1 Planning, Development & Facilities 349 Magnolia Avenue Glendale, California Tel: Fax: Project Name: Jefferson ES-12 Classroom Bldg. DSA No: A#: , File#:19-41 District PO No: District Contract No: /16 REQUEST FOR INFORMATION (RFI) To: Armond Mailan From:Chalmers Construction Services Inc. Required by: Ara Baghdasarians RFI No. 039 Date: 06/23/16 Answered: REFERENCE: Drawing(s) - Specification(s) Page(s) CONTRACTOR S REQUEST: Attached Please Find Challenger Ornamental Iron Work, Inc. (Structural & Misc. Steel Sub) RFI #33 PROPOSED SOLUTIS: DISTRICT REPRESENTATIVE S ADDITIONAL INFORMATION: ARCHITECT S RESPONSE: NAC 06/30/16: 1. See response to recently issued RFI# 037, to obtain information of clouded location 2. Not confirmed. Fall assets beam to be 4" from the bottom of roof deck (at location of installation 10" from face of elevator shaft) which is within the depth / profile of elevator hoist beam. See Attached , 06/29/16 3.Dims for center of opening given on revised ASK-005AR see attached. *This response was provided FOR INFORMATION ONLY with no effect to the contract. *This response is a CLARIFICATION of the contract. (NO COST or TIME EFFECT) *This response is a MINOR CHANGE to the contract with no effect to the contract cost or time. (NO COST or TIME EFFECT) **This response CHANGES the contract with an anticipated effect to contract cost and/or time. (COST/TIME EFFECT) The Contractor is to prepare a Change Order Proposal before proceeding. * This does not modify contract cost or time. If the recipient believes that the RFI has any effect on contract cost and/or time, the recipient shall respond in writing in accordance with Contract provisions.

2 CHALLENGER ORNAMENTAL IRON WORK, INC. 437 W.PALMER AVE., GLENDALE CA TEL: (818) FAX: (818) REQUEST FOR INFORMATION TO: CHALMERS CONSTRUCTION SERVICES, INC. RFI NO.: 33 ATTN: DATE: PROJECT NAME: JEFFERSON ELEMENTARY SCHOOL JOB NO: /16 SUBJECT: STRUCTURAL STEEL SHOP DRAWINGS SPEC SECTION: DWG/DETAIL NO: NEED URGENT RESPONSE TO AVOID DELAY IN FABRICATION. SEE ATTACHED REVISED CHALLENGER ELEVATOR DRAWING SHEET E1A. PLEASE FURNISH/VERIFY/CONFIRM THE FOLLOWING: 1. CLOUDED 5, 8-4, & 9-11 REVISED DIMENSIONS ARE PER ATTACHED CHALLENGER RFI #1R2 DATED 5/19/16 THAT WAS NOT YET ANSWERED. PLEASE CONFIRM CLOUDED DIMENSIONS. THE 5 DIMENSION IS TO CLEAR THE W18x40 SECOND FLOOR BEAM PLUS DRYWALL FINISH. 2. SEE ATTACHED REVISED ELEVATOR SHOP DRAWING SHEET 2 OF 12. THE ELEVATOR SHOP DRAWINGS SHOWED THE BOTTOM OF THE HSS4x4 FALL ARREST BEAM TO BE AT 29-0 (16-0 PLUS 13-0 = 29-0). THE TOP OF THE ROOF BEAM WHERE THE HSS4x4 BEAM OCCURS IS AT TOS = /-. IN ORDER FOR THE HSS4x4 TO FIT WITHIN THE W12x19 BEAM (MARKED 60C) ABOVE LINE G, THE BOTTOM OF THE HSS4x4 NEEDS TO BE AT PLEASE CONFIRM USING BOTTOM OF HSS4x4 = IS OK. 3. PLEASE FURNISH FOUR MISSING DIMENSIONS TO LOCATE THE THREE W8x10 BEAMS MARKED 60F & 60D. PLEASE FURNISH THE ABOVE. ORLANDO C. FUERTEZ STEEL DETAILER ATTACHMENTS: 1. CHALLENGER REVISED DRAWING SHEET E1A. 2. ELEVATOR DRAWING SHEET 2 OF CHALLENGER RFI #1R2 DATED 5/19/16 (NOT YET ANSWERED). JES-RFI-33 SHT E1A AT ELEVATOR.doc Page 1 of 1

