1 Project Scope Management Work Breakdown Structure (WBS) Created in Planning Process -> Scope Area Benefits of Work Breakdown Structure Organizes and defines the total scope of the project Helps prevent work from slipping through cracks Provide the big picture to the project team and where their works fit in Gets team buy-in and builds the team Facilitates communication and cooperation Is the foundation of the project
2 Work Breakdown Structure (WBS) Work Breakdown Structure (WBS) Breaks the project into smaller and more manageable pieces called Work Package Work not in the WBS is outside the scope of the project Decomposition approach: Functional Lifecycle/ Phase Product component/ Deliverable
3 Work Breakdown Structure (WBS) Functional Approach Work Breakdown Structure (WBS) Lifecycle/ Phase Approach
4 Work Breakdown Structure (WBS) Product Component Approach Work Breakdown Structure (WBS)
5 Work Breakdown Structure (WBS) Level 0 Level 1 Level 2 Level 3 Work Breakdown Structure (WBS) Two ways of presentation: Tree- structured Tabular Project Name
6 Work Breakdown Structure Example WBS for House Building Project WBS Example Level 1 House Building Project Level 0 1.Concrete 2. Framing 3. Plumbing 4. Electrical 5. Interior 6. Roofing 1.1 Pour Foundation 2.1 Frame Exterior Walls 3.1 Install Water Lines 4.1 Install Wiring 5.1 Install Drywalls 6.1 Install Felt 1.2 Install Patio 2.2 Frame Interior Walls 3.2 Install Gas Lines 4.2 Install Outlets & Switches 5.2 Install Carpets 6.2 Install Shingles 1.3 Stairway 2.3 Install Roofing Trusses 3.1 Install Bath & Kitchen Fixtures 4.3 Install Fixtures 5.3 Painting 6.3 Install Vents Level 2
7 Project Time Management Activity Sequencing Identifies and documents dependencies among schedule activities 4 Types of dependencies/ relationships SS Start-to-Start SF Start-to-Finish FS Finish-to-Start FF Finish-to-Finish Dependency Determination Mandatory dependencies Discretionary dependencies External dependencies Lead and Lag i.e. SS CD = -5d, FS AB = 3d Uses Network Diagram AON, AOA
8 Project Scheduling Critical Path Method (CPM) Is a project network analysis technique used to predict total project duration Calculates the shortest time necessary to complete a project Uses Most likely duration Identified by calculating the earliest and latest start and end dates for every task The Critical Path is the route with zero float (slack) Project Scheduling Float (Slack) the amount of time you can delay the activity with no affect to other parts Total Float (TF) = the amount of time you can delay the earliest start of a task without delaying the ending of the project (Formula: TF = LS-ES) Free Float (FF) Project Float Forward Pass - ES, EF; Backward Pass LS, LF Backward Pass Forward Pass
9 Project Scheduling Exercise 1 Project Scheduling Key 1 In details - Forward Pass
10 Project Scheduling Key 1 Forward Pass Project Scheduling Key 1 Forward Pass
11 Project Scheduling Key 1 Forward Pass Project Scheduling Key 1 Forward Pass
12 Project Scheduling Key 1 Backward Pass Project Scheduling Key 1 Total Float and Critical Path
13 Project Scheduling Quiz A project has three critical paths. Which of the following BEST described how this affects the project? a. It makes it easier to manage. b. It increases the project risk. c. It requires more people. d. It makes it more expensive. Effort Estimation
Planning & Scheduling
Planning & Scheduling Dr. Nabil I. El Sawalhi Assistant Professor of Construction Management Chapter 3 1 Planning Successful Project Management depends on continues planning. The activities of Designers,
More informationPMP Exam Preparation Course Project Time Management
Project Time Management 1 Project Time Management Processes Define Activities Sequence Activities Estimate Activity Resources Estimate Activity duration Develop Schedule Control Schedule In some projects,
More informationPrimavera P6 Exercise Worksheet
Primavera P6 Exercise Worksheet Revision 1.04 P6 Exercise Worksheet Introduction These exercises are for use in support of the Ten Six Consulting Primavera P6 Professional video training course. At the
More informationDeveloping a Project Plan
Chapter 6 Developing a Project Plan I had six honest serving men who taught men all I know : their names were what and how and why, and when and where and who. Rudyard Kipling Project Management 105 Figure
More informationSoftware Project Management
Software Project Management Dr. M.E. Fayad, Professor Computer Engineering Department College of Engineering, San José State University One Washington Square, San José, CA 95192-0180 E-mail: m.fayad@sjsu.edu
