This paper compares a number of traditional load in/out techniques against a single LoadFast advanced rolling platform and Beam Hoist

Size: px
Start display at page:

Download "This paper compares a number of traditional load in/out techniques against a single LoadFast advanced rolling platform and Beam Hoist"

Transcription

1 Cost Comparison of Load In/Out Techniques Summary This paper compares a number of traditional load in/out techniques against a single LoadFast advanced rolling platform and Beam Hoist It considers the practical process issues and compares them according to elapsed process time along with the associated costs for the various loading methods. The effects of the following are taken into account:- Once off costs o Design time o Temporary works including scaffolding o Removal of temporary works o Installation and removal Ongoing costs o Rental o Movement costs whether by Tower Crane or Beam Hoist o Loading times o Manning The comparisons made are to traditional:- Scaffold (Alimak) Hoists Buck Hoist Material Hoists Scaffold Platform The results may be tabulated as follows :- Per 40 hour week Load out time for 1000 loads - weeks Platform/beam hoist Alimak Buck Hoist Scaffold Platform % Savings Number of Loads Alimak Buck Hoist Scaffold Platform 50 11% 10% -11% % 50% 20% % 63% 35% % 72% 47% % 80% 59% Copyright LoadFast Systems 2012 Page 1

2 Cost Saving Number Of Loads Alimak Buck Hoist Scaffold Platform 50 $ -2, $ -2, $ -6, $ 15, $ 15, $ $ 37, $ 37, $ 7, $ 81, $ 81, $ 24, $ 435, $ 434, $ 154, The analysis assumes a fixed 17 week hire period for all types of systems. With the capability of a greater number of load outs/week it is possible to reduce the load in/out time further, creating additional cost savings for the LoadFast range of products. This additional cost saving is seen on reduction of rental costs, on site costs, and cost savings by reaching project milestones earlier. These have not been included in these calculations due to differences between sites. The following overall conclusions may be seen By using a LoadFast combination system, reductions in cost of up to 78 % can be achieved, together with load out times reduced by 85 % Whilst the savings over a scaffold platform are smaller, there are still substantial gains to be achieved if there are any relocations required, or a platform / hoist combination is used In all cases if the load in/out point needs to be relocated, a LoadFast system is always more cost and time effective. Copyright LoadFast Systems 2012 Page 2

3 Initial Comparison The features are compared in the table below. The process steps for their use may be described as follows : LoadFast Platform and Hoist Check loadings and structure for access positions Design and manufacture any special steelwork for mounting purposes Transport LoadFast system to site and erect using tower/mobile crane Material loading process; (up to 5 ton can be loaded with each lift) o Load arrives on site o Lift load off lorry by Beam Hoist and into rolling platform in one operation o Move load from rolling platform to work area At end of project, remove LoadFast system components and any special steelwork directly to transport Alimak scaffold hoists. Design and check loadings for each access position. A new position means a new design process. Design constraints mean the Max load of hoist is typically less than 2 ton and the gate opening is a maximum of ~2m leading to the requirement to break down full loads into 2 or 3 sub-loads Erect scaffolding and hoist (typically called Alimak) Loading process o Load arrives on site o Lift load off lorry by tower crane or fork lift, into a compound. (it is rare that the lorry can get direct to Alimak hoist ) o Break down loads into part loads o Transport to Alimak o Lift into appropriate floor into building o Move load from Alimak to work area Remove Hoist and Scaffold Make good fixing points Buck Hoist Design and check loadings for each access position. A new position means a new design process. Design constraints mean the Max load of the climber is typically less than 2 ton requiring a break down of full loads into 2 or 3 sub-loads. Dimensional constraints also apply here. Erect any scaffolding and mast climber Loading process Copyright LoadFast Systems 2012 Page 3

4 o Load arrives on site o Lift load off lorry by tower crane or fork lift, into a compound. (it is rare that the lorry can get direct to climber) o Break down loads into part loads o Transport to climber o Lift into appropriate floor into building o Move load from climber to work area Remove climber and any scaffold Make good fixing points Other process constraints On city sites space is a premium and generally there is no intermediate storage for pallets, broken down loads etc The larger loads, such as bathroom pods cannot be broken down into smaller loads so can only be loaded via a scaffold platform or loading platform Scaffold hoists and Mast Climber lifts go up very slowly at approx one quarter the speed of a tower crane., adding more time to the process Climbers / Hoists are multi use, often used simply to transport personnel and hence time availability for material movement is constrained Copyright LoadFast Systems 2012 Page 4

5 Comparison Feature Table LoadFast beam Scaffold Hoist Buck Hoist Scaffold Platform hoist and rolling platform WLL ( Lbs ) <4000 > Footprint Within building External External External Installation No permanent structural tie in to repair at end Structural rework needed Structural rework needed Structural rework needed Utilisation Material Only Shared Usually people only Shared Positioning Relocatable Fixed Fixed Fixed Loading area Multiple sizes Limited / Small Limited / Small Small Operator requirement None Skilled Skilled None Design cost Low High High Medium Running cost Low Expensive Expensive Low Complexity Low High High Med Usage Dedicated Multiple Multiple Dedicated Copyright LoadFast Systems 2012 Page 5

