1 BILL OF QUANTITY Proposed Market Shed OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) ELEMENT NO. 1: - SUBSTRUCTURE (ALL PROVISIONAL): - Excavations and Earthworks: - A Clear site of all bush and grass and cart away from site 400 Sm 50 20,000 B Excavate oversite average 200mm deep and cart away 400 Sm ,000 C Excavate trench for strip foundation not exceeding 1.5m deep 193 Cm ,250 D Ditto for column bases 45 Cm ,250 E Extra over excavations for excavating in rock 95 Cm ,500 F Return fill and ram selected excavated material 136 Cm ,600 G Cart away surplus excavated material from site 249 Cm ,250 H Allow for planking and strutting and keeping excavations free from fallen material 1 Item 15,000 15,000 I Allow for keeping excavations free from water 1 Item 15,000 15,000 Hardcore: - J Approved hardcore filling well compacted 109 Cm ,750 K 50mm thick murram blinding 364 Sm ,400 L Treat Hardcore surface with approved insecticide 364 Sm ,520 Concrete works: - M Plain concrete (1:4:8) in 50mm blinding under strip foundation 160 Sm ,000 N Ditto under column bases 12 Sm 400 4,800 O Plain concrete (1:3:6) in steps 3 Cm 9,500 28,500 Vibrated reinforced concrete (1:2:4) in: - P Strip foundation 33 Cm 11, ,500 Q Column bases 7 Cm 11,500 80,500 R Columns 1 Cm 11,500 11,500 S 150mm surface bed 364 Sm 1, ,900 Carried to collection 1,712,220 Page 1 of 10
2 Sawn formwork to: - A Vertical sides of columns 10 Sm 450 4,500 B Vertical sides of strip foundation 105 Sm ,250 B Edges of surface bed mm high 80 Lm ,000 High yield reinforcement bars: - C 8mm diameter bars 293 Kg ,160 D 10mm ditto 464 Kg ,680 E 12mm ditto 291 Kg ,920 F BRC mesh type A Sm ,400 G Sub-wall: - 200mm thick natural stone walling in cement sand (1:3) mortar 291 Sm 1, ,300 Damp proof course: - H 200mm wide Hessian based Bituminous felt DPC 80 Lm ,000 Damp proof membrane: - I 500 gauge polythene sheet DPM 364 Sm ,400 Plinth: - J 15mm thick cement rendering on plinth walls 35 Sm 230 8,050 K L Prepare and apply three coats first quality Bitumastic paint on plinth walls 35 Sm 180 6,300 Paving slabs around the Building: x 600 x 50mm pre-cast concrete paving slabs including 250mm murram and 50mm sand bed 90 Sm 1,000 90,000 Carried to collection 851,960 COLLECTION: - Brought forward from page SHL / 1 1,712,220 Brought down from above 851,960 TOTAL OF SUBSTRUCTURE, CARRIED TO SUMMARY 2,564,180 Page 2 of 10
3 ELEMENT NO. 2: - STEEL STRUCTURE; 100mm diameter x4mm thick CHS steel columns with 200x200x6mm thick steel plate (ms) welded at top and bottom with 4. holes drilled ito each plate, bottom bolted to stud columns: A Columns 2850mm high 14 1,500 21,000 Fittings B C 200x200x6mm thick gusset plate with 4. holes to receive bolts ,600 12mm diameter 50mm long bolts with head, nut and washer ,840 Painting: Prepare and apply one coat red lead oxide primer on: D General surfaces of metal 40 Sm 180 7,200 Prepare and apply three coats gloss oil paint on: E General surfaces of metal 40 Sm ,000 Floor finishes: - F 32mm thick cement sand (1:3) floor screed 364 Sm ,480 G 100 x 25mm ditto skirting 99 Lm 100 9,900 WALLING; Fine chiselled natural stone walling bedded and jointed in cement sand mortar (1:3) and reinforced with and including 20swg hoop iro 150mm thick reinforced in every course 30 SM , mm thick ditto 25 SM ,500 Horizontal damp proof course 150mm wide levelled and bedded in mortar 20 LM 110 2, mm ditto 25 LM 90 2,250 TOTAL OF FRAME AND WALLING, CARRIED TO SUMMARY 225,970 Page 3 of 10