More informationPDM. Precedence Diagramming Method (PDM) Part 1. Finish to Start (FS) PDM. Finish to Start (FS) (cont.) Start to Start (SS) Con E 441 P05
PDM Precedence Diagramming Method (PDM) Part 1 Con E 441 P05 A. Four (4) possible relationships 1. Finish to Start (FS). Start to Start (SS) 3. 4. Start to Finish (SF) B. Plus combined relationships SS
More informationProject Management THE MANAGERIAL PROCESS
Project Management THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Third Edition Lecture 4 Developing a Project Plan Activity on Node (AON) Copyright 2006 The McGraw-Hill Companies. All rights reserved.
More informationFor the PMP Exam using PMBOK Guide 5 th Edition. PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc.
For the PMP Exam using PMBOK Guide 5 th Edition PMI, PMP, PMBOK Guide are registered trade marks of Project Management Institute, Inc. 1 Contacts Name: Khaled El-Nakib, MSc, PMP, PMI-RMP URL: http://www.khaledelnakib.com
More informationIST 302 : Project Time Management
IST 302 : Project Time Management Developing quality schedules is important. 1 Schedule issues are the main reason for conflicts on projects There are five core project time management process groups.
More informationEstimating and Scheduling
Estimating and Scheduling Practical Tips and Techniques for Construction Scott Feeney, CPE, LEED AP Q1stCM Ram Ramdass, PMP, PSP Turner Construction April 2018 Today s Discussion: Scheduling techniques
More informationProject Time Management
Project Time Management Understand the importance of project schedules and good project time management. Define activities as the basis for developing project schedules. Describe how project managers use
More informationArtificial Intelligence
Artificial Intelligence Combinatorial Optimization G. Guérard Department of Nouvelles Energies Ecole Supérieur d Ingénieurs Léonard de Vinci Lecture 4 Outline 1 2 Decisions about Resource Allocation Which
More informationViews and Layouts for Program Management
MnDOT Project Management Office Presents: Views and Layouts for Program Management Presenter: Jonathan McNatty Senior Schedule Consultant DRMcNatty & Associates, Inc. Housekeeping Items Lines will be muted
More information12/26/2013. Sharif University of Technology. Session#11. Instructor. Class time. Course evaluation. International Campus Kish
International Campus Kish Sharif University of Technology Session#11 Instructor Omid Fatahi Valilai, Ph.D. Industrial Engineering Department, Sharif University of Technology Email: Fvalilai@Sharif.edu,
More informationCambridge International AS & A Level Computer Science
Topic Support Guide Cambridge International AS & A Level Computer Science 9608 For examination from 2017 Topic 4.4.3 Project management PERT and GANTT charts Cambridge International Examinations retains
More informationEstimating Project Schedule-Time and Cost
Estimating Project Schedule-Time and Cost Chapter 5 5 1 Where We Are Now 5 2 1 Overview Seminar Agenda What is involved in schedule and cost management? In-depth Determining the sequence of activities
More informationBUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 22.11.2011 Why? To forecast the events/activities in the building project To lay down deadlines To forecast the requirements of money and other
More informationProject Forecast Survey Results Good Scheduling Practices June 2016
Good Scheduling Practices 5 June 6 Good Scheduling Practices 5 June 6 Executive Summary There is a saying failing to plan is planning to fail, but what if the plan itself is a failure? The scheduling of
More informationChapter 3 Managing the Information Systems Project
Princess Noura University Computer Science and Information Faculty Information Systems Department IS321 Chapter 3 Managing the Information Systems Project Learning Objectives Discuss skills required to
More informationProject Management. Learning Objectives. What are Projects? Dr. Richard Jerz. Describe or Explain:
Project Management Dr. Richard Jerz 1 Learning Objectives Describe or Explain: What are projects The role of the project manager Work breakdown structure Project management tools (Gantt, PERT, & CPM) The
More informationProject Planning and Estimating DJ
Project Planning and Estimating DJ201 0807 Copyright ESI International August 2007 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any
More informationIntroduction. Project Scheduling. Morgan State University ARCH 738: REAL ESTATE PROJECT MANAGEMENT. Jason E. Charalambides, PhD, M.