6 Flow Process LoadFast beam hoist and rolling platform Copyright LoadFast Systems 2012 Page 6

7 Flow Process Scaffold Hoist / Buck Hoist Copyright LoadFast Systems 2012 Page 7

8 One Off Costs LoadFast Rolling Platform LoadFast Beam Hoist Buck Hoist Scaffold Platform Rate/min Manning LoadFast Combination Scaffold Hoist Buck Hoist Scaffold Platform Design Scaffold Installation Installation Scafffold Removal Removal Structure Remedial Work Scaffold Rental week rental period average Mins Cost $ 23, $ 17, $ 17, $ 15, Per Load Costs Remove from transport Transport to compound Breakdown of Pallet to smaller loads ( 2 ) Transport of pallet to to load position Waiting time Load Tower Crane Time Vertical Transit Time Unload Transport of pallet to work position Mins Cost $ $ $ $ % time savings 84% 84% 65% Load outs / week Load outs in rental period Total Project Costs Number of Loads per building 50 $ 24, $ 22, $ 22, $ 18, $ 28, $ 44, $ 44, $ 28, $ 33, $ 71, $ 70, $ 41, $ 43, $ 124, $ 124, $ 67, $ 119, $ 554, $ 554, $ 274, % Savings using LoadFast Combinations Cost Savings using LoadFast combinations 50-9% -10% -37% $ -2, $ -2, $ -6, % 35% -1% $ 15, $ 15, $ % 53% 19% $ 37, $ 37, $ 7, % 65% 36% $ 81, $ 81, $ 24, % 78% 56% $ 435, $ 434, $ 154, Copyright LoadFast Systems 2012 Page 8

9 General Assumptions over a 17 week hire period Area Specific Design Scaffold Installation Installation Removal Structural remedial work Scaffold rental Rental period Remove from transport Transport to compound Breakdown of Pallet Transport of multiple pallets Waiting Time Load Tower Crane Time Vertical Transit time Unload Transport of Pallet General Logic More design work needed for interface with structure for all techniques other than LoadFast systems Temporary works required for both Scaffold Hoist and Mast Climber Required in all cases 1 week for full scaffold system installation, LoadFast based on 2 off standard installations Removal based on standard rates LoadFast based on 2 off standard removals Remedial work on pick up points required for all techniques other than LoadFast systems Based on temporary works time x commercial scaffold rental assumed 10 storey building Average LoadFast system rental period is 17 weeks, assumed 2 off rolling platforms, 2 off Scaffold Platforms $750 / wk for Scaffold Hoist and Buck Hoist $240 / wk for LoadFast rolling Platform $1000 / wk for LoadFast Beam Hoist $320 / wk for Scaffolding Known quote of $14500 for mast climber scaffolding 18m long x 10 M high Labour only cost some additional costs for additional equipment but similar across all techniques Labour only cost understated for both Scaffold Hoist and Buck Hoist because of additional equipment required Labour only cost understated for both Scaffold Hoist and Buck Hoist because of additional equipment required Labour only cost understated for both Scaffold Hoist and Buck Hoist because of additional equipment required Estimated wait time for crane / hoist can be significantly longer as they are shared. Double for Scaffold Hoist / Buck Hoist as there are now two loads Labour only cost understated for both Scaffold Hoist and Mast Climber because of additional equipment required Estimated lift time For Scaffold Hoist and Buck Hoist significantly longer transit time Faster with Rolling Platform due to the ability of the load to be easily pulled into the building. Double for Scaffold Hoist / Buck Hoist as there are now two pallets. Double for Scaffold Hoist / Buck Hoist as there are now two pallets. Manning at $45/hour all up including benefits Tower crane costs based on $6000/wk at 40 hours availability Copyright LoadFast Systems 2012 Page 9

10 Savings Comparison Savings over Scaffold Hoist %Saving 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% -10% -20% $460, $450, $440, $430, $420, $410, $400, $390, $380, $370, $360, $350, $340, $330, $320, $310, $300, $290, $280, $270, $260, $250, $240, $230, $220, $210, $200, $190, $180, $170, $160, $150, $140, $130, $120, $110, $100, $90, $80, $70, $60, $50, $40, $30, $20, $10, $- $-10, $-20, $-30, Number of Loads % Savings using LoadFast Combinations Cost Savings using LoadFast combinations Copyright LoadFast Systems 2012 Page 10

11 Savings over Buck Hoist 90% $500, % $450, % $400, % $350, % $300, % Savings using LoadFast Combinations %Saving 40% 30% $250, $200, Cost Savings using LoadFast combinations 20% $150, % $100, % $50, % $- -20% $-50, Number of Loads Copyright LoadFast Systems 2012 Page 11

12 Savings Over Scaffold Platform 80% $180, % $160, $140, % $120, % Savings using LoadFast Combinations %Saving 20% 0% $100, $80, $60, Cost Savings using LoadFast combinations -20% $40, $20, % $- -60% Number of Loads $-20, Copyright LoadFast Systems 2012 Page 12

