1 LEED Certification Strategy INTRODUCTION This document outlines the LEED Certification strategy for the proposed new Seniors Lodge to replace the existing Autumn Glen lodge and Poplar Grove Court Senior self-contained units located centrally in the Town of Innisfail. The information contained herein includes forwardlooking statements that may alter as design progresses, in response to changing Owner requirements, political or economic factors, or other parameters outside the control of the Design Team. PROJECT OVERVIEW The new 60-unit SL1 and SL2 lodge combined with a 30-unit Senior Self-contained facility, will be built to B3 building code occupancy standards (2014). The SL1 and SL2 -lodge units will have six one-bedroom units and 54 standard lodge units. The 3-story building shall have a core area with ASHC-specified elements including a kitchen, café and lounge, family dining area, activity room, and laundry. Offices, boardroom, storage, and accessible washrooms will complete the central area, with private living suites to the east. Each floor will include a craft room/reading room, multi purpose function area, dining area, hair dressing room, laundry, assisted bath and storage rooms. The Lodge will also provide outdoor access to landscaped courtyards and other ambient features. The building will be owned by (Alberta Senior Housing Corporation (ASHC) and managed by the Parkland Foundation Housing Management Body (HMB) and the Bethany Group as a contracted facility operator. The design and construction of the facility will apply sustainable building strategies of the LEEDv4 Building Design & Construction (BD+C) Rating System. The project team has committed to achieving a LEED Silver certification level, and to following an integrated project planning and design (IPPD) framework guided by the Whole System Integrated Design Process (WSIP) standard of practice. The LEEDv4 Rating System was selected as an appropriate pilot for expressing sustainable design, construction and operational commitment for this building type. This document captures key planning, design, construction, verification and lifecycle features to be undertaken towards the goal of LEEDv4 Silver Certification for the facility. Green Building Objectives Best management practices in green building design and construction include but are not limited to: Indoor air quality protection Occupant comfort and control Reduced energy and water consumption Natural daylighting and connection to the outdoors Limited site disturbance and integration with the surrounding environment Natural landscaping and stormwater management strategies Climate resilient and durable building Ease of operations Desired destination and sense of place in the community 97
2 LEED Certification Strategy INTEGRATED PROJECT PLANNING & DESIGN STRATEGY LEED is used as a green compass for sustainable building design, construction and operations. LEED Certification provides assurance that a building shall provide operational efficiency, environmental performance, and occupant enjoyment throughout its lifecycle. A successful green building relies on continued communication and partnership aligned towards a common vision or idea. The delivery of this project will be driven by an integrated design process (IDP). IDP methodology promotes an interactive design culture that actively engages participants and encourages feedback from all team and stakeholders in a participatory and integrative conversation. LEED Scorecard While the LEED Rating System is structured so that achievement of all credits is not possible, the Team shall achieve all Prerequisites and a minimum of 50 LEED Credits from the following categories: 1. Location & Linkages 2. Sustainable Sites 3. Water Efficiency 4. Energy & Atmosphere 5. Materials & Resources 6. Indoor Environmental Quality 7. Innovation in Design 8. Regional Priority Site review, client feedback, and design team meeting discussions informed specific LEED Credit categories. Credits evaluated as achievable were noted as Targeted(Y) while resource intensive or undetermined strategies were noted as Potential(?) for further discussion. Drawings, satellite imagery, and physical inspection of the project location identified prohibitive conditions related to municipal infrastructure and geography. Related Credits were identified as Not Pursued(N). From this, a LEED Scorecard (Appendix I) was assembled capturing Credit opportunities for the project. The initial count of 53 points was within the range of for LEED Silver. The Scorecard will provide an compliance and benchmarking tool throughout the project, and will continue to be updated following project meetings, and in response to Client feedback. The attached LEED Certification Plan contains a breakdown of Targeted, Potential and Not Pursued LEED Credits. LEED Process Integration A LEED Road Map will be provided to all team members detailing roles, responsibilities, tasks, timelines, documentation and execution requirements to achieve each Credit and Prerequisite. The LEED Map will be reviewed by the Design Team, and updated and issued as required. This project will be registered with the CaGBC and registered in LEED Online. LEED Online will provide a collaborative, online project interface to ensure efficiency, responsiveness, and a high degree of team integration. SUSTAINBILITY PERFORMANCE MANAGEMENT LEED project compliance shall be regularly monitored by the LEED Consultant, and corrective actions undertaken as necessary, throughout design and construction. Administrative and process reviews will be documented and communicated by the LEED Consultant to the Design Team at monthly site meetings. Identified gaps or issues shall be addressed by the LEED Consultant and brought into conformance with the LEED Certification Plan. 98
3 LEED Certification Strategy Sustainable Design Controls The Design Team shall ensure achievement of LEED Certification by applying an integrated design process or IDP. IDP is a recognized strategy which allows feedback and expertise from design and construction disciplines to be proactively implemented into a project to achieve increasing levels of building performance. This process includes the monthly review of the LEED Road Maps and the LEED Certification Plan as noted above. IDP will promote detailed design discussions to identify and adopt synergies to reduce energy, water and resources across disciplines and building systems. Beginning in conceptual design and continuing throughout the contract document phase, the green building performance analysis will involve elements of discovery and implementation related to site context, owner requirements, occupant usage, and other operational parameters. The Design Team shall design efficient building systems and components that contribute to reduced energy and water consumption, while ensuring occupant comfort and a high quality indoor environment. Compliance reviews shall be undertaken for the following design elements: Design Drawings o Site Plans (assess opportunities to achieve Location & Linkages and Sustainable Sites Credits) o Floor Plans (assess compliance to Indoor Environmental Quality Credits) o Landscaping Plan (assess compliance with Sustainable Sites and Water Efficiency Credits) o Mechanical and Electrical Drawings, Plans and Briefs (assess compliance to Energy & Atmosphere, Water Efficiency, and Indoor Environmental Quality Credits and Prerequisites) Building Energy Model Photometric Plan Daylight Simulation Thermal Comfort Assessment Stormwater Management Plan Calculations to support Mechanical, Electrical and Civil design, related to LEED Credits Energy Model An energy model shall be developed to drive achievement of 10 points under LEEDv4 Credit EA Optimize Energy Performance. Informed by a review of the drawings and technical requirements, the energy simulation shall ensure appropriate design measures are implemented in order to meet requisite energy efficiency targets and the energy performance target. The energy model shall be performed by a qualified energy modeler. Sensitivity analysis shall be used to evaluate potential energy efficiency measures, comparing assemblies and technologies in relation to capital costs, energy cost saving, and payback periods. Selected electrical and mechanical systems shall integrate with the building control system, to facilitate effective, long-term facility operation and lifecycle utility savings. Renewable energy options will be evaluated for payback periods, and tied into protocols for commissioning, energy metering, and building education. 99
