1 WPAFB Hospital Renovation Gateway III Matt White Walsh/Butt JV Jeremy Cobb - USACE US Army Corps of Engineers

2 Overview Scope Phasing Issues/Challenges Questions Topics 2

3 Medical Center Overview The current 786k sf Medical Center was built in 1956 with an addition in Serves approximately 58,000 beneficiaries. Active Duty, Dependents, Retirees Parts of the facility have been upgraded within the last five years to bring outpatient clinical areas and inpatient ward infrastructure up to modern clinical standards. The majority of the Medical Center still required modernization. 3

4 Project Overview Renovation of the Wright Patterson Medical Center, (building 830). The project also includes infrastructure upgrades to the Central Utility Plant, re-roofing and upgrades, and a small landscape/green space dining area. Scope Renovate SF: 258,890 SF of 786,000 SF Electrical Distribution System Replacement AHU Replacement/Upgrades

5 Organizations WPAFB 88 th Medical Group WPAFB 88 th Civil Engineer Directorate Air Force Civil Engineer Center HQ Air Force/Surgeon General Defense Health Agency (DHA) US Army Corps of Engineers, Louisville District Walsh/Butt Joint Venture (Contractor) HKS Inc. (Designer of Record) 5

6 Contract Overview Swing Space-Design Build (Separate Contract) Start: 17 Jun 11 Completion: 28 Nov 11 Primary Construction-Design/Bid/Build Start: 25 Oct 11 Completion: 09 Dec 14 Contract Duration: 1,141 days $90,000,000 +/- 6

7 Construction Safety Review Over 400,000 Man Hours Over 2,000 equipment-hours to date Over 900 New Employee Orientations Zero lost-time accidents Two Full-Time On-Site Safety Professionals Safety Applies to Tradesmen but also Patients, Staff, Visitors Every Action has the potential to Impact the Mission 7

8 Major Renovation Areas Surgery ICU Central Sterile Kitchen Education and Training Resource Management Mental Health Gastro Residency On Call Sleep Lab Medical Command Education and Train. Call Center Radiology/Mammo Orthopedics Perinatal ENT/Audio Opt./Opth. General Surgery Laser Eye

9 Minor Renovation Areas Medical Clinics (3 Clinics) Dental Women s Health Chapel Urology Housekeeping Nutritional Medicine

10 Project Footprint/Phasing Jan 2012 Jun 2013 Dec 2014 Progress: 3rd Floor 4th Floor 5th Floor Basement 1st Floor 2nd Floor

11 Completed Project Footprint

12 Challenges Infection Control Outages Surgery Phase I and II Central Sterile Temp Trailer Food Service Trailers Medical Equipment

13 Infection Control Risk Assessment Type of Work Temporary Partitions Sealing of Existing Establish Negative Air Pressures in Renovation Spaces Maintenance/Monitor/Report

14 Planned/Scheduled Outages Over 300 Outages to date Domestic Water, Heating Hot-water, Power-Normal, Lighting, Emergency, Critical, AHU, Medical Gases Aged Utilities-Non-Working Valves, Breakers, Equipment Coordination with Facilities and Users and scheduled way in advance

15 Surgery Located on the second floor Major Renovation Two Phases with Shutdowns in Between 5 ORs Now-4 More at the end Temporary Utilities to Serve Operations Phasing critical 9 ORs + 1 Hybrid OR (Imaging/Procedure)

16 Surgery Phasing 2A

17 Surgery Phasing 2B

18 Surgery Phasing 2C

19 Before and After Surgery

20 Before and After Surgery OR

21 Central Sterile Located in the Basement Requires a temporary shutdown and out sourcing of the Central Sterile services. Renovation includes a restructure of the flow of operations within the current foot print of the space and replacement of the washers and ultrasonic cleaner. 21

22 Central Sterile Swing Space Requested of Users to retain Inventory, Staff, and control of services. New Technology, unit, one of kind. Fully Functional CSS Maintenance and Service Challenges