CRANE LOADING PLATFORMS

CRANE LOADING PLATFORMS CRANE LOADING PLATFORMS www.samsonequipment.co.uk INTRODUCTION Samson Equipment Ltd have over 50 years combined experience in the cranes and lifting industry and have drawn on this expertise to offer a

More information

THE. Unitized Advantage

THE. Unitized Advantage THE Unitized Advantage The BCi Unitized Advantage Packaging & Delivery 1. Identification Prior to packaging, each panel or item is marked with a unique alphanumeric identifier corresponding to a unique

More information

MATERIAL HANDLING CHAPTER OUTLINE

MATERIAL HANDLING CHAPTER OUTLINE 3 MATERIAL HANDLING CHAPTER OUTLINE 3.1 Introduction and Meaning 3.2 Objectives of Material Handling 3.3 Principles of Material Handling 3.4 Selection of Material Handling Equipments 3.5 Evaluation of

More information

Contents. Introduction 5. CantiDeck System 6. Fixed Flush CantiDeck 8. Super Roller CantiDeck 10. Specifications 12.

Contents. Introduction 5. CantiDeck System 6. Fixed Flush CantiDeck 8. Super Roller CantiDeck 10. Specifications 12. Introduction 5 CantiDeck System 6 Fixed Flush CantiDeck 8 Super Roller CantiDeck 10 Contents. Specifications 12 Configurations 14 Other Solutions 24 Case Study 32 Custom 34 Consultancy 36 Associated Products

More information

The Merits of Structural Steelwork

The Merits of Structural Steelwork B309 12pp Final 11/12/02 11:14 AM The Merits of Structural Steelwork Page 2 The Purpose of this Reference Manual The guide, which has been prepared by BCSA, should be used in discussions with clients and

More information

PALLET RACKING SOLUTIONS

PALLET RACKING SOLUTIONS PALLET RACKING SOLUTIONS DESIGN, MANUFACTURE, INSTALL Based in Milton Keynes, Apex has provided pallet racking solutions to a huge number of household name brands, across all sectors and industries. Our

More information

Preston dekx Loading Platform for Cranes Overhead Protection or Decking Cantilevered Support or Storage Patented Worldwide

Preston dekx Loading Platform for Cranes Overhead Protection or Decking Cantilevered Support or Storage Patented Worldwide Preston dekx Loading Platform for Cranes Overhead Protection or Decking Cantilevered Support or Storage Patented Worldwide Preston SuperDeck is a Preston invention and the best and leading loading platform

More information

Operations and Rigging (Construction)

Operations and Rigging (Construction) Qualification Title: Level 2 NVQ Diploma in Accessing Operations and Rigging (Construction) Pathway 1: Level 2 NVQ Diploma in Accessing Operations and Rigging (Scaffolding) Pathway 2: Level 2 NVQ Diploma

More information

Operations and Rigging (Construction)

Operations and Rigging (Construction) Qualification Title: Level 2 NVQ Diploma in Accessing Operations and Rigging (Construction) Pathway 1: Level 2 NVQ Diploma in Accessing Operations and Rigging (Scaffolding) Pathway 2: Level 2 NVQ Diploma

More information

Scottish House Builders Health & Safety Forum

Scottish House Builders Health & Safety Forum Scottish House Builders Health & Safety Forum SG 4:10 Preventing Falls in Scaffolding Presentation By Mark Clarke Clarke Health & Safety Consultants The History of Scaffolders Falling From Scaffolds Prior

More information

Operations and Rigging (Construction)

Operations and Rigging (Construction) Qualification : NVQ Diploma in Accessing Operations and Rigging (Construction) Pathway 1: NVQ Diploma in Accessing Operations and Rigging (Scaffolding) Pathway : NVQ Diploma in Accessing Operations and

More information

Lödige LorryLifts. Technology in Motion

Lödige LorryLifts. Technology in Motion Lödige LorryLifts Lödige LorryLifts carry heavy weight lorries and road vehicles to many various levels for loading or unloading. Technology in Motion Lödige Industries With a worldwide labour force of

More information

Tru-lift. The self lifting, core forming system from Forming Concepts Inc

Tru-lift. The self lifting, core forming system from Forming Concepts Inc Tru-lift The self lifting, core forming system from Forming Concepts Inc Features & Benefits Complete system raised during the lifting cycle, maximizing system effectiveness. Introduction Tru-lift is the

More information

Prepared by Andrew Panda. EXPANDA Fence System

Prepared by Andrew Panda. EXPANDA Fence System Prepared by Andrew Panda EXPANDA Fence System Index 1.Introduction Page 3 2.Background Page 4 3. Existing Fence Systems Page 5 4.Features 4.1 Packaging Page 6-8 4.2 Rubber flaps Page 9 4.3 Exclusion Zone

More information

Is off-site construction greener? Bob Francis, Director Modular Systems +

Is off-site construction greener? Bob Francis, Director Modular Systems + Is off-site construction greener? Bob Francis, Director Modular Systems + Modular Systems + Who we are What sustainability means to us Building Information Modelling (BIM) Reduced local impact Zero defects

More information

Automated roll warehouse case study: Stora Enso Imatra

Automated roll warehouse case study: Stora Enso Imatra Automated roll warehouse case study: Stora Enso Imatra By Kaj Fahllund, VP Paper and Converting, Pesmel Oy In the summer of 2016, Stora Enso announced their intention to invest in Imatra mills in order

More information

Products. Conveyor Systems. System components

Products. Conveyor Systems. System components Products Conveyor Systems System components Chain conveyor Roller conveyor Accumulating roller conveyor Conveying, wide face leading. Optional load guidance with side rails. Conveying, narrow face leading.