4 LEED Certification Strategy Water Systems Design The integrated design process will involve a preliminary water budget analysis to explore potential reductions in potable water consumption. Aspects of building water use, including occupant consumption patterns and landscape requirements, will inform fixture selection and opportunities for sub-metering and reducing demand. Lighting Systems Design & Light Quality Lighting systems shall be designed to optimize use of natural lighting, supported by energy efficient fixtures and controls. Window sizing and placement shall be configured to take advantage of natural daylight. Selection of energy efficient fixtures and lighting controls such as occupancy and daylight sensors, will minimize energy usage and consumption from non-plug loads. Interior surfaces shall be selected based on contribution to passive light distribution throughout the space. Finish selections will favour surfaces and materials that disperse light and reduce lighting densities. Light colour and reflective finishes shall be selected for areas such as ceilings, raised surfaces and transitional spaces, to prevent issue of glare and heat gain, while maximizing light transmission within occupied areas. Indoor Environmental Quality In addition to lighting quality and control, thermal comfort conditions play a key factor in occupant comfort and enjoyment of their space. Careful attention to thermal quality standards will influence design to maximize occupant satisfaction with interior air and surface temperatures. Provision of quality views to the exterior will ensure that each resident can benefit from the physiological and phycological impact that a visual connection to the outdoors provides. Interior Design & Finishing Careful attention will be paid to the specification and selection of healthy, sound-attenuating interior finishes and finishing components. Combined with a robust construction air quality protection plan, environmentally responsible finish selection will deliver a combination of health benefits through reductions in off-gassing of materials, long-term exposure to chemical substances, and creation of an acoustically benign environment. Sustainable Construction Controls The LEED Consultant shall orient and work with the General Contractor to achieve sustainable building best management practices throughout construction, in addition to complying with applicable environmental regulatory requirements. Construction personnel shall coordinate construction LEED documentation, submittals, photos, reports and general site monitoring, with support and quality control by the LEED Consultant. Construction operational controls shall include: 1. Incorporation of LEED requirements in the Construction Specification (LEED Specification) 2. Provision of LEED support, training and guidance to subtrades 3. Sourcing environmentally-responsible and compliant materials as per Specification 4. Monitor and document compliance to LEED Construction Plans: Indoor Air Quality Management Plan, Erosion & Sedimentation Control Plan, and Construction Waste Management Plan 100
5 LEED Certification Strategy 5. Coordinate with Commissioning Agent and Mechanical Consultant to ensure site controls are in place prior to execution of commissioning activities and pre-occupancy IAQ Management Strategy (Air Testing) Compliance reviews shall be undertaken for the following construction elements: Construction Specifications o Construction Waste Management o Site Housekeeping o Erosion & Sedimentation Control o Indoor Environmental Quality o No Smoking Policy o VOC-compliant product selection Erosion & Sedimentation Control Plan Waste Management Plan Indoor Air Quality (IAQ) Management Plan Construction LEED Toolsuite The LEED Consultant shall provide to the General Contractor a LEED Toolsuite consisting of LEED site procedures, submittal forms, tracking spreadsheets, and compliance monitoring report templates. Compliance monitoring activities for Construction Waste Management, Erosion and Sedimentation Control, and Indoor Air Quality Management, shall include photographs and written reports as per specified LEED requirements. The LEED Toolsuite shall be utilized by the Contractor for ease of review, approval, monitoring and tracking of associated LEED construction elements (materials, systems and processes) throughout the project. All documents are protected and controlled, and shall be maintained in hard copy and in secure electronic project management systems by the LEED Consultant and the Contractor as specified. LEED SUBMITTAL TO CAGBC At construction completion, the LEED Consultant shall conduct a final LEED quality assurance audit of all LEED Submittal documentation, including: drawings, calculations, LEED Letter Templates, narratives, product submittals, photographs, monitoring reports, and other supporting information. The complete LEED Submittal Package will be provided electronically to the CaGBC within the prescribed timeline from Substantial Completion. The LEED Consultant shall manage documentation, clarifications, audits and communications throughout the LEED Certification process, including notification to the Client of Project LEED Submittal, receipt of CaGBC Review Responses, and ultimately, LEEDv4 Silver Certification. 101
6 LEED Scorecard 102
7 LEED CERTIFICATION PLAN A high-level analysis of each LEED Credit is provided, capturing the intended direction at the time the document was issued. The strategy will undergo development and refinement through upcoming LEED design charrettes and ongoing IDP meetings in reflection of the dynamic process of sustainable design. 1 INTEGRATIVE PROCESS C Design discussion confirmed commitment to sustainability through ongoing coordination and evaluation of green features. Analysis of water and energy use and reduction must impact design decisions in quantifiable way. LOCATIONS AND LINKAGES 16 LEED FOR NEIGHBOURHOOD DEVELOPMENT LOCATION C The project is not located a LEED for Neighbourhood Development (LEED ND) community 1 SENSITIVE LAND PROTECTION C The site conforms with the condition of Previously Developed land. 2 HIGH PRIORITY SITE C The site is not provincially designated as a high priority for redevelopment, nor is it classified as a historic district. 2 3 SURROUNDING DENSITY AND DIVERSE USES C The site appears to meet the required proximity to 8+ diverse use types within 800m (2 points). 1 4 ACCESS TO QUALITY TRANSIT C Existing municipal transit does not provide the requisite number of weekday and weekend trips. The Seniors shuttle may not be used to earn this Credit. Transit frequency will be investigated further with the HMB. 103