23 Temporary Trailer Site FOOD SERVICE CENTRAL STERILE

24 Food Service Located in basement Renovated in place and will be extensive. Goal of this renovation - right size food preparation kitchen along with improving the customer flow and upgrade current equipment and infrastructure deficiencies. Utilize Kitchen Trailers to Retain Food Service on Site and Renovate in 1 Phase instead of 8 24

25 Medical Equipment Not Typically Purchased By Construction Contractors Months of Meetings to confirm equipment purchases Users want/need latest technology Coordination of Equipment, Options, Accessories-Joint Supply Schedule Re-use

26 Issues Existing/Differing Site Conditions Water Valves Fire rated shafts and chases Electrical Equipment HVAC Balancing, Digital Controls, Air Handlers, Ductwork Project Funding - Changes 26

27 QUESTIONS? 27

State of Kuwait Ministry of Health Infection Control Directorate. The role of infection control In design of health care facilities

State of Kuwait Ministry of Health Infection Control Directorate. The role of infection control In design of health care facilities State of Kuwait Ministry of Health Infection Control Directorate The role of infection control In design of health care facilities 2007 INTRODUCTION Hospital design should ensure that patients, especially

More information

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion Mechanical Systems Redesign Proposal Thesis Proposal Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth December 12, 2014 Revised: January 16, 2015 Revised:

More information

SUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013

SUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013 SUNY Hospitals & A Healthier New York Capital Briefing March 1, 2013 Profile of SUNY Capital Programs Square Footage (in millions) 18.9 20.5 58.5 3.3 Educational Facilities Residence Halls Hospitals Community

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Facility Services Update Joint Conference Committee October 8, 2013

Facility Services Update Joint Conference Committee October 8, 2013 Facility Services Update Joint Conference Committee October 8, 2013 14 major buildings on 14 acres Approximately 1.5 million gross sq. ft. 42 Elevators More than150 miles of piping More than 2,000 plumbing

More information

Healthcare Profile + Services About Us Established in 1965, DEDC is a privately owned, full-service, multidisciplined engineering and design firm. We offer inhouse expertise in mechanical HVAC, electrical,

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation Step One: Using the following table, identify the Type of Construction Project Activity (Type A-D) TYPE A TYPE B TYPE

More information

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E. Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E. Degenkolb Engineers MCEER 2006 Annual Meeting Diagnostic & Treatment Building Designed

More information

Marketing Prioritization Alignment and Dashboard Reporting

Marketing Prioritization Alignment and Dashboard Reporting Marketing Prioritization Alignment and Dashboard Reporting Presented by Gundersen Health System: Pamela Maas, Chief Business Development and Marketing Officer Julieann Paulson, Service Line Marketing Consultant

More information

LEVEE SAFETY UPDATE. June 28,2017

LEVEE SAFETY UPDATE. June 28,2017 LEVEE SAFETY UPDATE 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 June 28,2017 The

More information

Optimizing Energy Use in a HealthCare Setting. Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning

Optimizing Energy Use in a HealthCare Setting. Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning Optimizing Energy Use in a HealthCare Setting Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered

More information

Texas Hospital. Central Plant Redesign. Central Utility Plant SECOND PLACE HEALTH CARE FACILITIES, EXISTING 2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES

Texas Hospital. Central Plant Redesign. Central Utility Plant SECOND PLACE HEALTH CARE FACILITIES, EXISTING 2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, January 2014. Copyright 2014 ASHRAE. Posted at www. ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

We are the Army s Home

We are the Army s Home Society of American Military Engineers (SAME) Muhammad A. Bari, Director of Public Works U.S. Army Garrison, Fort Irwin, CA Our mission is to provide standardized, effective & efficient services, facilities

More information

9/13/2011. Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center. Terry Malloy P.E., Cxa, Project Manager, Teng & Associates

