4400 Series UPS Seismic Adapter Kit Installation Instructions

Size: px
Start display at page:

Download "4400 Series UPS Seismic Adapter Kit Installation Instructions"

Transcription

1 4400 Series UPS Seismic Adapter Kit Installation Instructions Date: October 2015 Doc. No.: The 4400 Series cabinets can be installed to meet California OSHPD seismic specifications using the optional Seismic Kit and the floor anchorages specified below. These instructions describe how to install the seismic adapter kits on the 4400 Series UPS, Battery, and Auxiliary Cabinets. There is a SEISMIC KIT for each cabinet style: kva, 50 kva, and 80 kva kVA Seismic Installation kVA Seismic Installation kVA Seismic Installation kVA Seismic Installation Table 1 lists the contents of the kVA Seismic Kit. Figure 1 shows the order of assembly for the [bolt + lockwasher + washer] fastener group. TABLE KVA SEISMIC CONTENTS 5.55 in (141 mm) 9.22 in (234 mm) 4.28 in (109 mm) SEISMICKIT Contents No. P/N* Description Quan TOP SEISMIC BRACKET 30kVA) BASE MOUNTING BRACKET, 1 4-a Hex Bolt, 1/4 20,1-1/2 1 4-b Flat Washer, 1/4 1 4-c E Ring, F/0.25 Shaft 1 -a Hex Bolt, 5/16 18 x b Lock Washer, 5/ c Flat Washer, 5/ Seismic Kit Installation Manual in. (865 mm) 12 in (305 mm) 12 in (305 mm) 1/2 in. Bolt (6) a b c FIGURE 1: FASTENER GROUP (BOLT +LOCK WASHER + WASHER) 4400 Series UPS Seismic Kit Installation Instructions Base Plate Footprint 2.0 in (51 mm) Conduit Knock-out (3 Places) Cabinet Footprint 2.75 in (70 mm) FIGURE 2: 15-30KVA SEISMIC ANCHORAGE - FLOOR PATTERN 1.75 in (44.4 mm) 1

2 15-30 kva Seismic Adapter Kit (Cont.) 1. Prepare the floor anchorages. Arrange the anchorages to accommodate the final layout including placement of ancillary battery and/or Auxiliary cabinets. (Figure 2) 2. Prepare the wall anchorages. Key measurements off the anchorage placement in Step 1. (Figure 3) 3. Table 1 lists the components of the 30kVA Seismic Kit. Figure 4 show the Seismic anchorage components in the Seismic Kit for the 30kVA cabinets. 4. Assemble the fastener groups in Table 1, [4a-4c], [10a-10c], and [a-c] as shown in Figure Secure the Top Seismic Bracket [1] to the top rear of the UPS using two (2) fastener group []. (Figure 5) 6. Install the Base Brackets, [2], on the UPS base. Use two (2) fastener group [10] for each bracket. (Figure 6) 7. Secure the Base Mounting Bracket, [3], to the floor anchors installed in Step Roll the kva UPS cabinet between the two vertical sides of the Base Mounting Bracket, [4]. (Figure 7) 9. Line up the UPS so the bolt holes on the Bottom Seismic Brackets line up with the holes on the Seismic Base Plate vertical sides. 10. Secure the UPS to the Seismic Base Plate using the remaining eight (8) fastener group []. Insert the bolts through the Seismic Bracket to the welded nuts on the Seismic Base Plate. (Figure 7). Secure the Top Seismic Bracket, [1], to the wall anchors installed in Step Once installation is complete, use the single Fastener Group [4] to secure the door of the UPS. (Figure 8) 5 in (127 mm) in. (1688 mm) 1/4 Bolt Anchor (2) in (255 mm) 9.27 in (471 mm) Base Mounting Bracket FIGURE 3: 15-30KVA SEISMIC ANCHORAGE - WALL PATTERN 1 Cabinet Wall Footprint P/N SEISMICKIT FIGURE 5: TOP SEISMIC BRACKET INSTALLATION FIGURE 4: SEISMIC KIT COMPONENTS (15-30 KVA) Series UPS Seismic Kit Installation Instructions

