sand Mine 2 S.. in schedule Category B, Project or Activity 1(a)
More informationAPPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Commercial Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease
More informationUPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.
Annexure - III UPDATED FORM I For Amendment to Environmental Clearance (Environmental Clearance issued by MOEF vide. F.. J-11011/366/2007-IA-II (I) Dated, 15.04.2008.) SUBMISSION To Ministry of Environment
More informationAPPENDIX I (See paragraph 6) FORM 1
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item Details 1 Name of the Project WHITE LILLIES (Residential Project) 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage
More informationAppendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN
Appendix I Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML 219/1997 PRODUCTION CAPACITY: 50,000 TPA
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new tification of MoEF dated 01-12-2009 vide S.O 3067 (E)) (I) BASIC INFORMATION S.. Item Details 1. Name of the project/s M/s. S.L.N.S. Granites Mining of Colour Granite 4.90 Ha 2. S..
More informationAPPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Sr. Item 1 Name of the Project Residential Project 2 S. number in schedule 8(a) Proposed 3 capacity/area/length/tonnage to be handled/command area/lease
More informationSri.T.N.Balasubramanya
Sri.T.N.Balasubramanya (Earlier: M/s.Global Golden Rocks) Extent: 5 Ha Colour Granite Quarry Sy.No.65 of Lattigam Village, Nandigam Mandal, Srikalulam District, Andhra Pradesh UPDATED FORM-I FORM 1 (As
More informationSand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1
FORM-1 SRUSHTI SEWA, NAGPUR 1 FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sand, Stone and Bajri Mining Project 2. Serial. in the schedule 1(a) Mining of Mineral 3. Proposed capacity
More informationSubmitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.
Application for Prior Environmental Clearance (Form 1) For Proposed Colour Granite Mine over an Extent of 3.000 Hectares, in Sy. : 143 of Bharthupuram village, Nandigam Mandal, Srikakulam District, Andhra
More informationFORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)
FORM 1 (I) Basic Information Item Details 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a) 3 Proposed capacity/ area/ length/ tonnage to be handled/command area/lease area/number
More informationProposed Multiplex & Commercial Complex FORM I
I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Multiplex cum Commercial Complex 2 no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 13,218.80
More informationAPPENDIX- I FORM- 1. (I) Basic Information:
(I) Basic Information: APPENDIX- I FORM- 1 Item Details 1. Name of Project Sand Stone Mining Project, M.L..-08/1987, Area 150.926 Ha., located n/v -Gubrenda, Tehsil -Karauli, District Karauli, (Rajasthan)
More informationUPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)
UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana) Venkateswara Mines & Minerals (Earlier: Sri Bode Vijayasen Reddy), Kannaraopet Village, Nallabelli Mandal, JayashankarBhupalpally
More informationProject: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I
FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining
More informationFORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.
FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B,
More informationFORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.
FORM- I Page 0 of 15 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Sati & Garhi Sand Ghat on Ulai River of District- Jamui. 2. S.. in the schedule
More informationFORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE
FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (22309.63 SQ. M) AT ANAMOL LIFE STYLE RESIDENTIAL CUM COMMERCIAL BUILDING S. No. 206, O.P. NO. 129, F.P. NO. 129 OF D.T.P.S. NO. 241, NANA CHILODA, GANDHINAGAR,
More informationFORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Squadm Mines & Minerals Pvt. Ltd - Road Metal & Building Stone 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationNo 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S. Item Details No 1 Name of the Project/s 2 S. No in the Schedule 1(a) 3 Proposed capacity/area/length/tonnage to Mine lease area is 8.91 Ha,
More informationITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT
Application for Extension of Environmental Clearance (EC) UPDATED (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic
More information9 Plot/Survey/Khasra No S.No: 153/1, 153/2, 171/1, 171/2A, 172/1B1, 172/1B2, 172/C1, 172/1C2, 172/2A, 172/2B, 172/2C & 180/1.