9/13/2011. Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center. Terry Malloy P.E., Cxa, Project Manager, Teng & Associates Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center September 21 st, 2011 4:15pm 5:15pm Terry Malloy P.E., Cxa, Project Manager, Teng & Associates Energy consumption (BTU/SF) in

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation

Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation Figure 3-6. Sample ICRA Matrix of Precautions Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation Step 1: Using the following table, identify the Type of Construction

More information

MEMORIAL HOSPITAL GULFPORT A PROJECT STUDY

MEMORIAL HOSPITAL GULFPORT A PROJECT STUDY MEMORIAL HOSPITAL GULFPORT A PROJECT STUDY Building a healthy community together 2005 u HURRICANE KATRINA REPAIRS 2012 u SURGERY MODERNIZATION 2001 u RADIOLOGY RENOVATION 2000 u CLINIC SUPPORT ADDITION

More information

Baffled Openings at Chain Link Fencing: Design shall consist of two end-posts set 4 feet apart, and a 10 foot wide chain-link fence panel equal in height as the adjacent fence. Chain link fence panel shall

More information

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC LIBRARY ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance

More information

University Health Network Infection Prevention and Control Requirements during Construction, Renovation and Building Maintenance

University Health Network Infection Prevention and Control Requirements during Construction, Renovation and Building Maintenance University Health Network Infection Prevention and Control Requirements during Construction, Renovation and Building Maintenance Introduction University Health Network follows the Canadian Standard Association

More information

Stobill to GRI The Staffing Challenges and Improvements

Stobill to GRI The Staffing Challenges and Improvements Stobill to GRI The Staffing Challenges and Improvements Alan Hunter General Manager, Emergency Care & Medical Services North East Sector and Cardiology Wednesday 28 th November 2012 5.10.11 Recession/CRES

More information

Keith Beidel Mechanical Option Centre Community Hospital East Wing Expansion State College, PA 9/30/02

Keith Beidel Mechanical Option Centre Community Hospital East Wing Expansion State College, PA 9/30/02 BUILDING AND PLANT ENERGY ANALYSIS REPORT: Part A Keith Beidel Mechanical Option Centre Community Hospital East Wing Expansion State College, PA 9/30/02 Executive Summary Centre Community Hospital East

More information

Allstream Centre Energy Performance Report

Allstream Centre Energy Performance Report Allstream Centre Energy Performance Report 2012 2014 TABLE OF CONTENTS INTRODUCTION... 1 ELECTRICAL CONSUMPTION... 2 ELECTRICAL ENERGY DISTRIBUTION... 3 BUILDING POWER AND SYSTEMS... 4 FACTORS CONTRIBUTING

More information

Healthcare construction

Healthcare construction Healthcare construction Role of the Infection Preventionist FIRAS R. ZABANEH, MT( ASCP), CIC, CIE OCT 1, 2015 ( N O T H I N G T O D I S C L O S E ) Current state Many Infection Preventionists view their

More information

NOYES EDUCATION CAMPUS

NOYES EDUCATION CAMPUS INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO ARCB 14 Oct 93

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO ARCB 14 Oct 93 DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC 20380-0001 MCO 12630.3 ARCB MARINE CORPS ORDER 12630.3 From: Commandant of the Marine Corps To: Distribution List Subj: FAMILY

More information

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No Laker Hall Program Study Intercollegiate Athletics Preferred Concept & Project Phasing SUCF Project No. 101009 26 January 2017 Agenda Preferred Concept - Existing Site Plan - Existing Floor Plans - Space

More information

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District Facilities and School Safety Committee Meeting October 25, 2018 Progress Update PROGRESS UPDATE Rien Construction (General

More information

Orientation Program for New Infection Control Professionals

Orientation Program for New Infection Control Professionals Orientation Program for New Infection Control Professionals Module 10: Construction and Renovation Orientation Program for New Infection Control Professionals Table of Contents Module 10: Construction