Project Scheduling ARCH 738: REAL ESTATE PROJECT MANAGEMENT Morgan State University Jason E. Charalambides, PhD, M.ASCE, AIA, ENV_SP (This material has been prepared for educational purposes) Introduction
More informationProject Green House. Green Team. Making the world greener one house at a time
Project Green House Making the world greener one house at a time UC Berkeley Extension, Business and Management UCB X470 Project Management February 2008 Green Team Lori Plein Anne Cairney Ferdinand Bueno
More informationAdministration. Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by.
Welcome to the Eastwood Harris Pty Ltd MICROSOFT PROJECT AND PMBOK GUIDE FOURTH EDITION training course presented by Paul E Harris Administration Evacuation Timings, meals and facilities Mobile phones
More informationGLOSSARY AND INDEX. Glossary Index Project Management Institute, 130 South State Road, Upper Darby, PA USA 155
GLOSSARY AND INDEX Glossary Index iv 1996 Project Management Institute, 130 South State Road, Upper Darby, PA 19082 USA 155 156 NOTES GLOSSARY 1. Inclusions and Exclusions This glossary includes terms
More informationKitchen Remodel Estimator. Contact Info: Project Summary: Design. Demo
Kitchen Remodel Estimator Thinking about remodeling your kitchen? If you would like a free bid from Excel Builders, we have provided a list of questions that will need to be filled out with detail in order
More informationMaterial Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5
Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00
More informationYour easy, colorful, SEE-HOW guide! Plain&Simple. Microsoft Project Ben Howard
Your easy, colorful, SEE-HOW guide! Plain&Simple Microsoft Project 03 Ben Howard Published with the authorization of Microsoft Corporation by O Reilly Media, Inc. 005 Gravenstein Highway North Sebastopol,
More informationCHAPTER 1. Basic Concepts on Planning and Scheduling
CHAPTER 1 Basic Concepts on Planning and Scheduling Eugénio Oliveira Scheduling, FEUP/PRODEI /MIEIC 1 Planning and Scheduling: Processes of Decision Making regarding the and ordering of activities as well
More informationOperations Management
17-1 Project Management Operations Management William J. Stevenson 8 th edition 17-2 Project Management CHAPTER 17 Project Management McGraw-Hill/Irwin Operations Management, Eighth Edition, by William
More informationPembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS
Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS STANDARD FEATURES LIST Foundation Concrete walls 4 concrete floor slab Interior basement unfinished Standard nine foot foundation walls
More informationWork Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free
/ / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary
More informationCounty of Santa Barbara, California Facility Condition Assessment 2014
Project No.: P05000.001 Building Number: P05000 Lompoc VMB Grounds Project Description: Overlay, Seal Coat and Restripe Parking Lots Background: The asphalt paving comprises approximately 135,600 square
More informationCalculating and Using Float
Core Scheduling Papers: #5 Calculating and Using Float Origin of Float The concept of schedule float is the creation of the Critical Path Method (CPM) of scheduling. Before 1957 float only had one meaning
More informationOWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"
OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS Schedule "C" Building Code All Ready To Move (RTM) Homes are built according to the Alberta Building Code and National Building Code. Please note that
More informationIntroduction to Project Management (PM101) Course 6 Scope and Requirements
Introduction to Project Management (PM101) Course 6 Scope and Requirements Slide 1 Slide 2 The Importance of Scope & Requirements Definition Approximately 56% of software defects can be traced to scope
More informationWorkWrite-Up and Bid Document
WorkWrite-Up and Bid Document Eloise Ellis 14664 E 630rd peggs, OK 74452- (918) 598-3552 Contractor Name Contractor Signature --..~~--.-.---~-.---.--..-- Bid Due Date: Trade Area Description Comments Manual
More informationProject Management CSC 310 Spring 2017 Howard Rosenthal
Project Management CSC 310 Spring 2017 Howard Rosenthal 1 No?ce This course is based on and includes material from the text: Effective Project Management - Traditional, Agile, Extreme 7TH Edition Authors:
More informationSeal Harbor Development 1 Nagog Park Acton, MA 01720
Seal Harbor Development 1 Nagog Park Acton, MA 01720 Specifications for Ocean Mist Villages Foundation and Concrete Floors Footings All footings are constructed and poured with 3000 lb mix, continuous
More informationBuilding Program Example. Eric Anderson
Building Program Example Eric Anderson MINIMUM SPATIAL/FUNCTIONAL REQUIREMENTS SPACE NUMBER OF OCCUPANTS USE TYPE Activity Room 100-200 Assembly Meeting Rooms (5) Referenced at Room Descriptions Business
More informationDavis Frame Co., Inc. Construction Budget Considerations
Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More information1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and
More informationTopic # 12. CIS Project Management: an overview
Topic # 12 CIS Project Management: an overview Project Planning Major Activities during Project Planning: 1) describing project scope, alternatives, and feasibility; 2) dividing the project into manageable
More informationCPM in Construction Management transition from 7 th to 8 th Edition. James J. O Brien Fredric L. Plotnick
CPM in Construction Management transition from 7 th to 8 th Edition James J. O Brien Fredric L. Plotnick Introduction to CPM is Still Required Chapter 1. Introduction to CPM Planning and Scheduling 3 1.1
More informationWhy do we grade dwellings or what is the goal when setting the grade of the dwelling?
Why do we grade dwellings or what is the goal when setting the grade of the dwelling? What should you be looking for specifically when grading a dwelling? What components make up the grade of a dwelling?
More informationPRINCESS NOURA UNIVESRSITY. Project Management BUS 302. Reem Al-Qahtani
PRINCESS NOURA UNIVESRSITY Project BUS 302 Reem Al-Qahtani This is only for helping reading the PMBOK it has our notes for focusing on the book Project Framework What is PMBOK? o PMBOK= Project Body of
More informationTEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,
More informationTHE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE
THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment
More informationMBA Group Project Guidelines. Interim inspection to document accepted deliverables
MBA 520 - Group Project Guidelines Interim inspection to document accepted deliverables This week, you will begin work on your Group Project for this module. You will work as a group but will submit the
More informationMINGGU Ke 2 Analisa dan Perancangan Sistem Informasi
MINGGU Ke 2 Analisa dan Perancangan Sistem Informasi Pokok Bahasan: Project Management Tujuan Instruksional Khusus: Learing to Choose and Manage System Information Project Referensi: (1) Hoffer, J.A.,
More informationSTUART-HOBSON MIDDLE SCHOOL
INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBUILDING HOME CONSTRUCTION
1 Area Items: House plan SAMPLE-ADDITION Proposed House plan CAT SEL ACT DESCRIPTION CALC QNTY REMOVE REPLACE TOTAL 49. AWN PEH Patio Enclosure - Screening 272 272.00 SF 0.00+ 8.97 = 2,439.84 ncludes:
More informationA Framework for Project Management. The Project Management Institute Education Department
A Framework for Project Management The Project Management Institute Education Department Your Expectations What would you like to learn from this experience? Solution to a specific problem? Project management
More informationPMBOK Guide Fifth Edition Pre Release Version October 10, 2012
5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Version 7 and Earlier Versions 3 day training course PMI REP No 3001 Course Number PP6 Administration Evacuation Timings and meals Facilities Mobile
More informationThe CornerStone Cottage Series
The CornerStone Cottage Series We welcome you to use this booklet as a tool as you plan your deep woods cabin retreat or up-north lake front cottage. These unique homes are designed to inspire and spark
More informationCourse Outline. TEC D 205 Engineering Tech Project Planning Olympic College Bremerton, WA. Week 1 Chapter 4: DEFINING THE PROJECT
Course Outline TEC D 205 Engineering Tech Project Planning Week 1 Chapter 4: DEFINING THE PROJECT 1. Step one: Defining the Project Scope A. Employing a Project Scope Checklist 1. Project objective 2.