More information

Generation Hop up brackets to be removed and boards moved to lift above.

Generation Hop up brackets to be removed and boards moved to lift above. Denotes Ladder for Access from 2nd Lift to Extenda Bracket Generation Hop up brackets to be installed to manufacturer's instructions. Installed at 1200mm c/c max & 1050mm down from top of wall section.

More information

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM)

Costs and benefits of reducing waste in construction. Defence sector new build Woolwich single living accommodation modernisation (SLAM) Costs and benefits of reducing waste in construction Defence sector new build Woolwich single living accommodation modernisation (SLAM) Value Percentage of 3.2m construction cost Cost saving potential

More information

Schindler CLIMB LiftTM Transportation Solution For Your Construction Site

Schindler CLIMB LiftTM Transportation Solution For Your Construction Site Transportation Solution For Your Construction Site Speed up construction Save expense Safe operation with higher transportation efficiency from material through to manpower under all conditions Fast development

More information

Dr. Ahmed Hussien Elyamany 2017 Questions

Dr. Ahmed Hussien Elyamany 2017 Questions Questions Question 1 (25 Marks): Select the best answer from the available choices for each of the following: 1. Cranes may be used for 2. cranes consist of a carrier and superstructure equipped with a

More information

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS Garnsworthy Square 46, 62 & 64 Garnsworthy St Springvale rth Victoria 3171 Updated on 22/02/08 STC105 Name BASIC SCAFFOLDING KNOWLEDGE QUESTIONS THE PROFESSIONAL Scaffold Tools Scaffold Belts Couplers

More information

USER S MANUAL. HAKI Loading Tower

USER S MANUAL. HAKI Loading Tower USER S MANUAL HAKI Loading Tower HAKI AB 2018 Important information HAKI s product liability and user s manuals apply only to scaffolds that are entirely composed of components that have been made and

More information

Presented by : Liam Gooding

Presented by : Liam Gooding Presented by : Liam Gooding Every day as safety professionals we face challenges. Some big, some small. Over the past year we have been focusing on some challenges to problems by providing practical solutions

More information

Hi-Point TM off-site roof system

Hi-Point TM off-site roof system CI/SfB (27) Xh September 2006 Kalzip Ltd Hi-Point TM off-site roof system Benefits Hi-Point... off-site roof system with the benefits built-in A superior, simple and safer method of roof construction Health

More information

Sequence. Dynamic. Compact. Tower

Sequence. Dynamic. Compact. Tower equence Dynamic Compact Tower ystem solutions Preconfigured maximum performance in compact spaces. Me uence - Automated goods issue 1 Mequence Variant peed imple, automatic and intelligent load supply

More information

Onward and Upward Case Study of a Hospital Vertical Expansion Project

Onward and Upward Case Study of a Hospital Vertical Expansion Project Onward and Upward Case Study of a Hospital Vertical Expansion Project Tuesday, October 2, 2012 11:15 AM 12:45 PM Presenters Nick Slater Patti Hays Mary J. Schafer Michael Bluhm Principal, MSKTD & Associates,

More information

GRIDFLEX The flexible slab formwork with safe accessible grid elements

GRIDFLEX The flexible slab formwork with safe accessible grid elements GRIDFLEX The flexible slab formwork with safe accessible grid elements 07044 Edition 04 2011 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax

More information

PALLETPAL Level Loaders, Turntables, Rotators/Inverters and Transporters

PALLETPAL Level Loaders, Turntables, Rotators/Inverters and Transporters PALLETPAL Level Loaders, Turntables, Rotators/Inverters and Transporters Load and Unload Pallets the Faster, Safer and Easier Way Loading and unloading pallets is time consuming, back breaking work that

More information

The following is Copyright 2009 The Queen s Printer, Saskatchewan

The following is Copyright 2009 The Queen s Printer, Saskatchewan Saskatchewan Elevated Work Platform This material has been extracted from the Regulations and Acts of the Province as an aid to help students better understand the subject. This is not an official source

More information

Fork Mounted Spreader Bars

Fork Mounted Spreader Bars Fork Mounted Spreader Bars Model - MASPRX-1320 Installation and Safety Manual www.haugenattachments.com Adjustable Spreader Bars -Engineering Haugen Spreader Bar model MASPRX 1320 is designed for use on

More information

Access Equipment Market Report - UK Analysis

Access Equipment Market Report - UK Analysis Access Equipment Market Report - UK 2016-2020 Analysis Published: 18/11/2016 / Number of Pages: 63 / Price: 845.00 Introduction and Overview The 12th edition of the'access Equipment Market Report - UK