More information

STRATEGIC ENERGY MANAGEMENT PLAN FOR ST. THOMAS ELGIN GENERAL HOSPITAL 2015

STRATEGIC ENERGY MANAGEMENT PLAN FOR ST. THOMAS ELGIN GENERAL HOSPITAL 2015 STRATEGIC ENERGY MANAGEMENT PLAN FOR ST. THOMAS ELGIN GENERAL HOSPITAL 2015 Strategic Energy Management Plan Page 1 Contents About STEGH... 3 Introduction... 4 Energy Management Vision... 6 Guiding Principles

More information

STATEMENT OF QUALIFICATIONS. Detention/Public Safety Statement of Qualifications DETENTION/PUBLIC SAFETY

STATEMENT OF QUALIFICATIONS. Detention/Public Safety Statement of Qualifications DETENTION/PUBLIC SAFETY STATEMENT OF QUALIFICATIONS 23 DETENTION/PUBLIC SAFETY Since 19 WHO WE ARE HISTORY: Established in 1923 Family-owned, 4th Generation SIZE: 80 Professional Staff 100-150 Tradesmen Annual Project Revenues

More information

SEVEN GENERATIONS ARCHITECTURE & ENGINEERING JANUARY 26, Request for Qualifications from. Potential Teaming Partners

SEVEN GENERATIONS ARCHITECTURE & ENGINEERING JANUARY 26, Request for Qualifications from. Potential Teaming Partners SEVEN GENERATIONS ARCHITECTURE & ENGINEERING JANUARY 26, 2018 Request for Qualifications from Potential Teaming Partners GENERAL FIRM INFORMATION Where tradition fuels innovation Seven Generations Architecture

More information

Improving the Patient Experience Through Facilities Maintenance Programs

Improving the Patient Experience Through Facilities Maintenance Programs Improving the Patient Experience Through Facilities Maintenance Programs Presenters: Jon Utech, Senior Director, Cleveland Clinic John Wood, Senior Facilities Operations Consultant/ Senior Associate, Mazetti+GBA

More information

Technical Report Three

Technical Report Three Technical Report Three Mechanical System Existing Conditions Evaluation Prepared by: Timothy Berteotti Prepared for: Date: November 16, 2011 Table of Contents Executive Summary...3 Design Objectives...3

More information

Norwood High Service Pump Replacement

Norwood High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Juvenile Commitment Center Stanislaus County. Corrections Facilities

Juvenile Commitment Center Stanislaus County. Corrections Facilities Juvenile Commitment Center Stanislaus County Corrections Facilities What if......there was a company that could be your one stop Construction Service provider?...this company was knowledgeable of all aspects

More information

Energy Management Journey

Energy Management Journey Energy Management Journey Arnold Granger, P.E., CEM Director of Energy Management Dr. Yeqiao Zhu, P.E., MBA Director of Facilities Patient Care and Prevention Facilities Patient Treatment Research Facilities

More information

The Biggest Loser REDUCING HIGHER EDUCATION COSTS BY 50%

The Biggest Loser REDUCING HIGHER EDUCATION COSTS BY 50% The Biggest Loser REDUCING HIGHER EDUCATION COSTS BY 50% Ian Hadden, PE, LEED AP BD+C, CEM Director, Energy Management Services University of Arkansas at Little Rock 501-313-9597 ithadden@ualr.edu.com

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

FRANK MILLS INFECTION RATES HVAC ISSUES HVAC IN HEALTHCARE. Developments in ASHRAE and CIBSE

FRANK MILLS INFECTION RATES HVAC ISSUES HVAC IN HEALTHCARE. Developments in ASHRAE and CIBSE HVAC IN HEALTHCARE Developments in ASHRAE and CIBSE FRANK MILLS ENVIRONMENTAL DESIGN CONSULTANTS, CHORLEY, LANCASHIRE FRANK MILLS VICE CHAIR, CIBSE HEALTHCARE GROUP MEMBER ASHRAE TC 9.6 HEALTHCARE TECH