3 15-30 kva Seismic Adapter Kit (Cont.) FIGURE 6: BOTTOM SEISMIC BRACKET INSTALLATION Slide UPS into Base Plate FIGURE 7: INSTALLING ON SEISMIC BASE PLATE 4 FIGURE 8: SEISMIC DOOR ANCHOR (15-30 KVA) 4400 Series UPS Seismic Kit Installation Instructions

4 Series UPS Seismic Kit Installation Instructions FIGURE 9: SEISMIC KVA DIMENSAIONAL DRAWING

5 kVA Seismic Installation Table 2 lists the contents of the kVA ( SEISMICKIT) and 80kVA ( SEISMICKIT) Seismic Kits. Figure 1 shows the order of assembly for the [bolt + lockwasher + washer] fastener group. TABLE 2 50 KVA SEISMIC KIT CONTENTS SEISMICKIT Contents No. P/N* Description Quan TOP SEISMIC BRACKET SEISMIC MOUNTING CHANNEL 2 7-a Hex Bolt, 1/4 20,1-1/2 1 7-b Flat Washer, 1/4 1 7-c E Ring, F/0.25 Shaft 1 10-a Hex Bolt, 1/2 13 x 3/ b Lock Washer, 1/ c Flat Washer, 1/2 8 -a Hex Bolt, 5/16 18 x 1 4 -b Lock Washer, 5/16 4 -c Flat Washer, 5/ Seismic Kit Installation Manual 1 a b c FIGURE 1: FASTENER GROUP (BOLT +LOCK WASHER + WASHER) 5 1. Prepare the floor anchorages. Arrange the anchorages to accommodate the final layout including placement for ancillary battery and/or Auxiliary cabinets. (Figure ) 2. Prepare the wall anchorages. Key measurements off the anchorage placement in Step 1. (Figure 12) 3. Table 2 lists the components of the 50kVA Seismic Kit. Figure 10 show the Seismic anchorage components in the Seismic Kit for the 50kVA cabinets. 4. Assemble the fastener groups in Table 2, [7a-7c], [10a-10c], and [a-c] as shown in Figure Secure the Top Seismic Bracket [5] to the top rear of the UPS using three (3) fastener group []. (Figure 13) 6. Position the UPS over the floor anchors 7. Slip each Seismic Mounting Channel [6] over the three floor anchors on each side of the UPS. 8. Tilt the Base bracket up against the UPS bottom bracket on the UPS base. 9. Align the holes in the Seismic Mounting Channels [6] with the UPS bottom brackets. 10. Use the remaining eight (8) fastener group [] to secure the Seismic Mounting Channels [6] to the UPS bottom brackets. (Figure 14, Figure 15). Secure the Top Seismic Bracket to the wall anchors using 5/16 Bolts. 12. Once installation is complete, secure the door of the UPS using the two (2) Fastener Group [7]. (Figure 16) 7 P/N SEISMICKIT 6 FIGURE 10: SEISMIC KIT COMPONENTS (50 KVA) 4400 Series UPS Seismic Kit Installation Instructions

6 4.59 in (2 mm) 37.2 in. (944 mm) 2.03 in (51 mm).5 in. (292 mm).5 in. (292 mm) 5/8 in. Bolt Anchor (6) in. (713 mm) in. (1905 mm) 7.0 in (178 mm) 5/16 in. Bolt Anchor (4) 10.0 in (254 mm) 7.0 in 4.06 in (178 mm) (103 mm) 5.0 in (127 mm) in (356 mm) Seismic Mounting Channel 32.1 in. (816 mm) FIGURE : 50KVA SEISMIC ANCHORAGE - FLOOR PATTERN 32.1 in. (816 mm) FIGURE 12: 50KVA SEISMIC ANCHORAGE - WALL PATTERN Top Bracket P/N FIGURE 13: TOP SEISMIC BRACKET INSTALLATION 6 Bottom Bracket P/N FIGURE 14: BOTTOM SEISMIC BRACKET INSTALLATION (FLOOR AND ANCHORS NOT SHOWN) Series UPS Seismic Kit Installation Instructions

7 7 Fastener Group 5/16 in x 18 Bolt 5/16 in Lock Washer 5/16 Washer 5/16 in x 18 Press Nut Anchor Bolt FIGURE 15: 50 KVA SEISMIC FLOOR ANCHOR - DETAIL 7 FIGURE 16: SEISMIC DOOR ANCHOR (50-8/0 KVA) 4400 Series UPS Seismic Kit Installation Instructions