3 Teagan Castellon From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Andrew Ordway Wednesday, June 29, :26 PM Bradford Brewer Jorge Rivera RE: Fall Arrest Beam Elevation Follow up Flagged Brad, To follow up on our discussion, the fall arrest beam top of steel elevation is 4" below bottom of roof deck (at location of installation 10" from face of elevator shaft), which is within the depth/profile of the elevator hoist beam. Best regards, Andrew Ordway, PE Engineer O D M E. Colorado Blvd., Suite 200 Pasadena, CA From: Andrew Ordway Sent: Tuesday, June 28, :47 PM To: Bradford Brewer (bbrewer@nacarchitecture.com) Cc: Jorge Rivera (Jorge.Rivera@kpff.com) Subject: FW: Fall Arrest Beam Elevation Hi Brad, As discussed, please see the confirmation below from Kone regarding the permitted installation height for the fall arrest beam. Structurally we would recommend that the top and bottom of the fall arrest beam both beam installed 3" min from the top and bottom of the supporting roof framing to allow for welding access to install the connection. Best regards, Andrew Ordway, PE Engineer O D M E. Colorado Blvd., Suite 200 Pasadena, CA From: Grooters Troy [mailto:troy.grooters@kone.com] Sent: Tuesday, June 28, :41 PM To: Andrew Ordway Subject: RE: Fall Arrest Beam Elevation 1

4 Correct cannot be below the hoist beam profile or it interferes with the minimum overhead dimension. If it is higher than the profile of the hoist beam we begin to worry about access for the field mechanics. Troy Grooters District Installation Manager Los Angeles KONE Knott Ave, Suite B Cypress, CA Tel Mobile troy.grooters@kone.com From: Andrew Ordway [mailto:andrew.ordway@kpff.com] Sent: Tuesday, June 28, :14 PM To: Grooters Troy <Troy.Grooters@kone.com> Subject: Fall Arrest Beam Elevation Hi Troy, Thanks for your help today. I'm following up on our phone conversation to get a confirmation for the project architect (for Jefferson Elementary School ORG) indicating that installation of the fall arrest beam at any elevation within the depth of the hoistway beam will be okay. Note: This will relieve the requirement specified in note #13, which requires that the bottom of fall arrest beam be aligned to bottom of hoistway beam. Thank you, Andrew Ordway, PE Engineer O D M E. Colorado Blvd., Suite 200 Pasadena, CA

5

6

7 APPROXIMATELY 16FT TO UNDERSIDE OF ROOF DECK PER T.O. CONCRETE ELEVATIONS PROVIDED ON S202 (MINUS 6 1/4" DECK THICKNESS) Hoist beam and lifeline beam provided by KONE, installed by others Please confirm floor designations 06/20/2016 Attachment detail to KONE for the lifeline beam RFI#26, SSK-002 provided to KONE 06/20/2016 Hoist Beam connection per 2A/S601 Please confirm fire recall floors 6/17/2016 Floor to floor elevation confirmed at 14'-0", refer to A4.01, A9.02, &S201, & as noted in Structural Steel Shop Drawings

8 CHALLENGER ORNAMENTAL IRON WORK, INC. 437 W.PALMER AVE., GLENDALE CA TEL: (818) FAX: (818) REQUEST FOR INFORMATION TO: CHALMERS CONSTRUCTION SERVICES, INC. RFI NO.: 1R2 ATTN: DATE: PROJECT NAME: JEFFERSON ELEMENTARY SCHOOL JOB NO: /16 SUBJECT: STRUCTURAL STEEL SHOP DRAWINGS SPEC SECTION: DWG/DETAIL NO: SEE ATTACHED ANSWER TO CHALMERS RFI #2 AT ELEVATOR. PLEASE VERIFY/CONFIRM THE FOLLOWING: 1. IF THE NORTH WALL IS MOVED 7 NORTH, THE 7-11 CLEAR HOISTWAY IS STILL ENCROACHING ON THE W16x40 SECOND FLOOR BEAM BY 1/2 PLUS THE DRYWALL FOR A TOTAL OF 1 1/8 ENCROACHMENT. WE PROPOSE TO MOVE THE NORTH WALL ADDITIONAL 2 TO 8-4 FROM LINE 2. PLEASE CONFIRM RELOCATING THE WALL AN ADDITIONAL 2 NORTH IS ACCEPTABLE. 2. SEE ATTACHED KONE ELEVATOR SHOP DRAWING SHEET 1 OF 12 THAT IS PART OF ANSWER TO RFI. PLEASE VERIFY/CONFIRM THE FOLLOWING: a. THE INDICATED 7-11 CLEAR HOISTWAY SHALL BE FROM THE RELOCATED NORTH WALL PER ITEM 1 ABOVE TO AN IMAGINARY SHAFT WALL 7-11 FROM THE RELOCATED NORTH WALL. PLEASE CONFIRM. b. THE BRACKET ATTACHMENT LOCATION SHOWN ON ATTACHED KONE DRAWING SHEET 5 OF 12 SHALL BE FROM THE IMAGINARY SHAFT WALL PER ITEM a ABOVE. PLEASE CONFIRM. PLEASE VERIFY/CONFIRM THE ABOVE. ORLANDO C. FUERTEZ STEEL DETAILER ATTACHMENT: ANSWER TO CHALMERS RFI #2. JES-RFI-01R2 ELEVATOR SHOP DRAWINGS.doc Page 1 of 1