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Sustainable Buildings from LEED to Net Zero

Sustainable Buildings from LEED to Net Zero Sustainable Buildings from LEED to Net Zero Col(P) Peter DeLuca Commander US Army Corps of Engineers North Atlantic Division 10 May 2010 US Army Corps of Engineers SUSTAINABLE DESIGN AND CONSTRUCTION The

More information

Conservation & Demand Management Plan

Conservation & Demand Management Plan Conservation & Demand Management Plan Page 1 of 20 1 Executive Summary Conservation & Demand Management Plan 2014 The following Energy Conservation and Demand Management Plan is written for the Chatham-Kent

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP AIA Quality Assurance

More information

NSC Shelving & Storage for Epworth

NSC Shelving & Storage for Epworth NSC Shelving & Storage for Epworth Providing a complete storage and shelving solution: customised for Epworth HealthCare National Surgical Corporation worked with Epworth HealthCare to design, supply and

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Jackson Health System Miracle Building Plan Outreach Roundtable. May 16, 2017

Jackson Health System Miracle Building Plan Outreach Roundtable. May 16, 2017 Jackson Health System Miracle Building Plan Outreach Roundtable May 16, 2017 $1.5 billion Expanded Footprint Improved Patient Experience World-Class Facilities Innovative, Leading-Edge Care A Stronger,

More information

Resource Center. Investigation Areas

Resource Center. Investigation Areas Investigation Areas Depth Study: Re-Phasing The Project is a Phased project. The main focus of this analysis is rephasing the project with ICRA requirements in mind. I am looking to reduce the cost of

More information

INFECTION CONTROL ISSUES IN CONSTRUCTION AND RENOVATION

INFECTION CONTROL ISSUES IN CONSTRUCTION AND RENOVATION INFECTION CONTROL ISSUES IN CONSTRUCTION AND RENOVATION Evelyn Cook SPICE.unc.edu 919 966 1304 I want to begin with the premise that patients can leave the hospital sicker than they arrived if construction

More information

NON-TRADITIONAL PROJECT DELIVERY MODELS AT UCSF MEDICAL CENTER. Alan Laurlund, Vice President XL Construction Corporation Milpitas, California

NON-TRADITIONAL PROJECT DELIVERY MODELS AT UCSF MEDICAL CENTER. Alan Laurlund, Vice President XL Construction Corporation Milpitas, California NON-TRADITIONAL PROJECT DELIVERY MODELS AT UCSF MEDICAL CENTER Alan Laurlund, Vice President XL Construction Corporation Milpitas, California Kevin Ng, Senior Project Manager XL Construction Corporation

More information

Project : Power & Fuel consumption - an engineering initiative. VPS Rockland, Dwarka.

Project : Power & Fuel consumption - an engineering initiative. VPS Rockland, Dwarka. Project : Power & Fuel consumption - an engineering initiative VPS Rockland, Dwarka. VPS Rockland Dwarka Well-designed compact 103 bed Multi speciality hospital Plot area of 1250 square meter, and build

More information

Retrocommissioning (RCx)

Retrocommissioning (RCx) Retrocommissioning (RCx) Facilities & Services - Engineering Services Saving the planet, two buildings at a time. Mr. Karl Helmink Mr. Damon McFall Creating a Sustainable Campus What is Retrocommissioning

More information

Steve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University

Steve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University Post Occupancy Building Commissioning Successes through Continuous Commissioning Steve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University AIA Quality Assurance

More information

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014 Program Summary: This project involves renovating 80,000 SF of an existing warehouse to provide new classrooms, internal medicine clinics, radiology clinics, and laboratory. Program Statement: The first

More information

Energy Reduction in Hospitals

Energy Reduction in Hospitals Energy Reduction in Hospitals OSBORN ENGINEERING DAVE CHOUINARD, CBCP, LEED AP, DIRECTOR HEALTHCARE CARL SCHULTZ, PE, DIRECTOR ENERGY AND FACILITY SYSTEMS MARK WUTZ, PE, DIRECTOR ENERGY & COMMISSIONING