8 1 BICYCLE FACILITIES C The project is not located within 180m of a bicycle network. 1 1 REDUCED PARKING FOOTPRINT C Projects must achieve 20% reduction from the base ratio of parking spaces determined by US Institute of Transportation Engineers standard. The team determine it may be difficult to reduce parking footprint, as parking spots at the current facility are well utilized by residents. 1 GREEN VEHICLES C Infrastructure to support the charging of electric vehicles was considered cost prohibitive and unnecessary in terms of the rarity of alternatively-fuelled vehicles in the project s remote urban area. SUSTAINABLE SITES Y CONSTRUCTION ACTIVITY POLLUTION PREVENTION P An erosion and sedimentation control drawing, plan and associated processes and controls adhering to either the US EPA Construction General Permit, or the most stringent Canadian standard, will be developed by the civil engineer and implemented by the contractor throughout construction. Monitoring and photographs shall be undertaken by the General Contractor as required for this Prerequisite. 1 SITE ASSESSMENT C A site assessment consisting of review of topographic, geologic, biologic, climatic and anthropogenic elements will be conducted and documented in relation to influencing project design. 2 SITE DEVELOPMENT - PROTECT OR RESTORE HABITAT C Greenfield protection does not apply for the previously developed site. The project landscape will be designed to restore at least 30% of the site with native or adaptive vegetation. 1 OPEN SPACE C The project will provide outdoor vegetated space greater than or equal to 30% of the total site area. 104
9 2 1 RAINWATER MANAGEMENT C Civil calculations will determine whether at least 95 th percentile (2 points) or 98 th percentile (3 points) of the annual rainfall events can be managed on site by vegetation and other low-impact development strategies. Focus will be given to utilizing vegetated areas as biorientation features to allow absorption and infiltration of stormwater on site. 2 HEAT ISLAND REDUCTION C Roof and non-roof options will be utilized to provide reflective, shaded and vegetated surfaces to reduce heat island effect. Light coloured materials and providing shading through vegetation will be considered. 1 LIGHT POLLUTION REDUCTION C Site lighting design will adhere to night sky protection measures including: meeting uplight and light trespass requirements. The electrical engineer will provide a photometric plan (vertical illuminance calculations). Special attention will be paid to the lighting provided in the southwest corner where the receiving area is near the property line. WATER EFFICIENCY Y OUTDOOR WATER USE REDUCTION P No irrigation will be provided this complies with Option 1. The landscape will also be designed to require no irrigation system beyond a 2-year establishment period. Y INDOOR WATER USE REDUCTION P Applicable fixtures and fittings shall, in aggregate, reduce water consumption by 20% from the baseline case. All toilets, showerheads and private lavatory faucets shall be WaterSense labelled or equivalent. Y BUILDING LEVEL WATER METERING P A permanent water meter (measuring total potable water use for the building and site) will be installed. 2 OUTDOOR WATER USE REDUCTION P No irrigation system will be provided. The landscape will also be designed to reduce outdoor water use. 105
10 2 1 3 INDOOR WATER USE REDUCTION C Further incremental reduction in potable water use will be targeted. A minimum 30% (2 points) will be targeted through water efficient fixture selection. 35% = 3 points, 40% = 4 points, 45% = 5 points, 50% = 6 points. 2 COOLING TOWER WATER USE C A one-time potable water analysis will not be conducted as the facility will not have a cooling tower or evaporative condenser in which to limit cooling cycles and associated blowdown of chemical concentrates. 1 WATER METERING C Submeters may be provided for specified uses including domestic hot water boiler and process water (laundry, kitchen). At least 2 uses must be sub-metered. This strategy will be further analysed and determined in conjunction with the Mechanical Engineer. ENERGY & ATMOSPHERE Y FUNDAMENTAL COMMISSIONING AND VERIFICATION P A full commissioning program shall be undertaken to verify energy-related systems are installed, calibrated and perform according to the Owner s Project Requirements, Basis of Design, and Construction Documents. Y MINIMUM ENERGY PERFORMANCE P Energy simulation (modeling) will be used to analyse building energy use, and conduct a whole-building assessment to demonstrate a minimum 5% improvement of proposed building performance compared to a baseline building (as determined by ASHRAE ). Y BUILDING LEVEL ENERGY METERING P A building-level energy meter shall be installed to provide data on building energy consumption (gas, electric). Y FUNDAMENTAL REFRIGERANT MANAGEMENT P No chlorofluorocarbons (CFC) based refrigerants will be used in the HVAC&R systems. 106
11 5 1 ENHANCED COMMISSIONING & ENVELOPE COMMISSIONING C Additional commissioning tasks shall be undertaken including: review of construction documents and construction submittals, verification of operator training, verification of seasonal testing, verification of systems manual updates, and development of an ongoing commissioning plan. Building operations shall be reviewed 10 months after occupancy. (3 points) Fundamental commissioning tasks shall also be executed as relate to the building thermal envelope (2 points) Monitoring-based commissioning will not be pursued (1 point) OPTIMIZE ENERYG PERFORMANCE C Through integrated energy performance analysis and responsive design decisions, the project shall achieve at least a 24% improvement in whole-building energy performance. The project shall commit to an energy performance target (kw/m 2 -year) no later than schematic design. 1 ADVANCED ENERGY METERING C Permanent energy submeters shall be installed to provide data on hourly, daily, monthly and annual building energy consumption for all whole-building energy sources used by the building, and any individual energy use that represents 10% or more of total annual energy consumption. Data collection may be managed through a building automation system (BAS) that can store data for 36 months, and must be remotely accessible. 2 DEMAND RESPONSE C A demand-response program is not currently available, and the building occupancy type does not support load shifting or shedding. This Credit will not be pursued. 3 RENEWABLE ENERGY PRODUCTION C Currently there are no renewable energy grants available for this site. The possibility for future solar grant funding will be revisited throughout the project 107
12 1 ENHANCED REFRIGERANT MANAGEMENT C The project shall utilize only refrigerants with zero Ozone Depleting Potential, and Global Warming Potential of less than 50. Acceptable refrigerants shall be specified and approved by the design team. 2 GREEN POWER AND CARBON OFFSETS C The project team shall purchase a 5-year renewable energy contract to provide at least 50% (1 point) or 100% (2 points) of the project s energy annually. Renewable Energy Certificates (RECs) may be purchased to offset electrical use. Green Power contracts may be pursued for natural gas offsets. Providers must be Green-e Certified, or be generated at approved Canadian facilities. MATERIALS & RESOURCES Y STORAGE AND COLLECTION OF RECYCLABLES P An accessible, dedicated, sufficiently sized area for collection and storage of materials for occupant recycling of: paper, cardboard, glass, plastic and metal shall be provided. Designated storage receptacles for e-waste and batteries shall also be provided. Y CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT PLAN P A construction and demolition (C+D) waste management plan shall be developed by the design team and implemented by the General Contractor. Targeted diversion of at least 4 materials. 5 BUILDING LIFE-CYCLE IMPACT REDUCTION C The applicable strategy (3 points) for this Credit is to conduct a whole-building lifecycle assessment (LCA) using approved LCA software and demonstrate a 10% reduction in global warming potential and at least 2 other impact measures identified by LEED. This strategy is not targeted due to the expense of running the LCA, and relatively undeveloped datasets in the Canadian market. 108
