1 Section 1 Introduction 1.1 Purpose of the Design Review This document summarizes an independent design review of the 30% design plans dated May 8, 2012 for a proposed minor impoundment, as prepared by Chastain Skillman (Chastain). The approximately 250-acre impoundment is to be located in the Istokpoga Marsh Watershed Improvement District (District), approximately 0.85 miles southeast of the lake. The purpose of the impoundment is to store and treat stormwater, which will be released by the District during dry periods, as needed, for irrigation in the region. Royal Consulting Services, Inc. (RCS) was specifically requested to review the design and constructability of the above ground minor impoundment berms to determine if the design and budget were appropriate for the purpose, based on RCS experience on similar projects. Section 2 Preliminary Data Collection 2.1 Field Investigations RCS engineers performed hand borings at six locations for the proposed minor impoundment berm to visually inspect the soil layers to determine their suitability for impounding water. The boring sites selected are shown on Figure 1 and Table 1 lists the findings. Table 1 Field Investigations Summary HOLE ID GENERL LOCTION GPS COORDINTES* NORTH WEST DEPTH TO FIRST SUITBLE MTERIL (inches BLS) 1 SW Corner Center of South Side SE Corner bout 1500 Feet North of SE Corner bout 1980 Feet North of SW Corner North Side at Internal Corner *Note Hand held GPS data The borings were performed using a standard 2 ¼ diameter hand auger with a maximum investigation hole depth of 8 feet. The soil was removed from each hole in segments approximately equal to the height of the bucket and brought to the surface for evaluation. The process of boring and investigation continued until a soil layer that seemed to be suitable for construction of a berm, by visual inspection, was encountered. Page 1

2 Legend K Soil Boring rdaman Soil Boring TH-10 TH-9 6 TH-8 TH-11 TH-12 TH-7 TH-13 TH-6 5 JoySL 4 J:\0100\22\3 CD_GIS\GIS\Soil Borings.mxd 2/28/2013 TH-14 1 TH-5 TH-1 TH-2 TH-3 2 TH ,000 Feet 2,000 Copyright: 2012 Esri, DeLorme, NVTEQ, TomTom, Source: Esri, DigitalGlobe, GeoEye, i-cubed, USD, USGS, EX, Getmapping, erogrid, IGN, IGP, and the GIS User Community IMWID Berm nalysis Soils Investigation

3 2.2 Basis of Evaluation Istokpoga Marsh Watershed Improvement District The Natural Resources Conservation Services (NRCS), through their practice codes and construction specifications, provide the basis of design for most water impoundments constructed on agricultural sites. The following CS codes (construction specifications) provided a basis for this document: Embankment Pond (CS378) Earthfill (CS023) 2.3 Select Backfill The NRCS specifies that suitable earthfill material be used in a berm as Select Backfill, which is defined in CS023 as follows: Section 3 Select backfill: Select Backfill shall be material that is well graded, free of debris, roots, organic matter, and peat. Select backfill shall be material excavated for the Work (native) or may be imported. The Contractor may blend native materials to achieve a material that meets the requirements for Select Backfill. Select backfill shall be free of seeds of nuisance or exotic species. Select Backfill shall meet the following Unified Soil Classification System (STM D2487) designations: a. Water Retaining Embankments: CL, ML, SC b. Structure Backfill: SW, SP, SM Design Evaluation 3.1 Comparison of Data The Chastain Skillman 30% design plans and documentation provide two sources of soil information, SPT Borings and Muck Probes, both performed by rdaman & ssociates, Inc (rdaman). The rdaman geotechnical report provides the SPT data, which was also provided on Sheet 7 of the plan set. For comparison purposes, the RCS engineer selected the nearest SBT and proposed berm cross section sites to perform the hand borings for comparison. Table 2 Comparative Information RCS HOLE ID NEREST RDMN BORING NEREST CROSS SECTION EXISTING GROUND FT NVD88 1 TH TH TH TH TH TH Evaluation Procedure To provide an independent evaluation of the proposed berm design, the RCS analysis was conducted without coordination with the rdaman geotechnical report or the Chastain design plans. Page 3