4 Item Description Proposed Market Shed Qty Unit Rate Total ELEMENT NO. 3 GOODS DISPLAY SHELVES; The following in 32. Goods Display Shelves; Sawn cypress A 50x50mm bearer plugged 60 LM 90 5,400 B 50x50mm bearer 45 LM 70 3,150 Wrot cypress C 150x25mm boarding 175 LM ,000 Flap Doors D 50mm thick wrot cypress matchboarded door size 550x1000mm 16 NO 3,000 48,000 Ironmongery E 75mm pressed steel butt hinges 32 PRS 120 3,840 F 100mm steel padlock bolt complete 16 NO 150 2, ,790 Page 4 of 10
5 ELEMENT NO. 4: - ROOFING STEEL TRUSSES; The following in 7. Trusses welded and bolted in accordance with the fabricator's shop drawings to the Engineer's approval; A 60x60x4mm thick SHS rafter curved to metres radius 107 Lm ,610 B 60x60x4mm thick SHS joist curved to metres radius 101 Lm ,675 C Ditto curved to 884mm radius 22 Lm 300 6,600 D 40x40x3.2mm SHS struts and ties 184 Lm ,000 Fittings; 200x200x6mm thick gusset plate with 4. holes to E receive bolts ,200 12mm diameter 50mm long bolts with head, nut and F washer ,840 Purlins 125x50x2mm thick steel Z-purlins 521 Lm ,400 Roof coverings: - 28 gauge DUMU ZAS corrugated sheets Nailed to G purlins 567 Sm ,850 H Matching ridge, hip and valley caps 30 Lm 150 4,500 TOTAL OF ROOFING, CARRIED TO SUMMARY 631,675 Page 5 of 10
6 ELEMENT NO. 5 RAINWATER DISPOSAL The following in G28 Galvanised mild steel A B C 200x200mm box gutter fixed with and including 30x2mm flat gutter strips at 600mm centres 74 Lm ,200 Extra over gutter for stopped end piece with 200x200mm square outlet , x200mm downpipe fixed to steel columns with and including 30x2mm mild steel straps at 600mm centres 34 Lm ,200 D Extra over downpipe for swan neck ,200 E Extra over downpipe for water shoe ,200 Painting; Prepare and apply one coat of calcium plumbate and two coats of gloss oil paint to: F General surfaces of metal gutters 44 Sm ,000 G Ditto downpipes 27 Sm 250 6,750 TOTAL OF RAINWATER DISPOSAL, CARRIED TO SUMMARY 59,750 Page 6 of 10
7 ELEMENT NO. 6 FINISHES; Floor Finishes A 40mm thick cement sand (1:4) screed paving 364 SM ,200 B 20x100mm skirting ditto 136 LM ,320 Plasterwork C 12mm thick cement sand (1:3) plaster to wall surfaces 115 SM ,000 Painting Prepare and apply undercoat and two coats sheen paint D General plastered surfaces 115 SM ,450 TOTAL OF FINISHES, CARRIED TO SUMMARY 174,970 Page 7 of 10
8 SUMMARY: - 1 SUBSTRUCTURE 2,564,180 2 FRAME AND WALLING 225,970 3 DISPLAY SHELVES 111,790 4 ROOFING FROM PAGE 631,675 5 RAINWATER DISPOSAL 59,750 6 FINISHES 174,970 TOTAL OF BUILDER'S WORK, CARRIED TO MAIN SUMMARY 3,768,335 SHL / 9 Page 8 of 10
9 PRIME COST AND PROVISIONAL SUMS: - PRIME COST: - A Provide a prime cost sum of Kenya Shillings Two Hundred and Fifty Thousand for Electrical Works 150,000 PROVISIONAL SUMS: - B C Provide a provisional sum of Kenya Shillings One Hundred Thousand for Contigencies 100,000 Provide a provisional sum of Kenya Shillings Fifty Thousand for Project Management 50,000 TOTAL OF PRIME COST AND PROVISIONAL SUMS, CARRIED TO MAIN SUMMARY 300,000 PS / 1 Page 9 of 10
10 MAIN SUMMARY: - A BUILDER'S WORK FROM PAGE SHL / 9 3,768,335 B P.C. & PROVISIONAL SUMS FROM PAGE PS/1 300,000 SUB-TOTAL 4,068,335 ADD 16% VAT 650,934 TOTAL CARRIED TO FORM OF TENDER 4,719,269 AMOUNT IN WORDS: CONTRACTOR'S NAME: ADDRESS: SIGNATURE..DATE NAME OF WITNESS.. ADDRESS: SIGNATURE..DATE MS / 1 Page 10 of 10
BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA
BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA CONSTRUCTION OF MODEL DISPENSARY BLOCK Item DESCRIPTION QTY UNIT RATE TOTAL(KS ELEMENT : SUBSTRUCTURE (ALL PROVISIONAL):
More informationCOUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK
PROPOSED ECD BLOCK ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed Excavate vegetable soil average 200mm
More informationCarried to collection
ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed 40 sm Excavate vegetable soil average 200mm deep and cart
More informationPROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE BILLS OF QUANTITIES PROPOSED TWIN ECD CLASSROOM FINANCIAL YEAR
PROPOSED CONSTRUCTION OF TWIN ECD CLASSROOM AND THREE DOOR PIT LATRINE EMC/EDU/1 ELEMENT 01: SUBSTRUCTURES (All Provisional) A Oversite Excavations Excavate oversite to remove vegetable soil 150mm thick
More informationPROPOSED ERECTION AND COMPLETION OF CEREAL STORE.
PROPOSED ERECTION AND COMPLETION OF. AB/1 STORE ELEMENT NO. 1 A B SUBSTRUCTURES (ALL PROVISIONAL) Excavations Clear site of small bushes and grub roots of small trees and cart away Excavate average 150mm
More informationITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED SURGICAL THEATER - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation -
PROPOSED SURGICAL THEATER ELEMENT NO. 1 SUBSTRUCTURES Oversite excavation A Excavate oversite to remove top soil average 150mm deep and cart away 446 sm Excavation B C D E Excavate to reduce levels commencing
More informationITEM DESCRIPTION QTY UNIT RATE K.SHS PROPOSED KMTC CLASSROOMS AT NYAHURURU L HOSPITAL - - ELEMENT NO. 1 SUBSTRUCTURES. Oversite excavation -
PROPOSED KMTC CLASSROOMS AT NYAHURURU L HOSPITAL ELEMENT NO. 1 SUBSTRUCTURES Oversite excavation A Excavate oversite to remove top soil average 150mm deep and cart away 400 sm Excavation B C D E Excavate
More information300 SM 285 SM 256 CM 70 CM 63 CM 210 SM 241 SM 3 CM
ADMINISTRATION BLOCK ELEMENT NO. 1 SUBSTRUCTURE WORKS (All Provisional) NOTE: This elements include all works upto and including the ground floor slab EXCAVATED EARTH WORK A B C D Clear over site to remove
More informationDescription Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationWORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00
Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type
More informationSTATE DEPARTMENT OF PUBLIC WORKS. Telegrams: MINIWORKS, Embu County Works Office. When replying please quote P.O. Box Embu.
073 REPUBLIC OF KENYA STATE DEPARTMENT OF PUBLIC WORKS Telegrams: MINIWORKS, Embu County Works Office Telefax: 31775 Embu County When replying please quote P.O. Box 29-60100 Embu. PROPOSED REMOVAL OF ASBESTOS
More information138 Sm. 138 Cm. Excavate vegetable soil average 200mm deep and cart away as directed.
PROPOSED 5-BED MATERNITY WING AT MAUNAROK DISPENSARY ELEMENT NO. I SUBSTRUCTURE (ALL PROVINSIONAL) A site clearance Clear the site off grass, shrubs and all vegetation cart away as directed 138 Sm B Excavate
More informationTITLE: ABLUTION BLOCK WITH BIODIGESTER. ITEM No. D E S C R I P T I O N UNIT QTY
SUBSTRUCTURES 01 SITE CLEARANCE A Clear site of all shrubs, thicket & undergrowth including m² 170 grubbing up of roots and dispose off as directed by the Engineer. (provisional) B Removal of trees and
More informationPROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount
EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square
More informationItem Description Qty Unit Rate Total 1 NO. SINGLE WORKSHOP BLOCK ELEMENT NO. 1: SUBSTRUCTURE
1 NO. SINGLE WORKSHOP BLOCK ELEMENT NO. 1: SUBSTRUCTURE Excavations Excavations including maintining and supporting sides and keeping free from water, mud and fallen materials A B C Clear site of all bushes,
More informationReturn, fill in and ram well selected excavated materials to make up levels around wall foundations.