9 Planning, Development & Facilities 349 Magnolia Avenue Glendale, California Tel: Fax: FOR REFERENCE ONLY. SEE COIW RFI #1R2 5/19/16 Project Name: Jefferson ES-12 Classroom Bldg. DSA No: A#: , File#:19-41 District PO No: District Contract No: /16 REQUEST FOR INFORMATION (RFI) To: Armond Mailan From:Chalmers Construction Services Inc. Required by: Ara Baghdasarians RFI No. 002 Date: 04/26/16 Answered: REFERENCE: Drawing(s) - Specification(s) Page(s) CONTRACTOR S REQUEST: Attached Please Find Challenger Ornamental Iron Work, Inc. (Structural & Misc. Steel Sub) RFI #1R PROPOSED SOLUTIS: 5. NAC PROPOSES TO MOVE THE NORTH WALL IN THE ELEVATOR SHAFT NORTH 7" TO ALLOW FOR A 7'-11" CLR HOST WAY, SEE ASK-01. CONTRACTOR TO VERIFY THAT SPACE IS ADIQUATE FOR ELEVATOR MANUFACTURER. DISTRICT REPRESENTATIVE S ADDITIONAL INFORMATION: ARCHITECT S RESPONSE: NAC. 04/27/2016: 1. North arrow is at project north see 2/A0.11 for true north 2. from drywall to drywall, dimensions are 8'10" x 8'-7" after moving wall north 7" 3.Correct dimension is 1'-3" from grid line to inside face of wall KPFF : 4. STRUCTURALY ACCEPTABLE TO OMIT BEAM, IF NOT REQUIRED FOR SUPPORT OF ELEVATOR POSTS *This response was provided FOR INFORMATION ONLY with no effect to the contract. *This response is a CLARIFICATION of the contract. (NO COST or TIME EFFECT) *This response is a MINOR CHANGE to the contract with no effect to the contract cost or time. (NO COST or TIME EFFECT) **This response CHANGES the contract with an anticipated effect to contract cost and/or time. (COST/TIME EFFECT) The Contractor is to prepare a Change Order Proposal before proceeding. * This does not modify contract cost or time. If the recipient believes that the RFI has any effect on contract cost and/or time, the recipient shall respond in writing in accordance with Contract provisions.

10 CHALLENGER ORNAMENTAL IRON WORK, INC. 437 W.PALMER AVE., GLENDALE CA TEL: (818) FAX: (818) FOR REFERENCE ONLY. SEE COIW RFI #1R2 5/19/16 REQUEST FOR INFORMATION TO: CHALMERS CONSTRUCTION SERVICES, INC. RFI NO.: 1R ATTN: DATE: PROJECT NAME: JEFFERSON ELEMENTARY SCHOOL JOB NO: /16 SUBJECT: STRUCTURAL STEEL SHOP DRAWINGS SPEC SECTION: DWG/DETAIL NO: SEE ATTACHED ELEVATOR DRAWING SHEETS 1 OF 12 AND 5 OF 12 FROM KONE ELEVATOR COMPANY. PLEASE FURNISH/VERIFY THE FOLLOWING: 1. REFERENCE NORTH IS GOING UP. 2. FURNISHED 7-11 AND 8-10 WALL TO WALL DIMENSIONS ARE TO FACE OF DRYWALL. 3. BASED ON SHEET A902, GRIDLINE F IS 1-3 LEFT OF THE FACE OF WALL. 4. SHEET S202 AT ELEVATOR AREA BELOW LINE F, INDICATED W12x19 BEAM JUST BELOW LINE F IS NOT REQUIRED ANYMORE. THE CENTERLINE OF THE HSS10x6 ELEVATOR GUIDE COLUMN IS ONLY 12 FROM LINE F. NO ROOM FOR THE W12x19 BEAM. PER DETAIL 1/S903, A 1/4 THICK BENT PLATE SHALL BE PROVIDED WHERE ELEVATOR GUIDE RAIL COLUMN OCCURS ON THE EAST AND WEST SIDE OF ELEVATOR. 5. PLEASE LOCATE LINE 2 ON ATTACHED ELEVATOR DRAWING SHEET 1 OF 12. PLEASE FURNISH/VERIFY: a. GRIDLINE 2 CANNOT BE INSIDE THE 7-11 CLEAR HOISTWAY DIMENSION. IF GRIDLINE 2 IS INSIDE THE 7-11 HOISTWAY DIMENSION, THE 2ND FLOOR AND ROOF BEAMS ABOVE WILL INTERFERE WITH THE 7-11 CLEAR HOISTWAY PATHWAY DIMENSION. b. IF GRIDLINE 2 IS SOUTH OF THE 7-11 CLEAR HOISTWAY DIMENSION, PLEASE FURNISH: b.1. DIMENSION FROM LINE 2 TO INSIDE FACE OF DRYWALL (SHAFT WALL). b.2. THE 7-11 CLEAR HOISTWAY DIMENSION SHOULD BE REVISED TO CLEAR THE 2ND FLOOR AND ROOF BEAM ABOVE. PLEASE FURNISH REVISED CLEAR HOISTWAY DIMENSION. b.3. SEE ATTACHED ELEVATOR DRAWING SHEET 5 OF 12. IF THE 7-11 DIMENSION WILL BE REVISED, PLEASE LOCATE FROM LINE 2 THE THREE ELEVATOR GUIDE RAIL COLUMNS IN THE NORTH-SOUTH DIRECTION. PLEASE FURNISH/VERIFY THE ABOVE. NEED URGENT RESPONSE IN ORDER TO PROCEED WITH THE PREPARATION OF SHOP DRAWINGS FOR BEAMS AND ELEVATOR GUIDE RAIL COLUMNS AT ELEVATOR AREA. ORLANDO C. FUERTEZ STEEL DETAILER ATTACHMENT: KONE ELEVATOR SHOP DRAWINGS SHEETS 1 & 5 JES-RFI-01R ELEVATOR SHOP DRAWINGS.doc Page 1 of 1