FORM I I. BASIC INFORMATION Item Details 1 Name of the project Proposed construction of residential building by M/s. CASA GRANDE AXIOM PRIVATE LIMITED. 2 no. in the schedule 8 (a) 3 Proposed area Area
More informationForm I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens
Form I for Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens at T.P.S. 2, F.P.. 182/P, Sub Plot-A, OP. 43, R.S.. 85/P Vesu-Bhartana-Vesu, Tal: Choryasi Dist: Surat, Gujarat
More informationFORM 1 (Application for Environment Clearance)
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance) Name of the Project: Location / site alternatives under consideration: Size of the Project: Shreedhar Sparsh
More informationFORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.
(I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total
More information.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s
.APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information. Item Details 1. Name of the project/s Peddayekkaluru White Shale Mine M/s. Swathi Mines 2.. in the schedule Proposed capacity/area/length/ tonnage
More informationUPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas
UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE At: Brahmanipali, Dustrict: Sambalpur, Odisha Sri Fakir Rohidas Prepared By Centre for Envotech and Management Consultancy Pvt. Ltd. Bhubaneswar
More informationFORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))
FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item
More informationFORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 9.890 ha. of Proposed Colour Granite Mine of Sri S. Senthil Kumar 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationDetails required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)
Details required for submitting Fresh EC Application (Category B2 Projects: Mining of Minor Minerals) 1. Project Sector (Non-Coal Mining) 2. Project Type (New, Expansion, Modernization) If Project Type
More informationFORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project
FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm
More information556/2C2,3B2,4A,5B,6B,7,8,9,10,11A,12A, 12B2,
I. BASIC INFORMATION FORM I. Item Details 1 Name of the project Proposed Construction of Residential Development Royal Nesto by K. K. Chandrasekar, Krishna Kishor, B. Paranthaman Sethupathi, Paulvannan,
More informationFOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR
FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR MANUFACTURING MAN MADE FIBER (PARTIALLY ORIENTED YARN (POY), FULLY DRAWN YARM (FDY), TEXUTURISED YARN, TWISTED YARN - OTHER THAN RAYON THROUGH
More informationAPPENDIX I. (See Paragraph 6) FORM 1
APPENDIX I (See Paragraph 6) FORM 1 (I) Basic Information Item Details 1 Name of the Project Satva Shiva Gold 2 S. in the Schedule 8(a) 3 Proposed capacity/ area/ length/ tonnage to be handled/ command
More informationApplication Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &
Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd 14-09-2006 & 01-12-09 To be submitted By Project Proponent To Madhya Pradesh State Environmental
More informationFORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.
FORM 1 (Submitted to Ministry of Environment, Forests & Climate Change) BY SRI LAKSHMI GAYATRI HOSPITAL (P) LTD. Proposed at: SY. NO. 306, BACHUPALLY VILLAGE, QUTHABULLAPUR MANDAL, RANGAREDDY DISTRICT,
More informationFORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific
FORM 1 (I) Basic Information Sl.. Item Details 1. Name of the project/s 6.490 ha. of Proposed Colour Granite Mine of M/s. Alief Exports 2. S.. in the schedule Item- 1(a) (Mining of Minerals) 3. Proposed
More informationRenewal of Environmental Clearance for Commercial Complex City Square 2 S. No. in the Schedule 8 (a), Building & Construction project
1 SCOPING 1.1 FORM 1 The scoping for the project has been done based on Form-I, as per EIA tification, dated September 14, 2006 amended as on date. The scoping details are as follows: I. Basic Information
More informationM/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District
Application for Prior Environmental Clearance (Form 1) For Proposed Road Metal / Building Stone/ Robo/Manufacture Sand Mine Over An Extent Of 9.712 Hectares, in Sy.. 743 of Somandepalli Village, Somandepalli
More informationM/S Overseas Min Tech Consultants, Jaipur 1
(I) Basic Information: APPENDIX I (See paragraph 6) FORM 1 S.. Item Details 1. Name of Project Proposed Soapstone Mining Project, Khasra 60, 61, 63, Area: 11.1830Hect., Production: 17508 TPA, Near Village:
More informationAPPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (AI) (viii) (ix) (x) Basic Information Name of the Mining Lease
More informationFORM-I. Environmental Clearance (EC)
FORM-I Environmental Clearance (EC) FOR M/S. Mahanth mica mines (MICA, QUARTZ & FELDSPAR MINES) Léase Area : 47.01 Acres/ 19.05 Ha Sy.. 140/P, 142, 143/P & 139/3 Kalichedu (V), Sydapuram (M), SPSR Nellore
More informationFORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.