ELEMENT NO. 1 EARTH WORKS & SUBSTRUCTURE [ALL PROVISIONAL] The works in this section includes all work up to and including ground floor slab :- Excavation / Earth works A. B. Clear the site of all bushes,
More informationREPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: THE NATIONAL TREASURY Finance - Nairobi POBox
REPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: 22921 THE NATIONAL TREASURY Finance - Nairobi POBox 30007-00100 FAX NO. 310833 NAIROBI Telephone: +254 2252299 Website: www.treasury.go.ke When
More informationD Bulk Excavate in black cotton soils depth exceeding 1.5 M but not exceeding 3.0m 2,488 CM 450 1,119,600.00
SUBSTRUCTURES (All provisional) Site Preparation A Clear site of all bushes, shrubs and grub up roots and remove from site 1,800 SM 120 216,000.00 B C Excavations & Earthworks Excavate oversite soil average
More informationCATCHMENT STRUCTURE 13M X 15M
BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,
More informationKGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.
KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-BDD-07-2017 TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY. 11 th May 2017 In accordance
More informationDevelopment of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.
Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,
More informationItem Description Qty Unit Rate Total x 1500 mm with one fixed light and two hanging lights 18 No 9, ,000
ELEMENT NO.1 WINDOWS Standard steel casement windows complete with hinges, stays, fasteners, pinning lugs to concrete or block work surround and bedding frame in cement and sand mortar A 1550 x 1500 mm
More informationBUILDERS WORKS ITEM DESCRIPTION QTY UNIT RATE TOTAL ELEMENT NO.1 REINFORCED CONCRETE SUPERSTRUCTURE FRAME (ALL PROVISIONAL)
BUILDERS WORKS ELEMENT NO.1 REINFORCED CONCRETE SUPERSTRUCTURE FRAME (ALL PROVISIONAL) Vibrated reinforced concrete (1:2:4/20-20mm aggregate ) as described in:- A. Beam 35 CM B Columns 25 CM C Ramp/ steps
More informationClear site of works of grass, bush and small trees and grub up roots, fill with selected soil and burn all arisings SM 1,969
SECTION NO. 2 GODOWN ELEMENT NO. 1 SUBSTRUCTURES Site works A B Clear site of works of grass, bush and small trees and grub up roots, fill with selected soil and burn all arisings SM 1,969 Cut down small
More informationProviding and laying hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost of bedding). 40mm 22.
1 CG0001 Clearing grass including removal of rubbish within 50m of site 91.00 m² 2 EW0001 Surface dressing of ground, including removal of vegetation and inequalities < 150mm deep, disposal of rubbish
More informationB Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1
PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%
More informationKENYA ELECTRICITY GENERATING COMPANY LIMITED TENDER NO. KGN-TURK DATE: 22/05/2017 TENDER FOR RELOCATION OF STORES AT TURKWEL POWER STATION
KENY ELECTRICITY GENERTING COMPNY LIMITED TENDER NO. KGN-TURK-06-2017 DTE: 22/05/2017 TENDER FOR RELOCTION OF STORES T TURKWEL POWER STTION DDENDUM NO. 3: In accordance with the tender mentioned above,
More information1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT 1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African
More informationBQ FOR MARUNGU MATERNITY ITEM DESCRIPTION QTY UNIT ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL)
BQ FOR MARUNGU MATERNITY ITEM DESCRIPTION QTY UNIT ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed 175 sm Excavate
More informationPROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI
GROUND FLOOR COMPLETION OF WORKS TO GROUND FLOOR SITE WORKS DEMOLITIONS AND ALTERATIONS Ground floor Removing a polythene damp proof membranes, complete with mesh fabric reference A 252, hacking edges
More informationBILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African Rands.