8 Series UPS Seismic Kit Installation Instructions FIGURE 17: SEISMIC 50 KVA DIMENSAIONAL DRAWING

9 kVA Seismic Installation Table 3 lists the contents of the kVA Seismic Kit SEISMICKIT. Figure 1 shows the order of assembly for the [bolt + lockwasher + washer] fastener group. TABLE 3 80 KVA SEISMIC KIT CONTENTS SEISMICKIT Contents No. P/N* Description Quan TOP SEISMIC BRACKET 1 7-a Hex Bolt, 1/4 20,1-1/2 2 7-b Flat Washer, 1/4 2 7-c E Ring, F/0.25 Shaft 2 -a Hex Bolt, 5/16 18 x 1 4 -b Lock Washer, 5/16 4 -c Flat Washer, 5/ Seismic Kit Installation Manual 1 a b c FIGURE 1: FASTENER GROUP (BOLT +LOCK WASHER + WASHER) 80 kva 1. Prepare the floor anchorages. Arrange the anchorages to accommodate the final layout including placement for ancillary battery and/or Auxiliary cabinets. (Figure 19) 2. Prepare the wall anchorages. Key measurements off the anchorage placement in Step 1. (Figure 20) 3. Table 3 lists the components of the 80kVA Seismic Kit. Figure 18 show the Seismic anchorage component in the Seismic Kit for the 80kVA cabinets. 4. Assemble the fastener groups in Table 3, [7a-7c] and [a-c] as shown in Figure Secure the Top Seismic Bracket [5] to the top rear of the UPS using three (3) fastener group []. (Figure 21) 6. Position the 80 kva cabinet over the four floor anchors and secure the unit. 7. Secure the Top Seismic Bracket to the wall anchors using 5/16 Bolts. 8. Once installation is complete, secure the door of the cabinet using the two (2) Fastener Group [7]. (Figure 16) 80 kva 7 5 P/N SEISMICKIT FIGURE 18: SEISMIC KIT COMPONENTS (50 KVA) 4400 Series UPS Seismic Kit Installation Instructions

10 2.5 in (64 mm) 2.5 in (64 mm) 27.1 in. (689 mm) 7.0 in (178 mm) 10.0 in (254 mm) 7.0 in (178 mm) 5/16 in. Bolt Anchor (4) 5.0 in (127 mm) 37.2 in. (944 mm) in. (704 mm) in. (1904 mm) 5/8 in. Bolt Anchor (4) in (344 mm) Base C-Channel 32.1 in. (816 mm) FIGURE 19: 80KVA SEISMIC ANCHORAGE - FLOOR PATTERN 32.1 in. (816 mm) FIGURE 20: 80KVA SEISMIC ANCHORAGE - WALL PATTERN 5 FIGURE 21: TOP SEISMIC BRACKET INSTALLATION Series UPS Seismic Kit Installation Instructions

11 FIGURE 22: SEISMIC 80 KVA DIMENSAIONAL DRAWING 4400 Series UPS Seismic Kit Installation Instructions

12 SOCIAL INFRASTRUCTURE SYSTEMS GROUP POWER ELECTRONICS DIVISION West Little York Road, Houston, Texas US (855) Fax. (713) Canada (800) Mexico 01/800/ Printed in the U.S.A.

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets

SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets SEISMIC PROTECTION SYSTEMS Bracing Products for Racks & Cabinets Seismic Frame Two-Post Rack Page 11-3 Seismic Protection Products - Racks Page 11-6 Seismic Protection Products - Runway Page 11-8 Seismic

More information

Raised Basement. Mechanical Installation Guide

Raised Basement. Mechanical Installation Guide R Raised Basement Mechanical Installation Guide Ensure masonry work is correct. If recessed, the depth must be 14 inches deep unless otherwise specified for a custom application. Width and length may vary

More information

SECTION I -- IRONWORK

SECTION I -- IRONWORK SECTION I -- IRONWORK CONTENTS PAGE 1. GENERAL... I-2 1.1. Introduction... I-2 2. REQUIREMENTS... I-2 2.1. General... I-2 2.2. Auxiliary Framing... I-2 2.3. High Seismic Risk Zone Requirements... I-3 2.4.