13 1 1 BUILDING PRODUCT DISCLOSURE & OPTIMIZATION: ENVIRONMENTAL PRODUCT DECLARATIONS (EPD) The project aims to use at least 20 different permanently installed products from at least 5 different manufacturers, for which an Environmental Product Declaration is available for the product. C 1 1 BUILDING PRODUCT DISCLOSURE & OPTIMIZATION: SOURCING OF RAW MATERIALS C Products with raw material source and extraction reports are relatively rare for most materials. As an alternate path, the design team will evaluate feasibility of specifying recycled, regionally-sourced or FSC-certified wood products that account for at least 25% by cost of total value of permanently installed products. Structure and enclosure materials cannot constitute more than 30% of the value of compliant building products. 1 1 BUILDING PRODUCT DISCLOSURE & OPTIMIZATION: MATERIAL INGREDIENTS C Products with compliant chemical inventories, or documented material ingredient optimization reports, or from suppliers with 3 rd party documented and robust health, safety and risk management programs, will be targeted. 1 1 CONSTRUCTION & DEMOLITION WASTE MANAGEMENT C The project shall divert a minimum of 50% (1 point) of at least 3 construction waste streams. A second point is available for 75% diversion of 4 material streams. Generating no more than 2.2kg of waste per m 2 of building floor area would provide 2 points. 75% construction waste diversion will be required of the General Contractor through Specification. The existing building demolition may present non-recyclable materials. A material salvage plan will be developed to maximize diversion. Hazardous materials are excluded from the calculation INDOOR ENVIRONMENTAL QUALITY Y MINIMUM INDOOR AIR QUALITY PERFORMANCE P Ventilation design shall meet the minimum requirements of ASHRAE Section
14 Y ENVIRONMENTAL TOBACCO SMOKE CONTROL P Smoking shall be prohibited inside the building. Smoking shall be prohibited outside the building, except in designate smoking areas the prescribed 7.5m distance away from all entries, outdoor air intakes, and operable windows. No-Smoking signage shall be posted within 3m of all building entrances. 1 1 ENHANCED INDOOR AIR QUALITY STRATEGIES C The project shall be designed with permanent entryway systems at all main entrances, to remove and prevent contaminants, dirt and particulates from entering the building. The air handling equipment shall be fitted with MERV 13 filters, and each space where chemicals may be stored, used or mixed shall be exhausted (minimum 0.50cfm per square foot) and designed with self-closing doors and deck-to-deck partitions (or hard ceiling). 2 1 LOW EMITTING MATERIALS C Low-VOC materials shall be selected for the following 5 categories of interior applied products (2 points if furniture is included in project scope, 3 points if furniture is not included in project scope): 1. Paints and coatings 2. Adhesives and sealants 3. Flooring 4. Composite wood 5. Insulation (ceiling, walls, thermal and acoustic) Alternatively, 3 points are awarded if VOC-compliant furniture is specified and installed when furniture is included in the scope of work, and the 5 categories noted above are met. 1 CONSTRUCTION INDOOR AIR QUALITY (IAQ) MANAGEMENT PLAN C An IAQ Management Plan shall be developed by the design team and implemented by the General Contractor. Regular inspections and photographs are required for achievement of this Credit. 2 INDOOR AIR QUALITY ASSESSMENT C The building will be tested for air quality contaminants prior to occupancy. 110
15 1 THERMAL COMFORT C Identified as a critical priority, the project shall be designed to meet the occupant thermal comfort conditions of ASHRAE or the ISO and CEN Standards for thermal environments. The calculations shall be performed by the Mechanical Engineer. 1 1 INTERIOR LIGHTING C The project shall include responsive lighting controls for 90% of occupants. Light controls shall enable at least 3 lighting levels (on, off, dim). Multioccupant spaces shall be fit with multizone controls. An additional point for providing 4 of 9 light quality strategies may be pursued following consultant with the electrical designer. 2 1 DAYLIGHT C Daylight simulation will demonstrate that required illuminance of 300lux-3000lux will be met as a percentage of occupied floor area (75% - 1 point, 90% - 2 points). Glare-control devices will be provided in occupied spaces. 1 QUALITY VIEWS C The project shall be designed such that a direct line of sight to the outdoors via vision glazing will be achieved for 75% of all regularly occupied floor areas. 1 ACOUSTIC PERFORMANCE C For all occupied spaces, requisite HVAC noise thresholds, reverberation times, sound isolation and sound masking shall be met through acoustic analysis and selection of appropriate materials and installation methods. 111
16 INNOVATON IN DESIGN Innovation in Design (ID) credits provide opportunities to achieve exceptional performance above established LEED requirements, apply Credits from other LEED Rating Systems, and showcase progressive performance strategies not addressed by the LEED Rating System. Options to be discussed in future design meetings: 1 REDUCED MERCURY IN LIGHTING LEED FOR EXISTING BUILDINGS C Lighting design will incorporate 100% LED lighting, which automatically grants achievement of this credit. 1 GREEN BUILDING EDUCATION C Educate occupants and visitors on green features of the building through means such as signage, interactive displays, tours, and other elements (e.g. live building dashboard via laptop) Innovation to be determined C Potential pilot credit options will be evaluated (e.g. possibility of using 100% legal wood as defined by LEED). 1 LEED ACCREDITED PROFESSIONAL 1 C A designated LEED Consultant is part of the design team. REGIONAL PRIORITY Regional Priority (RP) credits allow teams in unique geographic regions to be recognized for outstanding effort in reducing the impacts of their project in relation to limitations, challenges and environmental priorities specific to that region. Autumn Glen Lodge is in an area classified as Prairies-Urban. Once the base Credit is achieved, the corresponding RP credits are automatically awarded. Feasible options were identified: 1 SS LIGHT POLLUTION REDUCTION -1 POINT C 1 EA ENHANCED COMMISSIONING -5POINTS C 1 EA OPTIMIZE ENERGY PERFORMANCE 10 POINTS C 1 WE INDOOR WATER USE REDUCTION- 4 POINTS C 112
LEED Project Delivery Process Manual Appendices
LEED Project Delivery Process Manual Appendices November 2016 Second Edition Appendices Page Appendix 1: Other Alberta Requirements and Green Building Standards 3 Appendix 2: Integrated Design Process
More informationLEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods
LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods
More information500 WEST PUTNAM AVENUE GREENWICH, CT
LEED-CI ANALYSIS June 2015 500 WEST PUTNAM AVENUE GREENWICH, CT To learn more please visit the sustainability section of our website: www.slgreen.com or contact Jay Black, SL Green s director of sustainability
More informationLEED Application Guide for Multiple Buildings and On Campus Building Projects