More informationPROGRESSIVE REPORT FOR CABANA MEMORIAL BUILDING CLIENT: SISTERS OF IMMACULATE HEART OF MARY RAPARATRIX GOOGONYA CONTRACTOR:BUCONS (U) LIMITED
PROGRESSIVE REPORT FOR CABANA MEMORIAL BUILDING CLIENT: SISTERS OF IMMACULATE HEART OF MARY RAPARATRIX GOOGONYA CONTRACTOR:BUCONS (U) LIMITED MARCH 2016 Table of Contents Chapter one:... 2 Overview of
More informationAppendix 4. Bills of Quantities
Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic
More informationSITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT
SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,
More informationMANDATORY TENDER INSTRUCTIONS
MANDATORY TENDER INSTRUCTIONS TENDER NO. TENDER DESCRIPTION LOCATION KCO/03/07/FY19 WATER PIPELINE INSTALLATION OF MLANGO B- DANICHA PRIMARY WATER PROJECT IN GANZE SUB COUNTY. KILIFI Plan International
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More information% OF WORK DONE ITEM DESCRIPTION UNIT QTY RATE AMOUNT VALUE OF WORK DONE
ITEM DESCRIPTION UNIT QTY RATE AMOUNT VALUE OF PROPOSED UPGRADE&CIVIL S AT KANYAKINE 33/11KV SUBSTATION [BILL OF QUANTITIES] SECTION. 1 Preliminaries a Allow for temporary site office adequate for materials&
More informationPROPOSED EXTERNAL WORKS AT NKABUNE TECHNICAL TRAINING INSTITUTE BILL 1 DRIVEWAYS AND PARKINGS
PROPOS XTRNAL WORKS AT NKABUN THNIAL TRAINING INSTITUT BILL 1 RIVWAYS AN PARKINGS ITM NO SRIPTION QTY UNIT RAT AMOUNT SIT LARAN AN XAVATION 418 SM A ut grass and shrubincluding grubbing roots along proposed
More informationApproximate estimate of renovation and extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR
Approximate estimate of renovation extension work of faculty room in JIST, Jorhat-10 Estimate is prepared as per PWD SOR 2013-14 SL Description of the work No 1 DISMANTLING Unit quantity Rate Amount 1.1
More informationWORK BELOW LOWEST FLOOR FINISH BQ/1/4 230, FRAME BQ/2/8 441, UPPER FLOOR BQ/3/2 507, ROOF BQ/4/8 202,915.35
Summary Description Page No Amount Summary WORK BELOW LOWEST FLOOR FINISH BQ/1/4 230,694.60 FRAME BQ/2/8 441,488.20 UPPER FLOOR BQ/3/2 507,277.98 ROOF BQ/4/8 202,915.35 STAIRS, RAMPS AND STAIRCASE FINISHES
More informationTransit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur Notice Inviting Tender
Transit campus, Govt ITI Berhampur (2nd Floor), Engineering School Junction N.H-59, Berhampur-760010 Sl. No-IWD / NIQ / PE / 2017-18 /07 Date:- 16.06.17 Notice Inviting Tender The Project Engineer (E),
More informationPROJECT: PROPOSED MIGRANTS RESOURCE CENTER - MOGADISHU - IMPLEMENTED BY: CLIENT.
PROJECT: PROPOSED MIGRANTS RESOURCE CENTER IMPLEMENTED BY: CLIENT. MIGRANTS RESOURCE CENTER RESOURCE CENTER IOM : FEBRUARY 2018 DRAWING INDEX SHEET N O 01. 01/24 02. 02/24 03. 03/24 04. 04/24 05. 05/24
More informationKISIAN 33/11KV SUBSTATION
BILL OF QUANTITIES FOR PROPOSED BUILDING & CIVIL WORKS AT KISIAN 33/11 KV SUBSTATION 1 Preliminaries A Allow for a temporary site office adequate to accomondate six 1 persons,notice board, shelves and,
More informationARCHITECTURAL DRAWINGS
PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05
More informationBILL OF QUANTITIES. S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of
BILL OF QUANTITIES Name of Work: Beautification of Adalatganj Talab, Patna, Bihar S.No Discription Unit Rate Quantity 1 Boring, Providing and installing cast in situ single under reamed piles of specified
More informationTENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA
TENDER DOCUMENT VOL - II (FINANCIAL BID) CONSTRUCTION OF BOUNDARY WALL FOR ICSI-CENTRE OF EXCELLENCE (CoE) KOLKATA AT PLOT NO. IIA/35, ACTION AREA IIA, NEW TOWN, KOLKATA, WEST BENGAL 700 157 Pages (1 5)
More informationCHAPTER 8. Concrete Work
