4400 Series UPS Seismic Adapter Kit Installation Instructions
|
|
- Anabel Perry
- 6 years ago
- Views:
Transcription
1 4400 Series UPS Seismic Adapter Kit Installation Instructions Date: October 2015 Doc. No.: The 4400 Series cabinets can be installed to meet California OSHPD seismic specifications using the optional Seismic Kit and the floor anchorages specified below. These instructions describe how to install the seismic adapter kits on the 4400 Series UPS, Battery, and Auxiliary Cabinets. There is a SEISMIC KIT for each cabinet style: kva, 50 kva, and 80 kva kVA Seismic Installation kVA Seismic Installation kVA Seismic Installation kVA Seismic Installation Table 1 lists the contents of the kVA Seismic Kit. Figure 1 shows the order of assembly for the [bolt + lockwasher + washer] fastener group. TABLE KVA SEISMIC CONTENTS 5.55 in (141 mm) 9.22 in (234 mm) 4.28 in (109 mm) SEISMICKIT Contents No. P/N* Description Quan TOP SEISMIC BRACKET 30kVA) BASE MOUNTING BRACKET, 1 4-a Hex Bolt, 1/4 20,1-1/2 1 4-b Flat Washer, 1/4 1 4-c E Ring, F/0.25 Shaft 1 -a Hex Bolt, 5/16 18 x b Lock Washer, 5/ c Flat Washer, 5/ Seismic Kit Installation Manual in. (865 mm) 12 in (305 mm) 12 in (305 mm) 1/2 in. Bolt (6) a b c FIGURE 1: FASTENER GROUP (BOLT +LOCK WASHER + WASHER) 4400 Series UPS Seismic Kit Installation Instructions Base Plate Footprint 2.0 in (51 mm) Conduit Knock-out (3 Places) Cabinet Footprint 2.75 in (70 mm) FIGURE 2: 15-30KVA SEISMIC ANCHORAGE - FLOOR PATTERN 1.75 in (44.4 mm) 1
2 15-30 kva Seismic Adapter Kit (Cont.) 1. Prepare the floor anchorages. Arrange the anchorages to accommodate the final layout including placement of ancillary battery and/or Auxiliary cabinets. (Figure 2) 2. Prepare the wall anchorages. Key measurements off the anchorage placement in Step 1. (Figure 3) 3. Table 1 lists the components of the 30kVA Seismic Kit. Figure 4 show the Seismic anchorage components in the Seismic Kit for the 30kVA cabinets. 4. Assemble the fastener groups in Table 1, [4a-4c], [10a-10c], and [a-c] as shown in Figure Secure the Top Seismic Bracket [1] to the top rear of the UPS using two (2) fastener group []. (Figure 5) 6. Install the Base Brackets, [2], on the UPS base. Use two (2) fastener group [10] for each bracket. (Figure 6) 7. Secure the Base Mounting Bracket, [3], to the floor anchors installed in Step Roll the kva UPS cabinet between the two vertical sides of the Base Mounting Bracket, [4]. (Figure 7) 9. Line up the UPS so the bolt holes on the Bottom Seismic Brackets line up with the holes on the Seismic Base Plate vertical sides. 10. Secure the UPS to the Seismic Base Plate using the remaining eight (8) fastener group []. Insert the bolts through the Seismic Bracket to the welded nuts on the Seismic Base Plate. (Figure 7). Secure the Top Seismic Bracket, [1], to the wall anchors installed in Step Once installation is complete, use the single Fastener Group [4] to secure the door of the UPS. (Figure 8) 5 in (127 mm) in. (1688 mm) 1/4 Bolt Anchor (2) in (255 mm) 9.27 in (471 mm) Base Mounting Bracket FIGURE 3: 15-30KVA SEISMIC ANCHORAGE - WALL PATTERN 1 Cabinet Wall Footprint P/N SEISMICKIT FIGURE 5: TOP SEISMIC BRACKET INSTALLATION FIGURE 4: SEISMIC KIT COMPONENTS (15-30 KVA) Series UPS Seismic Kit Installation Instructions