More information

Fig. 1 - Standard Clevis Hanger

Fig. 1 - Standard Clevis Hanger Revision 10/24/2007 Fig. 1 - Standard Clevis Hanger Component of State of California OSHPD Approved Seismic Restraints System Size Range Size 1/2" thru 36" pipe. Function Recommended for the suspension

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

Large cable sizes stronger than pipe/strut

Large cable sizes stronger than pipe/strut Legrand Seismic Wire Rope/Cable Bracing is the recommended seismic bracing for Legrand wire mesh and ladder tray systems. It is UL Listed, complies with all building codes and standards, and offers significant

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V

Installation. Smart-UPS VT in Parallel kva 380/400/415 V 208/220 V 200/208 V Installation Smart-UPS VT in Parallel 10-40 kva 380/400/415 V 208/220 V 200/208 V Contents Safety... 1 IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS.............................. 1 Prepare for

More information

Fig Beam Clamp Retaining Strap (B-Line B3367)

Fig Beam Clamp Retaining Strap (B-Line B3367) Fig. 69 - Beam Clamp Retaining Strap (B-Line B3367) Size Range: 3 /8"-16 thru 3 /4"-10 rod 4 (101.6mm) thru 16 (406.4mm) lengths Note: longer lengths are available consult factory Material: Pre-Galvanized

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

MERCEDES SPRINTER PARTITION INSTALLATION INSTRUCTIONS

MERCEDES SPRINTER PARTITION INSTALLATION INSTRUCTIONS www.sortimo.knapheide.com Document # 3964-01 The following instructions detail the procedure for installing a Sortimo By Knapheide Protexx Partition in a Mercedes Sprinter. This guide is intended to walk

More information

FIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC

FIXTURE CARRIERS TABLE OF CONTENTS S-WD-FC TABLE OF CONTENTS Pictorial Index Product Recommendations Water Closet Carriers Matching Water Closet & Carrier Closet Carrier Selection & Battery Set-Up Stud & Nipple Adjustment to Finished Wall Anchoring

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

Cantilevered Rail System

Cantilevered Rail System Knight Global's Cantilevered Rail Systems are designed to eliminate the need for a four post floor structure system. It provides an alternative to workstations with minimal floor space. A wide range of

More information

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available. Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon

More information

PATHWAYS FOR COMMUNICATIONS SYSTEMS

PATHWAYS FOR COMMUNICATIONS SYSTEMS 270528 PATHWAYS FOR PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all labor, materials, and equipment for the complete installation of work called for in the Contract Documents. 1.2 SCOPE OF WORK A. This

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.

More information

IBC Compliant Seismic Rated Isolators

IBC Compliant Seismic Rated Isolators ISOLATORS IBC Compliant Seismic Rated Isolators Features & Benefits Rugged steel housing is designed to handle high wind and seismic forces. Housing serves as blocking during equipment erection. Top plate

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS Page 1 of 9 SECTION 10 2238.13 LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED FOLDING GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Thank you for purchasing our product. *Please read these instructions and follow them step by step.

Thank you for purchasing our product. *Please read these instructions and follow them step by step. PAGE 1 OF 5 PORTA-DOCK, INC. AD01- DS 4'x 16'SW-AA - AP01- DS 4'x 16'SW-APD AW01- DS 4'X 16'SW-CPD ALUMINUM PORTA-DOCK *For Beige Decking Add the Letter B to the Model* Thank you for purchasing our product.

More information

Originally Issued: 03/08/2013 Revised: 03/14/2017 Valid Through: 03/31/2019

Originally Issued: 03/08/2013 Revised: 03/14/2017 Valid Through: 03/31/2019 EVALUATION SUBJECT: ALUR DIVIDING WALL REPORT HOLDER: Modular Architectural Interiors LLC dba MAI 330 Waterloo Valley Road Mount Olive, NJ 07828 Phone: (973) 446-2300 Fax: (973) 446-2399 www.maispace.com

More information

BGR Series. features: 19 gangable enclosures. what great systems are built on.