Planning, Development & Facilities 349 Magnolia Avenue Glendale, California Tel: Fax: TRANSMITTAL

Planning, Development & Facilities 349 Magnolia Avenue Glendale, California Tel: Fax: TRANSMITTAL Planning, Development & Facilities 349 Magnolia Avenue Glendale, California 91204 Tel: 818.507.0201 Fax: 818.507.4911 Project Name: Jefferson ES-12 Classroom Bldg DSA No: A#:03-114361, File#:19-41 District

More information

Addendum 1 Resort Lifestyle Communities- Office Addition

Addendum 1 Resort Lifestyle Communities- Office Addition Addendum Resort Lifestyle Communities- Office Addition. See attached Reflected Ceiling Plan for framing and drywalling of interior bulkheads and ceilings. See attached Structural Sheets S. and S3.6 for

More information

Report No. 404-F Meeting Date: October 11, 2011 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA

Report No. 404-F Meeting Date: October 11, 2011 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA Report No. 404-F Meeting Date: October 11, 2011 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA Topic: AMENDMENT NO.1 TO INCREASE CONTRACT WITH CARMICHAEL-KEMP, ARCHITECTS FOR

More information

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum. ADDENDUM NUMBER: 2 PROJECT: UNC Charlotte Residence Hall Phase XIV - Elevator Bid Package DATE: May 28, 2015 OWNER: UNC Charlotte ARCHITECT: FWA Group NOTICE TO BIDDERS: This addendum is issued prior to

More information

Addendum # 4 August 9, 2018

Addendum # 4 August 9, 2018 Addendum # 4 August 9, 2018 Richards Consulting & Associates Limited R.R.3 Red Deer, Alberta T4N 5E3 Phone: 403-886-2919 Fax: 403-886-2733 PROJECT: Connector Building Phase 2, Lac La Biche, Alberta THIS

More information

TG Structural Steel Superstructure

TG Structural Steel Superstructure TG07.1 - Structural Steel Superstructure Questions are numbered in the order received. Numbers missing in the sequence either have been answered in a previous response set or will be included in a future

More information

ADDENDUM NO. 1. Revised Bid Receipt/Opening Date, Question/Answer, Additional Information, and Revised Drawings

ADDENDUM NO. 1. Revised Bid Receipt/Opening Date, Question/Answer, Additional Information, and Revised Drawings ADDENDUM NO. 1 DATE: September 16, 2016 INVITATION FOR BID: IFB J170003990 Coliseum Fall Protection DATED: August 29, 2016 RECEIPT DATE: September 28, 2016 (CHANGED) OPENING DATE: September 29, 2016 (CHANGED)

More information

Connection Design Assistance Manual

Connection Design Assistance Manual Connection Design Assistance Manual Architectural Precast Concrete Glass Fiber Reinforced Concrete Cast Stone Architectural Precast Association 6710 Winkler Road, Suite 8 Fort Myers, FL 33919 Phone: 239-454-6989

More information

TG Structural Steel Superstructure

TG Structural Steel Superstructure TG07.1 - Structural Steel Superstructure Questions are numbered in the order received. Numbers missing in the sequence have been answered in previous response sets. Question 0149 2.11.2013 1. Please reference

More information

Call for any further details including but not limited to material, temper, thickness, paint and design.

Call for any further details including but not limited to material, temper, thickness, paint and design. Material: extruded aluminum Fabrication Method: welded and mechanically fastened Finish: 2 part polyurethane paint powder coated Kynar finish available upon request Decking: aluminum interlocking pan Standard

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

DSA Inspectors. Arcadia USD. Arcadia HS Campus Enrichment. Inspection Report Apr 2014

DSA Inspectors. Arcadia USD. Arcadia HS Campus Enrichment. Inspection Report Apr 2014 DSA Inspectors Arcadia USD Arcadia HS Campus Enrichment Inspection Report Apr 2014 Architect DSA Application No. A03-111889 33 Narcissa Drive, Rancho Palos Verdes, CA 90275 (626) 786-4331 Info@KnowlandInc.com

More information

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS

More information

DOCUMENT ADDENDUM NO. 1

DOCUMENT ADDENDUM NO. 1 DOCUMENT 00 91 01 ADDENDUM NO. 1 1. GENERAL This document includes requirements that clarify or supersede portions of the bid and/or contract requirements for the project. This Addendum is a Contract Document.