FORM 1 Basic Information Item Details 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD. located at Survey : 64 ne Lagu, Sabarmati Nadi Patt Village:
More informationAPPENDIX I. (See paragraph-6) FORM 1
(I) Basic Information APPENDIX I (See paragraph-6) FORM 1. Item Details 1 Name of the Project/s M/s Cane Agro Energy India Limited 2 S.. in the Schedule 5(g) 3 Proposed capacity/area/length/tonnge to be
More informationAPPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE
APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (II) (viii) (ix) (x) Basic Information Name of the Mining Lease
More information(I) Basic Information:
(I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased
More informationRevised FORM - I & PRE-FEASIBILITY REPORT
Hind Energy & Coal Beneficiaton (India) Ltd. [Change in Technology from Dry to Wet Type of Coal Washery in EC issued by MoEF letter vide no. J-11015/364/2009-IA-II(M) dated 21st May 2014] at Hindadih Village,
More informationFORM Name of the project/s Amendment in Existing Environmental Clearance to
(1) Basic Information FORM-1 Sl. Item Details 1. Name of the project/s Amendment in Existing Environmental Clearance to Convert Existing Underground MS storage Tanks 2 X 200 KL (Tk3 & Tk4) to store Ethanol
More informationForm 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat.
PYRAMID INFRA Form 1, Form 1(A) and Proposed ToR for Residential Project Pramukh Aura at Chala, Taluka: Vapi & District: Valsad, Gujarat. JANUARY 2018 CONTENTS 1 SCOPING... 4 1.1 FORM 1... 4 1.2 FORM 1(A)...
More informationREPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR
REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of
More informationAppendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN
Appendix I Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN AREA: 1.0 HECT (NON FOREST LAND) ML: 27/1990 ( R ) 53/2009 PROPOSED PRODUCTION
More informationApplication for Prior Environmental Clearance (EC)
Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information
More informationProposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1
Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-
More informationForm 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat.
MR. SUBHASH KOTADIA Form 1, Form 1(A) and Proposed ToR for Residential Project at Chala, Taluka: Vapi & District: Valsad, Gujarat. MARCH 2018 CONTENTS 1 SCOPING... 4 1.1 FORM 1... 4 1.2 FORM 1(A)... 17
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I)Basic Information S. Item Details 1 Name of the project 1.79Acr nakti Limestone Mines (Minor Mineral) 2 S.. in schedule Category B, Project or Activity 1(a) (As
More informationExpansion of MDI Complex, Plot No 25, Sector 16A, Noida, Uttar Pradesh
Plot 25, Sector 16A, ida, Uttar Pradesh (I) Basic Information FORM- I S.. Item Details 1. Name of the project/s Expansion of MDI Complex 2. S.. in the schedule 8 (a) 3. Proposed capacity/ area/ length/
More informationApplication Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu
Form 1 as per EIA tification 2006 for Chockampatti Earth Quarry of Thiru.T.Poosai Durai, Chockampatti Village, Kadayanallur Taluk, Tirunelveli District, Tamil Nadu State. Application Form for Obtaining
More informationFORM 1. Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project
FORM 1 Amendment in Environment Clearance Of Redevelopment Project Redevelopment Project At C.S. 990 situated at 243-G Patthe Bapurao Marg (Falkland Road), at Girgaon, Division D ward, Mumbai 400 004.
More informationApplication for Prior Environmental Clearance (EC) FORM 1
Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information
More informationA 'N 'E B 'N 'E C 'N 'E D 'N 'E
Gata. 12, Gata. 164, 352 & 1295/5 Basic Information FORM- 1 S.. Item Details 1. Name of the project/s Sand/Moram Mining 2. S.. in the schedule 1(a)i 3. Proposed capacity/area/length/tonnage to be handled
More informationAPPENDIX I (See paragraph 6) FORM 1
APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project Limestone Mine 2. S.. in the schedule S.. 1(a) mining of mineral is 3. Proposed capacity/area/length/tonnage
More informationUPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT
UPDATED FORM I Of 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT APSEZ, Atchutapuram, Visakhapatnam district, Andhra Pradesh By RAIN CALCINER LIMITED Prepared By B.S.