BGR Series. features: 19 gangable enclosures. what great systems are built on. GR Series 19 gangable enclosures next generation rack, designed with significant installation and performance benefits features: Provides more rackspace in a smaller overall height than similar racks ccepts

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

U-LAP. UTR-30 & UTR-70 Recipro Air Lappers Repair Manual. BORIDE Engineered Abrasives 2615 Aero Park Dr. Traverse City, MI

U-LAP. UTR-30 & UTR-70 Recipro Air Lappers Repair Manual. BORIDE Engineered Abrasives 2615 Aero Park Dr. Traverse City, MI U-LAP UTR-30 & UTR-70 Recipro Air Lappers Repair Manual UTR-20-30-70 Repair Instruction Manual Repair Instruction Manual Content Exploded View --------------------------------------------------------------------Page

More information

The advantages of resistance welding versus Mig welding are: Weld consistency Weld strength Floor cleanliness.

The advantages of resistance welding versus Mig welding are: Weld consistency Weld strength Floor cleanliness. self-supported tri Flooring Systems Self-Supported TriDEK floors have a truss system that eliminates the need for floor frames or other support methods. TriDEK self-supported floors can be used to span

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Box Rail. Single Box Rail Bracket

Box Rail. Single Box Rail Bracket HANGERS & RAILS Box Rail Accordion Door Hangers Max. Door Weight (SWL) 450 lbs Meets ANSI/BHMA A156.14, Grade 1. Rail is carefully formed to give an even tread to hanger wheels. Packaging: Bundled without

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16 long / 1/2 thick or 16 oz. copper Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Modular CABANA Kit 16 x 16 (6x6) Hipped Roof & Build-in Transoms Entry Key Lock Set (bright brass or dark bronze)

More information

Materials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.

Materials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available. Pipe clamps offered in this section are designed for support and attachment of pipe to structural members. wide range of pipe clamps are available for various applications. Materials arbon Steel is used

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-10 22 13 (August 2016) --------------------------- Preparing Activity: NAVFAC Superseding UFGS-10 22 13 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

VertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount)

VertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount) VertiGreen Modular Living Wall System Installation Instructions (VGM-06 and VGM-10 Wall Mount) This instruction is a guide to installing the VertiGreen Modular Living Wall System on a wall or support structure.

More information

General Features of Cantilever Racking

General Features of Cantilever Racking CANTILEVER General Features of Cantilever Racking Cantilever racking is specifically designed to store long or varying length items, such as metal beams, pipes, molding, wooden boards, metal and plastic

More information

Seismic Restraints. Cent-R-Rail Supplement* SYSTEMS THAT MAKE SENSE

Seismic Restraints. Cent-R-Rail Supplement* SYSTEMS THAT MAKE SENSE SRSCR-0 Seismic Restraints Cent-R-Rail Supplement* Multi-Directional Bracing For Data-Track, Half-Rack and Multi-Tier Half-Rack Systems Structural Engineer S 9 *To be used in conjunction with Cooper B-Line

More information

Seismic Installation Manual

Seismic Installation Manual Seismic Installation Manual California Office of Statewide Health Planning & Development OPA-2123-10 This manual provides the design strength capacities and installation guidelines for the Bracing System

More information

Industrial Shelving. Q Line, Z-Line/Steel Shelves, Bulk Storage and Heavy-Duty Reinforced Shelving SYSTEMS FOR SUCCESS

Industrial Shelving. Q Line, Z-Line/Steel Shelves, Bulk Storage and Heavy-Duty Reinforced Shelving SYSTEMS FOR SUCCESS Industrial Shelving Q Line, Z-Line/Steel Shelves, Bulk Storage and Heavy-Duty Reinforced Shelving Q Line & Z-Line/Steel Shelving Heavy Duty Reinforced Shelving & Bulk Storage Shelving 2 Industrial Shelving

More information

Shown with optional high capacity air conditioning system and exterior quartz lights. New style exterior mounted quartz lights.

Shown with optional high capacity air conditioning system and exterior quartz lights. New style exterior mounted quartz lights. Custom designed cabinetry at the forward end of the car tread plates. The photo at the left shows the end cabinets in the stored position while the right photo features the cabinets in the raised position

More information

Seismic Installation Manual

Seismic Installation Manual Seismic Installation Manual This manual provides the design strength capacities and installation guidelines for the Restraint systems brace components for use in the design of an overall bracing/restraint

More information

Materials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.