More information

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION STRUCTURE MOUNT RAILING SYSTEM SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety

More information

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP Agenda Introduction (5 minutes) UCF Introduction (5 minutes) Project

More information

A Homeowner s Guide to Renovation and Addition Permits

A Homeowner s Guide to Renovation and Addition Permits A Homeowner s Guide to Renovation and Addition Permits What is a Building? The Building Code Act of Ontario defines a building as: 1. A structure occupying an area greater than 10 m2 (108 sq. ft.) consisting

More information

AIR CRE Industrial Building Standards

AIR CRE Industrial Building Standards AIR CRE Industrial Building Standards Established March 1993 AIR CRE 500 N Brand Blvd, Suite 900, Glendale CA, 91203 AIR CRE INDUSTRIAL BUILDING STANDARDS TABLE OF CONTENTS SECTION 1 Introduction P. 1

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project

More information

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued July 22, 2010 Information Bulletin No. IB-016 DOCUMENT SUBMITTAL

More information

DECK CONSTRUCTION REQUIREMENTS

DECK CONSTRUCTION REQUIREMENTS DECK CONSTRUCTION REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern. We

More information

APPENDIX 1 PROJECT REQUIREMENTS

APPENDIX 1 PROJECT REQUIREMENTS APPENDIX 1 PROJECT REQUIREMENTS I) Scope of Work This section contains a general summary of the work the Contractor shall perform under this contract. If any conflict exists between the work described

More information

ORANGE VISTA HIGH SCHOOL PHASE I

ORANGE VISTA HIGH SCHOOL PHASE I 975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report February 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

ADDENDUM NO. 2. November 8, For: Wawona Hotel Heating Replacement CIF 5013

ADDENDUM NO. 2. November 8, For: Wawona Hotel Heating Replacement CIF 5013 November 8, 2012 For: Wawona Hotel Heating Replacement CIF 5013 Issued by: The Yosemite National Park Concessionaire Delaware North Companies Parks & Resorts at Yosemite, Inc. (DNC) Yosemite National Park

More information

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA Structural Analysis Overview: During the structural analysis of the in Lancaster, Pa, a redesign of the lateral and gravity system from masonry bearing and shear walls to a staggered truss system was performed.

More information

Town of Kingsville. Building Department

Town of Kingsville. Building Department Town of Kingsville Building Department GUIDE TO ACCESSORY STRUCTURES AND DECKS FOR BUILDING PERMITS www.kingsville.ca 2017 Disclaimer: The fees and by-law information compiled within this guide are for

More information

Addendum No: One (1) Date: April 16, 2013 Project No.: College of the Muscogee Nation Student Center

Addendum No: One (1) Date: April 16, 2013 Project No.: College of the Muscogee Nation Student Center ADDENDUM Addendum No: One (1) Date: April 16, 2013 Project No.: 12017.00 Project: Location: College of the Muscogee Nation Student Center Okmulgee, Oklahoma This Addendum is issued for information of the

More information

SECTION ROOF EDGE SAFETY RAILING SYSTEM

SECTION ROOF EDGE SAFETY RAILING SYSTEM SECTION 07720 ROOF EDGE SAFETY RAILING SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Provide and install freestanding KeeGuard Roof Edge Protection System, including pipe railings, uprights, bases, counterweights,

More information

TG07.5 Metal Stairs and Ladders Construction Services

TG07.5 Metal Stairs and Ladders Construction Services TG07.5 Metal Stairs and Ladders Construction Services Questions are numbered in the order received. Numbers missing in the sequence will be answered in a future response set. Question Submission Date TG07.5-001

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016)

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016) 508 Baylor Court Suite C Chesapeake, VA 23320 757.436.0610 phone 757.436.2070 fax Mr. Steven McMahon Manager of Architectural Services Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:

More information

PennDOT e-notification No. 13

PennDOT e-notification No. 13 PennDOT e-notification No. 13 Bureau of Project Delivery Bridge Design and Technology Division April 3, 2006 (Revised April 2016) Interim Revision to Bridge Standard Drawing(s) Drawing 86-353 PE (Change

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

MITTERSILL WARMING HUT

MITTERSILL WARMING HUT STATE OF NEW HAMPSHIRE DEPARTMENT OF RESOURCES AND ECONOMIC DEVELOPMENT DIVISION OF PARKS AND RECREATION PROJECT #: CAP 1786 FRANCONIA NOTCH STATE PARK FRANCONIA, NEW HAMPSHIRE DRAWING LIST: COVER SHEET

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

CONTRACTOR Bid (Project A) Bid (Project B) TOTAL (Project A + B) Willkom Inc $ 2,057, $ 1,894, $ 3,951,000.

