SECTION MECHANICAL INSULATION

Size: px
Start display at page:

Download "SECTION MECHANICAL INSULATION"

Transcription

1 SECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. B. Division-15 Basic Materials and Methods sections apply to work of this section DESCRIPTION OF WORK A. Extent of mechanical insulation required by this section is indicated on drawings, and by requirements of this section. B. Types of mechanical insulation specified in this section include the following: 1. Piping System Insulation: a. Domestic Water Piping Systems. 2. Ductwork System Insulation: a. Cold Ductwork. b. Exposed Ductwork 1.03 QUALITY ASSURANCE A. Manufacturers. Firms regularly engaged in manufacture of mechanical insulation products, of types and sizes required, whose products have been in satisfactory use in similar service for not less than 5 years. B. Installer. A firm with at least 10 years successful installation experience on projects with mechanical insulations similar to that required for this project. C. Flame/Smoke Ratings. Provide composite mechanical insulation (insulation, jackets, coverings, sealers, mastics and adhesives) with flame-spread rating of 25 or less, and smoke-developed rating of 50 or less, as tested by ANSI/ASTM E 84 (NFPA 255) method. In air plenums, smoke-developed rating shall be 50 or less. D. Asbestos-Free. All materials shall be guaranteed to be 100% free of any asbestos materials SUBMITTALS A. Product Data. Submit manufacturer's specifications and installation instructions for each type of mechanical insulation. Submit schedule showing manufacturer's product number, thickness, and furnished accessories for each mechanical system requiring insulation DELIVERY, STORAGE AND HANDLING A. Deliver insulation, coverings, cements, adhesives, and coatings to site in containers with manufacturer's stamp or label, affixed showing fire hazard ratings of products Interiors Package

2 B. Protect insulation against dirt, water, chemical, and mechanical damage. Do not install damaged insulation; remove from project site. PART 2 - PRODUCTS 2.01 ACCEPTABLE MANUFACTURERS A. Available Manufacturers. Subject to compliance with requirements, manufacturers offering products which may be incorporated in the work include, but are not limited to, the following: 1. Armstrong World Industries, Inc. 2. Certainteed Corp. 3. Schuller International Inc. 4. Owens-Corning Fiberglass Corp. 5. Knauf Fiberglass Co. 6. Pittsburg Corning Corp PIPE INSULATION MATERIALS A. Fiberglass Pipe Insulation: Owens-Corning One or Two Piece Pipe Insulation Fiberglass 25 ASJ/S All Service Jacket Schuller Flame Safe Pipe Insulation All Purpose Jacket - AP/S Certain-Teed/St. Gobain Fiber Glass Pipe Insulation All Service Jacket - ASJ/S Knauf F.G. Inc. Fiber Glass Pipe Insulation All Service Jacket - ASJ/S All above with self-seal lap. B. Flexible Elastomeric Thermal Pipe and Sheet Insulation: 1. Insulation shall meet the smoke developed and flame spread ratings listed in Article 01.03C. 2. For Service: -40 F to 220 F. Armstrong Armaflex II or AP Armaflex DUCTWORK INSULATION MATERIALS A. External Insulation (Rigid Board Type) (FSK Facing): 1. Material: 1. Certain-Teed/St. Gobain 1½" thick, 3 lb. density Fiberglass Board, (FSK Facing). 2. Owens-Corning 1½" thick, 3 lb. density Fiberglass Board (FSK Facing). 3. Schuller 1½" thick, 3 lb. density Fiberglass Board (FSK Facing). B. External Insulation (Blanket Type): 1. Material: 1. Schuller, R6. 1½" thick, FSK facing, 1-2" Tab Interiors Package