Concrete Work Clay Bricklaying Made Easy CONCRETE WORK Foundations for walls and piers All loadbearing walls and piers are required to stand on a concrete foundation, which must be able to receive and
More informationKANPUR SMART CITY LIMITED
Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries
More informationBILL OF QUANTITIES FOR KIPUNGANI SEA WALL
BILL NO 17 CONCRETE WORK (All Provisional) 17/1 Clear site of all obstacles and dispose as directed by the Engineer on site. SM 500 200 100,000.00 17/2 Set out works over land and water ITEM 1 50000 50,000.00
More informationJARAMOGI OGINGA ODINGA TEACHING AND REFERRAL HOSPITAL
REPUBLIC OF KENYA COUNTY GOVERNMENT OF KISUMU JARAMOGI OGINGA ODINGA TEACHING AND REFERRAL HOSPITAL PROPOSED CONSTRUCTION TO MICROWAVE & SHREDDER HOUSE AT JARAMOGI OGINGA ODINGA TEACHING & REFERRAL HOSPITAL
More informationITEM DESCRIPTION QTY UNIT RATE AMOUNT (KSHS)
ELEMENT NO.2: CONCRETE WORKS Sawn formwork as described to: A Columns; vertical sides 134 SM 400 53,600.00 B Sides and soffites; beams and/or lintols 302 SM 400 120,800.00 C Soffites of suspended roof
More informationAN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR
AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: EPI/WRO/CON/757/0119 FOR Construction of Boundary Wall and allied works for DHH & MCH Hospital at Kendrapara at Odisha state VOLUME III PRICE BID
More informationCalculation of requirement of Labour. for construction of IAY/CMRHM
Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour
More informationREHABILITATION OF LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062
LUUQ LOCAL ADMINISTRATION OFFICES GRANT NO.: - KIS062 PROJECT DETAILS Implementation Partner: Project title: OFFICES Grant No.: KIS069 Content : ARCHITECTURAL DRAWINGS SHEET NO. COVER SHEET INDEX SHEET
More informationBuilders Ironmongery
Builders Ironmongery 2015 Retail prices include VAT @ the appropriate rate Subject to availability. Prices may vary Pictures and specifications are a guide only OVERT LOCKE LTD West Street Somerton Somerset
More informationSCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.
SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04
More information1 1. 2. 3. 4. 5. 6. 7. 8. 9. 2 3 4 5 6 A1 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 o o o o o o o o o o o o o A18 o o o o o o o o o o o o o o o o o A19 A20 A21 A22 A23 A24 A25 B1 B2 B3
More informationAppendix 1A. 7. FWF and Community assess their resource 5/25/04 5/25/04
86 Appendix 1A WORK PLAN/ TIME-LINE FOR THE PROJECT IMPLEMENTATION. Task Name Start Finish 1. COMMUNITY INVOLVEMENT 11/23/03 08/30/06 2. Feedback to respondents & Community 11/23/03 11/23/03 sensitization
More informationNATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD
NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD TENDER FOR Construction of Stone Masonry Compound Wall for NIAB Campus at Survey No.37, Serlingampally, Hyderabad VOLUME V January 2013 HSCC
More information-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 0085137 -Session-1988-89 -Superclass- TE -Title- BUILDING TECHNOLOGY
More informationConstruction Technology Revision Guide
Construction Technology Revision Guide Sub structures and Super structures Super structure (Wall, floors roof) Sub structure (Foundations) 2 Thermal Insulation Thermal insulation helps to prevent heat
More informationUnit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.
Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit
More informationNote on the assessment:
Excerpt from: Transitional shelter: 8 designs, IFRC, 2012 Note on the assessment: The following is an excerpt from the Book Transitional Shelters: 8 Designs, IFRC, 2012, available from www.sheltercasestudies.org.