3 15-30 kva Seismic Adapter Kit (Cont.) FIGURE 6: BOTTOM SEISMIC BRACKET INSTALLATION Slide UPS into Base Plate FIGURE 7: INSTALLING ON SEISMIC BASE PLATE 4 FIGURE 8: SEISMIC DOOR ANCHOR (15-30 KVA) 4400 Series UPS Seismic Kit Installation Instructions
4 Series UPS Seismic Kit Installation Instructions FIGURE 9: SEISMIC KVA DIMENSAIONAL DRAWING
5 kVA Seismic Installation Table 2 lists the contents of the kVA ( SEISMICKIT) and 80kVA ( SEISMICKIT) Seismic Kits. Figure 1 shows the order of assembly for the [bolt + lockwasher + washer] fastener group. TABLE 2 50 KVA SEISMIC KIT CONTENTS SEISMICKIT Contents No. P/N* Description Quan TOP SEISMIC BRACKET SEISMIC MOUNTING CHANNEL 2 7-a Hex Bolt, 1/4 20,1-1/2 1 7-b Flat Washer, 1/4 1 7-c E Ring, F/0.25 Shaft 1 10-a Hex Bolt, 1/2 13 x 3/ b Lock Washer, 1/ c Flat Washer, 1/2 8 -a Hex Bolt, 5/16 18 x 1 4 -b Lock Washer, 5/16 4 -c Flat Washer, 5/ Seismic Kit Installation Manual 1 a b c FIGURE 1: FASTENER GROUP (BOLT +LOCK WASHER + WASHER) 5 1. Prepare the floor anchorages. Arrange the anchorages to accommodate the final layout including placement for ancillary battery and/or Auxiliary cabinets. (Figure ) 2. Prepare the wall anchorages. Key measurements off the anchorage placement in Step 1. (Figure 12) 3. Table 2 lists the components of the 50kVA Seismic Kit. Figure 10 show the Seismic anchorage components in the Seismic Kit for the 50kVA cabinets. 4. Assemble the fastener groups in Table 2, [7a-7c], [10a-10c], and [a-c] as shown in Figure Secure the Top Seismic Bracket [5] to the top rear of the UPS using three (3) fastener group []. (Figure 13) 6. Position the UPS over the floor anchors 7. Slip each Seismic Mounting Channel [6] over the three floor anchors on each side of the UPS. 8. Tilt the Base bracket up against the UPS bottom bracket on the UPS base. 9. Align the holes in the Seismic Mounting Channels [6] with the UPS bottom brackets. 10. Use the remaining eight (8) fastener group [] to secure the Seismic Mounting Channels [6] to the UPS bottom brackets. (Figure 14, Figure 15). Secure the Top Seismic Bracket to the wall anchors using 5/16 Bolts. 12. Once installation is complete, secure the door of the UPS using the two (2) Fastener Group [7]. (Figure 16) 7 P/N SEISMICKIT 6 FIGURE 10: SEISMIC KIT COMPONENTS (50 KVA) 4400 Series UPS Seismic Kit Installation Instructions
6 4.59 in (2 mm) 37.2 in. (944 mm) 2.03 in (51 mm).5 in. (292 mm).5 in. (292 mm) 5/8 in. Bolt Anchor (6) in. (713 mm) in. (1905 mm) 7.0 in (178 mm) 5/16 in. Bolt Anchor (4) 10.0 in (254 mm) 7.0 in 4.06 in (178 mm) (103 mm) 5.0 in (127 mm) in (356 mm) Seismic Mounting Channel 32.1 in. (816 mm) FIGURE : 50KVA SEISMIC ANCHORAGE - FLOOR PATTERN 32.1 in. (816 mm) FIGURE 12: 50KVA SEISMIC ANCHORAGE - WALL PATTERN Top Bracket P/N FIGURE 13: TOP SEISMIC BRACKET INSTALLATION 6 Bottom Bracket P/N FIGURE 14: BOTTOM SEISMIC BRACKET INSTALLATION (FLOOR AND ANCHORS NOT SHOWN) Series UPS Seismic Kit Installation Instructions
7 7 Fastener Group 5/16 in x 18 Bolt 5/16 in Lock Washer 5/16 Washer 5/16 in x 18 Press Nut Anchor Bolt FIGURE 15: 50 KVA SEISMIC FLOOR ANCHOR - DETAIL 7 FIGURE 16: SEISMIC DOOR ANCHOR (50-8/0 KVA) 4400 Series UPS Seismic Kit Installation Instructions
8 Series UPS Seismic Kit Installation Instructions FIGURE 17: SEISMIC 50 KVA DIMENSAIONAL DRAWING