More information

Legionella Control in Building Systems. Carl Schultz, PE National Healthcare Engineering Leader

Legionella Control in Building Systems. Carl Schultz, PE National Healthcare Engineering Leader Legionella Control in Building Systems Carl Schultz, PE National Healthcare Engineering Leader Legionella Basics Bacterium that causes respiratory diseases such as Legionellosis and Pontiac Fever Present

More information

BID PACKAGES 3-21, Addendum No. 03

BID PACKAGES 3-21, Addendum No. 03 WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

ARE YOU READY TO OPERATE? Designing ORs to meet new technological advancements

ARE YOU READY TO OPERATE? Designing ORs to meet new technological advancements ARE YOU READY TO OPERATE? Designing ORs to meet new technological advancements Gary Hamilton PE, SASHE, LEED AP BD+C, CxA, EDAC Ionel Petrus PE, LEED AP BD+C, CEM 2016 SmithGroupJJR 1 Objectives The audience

More information

Application for Zoning Certificate and/or Building Permit

Application for Zoning Certificate and/or Building Permit Application for Zoning Certificate and/or Building Permit 1. Fill out the Zoning Application and NIRA Application (if applicable) and return it to the Harrison Township Zoning Office. 2. Please allow 10

More information

Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration:

Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration: Risk Assessment and Preventive Measures Checklist for Construction and Renovation Location of Construction: Project Start Date: Estimated Duration: Project Manager (PM): Contractor(s): Infection Prevention

More information

Puget Sound Green Infrastructure Summit 2017

Puget Sound Green Infrastructure Summit 2017 * 130,000 SF office building 5 stories above-grade * Mixed use, including 15,000 SF retail space * City of Seattle Deep Green Pilot Program Stone34 Project Overview Matt Nielsen 2017-02-13 Seattle Deep

More information

NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING. Neidig Community Meeting July 2018

NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING. Neidig Community Meeting July 2018 NEIDIG ELEMENTARY SCHOOL ADDITION & RENOVATION PHASING Neidig Community Meeting July 2018 PROPOSED NEIDIG ELEMENTARY SCHOOL Expanded parking Separate bus loop Gymnasium Addition 2 story classroom wing

More information

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014 Program Summary: This project involves renovating 80,000 SF of an existing warehouse to provide new classrooms, internal medicine clinics, radiology clinics, and laboratory. Program Statement: The first

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

WATER SAFETY POLICY. Version Water Policy V2. Date to be reviewed June 2019 To by reviewed by Strategic Water Safety Group

WATER SAFETY POLICY. Version Water Policy V2. Date to be reviewed June 2019 To by reviewed by Strategic Water Safety Group East Cheshire NHS Trust WATER SAFETY POLICY Version 2.0 File ref 150820 Water Policy V2 Date approved draftcomments[1] June 2016 Date to be reviewed June 2019 To by reviewed by Strategic Water Safety Group

More information

Summary of Modifications/Changes in this Update

Summary of Modifications/Changes in this Update Summary of Modifications/Changes in this Update This Summary of Changes is for information only. It is not a part of the referenced document, and should not be used for project documentation. U.S. Department

More information

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare.

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare. Contracted Scope Provide a detailed description of your scope for this project. Responses should include: type of construction; size of project; contract value; length of project; and percentage of labor

More information

Both health-care facility classification and area classification, as per CSA, determine the design requirements.