More informationLOT 3:BILLS OF QUANTITY FOR CONSTRUCTION OF BLOOD BANK AT MALAKAL HOSPITAL UPPER NILE STATE Currency. Item Description Qty Unit
Lot 3 Construction of Blood Bank at Malakal Hospital Pages 1/40 SOUTH SUDAN-Health Systems Strengthening Round LOT 3:BILLS OF QUANTITY FOR CONSTRUCTION OF BLOOD BANK AT MALAKAL HOSPITAL UPPER NILE STATE
More informationESTIMATE FOR BUILDING WORKS BARONS COURT ROAD
ESTIMATE FOR BUILDING WORKS BARONS COURT ROAD 26TH JANUARY 2017 Project: Barons Court Date: 26/01/2017 QUALIFICATIONS, ASSUMPTIONS & EXCLUSIONS: 1 Qualifications:- 1.1 Prices exclude 20% VAT 1.2 Pre-start
More informationMr. A Sample Foxes Cottage Bolton Road Bury St Edmunds IP32 2DB 6th January 2014
Mr. A Sample Foxes Cottage Bolton Road Bury St Edmunds IP32 2DB TY MI PI NI CA AT L UR QU E OT SA AT MP IO N LE 6th January 2014 Dear Mr. A Sample, We are pleased to submit the following quotation as requested
More informationVOLUME 2 - BILL OF QUANTITIES
FEDERAL GOVERNMENT OF SOMALIA PROJECT: SPECIAL FINANCING FACILITY FOR LOCAL DEVELOPMENT CONTRACT FOR CONSULTING SERVICES: DEVELOPMENT OF PRELIMINARY AND DETAILED ENGINEERING DESIGNS AND SUPERVISION OF
More informationNATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT
NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI 620 015 ESTATE MAINTENANCE DEPARTMENT NOTICE INVITING TENDERS NO: NITT/EMD//Civil works / 2015 TENDER NOTIFICATION Ref: NITT/EMD/ CoW/Civil Works /15-16
More informationScanned by CamScanner
JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY
More informationAnnex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State
Annex II- Lot 2 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Lot: 2 Site 2-1: Allakandie All Prices of items shall include Supplying,
More information( B ) CEMENT CONCRETE ( PLAIN & REINFORCED ) RS. ( F ) DOORS, WINDOWS AND VENTILATORS RS. ( J ) STRUCTURAL STEEL WORK & ROOFING RS.
PROJECT : CONSTRUCTION OF ISOLATION SHED AT G.NO 314 TILEKARWADI OWNER : BAIF DEVELOPMENT RESEARCH FOUNDATION SCHEDULE OF QUANTITIES AND RATES * SUMMARY STATEMENT :- ( A ) EXCAVATION, FILLING AND SOLING
More informationAnnex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State
Annex III- Lot 3 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Lot: 3 Site 3-1: Sinja city All Prices of items shall include Supplying,
More informationEst. Cost : Rs.35,000/- Sl. No.
Note:-1) The execution of these model estimates is subjected to compliance / adherence to 60:40 : : Wage: material ratio at Grampanchayat as a UNIT 2) These model estimates shall be locally approved (technically)
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationBILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil
United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES
More informationSAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD.
SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. Open Tender tice : 118/OT/SRBWIPL/Roof-Retro fitting of Structure /2011 dated 21.12.2011 Tender and Contract document for Supply, fixing & erection of roof sheeting,
More informationINDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI
` INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068 NOTICE INVITING QUOTATION IG/CMD/NIQ-civil/2014 Dated: - 26/06/2014 Name of work:- Construction
More informationAmendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:
Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of
More informationTender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.
Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge
More informationSELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES
SELF-ASSESSMENT EXERCISE FOR CHAPTER 24: PREPARATION OF BILLS OF QUANTITIES Abstract the quantities and prepare a BQ for the basement measurement in Chapter 5. Please prepare a query sheet of problems
More informationCORRIGENDUM No: 1. to the. Volume 3: Technical Specifications. Publication Ref: BAM/ADMP/GPF/WRK/VC
CORRIGENDUM No: 1 to the Volume 3: Technical Specifications Publication Ref: BAM/ADMP/GPF/WRK/VC Subject: Construction of Green House Park Facilities Location: Saint Vincent and the Grenadines The Technical
More informationDescription Qty Unit Rate (US$) 1.00
9 February 2016 Rfx No. 7000001487 Annex II.1: Bill of Quantities for Nimule Fish Market Description Qty Unit Rate () PRELIMINARIES Amount () 0.1 The contractor shall provide and maintain temporary sheds
More informationAnnex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State
Annex I- Lot 1 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Lot: 1 Site 1-1: Sinnar city All Prices of items shall include Supplying,
More informationnominal mix cement concrete with crushed stone aggregate using concrete mixer in foundation, plinth and at ground level excluding cost of form work.