9 kVA Seismic Installation Table 3 lists the contents of the kVA Seismic Kit SEISMICKIT. Figure 1 shows the order of assembly for the [bolt + lockwasher + washer] fastener group. TABLE 3 80 KVA SEISMIC KIT CONTENTS SEISMICKIT Contents No. P/N* Description Quan TOP SEISMIC BRACKET 1 7-a Hex Bolt, 1/4 20,1-1/2 2 7-b Flat Washer, 1/4 2 7-c E Ring, F/0.25 Shaft 2 -a Hex Bolt, 5/16 18 x 1 4 -b Lock Washer, 5/16 4 -c Flat Washer, 5/ Seismic Kit Installation Manual 1 a b c FIGURE 1: FASTENER GROUP (BOLT +LOCK WASHER + WASHER) 80 kva 1. Prepare the floor anchorages. Arrange the anchorages to accommodate the final layout including placement for ancillary battery and/or Auxiliary cabinets. (Figure 19) 2. Prepare the wall anchorages. Key measurements off the anchorage placement in Step 1. (Figure 20) 3. Table 3 lists the components of the 80kVA Seismic Kit. Figure 18 show the Seismic anchorage component in the Seismic Kit for the 80kVA cabinets. 4. Assemble the fastener groups in Table 3, [7a-7c] and [a-c] as shown in Figure Secure the Top Seismic Bracket [5] to the top rear of the UPS using three (3) fastener group []. (Figure 21) 6. Position the 80 kva cabinet over the four floor anchors and secure the unit. 7. Secure the Top Seismic Bracket to the wall anchors using 5/16 Bolts. 8. Once installation is complete, secure the door of the cabinet using the two (2) Fastener Group [7]. (Figure 16) 80 kva 7 5 P/N SEISMICKIT FIGURE 18: SEISMIC KIT COMPONENTS (50 KVA) 4400 Series UPS Seismic Kit Installation Instructions
10 2.5 in (64 mm) 2.5 in (64 mm) 27.1 in. (689 mm) 7.0 in (178 mm) 10.0 in (254 mm) 7.0 in (178 mm) 5/16 in. Bolt Anchor (4) 5.0 in (127 mm) 37.2 in. (944 mm) in. (704 mm) in. (1904 mm) 5/8 in. Bolt Anchor (4) in (344 mm) Base C-Channel 32.1 in. (816 mm) FIGURE 19: 80KVA SEISMIC ANCHORAGE - FLOOR PATTERN 32.1 in. (816 mm) FIGURE 20: 80KVA SEISMIC ANCHORAGE - WALL PATTERN 5 FIGURE 21: TOP SEISMIC BRACKET INSTALLATION Series UPS Seismic Kit Installation Instructions
11 FIGURE 22: SEISMIC 80 KVA DIMENSAIONAL DRAWING 4400 Series UPS Seismic Kit Installation Instructions
12 SOCIAL INFRASTRUCTURE SYSTEMS GROUP POWER ELECTRONICS DIVISION West Little York Road, Houston, Texas US (855) Fax. (713) Canada (800) Mexico 01/800/ Printed in the U.S.A.
SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets
SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets Seismic Frame Two-Post Rack Page 11-3 Seismic Protection Products - Racks Page 11-6 Seismic Protection Products - Runway Page 11-8 Seismic
More informationRaised Basement. Mechanical Installation Guide
R Raised Basement Mechanical Installation Guide Ensure masonry work is correct. If recessed, the depth must be 14 inches deep unless otherwise specified for a custom application. Width and length may vary
More informationSECTION I -- IRONWORK
SECTION I -- IRONWORK CONTENTS PAGE 1. GENERAL... I-2 1.1. Introduction... I-2 2. REQUIREMENTS... I-2 2.1. General... I-2 2.2. Auxiliary Framing... I-2 2.3. High Seismic Risk Zone Requirements... I-3 2.4.
More informationFig. 1 - Standard Clevis Hanger
Revision 10/24/2007 Fig. 1 - Standard Clevis Hanger Component of State of California OSHPD Approved Seismic Restraints System Size Range Size 1/2" thru 36" pipe. Function Recommended for the suspension
More information1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.
SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2
More informationLarge cable sizes stronger than pipe/strut
Legrand Seismic Wire Rope/Cable Bracing is the recommended seismic bracing for Legrand wire mesh and ladder tray systems. It is UL Listed, complies with all building codes and standards, and offers significant
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationInstallation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V
Installation Smart-UPS VT in Parallel 10-40 kva 380/400/415 V 208/220 V 200/208 V Contents Safety... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS.............................. 1 Prepare for
More informationFig Beam Clamp Retaining Strap (B-Line B3367)
Fig. 69 - Beam Clamp Retaining Strap (B-Line B3367) Size Range: 3 /8"-16 thru 3 /4"-10 rod 4 (101.6mm) thru 16 (406.4mm) lengths Note: longer lengths are available consult factory Material: Pre-Galvanized
More informationSECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationMERCEDES SPRINTER PARTITION INSTALLATION INSTRUCTIONS
www.sortimo.knapheide.com Document # 3964-01 The following instructions detail the procedure for installing a Sortimo By Knapheide Protexx Partition in a Mercedes Sprinter. This guide is intended to walk
More informationFIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC
TABLE OF CONTENTS Pictorial Index Product Recommendations Water Closet Carriers Matching Water Closet & Carrier Closet Carrier Selection & Battery Set-Up Stud & Nipple Adjustment to Finished Wall Anchoring
More informationSECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and
More informationCantilevered Rail System
Knight Global's Cantilevered Rail Systems are designed to eliminate the need for a four post floor structure system. It provides an alternative to workstations with minimal floor space. A wide range of
More informationMaterials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.
Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon
More informationPATHWAYS FOR COMMUNICATIONS SYSTEMS
270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This
More informationPre-Fabricated Roof Curbs
Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.
More informationIBC Compliant Seismic Rated Isolators
ISOLATORS IBC Compliant Seismic Rated Isolators Features & Benefits Rugged steel housing is designed to handle high wind and seismic forces. Housing serves as blocking during equipment erection. Top plate
More informationWALL MOUNTED ARTICULATING JIB CRANE
SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More informationSECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS
Page 1 of 9 SECTION 10 2238.13 LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED FOLDING GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationThank you for purchasing our product. *Please read these instructions and follow them step by step.
PAGE 1 OF 5 PORTA-DOCK, INC. AD01- DS 4'x 16'SW-AA - AP01- DS 4'x 16'SW-APD AW01- DS 4'X 16'SW-CPD ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to the Model* Thank you for purchasing our product.
More informationOriginally Issued: 03/08/2013 Revised: 03/14/2017 Valid Through: 03/31/2019
EVALUATION SUBJECT: ALUR DIVIDING WALL REPORT HOLDER: Modular Architectural Interiors LLC dba MAI 330 Waterloo Valley Road Mount Olive, NJ 07828 Phone: (973) 446-2300 Fax: (973) 446-2399 www.maispace.com
More informationBGR Series. features: 19 gangable enclosures. what great systems are built on.
GR Series 19 gangable enclosures next generation rack, designed with significant installation and performance benefits features: Provides more rackspace in a smaller overall height than similar racks ccepts
More informationElevated Slab Sequence
Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)
More informationU-LAP. UTR-30 & UTR-70 Recipro Air Lappers Repair Manual. BORIDE Engineered Abrasives 2615 Aero Park Dr. Traverse City, MI
U-LAP UTR-30 & UTR-70 Recipro Air Lappers Repair Manual UTR-20-30-70 Repair Instruction Manual Repair Instruction Manual Content Exploded View --------------------------------------------------------------------Page
More informationThe advantages of resistance welding versus Mig welding are: Weld consistency Weld strength Floor cleanliness.
self-supported tri Flooring Systems Self-Supported TriDEK floors have a truss system that eliminates the need for floor frames or other support methods. TriDEK self-supported floors can be used to span
More informationSECTION PLATE CONNECTED WOOD TRUSSES
SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationBox Rail. Single Box Rail Bracket
HANGERS & RAILS Box Rail Accordion Door Hangers Max. Door Weight (SWL) 450 lbs Meets ANSI/BHMA A156.14, Grade 1. Rail is carefully formed to give an even tread to hanger wheels. Packaging: Bundled without
More informationSECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:
SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section
More informationModular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper
Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Modular CABANA Kit 16 x 16 (6x6) Hipped Roof & Build-in Transoms Entry Key Lock Set (bright brass or dark bronze)
More informationMaterials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.