4 Instead, the hand borings were used to develop proposed excavation depths and berm cross sections, based on field observations only. No laboratory testing was used. The RCS engineers realize the independent investigations conducted in this manner do not meet the same level of accuracy or have the same scientific basis as the rdaman report, but believe it is sufficient for comparison and evaluation purposes. The stated goal of the RCS analysis was to establish if there is potential for a reduction in construction costs, while still meeting the NRCS criteria for Pond Embankments. For each RCS hand boring, the volume of the excavation was calculated for the adjacent berm using the following procedures: Existing ground elevation provided by closest Chastain plans cross section Bottom of excavation at depth established by hand boring to first suitable material plus 6 inches of extra excavation Excavation bottom, which is equivalent to the width between the berm toe lines 15 wide berm top at elevation NVD88 Side slopes of the berm and excavation is 3:1 Compaction was ignored since it applies equally to both berm designs 3.3 Excavation Volume Calculations Table 3 provides the amount of excavation required to remove unsuitable material under the footprint of the berm and provide a stable base for the berm at the six locations selected for the hand borings. Table 3 Excavation Volumes HOLE ID NEREST CROSS SECTION PROPOSED EXCVTION ELEVTION (FT NVD88) EXCVTION VOLUME (YD 3 /FT) DIFFERENCE (YD 3 /FT) Chastain RCS Chastain RCS Section 4 Evaluation Summary The site selected for the minor impoundment is a challenging location to construct an above ground impoundment capable of retaining water, since it requires the removal of a substantial quantity of unsuitable soil. However, the last column of Table 3 indicates that there is a potential for reducing the total earth work volume calculated by Chastain and thus the corresponding cost of the project. The percent reduction at the six sites analyzed by RCS ranged from 19% to 64% with the average being 51%. The reduction in work would primarily affect three tasks: muck removal, suitable fill Page 4

5 excavation and placement of the suitable fill. Other savings might be realized such as job overhead, office facilities, dewatering, and SWPPP plan monitoring but the savings for these items would constitute only a small portion of the overall project and will be ignored for the purposes of this evaluation. ssuming that the entire berm has the same reduction rate as calculated above and using the Chastain Preliminary Opinion of Probable Cost dated pril 28, 2012 as a basis of volumes and unit costs the following savings would then be possible for the three tasks: Table 4 Potential Cost Reduction CHSTIN 30% ESTIMTE No DESCRIPTION UNIT QUN. UNIT COST TOTL *RCS REDUCTION 12 Regular Excavation Work (Muck) 500,000 CY $6.00 $3,000,000 $1,530, Subsoil Excavation (Fill Material) 255,000 CY $2.50 $637,500 $325, Embankment 255,000 CY $2.50 $637,500 $325,125 *Note: Based on 51% average Subtotal $4,275,000 $2,180,250 10% Contingency $427,500 $218,025 Total $4,702,500 $2,398,275 The Chastain 30% design construction cost estimate for the project was $6,954,255. The RCS potential reduction of $2,398,275, would decrease the project total to $4,555,980, assuming no other scope or budget changes are made. In a similar manner of using NRCS standards, substantial cost saving could be realized for the water control structures and pump station. fitfor-purpose pump station based on agricultural criterion could provide the same functionality and safety as the proposed station while saving substantial capital and construction costs. RCS estimates that the $1,192, cost budgeted by Chastain for the pump station could be reduced by at least $500, if this design approach is taken. Finally, the redesign of the overflow weir using agricultural appropriate structures could eliminate large concrete components and thus further reduce the development cost. Page 5

Research Design for Archaeological Fieldwork Draft 1

Research Design for Archaeological Fieldwork Draft 1 March 2013 FEDERAL WAY LINK EXTENSION Research Design for Archaeological Fieldwork Draft 1 This page intentionally left blank. Sound Transit Federal Way Link Extension Research Design for Archaeological

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SOIL & SITE RECONNAISSANCE

SOIL & SITE RECONNAISSANCE SOIL & SITE RECONNAISSANCE Austin North Tract Lawyers Road East Marshville, North Carolina Prepared for: Chris Miller, ALC, RF Carolinas Real Estate Operations Manager American Forest Management, Inc.