More informationRESOURCE MANAGEMENT. Dr. Ahmed Elyamany
1 RESOURCE MANAGEMENT Dr. Ahmed Elyamany Outline Definition of Resources Resource Aggregation/Loading Problems Associated with Resource Resource Leveling Resource Scheduling What a resource? 3 Any thing
More informationWelcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management
Welcome to the Eastwood Harris Pty Ltd Primavera P6 Versions 8.2 EPPM Web Tool 2 day training course Enterprise Portfolio Project Management Page 2 Copyright Eastwood Harris Pty Ltd IMPORTANT POINTS FOR
More informationProject Management Techniques
Project Management Techniques CHAPTER C Learning Objectives After reading this chapter, you should be able to: Calculate net present value, payback period, and return on investment Chapter Outline Calculating
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationProject management tools and techniques assist project managers and their teams in various aspects of project management Some specific ones include
Abeer Bin Humaid Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements Triple constraints of project management Every
More informationWellington Manor Series
Wellington Manor Series Single-Section Homes titanhomesny.com 2 titanhomesny.com About us A home should say something about the people who live inside it. From contemporary to traditional, our homes will
More informationPlan Your Work, Work Your Plan. Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology
Plan Your Work, Work Your Plan Dr. R. Rockland Chair and Professor, Department of Engineering Technology New Jersey Institute of Technology Agenda Understand what a project is Understand the basics of
More informationWelcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course
Welcome to the Eastwood Harris Pty Ltd PRINCE2 TM Revised 2009 and Microsoft Project 2010 training course Administration Evacuation Timings, meals and facilities Mobile phones and emails Introductions
More informationBUILDING YOUR HOME the right way
BUILDING YOUR HOME the right way Mirage Super 16 & 20 MIR1676-348-10 Mirage - Super 16 Series MIR1676-349-10 MIR1676-350-10 Available models and floorplans MIR1676-328-10 MIR1676-330-10 MIR1676-333-10
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationProject Scheduling with GanttProject. EGR 386w
Project Scheduling with GanttProject EGR 386w 1 GanttProject http://www.ganttproject.biz/ Download version 2.6.x Has numbered tasks option The video (access from ganttproject.biz) http://www.youtube.com/watch?v=5rhcsa5ad34&feature=youtu.be
More informationCTE - CIP Course Details Catalog
Status: Open Start Year: 2011 End Year: Group 1 Minimum Carnegie Units: 2.00 Minimum Course Selection: School: 1 ACC: 0 Regional: 0 13052A001 Production Technology 1.00 2011 11002A001 Communication Technology
More informationitaskx 3 Project Management User Manual
itaskx 3 Project Management User Manual GET STARTED Basics Recommended workflow Views in itaskx Adjust project options Set working time for the project-calendar 2 Unit 1 Project management basics Learn
More informationDesign Process & Project Management AN ITERATIVE DESIGN PROCESS. Prof Picone, Mississippi State University. Test Verification
JEE4980 Sr Design Project Lecture Wilcox Chapter 1 discussion Assignment Team Progress Report due BL Team Meeting Agenda due BL Team Charter 1 ST draft due EL Product Brainstorm due EL Baseline design
More informationEdouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com
Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"
More informationCHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC
CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master
More informationAVID Intelligent Home Plans
Home Builder Rental Equipment Landscaping, Sprinklers Gutters & Downspouts Insulation, Rough electrical, lighting, appliances Engineered lumber, Joist Trusses, Sheathing Plywood, Lumber Roofing, siding,
More informationSECTION 6. Residential Warranty Corporation 10 Year, Limited Structural Warranty. Year One
SECTION 6 Residential Warranty Corporation 10 Year, Limited Structural Warranty Year One Foundations basement, crawl space, slab on grade. Framing ceiling, floor, roof, wall. Exterior structurally attached