3 2. Owens-Corning, ED75, 1½" thick, FRK " Tab. 3. Certain-Teed/St. Gobain, Type IV, 1½" thick, FSK 1-2" Tab. C. Ductwork Insulation Accessories. Provide staples, bands, wires, tape, anchors, corner angles and similar accessories as recommended by insulation manufacturer for applications indicated. D. Ductwork Insulation Compounds. Provide cements, adhesives, coatings, sealers, protective finishes and similar compounds as recommended by insulation manufacturer for applications indicated. PART 3 - EXECUTION 3.01 INSPECTION A. Examine areas and conditions under which mechanical insulation is to be installed. Do not proceed with work until unsatisfactory conditions have been corrected in manner acceptable to Installer PLUMBING PIPING SYSTEM INSULATION A. Insulation Omitted. Omit insulation on chrome-plated exposed piping (except for handicapped fixtures), air chambers, unions, flanges, strainers, check valves, balance cocks, flow regulators, drain lines from water coolers, drainage piping located in crawl spaces or tunnels, buried piping, fire protection piping, and pre-insulated equipment. Omit insulation on exposed plumbing fixture runouts from faces of wall or floor to fixture; on unions, flanges, strainers, flexible connections, and expansion joints. B. Cold Piping: 1. Application Requirements: Insulate the following cold plumbing piping systems: a. Domestic cold water piping. 2. Insulate each piping system specified above with one of the following types and thicknesses of insulation: a. Pipe size 1" and smaller: Flexible unicellular (Armaflex) 1/2" thick. b. Pipe size 1 ½ and less: ½ polyethylene foam(imcoa) or fiberglass. c. Pipe Size 2 and larger: 1 fiberglass DUCTWORK SYSTEM INSULATION A. Cold Ductwork (below ambient temperature): 1. Application Requirements: Insulate the following cold ductwork: 1. HVAC supply ductwork between RTU fan discharge to last supply grille. 2. Insulate each ductwork system specified above with one of the following types and thicknesses of insulation: 1. Insulation: Flexible fiberglass; 1½" thick, application limited to concealed locations Interiors Package

4 2. Exposed Locations in finish areas. Double wall duct construction with interior flexible insulation, 1 ½ thick, perforated interior face, with mylar coating vapor barrier INSTALLATION OF PIPING INSULATION A. General. Install insulation products in accordance with manufacturer's written instructions, and in accordance with recognized industry practices to ensure that insulation serves its intended purpose. B. Install insulation on pipe systems subsequent to testing and acceptance of tests. C. Install insulation materials with smooth and even surfaces. Insulate each continuous run of piping with full-length units of insulation, with single cut piece to complete run. Do not use cut pieces or scraps abutting each other. D. Clean and dry pipe surfaces prior to insulating. Butt insulation joints firmly together to ensure complete and tight fit over surfaces to be covered. E. Maintain integrity of vapor-barrier jackets on pipe insulation, and protect to prevent puncture or other damage. F. Pipe hangers may be attached directly to the piping for domestic water piping, rainleaders, steam and steam condensate, condenser water piping, heating hot water supply and return. On all chilled water and well water piping the hangers shall be installed outside of the insulation. G. Insulation Repair Work. Any and all insulated surfaces that are disturbed purposely or inadvertently shall be neatly repaired including finish painting to match original. H. Exposed Ends. Pipe insulation sections that have exposed ends at valves and other accessories shall be treated as follows: 1. In concealed areas such as suspended ceilings, tunnels and pipe shafts the ends may remain as cut except that such ends shall be vaporproofed with mastic sealer if installed on cold or chilled water. Other services may be left untreated. 2. In exposed areas such as mechanical spaces or finished spaces the ends shall be neatly tapered and vaporproofed with mastic sealer. I. Extend piping insulation without interruption through walls, floors and similar piping penetrations, except where otherwise indicated. 1. Refer to sections pertaining to sealing of sleeves. J. Install pipe hanger inserts to prevent compression of insulation. 1. Pipe hanger inserts shall be rigid insulation (calcium silicate) of length conforming to the following table: Pipe Size Minimum Insert Length 1½" to 2½" 10" 3" to 6" 12" 8" to 10" 16" Interiors Package

5 12" and larger 22" Inserts shall be of same thickness as adjoining insulation and shall be installed with ASJ, vapor barrier jacket and seals INSTALLATION OF DUCTWORK INSULATION A. General. Install insulation products in accord with manufacturer's written instructions and in accordance with recognized industry practices to ensure that insulation serves its intended purpose. B. Install insulation materials with smooth and even surfaces. C. Clean and dry ductwork prior to insulating. Butt insulation joints firmly together to ensure complete and tight fit over surfaces to be covered. D. Maintain integrity of vapor-barrier on ductwork insulation, and protect it to prevent puncture and other damage. E. Extend ductwork insulation without interruption through walls, floors and similar ductwork penetrations, except where otherwise indicated. F. Lined Ductwork. Except as otherwise indicated, omit insulation on ductwork where internal insulation or sound absorbing linings have been installed. G. Blanket Insulation: 1. All rectangular and round ducts when scheduled shall be insulated with fiberglass blanket 1½" thick with FSK or FRK vapor barrier jacket with 1-2" tab of grades mentioned above. 2. The insulation shall be applied with edges tightly butted and secured to the metal surface with strips of insulation bonding adhesive. Foster Duct-Fas or 3M #33 adhesive applied in 6" wide strips every 18 inches. 3. On ducts over 24" wide the blanket shall be additionally secured to the bottom of the duct with welded pins and clips on not greater than 18" centers. All pins shall be sealed with matching tape patches PROTECTION AND REPLACEMENT A. Replace damaged insulation which cannot be repaired satisfactorily, including units with vapor barrier damage and moisture saturated units. B. Protection. Insulation Installer shall advise Contractor of required protection for insulation work during remainder of construction period, to avoid damage and deterioration. END OF SECTION Interiors Package