More information

Construction Method Statement

Construction Method Statement Construction Method Statement Planning Application Phase 17 October 2014 for 79-85 Monier Road London E3 2PS Penten Group Ltd 816 Garratt Lane London SW17 0LZ Tel: 020 8772 4040 Description Contents Page

More information

Tyre Handling Conveyors and placed out of the way on the side with a length of 6m or 7m! With these conveyors you can reduce the time for the loading

Tyre Handling Conveyors and placed out of the way on the side with a length of 6m or 7m! With these conveyors you can reduce the time for the loading Tyre Handling Conveyors When completely extend, available in total lengths of 15m or 20m These conveyors can be extended continuously and are operated via a control panel at the lifting-platform. Electronically

More information

World Trade Center New York, USA - Reconstruction -

World Trade Center New York, USA - Reconstruction - World Trade Center New York, USA - Reconstruction - HOISTING AT WORLD TRADE CENTER L Assomption, Quebec (September 29 th, 2011)- RAXTAR and Hydro Mobile are very proud to have been selected by Atlantic

More information

POWERED BY KNOWLEDGE

POWERED BY KNOWLEDGE POWERED BY KNOWLEDGE DISCOVER MORE, VISIT WWW.CQEGROUP.COM OR GIVE US A CALL 0845 520 1101 WELCOME ENGINEERING GROUP Powered by Knowledge Cantideck is part of Conquip Engineering Group, a market leading,

More information

Optimized Efficiency and Performance - automated unit load warehousing. The Hi-Racker Automated VNA

Optimized Efficiency and Performance - automated unit load warehousing. The Hi-Racker Automated VNA Optimized Efficiency and Performance - automated unit load warehousing The Hi-Racker Automated VNA The multi-talented order picking stacker " H I R a c k e r ". Storage and retrieval or order picking?

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls Build faster, pay less. Strength in building technology Uses The Kerkstoel reinforced double walls consist of two slabs of reinforced concrete joined to each other by lattice

More information

RIGGING Complete basic rigging work

RIGGING Complete basic rigging work 1 of 5 level: 2 credit: 35 planned review date: December 2010 sub-field: purpose: entry information: accreditation option: moderation option: Lifting Equipment People credited with this unit standard are

More information

Loading Dock Buyers Guide

Loading Dock Buyers Guide Loading Dock Buyers Guide Basic Trailer Unloading Mobile Ramp Fixed Position Loading Dock Portable Loading Docks Portable Loading Dock Railcar Unload Implements Utility Vehicles Mobile Loading Dock Specialty

More information

Unique Design Concrete Preheater Tower

Unique Design Concrete Preheater Tower Unique Design Concrete Preheater Tower Preheater tower constructed of concrete with steel floors Concrete section 105m high (35 storey building) Additional 10m cyclone structure Footprint 25.3m by 20.4m

More information

Operator Training Program. PROSTAK Storage Management Systems

Operator Training Program. PROSTAK Storage Management Systems Operator Training Program PROSTAK Storage Management Systems Operator Training Index 1. PROSTAK System Nomenclature Slide 3 2. Safe Operating Guidelines Slides 4 and 5 3. Types of PROSTAK Stackers Slide

More information

PALLET RACKING SOLUTIONS. A Whittan Group Company

PALLET RACKING SOLUTIONS. A Whittan Group Company PALLET RACKING SOLUTIONS A Whittan Group Company DESIGN MANUFACTURE INSTALL Link specialises in the design, manufacture and installation of a wide range of versatile storage equipment; from adjustable

More information

NILESH PANCHOLI B.E. (Mech.), M.E. (CAD/CAM) Indus Institute of Technology & Engineering Ahmedabad

NILESH PANCHOLI B.E. (Mech.), M.E. (CAD/CAM) Indus Institute of Technology & Engineering Ahmedabad NILESH PANCHOLI B.E. (Mech.), M.E. (CAD/CAM) Indus Institute of Technology & Engineering Ahmedabad 1 Introduction and Concept 2 Material handling is the function of moving the right material to the right

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

NZQA Expiring unit standard version 3 Page 1 of 6

NZQA Expiring unit standard version 3 Page 1 of 6 Page 1 of 6 Title Supervise civil construction earthworks Level 4 Credits 15 Purpose People credited with this unit standard are able to: estimate quantities of material to be excavated and calculate haul

More information

Flow-Rail Pallet Storage System

Flow-Rail Pallet Storage System Flow-Rail Pallet Storage System Flow-Rail is a high-density pallet storage system operated using conventional fork-lift trucks. It is a non-motorized, last-in/first-out system that can hold from 3 up to

More information

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly MOBILE ACCESS TOWER Incorporating the 3T method of assembly SHALLOW BRACE INSTRUCTION MANUAL 2 INTRODUCTION This instruction manual contains all the information required to correctly assemble the OCTO

More information

MTS Criterion Series 40

MTS Criterion Series 40 MTS Criterion Series 40 Manual Title Lifting and Moving Additional Instructions Information be certain. 100-231-444 C Copyright information Trademark information Proprietary information Software validation

More information

Sheet and bar stock. Vertical Lift System (VLS)