Materials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available. Pipe clamps offered in this section are designed for support and attachment of pipe to structural members. wide range of pipe clamps are available for various applications. Materials arbon Steel is used

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS

More information

Modern Rumford. MR 48 fireplaces

Modern Rumford. MR 48 fireplaces Modern Rumford MR 48 fireplaces Construction Guidelines For MR-48-1 Kit System Cellar Building, Suite 300 1124 NW Couch Street Portland, OR 97209 Ph. 503-227-0547 Fax 503-227-0548 info@mobergfireplaces.com

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems.

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. 1. Hangers and supports for electrical equipment and systems. SECTION 26 05 29 HANGERS AND SUPPORTS FOR PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Hangers and supports for electrical equipment and systems. 1.2 DEFINITIONS A. EMT: Electrical

More information

SECTION TOILET COMPARTMENTS. A. Section Metal Fabrications: Concealed steel support members.

SECTION TOILET COMPARTMENTS. A. Section Metal Fabrications: Concealed steel support members. SECTION 10155 TOILET COMPARTMENTS PART 1 GENERAL 1.1 SECTION INCLUDES A. Plastic laminate partitions. 1.2 RELATED SECTIONS A. Section 05500 - Metal Fabrications: Concealed steel support members. B. Section

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated

More information

DURA-BLOK Rooftop Supports

DURA-BLOK Rooftop Supports Cooper B-Line s new line of DURA-BLOK products gives you a versatile and long-term solution for all your roof top support needs. Designed with flexibility in mind, Dura-Blok is ideal for roof top support

More information

OPERATOR S SAFETY MANUAL

OPERATOR S SAFETY MANUAL June 2011 OPERATOR S SAFETY MANUAL Sumner Pipe Jacks www.sumner.com 7514 Alabonson Road Houston, TX 77088 U.S.A ph: 281.999.6900 fax: 281.999.6966 470 Collier MacMillan Drive Unit 2 & 3 Cambridge, ON N1R

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Post Style with ABS Real Tuff

Post Style with ABS Real Tuff Post Style with ABS Real Tuff Mantova s patented Post Shelving with ABS Real Tuff removable shelves have been making life easier for thousands of Australian businesses for more then a decade. Removable

More information

TOLCO Fire Protection Support Systems. Pipe Hangers Supports Seismic Bracing. UL Listed FM Approved for Fire Sprinkler Installations

TOLCO Fire Protection Support Systems. Pipe Hangers Supports Seismic Bracing. UL Listed FM Approved for Fire Sprinkler Installations TOLCO Fire Protection Support Systems Pipe Hangers Supports Seismic Bracing UL Listed FM Approved for Fire Sprinkler Installations Revision 12/06/2007 Catalog Forward This catalog has been created with

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a potentially dangerous situation

More information

SECTION SEISMIC CONTROL OSHPD

SECTION SEISMIC CONTROL OSHPD SECTION 01451 PART 1 - GENERAL 1.01 DESCRIPTION A. Provide all required seismic restraints and calculations in order to insure that the installation of all architectural, mechanical, and electrical equipment/components

More information

BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S

BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S BOILER INSTALLATION INSTRUCTIONS FOR RU 1S / BRU 1 RU 2S / BRU 2 RU 3S ASSEMBLY INSTRUCTIONS General Instructions: The STREBEL RU boilers are special boilers for oil or gas-fired (forced) burners. They

More information

Liner Replacement Instructions:

Liner Replacement Instructions: Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working

More information

DURA-BLOK is made from 100% recycled rubber and qualifies for LEED credits. Reflective strips on both sides allow for easy product visibility.

DURA-BLOK is made from 100% recycled rubber and qualifies for LEED credits. Reflective strips on both sides allow for easy product visibility. is made from 100% recycled rubber and qualifies for LEED credits. Reflective strips on both sides allow for easy product visibility. Channels are through bolted on all sizes for added strength and a 1

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

Installation Instructions

Installation Instructions Installation Instructions Dynarail Safety Ladder System Corrosion Resistant Nonconductive Fire Retardant High Strength-To-Weight Ratio Long, Low Maintenance Life Meets OSHA, BOCA & Other Building Code

More information

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE. The Steel Strong-Wall is a corrugated steel panel which is designed to be fixed directly to the concrete foundations of a building, within the external or internal wall, via a bolted connection. FEATURES