Pipe clamps offered in this section are designed for support and attachment of pipe to structural members. wide range of pipe clamps are available for various applications. Materials arbon Steel is used
More informationREV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms
REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationVertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount)
VertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount) This instruction is a guide to installing the VertiGreen Modular Living Wall System on a wall or support structure.
More informationGeneral Features of Cantilever Racking
CANTILEVER General Features of Cantilever Racking Cantilever racking is specifically designed to store long or varying length items, such as metal beams, pipes, molding, wooden boards, metal and plastic
More informationSeismic Restraints. Cent-R-Rail Supplement* SYSTEMS THAT MAKE SENSE
SRSCR-0 Seismic Restraints Cent-R-Rail Supplement* Multi-Directional Bracing For Data-Track, Half-Rack and Multi-Tier Half-Rack Systems Structural Engineer S 9 *To be used in conjunction with Cooper B-Line
More informationSeismic Installation Manual
Seismic Installation Manual California Office of Statewide Health Planning & Development OPA-2123-10 This manual provides the design strength capacities and installation guidelines for the Bracing System
More informationIndustrial Shelving. Q Line, Z-Line/Steel Shelves, Bulk Storage and Heavy-Duty Reinforced Shelving SYSTEMS FOR SUCCESS
Industrial Shelving Q Line, Z-Line/Steel Shelves, Bulk Storage and Heavy-Duty Reinforced Shelving Q Line & Z-Line/Steel Shelving Heavy Duty Reinforced Shelving & Bulk Storage Shelving 2 Industrial Shelving
More informationShown with optional high capacity air conditioning system and exterior quartz lights. New style exterior mounted quartz lights.
Custom designed cabinetry at the forward end of the car tread plates. The photo at the left shows the end cabinets in the stored position while the right photo features the cabinets in the raised position
More informationSeismic Installation Manual
Seismic Installation Manual This manual provides the design strength capacities and installation guidelines for the Restraint systems brace components for use in the design of an overall bracing/restraint
More informationMaterials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.
Pipe clamps offered in this section are designed for support and attachment of pipe to structural members. wide range of pipe clamps are available for various applications. Materials arbon Steel is used
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF
More informationPanel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT
IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS
More informationModern Rumford. MR 48 fireplaces
Modern Rumford MR 48 fireplaces Construction Guidelines For MR-48-1 Kit System Cellar Building, Suite 300 1124 NW Couch Street Portland, OR 97209 Ph. 503-227-0547 Fax 503-227-0548 info@mobergfireplaces.com
More informationSECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems.
SECTION 26 05 29 HANGERS AND SUPPORTS FOR PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Hangers and supports for electrical equipment and systems. 1.2 DEFINITIONS A. EMT: Electrical
More informationSECTION TOILET COMPARTMENTS. A. Section Metal Fabrications: Concealed steel support members.
SECTION 10155 TOILET COMPARTMENTS PART 1 GENERAL 1.1 SECTION INCLUDES A. Plastic laminate partitions. 1.2 RELATED SECTIONS A. Section 05500 - Metal Fabrications: Concealed steel support members. B. Section
More informationTelecommunication Spaces
Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137
More informationFORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual
FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated
More informationDURA-BLOK Rooftop Supports
Cooper B-Line s new line of DURA-BLOK products gives you a versatile and long-term solution for all your roof top support needs. Designed with flexibility in mind, Dura-Blok is ideal for roof top support
More informationOPERATOR S SAFETY MANUAL
June 2011 OPERATOR S SAFETY MANUAL Sumner Pipe Jacks www.sumner.com 7514 Alabonson Road Houston, TX 77088 U.S.A ph: 281.999.6900 fax: 281.999.6966 470 Collier MacMillan Drive Unit 2 & 3 Cambridge, ON N1R
More informationB. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.
SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationPost Style with ABS Real Tuff
Post Style with ABS Real Tuff Mantova s patented Post Shelving with ABS Real Tuff removable shelves have been making life easier for thousands of Australian businesses for more then a decade. Removable
More informationTOLCO Fire Protection Support Systems. Pipe Hangers Supports Seismic Bracing. UL Listed FM Approved for Fire Sprinkler Installations
TOLCO Fire Protection Support Systems Pipe Hangers Supports Seismic Bracing UL Listed FM Approved for Fire Sprinkler Installations Revision 12/06/2007 Catalog Forward This catalog has been created with
More informationBEARING METAL STUD FRAMING
L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or
More informationZ5028 E3/Ci80 Horizontal bracket Mounting instructions
Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a potentially dangerous situation
More informationSECTION SEISMIC CONTROL OSHPD
SECTION 01451 PART 1 - GENERAL 1.01 DESCRIPTION A. Provide all required seismic restraints and calculations in order to insure that the installation of all architectural, mechanical, and electrical equipment/components
More informationBOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S
BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S ASSEMBLY INSTRUCTIONS General Instructions: The STREBEL RU boilers are special boilers for oil or gas-fired (forced) burners. They
More informationLiner Replacement Instructions:
Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working
More informationDURA-BLOK is made from 100% recycled rubber and qualifies for LEED credits. Reflective strips on both sides allow for easy product visibility.
is made from 100% recycled rubber and qualifies for LEED credits. Reflective strips on both sides allow for easy product visibility. Channels are through bolted on all sizes for added strength and a 1
More informationB. Polyethylene samples shall be submitted for Owner approval of color and quality.
Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and
More informationInstallation Instructions
Installation Instructions Dynarail Safety Ladder System Corrosion Resistant Nonconductive Fire Retardant High Strength-To-Weight Ratio Long, Low Maintenance Life Meets OSHA, BOCA & Other Building Code
More informationFEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.
The Steel Strong-Wall is a corrugated steel panel which is designed to be fixed directly to the concrete foundations of a building, within the external or internal wall, via a bolted connection. FEATURES
More informationRS32 Multi-Section Skylight System under/over seam clip double diverter
INSTALLATION INSTRUCTIONS RS32-x RS32 Multi-Section Skylight System under/over seam clip double diverter www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981 SKYLIGHT ACRYLIC skyline series
More informationHow to Construct a Feral Enclosure
How to Construct a Feral Enclosure by Bob Breeze For questions and further information: bob.breeze@gmail.com April 2016 Please note, this is a living document. If you need further information or would
More informationEstablished DOC. NO : SSI / PROFILE Rev-03
Established 2002 www.sandskuwait.com C O M P A N Y P R O F I L E DOC. NO : SSI / PROFILE-001 - Rev-03 2 S & S International Company W.L.L. was Incorporated in 2009 with the primary objective of becoming
More informationGMV Super Star. Part List
GMV Super Star Part List 25 Table of Contents Part List 25 Magazine... 28 Target Retainer... 30 Throwing Table... 31 Main Frame... 32 Turntable... 33 Base... 34 Elevator... 35 Throwing Arm... 36 Motor...
More informationAluma EasySet Continuing Innovation from Aluma S ystems
Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma
More informationStainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K
T Premium Panel, protection category IP 69K IP 69 K.6 H H H Optionally with or without keyboard housing Resistant to high-pressure cleaning (protection category IP 69K). The seal lies between two surfaces
More informationSECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationPLATFORMS. Aluminum Platforms
PLATFORMS Aluminum Platforms Better than steel or wood platforms for mounting transformers, regulators, switches and heavy equipment. 1. Easier handling, storage and transporting. 2. Easier installation.