LEED Application Guide for Multiple Buildings and On Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationLEED Application Guide for Multiple Buildings and On-Campus Building Projects
LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011
More informationLEED version 4 Leadership in Energy and Environmental Design
LEED version 4 Leadership in Energy and Environmental Design United States Green Building Council Founded in 1993, the United States Green Building Council (USGBC) was the first Green Building Council
More informationLEED 2009 for New Construction and Major Renovations
LEED 2009 for New Construction and Major Renovations Bayshore District Operations Building Project Checklist 4.28.6 20 4 0 Sustainable Sites Possible Points: 26 Y? N d/c Notes: Y C Prereq Construction
More informationLEED v4 Building Design and Construction Quiz #8 EQ
LEED v4 Building Design and Construction Quiz #8 EQ 1. Which of these is considered an unoccupied space? [Choose three] A. School classroom B. Mechanical room C. Meeting room D. Locker room E. Restroom
More informationAnalysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA
Analysis 1 LEED Analysis of Laboratory Buildings Background The LEED program (Leadership in Energy and Environmental Design) established by the U.S. Green Building Council is becoming the standard by which
More information2016 LEED Equivalency Analysis for Stanford Campus
6 LEED Equivalency Analysis for Stanford Campus Analysis performed by: Moira Hafer, LEED AP O+M Office of Sustainability Department of Sustainability & Energy Management Stanford University Category Type
More informationLEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP
LEED 2009 for Commercial Interiors Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP Homes Commercial Interiors Core & Shell New Construction Schools Healthcare Existing Building Operations
More informationLEED And Your Indoor Environment
LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings
More informationWMU Facility Life Cycle Design Guidelines Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16)
Update (Approved by VP Van Der Kley & Facilities Management on 4/28/16) Developed by Sustainable Design Committee: Christopher Caprara, Devon Miller, Carolyn Noack, Eleonora Philopoulos, Kelsey Pitschel,
More informationErrata Sheet. LEED for Schools Reference Guide First Edition for the document titled:
Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic
More informationLEED Leadership in Energy and Environmental Design
LEED Leadership in Energy and Environmental Design United States Green Building Council (USGBC) Founded in 1993, the United States Green Building Council (USGBC) was the first Green Building Council formed
More informationA Building Commissioning Overview. Presented by: Goetting & Associates Commissioning
A Building Commissioning Overview Presented by: Goetting & Associates Commissioning www.goettingcx.com What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of
More informationResearch Analysis: Building Envelope and LEED Credits Introduction
: Building Envelope and LEED Credits Introduction Green buildings are no longer a new idea and are quickly becoming the trend in the slowly changing industry of building construction. Even though the essence
More informationThermiser Insulated Rolling Doors Comprehensive Guide to Earning LEED v4 Credits
Thermiser Insulated Rolling Doors Comprehensive Guide to Earning LEED v4 Credits 1 Thermiser Insulated Rolling Doors Earning LEED v4 Credits Cookson s Thermiser Insulated Rolling Doors can provide a significant
More informationLEED for Commercial Interiors
LEED-CI LEED for Commercial Interiors Kim Lam Renee Webley What is the LEED-CI Rating System? The benchmark for tenant improvements of new or existing office space. An integrated design tool that sets
More information1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2)
1) MERV (Minimum Efficiency Reporting Value) is relevant to which ASHRAE standards in LEED v4? (Choose 2) A. 52.2-2007 B. 55-2010 C. 62.1-2010 D. 90.1-2010 E. 189.1 Answer A and C. 52.2-2007 - ASHRAE Standard
More informationGreen Building Rating System
An Introduction to the U.S. Green Building Council and the LEED TM Green Building Rating System March 2004 U.S. Green Building Council The nation's foremost coalition of leaders from across the building
More informationLEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction
LEED v4 for Homes, Residential Project Summary and Checklist One and Two Family New Construction Summary Date of Application Path Project Project Address Owner Architect Third Party Third Party Provider
More informationLEED CERTIFICATION PROJECT REVIEW REPORT
LEED CERTIFICATION PROJECT REVIEW REPORT How to Interpret this Report Purpose Leadership in Energy and Environmental Design (LEED) was designed by the US Green Building Council to encourage and facilitate
More informationLEED for Existing Buildings:
LEED for Existing Buildings: Operations and Maintenance 101 0 Agenda 1. Overview of changes to LEED-EBOM 2009 3. Assessing Building Opportunities Building Exterior and Site Water Efficiency Energy & Atmosphere
More informationGenentech Building 20 Office LEED-CI Gold XL CONSTRUCTION
Genentech Building 20 Office LEED-CI Gold Above and Beyond A LEED Gold 50,00 s.f. tenant improvement, the space was originally designed with a goal to achieve LEED silver certification. Innovative approaches
More informationEnvironmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program
Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program Agenda EWaS Overview History Who is EWaS? Mission EWaS Standards & Tools Energy Efficiency HVAC equipment
More informationCase Study: Element PROJECT DESCRIPTION
Case Study: Element PROJECT DESCRIPTION Project type: Project gross SF: Number of keys: Location: Hotel (Hospitality), extended-stay prototype Varies, prototypical SF: 79,035 SF gross Varies, prototypical:
More informationSACRAMENTO County New Animal Care Facility LEED Elements
Construction Activity Pollution Prevention We reduced pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust generation by creating an Erosion and
More informationSynergies & Trade-offs: IP category
Synergies & Trade-offs: IP category Integrative Process (IP) Related Synergies and Trade-offs IPc Integrative Process LTc Access to Quality Transit LTc Reduced Parking Footprint SSc Heat Island Reduction
More informationLEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS
LEED V4 FACT SHEET FOR STEEL PRODUCTS USED IN CONSTRUCTION APPLICATIONS Designers and builders have long recognized steel for its strength, durability and functionality. An important aspect of steel s
More informationTHERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS
SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB
More informationGSA Public Buildings Service. GSA LEED Applications Guide
GSA Public Buildings Service GSA LEED Applications Guide February 2005 Acknowledgements The authors of the GSA LEED Applications Guide would like to thank Mr. David B. Eakin, Chief Engineer in the Office
More informationGreen Building Ordinance Overview
Green Building Ordinance Overview September, 2013 City of Dallas Sustainable Development and Construction Dallas Green Ordinance 2008 Task Force Recommendations Two-phase implementation strategy Solution
More informationWhat s New in LEED v4
July 2017 AIA Course Number: LEED17A What s New in LEED v4 A focus on Material & Resources (MR) and Indoor Environmental Quality (IEQ) AIA Registration 2 Armstrong World Industries is a registered provider
More informationNPCA SUSTAINABILITY RESOURCE. Precaster s Guide to. LEED v4. National Precast Concrete Association. 1 PRECASTER S GUIDE TO LEED v4 precast.