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationProject Management Concepts, Tools & Techniques
Project Management Concepts, Tools & Techniques Course ISI-1438 5 Days Instructor-led, Hands on Introduction This highly interactive 5 day, instructor-led workshop is designed to give participants a solid
More information810 WALKER ROAD GREAT FALLS, VA COMMUNITY PLAN
GREAT FALLS - FRST 810 WALKER ROAD GREAT FALLS, VA 22066 COMMUNITY PLAN purposes only. Above information is believed to be accurate but should not be relied on without verification. See Sales Representative
More informationCENTRAL GREAT PLAINS SERIES
CENTRAL GREAT PLAINS SERIES 1 2 MADE FOR LIVING A heritage of excellence. Atlantic Homes has been providing families with quality homes for generations. With a unique combination of state-of-the-art manufacturing
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationWallingford, CT. Project Manager: Karen Charest Ext. 233
Wallingford, CT Project Manager: Karen Charest 203-265-1821 Ext. 233 THE MARTHA 1 MODEL at Simpson Village Martha 1 Model Total The rendering and floor plans substantially represent the model depicted.
More informationGreen Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING
Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.
More informationToronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI
BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached
More informationProject Scheduling and Tracking. CIS 375 Bruce R. Maxim UM-Dearborn
Project Scheduling and Tracking CIS 375 Bruce R. Maxim UM-Dearborn 1 What does the customer want to know? Do you understand my needs? Can you design a system to help me? How long will it take? How much
More informationObjectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management
PMP Training Training Topics Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationThe Homeowner s Building Application Checklist for Constructing a Residential Addition
The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential
More informationFLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE
FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE PROVIDENCE Prairie 1713 2 + Den 2 2 $341,400 Country Cottage 1713 2 + Den 2 2 $343,400 Craftsman 1713 2 + Den 2 2 $349,400 2 bedrooms + den or optional
More informationGPE engineering project management. Project Management in an Engineering Context
GPE engineering project management Project Management in an Engineering Context PM Network diagrams in context SOW CHARTER SCOPE DEFINITION WBS circulation, negotiation, translation WBS WP à activities
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationCAREERS. in the Construction TRADES
CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified
More informationStudent Handout. Authors: NAWIC Education Foundation, Jessica Frichtel & Tim Bingham. Experiential Learning Opportunity
Student Handout Authors: NAWIC Education Foundation, Jessica Frichtel & Tim Bingham Experiential Learning Opportunity National Center for Construction Education & Research. All rights reserved. No Part
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationCHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD
TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of
More informationREO Client Safety Hazard Requirements
REO Client Safety Hazard Requirements Safety Hazards Safeguards clients are continually reporting missing safety hazards or allowables across the nation and it is jeopardizing our relationship with our
More informationProject #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50
Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed
More informationD D. WorkWrite-Up and Bid Document/By Trade. Harriett Petit. Contractor Name: PO Box 282 Marble City, OK (918)
WorkWrite-Up and Bid ocument/by Trade Harriett Petit PO Box 282 Marble City, OK 7-4945 (918) 479-5555 Contractor Name: Contractor Signature: This document must be signed to be a valid bid. PROJECT TYPE:
More informationFeasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.
Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove
More information