DETAILED ESTIMATE Name of Work : DETAILED ESTIMATE OF PROPOSED RAW MATERIAL & FINISHED GOODS STORAGES, CASSIA TORRA SEED CLEANING UNIT, CASSIA TORRA POWDER & GUM MANUFACTURING PLANT AT IIDC NAYANPUR GIRWARGANJ
More informationTITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY
D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm
More informationBill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.
Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations
More informationELEMENT NO.1: Kitchen Extract system; Extract System: Supply and fix the following Kitchen Extract System and associated Equipments:-
SPECIFICATIONS AND BILLS OF QUANTITIES FOR KITCHEN HOOD AND VENTILATION SYSTEM, L.P. GAS STORAGE TANK AND GAS DISTRIBUTION SERVICES TO THE PROPOSED CONSTRUCTION AND COMPLETION OF 1 OFFICE BLOCK FOR THE
More informationDrainage, Road Drainage and Collection Pit A - EXCAVATION:
57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including
More informationPercentage BoQ. Validate Print Help. Tender Inviting Authority: S.K. Gupta, Manager (Civil)
Validate Print Help Percentage BoQ Tender Inviting Authority: S.K. Gupta, Manager (Civil) Name of Work: Repair works at F & B outlets as K4, K6, K7, K8,K10 & Food Court-II and Hall -20 Contract No: Bidder
More informationProject Solutions Design & Build
W Conservatory SW Ground Floor Layout NW S Garage SE Project Solutions Design & Build Ground Floor Elevation NE E Ground Floor Layout Roof Layout End Elevation Ground Floor Elevation Side Elevation Garage
More informationITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal
EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0
More informationSAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD.
SAIL-RITES BENGAL WAGON INDUSTRY PVT. LTD. Open Tender tice : 24/OT/R/SRBWIPL/New Shed-floor/2012 dated 23.05.2012 Tender and Contract document for Construction of new shed that includes supply, fabrication,
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10
CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances
More informationPROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.
BILL 1 : GENERAL & PRELIMINARIES A B C Allow for preliminaries of mobilization and set up, storage facilities etc,minor preparatory works and compliance with conditions of contract. 1.00 Allow a Prime
More informationEXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS
BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:
More informationKERAJAAN MALAYSIA JABATAN KERJA RAYA
JKR20800-0196-15 KERAJAAN MALAYSIA Schedule of Rates for the supply of all labour, materials, tools, plants, appliances and everything else necessary for the erection and completion of: all in accordance
More informationKEEP YOUR FAMILY SAFER FROM EARTHQUAKES AND TYPHOONS BY MAKING SURE YOUR HOUSE FOLLOWS THESE 6 BASIC PRINCIPLES
KEEP YOUR FAMILY SAFER FROM EARTHQUAKES AND TYPHOONS BY MAKING SURE YOUR HOUSE FOLLOWS THESE 6 BASIC PRINCIPLES 5. WELL BRACED WALLS FIRMLY CONNECTED TO THE FOUNDATION 6. STURDY ROOF FIRMLY CONNECTED TO
More informationNOTICE TO BIDDERS. TO: All Bidders FROM: Alvin Kumar DATE: 20 th July 2017 DESIGNATION: Deputy Manager Project
NOTICE TO BIDDERS TO: All Bidders FROM: Alvin Kumar : 20 th July 2017 DESIGNATION: Deputy Manager Project Proposed New Changing Room and Waoom Facility at Nasinu Campus LOCATION: LOCATION: FNU Nasinu Campus
More informationSOUTH ELEVATION OF CLASSROOMS. NORTH ELEVATION OF CLASSROOMS (section through hall) HaysomWardMiller Architects CLASS ELEVATIONS
SOUTH ELEVATION OF CLASSROOMS NORTH ELEVATION OF CLASSROOMS (section through hall) CLASS ELEVATIONS 7 Downing Place, Cambridge, CB2 3EL, UK T: 01223 578545 F: 01223 351955 E: info@haysomwardmiller.co.uk
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES
CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances
More information