NPCA SUSTAINABILITY RESOURCE Precaster s Guide to LEED v4 National Precast Concrete Association 1 PRECASTER S GUIDE TO LEED v4 precast.org Precaster s Guide to LEED v4 If you haven t worked on a LEED Leadership
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationCALGreen 2013 Tier Comparison to LEED v4
CG-2016 5.106.1 SSp1 All projects must have a SWPP plan that meets State national Pollution CALGreen and LEED v4 are equivalent. Storm Water Soil Loss Discharge Elimination (NPEDS) Prevention Plan The
More informationExisting vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.
Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in
More informationPROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition
PROPOSED SAN FRANCISCO GREEN BUILDING CODE AMENDMENTS 2016 Edition Chapter 1 GENERAL SECTION 101 GENERAL 101.1 Title. These regulations shall be known as the California San Francisco Green Building Standards
More informationADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM
APRIL 2012 ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM Abu Dhabi Education Council Infrastructure and Facilities Division Jyoti Sharma, Senior Architect, Design Section WHY SUSTAINABILITY IS IMPORTANT UAE
More informationPROJECT DESIGN EVALUATION AND APPROVAL PROCESS DESIGN AND CONSTRUCTION STANDARD
PART 1: GENERAL 1.01 General Requirements A. These guidelines are intended to provide a framework to evaluate building projects for the University of Texas at Austin to: 1. Verify the feasibility of options
More information2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:
2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen
More informationSchematic Design Stage Report for Stanford Knight Management Center
1 of 12 6/5/2007 11:26 PM Schematic Design Stage Report for Stanford Knight Management Center INTRODUCTION Stanford Knight Management Center, Stanford, California is a 4 story, 357,684 ft² building. There
More informationLEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN
LEADERSHIP IN ENERGY AND Leadership in Energy and Environmental Design (LEED) Green Building Rating System is a third-party certification for the design, construction and operation of environmentally friendly
More informationThe 2010 California Green Building Code; "CalGreen" effective January 1st, 2011
1 The 2010 California Green Building Code; "CalGreen" effective January 1st, 2011 Existing Culver City Building Safety Division Green Programs: The Culver City Mandatory Photovoltaic Requirement, effective
More information37% 100% 100% PROJECT HIGHLIGHTS LEED Facts. Wiener Auditorium
Taubman Building, 15 Eliot St., Cambridge, MA, 02138 LEED CI V2009 GOLD The is a 2,943 square foot space located in the Taubman Building of the Harvard Kennedy School of Government. The project scope includes
More informationLEED for Homes Project Checklist
LEED for Homes Project Checklist Builder Name: Project Team Leader: Home Address (Street/City/State): Project Description Adjusted Certification Thresholds Building Type: Project type: Certified: 45.0
More informationMEP's Letter of Assurance
MEP's Letter of Assurance Instructions Multifamily Residential WELL Certification is determined by onsite Performance Verification and documentation, including Letters of Assurance from the appropriate
More informationMEP's Letter of Assurance
MEP's Letter of Assurance Instructions WELL Certification is determined by onsite Performance Verification and documentation, including Letters of Assurance from the appropriate professionals overseeing
More informationLEED TM Implementation Guide for Municipal Green Buildings
LEED TM Implementation Guide for Municipal Green Buildings LEED TM Implementation Guide for MUNICIPAL GREEN BUILDINGS Developed by: PAUL KERNAN ARCHITECT INC. INTEGRAL DESIGN / ENGINEERING In association
More informationLEED v4 and Beyond: UDI Vancouver Breakfast Jan 18, Next Generation of Green Building in Canada. Thomas Mueller President & CEO
LEED v4 and Beyond: Next Generation of Green Building in Canada UDI Vancouver Breakfast Jan 18, 2014 Thomas Mueller President & CEO 2 3 4 5 6 7 Click to add name of presentation 8 Improved Environmental
More informationGREEN DESIGN FEATURES / LEED PROJECT CASE STUDY HALIFAX CENTRAL LIBRARY. Architecture + Interior Design
GREEN DESIGN FEATURES / LEED PROJECT CASE STUDY Architecture + Interior Design INTRODUCTION & LEED In an effort to build community, the design of the Halifax Central Library was completed in concert with
More informationDESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE
DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE Based upon B3 Minnesota Sustainable Building Guidelines VERSION 2.1 Notes to the reader have been added to this document within numerous text boxes
More informationLEED Analysis of the Knight Management Center. Energy & Atmosphere. Materials & Resources
LEED of the Knight Management Center Energy & Atmosphere Materials & Resources Energy & Atmosphere: 17 possible points LEED-NC Scorecard LEED for New Construction v2.2 Registered Project Checklist Project
More informationULMA S COMPROMISE & CONTRIBUTION TO LEED CERTIFICATION
ULMA S COMPROMISE & CONTRIBUTION TO LEED CERTIFICATION UNDERSTANDING LEED Leadership in Energy and Environmental Design- LEED is an internationally recognized green building certification system, providing
More informationGreen Building Rating System For Commercial Interiors. Version 2
Green Building Rating System For Commercial Interiors Version 2 November 2004 Leadership in Energy and Environmental Design (LEED ) Buildings fundamentally impact people s lives and the health of the planet.
More informationNEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS
NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS TABLE OF CONTENTS Introduction Page 2 Project Description Page 2 Owner s Directives Page 4 Design
More informationLEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S.
LEED 2009 FOR EXISTING BUILDINGS OPERATIONS AND MAINTENANCE ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S. October 2011 This is a draft document and can be used only in the interim until LEED
More informationA. The project is intended to achieve LEED Certification at the Silver Level per the U.S. Green Building Council LEED for Schools 2007 rating system.
SECTION 23 01 01 HVAC LEED REQUIREMENTS PART 1 -GENERAL 1.1 WORK INCLUDES A. Compliance with LEED project requirements. B. Coordination of LEED construction phase activities. C. Data gathering of construction
More informationSUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR
1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR 1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR There are many reasons
More informationLEED -Existing Buildings. Crescent Ridge Corporate Center I
LEED -Existing Buildings Crescent Ridge Corporate Center I LEED Leadership in Energy and Environmental Design The U.S. Green Building Council is a coalition of leaders in the building industry promoting
More informationThis presentation provides: An overview of the 2013 version of Green Globes plus Compliance details on the lighting related provisions this
This presentation provides: An overview of the 2013 version of Green Globes plus Compliance details on the lighting related provisions this sustainability standard 1 This presentation is protected. 2 This
More informationFresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION
Fresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION SUPPORTING GREEN INITIATIVES WITH INNOVATION As one of the first manufacturers of air movement and control equipment to join the U.S. Green
More informationAlpen Windows - LEED Impact Analysis
ALPEN WINDOWS MATERIALS: Energy Efficient Windows Alpen Windows - LEED Impact Analysis SECTION I. PRODUCT IDENTIFICATION Product Name: Alpen Windows Manufacturer: Alpen High Performance Products 6268 Monarch
More informationGreen Building Rating System For Commercial Interiors
Green Building Rating System For Commercial Interiors Version 2.0 *Updated December 2005 November 2004 *With revised EA section for projects registered after June 26, 2007. LEED for Commercial Interiors
More informationBUILDING FOR OUR FUTURE
BUILDING FOR OUR FUTURE The John T. Chambers Technology Center is a LEED Certified Building The Leadership in Energy and Environmental Design (LEED) Green Building Rating System is a voluntary national
More informationCompliance to the IgCC. September 29, 2011
Bringing Outcome-Based Compliance to the IgCC September 29, 2011 Outcome-Based Codes: Any code requirement or code enforcement mechanism based on actual outcomes in buildings after they have been occupied.
More information35% reduction in water use below code maximum 83% 88% 49% reduction in lighting power density 12%
Science Center Cabot Library Project LEED CI v4.0 1 Oxford Street, Cambridge, ma LEED Certified Project Profile December 2017 The Science Center Cabot Library project was comprised of renovating the entry,
More information45% 39% 17% 92% 100% All paints and adhesives are low VOC
HGSE LONGFELLOW HALL RENOVATION LEED CI-2009 13 APPIAN WAY CAMBRIDGE, MA 02138 LEED PLATINUM PROJECT PROFILE The Harvard Graduate School of Education (HGSE) made significant upgrades to Longfellow Hall
More informationEvergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program
Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC
More informationGreen Ordinance Implementation City of Dallas, TX
Green Ordinance Implementation City of Dallas, TX City of Dallas BUILDING INSPECTION DEPARTMENT Phase 1 Effective Date October 1, 2009 Applications for building permits Structure One ordinance amending
More informationColumbia Skylights may qualify your project for LEED points in the following categories: Columbia Skylights - Potential Contribution to LEED projects
3.0 Statement Columbia Skylights Statement for New Construction (NC) Version 3.0 Credit Documentation The Leadership in Energy and Environmental Design () Green Building Rating System promotes the adoption
More informationCITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction
CITY OF ORANGE BUILDING DIVISION 2016 Green Building Code Requirements For Residential Construction In order to facilitate sustainable construction practices, all new projects* must comply with the State
More informationNew Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction
New Montgomery County Elementary School Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction LEED certification promotes environmentally friendly buildings and sites through
More informationLEED FACT SHEET AND BACKGROUND
Updated 2012 LEED FACT SHEET AND BACKGROUND Tupper Lake, NY - The Wild Center in Tupper Lake, New York, received a Leadership in Energy and Environmental Design (LEED) Silver certification. The LEED certification,
More informationINTERIORS GREEN GLOBES FOR SUSTAINABLE INTERIORS. Green Globes for SUSTAINABLE GREEN GLOBES TECHNICAL REFERENCE MANUAL
GREEN GLOBES TECHNICAL REFERENCE MANUAL Green Globes for SUSTAINABLE SI INTERIORS GREEN GLOBES FOR SUSTAINABLE INTERIORS Technical Reference Manual Version 1.1 March 4th, 2016 2016 2016 Green Building
More informationToyota Logistics Service. Portland Vehicle Distribution Center Redevelopment
Toyota Logistics Service Portland Vehicle Distribution Center Redevelopment Background Toyota operating in the Port of Portland since 1976. Import only based business model for Toyota when developed. 1990
More informationMcCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007
Project Highlights McCollum Hall Classroom Renovation Project Profile LEED-CI Gold, August 2007 > 42.7% reduction in potable water usage achieved with high-efficiency low-flow fixtures > 94.6% of the construction
More informationLEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise
LEED v4 Credit Guidance for Andersen Products LEED for Building Design and Construction: Homes and Multifamily Midrise About LEED Certification The U.S. Green Building Council s LEED green building program
More informationBryant University s Energy Guidelines for Sustainability
Bryant University s Energy Guidelines for Sustainability Rising carbon emissions have a disruptive impact on global climate patterns and pose a risk to the security of communities around the world. The
More informationGreen Star Design & As Built v1.2. Minor wording corrections have been implemented throughout the Submission Guidelines to improve clarity.