SECTION MECHANICAL INSULATION

SECTION MECHANICAL INSULATION SECTION 15250 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

B. Refer to Section : Air Distribution for lined ductwork requirements.

B. Refer to Section : Air Distribution for lined ductwork requirements. SECTION 230700 MECHANICAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following: SECTION 15250 PART I - GENERAL 1.01 WORK INCLUDED A. Types of insulation specified in this section include the following: 1. Piping System Insulation: a. Domestic Cold Water b. Domestic Hot water c. Heating

More information

FIRE STATION 55 June 14, 2010

FIRE STATION 55 June 14, 2010 SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds. SECTION 230713 DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated. SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 23 07 00_ HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Piping system insulation. 2. Equipment insulation. 3.

More information

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 22 0700 - PLUMBING INSULATION PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. All work covered in this section consists of furnishing all labor, equipment, materials and accessories, and performing

More information

PROJ. NO SECTION HVAC DUCT INSULATION

PROJ. NO SECTION HVAC DUCT INSULATION SECTION 23 07 13 HVAC DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5 and below. 230700 HVAC INSULATION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 232300 Refrigeration B. Section 233100 Air Distribution 1.02 INSULATION A. General Requirements for Flexible Insulation: 1. Use is

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

SECTION MECHANICAL SYSTEMS INSULATION

SECTION MECHANICAL SYSTEMS INSULATION SECTION 23 0700 MECHANICAL SYSTEMS INSULATION PART 1 - GENERAL 1.1 RELATED WORK A. Section 23 0529 - Mechanical Supporting Devices B. Section 23 3114 - Ductwork (Duct Lining) 1.2 REFERENCE A. Work under

More information

State of Alaska Section State Office Building HVAC Fan Replacement MECHANICAL INSULATION

State of Alaska Section State Office Building HVAC Fan Replacement MECHANICAL INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Specific requirements, products and methods of execution which relate to the insulation of ductwork, piping, valves and fittings. B. Related Sections:

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 23 0700 - HVAC INSULATION PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. All work covered in this section consists of furnishing all labor, equipment, materials and accessories, and performing all

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS P00000000 0000 DOCUMENTS ARCHITECTURE ENGINEERING AND CONSTRUCTION ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION DIVISION

More information

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket. SECTION 230719 - HVAC PIPING INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Piping insulation. B. Jackets and accessories. 1.2 RELATED REQUIREMENTS A. Section 07813 - Fire Procection, HVAC & Plumbing

More information

SECTION (15081) - HVAC INSULATION

SECTION (15081) - HVAC INSULATION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: SECTION 23 07 00 (15081) - HVAC INSULATION 1. Insulation Materials 2. Jackets 3. Accessories and Attachments 4. Vapor Retarders B. Related Sections: 1.02

More information

SECTION PROJECTED SCHEDULE

SECTION PROJECTED SCHEDULE Addendum No: One (1) Project: Architect s Project No: Burton Memorial Coliseum HVAC Upgrades & Improvements Bid # DB-2017-FM-138 MA1701 Date: January 10, 2018 To: All Plan Holders Introduction The following

More information

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION HVAC INSULATION

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION HVAC INSULATION DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) PART 1 GENERAL 1.01 DESCRIPTION A. Insulate the following: 1. Piping: a. Heating water b. Chilled water c. Condenser water (outdoors with heat

More information

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade 1.2

More information

Division 15 INSULATION Section 15100

Division 15 INSULATION Section 15100 Page 1 of 5 SECTION PAGE PART 1 GENERAL 2 1.1 General 2 1.2 References 2 1.3 Work Included 2 1.4 Related Work 2 1.5 Quality Assurance 3 PART 2 PRODUCTS 3 2.1 Description 3 PART 3 EXECUTION 3 3.1 Workmanship