Sheet and bar stock. Vertical Lift System (VLS) 169 Sheet and bar stock Handling systems Vertical Lift System (VLS) 217 92 169 CONTENTS Vertical Lift System 02 How It Works 04 Sheet Metal VLS Features 06 Sheet Metal VLS Specifications 07 Sheet Metal

More information

Joint Structural Division. Standard for. Structural Engineering Services. 2nd Edition

Joint Structural Division. Standard for. Structural Engineering Services. 2nd Edition Joint Structural Division Standard for Structural Engineering Services 2nd Edition SSES2.indd 1 7/20/16 9:39:16 AM Joint Structural Division Second Edition June 2016 Preface The Institution of Structural

More information

AS/RS APPLICATION, BENEFITS AND JUSTIFICATION IN COMPARISON TO OTHER STORAGE METHODS: A WHITE PAPER

AS/RS APPLICATION, BENEFITS AND JUSTIFICATION IN COMPARISON TO OTHER STORAGE METHODS: A WHITE PAPER AS/RS APPLICATION, BENEFITS AND JUSTIFICATION IN COMPARISON TO OTHER STORAGE METHODS: A WHITE PAPER PREPARED BY: Howard Zollinger, P.E. Zollinger Associates, Inc. Copyright 1999 SCOPE This White Paper

More information

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN JSP Construction Ltd 11-13 City Road Cardiff CF24 3BJ Revisions Issue Description Approved By Signed Date 19/10/16 1st issue AN JP 19.10/16 Rev A Updated with

More information

Chapter 9 Storage & Warehouse Systems

Chapter 9 Storage & Warehouse Systems FACILITIES PLANNING & DESIGN Alberto Garcia-Diaz J. MacGregor Smith Chapter 9 Storage & Warehouse Systems 1. Warehouse Layout Model 2. Storage Equipment 3. Automated Storage & Retrieval System 1 Dedicated

More information

Maximize Your Space. Mezzanines are ideal for:

Maximize Your Space. Mezzanines are ideal for: www.vertispace.ws Maximize Your Space Worker productivity and manufacturing efficiencies are under constant scrutiny in today s business world. Whether you re an operations manager charged with expanding

More information

PALLET RACKING SOLUTIONS

PALLET RACKING SOLUTIONS PALLET RACKING SOLUTIONS 01952 683 900 A Whittan Group Company OPTIMUM STORAGE OF PALLETISED GOODS The Link racking system, one of the most widely used pallet racking systems available today, has evolved

More information

storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights.

storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights. storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights. CONVENTIONAL PALLET RACKING The Stow Pal Rack system consists of a full range of basic

More information

Ergonomic Lifting Solutions Photo Gallery

Ergonomic Lifting Solutions Photo Gallery Ergonomic Lifting Solutions Photo Gallery Lift and Tilt Tables are used to position large assemblies during manufacturing. Necropsy Lift Table (small animal autopsy) with accordion shirting. Every single

More information

Access Equipment Market Report - UK

Access Equipment Market Report - UK Access Equipment Market Report - UK 2018-2022 Published: 22/11/2018 / Number of Pages: 65 / Price: 845.00 Introduction and Overview The 13th edition of the 'Access Equipment Market Report - UK 2018-2022'

More information

The Trade Fair Forwarding Agent Tariffs

The Trade Fair Forwarding Agent Tariffs valid from 2018 messe.de General 1 The Trade Fair Forwarding Agent Tariffs 1 through 4 apply for all work performed on site at the Hannover Exhibition Center by forwarding agents authorized by Deutsche

More information

Construction Method Statement

Construction Method Statement Construction Method Statement Introduction. The project involves the construction of the new Apartment Extra Car Home for Grwp Cynefin in Pothmadog, Gwynedd, Wales. The programme and construction methodology

More information

MEMORIAL HOSPITAL GULFPORT A PROJECT STUDY

MEMORIAL HOSPITAL GULFPORT A PROJECT STUDY MEMORIAL HOSPITAL GULFPORT A PROJECT STUDY Building a healthy community together 2005 u HURRICANE KATRINA REPAIRS 2012 u SURGERY MODERNIZATION 2001 u RADIOLOGY RENOVATION 2000 u CLINIC SUPPORT ADDITION

More information

The Trade Fair Forwarding Agent Tariffs valid from 2018

The Trade Fair Forwarding Agent Tariffs valid from 2018 valid from 2018 messe.de General 1 1 through 4 apply for all work performed on site at the Hannover Exhibition Center by forwarding agents authorized by Deutsche Messe AG. The rates for any services not

More information

About us. A proudly Western Australian owned Services company, SMS Group offers a full range of services including:

About us. A proudly Western Australian owned Services company, SMS Group offers a full range of services including: About us Scaffolding Management Services was formed by the Welsh family in Western Australia in 2001. Since then, SMS has rapidly expanded to deliver a range of services to the commercial, industrial and

More information

QUORUM MINING & RELINING SERVICES HEALTH AND SAFETY MANAGEMENT

QUORUM MINING & RELINING SERVICES HEALTH AND SAFETY MANAGEMENT SCAFFOLDING AND ELEVATED WORK PROCEDURE STATEMENT OF PROCEDURE: This procedure reviews the hazards associated with the use of scaffolds and how to control or minimize those hazards. This procedure also