More informationPanduit Corporation Tinley Park, Illinois. Outset and Inset Cabinets Seismic Load Rating and Anchorage Design
Panduit Corporation Tinley Park, Illinois Outset and Inset Cabinets Seismic Load Rating and Anchorage Design February 13, 2013 Degenkolb Job Number B2439007.00 www.degenkolb.com 500 Degenkolb Engineers
More informationPATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge
Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth
More informationECONO 200 INPLANT OFFICE
Warehouse Storage & Material Handling Equipment+ ECONO 200 INPLANT OFFICE INSTALLATION & ASSEMBLY INSTRUCTIONS American Surplus Inc. 1 Noyes Ave. East Providence, RI Phone: (800) 989-7176 Fax: (401) 434-7414
More informationSteel Door Frame Installation in Masonry Construction
Steel Door Frame Installation in Masonry Construction Steel Door Frame Installation in Masonry Construction This manual provides step-by-step instructions for the installation of a steel door frame in
More informationLista Storage Wall Systems
Lista Storage Wall Systems At Panoz Motor Sports, Lista s shallow depth Storage Wall Systems allow maximum storage capacity and full access, together with spacesaving narrow aisles. STORE LARGE AND SMALL
More informationKINETICS Pipe & Duct Seismic Application Manual
QUICK START READ ME FIRST I1.1 Seismic Restraint Categories and Types: Seismic restraints for pipe and duct are generally separated into to two categories. 1. Transverse Seismic Restraints: These act to
More informationMODEL: SIGHT-LINE- COMMAND CENTER CONSOLES
2015 WINSTED CORPORATION 1) GENERAL DESCRIPTION 1.1 Sight-Line Command Center Consoles. SeeAppendix A - C for typical styles and measurements. 1.2 The contractor shall supply a system capable of supporting
More informationMERCEDES SPRINTER PARTITIONS W/ SLIDING DOOR INSTALLATION INSTRUCTIONS
www.sortimo.knapheide.com Document # 6235-01 The following instructions detail the procedure for installing a Sortimo By Knapheide Protexx Partition in a Mercedes Sprinter. This guide is intended to walk
More informationDe Montfort Mark 7 Incinerator (Flatpack)
De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where
More informationGALVA-STOP. Pallet Rack Backing Safety System
GALVA-STOP Pallet Rack Backing Safety System INDEX ABOUT GALVA-STOP PALLET RACK BACKING SAFETY SYSTEM...4 VERTICAL PANELS FOR NEW INSTALLATIONS OVERVIEW AND ILLUSTRATIONS...5 VERTICAL PANELS FOR TOP BAY
More informationHANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity
HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications
More informationSPORTS AND STADIUM LIGHTING. Solutions for Amatuer and Professional Athletic Venues
SPORTS AND STADIUM LIGHTING Solutions for Amatuer and Professional Athletic Venues ENGINEERED SUPPORT STRUCTURES Now a global network of 50 facilities spanning 15 countries, Valmont Industries consists
More informationITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)
ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types
More informationApplied Maintenance Supplies & Solutions
Applied Maintenance Supplies & Solutions SM Inventory Management, Vending and More Applied Maintenance Supplies & Solutions (Applied MSS SM) brings lean principles to your management of MRO consumables
More informationSeismic Installation Manual
Seismic Installation Manual This manual provides the design strength capacities and installation guidelines for the Bracing System for use in the design of an overall bracing system for suspended nonstructural
More informationbuilt build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL
uilt build to FORMWORKS Company Projects Products CLIMBING SYSTEMS Pilosio s CLIMBING SYSTEM with mechanical handling enable vertical construction joints to be created in succession without the aid of
More informationINSTALLATION INSTRUCTIONS. Wall Sleeve Kit. For Use With MGE/MCE/MHP Series Magic-Pak Unit
INSTALLATION INSTRUCTIONS Wall Sleeve Kit For Use With MGE/MCE/MHP Series Magic-Pak Unit This manual must be left with the homeowner for future reference. This is a safety alert symbol and should never
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 05 48.00 10 (October 2006) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 05 48.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationCITY OF FARGO SPECIFICATIONS SIGNING
SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete
More informationSECTION CLIMBING WALLS
SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2
More informationDelivering Reliability. Electrical Vaults. Power & Energy-Underground Structures
A Delivering Reliability Electrical Vaults Power & Energy-Underground Structures A The Benefits of Precast Vaults Electrical vaults house power cables and transformers, and are a preferred alternative
More informationBUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466
BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein
More informationTEST REPORT. Rendered to: SENTINEL FENCE AND RAIL. For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post
TEST REPORT Rendered to: SENTINEL FENCE AND RAIL For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post Report No: Report Date: 10/23/12 130 Derry Court York, PA 17406-8405
More informationElevationSeriesUprightBike
ElevationSeriesUprightBike (95C-ALLxx-xx, 97C-ALLxx-xx, 95C-IFIxx-xx, PCSC-ALLxx-xx) PartsManual 13.04.11 Table of Contents Miscellaneous 2 Miscellaneous Part Numbers 2 Console Assembly 3 Consoles 3 Drive
More informationGeneral Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety
Instructions for Part # SC500-AF General Guidelines It is the user s responsibility to read and follow all instructions. Keep these instructions with the product at all times and review before each use.
More informationCANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE
CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is
More informationZ5033 E3 Ball joint adapter Mounting instructions
Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter References in the manual This refers to a potentially dangerous situation which may lead to personal injury. This refers to
More information