More information

RS32 Multi-Section Skylight System under/over seam clip double diverter

RS32 Multi-Section Skylight System under/over seam clip double diverter INSTALLATION INSTRUCTIONS RS32-x RS32 Multi-Section Skylight System under/over seam clip double diverter www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981 SKYLIGHT ACRYLIC skyline series

More information

How to Construct a Feral Enclosure

How to Construct a Feral Enclosure How to Construct a Feral Enclosure by Bob Breeze For questions and further information: bob.breeze@gmail.com April 2016 Please note, this is a living document. If you need further information or would

More information

Established DOC. NO : SSI / PROFILE Rev-03

Established DOC. NO : SSI / PROFILE Rev-03 Established 2002 www.sandskuwait.com C O M P A N Y P R O F I L E DOC. NO : SSI / PROFILE-001 - Rev-03 2 S & S International Company W.L.L. was Incorporated in 2009 with the primary objective of becoming

More information

GMV Super Star. Part List

GMV Super Star. Part List GMV Super Star Part List 25 Table of Contents Part List 25 Magazine... 28 Target Retainer... 30 Throwing Table... 31 Main Frame... 32 Turntable... 33 Base... 34 Elevator... 35 Throwing Arm... 36 Motor...

More information

Aluma EasySet Continuing Innovation from Aluma S ystems

Aluma EasySet Continuing Innovation from Aluma S ystems Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma

More information

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K

Stainless steel. 1.6 Stainless steel IP 69 K. Premium Panel, protection category IP 69K T Premium Panel, protection category IP 69K IP 69 K.6 H H H Optionally with or without keyboard housing Resistant to high-pressure cleaning (protection category IP 69K). The seal lies between two surfaces

More information

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

PLATFORMS. Aluminum Platforms

PLATFORMS. Aluminum Platforms PLATFORMS Aluminum Platforms Better than steel or wood platforms for mounting transformers, regulators, switches and heavy equipment. 1. Easier handling, storage and transporting. 2. Easier installation.

More information

Panduit Corporation Tinley Park, Illinois. Outset and Inset Cabinets Seismic Load Rating and Anchorage Design

Panduit Corporation Tinley Park, Illinois. Outset and Inset Cabinets Seismic Load Rating and Anchorage Design Panduit Corporation Tinley Park, Illinois Outset and Inset Cabinets Seismic Load Rating and Anchorage Design February 13, 2013 Degenkolb Job Number B2439007.00 www.degenkolb.com 500 Degenkolb Engineers

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

ECONO 200 INPLANT OFFICE

ECONO 200 INPLANT OFFICE Warehouse Storage & Material Handling Equipment+ ECONO 200 INPLANT OFFICE INSTALLATION & ASSEMBLY INSTRUCTIONS American Surplus Inc. 1 Noyes Ave. East Providence, RI Phone: (800) 989-7176 Fax: (401) 434-7414

More information

Steel Door Frame Installation in Masonry Construction

Steel Door Frame Installation in Masonry Construction Steel Door Frame Installation in Masonry Construction Steel Door Frame Installation in Masonry Construction This manual provides step-by-step instructions for the installation of a steel door frame in

More information

Lista Storage Wall Systems

Lista Storage Wall Systems Lista Storage Wall Systems At Panoz Motor Sports, Lista s shallow depth Storage Wall Systems allow maximum storage capacity and full access, together with spacesaving narrow aisles. STORE LARGE AND SMALL

More information

KINETICS Pipe & Duct Seismic Application Manual

KINETICS Pipe & Duct Seismic Application Manual QUICK START READ ME FIRST I1.1 Seismic Restraint Categories and Types: Seismic restraints for pipe and duct are generally separated into to two categories. 1. Transverse Seismic Restraints: These act to

More information

MODEL: SIGHT-LINE- COMMAND CENTER CONSOLES

MODEL: SIGHT-LINE- COMMAND CENTER CONSOLES 2015 WINSTED CORPORATION 1) GENERAL DESCRIPTION 1.1 Sight-Line Command Center Consoles. SeeAppendix A - C for typical styles and measurements. 1.2 The contractor shall supply a system capable of supporting