More information

PALLET RACKING SOLUTIONS. A Whittan Group Company

PALLET RACKING SOLUTIONS. A Whittan Group Company PALLET RACKING SOLUTIONS A Whittan Group Company DESIGN MANUFACTURE INSTALL Link specialises in the design, manufacture and installation of a wide range of versatile storage equipment; from adjustable

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls HOW YOUR BUILDING WORKS TAKES PLACE FASTER WHILE YOUR COSTS REMAIN LOW DOUBLE WALLS Strength in building technology The Kerkstoel reinforced double walls consist of two

More information

1 Exam Prep BCSI Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses Questions and Answers

1 Exam Prep BCSI Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses Questions and Answers 1 Exam Prep BCSI Guide to Good Practice for Handling, Installing, Restraining and Bracing of Metal Plate Connected Wood Trusses Questions and Answers Problem Set #1 1. According to BCSI, for lifting truss

More information

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014

GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh ( , ) 22 March 2014 GMS Composite Ltd. Shardagonj, Kashimpur,Gazipur,Bangladesh (23.968661, 90.296963) 22 March 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate that the working stresses of columns

More information

1 Transport. Introduction. 1.1 Lorries have empty or part loads

1 Transport. Introduction. 1.1 Lorries have empty or part loads 1 Transport Introduction The way that transportation is managed in relation to construction has a number of implications. Clearly the efficient movement of materials to sites is a fundamental requirement

More information

Services and Product Introduction and Overview

Services and Product Introduction and Overview Services and Product Introduction and Overview Premium Services and Products Designed for the Power, Industrial, Commercial, Bridge, and Offshore Access Industry SERVICES OVERVIEW Scaffolding Services

More information

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) This document sets out the Morgan Sindall standards for the control of Mobile Elevated Work Platforms (MEWP) on its projects. It

More information

Safe Work Method Statement Perimeter and Balcony Fallguard (0003)

Safe Work Method Statement Perimeter and Balcony Fallguard (0003) Safe Work Method Statement Perimeter and Balcony Fallguard (0003) To be used in conjunction with SWMS 0001 General Site Activities and Fallguard Installation Manual. JOB DETAILS Principal Contractor Project

More information

Concrete Pipe Delivery Near Miss

Concrete Pipe Delivery Near Miss Concrete Pipe Delivery Near Miss WHAT HAPPENED? A Load of 4 No.1800mm diameter concrete pipes arrived to site for off loading. The site entrance was restricted in width and the trailer was reversed outside

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SWMS 002 Erect / Dismantle Single Bay Towers and/or Multiple Bay Towers Page of 9 ABN: 40 088 478 399 This SWMS has been prepared and authorised by OLDFIELDS ACCESS PTY LTD ACN: 088 478 399 Date: Issue

More information

Automated scaffold. mastclimbers

Automated scaffold. mastclimbers Automated scaffold c&a mastclimbers We have been covering the mastclimber market for many years and it has often seemed to be on the verge of a major market breakthrough. As the concept has developed and

More information

Walking & Working Surfaces / Back Safety and Ergonomics

Walking & Working Surfaces / Back Safety and Ergonomics Walking & Working Surfaces / Back Safety and Ergonomics 29 CFR 1910.21-30 29 CFR 1910.66-67 67 29 CFR 1926.450-454 454 29 CFR 1926.1050-1060 1060 Scope Federal regulations cover the rules for the design

More information

Exhibitor Information. etc.venues 155 Bishopsgate EC2M 3YD

Exhibitor Information. etc.venues 155 Bishopsgate EC2M 3YD Exhibitor Information etc.venues 155 Bishopsgate EC2M 3YD Introduction We would like to officially welcome you to etc.venues located on the first floor of 155 Bishopsgate, in the heart of the City of London.

More information

ADMINISTRATIVE BULLETIN

ADMINISTRATIVE BULLETIN 2013 SAN FRANCISCO BUILDING CODE AB-023 ADMINISTRATIVE BULLETIN NO. AB-023 : DATE : January 2009 (Updated 01/01/14 for code references) [This bulletin supersedes AB-023, dated September 18, 2002, revised

More information

Shree Balaad Handling Works

Shree Balaad Handling Works +91-8048762664 Shree Balaad Handling Works https://www.hydraulicliftingequipment.com/ We are into manufacturing, supplying and exporting an array of Lifting Equipment, Pallet Trucks, Hydraulic Stacker

More information

Rail Freight Terminal

Rail Freight Terminal Rail Freight Terminal One of a series of background topic papers prepared by db symmetry in support of a public consultation on proposals for a strategic rail freight interchange in Blaby district, to

More information

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE LADDERSPAN AGR BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards Stabilisers

More information

SUSSEX. dedicated... TRANSPORT. TRANSPORT & WAREHOUSING

SUSSEX. dedicated... TRANSPORT.   TRANSPORT & WAREHOUSING www.sussextransport.com Company Overview Established as a family business in 1990, Sussex Transport has grown into an exceptional transport company by building and maintaining a reputation for high standards.