CONTRACTOR Bid (Project A) Bid (Project B) TOTAL (Project A + B) Willkom Inc $ 2,057, $ 1,894, $ 3,951,000. ABSTRACT OF BIDS DATE BIDS RECEIVED: December 5, 2017 HS - HS - Replace Bleachers Theater Repair & POT Estimate $ 2,108,496.00 $ 1,421,338.00 $ 3,529,834.00 CONTRACTOR Bid 1810033 (Project A) Bid 1810034

More information

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA 95825 Phone (916) 568-3071 FAX (916) 568-3145 Purchasing Department Sacramento City College American River College Cosumnes River College

More information

Residential Building Permits

Residential Building Permits JWS INSPECTION SERVICE 3407-43B Avenue Lloydminster, Saskatchewan S9V-2G1Ph:780-808-5704 Email: jsydoruk@sasktel.net Residential Building Permits A residential building is a one or two unit dwelling, along

More information

Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement

Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement DATE: July 15, 2011 ADDENDUM NUMBER: 2 MODIFYING: Specifications No. 1698 PROJECT: Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement BID TIME AND DATE: 2:00 p.m., July 19, 2011

More information

Natural Sweater Village Ltd

Natural Sweater Village Ltd Natural Sweater Village Ltd Raju Tower, Gouripur, Ashulia, Dhaka (23.887817E,90.318335N) 19 December 2013 1 2 Building 1 Building Observations 3 Drawings do not correspond with constructed condition in

More information

PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT.

PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT. October 23, 2017 PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT. PROJECT ADDRESS: 775 N. LARK ELLEN AVENUE, WEST COVINA, CA 91791 DSA A#:

More information

1. Include plans, elevations, sections, details, and attachments to other work.

1. Include plans, elevations, sections, details, and attachments to other work. SECTION 102213- PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE

V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CAN/CSA B355 CAN/CSA B613 Part No. 000690 22-m08-2017 Copyright 2017 Savaria Concord Lifts, Inc. All rights reserved.

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System SECTION 05720 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

Metal Fabricators. Phone DAKA (3252) Fax Serving the Construction Industry and Manufacturers Since 1977

Metal Fabricators. Phone DAKA (3252) Fax Serving the Construction Industry and Manufacturers Since 1977 Metal Fabricators Serving the Construction Industry and Manufacturers Since 1977 Structural Steel, Joists & Deck Miscellaneous & Ornamental Metals, Stairways & Railings OEM Fabrication / Custom Metal Work

More information

The addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1

The addendum consists of six (6) pages of 8½ x 11 text and three (3) 30 x 42 drawings*. End of Addendum 1 ADDENDUM # ENTRYWAY UPGRADES KILLINGLY INTERMEDIATE SCHOOL 99 UPPER MAPLE STREET DAYVILLE, CT 0 S/P+A PROJECT NO. 8.8 DATE: July, 08 The following changes to the Drawings and Project Specifications shall

More information

STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL

STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL JLR JOB NO. 26662-19 ISSUED FOR TENDER DECEMBER 22, 2014 COVERS AND DRAWING LISTS STRUCTURAL 000 COVER SHEET S100 GENERAL NOTES, FLOOR PLAN & DETAILS

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System SECTION 05720 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass

More information

Angio to Cath. Lab Renovation ADDENDUM #2 12/29/2017

Angio to Cath. Lab Renovation ADDENDUM #2 12/29/2017 Angio to Cath. Lab Renovation ADDENDUM #2 12/29/2017 1. Please see the attached revised Bid Form. 2. Please see the attached Bid Addendum No. 2 Document produced by Sfeir Architects BID SCHEDULE for Angio

More information

ADDENDUM NUMBER ONE (1) September 30, 2015

ADDENDUM NUMBER ONE (1) September 30, 2015 ADDENDUM NUMBER ONE (1) September 30, 2015 TO: LAWRENCE H. PEEK ARCHITECTS P.O. Box 2932; Homer, Alaska 99603 CITY OF WHITTIER PUBLIC SAFETY FACILITY WHITTIER, ALASKA ARCHITECT S PROJECT NUMBER - 14003

More information

CEILING MOUNTED ARTICULATING JIB CRANE

CEILING MOUNTED ARTICULATING JIB CRANE SECTION 14657 CEILING MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

Structural Design for a Low Rise Office Building

Structural Design for a Low Rise Office Building University of Wyoming Wyoming Scholars Repository Honors Theses AY 15/16 Undergraduate Honors Theses Spring 5-15-2016 Structural Design for a Low Rise Office Building Shane Halverson University of Wyoming,