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project 3.274 Ha Kapsada Limestone Mines (Minor Mineral) of M/s I.V.R.C.L Limited 2 S.. in schedule Category B,
More informationAPPENDIX I (See paragraph - 6) FORM 1
APPENDIX I (See paragraph - 6) FORM 1 (I) Basic Information S. Item Details 1 Name of the project Ambey Mahila Swa Sahayata Samuh 2 S.. in schedule Category B, Project or Activity 1(a) (As per EIA tification
More informationAPPENDIX I (See paragraph 6) FORM 1
(I) Basic Information APPENDIX I (See paragraph 6) FORM 1 Serial Item Details Number 1. Name of the project/s Flatted Development/Warehouse 2. S.. in the schedule Schedule 8 (a) 3. Proposed capacity/ area/length/
More informationEXPANSION OF SPORTS INJURY CENTRE AT SAFDARJUNG ENCLAVE, NEW DELHI
Application for Prior Environmental Clearance (EC) FORM 1 (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt. 01.12.2009. Basic Information
More informationTHE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company)
APLICATION IN UPDATED FORM - I FOR ENVIRONMENTAL CLEARANCE AMENDMENT (Ref.: As per MoEF tification. S.O. 1533 dated 14.09.2006 & Subsequent Amendments vide S.O. 3067 dated 01.12.2009) IN RESPECT OF JALAGAM
More informationFORM I (OPENCAST LATERITE MINE ha)
SHAIK IMAM SURVEY. 172, 173 & 174, SIDDLOOR VILLAGE, VIKARABAD MANDAL AND DISTRICT, TELANGANA STATE FORM I (OPENCAST LATERITE MINE- 6.176 ha) SUBMITTED BY Sri Shaik Imam R/o 8-2-579/B, Road No. 8, Banjara
More informationM/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD
` SUBMISSION OF FORM I & IA TOWARDS GETTING PRIOR ENVIRONMENTAL CLEARANCE (EC) For M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD (Residential Apartment Construction Project) Sy.. 298/1 & 2 Vepagunta,
More informationCentrade At Plot No. 1, Sector 140, NOIDA Noida, U.P FORM- I
At Plot. 1, Sector 140, NOIDA ida, U.P FORM- I (I) Basic Information S.. Item Details 1. Name of the project/s Centrade 2. S.. in the schedule 8 (a) 3. Proposed capacity/ area/ length/ tonnage to be handled/
More informationSalient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon
Salient Features of Proposed Project Namely Surya Emerald proposed to be developed by M/s. Surya Buildcon 1 Project Name and Location Address Surya Emerald Proposed to be developed by M/s. Surya Buildcon
More informationMOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR)
UPDATED FORM 1 SUBMISSION TO MINISTRY OF ENVIRONMENT, FORESTS & CLIMATE CHANGE, NEW DELHI MOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR) [AMENDMENT IN ENVIRONMENTAL CLEARANCE] VILLAGE : FIROZPUR HAFIZ
More informationFORM-I. Sector-16-B, GH Greater Noida, U.P.
ida, U.P. APPENDIX I (See paragraph-6) FORM 1 S.. Item Details 1. Name of the project/s Residential Complex entitled Ajnara Homes by M/s APV Reality Ltd. 2. S.. in the schedule 8 (b): Township and Area
More informationMs.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu
Application for Prior (Environmental Clearance) Transfer of EC- Form 1 For Transfer of EC from Ms.K.M.Altaf Kouser to Ms.Thriveni Earthmovers Private Limited Over an Extent of 4.838 Hectares of Road Metal
More informationHaridarshan Residency ( Row Type House & School Building )
Survey.. 18, Moje: : Shekhpur, Tal: Kamrej, Dist.: Surat, Gujarat 394 130 FORM 1 AND BASIC INFORMATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR NEW PROJECT OF Haridarshan Residency Block. 18, Village:
More information30 TPH Fertilizer Blending unit for Customized NPK Production at Zuarinagar, Sancoale, Marmugao, SouthGoa, Goa
2012 Development of Viper Island as a high class tourist destination in A&N Islands with various recreational and entertainment activities Form 1 Form 1 & TOR 30 TPH Fertilizer Blending unit for Customized