More information

Halsion making buildings work for everyone. MEP utility pod guide

Halsion making buildings work for everyone. MEP utility pod guide Halsion making buildings 1 MEP utility pod guide With the need for construction projects to be rolled out in less time than ever, Pre-Fabrication of key components has never been greater to for fill key

More information

Atlet Ergo Stacker Picker The high-performance narrow aisle combination machine

Atlet Ergo Stacker Picker The high-performance narrow aisle combination machine Atlet Ergo Stacker Picker The high-performance narrow aisle combination machine Performance the tangible outcome of stability and perfection The extremely stable mast design of the Atlet Ergo Stacker Picker

More information

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15 Erection manual Tube-Lock Concept 2013-02 Page: 1 of 15 Contents Subject Page Illustration of Tube-Lock Concept 3 Parts of Tube-Lock concept 4 Legislation 5 Erecting a Tube-Lock Concept scaffold 6 Technical

More information

PROLYTE MPT-TOWER MANUAL ASSEMBLY INSTRUCTIONS

PROLYTE MPT-TOWER MANUAL ASSEMBLY INSTRUCTIONS Make sure to read and fully understand this manual, and its specific notes and warnings, prior to assembly and erection of the structure. PROLYTE MPT-TOWER MANUAL ASSEMBLY INSTRUCTIONS Contents: 1 System

More information

On-site Assessment (OSA) Contents

On-site Assessment (OSA) Contents (OSA) Contents To view a specific OSA click on the title of the category in the Category Description column. To return to the Contents page click on the CPCS Logo within the OSA (1st page of each OSA only).

More information

Pallet Racking. Versatile, cost effective and easy to install pallet racking systems.

Pallet Racking. Versatile, cost effective and easy to install pallet racking systems. Pallet Racking Versatile, cost effective and easy to install pallet racking systems www.avantauk.com Our full range of Pallet Racking is available at www.avantauk.com Narrow aisle racking Easily installed,

More information

MIAS EXCELLENCE IN MOTION

MIAS EXCELLENCE IN MOTION MIAS EXCELLENCE IN MOTION Welcome to MIAS Group Global Provider of Load Handling and Transport Technology. Based in Five Countries around the World: China, Germany, Hungary, Italy, USA. MIAS Innovation

More information

1 Equipment and lifting solutions Verification of Competency Cranes & Rigging V2.0 Oct-2105

1 Equipment and lifting solutions Verification of Competency Cranes & Rigging V2.0 Oct-2105 Name Date of assessment: This Challenge Test is designed to assess your ability to understand and perform the duties of operating in the workplace. This Challenge Test is a theory based assessment of underpinning

More information

PALLET RACKING SOLUTIONS

PALLET RACKING SOLUTIONS PALLET RACKING SOLUTIONS A Whittan Group Company OPTIMUM STORAGE OF PALLETISED GOODS The Link racking system, one of the most widely used pallet racking systems available today, has evolved as a result

More information

This conveyor system represents an ideal combination between the efficiency of the stacker cranes and the entry, dispatch and handling processes of

This conveyor system represents an ideal combination between the efficiency of the stacker cranes and the entry, dispatch and handling processes of This conveyor system represents an ideal combination between the efficiency of the stacker cranes and the entry, dispatch and handling processes of the load units. It can be seen as a set of elements designed

More information

Communication Please contact Loading Dock associates on or Hotel Security on upon arrival.

Communication Please contact Loading Dock associates on or Hotel Security on upon arrival. LOADING DOCK MANAGEMENT General Access Guidelines It is the organizer s responsibility to ensure that exhibitors/contractors are made aware of the following information regarding use of the loading dock.

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

25 August Working at Height

25 August Working at Height 25 August 2016 Working at Height Contents 1. Hierarchy of Methods... 1 1.1 Hierarchy for selection Methods for Working at Height... 1 Introduction... 1 1.2 Basis of Hierarchy... 1 1.3 Collective Protection

More information

Material handling solutions

Material handling solutions DESCRIPTION In this competitive world production plays a major role in manufacturing industries. Transferring of the component manually takes a large amount of time in the material handling process. Efforts

More information

Plant Layout and Material Handling

Plant Layout and Material Handling Plant Layout and Material Handling IV year-ii semester COURSE CODE A80365 Prepared by G S Vivek, Assistant Professor A.Venu Prasad, Assistant Professor MECHANICAL ENGINEERING INSTITUTE OF AERONAUTICAL

More information

FOR EFFICIENT AND SAFE FLOW OF PEOPLE DURING CONSTRUCTION. Courtesy of the Gold Coast Bulletin. KONE JumpLift

FOR EFFICIENT AND SAFE FLOW OF PEOPLE DURING CONSTRUCTION. Courtesy of the Gold Coast Bulletin. KONE JumpLift FOR EFFICIENT AND SAFE FLOW OF PEOPLE DURING CONSTRUCTION Courtesy of the Gold Coast Bulletin KONE JumpLift Jump ahead of schedule with KONE JumpLift Do you want to improve construction efficiency and

More information