More information

HVAC Piping Insulation FIBERGLAS Insulation. General Specification Guide SECTION

HVAC Piping Insulation FIBERGLAS Insulation. General Specification Guide SECTION HVAC Piping Insulation FIBERGLAS Insulation General Specification Guide PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals,

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

HVAC Piping Insulation- FIBERGLAS Insulation

HVAC Piping Insulation- FIBERGLAS Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. B. Related

More information

INSULATION SECTION 15250

INSULATION SECTION 15250 INSULATION SECTION 15250 PART 1 GENERAL 1.1 DESCRIPTION A. Provide complete systems of insulation for piping, ducts, boiler stacks and breeching, and mechanical equipment as specified. B. Related work

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 07 00 - SYSTEM INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION PART 1 GENERAL 1.01 SUMMARY Section 15145 This Section includes insulation for piping and equipment as called out on the Plans. 1.02 MEASUREMENT AND PAYMENT No separate payment will be provided for the

More information

SECTION DUCTWORK INSULATION

SECTION DUCTWORK INSULATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK SECTION 23514 DUCTWORK INSULATION A. Provide thermal insulation on the ductwork installed and required on this Project shown on the Drawings, specified herein and

More information

NCCER Progress Blvd, Alachua, Florida Tel: (888)

NCCER Progress Blvd, Alachua, Florida Tel: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Tel: (888) 622-3720 E-mail: info@nccer.org INSULATING Competencies / Objectives Level One MODULE 19101 - ORIENTATION 1. Explain what insulation is and

More information

SECTION PLUMBING INSULATION

SECTION PLUMBING INSULATION SECTION 22 07 00 PLUMBING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes equipment insulation, covering, and thermal insulation for piping systems including vapor retarders, jackets and accessories.

More information

SECTION DUCT INSULATION

SECTION DUCT INSULATION SECTION 23 07 13 - DUCT INSULATION PART I - GENERAL 1.1 SECTION INCLUDES A. Ductwork Insulation B. Fan and Equipment Insulation C. Insulation Jackets D. Insulation Lagging 1.2 RELATED SECTIONS A. Section

More information

.1 The following is a list of standards which may be referenced in this Section:

.1 The following is a list of standards which may be referenced in this Section: Construction of Sodium Hypochlorite and Chemical Storage Buildings Page 1 of 14 1. GENERAL 1.1 References.1 The following is a list of standards which may be referenced in this Section:.1 ASHRAE:.1 Standard

More information

MECHANICAL INSULATION

MECHANICAL INSULATION MECHANICAL INSULATION GENERAL INFORMATION 1.1 Comply with more stringent of following latest edition of Energy Conservation and Construction Code of New York City, ASHRAE and this Guideline. DESIGN REQUIREMENTS

More information

Addendum to Specifications

Addendum to Specifications Addendum to Specifications SOW #: Construction Specification #: Date: Additions to Specifications: Deletions to Specifications: Engineer Date Design Engineering Manager Date Page 2 of 7 PART 1 - GENERAL

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 GENERAL SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 1.01 SECTION INCLUDES A. Pipe markers. 1.02 REFERENCE STANDARDS A. ASME A13.1 - Scheme for the Identification of Piping

More information

SUPERIOR CAL-SHIELDS Features & Benefits FAST

SUPERIOR CAL-SHIELDS Features & Benefits FAST SUPERIOR CAL-SHIELDS Features & Benefits FAST One-piece hinged construction Insulation, vapor barrier and G-90 galvanized steel shield in one unit. Butt-and-go Insulation extends beyond the steel shield

More information

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6 Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade.3 Section

More information

Section Roof/Ceiling Thermal Insulation

Section Roof/Ceiling Thermal Insulation Section 07200 Roof/Ceiling Thermal Insulation Part 1 General 1.01 Summary A. Provide glass fiber thermal insulation for (roof) (ceiling) assembly as indicated in building plans. 1.02 Materials Provided

More information

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5 Burrow Avenue Pumping Station Upgrades Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Section Includes:.1 Thermal insulation for piping and piping accessories in commercial type applications. 1.2 REFERENCES.1

More information

GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO

GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO SECTION 07210 BUILDING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 072100-1 SECTION 072100 PART 1 - GENERAL 1.1 M.S.U. ISSUES A. It the intent of MSU that insulation of its projects will comply with LEED NC 3 Credit Requirements EA Prerequisite

More information

HVAC INSULATION

HVAC INSULATION PART 1 GENERAL 1.01 DESCRIPTION A. The requirements of this section apply to the insulation of mechanical equipment specified elsewhere in these specifications. B. Related Work: The requirements of Section

More information

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation Recommended Design Considerations and Guide Specifications For Commercial Building Insulation Date of Issue: October 1, 2004 Recommended Design Considerations and Guide Specifications For Commercial Building

More information

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 230719 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes insulating the following HVAC piping systems: 1. Chilled-water and brine piping, [indoors] [and] [outdoors]. 2. Heating hot-water piping,

More information

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings.