More information

Final Estimates Level 2. Module 5: Earthwork Computations

Final Estimates Level 2. Module 5: Earthwork Computations Florida Department of TRANSPORTATION Final Estimates Level 2 Module 5: Earthwork Computations 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 5 1 5-1 Module Content Basic Earthwork Terminology

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

SC-01 Surface Outlet and Baffle Sediment Basin

SC-01 Surface Outlet and Baffle Sediment Basin Greenville County Technical Specification for: SC-01 Surface Outlet and Baffle Sediment Basin 1.0 Surface Outlet and Baffle Sediment Basin This Specification contains requirements for the design and construction

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

TABLE OF CONTENTS. 5.0 LABORATORY TESTING Corrosion Series Testing Consolidation Testing... 5

TABLE OF CONTENTS. 5.0 LABORATORY TESTING Corrosion Series Testing Consolidation Testing... 5 TABLE OF CONTENTS 1.0 SITE AND PROJECT DESCRIPTION... 1 2.0 NRCS SOIL SURVEY... 1 3.0 USGS POTENTIOMETRIC MAP DATA... 2 4.0 SUBSURFACE EXPLORATION... 3 4.1 SPT Borings... 3 4.2 Groundwater Measurement...

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Prince George s County, MD Levee Response and Remediation Plan

Prince George s County, MD Levee Response and Remediation Plan Prince George s County, MD Levee Response and Remediation Plan Presented By: Hilary Stephens-Kendro Prepared for: Prince George s County Department of Public Works and Transportation Project Background

More information

CCR Rule Operating Criteria Closure Plan

CCR Rule Operating Criteria Closure Plan CCR Rule Operating Criteria 257.102 Closure Plan FGD Pond 2 Jim Bridger Plant Point of Rocks, Wyoming PREPARED FOR PacifiCorp 1407 West North Temple Salt Lake City, UT 84116 (801) 521-0376 Fax (801) 220-4748

More information

Information for File # KAL

Information for File # KAL Information for File # 2016-03711-KAL Applicant Corps Contact Enbridge Energy, Limited Partnership Kristoffer A. Laman Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Kristoffer.A.Laman@usace.army.mil

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

Annual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station

Annual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station Annual Inspection Report CCR Surface Impoundment MidAmerican Energy Company, Louisa Generating Station Final January 15, 2016 Annual Inspection Report CCR Surface Impoundment Prepared for MidAmerican Energy

More information

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA CERTIFICATE AUTHORIZATION: 2 24 ANCHOR WALL ENGINEERING, LLC MATERIAL NOTES. Concrete Retaining Wall Units: "Anchor Diamond Pro Retaining Wall Units" as manufactured by Block USA under license from Anchor

More information

Imagine the result. Bottom Ash Storage Pond - CCR Groundwater Monitoring Well Network Evaluation. American Electric Power Service Corporation

Imagine the result. Bottom Ash Storage Pond - CCR Groundwater Monitoring Well Network Evaluation. American Electric Power Service Corporation Imagine the result merican Electric Power Service Corporation Bottom sh Storage Pond - CCR Groundwater Monitoring Well Network Evaluation J. Robert Welsh Power Plant 1187 County Road 4865 Titus County

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Longview, WA. Kalama, WA PROJECT SITE. PROJECT: Kalama Manufacturing and Marine Export Facility Project FIGURE 1: VICINITY MAP

Longview, WA. Kalama, WA PROJECT SITE. PROJECT: Kalama Manufacturing and Marine Export Facility Project FIGURE 1: VICINITY MAP Longview, WA Esri, HERE, DeLorme, MapmyIndia, OpenStreetMap contributors, and the GIS user community PROJECT SITE 0 2,875 5,750 11,500 Feet PURPOSE: Construct a facility to manufacture and exp IN: Columbia

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan R.M. SCHAHFER GENERATING STATION CCR SURFACE IMPOUNDMENT INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Wheatfield, Indiana Pursuant to 40 CFR 257.82 Submitted To: Northern

More information

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe. MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan CCR Temporary Storage Pad Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. October 2016 Paul T. Swenson 2016.10.13 18:30:03-05'00' 234 West Century

More information

AMERICAN ELECTRIC POWER (SWEPCO)

AMERICAN ELECTRIC POWER (SWEPCO) 2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION

More information

Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17

Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17 Client: Joe Landowner Location: CARROLL County, IOWA Twp/Rng/Sec: 085N 035W 17 Legend Structure Wetland Features 0-18 in 18-36 in 36-48 in > 48 in Max Temporary Pool Watershed ± 0 0.05 0.1 0.2 Miles 0

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E. LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

TURNPIKE SUPPLEMENT FDOT DRAINAGE MANUAL

TURNPIKE SUPPLEMENT FDOT DRAINAGE MANUAL TURNPIKE SUPPLEMENT TO THE FDOT DRAINAGE MANUAL FLORIDA S TURNPIKE ENTERPRISE DRAINAGE DESIGN OFFICE January 2019 INTRODUCTION As part of the Turnpike s continuing quality enhancement effort, this Supplement