More information

MERCEDES SPRINTER PARTITIONS W/ SLIDING DOOR INSTALLATION INSTRUCTIONS

MERCEDES SPRINTER PARTITIONS W/ SLIDING DOOR INSTALLATION INSTRUCTIONS www.sortimo.knapheide.com Document # 6235-01 The following instructions detail the procedure for installing a Sortimo By Knapheide Protexx Partition in a Mercedes Sprinter. This guide is intended to walk

More information

De Montfort Mark 7 Incinerator (Flatpack)

De Montfort Mark 7 Incinerator (Flatpack) De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where

More information

GALVA-STOP. Pallet Rack Backing Safety System

GALVA-STOP. Pallet Rack Backing Safety System GALVA-STOP Pallet Rack Backing Safety System INDEX ABOUT GALVA-STOP PALLET RACK BACKING SAFETY SYSTEM...4 VERTICAL PANELS FOR NEW INSTALLATIONS OVERVIEW AND ILLUSTRATIONS...5 VERTICAL PANELS FOR TOP BAY

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

SPORTS AND STADIUM LIGHTING. Solutions for Amatuer and Professional Athletic Venues

SPORTS AND STADIUM LIGHTING. Solutions for Amatuer and Professional Athletic Venues SPORTS AND STADIUM LIGHTING Solutions for Amatuer and Professional Athletic Venues ENGINEERED SUPPORT STRUCTURES Now a global network of 50 facilities spanning 15 countries, Valmont Industries consists

More information

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types

More information

Applied Maintenance Supplies & Solutions

Applied Maintenance Supplies & Solutions Applied Maintenance Supplies & Solutions SM Inventory Management, Vending and More Applied Maintenance Supplies & Solutions (Applied MSS SM) brings lean principles to your management of MRO consumables

More information

Seismic Installation Manual

Seismic Installation Manual Seismic Installation Manual This manual provides the design strength capacities and installation guidelines for the Bracing System for use in the design of an overall bracing system for suspended nonstructural

More information

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL uilt build to FORMWORKS Company Projects Products CLIMBING SYSTEMS Pilosio s CLIMBING SYSTEM with mechanical handling enable vertical construction joints to be created in succession without the aid of

More information

INSTALLATION INSTRUCTIONS. Wall Sleeve Kit. For Use With MGE/MCE/MHP Series Magic-Pak Unit

INSTALLATION INSTRUCTIONS. Wall Sleeve Kit. For Use With MGE/MCE/MHP Series Magic-Pak Unit INSTALLATION INSTRUCTIONS Wall Sleeve Kit For Use With MGE/MCE/MHP Series Magic-Pak Unit This manual must be left with the homeowner for future reference. This is a safety alert symbol and should never

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 05 48.00 10 (October 2006) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 05 48.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

SECTION CLIMBING WALLS

SECTION CLIMBING WALLS SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2

More information

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures A Delivering Reliability Electrical Vaults Power & Energy-Underground Structures A The Benefits of Precast Vaults Electrical vaults house power cables and transformers, and are a preferred alternative

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

TEST REPORT. Rendered to: SENTINEL FENCE AND RAIL. For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post

TEST REPORT. Rendered to: SENTINEL FENCE AND RAIL. For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post TEST REPORT Rendered to: SENTINEL FENCE AND RAIL For: 120 in by 42 in Fully-Welded Aluminum Guardrail Assembly with Intermediate Support Post Report No: Report Date: 10/23/12 130 Derry Court York, PA 17406-8405

More information

ElevationSeriesUprightBike

ElevationSeriesUprightBike ElevationSeriesUprightBike (95C-ALLxx-xx, 97C-ALLxx-xx, 95C-IFIxx-xx, PCSC-ALLxx-xx) PartsManual 13.04.11 Table of Contents Miscellaneous 2 Miscellaneous Part Numbers 2 Console Assembly 3 Consoles 3 Drive

More information

General Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety

General Guidelines. Tools Required. Instructions for Part # SC500-AF. Safety Instructions for Part # SC500-AF General Guidelines It is the user s responsibility to read and follow all instructions. Keep these instructions with the product at all times and review before each use.

More information

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is

More information

Z5033 E3 Ball joint adapter Mounting instructions

Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter References in the manual This refers to a potentially dangerous situation which may lead to personal injury. This refers to

More information