Both health-care facility classification and area classification, as per CSA, determine the design requirements. ACCREDITATION STANDA RDS HEATING, VENTILATION AND AIR-CONDITIONING SYSTEM (HVAC) Class 3 Facility: Local Anesthesia Heating, ventilation and air-conditioning system standards are a primary infection prevention

More information

MEDICAL WASTE MANAGEMENT STUDY NOTES

MEDICAL WASTE MANAGEMENT STUDY NOTES MEDICAL WASTE MANAGEMENT STUDY NOTES UNIT 1 INTRODUCTION Hospital and other health care establishment has a duty of care for the environment and for public health and have particular responsibility in

More information

Stanford University Water Efficiency Program Marty Laporte Jennifer Fitch Thomas Bartleman

Stanford University Water Efficiency Program Marty Laporte Jennifer Fitch Thomas Bartleman Pilot Testing New Wi-Fi Weather-Based Irrigation Controller Technology at Stanford University February 2014 October 2015 Initial Pilot Study Findings for Water Conservation College Group Stanford University

More information

Abington Memorial Hospital Abington, PA. Project Description

Abington Memorial Hospital Abington, PA. Project Description Project Description Project Description Project Background The expansion is a seven story, 360,000 SF addition with a total project cost of $98 million. Construction began in February 2003 and the project

More information

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening

More information

No Patient Left Behind: Leading Transition to Modernized Capability

No Patient Left Behind: Leading Transition to Modernized Capability No Patient Left Behind: Leading Transition to Modernized Capability Session #163, February 22, 2017 Colonel Rich Wilson, Chief, Solution Delivery Division, Health Information Technology (J6), Defense Health

More information

BARNARD ELEMENTARY SCHOOL

BARNARD ELEMENTARY SCHOOL INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Time is Money 150,000 sf Hospital in 8 ½months Concept through Construction

Time is Money 150,000 sf Hospital in 8 ½months Concept through Construction Time is Money 150,000 sf Hospital in 8 ½months Concept through Construction Dr. Glenn Mitchell, Mercy Health, Retired Dave Hitchcock, Aspen Street Architects Charlie Walden, Walden Structures Inc. Learning

More information

Water Balance and Roadmap Update Pacific Northwest National Laboratory Kate McMordie and Brian Boyd

Water Balance and Roadmap Update Pacific Northwest National Laboratory Kate McMordie and Brian Boyd Water Balance and Roadmap Update Pacific Northwest National Laboratory Kate McMordie and Brian Boyd Army Net Zero Workshop 18-20 Jan 2012 Assistant Secretary of the Army (s, Energy & Environment) Agenda

More information

MHS GENESIS Transforming the Military Health System

MHS GENESIS Transforming the Military Health System AMSUS 2018 MHS GENESIS Transforming the Military Health System Maj Gen Lee Payne, USAF, MC, CFS Assistant Director-Combat Support & MHS Functional Champion 28 Nov 2018 National Harbor MD Disclosures Presenter

More information

Architectural & Engineering Services for Air Conditioning Alleghany High School

Architectural & Engineering Services for Air Conditioning Alleghany High School February 7, 2011 Architectural & Engineering Services for Air Conditioning Alleghany High School October 1, 2012 Who We Are All Architectural/Engineering Services In-House Total Staff of 36 Roanoke Office

More information

No Patient Left Behind: Leading Transition to Modernized Capability

No Patient Left Behind: Leading Transition to Modernized Capability No Patient Left Behind: Leading Transition to Modernized Capability Session #163, February 22, 2017 Colonel Rich Wilson, Chief, Solution Delivery Division, Health Information Technology (J6), Defense Health

More information

AUTOMATION ZONE BUILDER

AUTOMATION ZONE BUILDER AUTOMATION ZONE BUILDER Energy Saving More than 1,000 JOB In JAPAN Come to Thailand Contribution for Your Buildings We would like to propose Energy Saving Solutions to contribute your energy saving activities.