More information

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION CHAPTER 23.105 GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION Sections 23.105.101 General... 1 23.105.102 Definitions... 1 23.105.103 Permits required... 3 23.105.104 Hazards.... 4 23.105.105 Permit

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) East and West Bottom Ash Pond Pirkey Plant Hallsville, Texas October, 2016 Prepared for: Southwest Electric Power Company (SWEPCO) - Pirkey Plant Hallsville,

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

Inflow Design Flood Control System Plan

Inflow Design Flood Control System Plan Inflow Design Flood Control System Plan BAILLY GENERATING STATION CCR SURFACE IMPOUNDMENT INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN Chesterton, Indiana Pursuant to 40 CFR 257.82 Submitted To: Northern Indiana

More information

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE 378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,

More information

CCR LANDFILL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN. Pursuant to 40 CFR

CCR LANDFILL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN. Pursuant to 40 CFR Run-On & Run-Off Control System Plan R.M. SCHAHFER GENERATING STATION CCR LANDFILL RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN Wheatfield, Indiana Pursuant to 40 CFR 257.81 Submitted To: Northern Indiana Public

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES

BLOCKING AND FILLING SURFACE DRAINAGE DITCHES MINNESOTA WETLAND RESTORATION GUIDE BLOCKING AND FILLING SURFACE DRAINAGE DITCHES TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-1 Publication Date: 10/14/2015 Table of Contents Introduction Application

More information

Istokpoga Marsh Water Improvement District. Water Quality Improvement Project. Copper Corrective Actions. Soil Management Plan.

Istokpoga Marsh Water Improvement District. Water Quality Improvement Project. Copper Corrective Actions. Soil Management Plan. Istokpoga Marsh Water Improvement District Water Quality Improvement Project Copper Corrective Actions Soil Management Plan Prepared by South Florida Water Management District West Palm Beach, Florida

More information

c. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part

c. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part Florida Building Code Plumbing APPENDIX F, 5 th Edition (2014) Amendment to APPENDIX F c. Sprinkler layout. Sprinkler layout may be modified to adjust for field conditions provided it complies with part

More information

Annual Groundwater Monitoring Report

Annual Groundwater Monitoring Report nnual Monitoring Report Kentucky Power Company Big Sandy Plant Bottom sh Pond CCR Management Unit Louisa, Kentucky January 2018 Prepared by: merican Electric Power Service Corporation 1 Riverside Plaza

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert.

q Item meets standard Project ID: X Item not acceptable Contractor: N/A Item not applicable Inspector: C Item requires engineer s cert. SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION q Item meets

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

BASE BID FORM FY 2015

BASE BID FORM FY 2015 BASE BID FORM FY 2015 STORMWATER TREATMENT AREA - BASE BID (FY2015) THE LUMP SUM (LS) PRICES FOR ITEMS 1-6 SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND ALL APPLICABLE

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

Minneapolis Impound Lot Facility Improvements Minneapolis, MN BCWMC

Minneapolis Impound Lot Facility Improvements Minneapolis, MN BCWMC Memorandum BCWMC May 17, 2018 Meeting Agenda Project: 23270051 2017 2144 5C Minneapolis Impound Lot Facility Improvements Minneapolis, MN BCWMC 2017-37 Summary: Proposed Work: Temporary surcharge for new

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

B512 - GABIONS - OPSS 512

B512 - GABIONS - OPSS 512 B512 - - OPSS 512 512.1 GENERAL Gabions are contained rectangular units made of steel wire mesh and filled with stone. The double twisted wire mesh is galvanized and PVC (polyvinyl chloride) coated. Gabions

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Hayden Station 13125 U.S. Highway 40 Hayden, Colorado 81638 January 18, 2018 Table of Contents Certification...