More information

Advance Notice June 27, Cougar Ridge and Sunset Elementary Schools Change Order #7 Crawford

Advance Notice June 27, Cougar Ridge and Sunset Elementary Schools Change Order #7 Crawford Advance Notice June 27, 2018 Cougar Ridge and Sunset Elementary Schools Change Order #7 Crawford Action to be taken: I move the board approve the Cougar Ridge and Sunset Elementary Schools Change Order

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO. BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SAN!' A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES DESIGN & CONSTRUCTION TEL:

More information

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

DALLAS-FORT WORTH INTERNATIONAL AIRPORT DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR

More information

RAPID STRUCTURAL ASSESSMENT REPORT

RAPID STRUCTURAL ASSESSMENT REPORT Structure Type: SUPERSTRUCTURE Work Order: 5540 Facility Name: Pier 68 Warehouse FIN: 1680036 Building- Bldg. # 36 Asset Number: 1680-BLDG36 Facility Code: 3490 Asset Activity: STRUCTURE TWO YR Port Engineer:

More information

V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE

V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE V1504 VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CAN/CSA B355 CAN/CSA B613 08-m08-2016 Part No. 000690 Copyright 2016 Savaria Concord Lifts, Inc. All rights reserved.

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 1: Stairs DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project

More information

Applicant: FRANK RIGA and JOHN BERTACCO Kipling Avenue, Woodbridge. No Planning Comments were received at the time this agenda was printed.

Applicant: FRANK RIGA and JOHN BERTACCO Kipling Avenue, Woodbridge. No Planning Comments were received at the time this agenda was printed. File: A169/14 Item # 8 Ward #2 Applicant: FRANK RIGA and JOHN BERTACCO Address: Agent: Notes: 8336 Kipling Avenue, Woodbridge NONE No Planning Comments were received at the time this agenda was printed.

More information

See attached sketches showing clarifications to Gaylord Entry Roof and Bridge Roof per review and on site and with Central States Roofing.

See attached sketches showing clarifications to Gaylord Entry Roof and Bridge Roof per review and on site and with Central States Roofing. ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS AIA DOCUMENT G710 (Instructions on reverse side) Owner 1 Architect 1 Consultant 1 Contractor 1 Field 0 Other 0 PROJECT: OWNER: The Edge @ City Park 1855 Gaylord Street

More information

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f STANMYRE + NOEL Architects, P.C. 1890 Preston White Drive, Suite 104 Reston, VA 20191 v. 703.471.9350 f. 703.834.1031 info@snarchitects.com S E P T E M B E R 19, 2 0 1 6 ADDENDUM #3 PROJECT: WHITE OAKS

More information

INCLINATOR ELEVETTE. Planning Guide. CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR

INCLINATOR ELEVETTE. Planning Guide. CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR INCLINATOR ELEVETTE Planning Guide CABLE DRUM 1000 lb. (454 Kg) AMERICA S MOST CUSTOMIZABLE ELEVATOR Introduction It started over 90 years ago with a passion to help an ailing friend access his multi-level

More information

SPECIFICATIONS Section Gable Walkway Covers

SPECIFICATIONS Section Gable Walkway Covers Part 1: General 1.1 Related Documents SPECIFICATIONS Section 107303 Gable Walkway Covers A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.2 Engineering Design

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Glenlake Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Glenlake Modular Railing System SECTION 05 5200 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Glenlake Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install post supported stainless steel railings and components.

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Structural Observation Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2013

Structural Observation Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2013 Structural Observation Program Based on the 2013 California Building Code (CBC) Chapter 17 Published 2013 City of Pismo Beach, Building Division 760 Mattie Road Pismo Beach, CA 93449 (805) 773-7040 Fax:

More information

CONTRACT NO. DOL-ETA-16-C-0043

CONTRACT NO. DOL-ETA-16-C-0043 CONTRACT NO. DOL-ETA-16-C-0043 EXTERIOR FAÇADE WALL BRACING GULFPORT JOB CORPS CENTER GULFPORT, MISSISSIPPI SEPTEMBER 2016 PREPARED FOR: U.S. DEPARTMENT OF LABOR PREPARED BY: September 30, 2016 Maria J.

More information

DECK DAMAGE AND PENETRATIONS

DECK DAMAGE AND PENETRATIONS DECK DAMAGE AND PENETRATIONS Prepared By Richard B. Heagler, P.E. SDI CONSULTANT Copyright 1987 (Rev. 2000) All rights reserved P.O. Box 25 Fox River Grove, IL 60021 Phone: (847) 458-4647 Fax: (847) 458-4648

More information

DEFINITIONS: The following definitions apply to terms used in this document:

DEFINITIONS: The following definitions apply to terms used in this document: PURPOSE: California Code of Regulations (CCR), Title 24, Part 1, CCR, Chapter 4, Article 1 (Sections 4-211 through 4-220) and Group1, Articles 5 and 6 (Sections 4-331 through 4-344) provide regulations