More information

Civista Medical Center Thad Maugle RESEARCH. The construction at Civista Medical Center consists of three phases; a main

Civista Medical Center Thad Maugle RESEARCH. The construction at Civista Medical Center consists of three phases; a main RESEARCH Problem The construction at Civista Medical Center consists of three phases; a main building addition, a vertical expansion of the existing building, and selective renovations. All three areas

More information

Project Narrative Why is this project special? Self Regional Healthcare (SRH), in Greenwood South Carolina, is a 358-bed, non-profit healthcare system

Project Narrative Why is this project special? Self Regional Healthcare (SRH), in Greenwood South Carolina, is a 358-bed, non-profit healthcare system Contracted Scope Project Description/Type of Construction The project scope included the complete demolition and removal of the top four floors of the Old Main Patient Tower, built in the 1950s, plus the

More information

Creating a Lean Culture Transformational Leadership for Lean Health Care

Creating a Lean Culture Transformational Leadership for Lean Health Care Creating a Lean Culture Transformational Leadership for Lean Health Care Bruce Roe, MD President and CEO Executive Champion, Transformation February 15, 2017 St.Boniface Hospital 180 Departments 7 Separate

More information

Medical Military Facilities

Medical Military Facilities MEDICAL TEMPLATES Medical Military Facilities prepared for: United States Army United States Navy United States Air Force Purpose The purpose this document is to supplement UFC 451001 in providing detailed

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Adaptation of Scrum to Facility Planning and Design. U.S. Army Health Facility Planning Agency (HFPA)

Adaptation of Scrum to Facility Planning and Design. U.S. Army Health Facility Planning Agency (HFPA) Welcome Adaptation of Scrum to Facility Planning and Design U.S. Army Health Facility Planning Agency (HFPA) Session Description Changes in local health care support for soldiers and their families in

More information

SGH Competency Framework: GLF

SGH Competency Framework: GLF SGH Competency Framework: GLF 6 th December 2009 Dr Camilla Wong Deputy Director, Allied Health Division 6 DECEMBER 2009 Set up Adapted CoDEG GLF to SGH setting & mapped competencies to experience of pharmacist

More information

Leading Techniques for Energy Savings in Healthcare Facilities

Leading Techniques for Energy Savings in Healthcare Facilities Healthcare Leading Techniques for Energy Savings in Healthcare Facilities Learn how building automation products and services can reduce energy costs at healthcare facilities. This paper outlines proven

More information

HEALTHCARE SOLUTIONS TRANSCAR AUTOMATED GUIDED VEHICLE

HEALTHCARE SOLUTIONS TRANSCAR AUTOMATED GUIDED VEHICLE HEALTHCARE SOLUTIONS TRANSCAR AUTOMATED GUIDED VEHICLE 2 TRANSCAR GENERATION 3 SWISSLOG IS A LEADING PROVIDER OF INNOVATIVE, INTEGRATED LOGISTICS SOLUTIONS FOR HOSPITALS Answering tomorrow s hospital logistics

More information

APPENDIX A DEFINITIONS OF BUILDING AREAS

APPENDIX A DEFINITIONS OF BUILDING AREAS A. GENERAL REQUIREMENTS DEFINITIONS OF BUILDING AREAS 1. The Project Architect/Engineer shall submit an estimate with the Schematic Design Phase submission, and shall submit calculations with the Design

More information

For efficient interventions

For efficient interventions For efficient interventions 37 % more information per image may be crucial for an optimal workflow. You can see all the surrounding structures at a glance and can accurately plan and perform your intervention.

More information

Construction in Healthcare: Does it put Patients or Workers at Risk? Not if we do ICRA correctly! Infection Control Risk Assessment (ICRA)

Construction in Healthcare: Does it put Patients or Workers at Risk? Not if we do ICRA correctly! Infection Control Risk Assessment (ICRA) Infection Control Risk Assessment (ICRA) What Does it Mean? Deb Hess, RN, CIC Supervisor Infection Control & Prevention Lancaster General/Penn Medicine Construction in Healthcare: Does it put Patients

More information

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility Civil District Court Parish of New Orleans Image Courtesy of EDR MA Renovation & Utilization Feasibility Challenges with Courthouse Design Courthouse Space Standards and Requirements Charity Hospital Building

More information