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings. BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 8 PART 1 GENERAL 1.1 SUMMARY.1 Section Includes: 1.2 REFERENCES.1 Thermal insulation for insulated piping and piping accessories affected by construction and new

More information

SECTION THERMAL INSULATION GENERAL THERMAL INSULATION PART RELATED DOCUMENTS

SECTION THERMAL INSULATION GENERAL THERMAL INSULATION PART RELATED DOCUMENTS SECTION 15250 - THERMAL INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS are a part of this Section. 1.02 SUMMARY A.

More information

SECTION FLUID-APPLIED WATERPROOFING

SECTION FLUID-APPLIED WATERPROOFING SECTION 07140 FLUID-APPLIED WATERPROOFING PART 1 GENERAL 1.1 SUMMARY A. Section includes fluid applied rubberized asphalt and/or elastomeric membrane waterproofing; and surface dusting and/or protective

More information

A. Source Limitations: Obtain each type of building insulation through one source.

A. Source Limitations: Obtain each type of building insulation through one source. SECTION 07210 - BUILDING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...

More information

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 220719 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes insulating the following plumbing piping services: 1. Domestic hot-water piping. 2. Domestic recirculating hot-water piping. 3. Supplies

More information

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.

B. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers. SECTION 230529 - HANGERS AND SUPPORTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Sleeves. 6. Mechanical sleeve seals. 7. Firestopping

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Interior gypsum wallboard. 2. Tile backing panels. B. Related Sections: 1. Section 012300 Alternates. 1.2 SUBMITTALS A.

More information

A. This Section includes acoustical panel ceilings installed with exposed suspension systems.

A. This Section includes acoustical panel ceilings installed with exposed suspension systems. SECTION 09511 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1 ADDENDUM Project: BYU-I Smith Building Chiller Replacement Project No.: 11162 Addendum No.: 1 Project Address: BYU-Idaho Operations Building Rm. #213, Rexburg, Idaho 83460 Date: 2/18/16 Owner: BYU-Idaho

More information

This specification describes the minimum requirements for industrial thermal insulation.

This specification describes the minimum requirements for industrial thermal insulation. 016/09/7 1/7 1.0 PURPOSE This specification describes the minimum requirements for industrial thermal insulation. Read it in conjunction with the applicable insulation and insulation finish specifications

More information

SECTION THERMAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 072100 - THERMAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6 DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00

More information

GUIDE SPECIFICATION: DUCT LINER

GUIDE SPECIFICATION: DUCT LINER GUIDE SPECIFICATION: DUCT LINER This specification guide includes thermal & acoustical insulation for ductwork and air handling systems. This section is based on the format recommended by MICA (Midwest

More information

New Construction. Corner Store # W N San Antonio, TX Mechanical, Electrical and Plumbing Specifications BID ISSUE 02/27/17

New Construction. Corner Store # W N San Antonio, TX Mechanical, Electrical and Plumbing Specifications BID ISSUE 02/27/17 CST BRANDS, INC. New Construction Corner Store #1858 9130 W. 1604 N San Antonio, TX 78250 Mechanical, Electrical and Plumbing Specifications BID ISSUE 02/27/17 02/27/17 02/27/17 Mechanical Electrical INDEX

More information

SECTION ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL

SECTION ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL SECTION 09511 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No. SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

GUIDE SPECIFICATION: MECHANICAL SYSTEMS

GUIDE SPECIFICATION: MECHANICAL SYSTEMS GUIDE SPECIFICATION: MECHANICAL SYSTEMS This specification guide includes thermal & acoustical insulation for piping, equipment, vessels, and air handling systems. This section is based on the format recommended

More information

*************************************************************************************************************

************************************************************************************************************* 15180 MECHANICAL SYSTEMS INSULATION ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 07 16 *************************************************************************************************************

More information

SECTION PLUMBING PIPING SYSTEM

SECTION PLUMBING PIPING SYSTEM SECTION 15410 - PLUMBING PIPING SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY

More information

Revision May 2017 SECTION INSULATION SYSTEMS

Revision May 2017 SECTION INSULATION SYSTEMS Revision May 07 SECTION 0700 SYSTEMS.0 This section defines insulation system guidelines and requirements for piping, ductwork, and equipment insulation. (Interior piping and equipment, exterior piping,