More information

Reclamation Plan Modification for the Patrie Pit

Reclamation Plan Modification for the Patrie Pit for the Patrie Pit Table of Contents Reclamation Plan Narrative.. Page 1 11 Plat Map.... Figure 1 Soils Map & Descriptions. Figure 2 Erosion Control Typical BMPs.... Figure 3 WI Construction Specification

More information

CCR Annual Inspection (b) for the West Ash Pond at the F. B. Culley Generating Station. Revision 0

CCR Annual Inspection (b) for the West Ash Pond at the F. B. Culley Generating Station. Revision 0 Submitted to Southern Indiana Gas & Electric Company dba Vectren Power Supply, Inc. (SIGECO) One Vectren Square Evansville, IN 47708 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83

More information

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light 100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light Maintenance Facility (VSLMF) Osceola County, Florida

More information

Joe Landowner Location: Carroll, Iowa Twp/Rng/Sec: 082N 034W 08. Information and Estimated Cost Maximum pool surface area

Joe Landowner Location: Carroll, Iowa Twp/Rng/Sec: 082N 034W 08. Information and Estimated Cost Maximum pool surface area Client: Joe Landowner Location: Carroll, Iowa Twp/Rng/Sec: 082N 034W 08 Legend Structure Pool Features Max Temporary Pool Existing Tile Watershed ± 0 0.015 0.03 0.06 Miles 0 0.0225 0.045 0.09 Kilometers

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY

HISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:

More information

Rainwater Harvesting at Stillwater Country Club

Rainwater Harvesting at Stillwater Country Club technical memo Project Name BCWD Community Demonstration BMP Projects Date 12/05/2018 / Contact info Cc / Contact info From / Contact info Regarding BCWD Board of Managers Karen Kill, District Administrator

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST CONSTRUCTION PLAN BID SET PREPARED FOR: LOCATION MAP CARRABELLE US ROUTE 319/98 EASTPOINT Prepared By Plan Design Enable CORPORATE

More information

SECTION BUILDING EARTHWORK

SECTION BUILDING EARTHWORK Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Pond 21, Pond 22, Pond 23 & WWSP Oklaunion Power Station Vernon, Texas October, 2016 Prepared for: Public Service Company of Oklahoma Prepared by: American

More information

VICINITY MAP AND SITE MAP. Page 1 of 9

VICINITY MAP AND SITE MAP. Page 1 of 9 INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction

More information

Aquatic Plant Control

Aquatic Plant Control Tawas Lake Nuisance Aquatic Plant Control Report Prepared for: Tawas Lake Improvement Association Aquatic Plant Control Prepared by: Progressive AE 1811 4 Mile Road, NE Grand Rapids, MI 49525-2442 616/361-2664

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

Rethinking Water Management Systems

Rethinking Water Management Systems Rethinking Water Management Systems Table of Contents Introduction... 1 PIPE-R Reservoir System Installation Procedure... 2 Product Delivery and Assembly... 2 Site Layout and Excavation... 3 Preparation

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project. May 23, 2012

Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project. May 23, 2012 STORMWATER INFORMATION AND CALCULATIONS FOR ENVIRONMENTAL RESOURCE PERMIT Istokpoga Marsh Watershed Improvement District (IMWID) Minor Impoundment Project Prepared by Chastain-Skillman, Inc. Prepared for

More information

USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY. Adam Gold Geog 591

USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY. Adam Gold Geog 591 USING ARCSWAT TO EVALUATE EFFECTS OF LAND USE CHANGE ON WATER QUALITY Adam Gold Geog 591 Introduction The Soil and Water Assessment Tool (SWAT) is a hydrologic transport model with an objective to predict

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

SECTION 500 STRUCTURES

SECTION 500 STRUCTURES SECTION 500 STRUCTURES 500.1 GENERAL This section defines the various construction items that are associated with the completion of a concrete, steel, timber, or masonry unit structures, or a combination

More information

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J

DRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA

More information

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM The following paragraphs provide general guidelines on developing construction and material specifications for specific

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Suggested Stormwater Management Practices For Individual House Lots

Suggested Stormwater Management Practices For Individual House Lots Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These

More information

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered. SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

Marion County Planning & Zoning Commission

Marion County Planning & Zoning Commission Marion County Planning & Zoning Commission Date: 9/16/25 P&Z: 9/28/25 BCC: 10/20/25 Item Number 151006SU Type of Application Special Use Permit Request Special Use Permit to establish a: - Pork & Lamb

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion

More information

Fountain Lake Restoration Project

Fountain Lake Restoration Project NRT, AN OBG COMPANY, PRESENTS: Fountain Lake Restoration Project Andrew Millspaugh, PE WEDA Dredging Summit & Expo, June 26-29, 2017 OUTLINE Project History Lake Modeling & Dredging Plan Upland Confined

More information