More information

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements General Information Site Card. Before starting construction, post the site card (issued by the City) in a front window visible from the street. Miss Dig. Before you dig, call Miss Dig at 800.482.7171 This

More information

SECTION ORCHESTRA PIT FILLER

SECTION ORCHESTRA PIT FILLER PART 1 - GENERAL 1.1 SECTION INCLUDES A. Orchestra pit filler. 1.2 REFERENCES SECTION 11 61 00 ORCHESTRA PIT FILLER A. American Hardboard Association (AHA): 1. AHA A135.4-95: Basic Hardboard. B. American

More information

BOND CONSTRUCTION UPDATE

BOND CONSTRUCTION UPDATE BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND

More information

ADDENDUM #5. Northbrook/Glenview District 30 New Maple School. Construction Manager s Bid Package Clarification No. 5/Addendum No.5 January 22nd, 2018

ADDENDUM #5. Northbrook/Glenview District 30 New Maple School. Construction Manager s Bid Package Clarification No. 5/Addendum No.5 January 22nd, 2018 NICHOLS & SSOCITES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 6006 Fax 847.394.620 DDENDUM # Northbrook/Glenview District 30 New Maple School Construction Manager s Bid Package Clarification

More information

Proud of its Heritage, Preparing for its Future

Proud of its Heritage, Preparing for its Future TUSTIN Proud of its Heritage, Preparing for its Future Revised August 2013 USER GUIDE FOR THE INSTALLATION OF RESIDENTIAL ROOM ADDITIONS OR ALTERATIONS PURPOSE This guide describes the City of Tustin s

More information

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System SECTION 05 5200 ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Casino Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install stainless steel railings and components. 1.02 REFERENCE

More information

SECTION ENTRANCE FLOOR GRILLES SPECIFICATIONS

SECTION ENTRANCE FLOOR GRILLES SPECIFICATIONS SECTION 12 48 16 ENTRANCE FLOOR GRILLES SPECIFICATIONS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

SPECIAL INSPECTION AND TESTING AGREEMENT

SPECIAL INSPECTION AND TESTING AGREEMENT COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 MAGNETIC SHIELDING PART 1 GENERAL 1.1 GENERAL

More information

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07 Latrobe Elementary School Greater Latrobe School District 08 January 2018 PROJECT SUMMARY Work Completed to date: Ductwork sealed off. Slab Prep in Main

More information

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1 September 9, 2014 to the BIDDING DOCUMENTS for ELLIS COUNTY COMPLEX Records Storage Building Waxahachie, Texas

More information

PROPOSED CHANGE ORDER

PROPOSED CHANGE ORDER PROPOSED CHANGE ORDER CLW Builders, Inc. 1431 Ocean Avenue, San Francisco CA 94112 Tel: 4153339788 Fax: 4153339787 TO: Robert Tigbao San Francisco Department of Public Works SECTION: DATE: 03/07/17 PCO

More information

Trex Commercial Products page Decorative Metal Railing

Trex Commercial Products page Decorative Metal Railing SECTION 05 73 00 DECORATIVE METAL RAILINGS TREX COMMERCIAL PRODUCTS Monaco Modular Railing System PART 1 GENERAL 1.01 WORK INCLUDED A. Furnish and/or install supported glass stainless steel railings, glass

More information

REQUEST FOR PROPOSAL FOR MATERIAL TESTING AND SPECIAL INSPECTION SERVICES

REQUEST FOR PROPOSAL FOR MATERIAL TESTING AND SPECIAL INSPECTION SERVICES REQUEST FOR PROPOSAL FOR MATERIAL TESTING AND SPECIAL INSPECTION SERVICES DATE: November 13, 2018 PROJECT: OWNER: BUDGET: University Farm Pavilion College of Agriculture and Environmental Services NC A&T

More information

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings

Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Wood Decks Zoning and construction requirements for open non-sheltered wood decks for residential dwellings November 2017 contents General Information... 3

More information

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (Print first / last name) Phone:

More information

PR (rev ) Page 1 of 22 DIVISION OF THE STATE ARCHITECT DEPERTMENT OF GENERAL SERVICES STATE OF CALIFORNIA

PR (rev ) Page 1 of 22 DIVISION OF THE STATE ARCHITECT DEPERTMENT OF GENERAL SERVICES STATE OF CALIFORNIA A Division of the State Architect (DSA) Procedure documents a process or series of steps that DSA staff and/or external stakeholders must complete in order to fulfill one or more administrative requirements

More information

NEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1

NEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1 MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE

More information

Submittal Review A

Submittal Review A Submittal Review TO: Pavilion Construction DATE: 07.20.2015 JOB NO.: 1484P 4700 SW Macadam Ave Suite 200 ATTENTION: Riley Tobin Portland, OR 97239 RE: BSD Sunset High School Concession Stand/Interior Renovations

More information

Grimes Elementary School Renovation September 7, 2010 Houston Independent School District SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information