CHANGE LOG Minor wording corrections have been implemented throughout the Submission Guidelines to improve clarity. MANAGEMENT 1 Green Star Accredited Professional 2 Commissioning and Tuning R2.02.01 Introduced
More informationSAS International GSAS / QSAS compliance
Environmental Commitment SAS International is committed to ensuring environmental best practice throughout the life of its products to ensuring minimum impact upon the global environment. As a business
More informationScience Gazing: Sustainable Solutions for High Performance Laboratories. David Gibney Western Regional Director HDR Sustainable Design Solutions
Science Gazing: Sustainable Solutions for High Performance Laboratories David Gibney Western Regional Director HDR Sustainable Design Solutions About HDR Founded in 1917 7,500+ employees Employee owned
More informationNONRESIDENTIAL ADDITIONS & ALTERATIONS 2016 CALGreen Checklist
NONRESIDENTIAL ADDITIONS & ALTERATIONS 2016 Applies to Nonresidential Addition and Alteration projects without sleeping accommodations and meeting the following criteria: The permit application is submitted
More informationVOL. 2/ DESIGN+ CONSTRUCTION. Group 1 Projects. Building Design and Performance Standards. University of Hawaii at Manoa
University of Hawaii at Manoa Building Design and Performance Standards VOL. 2/ DESIGN+ CONSTRUCTION Group 1 Projects To be used by Design and Construction Teams [BLANK] Page 2 of 190 UHM BDPS- D+C GROUP
More informationConstruction Indoor Air Quality (IAQ) Management Plan
Denver School of Science & Technology Middle School 2000 Valentia Street Denver, CO 80238 Telephone: 303-643-5775 Main Fax: 303-673-5776 Construction Indoor Air Quality (IAQ) Management Plan Denver School
More informationSABIC INITIATIVES IN GREEN LEED CERTIFIED BUILDING
SABIC INITIATIVES IN GREEN LEED CERTIFIED BUILDING ABDULLAH AL-REFAIE, PROGRAM DIRECTOR, HOME OF INNOVATION THE SAUDI INTERNATIONAL BUILDING & CONSTRUCTIONS TECHNOLOGY CONFERENCE 2015 - KACST 11 th 12
More informationBalco, Inc. PC Series Partition Closure Systems
Balco, Inc. PC Series Partition Closure Systems Applicable Rating Systems: CI - Commercial Interiors RETAIL CI - Retail, Commercial Interiors Balco, Inc. PC Series Partition Closure Systems Contributes
More informationLight Control and LEED
Light Control and LEED How light control helps achieve LEED certification in new construction and major renovations of commercial buildings AIA Program Number LCAL10 1.0 Learning Unit HSW/SD Approved by
More informationGUIDE SPECIFICATION: DUCT LINER
GUIDE SPECIFICATION: DUCT LINER This specification guide includes thermal & acoustical insulation for ductwork and air handling systems. This section is based on the format recommended by MICA (Midwest
More information88.2% 32% 23% WEITZ LABORATORY GOLD. PROJECT HIGHLIGHTS LEED Facts. of on-site generated construction waste was diverted from landfills.
WEITZ LABORATORY GORDON MCKAY LABS BUILDING, 9 OXFORD STREET, CAMBRIDGE, MA 02138 LEED-CIV3.0 GOLD The Gordon McKay Laboratory of Applied Science (McKay) building, occupied and operated by the School of
More informationTD CANADA TRUSTCREDIT VALLEY TOWN PLAZA
TD CANADA TRUSTCREDIT VALLEY TOWN PLAZA 6051 CREDITVIEW RD, MISSISSAUGA, ON 2016 CANADIAN CONSULTING ENGINEERING AWARD SUBMISSION Submitted by: Integral Group 1 PROJECT INFORMATION Project Name: TD Canada
More information75% 40% reduction in water consumption. 43% 68% 90%
HOLOKE EIGHTH FLOOR CAMPUS SERVICE CENTER 75 Mount Auburn Street, Cambridge, MA 02138 LEED-CI V3 GOLD The Harvard Campus Service Center LEED CI project is an interior renovation of existing office space
More informationEnergy and Atmosphere
The Most! Goals Reduce Energy Use and Support the Use of More Environmentally Friendly Energy Sources Stop Global Warming / Reduce GHG Emissions Eliminate / Reduce Air Pollution EAP1 Fundamental Commissioning
More informationLEED for Homes Mid-Rise 2010 Verification & Submittal Guidelines For Verification Teams
LEED for Homes Mid-Rise 2010 Verification & Guidelines For Verification Teams These guidelines summarize the verification and submittal requirements for LEED for Homes Mid-Rise. Roles and Responsibilities:
More informationRating System & Addendum. for New Construction & Major Renovations LEED Canada-NC Version 1.0
Rating System & Addendum for New Construction & Major Renovations LEED Canada-NC Version 1.0 December 2004 Introduction The Canada Green Building Council (CaGBC) has been officially established as a national
More informationOne That is Already Built.
Montgomery County Planning Board 2009 Growing Smarter Speaker Series Thursday, February 12 th, 2009 Green Building: Today s Practices Tomorrow s Challenges Carl Elefante, FAIA, LEED AP Principal Director
More informationDecoustics and LEED Leadership in Energy and Environmental Design
Decoustics and LEED Leadership in Energy and Environmental Design Buildings fundamentally impact people s lives and the health of the planet. In the United States, buildings use one-third of the total
More informationGreen Globes for New Construction
Blakely Hall, Issaquah WA The Green Building Initiative Green Globes for New Construction 4/26/16 Presenter: Shaina Weinstein Disclaimer: This presentation was developed by a third party and is not funded
More informationLEED-EB Project Case Study: JohnsonDiversey Headquarters
LEED-EB Project Case Study: JohnsonDiversey Headquarters CONTENTS HOW TO USE THIS CASE STUDY... II INTRODUCTION TO JOHNSONDIVERSEY...4 CULTIVATING AN ORGANIZATIONAL COMMITMENT TO LEED-EB...5 ACHIEVING