More information

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS BuildingName The Description of the Project P00000000 0000 DOCUMENTS Title Page Table of Contents Instruction to Bidders Form of Proposal Equal Opportunity Statement Form of Guarantee Supplemental General

More information

1. Building insulation in batt form. 2. Rigid board insulation. 3. Cavity wall insulation.

1. Building insulation in batt form. 2. Rigid board insulation. 3. Cavity wall insulation. SECTION 07210 BUILDING INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections,

More information

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION PRE-ENGINEERED BUILDING INSULATION PART 1 GENERAL SECTION 07213 PRE-ENGINEERED BUILDING INSULATION Microsoft Word Instructions: Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". 1.1 SECTION INCLUDES A. Pre-Engineered

More information

EcoTouch Insulation with PureFiber Technology

EcoTouch Insulation with PureFiber Technology PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

A. ASTM C203: Standard Test Methods for Breaking Load and Flexural Properties of Block-Type Thermal Insulation

A. ASTM C203: Standard Test Methods for Breaking Load and Flexural Properties of Block-Type Thermal Insulation SECTION 07 21 00 THERMAL INSULATION PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Perimeter Foundation Insulation. 2. Batt Insulation. 3. Vapor Barriers. B. Related Sections: Documents relating to

More information

SECTION GYPSUM BOARD PART 1 - GENERAL

SECTION GYPSUM BOARD PART 1 - GENERAL SECTION 09250 - GYPSUM BOARD PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 092900 GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 09511 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2 SECTION 10: 10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING 2 10.2 FINISHES 2 10.3 PIPING FORMAT 3 A. PIPE INSULATION 3 B. PIPE INSULATION 3 C. INSULATION ATTACHMENT 3 D. INSULATION

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY SECTION 09 21 16 A. Provide gypsum board assemblies as shown and specified. Work includes: 1. Walls, partitions, and soffits, including metal framing systems. 2. Acoustical

More information

Installation Guide QuietR Spiral Duct Liner

Installation Guide QuietR Spiral Duct Liner Table of Contents General Information 1-1 Recommendations and Limitations 2-1 Project Estimating 3-1 Grooving Duct Liner 4-1 Duct Liner Section 5-1 Adhesives Coatings and Pins 6-1 Straight Duct 7-1 Couplings

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 09250 GYPSUM BOARD PART 1GENERAL 1.1 SUMMARY A. Related Documents: General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and Drawings are collectively applicable

More information

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.

A. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation. SECTION 09512 - ACOUSTICAL TILECEILINGS (ACT-01 and ACT-02) PART 1 - GENERAL 1.01 SUMMARY A. Section includes ceilings consisting of acoustical panels and exposed suspension systems. This ceiling system

More information

Plumbing Pipe Insulation Specification Submitted by: Armacell LLC. Plumbing Pipe Insulation Specification Armacell LLC 1

Plumbing Pipe Insulation Specification Submitted by: Armacell LLC. Plumbing Pipe Insulation Specification Armacell LLC 1 Plumbing Pipe Insulation Specification 2005 Armacell LLC 1 Part 1 General 1.01 Scope of Work: A. Provide piping insulation as specified below. The purpose of the thermal pipe insulation is for condensation

More information

SECTION GYPSUM BOARD SYSTEM

SECTION GYPSUM BOARD SYSTEM PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 09 29 00 GYPSUM BOARD SYSTEM A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification sections,

More information

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent. SECTION 092900 - GYPSUM BOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

Project Title: Boiler Replacement for Rock Creek Campus ITB Due Date: 2:00 P.M., May 31, 2017 ADDENDUM NO. 2

Project Title: Boiler Replacement for Rock Creek Campus ITB Due Date: 2:00 P.M., May 31, 2017 ADDENDUM NO. 2 Date: May 18, 2017 Project Title: Boiler Replacement for Rock Creek Campus ITB Due Date: 2:00 P.M., May 31, 2017 ADDENDUM NO. 2 This Addendum No. 2 and the original ITB shall form the complete Boiler Replacement

More information

B. Qualification Data: For installers specified in Quality Assurance article.

B. Qualification Data: For installers specified in Quality Assurance article. SECTION 233113 METAL DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11 SECTION 09 29 00 GYPSUM BOARD 05/11 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 095133 - ACOUSTICAL METAL PAN CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING DIVISION 5 METALS SECTION 05 40 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information